M4 Smarter Motorway – Response from RBWM

Total Page:16

File Type:pdf, Size:1020Kb

M4 Smarter Motorway – Response from RBWM M4 Smarter Motorway – Response from RBWM General RBWM as part of the Thames Valley Local Economic Partnership is supportive of the M4 Smart Motorway project, as outlined in the TVB LEP Strategic Economic Plan. The Council recognises that the scheme will provide additional traffic capacity and more reliable journey times on the M4, where congestion at peak times is spreading to other parts of the day. These improvements will help maintain the Borough’s connectivity across the Thames Valley and the wider area, as well as London and Heathrow airport. However, RBWM fundamentally oppose the proposals for a third runway as part of Heathrow expansion due to the adverse environmental impact upon local residents, local businesses, institutions and the tourist trade and therefore would not support the M4 Smart Motorway scheme if it were being introduced to facilitate expansion at Heathrow. Traffic Impact Whilst the additional traffic capacity on the M4 motorway is to be supported, the Council remains concerned that the traffic impact on motorway junctions, approach roads as well as local roads has yet to be clearly identified. Mitigation measures to address these impacts needs to be considered and funding to implement appropriate measures needs to be identified. Road Safety Although the Council broadly supports the principals of the Smarter Motorway scheme, there are concerns about the full-time replacement of the hard shoulder with emergency refuge areas spaced a 2.5km intervals. A comparative safety assessment based on data from existing similar smart motorway arrangements would have supported this decision. Construction Impact Construction activity will need to be carefully managed in order to minimise impact upon adjacent residential properties. This includes the construction work compounds and traffic diversions from the motorway onto local roads during construction. Even in the absence of formal traffic diversions, we are concerned about traffic being displaced onto local roads in order to avoid the motorway during the construction phase. Construction related traffic also needs to be considered where this will have an impact upon local re roads. The decision to provide offline new bridges at A330 Ascot Road, Monkey Island Lane, B376 Datchet Road and Ditton Court Road is welcomed as this will reduce traffic disruption during construction for local residents. The timetable for construction of the scheme will conflict with other major construction projects in the area, including Crossrail, Western Rail Access to Heathrow, Maidenhead town centre developments and other committed development schemes across the Borough. Construction will therefore require careful co-ordination with the other on-going projects. We remain concerned that the proposed phasing of project, with M4 J12 to J8/9 opening before J8/9 to J3 will result in additional traffic problems in the Maidenhead area. The impact upon public rights of way during the construction phase also needs to be considered in order to minimise disruption. Impact upon Air Quality Bray/M4 AQMA This AQMA was declared in 2009 and road traffic in the area is the dominant source of pollution. NO2 concentrations near the M4 are the highest in the Borough and one of the highest within the area of the proposed scheme. The proposed scheme will increase motorway capacity by permanently converting the hard shoulder to a running lane creating a fourth lane. Emissions are predicted to increase and the distance between the traffic lane and sensitive receptors will be reduced. Historically the rates of improvement in air quality and future year projections of declining concentrations have always been overestimated. Given the degree of uncertainty about the rate of improvement in air quality it is reasonable to adopt a precautionary approach and consider potential control measure. We would not support the proposed scheme in its current form, with no control measures to reduce the air quality impact. In particular we recommend that Highways England consider noise barriers as a mean to improve air quality. It would be possible to improve the atmospheric dispersion of emissions from the M4 by increasing the height of the existing noise barriers in the area, which will also better contain the