Speed Limits Act 1984, S

Total Page:16

File Type:pdf, Size:1020Kb

Speed Limits Act 1984, S THE LONDON GAZETTE FRIDAY 28 MARCH 2008 SUPPLEMENT No. 1 79 The M6 Motorway (Southbound Carriageway Between The M65 Motorway (Junction 2 Westbound Entry Slip Junctions 15 and 14, Staffordshire) (Temporary Road) (Temporary Prohibition of Traffic) Order 2007 Restriction of Traffic) Order 2007 No. 2007/2360. - No. 2007/2303. - Enabling power: Road Traffic Regulation Enabling power: Road Traffic Regulation Act 1984, s. 14 Act 1984, s. 14 (1) (a). - Made: 23.07.2007. Coming into (1) (a) (7). - Made: 23.07.2007. Coming into force: force: 16.08.2007. Effect: None. Territorial extent & 30.07.2007. Effect: None. Territorial extent & classification: E. Local Unpublished classification: E. Local Unpublished The M65 Motorway (Junction 4 Eastbound Entry Slip The M6 Motorway (South of Junction 2 - North of Road) (Temporary Prohibition of Traffic) Order 2007 Junction 3) (Temporary Restriction and Prohibition of No. 2007/2103. - Enabling power: Road Traffic Regulation Traffic) Order 2007 No. 2007/2354. - Enabling power: Act 1984, s. 14 (1) (a). - Made: 03.07.2007. Coming into Road Traffic Regulation Act 1984, s. 14 (1) (a) (7). - force: 26.07.2007. Effect: None. Territorial extent & Made: 20.07.2007. Coming into force: 27.07.2007. Effect: classification: E. Local Unpublished None. Territorial extent & classification: E. Local The M65 Motorway (Junction 5 Westbound Exit Slip Unpublished Road) (Temporary Prohibition of Traffic) Order 2007 The M6 Motorway (South of Junction 13, No. 2007/2304. - Enabling power: Road Traffic Regulation Staffordshire) (Temporary Restriction of Traffic) Act 1984, s. 14 (1) (a). - Made: 23.07.2007. Coming into Order 2007 No. 2007/2365. - Enabling power: Road force: 16.08.2007. Effect: None. Territorial extent & Traffic Regulation Act 1984, s. 14 (1) (a) (7). - Made: classification: E. Local Unpublished 27.07.2007. Coming into force: 03.08.2007. Effect: None. The M66 Motorway (Junction 2, Northbound Territorial extent & classification: E. Local Unpublished Carriageway) (No. 2) (Temporary Prohibition of The M11 Motorway (Junctions 4 - 7) (Temporary Traffic) Order 2007 No. 2007/2301. - Enabling power: Prohibition of Traffic) Order 2007 No. 2007/2348. - Road Traffic Regulation Act 1984, s. 14 (1) (a). - Made: Enabling power: Road Traffic Regulation Act 1984, s. 14 30.07.2007. Coming into force: 23.08.2007. Effect: None. (1) (a), sch. 9, para. 27 (1). - Made: 06.08.2007. Coming Territorial extent & classification: E. Local Unpublished into force: 14.08.2007. Effect: S.I. 2007/1531 revoked. Territorial extent & classification: E. Local Unpublished Road traffic, Wales The M42 Motorway (Junctions 3, 4, 5 and 6) (Entry Slip Roads) (Temporary Prohibition of Traffic) Order The Road Traffic (Permitted Parking Area and Special 2007 No. 2007/2363. - Enabling power: Road Traffic Parking Area) (County Borough of Wrexham) Order Regulation Act 1984, s. 14 (1) (a). - Made: 27.07.2007. 2008 No. 2008/226 (W.28). - Enabling power: Road Coming into force: 03.08.2007. Effect: None. Territorial Traffic Act 1991, sch. 3, paras 1 (1), 2 (1) 3 (3). - Issued: extent & classification: E. Local Unpublished 20.02.2008. Made: 05.02.2008. Laid before the National The M42 Motorway (Junctions 7 and 8) and the M6 Assembly for Wales: 06.02.2008. Coming into force: Motorway (Junction 5) (Temporary Prohibition of 01.03.2008. Effect: 1984 c.27; 1991 c.40 modified in Traffic) Order 2007 No. 2007/2361. - Enabling power: relation to the parking area specified. Territorial extent & Road Traffic Regulation Act 1984, s. 14 (1) (a). - Made: classification: W. General. - In English and Welsh. Welsh 27.07.2007. Coming into force: 03.08.2007. Effect: None. language title: Gorchymyn Traffig Ffyrdd (Ardal Barcio a