District East VENUES: INCIDENT SITES LOCATIONS & THEIR RESPECTIVE IDENTIFIED RELIEF CENTERS

S. Venue Relief Centre No.

1. Scope Minar, MCD School, East Laxmi Nagar

Fraser Suite Hotel, Plot No. 4, District Centre, Community Centre, Chilla Gaon 2. Ph-I, -91 Open Space near Karkardooma Metro Station 3. Karkardooma Metro Station

V3S Mall, Plot No 12, Laxmi Nagar, District Centre, MCD School, East Laxmi Nagar 4. Delhi-92 Star City Mall, Mayur Vihar - I, Delhi East, Delhi - Community Centre, Chilla Gaon 5. 110092 Community Centre, Chilla Gaon 6. CNG, Filling Pump, Mayur Vihar, Phase-I EOC, DDMA (East) 7. VREC, AC 58, B-Block, DC Office Complex

Bhagidari Hall 8. EOC, DDMA (East) DC Office RSKV, 9. RSKV, Kondli 10. GBSSS, Vivek Vihar, Phase-II GBSSS, Vivek Vihar, Phase-II Civil Defence Office, Gram Shiksha Kendra School, Civil Defence Office, Gram Shiksha Kendra 11. Gandhi Nagar near Jheel Chowk, Gandhi Nagar School, Gandhi Nagar near Jheel Chowk, Opp. Furniture Market Gandhi Nagar Opp. Furniture Market New Building, ITI College, Vivek Vihar 12. Old ITI College, Vivek Vihar Ambedkar Institute of Advanced Ambedkar Institute of Advanced Communication 13. Communication Technologies & Research, Technologies & Research, Geeta Colony Geeta Colony

Mayur Vihar Phase-I, PKT-4 Market, RWA 57-G, 14. Central Park, MCD, Mayur Vihar, Pkt-IV Delhi-91 Lalita Prasad Arya Girls Senior Secondary School, 15. Open Space Anaj Mandi Anaj Mandi, RWA Shahdara, Vivek Vihar Community Centre, Geeta Colony (Sarthak RWA, Geeta Colony, Gandhi Nagar (Sarthak Vidya 16. Vidya Niketan) Niketan) Open Space around Akshardham Metro Akshardham Foot Over Bridge near Akshardham 17. Metro Station Station

Circulating Area in front of Anand Vihar 18. Anand Vihar Railway Station near ISBT Railway Station

19. Max Balaji Hospital, , Delhi Govt. Park in front of Max Balaji Hospital

48

DETAILED SCENARIOS AT VARIOUS SITES

S. No. Particulars Venues Scenarios Relief Centers

Due to Earthquake Tremors approx. 25% of the Scope Minar Building & ceiling had fallen, Ground Floor, 1 st Floor, 8 th High Rise Scope Minar, Laxmi MCD School, 1. Floor & 15 th Floor are most affected. The East Laxmi Nagar Building Nagar incident has resulted in 3 casualties, 4 seriously injured, 15 injured & 150 people are trapped inside.

Due to strong tremors 10% of the Hotel Fraser Suite Hotel, Plot Community Reception Area’s false ceiling had fallen High Rise No. 4, District Centre, Centre, Chilla 2. down which has resulted in 1 casualty, 2 Building Mayur Vihar Ph-I, Gaon seriously injured & 4 injured while 20 Delhi-91 are still trapped at I st & II nd Floor. Due to strong tremors of Earthquake 1 Open Space near Pillar of Metro Station had tilted which Metro Karkardooma Metro Karkardooma 3. has resulted in 2 casualties, 3 seriously Station Station Metro Station injured & 5 injured while 150 people are still trapped at Metro Station. 18% of the V3S Mall Building has collapsed while the open area is filled with debris due to Earthquake as a result V3S Mall, Plot No 12, MCD School, movement is completely restricted. The 4. Mall Laxmi Nagar, District East Laxmi Nagar incident has caused 3 casualties, injury Centre, Delhi-92 to 8 while 4 are seriously injured and many are trapped in the Food Court & Banquet Hall. Due to Earthquake the Banquet Hall & the Food Court had partially collapsed Star City Mall, Mayur Community which has resulted in 1 casualty, injury Centre, Chilla 5. Mall Vihar - I, Delhi to 4 while 2 are seriously injured and 30 East, Delhi - 110092 Gaon visitors including staff are trapped in the Food Court & Banquet Hall. Due to Earthquake Pipe Line at CNG Community CNG, Filling Pump, Station has burst and Poisonous Gas is Centre, Chilla 6. CNG Pump Mayur Vihar, Phase-I leaking due to which heavy congestion Gaon has caused 1 casualty & 5 injuries. Due to strong tremors, a wall of the VREC, AC 58, B-Block, Office Building has fallen which has EOC, DDMA Govt. 7. resulted in 2 seriously injured & 4 minor Building DC Office Complex (East) injured while 10 people are still trapped in the Office.