traffic noise from the new traffic lanes. The noise barriers would need to extend 350 metres to the west and 250 metres to the east of Windsor Road Overbridge. We would therefore suggest that the proposed scheme is an opportunity to mitigate the motorway air quality and noise impact in the area. Noise and Vibration Impact The decision to re-surface the whole of the motorway with low-noise surfacing, rather than just the sections of road to be widened, is welcomed. However, the scheme would result in running lanes being moved closer to adjoining residential properties and other receptors. Therefore the Council would wish for Highways England to take the opportunity to implement mitigation measures in order to reduce the noise impact upon residents wherever possible. Lighting Impact The decision to not introduce lighting on sections of the motorway through RBWM that are presently unlit is welcomed on environmental grounds. The decision to introduce LED lighting that can be dimmed and controlled remotely in order to reduce environmental impact is also welcomed. We would nevertheless recommend that the road safety implications of any changes to the lighting are given due consideration. Impact on Public Rights of Way River Thames Bridge This is presently a footway/cycleway. We would wish to see this status retained and width improved to 3m Thames Path National Trail Existing widths should be maintained and opportunities for improvements progressed. Any closures should be kept short and convenient. The Local Access Forum (LAF) Fast Response Team has examined the proposals for the M4 Smart Motorway and makes the following comments on behalf of the forum: • Marsh Lane (Bridge 3 on consultation plan) This forms part of an aspiration to improve horse riding in this area, in particular the forum is working towards a Multi-Use Route that will utilise this bridge. This area is heavily used by horse riders. Modifications are needed to this bridge to make it easier for use by horse riders which could easily be folded in to the design of the Highways England works, including building in a sufficient verge width and installing higher parapets on the bridge. The forum suggests that the BHS are consulted regarding the detailed design of the bridge. • Datchet Footpath 1 (Bridge 11 on the plan) This is used heavily by cyclists as well as walkers and the forum recommend that the opportunity is taken to improve the widths of the path to accommodate this use. • General comments The LAF note that there are approximately ten paths which cross the M4 in the borough. They request assurance from Highways England that these paths will be reinstated and put back to the same condition that they are now. .
Recommended publications
  • Great Western Railway Ships - Wikipedi… Great Western Railway Ships from Wikipedia, the Free Encyclopedia
    5/20/2011 Great Western Railway ships - Wikipedi… Great Western Railway ships From Wikipedia, the free encyclopedia The Great Western Railway’s ships operated in Great Western Railway connection with the company's trains to provide services to (shipping services) Ireland, the Channel Islands and France.[1] Powers were granted by Act of Parliament for the Great Western Railway (GWR) to operate ships in 1871. The following year the company took over the ships operated by Ford and Jackson on the route between Wales and Ireland. Services were operated between Weymouth, the Channel Islands and France on the former Weymouth and Channel Islands Steam Packet Company routes. Smaller GWR vessels were also used as tenders at Plymouth and on ferry routes on the River Severn and River Dart. The railway also operated tugs and other craft at their docks in Wales and South West England. The Great Western Railway’s principal routes and docks Contents Predecessor Ford and Jackson Successor British Railways 1 History 2 Sea-going ships Founded 1871 2.1 A to G Defunct 1948 2.2 H to O Headquarters Milford/Fishguard, Wales 2.3 P to R 2.4 S Parent Great Western Railway 2.5 T to Z 3 River ferries 4 Tugs and work boats 4.1 A to M 4.2 N to Z 5 Colours 6 References History Isambard Kingdom Brunel, the GWR’s chief engineer, envisaged the railway linking London with the United States of America. He was responsible for designing three large ships, the SS Great Western (1837), SS Great Britain (1843; now preserved at Bristol), and SS Great Eastern (1858).