Territorial extent & classification: E. Local Unpublished Ganiateir ac Ardal Barcio Arbennig) (Bwrdeistref Sirol Wrecsam) 2008. - 12p.: 30 cm. - 978-0-11-091706-1 £3.00 The M58 Motorway (Junction 5 Westbound Exit Slip Road) (Temporary Prohibition of Traffic) Order 2007 No. 2007/2300. - Enabling power: Road Traffic Regulation Road traffic, Wales: Speed limits Act 1984, s. 14 (1) (a). - Made: 18.07.2007. Coming into force: 22.07.2007. Effect: None. Territorial extent & The A487 Trunk Road (Synod Inn, Ceredigion) (50 classification: E. Local Unpublished mph Speed Limit) Order 2007 No. 2007/1687 (W.146). - The M60 Motorway (Junction 18 Eastbound Exit Slip Enabling power: Road Traffic Regulation Act 1984, s. 84 Road) and the M62 Motorway (Junction 18 Westbound (1) (2). - Made: 11.06.2007. Coming into force: Exit Slip Road) (Temporary Prohibition of Traffic) 15.06.2007. Effect: S.I. 2006/1079 (W.111) varied. Territorial extent & classification: W. Local. - In English Order 2007 No. 2007/2341. - Enabling power: Road and Welsh Unpublished Traffic Regulation Act 1984, s. 14 (1) (a). - Made: 31.07.2007. Coming into force: 29.08.2007. Effect: None. The A487 Trunk Road (Tremadog, Gwynedd) (40 Territorial extent & classification: E. Local Unpublished MPH Speed Limit) Order 2006 (Variation) Order 2007 The M61 J9/M65 J2 Motorways (Link Road to and No. 2007/1685 (W.144). - Enabling power: Road Traffic from Walton Summit Industrial Park) (Temporary Regulation Act 1984, ss. 84 (1) (2), 124, sch. 9, para. 27. - Made: 11.06.2007. Coming into force: 25.06.2007. Effect: Prohibition of Traffic) Order 2007 No. 2007/2302. - S.I. 2006/1079 (W.111) varied. Territorial extent & Enabling power: Road Traffic Regulation Act 1984, s. 14 classification: W. Local. - In English and Welsh (1) (a). - Made: 23.07.2007. Coming into force: Unpublished 16.08.2007. Effect: None. Territorial extent & classification: E. Local Unpublished Road traffic, Wales: Speed limits.
Recommended publications
  • Renewable & Low Carbon Energy Study
    Renewable and Low Carbon Energy Study Maslen Environmental Addendum Pendle Borough Council: January 2011 Following Pendle Council’s six-week public consultation1 on the findings of the Renewable and Low Carbon Energy Study (Maslen, 2010) the following comments should be noted when reading the study: Section 2.1.1 National Policy and European Context (Page 3) The planning Inspectorate will assume the role of the Infrastructure Planning Commission, following changes introduced in the Decentralisation and Localism Bill, 2010. Section 2.1.3 Local Policy Context (Page 10) In addition to Policy 19, the emerging Rossendale Core Strategy also includes Policy 20: Wind Energy, which sets out the criteria against which wind energy proposals will be assessed. Section 4.1.2 General Constraints (Page 21) The list under ‘Cultural Sensitivies’ should include a reference to ‘Historic Parks and Gardens’. Section 4.1.3 Considering Suitable Locations (Page 22) It should be noted that national policy on heritage assets is set out in Planning Policy Statement 5: Planning for the Historic Environment (PPS5) (Communities & Local Government, March 2010). Section 4.1.3 Considering Suitable Locations – Local Designations (Page 23) Consideration should also be given to ‘non designated heritage assets’ i.e. locally important, but not nationally designated, heritage resources. In some instances satisfactory mitigation of the impact of a proposal, on an environmental or cultural designation, may not be possible. In such cases an application may be refused. Section 4.2.3 Landscape – Wind Energy (Page 31) The Lancashire County Council Landscape Character Assessment has been informed by the historic landscape assessment of Lancashire carried out by the County Archaeology Service, which commenced in January 1999.
