Ministry of Energy of Georgia Power Industry Development
Plan of Georgia
Main directions of Energy Policy of Georgia
• Diversification of energy supply sources, optimal utilization of energy resources and creation of reserves;
• Utilization of Georgian renewable energy resources;
• Gradual harmonization of Georgian legislation with EU legislation;
• Development of Georgian energy market and improvement of energy trade mechanism ;
• Strengthening the transit role of Georgia in the region;
• Georgia – Regional Center for clean energy production and trade;
• A coherent approach to the development and implementation of energy efficiency;
• Implementation of energy projects considering environmental factors;
• Improvement of service quality and protection of consumer interests.
2
Existing Electricity Generation Units in Georgia
Total Installed Capacity – 3719MW. Hydro Power Plants: Thermal Power Plants: 65 HPPs 5 TPPs Installed Capacity– 2795 MW. Installed Capacity - 914 MW.
3 Investment Made and Planed in Energy Sector of Georgia • Ten Year Network Development Plan of Georgia- 850 mln. USD;
• Completed Construction of 14 Hydropower Plant and 2 Thermal Power Plant - 420 MW. - 540 mln. USD;
• Ongoing 122 Projects - 4,300 MW. – 8 bln. USD;
• Ongoing Construction of 17 Power Plants - 841 MW- 1.95 bln. USD;
• Thermal Power Plants - 500 MW- 500 mln. USD;
• 7 Power Plants will become operation with total installed capacity of 422.7 MW
4 10 Year Network Development Plan Transmission Lines length increases by 1700 KM, Estimated Investment 850 Mln. USD Shilda HPP • Region- Kakheti • River - Chelti • Installed Capacity - 5 MW. • Annual Generation- 30 Mln. KWH • Implemented Investment- $ 6,312,000 • Investor - LLC “ENERGIA”
Russia
Black Sea Kakheti
Turkey Armenia Azerbaijan 12 Shilda HPP
13 Akhmeta HPP • Region - Kakheti • River – Alazani, Ilto • Installed Capacity - 9.1 MW. • Annual Generation - 43.4 Mln. KWH • Implemented Investment - $ 9,800,000 • Investor - LLC “GEOENERGY”
Russia
Black Sea Kakheti
Turkey Armenia Azerbaijan 14 Akhmeta HPP
15 Pshavela HPP • Region - Kakheti • River - Stori • Installed Capacity - 1.95 MW. • Annual Generation - 9.5 Mln.KWH • Implemented Investment - $ 2,300,000 • Investor - LLC “STORI POWER”
Russia
Black Sea Kakheti
Turkey Armenia Azerbaijan 16 Pshavela HPP
17 Alazani 2 HPP • Region - Kakheti • River – Alazani • Installed Capacity - 6 MW. • Annual Generation - 40 Mln. KWh • Implemented Investment - $ 7,602,269 • Investor - LTD “ GEORGIAN INTERNATIONAL ENERGY CORPORATION”
Russia
Black Sea Kakheti
Turkey Armenia Azerbaijan 18 Alazani 2 HPP
19 Khadori 2 HPP • Region - Kakheti • River – Alazani • Installed Capacity - 5.4 MW. • Annual Generation - 30 Mln. KWH • Implemented Investment - $ 4,930,000 • Investor – LLC “PERI”
Russia
Black Sea Kakheti
Turkey Armenia Azerbaijan 20 Khadori 2 HPP
21 Bakhvi 3 HPP • Region - Guria • River - Bakhvistskali • Installed Capacity - 10 MW. • Annual Generation - 35 Mln. KWh • Implemented Investment - $ 14,139,039 • Investor - LLC “ BAKHVI HYDRO POWER”
Russia
Black Sea Guria
Azerbaijan Turkey Armenia 22 Bakhvi 3 HPP
