Water Intrusion Into Church Through Flat Roofs
Total Page:16
File Type:pdf, Size:1020Kb
Feasibility Study Overview St. Christopher’s Church How long have you been a member? Not a Member 2% 0-5 Years 22% 6-10 Years 0-5 Years 0% 6-10 Years 11 Year or More Not a Member 11 Year or More 76% What is your overall opinion of St. Christopher’s Church? Poor Average 0% 6% Superior Superior Very Good 48% Very Good Average 46% Poor How involved do you consider yourself to be in the church? Not Involved 6% Somewhat Involved 27% Very Involved Very Involved Involved 47% Somewhat Involved Not Involved Involved 20% Comments “I love this church… this is my home and my family.” “The people here are incredible.” “My kids see this entire church as a part of their family. They have many grandparents.” “It was six years ago when I first walked into this church. I was welcomed with smiles, and met Christ.” “Prior to any financial commitment, we would like to review the plan and submit comments, if appropriate.” “Prioritize: Essential repairs first. Do not spend money on inessentials, regardless of their desirability.” Plan? The Way We Were 1968 MLK … RFK … Vietnam … Nixon Apollo 8 – Christmas at the moon New church building under construction! 2016 - The Way We Are • Original church boiler, air exchanger, duct work • Undercroft moisture, mold, asbestos • Perilous access to undercroft well (wall, steps) • Water intrusion into church through flat roofs • Church electrical deficiencies • Unlighted signs and walkways • Significant drainage, erosion issues around church and Ed Bld • Ed Bld heat pump units at end of useful life • Ed Bld roof, chimney, attic fan, attic insulation problems • Many other things we can do to make us more attractive! l How do we know? • June 2014 professional buildings inspection told us so! • Church report • Education building report • Asbestos report • Mold report Church Building Needs Education Building & Outside • Drainage on south side • 7 heat pumps near end of useful life • Attic insulations, electrical, fan • Breezeway sides and posts • Brickwork • Tree removal • Parking lot renovation Our Way Forward • Address current B&G needs • Consider future B&G enhancements • Keep focus • To know Christ • To love Christ • To serve Christ in others Church Building 1 Replace church boiler 50,000 2 Replace church air exchanger 35,000 3 Replace duct work in church undercroft 20,000 Install commercial dehumidifier in undercroft and install 4 10,000 additional lighting 5 Repair/replace undercroft well south and west walls 40,000 6 Reinstall undercroft stairs 3,000 7 Re-grade around church to direct water from building 7,000 Install new wiring, light fixtures and outlets throughout 8 20,000 the church building 9 Refurbish needlepoint needles at altar 7,000 10 Cover 8 flat roofs to prevent debris accumulation 32,000 Repair/replace exterior lighting to illuminate walkways, 11 10,000 signs and church exterior 12 Install additional electrical outlets around both buildings 10,000 Church Building Total $206,000 Education Building Total 1 Replace all 8 heat pump units 50,000 2 Replace attic insulation 20,000 3 Install moisture barrier under EB classrooms 2,000 4 Re-grade soil on south, west, north sides of EB 5,000 Modify slope of sidewalk on north side of EB to drain 5 5,000 away from classrooms 6 Replace ridge shingles and missing shingles on EB roof 1,500 7 Repair EB chimney problems 4,000 8 Repair gable vent fan 2,000 9 Cover uncovered electrical connections in attic 1,000 Education Building TotaL $90,000 Exterior Projects 1 Install concrete pad and concealment fence around trash bins 8,000 2 Construct retaining wall on west side of church to prevent erosion 6,000 Construct retaining wall / memorial display on east side of church 3 15,000 to prevent erosion Construct retaining wall/ memorial display on south side of church 4 7,000 to prevent erosion Remove various trees and limbs on property to prevent fall 5 20,000 damage, leaf fall on roofs, and allow more light onto grounds 6 Resurface both parking lots 40,000 7 Repair or replace breezeway 50,000 Exterior Projects Total $146,000 Campaign Goal $450,000 Church Building Total $206,000 Education Building Total $90,000 Exterior Projects Total $146,000 Grand Total of Must Do Projects $442,000 Campaign Prayer “Most gracious and loving God, thank you for helping us to find Christ in this place through our ministries, our worship, our lives and for our reaching out to the world for the past 60 years. Help us now to move forward by remembering the past and those saints who have gone before us, and guiding us now towards carrying forward Christ in this place through our ministries, our worship and our lives. Through Jesus Christ, your Son, and our Savior.”.