Conejo Recreation and Park District Alex Fiore Teen Center and Goebel

Total Page:16

File Type:pdf, Size:1020Kb

Conejo Recreation and Park District Alex Fiore Teen Center and Goebel Job Name: Alex Fiore Teen Center and Goebel Adult Center Job Number: 1642-01-RC19 TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS 01 4525 Testing, Adjusting, and Balancing For HVAC 01 5713 Temporary Erosion and Sediment Control DIVISION 02 - EXISTING CONDITIONS 02 4100 Demolition 02 4119 Selective Structure Demolition DIVISION 03 - CONCRETE 03 0000 Concrete Work-General 03 0516 Underslab Vapor Barrier - Stego 03 1000 Concrete Forming and Accessories 03 2000 Concrete Reinforcing 03 3000 Cast-in-Place Concrete 03 3511 Concrete Floor Finishes DIVISION 04 - MASONRY 04 2000 Unit Masonry DIVISION 05 - METALS 05 5000 Metal Fabrications 05 7513 Decorative Metal Perforated Panels DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES 06 1000 Rough Carpentry 06 2000 Finish Carpentry 06 4100 Architectural Wood Casework 06 8316 Fiberglass Reinforced Paneling DIVISION 08 - OPENINGS 08 0671 Door Hardware Schedule 08 1213 Hollow Metal Frames 08 1400 Wood Doors DIVISION 09 - FINISHES 09 0561 Common Work Results for Flooring Preparation 09 0562 Remedial Floor Coating 09 2116 Gypsum Board Assemblies 09 3000 Tiling 09 5100 Acoustical Ceilings 09 6429 Wood Strip and Plank Flooring 09 6500 Resilient Flooring 09 6813 Tile Carpeting 8/11/2021 5:01 PM Table of Contents Page 1 of 3 Job Name: Alex Fiore Teen Center and Goebel Adult Center Job Number: 1642-01-RC19 09 7819 Plastic Laminate Faced Paneling 09 9113 Exterior Painting 09 9123 Interior Painting 09 9750 Anti-Graffiti Coating DIVISION 10 - SPECIALTIES 10 2113.17 Phenolic Toilet Compartments 10 2233 Accordion Folding Partitions 10 2239 Folding Panel Partitions 10 2800 Toilet, Bath, and Laundry Accessories DIVISION 11 - EQUIPMENT 11 4000 Foodservice Equipment 11 4001 Custom Fabricated Foodservice Equipment 11 6833 Athletic Equipment DIVISION 12 - FURNISHINGS 12 3600 Countertops DIVISION 13 - SPECIAL CONSTRUCTION 13 3000 Shipping Container Sheds 13 3123 Pre-Engineered Fabric Tension Structures DIVISION 21 - FIRE SUPPRESSION 21 1300 Fire Sprinkler System DIVISION 22 - PLUMBING 22 0500 Common Work Results for Plumbing 22 0513 Basic Plumbing Materials and Methods 22 0553 Plumbing Identification 22 0700 Plumbing Insulation 22 1000 Plumbing DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC) 23 0500 COMMON WORK RESULTS FOR HVAC 23 0513 Basic HVAC Materials and Methods 23 0700 HVAC Insulation 23 3000 Air Distribution 23 3813 Kitchen Ventilation System 23 8000 Heating, Ventilating and Air Conditioning Equipment DIVISION 26 - ELECTRICAL 26 0126 Test and Acceptance Requirements 26 0500 Common Work Results for Electrical 26 0513 Basic Electrical Materials and Methods 8/11/2021 5:01 PM Table of Contents Page 2 of 3 Job Name: Alex Fiore Teen Center and Goebel Adult Center Job Number: 1642-01-RC19 26 0516 Medium-Voltage Cables, Splices and Terminations 26 0519 Low-Voltage Wires (600 VOLT AC) 26 0526 Grounding and Bonding 26 0533 Raceways, Boxes, Fittings, and Supports 26 0800 Electrical Systems Commissioning 26 0923 Lighting Control Systems 26 2416 Panelboards and Signal Terminal Cabinets 26 5010 Solid State (LED) Lighting 26 5617 Parking Lot LED Lighting DIVISION 31 - EARTHWORK 31 1000 Site Clearing 31 2200 Grading 31 2316 Excavation 31 2316.13 Trenching 31 2323 Fill DIVISION 32 - EXTERIOR IMPROVEMENTS 32 1123 Aggregate Base Courses 32 1300 Skate Park Structure Concrete Paving 32 1301 Shotcrete 32 1313 Concrete Paving 32 1413 Precast Concrete Unit Paving 32 1816.13 Playground Protective Surfacing 32 1820.00 Basketball Court Surfacing 32 3119 Decorative Metal Fences and Gates 32 3300 Site Furnishings 32 4000 Landscape Cobble 32 8423 Irrigation System 32 9223 Sodding 32 9300 Plants DIVISION 33 - UTILITIES 33 0110.58 Disinfection of Water Utility Piping Systems 33 1416 Site Water Utility Distribution Piping 33 3113 Site Sanitary Sewerage Gravity Piping 33 4211 Stormwater Gravity Piping 8/11/2021 5:01 PM Table of Contents Page 3 of 3 Job Name: Alex Fiore Teen Center and Goebel Adult Center Job Number: 1642-01-RC19 Section 01 4525 Section 01 4525 Testing, Adjusting, and Balancing For HVAC PART 2 PRODUCTS End of Section 01 4525 8/11/2021 5:12 PM 01 4525 - Testing, Adjusting, and Balancing For HVAC Page 1 of 2 Job Name: Alex Fiore Teen Center and Goebel Adult Center Job Number: 1642-01-RC19 Section 01 4525 8/11/2021 5:12 PM 01 4525 - Testing, Adjusting, and Balancing For HVAC Page 2 of 2 Job Name: Alex Fiore Teen Center and Goebel Adult Center Job Number: 1642-01-RC19 Section 01 5713 Section 01 5713 Temporary Erosion and Sediment Control PART 1 GENERAL 1.01 SECTION INCLUDES A. Prevention of erosion due to construction activities. B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities. C. Restoration of areas eroded due to insufficient preventive measures. D. Storm water pollution prevention and control related to construction activities. E. Performance bond. F. Compensation of CRPD for fines levied by authorities having jurisdiction due to non-compliance by Contractor. 