    [Show full text]
  • Pendle Park E-Brochure V2
    FORWARD THINKING BUSINESS WWW.PENDLEPARK.COM Pendle Park is a new commercial business park located of junction 13 (M65) Planning permission granted* for a major new logistics/manufacturing estate of 600,000 sq ft covering 55 acres. Phase 1 - 250,000 sq ft (units from 1,500 - 195,000 sq ft) Phase 2 - Up to 350,000 sq ft (approx.) FORWARD THINKING BUSINESS *Outline Planning Secured (B1,B2,B8). Alternative Uses (Subject to Planning). COMMERCIAL INDUSTRIAL PARK PENDLE JCT 13 PARK Pendle Park is a major, new, M65 employment site ofering industrial, manufacturing and logistics opportunities. The site can accommodate a single unit of upto 400,000 sq ft on a design and build basis. Phase I ofers a range of smaller units from 1,500-22,500 sq ft as well as 195,000 sq ft which will be ready for occupation in Q2 2022. PHASE 1 Phase 2 will ofer a range of build to suit opportunities up to 350,000 sq ft. A full design team is in place and ready to provide PHASE 2 schemes based on the specific requirements of occupiers. Pendle Park will benefit from a dedicated access of the A665 with new junction. WWW.PENDLEPARK.COM FORWARD THINKING BUSINESS PENDLE PARK © 2021 WWW.PENDLEPARK.COM COMMERCIAL INDUSTRIAL PARK M65 Jct 13 A6068 LOMESHAYE INDUSTRIAL ESTATE M65 Jct 12 PENDLE PARK © 2021 WWW.PENDLEPARK.COM COMMERCIAL INDUSTRIAL PARK J 13 B6249 A6068 A56 LOCATION M65 B6249 The site is situated immediately adjacent to Lomeshaye Industrial Estate which is a well established M65 industrial / logistics location.
    [Show full text]
  • 09.01.07 Transport Locality Assessment
    November 2020 Transport Locality Assessments Introductory Note and Assessments – Cross-boundary allocations GMSF 2020 Table of contents 1. Background 2 1.1 Greater Manchester Spatial Framework (GMSF) 2 1.2 Policy Context – The National Planning Policy Framework 3 1.3 Policy Context – Greater Manchester Transport Strategy 2040 5 1.4 Structure of this Note 9 2. Site Selection 10 2.1 The Process 10 2.2 Greater Manchester Accessibility Levels 13 3. Approach to Strategic Modelling 15 4. Approach to Technical Analysis 17 4.1 Background 17 4.2 Approach to identifying Public Transport schemes 18 4.3 Mitigations and Scheme Development 19 5. Conclusion 23 6. GMSF Allocations List 24 Appendix A - GMA1.1 Northern Gateway - Heywood / Pilsworth Locality Assessment A1 Appendix B - GMA1.2 Northern Gateway - Simister and Bowlee Locality Assessment B1 Appendix C - GMA2 Stakehill Locality Assessment C1 Appendix D - GMA3.1 Roundthorn Medipark Extension and GMA3.2 Timperley Wedge Locality Assessment D1 1 1. Background 1.1 Greater Manchester Spatial Framework (GMSF) 1.1.1 The GMSF is a joint plan of all ten local authorities in Greater Manchester, providing a spatial interpretation of the Greater Manchester Strategy which will set out how Greater Manchester should develop over the next two decades up to the year 2037. It will: ⚫ identify the amount of new development that will come forward across the 10 Local Authorities, in terms of housing, offices, and industry and warehousing, and the main areas in which this will be focused; ⚫ ensure we have an appropriate supply of land to meet this need; ⚫ protect the important environmental assets across the conurbation; ⚫ allocate sites for employment and housing outside of the urban area; ⚫ support the delivery of key infrastructure, such as transport and utilities; ⚫ define a new Green Belt boundary for Greater Manchester.
