Debeda HPP • Region – Kvemo Kartli • River - Debeda • Installed Capacity - 3 MW
Total Page:16
File Type:pdf, Size:1020Kb
Ministry of Energy of Georgia Power Industry Development Plan of Georgia Main directions of Energy Policy of Georgia • Diversification of energy supply sources, optimal utilization of energy resources and creation of reserves; • Utilization of Georgian renewable energy resources; • Gradual harmonization of Georgian legislation with EU legislation; • Development of Georgian energy market and improvement of energy trade mechanism ; • Strengthening the transit role of Georgia in the region; • Georgia – Regional Center for clean energy production and trade; • A coherent approach to the development and implementation of energy efficiency; • Implementation of energy projects considering environmental factors; • Improvement of service quality and protection of consumer interests. 2 Existing Electricity Generation Units in Georgia Total Installed Capacity – 3719MW. Hydro Power Plants: Thermal Power Plants: 65 HPPs 5 TPPs Installed Capacity– 2795 MW. Installed Capacity - 914 MW. 3 Investment Made and Planed in Energy Sector of Georgia • Ten Year Network Development Plan of Georgia- 850 mln. USD; • Completed Construction of 14 Hydropower Plant and 2 Thermal Power Plant - 420 MW. - 540 mln. USD; • Ongoing 122 Projects - 4,300 MW. – 8 bln. USD; • Ongoing Construction of 17 Power Plants - 841 MW- 1.95 bln. USD; • Thermal Power Plants - 500 MW- 500 mln. USD; • 7 Power Plants will become operation with total installed capacity of 422.7 MW 4 10 Year Network Development Plan Transmission Lines length increases by 1700 KM, Estimated Investment 850 Mln. USD Shilda HPP • Region- Kakheti • River - Chelti • Installed Capacity - 5 MW. • Annual Generation- 30 Mln. KWH • Implemented Investment- $ 6,312,000 • Investor - LLC “ENERGIA” Russia Black Sea Kakheti Turkey Armenia Azerbaijan 12 Shilda HPP 13 Akhmeta HPP • Region - Kakheti • River – Alazani, Ilto • Installed Capacity - 9.1 MW. • Annual Generation - 43.4 Mln. KWH • Implemented Investment - $ 9,800,000 • Investor - LLC “GEOENERGY” Russia Black Sea Kakheti Turkey Armenia Azerbaijan 14 Akhmeta HPP 15 Pshavela HPP • Region - Kakheti • River - Stori • Installed Capacity - 1.95 MW. • Annual Generation - 9.5 Mln.KWH • Implemented Investment - $ 2,300,000 • Investor - LLC “STORI POWER” Russia Black Sea Kakheti Turkey Armenia Azerbaijan 16 Pshavela HPP 17 Alazani 2 HPP • Region - Kakheti • River – Alazani • Installed Capacity - 6 MW. • Annual Generation - 40 Mln. KWh • Implemented Investment - $ 7,602,269 • Investor - LTD “ GEORGIAN INTERNATIONAL ENERGY CORPORATION” Russia Black Sea Kakheti Turkey Armenia Azerbaijan 18 Alazani 2 HPP 19 Khadori 2 HPP • Region - Kakheti • River – Alazani • Installed Capacity - 5.4 MW. • Annual Generation - 30 Mln. KWH • Implemented Investment - $ 4,930,000 • Investor – LLC “PERI” Russia Black Sea Kakheti Turkey Armenia Azerbaijan 20 Khadori 2 HPP 21 Bakhvi 3 HPP • Region - Guria • River - Bakhvistskali • Installed Capacity - 10 MW. • Annual Generation - 35 Mln. KWh • Implemented Investment - $ 14,139,039 • Investor - LLC “ BAKHVI HYDRO POWER” Russia Black Sea Guria Azerbaijan Turkey Armenia 22 Bakhvi 3 HPP 23 Larsi HPP • Region – Mtskheta-Mtianeti • River - Tergi • Installed Capacity - 19 MW. • Annual Generation - 98 Mln. KWh • Implemented Investment - $ 17,543,000 • Investor – LLC “ENERGIA” Russia Mtskheta- Mtianeti Black Sea Azerbaijan Turkey Armenia 24 Larsi HPP 25 Aragvi HPP • Region – Mtskheta-Mtianeti • River - Tergi • Installed Capacity - 8.5 MW. • Annual Generation - 50 Mln. Kwh • Implemented Investment - $ 13,500,000 • Investor – LLC “ENERGO ARAGVI” Russia Mtskheta- Mtianeti Black Sea Azerbaijan Turkey Armenia 26 Aragvi HPP 27 Kazbegi HPP • Region – Mtskheta-Mtianeti • River - Brolis Tskali • Installed Capacity - 6 MW. • Annual Generation - 30 Mln. KWh • Implemented Investment - $ 3,000,000 • Investor - LLC “KAZBEGIHESI” Russia Mtskheta- Mtianeti Black Sea Azerbaijan Turkey Armenia 28 Kazbegi HPP 29 Paravani HPP • Region – Samtskhe-Djavakheti • River - Paravani • Installed Capacity- 86.54 MW. • Annual Generation - 410 Mln. KWh • Implemented Investment - $196,000,000 • Investor - LLC “GEORGIA – URBAN ENERJI” Russia Black Sea Samtskhe- Javakheti Azerbaijan Armenia Turkey 30 Paravani HPP 31 Racha HPP • Region – Racha-Lechkhumi and Kvemo Svaneti • River – Ritseula and Khedetura • Installed Capacity - 11 MW. • Annual Generation - 45.08 Mln KWh. • Implemented Investment - $ 7,156,194 • Investor – LLC “GEORGIAN INTERNATIONAL ENERGY CORPORATION” Russia Racha-Lechkhumi and Kvemo Svaneti Black Sea Azerbaijan Turkey Armenia 32 Racha HPP 33 Kazreti HPP • Region – Kvemo Kartli • River – Mashavera • Installed Capacity - 2.5 MW. • Annual Generation - 11 Mln.KWh • Implemented Investment - $ 1,200,000 • Investor - LLC “ WATER ENERGY” Russia Black Sea Kvemo Kartli Turkey Armenia Azerbaijan 34 Kazreti HPP 35 Debeda HPP • Region – Kvemo Kartli • River - Debeda • Installed Capacity - 3 MW. • Annual Generation - 10.5 Mln.KWh. • Implemented Investment - $ 4,200,000 • Investor - LLC “ HYDRO GEORGIA” Russia Black Sea Kvemo Kartli Turkey Armenia Azerbaijan 36 Debeda HPP 37 Gardabani TPP • Region – Kvemo Kartli • Installed Capacity - 231.2 MW. • Annual Generation - 1.6 Mln.KWh • Implemented Investment - 231 Mln. USD • Investors - JSC „PARTNERSHIP FUND“ AND JSC „GEORGIAN OIL & GAS CORPORATION” Russia Black Sea Kvemo Kartli Turkey Armenia Azerbaijan 38 Gardabani TPP 39 Power Plants Commenced In Recent Years Total Installed Capacity 420 MW Total Investment 540 Mln. USD N Project Company Region Installed Capacity (MW) 1 Bakhvi 3 HPP LLC “BAKHVI HYDRO POWER” Guria 10 2 Aragvi HPP LLC “ENERGO ARAGVI” Mtskheta-Mtianeti 8.5 3 Shilda HPP LLC “ENERGIA” Kakheti 5 4 Larsi HPP LLC “ENERGIA” Mtskheta-Mtianeti 19 5 Akhmeta HPP LLC ‘”GEOENERGY” Kakheti 9.1 6 Kazbegi HPP LLC “KAZBEGIHESI” Mtskheta-Mtianeti 6 7 Paravani HPP LLC “GEORGIA-URBAN ENERGY” Samtskhe-Javakheti 86.54 8 Pshavela HPP LLC “STORI POWER” Kakheti 1.95 9 Alazani 2 HPP LLC “GEORGIAN INTERNATIONAL ENERGY CORPORATION” Kakheti 6 10 Khadori 2 HPP LLC “PERI” Kakheti 5.4 11 Racha HPP LLC “GEORGAIN INTERNATIONAL ENERGY CORPORATION” Racha-Lechkhumi and Kvemo Svaneti 11 12 Kazreti