23 Larsi HPP • Region – Mtskheta-Mtianeti • River - Tergi • Installed Capacity - 19 MW. • Annual Generation - 98 Mln. KWh • Implemented Investment - $ 17,543,000 • Investor – LLC “ENERGIA”
Russia
Mtskheta- Mtianeti Black Sea
Azerbaijan Turkey Armenia 24 Larsi HPP
25 Aragvi HPP • Region – Mtskheta-Mtianeti • River - Tergi • Installed Capacity - 8.5 MW. • Annual Generation - 50 Mln. Kwh • Implemented Investment - $ 13,500,000 • Investor – LLC “ENERGO ARAGVI”
Russia
Mtskheta- Mtianeti Black Sea
Azerbaijan Turkey Armenia 26 Aragvi HPP
27 Kazbegi HPP • Region – Mtskheta-Mtianeti • River - Brolis Tskali • Installed Capacity - 6 MW. • Annual Generation - 30 Mln. KWh • Implemented Investment - $ 3,000,000 • Investor - LLC “KAZBEGIHESI”
Russia
Mtskheta- Mtianeti Black Sea
Azerbaijan Turkey Armenia 28 Kazbegi HPP
29 Paravani HPP • Region – Samtskhe-Djavakheti • River - Paravani • Installed Capacity- 86.54 MW. • Annual Generation - 410 Mln. KWh • Implemented Investment - $196,000,000 • Investor - LLC “GEORGIA – URBAN ENERJI”
Russia
Black Sea Samtskhe- Javakheti
Azerbaijan Armenia Turkey 30 Paravani HPP
31 Racha HPP
• Region – Racha-Lechkhumi and Kvemo Svaneti • River – Ritseula and Khedetura • Installed Capacity - 11 MW. • Annual Generation - 45.08 Mln KWh. • Implemented Investment - $ 7,156,194 • Investor – LLC “GEORGIAN INTERNATIONAL ENERGY CORPORATION”
Russia
Racha-Lechkhumi and Kvemo Svaneti
Black Sea
Azerbaijan Turkey Armenia 32 Racha HPP
33 Kazreti HPP • Region – Kvemo Kartli • River – Mashavera • Installed Capacity - 2.5 MW. • Annual Generation - 11 Mln.KWh • Implemented Investment - $ 1,200,000 • Investor - LLC “ WATER ENERGY”
Russia
Black Sea
Kvemo Kartli
Turkey Armenia Azerbaijan 34 Kazreti HPP
35 Debeda HPP • Region – Kvemo Kartli • River - Debeda • Installed Capacity - 3 MW. • Annual Generation - 10.5 Mln.KWh. • Implemented Investment - $ 4,200,000 • Investor - LLC “ HYDRO GEORGIA”
Russia
Black Sea
Kvemo Kartli
Turkey Armenia Azerbaijan 36 Debeda HPP
37 Gardabani TPP • Region – Kvemo Kartli • Installed Capacity - 231.2 MW. • Annual Generation - 1.6 Mln.KWh • Implemented Investment - 231 Mln. USD • Investors - JSC „PARTNERSHIP FUND“ AND JSC „GEORGIAN OIL & GAS CORPORATION”
Russia
Black Sea
Kvemo Kartli
Turkey Armenia Azerbaijan 38 Gardabani TPP
39 Power Plants Commenced In Recent Years Total Installed Capacity 420 MW Total Investment 540 Mln. USD
N Project Company Region Installed Capacity (MW) 1 Bakhvi 3 HPP LLC “BAKHVI HYDRO POWER” Guria 10 2 Aragvi HPP LLC “ENERGO ARAGVI” Mtskheta-Mtianeti 8.5 3 Shilda HPP LLC “ENERGIA” Kakheti 5 4 Larsi HPP LLC “ENERGIA” Mtskheta-Mtianeti 19 5 Akhmeta HPP LLC ‘”GEOENERGY” Kakheti 9.1 6 Kazbegi HPP LLC “KAZBEGIHESI” Mtskheta-Mtianeti 6 7 Paravani HPP LLC “GEORGIA-URBAN ENERGY” Samtskhe-Javakheti 86.54 8 Pshavela HPP LLC “STORI POWER” Kakheti 1.95 9 Alazani 2 HPP LLC “GEORGIAN INTERNATIONAL ENERGY CORPORATION” Kakheti 6 10 Khadori 2 HPP LLC “PERI” Kakheti 5.4 11 Racha HPP LLC “GEORGAIN INTERNATIONAL ENERGY CORPORATION” Racha-Lechkhumi and Kvemo Svaneti 11 12 Kazreti HPP LLC “WATER ENERGY” Kvemo Kartli 2.5 13 Shakshaketi HPP LLC "Medgroup Georgia" Shida Kartli 1.5