    [Show full text]
  • Lune Street, Padiham, Burnley, Lancashire, Bb12
    On behalf of N J Pask and R J Goode, Joint Fixed Charge Receivers FORMER SUPERMARKET LUNE STREET, PADIHAM, BURNLEY, LANCASHIRE, BB12 8DG SECURE INCOME INVESTMENT GUARANTEED BY CO-OP (12 YEARS UNEXPIRED) FORMER SUPERMARKET LUNE STREET, PADIHAM, BURNLEY, SECURE INCOME INVESTMENT LANCASHIRE, BB12 8DG GUARANTEED BY CO-OP INVESTMENT CONSIDERATIONS ■ Current rent of £179,885 per annum ■ We are instructed to seek offers in excess of £2,250,000 ■ Prominent town centre former supermarket investment (Two Million, Two Hundred and Fifty Thousand Pounds) subject ■ Fixed rental uplifts in June 2021 and ■ Situated in the attractive town of Padiham to contract and exclusive of VAT. This equates to an attractive June 2026, based on 2.25% per annum net initial yield of 7.52% after allowing for purchaser’s costs of ■ The unit comprises a total of 1,023.5 sq m (11,017 sq ft) compounded 5 yearly 6.33%. With the following guaranteed reversions: - of well configured floor space ■ Car parking for 80 cars Date Running Yield ■ Let for a further 12 years (no breaks) to the excellent ■ Freehold June 2021 8.40% covenant of Rochpion Properties (4) LLP, with Co-operative Group Limited as guarantor ■ Site area of 1.18 acres (0.48 hectares) June 2026 9.39% FORMER SUPERMARKET LUNE STREET, PADIHAM, BURNLEY, SECURE INCOME INVESTMENT LANCASHIRE, BB12 8DG GUARANTEED BY CO-OP A687 A65 A61 A19 LANCASTER A59 YORK LOCATION A658 M A65 O M6 A61 O ST Burnley is located in the county of Lancashire, 44 km (27 miles) to the Leeds A64 RRY R UA Bradford E A629 Q A6068 8 A1(M) LA 6 A19 north of Manchester, 17 km (11 miles) to the east of Blackburn and A585 60 E A N N LA E E V BLACKPOOL A59 PADIHAM LEEDS RYCLIFFE ST 48 km (30 miles) to the west of Bradford.
    [Show full text]
  • The M48 Motorway (Junctions 1-2)
    ROAD TRAFFIC: TRAFFIC REGULATION The M48 Motorway (Junctions 1-2) (Severn Bridge High Winds) The M62 Motorway (Junction 8 Westbound Entry Slip Road) (Temporary Restriction and Prohibition of Traffic) Order 2015 No. (Temporary Prohibition of Traffic) Order 2015 No. 2015/1256. - 2015/1228. - Enabling power: Road Traffic Regulation Act 1984, s. 14 Enabling power: Road Traffic Regulation Act 1984, s. 14 (1) (a). - (1) (b). - Issued: 26.03.2015. Made: 24.03.2015. Coming into force: Issued: 01.04.2015. Made: 25.03.2015. Coming into force: 12.04.2015. 28.03.2015. Effect: None. Territorial extent & classification: E. Local. - Effect: None. Territorial extent & classification: E. Local. - Available at Available at http://www.legislation.gov.uk/uksi/2015/1256/contents/made http://www.legislation.gov.uk/uksi/2015/1228/contents/made Non-print Non-print The M62 Motorway (Junction 23 to Junction 24) (Temporary The M50 Motorway (Junction 1 - Junction 4) (Temporary Prohibition of Traffic) Order 2015 No. 2015/1068. - Enabling power: Restriction and Prohibition of Traffic) Order 2015 No. 2015/1237. - Road Traffic Regulation Act 1984, s. 14 (1) (a). - Issued: 18.02.2015. Enabling power: Road Traffic Regulation Act 1984, s. 14 (1) (a). - Made: 05.02.2015. Coming into force: 16.02.2015. Effect: None. Issued: 20.04.2015. Made: 23.03.2015. Coming into force: 30.03.2015. Territorial extent & classification: E. Local. - Available at Effect: None. Territorial extent & classification: E. Local. - Available at http://www.legislation.gov.uk/uksi/2015/1068/contents/made http://www.legislation.gov.uk/uksi/2015/1237/contents/made Non-print Non-print The M62 Motorway (Junction 25 to Junction 26) (Temporary The M53 Motorway (Junctions 4-3 Northbound Carriageway and Prohibition of Traffic) Order 2015 No.