49

As a result of Earthquake, the ceiling of Bhagidari Hall & SR Building has fallen as result 3 are seriously injured while 2 Govt. Bhagidari Hall EOC, DDMA 8. are injured & 4 are minor injured. (East) Building DC Office Around 50 Visitors including few RWAs members & Official Staff are trapped in the campus. New Building of RSKV School which was under construction has been fallen down due to strong tremors of Earthquake 9. School RSKV, Kondli RSKV, Kondli which has resulted in 2 casualties, 1 seriously injured & 6 injured while 1500 Students are still trapped in the School. The School has developed huge cracks in the walls & 2 class rooms at the Ground Floor are partially collapsed as a result 3 GBSSS, Vivek Vihar, GBSSS, Vivek 10. School Students are seriously injured while 3 Phase-II Vihar, Phase-II Students & 2 Teachers are minor inured. 500 Students are trapped in the School Building. Civil Defence Civil Defence Office, The Building of Gram Shiksha Kendra Office, Gram Gram Shiksha Kendra School which was under construction has Shiksha Kendra School, Gandhi Nagar fallen down partially due to strong School, Gandhi 11. School near Jheel Chowk, tremors of Earthquake which has Nagar near Jheel Gandhi Nagar Opp. resulted in 1 seriously injured & 4 Chowk, Gandhi Furniture Market injured. Nagar Opp. Furniture Market The Old Building of ITI College has partially tilted & few of its part is New Building, damaged due to strong tremors of Old ITI College, Vivek ITI College, 12. College Earthquake which has resulted in 3 Vihar Vivek Vihar seriously injured & 5 injured while 75 Students are still trapped in the College Building. Ambedkar Ambedkar Institute of Institute of Ambedkar Institute has been damaged Advanced Advanced due to Earthquake which has resulted 3 Communication Communication 13. College casualties, minor injury to 3 while 2 are Technologies & Technologies & seriously injured and many Students are Research, Geeta Research, Geeta trapped in the College. Colony Colony

50

Mayur Vihar Phase-I, PKT-4 Market , RWA At RWA, Mayur Vihar-I, Pkt-IV Market, Central Park, 57-G, Delhi-91 the MTNL Office Wall has fallen down & MCD, Mayur 14. RWA 2 other shops had been damaged as a Sh. R.K Saxena, Vihar, Pkt-IV result 1 is seriously injured while 4 are President (M) minor injured. 9818720777

Lalita Prasad Arya Girls Senior Secondary The wall of the Secondary School had School, Anaj Mandi, fallen & many other buildings have Open Space Anaj RWA Shahdara, Vivek developed cracks in the walls. Few 15. RWA Mandi Vihar buildings in the area are tilted as results 1 Sh. Rajesh Aggarwal, are seriously injured while 4 are with President minor injuries. (M) 9818160606 The 5 Buildings in the Colony have RWA, Geeta Colony, developed severe cracks while the School Community Gandhi Nagar (Sarthak Building in front of the Community Vidya Niketan) Centre, Geeta 16. RWA Centre has partially collapsed as a result Colony (Sarthak Ms. Meera Sabbarwal, 2 casualties is identified while 5 are Vidya Niketan) President injured, around 20 are trapped in other (M) 9818571069 buildings in RWAs. Due to Earthquake Tremors Foot Over Open Space Akshardham Foot Bridge of Akshardham Metro Station had around Over Bridge near fallen which has resulted in 1 casualty, 2 17. Bridge Akshardham Akshardham Metro injuries & 2 seriously injured . Heavy Metro Station Station Traffic Jam has developed a chaos situation. Due to Earthquake false ceiling of the waiting room collapses & concourse area Circulating Area Railway Anand Vihar Railway catches fire due to short circuit. The in front of Anand 18. Station Station near ISBT incident results in 1 casualty, serious Vihar Railway injury to 3 persons while 4 are minor Station injured. Due to Earthquake 15% false ceiling of the OPD of the Old Building collapses Govt. Park in Max Balaji Hospital, 19. Hospital while fire due to short circuit occurs in front of Max Patparganj, Delhi the canteen. Due to the incident 2 major Balaji Hospital injured & 5 minor injured are identified.

51

ACTUAL EXERCISE:

As per Section 30, Sub Section 2 (xxviii) under Disaster Management Act, 2005 & in collaboration with National Disaster Management Authority (NDMA), a Mock Drill on Earthquake was executed by District Disaster Management Authority (East) at the above mentioned venues on 15 th February, 2012 at 11:30 AM.

The Drill started at 11:30 AM sharp with the Earthquake of 7.9 Richter Scale at Delhi- Moradabad fault line the intensity of earthquake was so high that it resulted in structural damage and fire incidents at various above cited venues.

The calls were made form incident site to the ESFs viz. 100, 101, 102 & 1077 and District East EOC Control Room (Ph: 22051234). Simultaneously calls were made to concerned Stake Holders in order to respond to emergency situation at various incident sites in District East.

In response to the call, the District Emergency Support Functionaries (ESFs) started reaching the site with their emergency resources, both Man Power & Equipment; in order to respond to the ‘Crisis’.