    [Show full text]
  • London Connections OFF-PEAK RAIL SERVICES
    Hertford East St Margarets Interchange Station Aylesbury, Banbury Aylesbury Milton Keynes, Luton Bedford, Stevenage, Letchworth, Welwyn Stevenage Harlow, Bishops Stortford, and Birmingham Northampton, Cambridge, Kings Lynn, Hertford Stansted Airport Limited services (in line colours) Wellingborough, Garden City Ware Rugby, Coventry, Kettering, Leicester, Huntingdon, Peterborough North and Cambridge and The North East Rye Limited service station (in colours) Birmingham and Nottingham, Derby Hatfield Bayford The North West House Escalator link and Sheffield Broxbourne Welham Green Cuffley Airport link Chesham Watford Bricket St Albans ST ALBANS HIGH WYCOMBE Amersham North Wood Abbey Brookmans Park Crews Hill Enfield Town Cheshunt Docklands Light Railway Watford WATFORD Cockfosters Theobalds Tramlink Garston How Park Potters Bar Gordon Hill Wagn Epping Beaconsfield JUNCTION Wood Street Radlett Grove Bus link Hadley Wood Oakwood Enfield Chase Railway Chalfont & Latimer Watford Bush Theydon Bois Croxley Hill UNDERGROUND LINES Seer Green Croxley High Street Silverlink County New Barnet Waltham Cross Green Watford Elstree & Borehamwood Southgate Grange Park Park Debden West Turkey Bakerloo Line Chorleywood Enfield Lock Gerrards Cross Oakleigh Park Arnos Grove Winchmore Hill Street Loughton Central Line Bus Link Stanmore Edgware High Barnet Bushey Southbury Brimsdown Buckhurst Hill Circle Line Denham Golf Club Rickmansworth Mill Hill Broadway Bounds Chiltern Moor Park Carpenders Park Totteridge & Whetstone Chingford Canons Park Burnt New Green
    [Show full text]
  • A Multi-Objective Ensemble Approach to Hydrological Modelling in the UK: an Application to Historic Drought Reconstruction
    Hydrol. Earth Syst. Sci. Discuss., https://doi.org/10.5194/hess-2019-3 Manuscript under review for journal Hydrol. Earth Syst. Sci. Discussion started: 15 January 2019 c Author(s) 2019. CC BY 4.0 License. A Multi-Objective Ensemble Approach to Hydrological Modelling in the UK: An Application to Historic Drought Reconstruction Katie A. Smith1, Lucy J. Barker1, Maliko Tanguy1, Simon Parry1, Shaun Harrigan2, Tim P. Legg3, Christel Prudhomme2,1,4, and Jamie Hannaford1,5 5 1 Centre for Ecology & Hydrology, Maclean Building, Benson Lane, Crowmarsh Gifford, Wallingford, Oxfordshire, OX10 8BB, UK 2 European Centre for Medium-Range Weather Forecasts, Shinfield Road, Reading, RG2 9AX, UK 3 Met Office, FitzRoy Road, Exeter, Devon, EX1 3PB, UK 4 Department of Geography, Loughborough University, Loughborough, LE11 3TU, UK 10 5 Irish Climate Analysis and Research UnitS, Department of Geography, Maynooth, Ireland Correspondence to: Katie A Smith ([email protected]) Abstract. Hydrological models can provide estimates of streamflow pre- and post- observations, which enable greater understanding of past hydrological behaviour, and potential futures. In this paper, a new multi-objective calibration method was derived and tested for 303 catchments in the UK, and the calibrations were used to reconstruct river flows back to 1891, 15 in order to provide a much longer view of past hydrological variability, given the brevity of most UK river flow records which began post-1960. A Latin Hypercube sample of 500,000 parameterisations for the GR4J model for each catchment were evaluated against six evaluation metrics covering all aspects of the flow regime from high, median and low flows.
    [Show full text]
  • What's Happening on the M4 Project During January?
    Upgrade to smart motorway Junction 3 to 12 January 2019 news bulletin Happy New Year and welcome to the first monthly information bulletin of 2019. This year will see a step up in the project as we move forward with bridges and structures work and prepare for the start of phase 2 of construction between Junctions 8/9 at Maidenhead and Junction 3 at Hayes. Our public engagement for this year is currently being organised. In March and April 2019 we will be holding the next set of Public Information Events for areas between junctions 8/9 to 3. Watch this space for information about these in the next bulletin. We are now moving into the new office and compound near Junction 10 which recently finished construction. The new compound will allow us to store the vast majority of our equipment and materials and reduce the need for large local compounds. It will also provide space for vehicle rescue and recovery facilities for users of the M4. What’s happening on the M4 project during January? Phase two of construction starts in 2019 M4 overnight closures during January Phase one of the project started in July 2018 and There are several overnight full closures (usually 22:00 comprises the area west from Junctions 8/9 leading to to 05:00) currently planned in January. The best way to Junction 12. While this is a significant piece of work in keep up to date with the various closures, including slip itself, phase two covering Junctions 8/9 eastwards into road closures, is the Traffic England website at: London and Junction 3 is a much more complex www.trafficengland.com.