    [Show full text]
  • An Integrated Economic Strategy for Pennine Lancashire Pennine Lancashire Multi Area Agreement | Submission Draft Page A2
    Pennine Lancashire Multi Area Agreement | Submission Draft Appendix A An Integrated Economic Strategy for Pennine Lancashire Pennine Lancashire Multi Area Agreement | Submission Draft Page A2 Contents Executive Summary Section A – Introduction and context A1 Introducing the Integrated Economic Strategy – Pennine Lancashire Today – The Economic Context – The City Regions and the Regional Context – The Productivity and Prosperity Gap – The Pennine Lancashire Output Gap – Skills and Employment: The Fundamental Challenge A2 Pennine Lancashire SWOT analysis A3 The Strategic Framework: RES, LES, SNR A4 A vision for Pennine Lancashire in 2020 Section B – Policy Areas and Strategic Interventions The Strategic Imperative - Bridging the GVA gap B1 Productive and competitive businesses Analysis 1.0 Enterprise, employment, sectors Strategy 1.1 Developing an enterprise culture 1.2 Promoting growth sectors 1.3 Encouraging innovation 1.4 Growing the knowledge economy B2 Skills and training Analysis 2.0 Education, skills (L1-5), occupational profile, forecast change Strategy 2.1 Raising attainment at all levels 2.2 Investing in higher level skills 2.3 Addressing the graduate deficit Pennine Lancashire Multi Area Agreement | Submission Draft Page A3 B3 Economic inclusion and increasing participation Analysis 3.0 Multiple deprivation, worklessness, NEETS Strategy 3.1 Addressing worklessness 3.2 A healthy workforce B4 Regional connectivity and influence Analysis 4.0 Exploiting our proximity to growth centres Strategy 4.1 Promoting a skilled and mobile workforce
    [Show full text]
  • Parliamentary Debates (Hansard)
    Wednesday Volume 590 14 January 2015 No. 91 HOUSE OF COMMONS OFFICIAL REPORT PARLIAMENTARY DEBATES (HANSARD) Wednesday 14 January 2015 £5·00 © Parliamentary Copyright House of Commons 2015 This publication may be reproduced under the terms of the Open Parliament licence, which is published at www.parliament.uk/site-information/copyright/. 849 14 JANUARY 2015 850 tight process. I will publish the draft clauses before House of Commons 25 August—sorry, I mean 25 January, which is, incidentally, before 25 August. With 25 January being a Sunday, we Wednesday 14 January 2015 might even meet the deadline with a few days to spare. Angus Robertson: Until now, the UK Government’s The House met at half-past Eleven o’clock position has been to remove the right of Scottish householders to object to unconventional gas or oil drilling underneath their homes. What will the position PRAYERS be between now and the full devolution of powers over fracking? Will the Department of Energy and Climate [MR SPEAKER in the Chair] Change give an undertaking that it will not issue any fresh licences? Mr Carmichael: The position will be as it is at the Oral Answers to Questions moment, which is that if there is any fracking project in Scotland, the hon. Gentleman’s colleagues in the Scottish Government will have the power, using planning or environmental regulations, to block it. They should not SCOTLAND seek to push the blame on to anyone else. The Secretary of State was asked— 11. [906928] Cathy Jamieson (Kilmarnock and Loudoun) (Lab/Co-op): I welcome what the Secretary of State has Shale Gas said.