HPP LLC “WATER ENERGY” Kvemo Kartli 2.5 13 Shakshaketi HPP LLC "Medgroup Georgia" Shida Kartli 1.5 14 Debeda HPP LLC “HYDRO ENERGY” Kvemo Kartli 3 JSC “PARTNERSHIP FUND” and JSC “GEORGIAN OIL & GAS Gardabani TPP Kvemo Kartli 231.2 15 CORPORATION 16 Tkibuli TPP LLC "Saknakhshiri" Imereti 13.2 40 Ongoing Construction Stage Projects 16 HPPs and 1 Wind Power Plant- 841 MW. Investment Cost - 1.95 Bln. USD Kasleti 2 HPP – 8.1 MW Lukhuni 2 HPP- 12 MW Nenskra HPP -280 MW Dariali HPP- 108 MW Rachkha HPP – 10.25 MW Saguramo HPP – 4.2 MW Khobi 2 HPP – 41.6 MW Nabeglavi HPP – 1.9 MW Skhalta HPP – 6 MW Shuakhevi HPP – 187 MW Okropilaura and Goginaura HPPs – 3.6 MW Khelvachauri HPP – 47.48 MW Kirnati HPP – Kirnati HPP – 51.25 Mw 6 MW Mtkvari HPP – 53 MW Wind Power Plant – 20.7 MW 41 7 Power Plants will Become Operational in 2016 Installed capacity N Project Company Region Investment (MW) 1 Dariali HPP JSC DARIALI ENERGY Mtskheta-Mtianeti 108.0 105 Mln. USD 2 Shuakhevi HPP LLC ADJARISTSQALI GEORGIA Achara 187.0 400 Mln. USD 3 Kirnati HPP LLC ACHAR ENERGY-2007 Achara 51.3 90 Mln. USD 4 Khelvachauri 1 HPP LLC ACHAR ENERGY-2007 Achara 47.8 70 Mln. USD LLC HYDRO DEVELOPMENT 5 Kintrisha HPP Achara 6.0 8 Mln. USD COMPANY 6 Nabeglavi HPP LLC AE-SGI Energy I Guria 1.9 2.8 Mln.USD LLC KARTLI WIND POWER 7 Kartli Wind Power Plant Shida Kartli 20.7 34 Mln. USD PLANT“ Total Installed Capacity of 7 Projects is 422.7 MW and Investment Cost – 710 Mln USD 43 The First wind Power Plant “KARTLI” • Wind Power Plant “Kartli” is a pilot alternative energy project in Georgia. • First stage involves implementation of 20 MW Installed Capacity Wind Project, with the perspective of up to 200 MW development. • The European Bank for Reconstruction and Development (EBRD) allocated 24,300,000 USD for project implementation. • Construction of Wind Power Plant starts in March 2016 and will be completed in September 2016. 44 Biomass 3 MW Thermal Power Plant • Installed Capacity is 3 MW (2 Mw + 1 MW); • Annual Generation is 25,920,000 KWh; • Project Location is in Rustavi area, Tbilisi-Rustavi highway, 17th kilometer, village Krtsanisi; • TPPs will operate on agricultural wastes; • The project is relevant and can be applied to other regions of the country, according on its great potential. 45 FDI in Energy Sector of Georgia 2012 IV- 2015 570 mln. USD 1% 9% 3% Agriculture, fishing 10% Mining 12% Manufacturing Energy sector 13% Construction 6% Hotels and restaurants 2% Transports and communications Health and social work 12% Real Estate 28% 4% Financial sector Other sectors 39 Strategy To Move Forward To develop east-west and north-south energy transportation infrastructure in order to increase transit capacity of the country To improve social and economic condition by attracting new investments in renewable energy projects and create new employment opportunities for local people To expand transmission infrastructure by investing in the construction of new interconnection lines. To strengthen co-operation with the international organizations in order to accelerate integration of the country into European and Euro-Atlantic organizations 47 .