    [Show full text]
  • 5406 Green Infrastructure Open Space
    COTSWOLD DISTRICT GREEN INFRASTRUCTURE OPEN SPACE AND PLAY SPACE STRATEGY 201 Open Spaces 4 There is considered to be three main Green Corridors in Fairford, 1) River Coln, 2) Pitman Brook and 3) the PROW from town to lake 104Fairford is well served with PROW and permissive paths, many of which are kept in good condition. There are areas of the footpath along the Coln that are in a state of disrepair and require urgent action to stop the bank from further degeneration. Lovers Walk requires resurfacing. Typology Quantity & Size Accessibility Quality Summary Green Corridors 1) Mix of PROW, 1) Mix of PROW, Essential - All are clean permissive path & permissive path & private. and litter free 1) River private. Coln 2) Permissive Path (closed E - (1) has clearly defined 2) Permissive Path every Tuesday) footpaths with a level 2) Pitman (closed every Tuesday) surface (2) & (3) defined Brook 3)Public access footpath, but not level. 3)Public access 3) PROW from E - All have nature features Path the town to lake 104 Desirable - All have appropriate signage D - All sites don't have multiple use, only walking D - All have no dog/litter bins X - (1) has disabled access in places (2) & (3) not X - 1, 2 & 3 have staff or volunteer involvement. Total amount of accessible space 17,728 metres Total amount of accessible space within 2 KM 17,728 metres (includes Public Rights of Way with 2 KM radius) Total amount of accessible space within 300m NA Findings Green Corridors Quantity and Accessibility: There is no requirement to set catchments for green corridors due to their linear nature.
    [Show full text]
  • Getting to Know Your River
    Would you like to find out more about us, or about your environment? Then call us on 08708 506 506 (Mon-Fri 8-6) A user’s guide to the email River Thames enquiries@environment- agency.gov.uk or visit our website www.environment-agency.gov.uk incident hotline getting to know 0800 80 70 60 (24hrs) floodline 0845 988 1188 your river Environment first: This publication is printed on paper made from 100 per cent previously used waste. By-products from making the pulp and paper are used for composting and fertiliser, for making cement and for generating energy. GETH0309BPGK-E-P Welcome to the River Thames safe for the millions of people who use it, from anglers and naturalists to boaters, We are the Environment Agency, navigation authority for the River Thames walkers and cyclists. This leaflet is an essential guide to helping the wide variety from Lechlade to Teddington. We care for the river, keeping it clean, healthy and of users enjoy their activities in harmony. To help us maintain this harmony, please To encourage better understanding amongst river users, there are nine River User Groups (RUGs) read about activities other than your own covering the length of the river from Cricklade to to help you appreciate the needs of others. Tower Bridge. Members represent various river users, from clubs and sporting associations to commercial businesses. If you belong to a club that uses the river, encourage it to join the appropriate group. Contact your local waterway office for details. Find out more about the River Thames at www.visitthames.co.uk Before you go..
    [Show full text]
  • Hydraulic Modelling Technical Note
    Wycombe Level 2 SFRA Wycombe District Council Hydraulic Modelling Technical Note Appendix C | 02 August 2017 Hydraulic Modelling Technical Note Wycombe DC Hydraulic Modelling Technical Note River Wye & River Thames model updates Project No: B127F005 Document Title: Hydraulic Modelling Technical Note Document No.: Appendix C Revision: 02 Date: 24 January 2017 Client Name: Wycombe DC Client No: Project Manager: Eve Lambourne Author: Monica Macias Jimenez File Name: River Wye&Thames Technical Note.docx Jacobs U.K. Limited 1180 Eskdale Road Winnersh, Wokingham Reading RG41 5TU United Kingdom T +44 (0)118 946 7000 F +44 (0)118 946 7001 www.jacobs.com © Copyright 2017 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This report has been prepared on behalf of, and for the exclusive use of Jacobs’ Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this report by any third party. Document history and status Revision Date Description By Review Approved V01 06/03/2017 Draft for client review Monica Mathieu Eve Macias Valois Lambourne Jimenez V02 26/07/17 Final (addresses WDC, EA, BCC comments) Monica Mathieu Eve Macias Valois Lambourne Jimenez V03 18/08/17 Final Monica Mathieu Eve Macias Valois Lambourne Jimenez i Hydraulic Modelling Technical Note Contents 1.