    [Show full text]
  • To Let / May Sell
    CHAMBERHALL TO LET / BUSINESS PARK MAY SELL HARVARD ROAD • BURY • BL9 0ES Block D - High quality Industrial / Warehouse units CHAMBERHALL11,000 to 33,000 sq ft (1,022 to 3,066 sq m) BUSINESS PARK Block D PHASE 1 3 UNITS REMAINING chamberhall.co.uk CHAMBERHALL A NEW BUSINESS LOCATION BUSINESS PARK MANCHESTER (9 MILES) A NEW BUSINESS M66 JUBILEE WAY LOCATION J2 CHAMBERHALL Chamberhall Business Park is Bury’s exciting new business location. A58 BUSINESS PARK BURY TOWN CENTRE In Phase 1, St. Modwen will deliver new, high quality industrial / warehouse accommodation in an A56 attractive landscaped setting over a range of sizes. Future development PEEL WAY plots will also be brought forward. WOODFIELDS BOLTON RETAIL PARK (5 MILES) Chamberhall is a quarter of a mile east of Bury Town Centre, and in easy walking distance of The Rock and Millgate shopping centres and the Metrolink, which provides services to Manchester at 6 minute intervals. Bury is approximately 5 miles East of Bolton, 6 miles South West Block D HARVARD ROAD of Rochdale and approximately 8 miles North West of Manchester City Centre. The borough of Bury is home to a diverse range of major employers such as JD Sports PLC, TNT UK, Polyfloor Ltd, Tetrosyl Ltd, Milliken UK, Thumbs Up UK, Wallwork Heat Treatment and William Hare. CHAMBERHALL PHASE 1 TOTALS 130,000 sq ft BUSINESS PARK HARVARD ROAD NORTH > CHAMBERHALL BUSINESS PARK LET/SOLD LET/SOLD Phase 2 – future development DUNSTER ROAD UNDER LET/SOLD OFFER Block D D1 D2 D4 D3 UNDER OFFER CASTLECROFT ROAD A56 MAGDALENE ROAD THE SCHEME ADDITIONAL BENEFITS OF THE SITE Chamberhall is a 17 acre site that will be developed Future phases are available to accommodate Reduced water bills Reduced business rates bills in a number of phases.
    [Show full text]
  • M65 to Yorkshire Corridor Study Stage 2: Option Development, Appraisal
    M65 to Yorkshire Corridor Study Stage 2: Option Development, Appraisal and Strategy Report July 2013 Document Control Sheet BPP 04 F8 Version 15 Project: M65 to Yorkshire Corridor Study Client: Lancashire County Council Project No: B1861600 Document title: Stage 2: Option Development, Appraisal and Strategy Report Ref. No: Originated by Checked by Reviewed by NAME NAME NAME ORIGINAL P Hibbert M Cammock A Spittlehouse NAME As Project Manager I confirm that the INITIALS Approved by above document(s) have been subjected to M Cammock Jacobs’ Check and Review procedure and that I approve them for issue MC DATE 17/04/13 Document status: Working Draft – First Issue REVISION NAME NAME NAME 1 P Hibbert M Cammock A Spittlehouse NAME As Project Manager I confirm that the INITIALS Approved by above document(s) have been subjected to M Cammock Jacobs’ Check and Review procedure and that I approve them for issue MC DATE 14/06/13 Document status: Draft REVISION NAME NAME NAME 2 P Hibbert M Cammock A Spittlehouse NAME As Project Manager I confirm that the INITIALS Approved by above document(s) have been subjected to M Cammock Jacobs’ Check and Review procedure and that I approve them for issue MC DATE 17/07/13 Document status: Final REVISION NAME NAME NAME NAME As Project Manager I confirm that the INITIALS Approved by above document(s) have been subjected to Jacobs’ Check and Review procedure and that I approve them for issue DATE Document status Jacobs U.K. Limited This document has been prepared by a division, subsidiary or affiliate of Jacobs U.K.
    [Show full text]
  • Liverpool City Region Superport
    /H`^HYKZ *VTTLYJPHS9LHS,Z[H[L:LY]PJLZ>VYSK^PKL Submission Document SD22 LIVERPOOL CITY REGION SUPERPORT AN ANALYSIS OF THE SUPPLY OF, AND DEMAND FOR, DISTRIBUTION SPACE WITHIN THE LIVERPOOL CITY REGION MarchT 2014 LIVERPOOL CITY REGION SUPERPORT 2 CONTENTS LIVERPOOL CITY REGION SUPERPORT Contents 1 Introduction .........................................................................................................8 1.1 Assets ..............................................................................................................................................8 1.2 Supply chain .................................................................................................................................. 10 1.3 Competition ................................................................................................................................... 10 1.4 Objectives ...................................................................................................................................... 11 2 Demand ..............................................................................................................12 2.1 Introduction ................................................................................................................................... 12 2.1.1 Shipper power ............................................................................................................................... 13 2.1.2 Retailer revolution .........................................................................................................................