14 Debeda HPP LLC “HYDRO ENERGY” Kvemo Kartli 3 JSC “PARTNERSHIP FUND” and JSC “GEORGIAN OIL & GAS Gardabani TPP Kvemo Kartli 231.2 15 CORPORATION 16 Tkibuli TPP LLC "Saknakhshiri" Imereti 13.2 40 Ongoing Construction Stage Projects 16 HPPs and 1 Wind Power Plant- 841 MW. Investment Cost - 1.95 Bln. USD Kasleti 2 HPP – 8.1 MW Lukhuni 2 HPP- 12 MW
Nenskra HPP -280 MW Dariali HPP- 108 MW
Rachkha HPP – 10.25 MW
Saguramo HPP – 4.2 MW Khobi 2 HPP – 41.6 MW
Nabeglavi HPP – 1.9 MW
Skhalta HPP – 6 MW
Shuakhevi HPP – 187 MW
Okropilaura and Goginaura HPPs – 3.6 MW Khelvachauri HPP – 47.48 MW Kirnati HPP – Kirnati HPP – 51.25 Mw 6 MW Mtkvari HPP – 53 MW Wind Power Plant – 20.7 MW 41 7 Power Plants will Become Operational in 2016
Installed capacity N Project Company Region Investment (MW)
1 Dariali HPP JSC DARIALI ENERGY Mtskheta-Mtianeti 108.0 105 Mln. USD
2 Shuakhevi HPP LLC ADJARISTSQALI GEORGIA Achara 187.0 400 Mln. USD
3 Kirnati HPP LLC ACHAR ENERGY-2007 Achara 51.3 90 Mln. USD 4 Khelvachauri 1 HPP LLC ACHAR ENERGY-2007 Achara 47.8 70 Mln. USD
LLC HYDRO DEVELOPMENT 5 Kintrisha HPP Achara 6.0 8 Mln. USD COMPANY
6 Nabeglavi HPP LLC AE-SGI Energy I Guria 1.9 2.8 Mln.USD LLC KARTLI WIND POWER 7 Kartli Wind Power Plant Shida Kartli 20.7 34 Mln. USD PLANT“ Total Installed Capacity of 7 Projects is 422.7 MW and Investment Cost – 710 Mln USD
43 The First wind Power Plant “KARTLI”
• Wind Power Plant “Kartli” is a pilot alternative energy project in Georgia.
• First stage involves implementation of 20 MW Installed Capacity Wind Project, with the perspective of up to 200 MW development.
• The European Bank for Reconstruction and Development (EBRD) allocated 24,300,000 USD for project implementation.
• Construction of Wind Power Plant starts in March 2016 and will be completed in September 2016.
44 Biomass 3 MW Thermal Power Plant
• Installed Capacity is 3 MW (2 Mw + 1 MW);
• Annual Generation is 25,920,000 KWh;
• Project Location is in Rustavi area, Tbilisi-Rustavi highway, 17th kilometer, village Krtsanisi;
• TPPs will operate on agricultural wastes;
• The project is relevant and can be applied to other regions of the country, according on its great potential.
45 FDI in Energy Sector of Georgia
2012 IV- 2015 570 mln. USD
1%
9% 3% Agriculture, fishing 10% Mining
12% Manufacturing
Energy sector 13% Construction 6% Hotels and restaurants 2% Transports and communications
Health and social work 12% Real Estate
28% 4% Financial sector
Other sectors
39 Strategy To Move Forward
To develop east-west and north-south energy transportation infrastructure in order to increase transit capacity of the country
To improve social and economic condition by attracting new investments in renewable energy projects and create new employment opportunities for local people
To expand transmission infrastructure by investing in the construction of new interconnection lines.
To strengthen co-operation with the international organizations in order to accelerate integration of the country into European and Euro-Atlantic organizations
47