During the Mock Drill Major Sudeep Dutt along with team of 40 members were the observers of the complete experience in District East. The Drill was successfully conducted with the participation of more than 18 Agencies like Govt. Department viz. Revenue Department, Police, Traffic Police, Delhi Fire Services, Delhi Health Services, CATS, St. John Ambulance Brigade, Rail Corporation, Army, NDRF, Civil Defence, Nehru Yuwa Kendra Sangathan, Delhi Disaster Management Authority, Delhi Transport Corporation, MTNL, Delhi Jal Board etc., Govt. Hospitals like Dr. Hedgewar Arogaya Sansthan Hospital, Chacha Nehru Bal Chikitsalaya, Lal Bahadur Shastri Hospital & Max Balaji Hospital (Private Hospital) & NGOs like Dera Sachha Sauda, Indian Development for Human Care, Anchal Charitable Trust, Shaheed Bhagat Singh Sewa Dal.

In addition to above, ‘Drop, Cover & Hold’ Drill followed by evacuation of the building was also carried in all the Govt., MCD & Private Schools of the District.

52

The drill incorporated the Incident Command System and Officers from Deputy Commissioner (East) Office acted as Incident Commander for various venues.

All the ESFs responded as per their Standard Operating Procedures (SOPs) and assigned duties & responsibilities & responded to the various Incident Sites promptly within 10-20 minutes. Mock Drill ended peacefully.

A Debriefing meeting was organized at 1:30 PM on 15th February, 2012 in the Bhagidari Hall of O/o the Deputy Commissioner (East) which was participated by all Nodal Officers from various departments as well as the In-charges of the 19 venues / sites and the Incident Commander deputed from Revenue Department at various sites as well as the Army Officials & NDRF Team Members.

Points discussed during debriefing meeting:

1. Few Agencies were present at the venue sites prior to the start of the mock drill. It was suggested by Deputy Commissioner (East) to all ESFs that the Agencies should start for the sites from their base stations only.

2. During the Mock Drill, Delhi Police efficiently managed the Law & Order conditions and promptly cordoned off the every incident site.

3. Deputy Commissioner (East) congratulated Delhi Traffic Police for making perfect arrangement for the control of Traffic congestion in the traffic prone areas.

4. Deputy Commissioner (East) congratulated Delhi Jal Board for providing water tanker at each incident site and every Relief Centres.

5. While the Mock Drill in Scope Minar, Laxmi Nagar was going on, a small fire incident also took place at V th floor in Core-I in the O/o Coal Ltd. However the fire was promptly & efficiently controlled by the Delhi Fire Services, no injuries were reported during the Incident.

6. MTNL established WLL connection at various sites while at few sites only Mobile MTNL Services were provided. The MTNL Helpline No. started at the Scope Minar was 220500202, however it was suggested to establish WLL connections, in future, at the Incident Site instead of providing mobile services, with the view that Mobile Service do not work efficiently during such disasters.

53

7. The Black Out (for 3 minutes) carried out by BSES at all Incident Sites at 11:30 hrs was appreciable. However Deputy Commissioner (East) suggested for carrying out complete black out of the Incident Site till the evacuation process is complete, in order to avoid any mishap.

8. NGOs in District East reacted promptly to the varying incidents. Shaheed Bhagat Singh Sewa Dal provided 6 ambulances at various venues while the volunteers from Dera Sachha Sauda assisted in Search & Rescue activities at all sites.

9. During the Mock Drill, a crunch of Ambulance was noticed mostly at all the sites. However this deficiency was overcome by utilizing Delhi Police PCR Vans for transferring the victims to the Hospitals.

10. The support provided by DMRC during the Mock Drill at Karkardooma Metro Station was commendable.

11. The response of the Delhi Health Services, Govt. & Private Hospitals was admired by Deputy Commissioner (East).

12. The efforts of Delhi Fire Service were commendable. Deputy Commissioner (East) congratulated Delhi Fire Services for their hard work & cooperation during the complete Mock Drill.

13. A fine response from NDRF along with the team of 45 members & Disaster Management equipments led by Sh. Ashok Rai (Inspector) was highly remarkable.

14. MCD responded in time at all the venues.

The Incident Commander, Sh. R.K. Misra, Deputy Commissioner (East) cum Chairperson, DDMA (East) appreciated all ESFs of District East for their tremendous support & cooperation in successfully carrying out the Mock Drill at 19 venues in the District. He also appreciated the response time of all Agencies & further suggested that there is need to have more such exercises so as to improve the inter agency coordination which was missing at few sites. Further visualizing the crunch of Ambulances at Incident Sites, it was suggested to strengthen the Medical response system in the District so as to efficiently cater the emergency situations.

54

The overall performance from all Agencies was satisfactory, which is further expected to improve by carrying out more such exercises in future. Special thanks were also made to Army Officials, NDRF Team & Director (NDMA).

The whole exercise completed at 4:00 PM.