    [Show full text]
  • Glebe Road, Skelmersdale Brochure
    FULLY REFURBISHED ENTER FOR SALE / MAY LET TWO ADJOINING PRODUCTION/WAREHOUSE UNITS 9,687 – 19,396 SQ FT GLEBE 16 & 49 GLEBE ROAD East Gilibrands Industrial Estate, Skelmersdale, Lancashire, WN8 9JP ROAD FULLY REFURBISHED WN8 9JP GLEBE ROAD M58 16 & 49 GLEBE ROAD East Gilibrands Industrial Estate, Skelmersdale, Lancashire, WN8 9JP GLEBE ROAD HOME AERIAL GILLIBRANDS ROAD LOCATION GLEBE ROAD DESCRIPTION ACCOMMODATION GALLERY A5068 GLENBURN ROAD M58 FURTHER INFORMATION JUNCTION 4 FOR SALE / MAY LET TWO ADJOINING PRODUCTION/ WAREHOUSE UNITS 9,687 – 19,396 SQ FT K I LL A5 7 7 LA LOCATION B A L A N 5 D G E FULLY REFURBISHED U 0 B A E 6 IR RO G S 8 EN A C CH GRE Glebe Road is strategically located close to TE H L O AN O E L L C ANE HUR Junctions 4 & 5 of the M58 Motorway, just 4 CH R O miles to the west of Junction 26 of the M6 A D B CHAPEL HOUSE GLEBE 5 Motorway and offers direct access to both the 3 1 SKELMERSDALE GLEBE 2 EET R TR H S regional and national motorway network. A H IG ROAD I L W A Y R 2 O GLEBE RD B Situated between Liverpool and Manchester, ROAD 531 A D 531 2 B G GR IL IMS L HAW R IB OAD Skelmersdale benefits from a purpose built R A N DS T RO A 16 & 49 GLEBE ROAD AD N road system linking well planned industrial H D ROA O L U OO East Gilibrands Industrial P S estates directly on to the motorway network.
    [Show full text]
  • Global Freight & Logistics
    SUPERPORT Global Freight & Logistics Hub Glasgow M8 Edinburgh M74 Newcastle Belfast M6 A1 Preston Bradford Liverpool Leeds IRELAND John Lennon M62 LIVERPOOL Airport Manchester Dublin Manchester Sheffield M56 International Airport M1 Stoke Nottingham M6 Derby Norwich Wolverhampton Birmingham Leicester Coventry A1 Cambridge M5 Northampton Felixstowe M40 NORTH Gloucester AND LATIN Swansea Oxford Luton AMERICA Cardiff M4 London Bristol M25 Southampton Brighton Plymouth MAINLAND EUROPE AND ASIA &DUERQ(IÀFLHQW&RVW(IIHFWLYH/RJLVWLFDO6HQVH 9LVXDOLVDWLRQRI0HUVH\*DWHZD\%ULGJH &217(176 SUPERPORT 1 SUPERPORT Developments 2 SUPERPORT Sites and Premises 3 Liverpool City Region 4 Long Term Vision 5 /LYHUSRROLQUHODWLRQWRJOREDOWUDGHURXWHV 9V[[LYKHT 30=,97663 -LSP_Z[V^L ;Z\NHY\ ;HP^HU:[YHP[ :H]HUUHO @\RH[HU :\La*HUHS +\IHP :OHUNOHP *OHUULS >PUK^HYK7HZZHNL :[YHP[VM 4VUH7HZZHNL /VYT\a 7HUHTH *HUHS :[YHP[VM )HI,S4HUKHI 4HSHJJH :\La9V\[L )HSIVH 4HRHZZHY :PUNHWVYL 3VTIVR ;VYYLZ *HWL9V\[L +\YIHU *HWLVM.VVK/VWL 4HNLSSHU7HZZHNL Executive Summary The £1billion investment in Liverpool of the UK from Birmingham of commercial and public sector SUPERPORT currently under way northwards – comprising over 30 stakeholders both within and beyond presents a generational opportunity million people and much of the UK’s the City Region. to place the port and surrounding manufacturing heartlands. logistics infrastructure at the heart of Liverpool SUPERPORT embodies business in the UK– creating a Global In order to redress that situation this ambition - encompassing local Freight
    [Show full text]