    [Show full text]
  • 96918 GB Waterways.Ai
    AINA WATERWAYS MAP INVERNESS Loch Ness Aberdeen Caledonian Canal Loch Oich Loch Lochy Fort William Dundee Perth Crinan Canal Loch Lomond Grangemouth Forth & Clyde Canal Union EDINBURGH Monkland Canal Canal GLASGOW NEWCASTLE- UPON-TYNE Sunderland Hartlepool Middlesbrough Derwent Tees Navigation Water Ullswater and Barrage Lake District Windermere Coniston Water Kendal Isle of Man Ripon River Ure Canal River Foss YORK Pocklington Lancaster Canal Canal River Leeds & River Hull Ouse Liverpool LEEDS Kingston- Canal Selby Air upon-Hull Ribble BRADFORD e & Canal BRADFORD C ald Link er N Rochdale avigation Canal Calder & New Hebble Junction Huddersfield Grimsby Navigation Canal Broad Canal Stainforth & River Oldham South Yorkshire Keadby Ancholme Huddersfield Navigation Canal Narrow Canal Sheffield Kirkby Ashton Canal & Tinsley Bridgewater MANCHESTER Canal Canal Chesterfield LIVERPOOL Peak SHEFFIELD Canal Fossdyke Forest Canal Navigation Runcorn Chesterfield Ellesmere Weaver Macclesfield Canal Port Partnership Lincoln Navigation Macclesfield Trent Witham Middlewich Canal Navigation Branch Navigation River Dee Shropshire Caldon Sleaford Union Crewe Canal Navigation Boston Canal Erewash Black Sluice Stoke-on-Trent Canal NOTTINGHAM Trent & Navigation Grantham Llangollen Llangollen Mersey Derby Canal Canal Grantham Canal Nottingham & Old King’s Shropshire Staffs & Trent & Beeston Canal Lynn Union Canal Mersey Canal River River River Worcs Glen Welland Nene Tidal River The Canal Burton Loughborough River Soar NORWICH Broads Great Yarmouth upon Great Ouse Trent River Relief Channel Birmingham Canal Nene Coventry River Montgomery Navigations Canal Peterborough Wissey Canal Leicester Lowestoft r e Wolverhampton Ashby iv River Little Canal Market R d Ouse r Harborough o e Sixteen f s Birmingham d BIRMINGHAM Arm e u Foot B O Fazeley Canal Old y Grand w l e E Union Canal Bedford N Staffs & Coventry River Stourbridge Leicester Line Middle Level Worcs Canal Canal Oxford River Lark Canal Navigations Old West River River Cam Bury St.
    [Show full text]
  • Final Report
    On the right path: Options for a body to aid future management of the English National Trails Yorkshire Dales National Park Authority on behalf of the National Trails Alliance Final Report Red Kite Environment Craggattak Consulting Caroline Butlin-Worrall March 2019 On the right path: Options for a body to aid future management of the English National Trails ______________________________________________ Yorkshire Dales National Park Authority on behalf of the National Trails Alliance Caroline Butlin-Worrall Red Kite Environment Pearcroft Pearcroft Rd Stonehouse Gloucestershire GL10 2JY Tel: 01453 822013 Email: [email protected] Cover photo: Hadrian’s Wall National Trail, Hadrian’s Wall Country On the Right Path: Options for a body to aid future management of the English National Trails Contents Summary ................................................................................................ i 1 Introduction ........................................................................................ 1 2 How the study was carried out .......................................................... 2 3 Background to National Trails .......................................................... 3 3.1 The National Trails ............................................................................................ 3 3.2 The England Coast Path (ECP) and Wales Coast Path (WCP) ........................ 4 3.3 Trail officers’ range of work ............................................................................... 4 3.4 National Trail
    [Show full text]
  • THE RIVER THAMES a Complete Guide to Boating Holidays on the UK’S Most Famous River the River Thames a COMPLETE GUIDE
    THE RIVER THAMES A complete guide to boating holidays on the UK’s most famous river The River Thames A COMPLETE GUIDE And there’s even more! Over 70 pages of inspiration There’s so much to see and do on the Thames, we simply can’t fit everything in to one guide. 6 - 7 Benson or Chertsey? WINING AND DINING So, to discover even more and Which base to choose 56 - 59 Eating out to find further details about the 60 Gastropubs sights and attractions already SO MUCH TO SEE AND DISCOVER 61 - 63 Fine dining featured here, visit us at 8 - 11 Oxford leboat.co.uk/thames 12 - 15 Windsor & Eton THE PRACTICALITIES OF BOATING 16 - 19 Houses & gardens 64 - 65 Our boats 20 - 21 Cliveden 66 - 67 Mooring and marinas 22 - 23 Hampton Court 68 - 69 Locks 24 - 27 Small towns and villages 70 - 71 Our illustrated map – plan your trip 28 - 29 The Runnymede memorials 72 Fuel, water and waste 30 - 33 London 73 Rules and boating etiquette 74 River conditions SOMETHING FOR EVERY INTEREST 34 - 35 Did you know? 36 - 41 Family fun 42 - 43 Birdlife 44 - 45 Parks 46 - 47 Shopping Where memories are made… 48 - 49 Horse racing & horse riding With over 40 years of experience, Le Boat prides itself on the range and 50 - 51 Fishing quality of our boats and the service we provide – it’s what sets us apart The Thames at your fingertips 52 - 53 Golf from the rest and ensures you enjoy a comfortable and hassle free Download our app to explore the 54 - 55 Something for him break.
    [Show full text]
  • WI News 2010
    WI News 2010 December: ~ December's walk: On a foggy December morning 13 members and friends set off from the old Saxon town of Cricklade, going along the Thames path, through an ancient Lammas meadow and then joining up with the disused section of two canals, Wilts & Berks and Thames & Severn. At Latton Junction a little festive refreshment was enjoyed. After arriving at Cerney Wick, field paths took us to the edge of one of the lakes in the eastern part of the Water Park. We then joined the railway path, previously The Midland and South Western Junction Railway, eventually reaching Cricklade and a delicious lunch at The White Hart. Cricklade WI walk, taken at Latton Junction, the meeting of two canals - Wilts & Berks and Thames & Severn. (December 2010 - photo courtesy of Jenny Hayne) ~ A happy buzz of chatter could be heard in Kington St Michael Village Hall when the WI was host to about 75 retired villagers on Sunday. As a gesture of friendship and community spirit each year their guests are invited to a festive Christmas gathering when mouth-watering home-made canapés are served and drinks flow freely. It is a lovely opportunity for villagers to get to know one another better, particularly if they are new to the area. President Viv Penney wished everyone a very happy Christmas on behalf of the WI. 1 November: ~ On a beautiful autumn morning 15 walkers left the War Memorial at Rode, an old woollen mill village. After passing Rode Hill House, which was the scene of one of the most infamous murders of the 19-century, we followed the River Frome to Farleigh Hungerford, where lunch was enjoyed at the Hungerford Arms, with beautiful views of the valley and castle ruins.
    [Show full text]
  • Lower Thames Fact File
    EA -Tham es LOW Lower Thames Fact File En v ir o n m e n t Ag e n c y This is one o f a number o f Fact Files which cover all the Rotocking main rivers in the Thames Region of the Environment ihe River Wye Agency. Due to its size and importance the Thames itself is covered by four fact files, dealing with the Upper Thames, from source at Thames Head to Eynsham, the Middle Thames from Eynsham to Hurley, the Lower Thames from Hurley toTeddington, and the Thames Tideway and Estuary extending fromTeddington in West London to Shoebury Ness just east of Southend. Lower Flackwell Heath Thames Marlow Hurle\ enley-on-Thames Maidenhead rgrave Windsor Id Windsor Binfield Burleigh The Bracknell Environment Agency The Environment Agency for smaller units from the Department o f the England and Wales is one o f the Environment. The Environment Agency is most powerful environmental committed to improving wildlife habitats and conserving regulators in the world. We provide the natural environment in all it undertakes. a comprehensive approach to the protection and Our key tool for the integrated management of the local management of the environment, emphasising water, land and air environment is the development of prevention, education and vigorous enforcement Local Environment Agency Plans (LEAPS). The Lower wherever necessary. The Agency’s creation on the 1 st Thames LEAP consultation report contains a April 1996 was a major step, merging the expertise of the comprehensive survey of local natural resources, pressures National Rivers Authority, Her Majesty’s Inspectorate of on these resources and the consequent state o f the local Pollution, the Waste Regulation Authorities and several environment.
    [Show full text]