1.02 RELATED REQUIREMENTS A. Section 31 1000 - Site Clearing: Limits on clearing; disposition of vegetative clearing debris. B. Section 31 2200 - Grading: Temporary and permanent grade changes for erosion control. 1.03 PERFORMANCE REQUIREMENTS A. Develop and follow an Erosion and Sedimentation Prevention Plan and submit periodic inspection reports. B. Do not begin clearing, grading, or other work involving disturbance of ground surface cover until applicable permits have been obtained; furnish all documentation required to obtain applicable permits. C. Provide to CRPD a Performance Bond covering erosion and sedimentation preventive measures only, in an amount equal to 100 percent of the cost of erosion and sedimentation control work. D. Timing: Put preventive measures in place as soon as possible after disturbance of surface cover and before precipitation occurs. E. Storm Water Runoff: Control increased storm water runoff due to disturbance of surface cover due to construction activities for this project. 1. Prevent runoff into storm and sanitary sewer systems, including open drainage channels, in excess of actual capacity or amount allowed by authorities having jurisdiction, whichever is less. 2. Anticipate runoff volume due to the most extreme short term and 24-hour rainfall events that might occur in 25 years. F. Erosion On Site: Minimize wind, water, and vehicular erosion of soil on project site due to construction activities for this project. 1. Control movement of sediment and soil from temporary stockpiles of soil. 2. Prevent development of ruts due to equipment and vehicular traffic. 3. If erosion occurs due to non-compliance with these requirements, restore eroded areas at no cost to CRPD. G. Erosion Off Site: Prevent erosion of soil and deposition of sediment on other properties caused by water leaving the project site due to construction activities for this project. 1. Prevent windblown soil from leaving the project site. 2. Prevent tracking of mud onto public roads outside site. 8/11/2021 5:13 PM 01 5713 - Temporary Erosion and Sediment Control Page 1 of 4 Job Name: Alex Fiore Teen Center and Goebel Adult Center Job Number: 1642-01-RC19 Section 01 5713 3. Prevent mud and sediment from flowing onto sidewalks and pavements. 4. If erosion occurs due to non-compliance with these requirements, restore eroded areas at no cost to CRPD. H. Sedimentation of Waterways On Site: Prevent sedimentation of waterways on the project site, including rivers, streams, lakes, ponds, open drainage ways, storm sewers, and sanitary sewers. 1. If sedimentation occurs, install or correct preventive measures immediately at no cost to CRPD; remove deposited sediments; comply with requirements of authorities having jurisdiction. 2. If sediment basins are used as temporary preventive measures, pump dry and remove deposited sediment after each storm. I. Sedimentation of Waterways Off Site: Prevent sedimentation of waterways off the project site, including rivers, streams, lakes, ponds, open drainage ways, storm sewers, and sanitary sewers. 1. If sedimentation occurs, install or correct preventive measures immediately at no cost to CRPD; remove deposited sediments; comply with requirements of authorities having jurisdiction. J. Open Water: Prevent standing water that could become stagnant. K. Maintenance: Maintain temporary preventive measures until permanent measures have been established. 1.04 SUBMITTALS A. See Article 9 of General Conditions - Submittals, for submittal procedures. B. Erosion and Sedimentation Control Plan: 1. Include: a. Site plan identifying soils and vegetation, existing erosion problems, and areas vulnerable to erosion due to topography, soils, vegetation, or drainage. b. Site plan showing grading; new improvements; temporary roads, traffic accesses, and other temporary construction; and proposed preventive measures. c. Where extensive areas of soil will be disturbed, include storm water flow and volume calculations, soil loss predictions, and proposed preventive measures. d. Schedule of temporary preventive measures, in relation to ground disturbing activities. e. Other information required by law. f. Format required by law is acceptable, provided any additional information specified is also included. 2. Obtain the approval of the Plan by authorities having jurisdiction. 3. Obtain the approval of the Plan by CRPD. C. Inspection Reports: Submit report of each inspection; identify each preventive measure, indicate condition, and specify maintenance or repair required and accomplished. PART 2 PRODUCTS PART 3 EXECUTION 3.01 EXAMINATION A. Examine site and identify existing features that contribute to erosion resistance; maintain such existing features to greatest extent possible. 3.02 PREPARATION A. Schedule work so that soil surfaces are left exposed for the minimum amount of time. 8/11/2021 5:13 PM 01 5713 - Temporary Erosion and Sediment Control Page 2 of 4 Job Name: Alex Fiore Teen Center and Goebel Adult Center Job Number: 1642-01-RC19 Section 01 5713 3.03 MAINTENANCE A. Inspect preventive measures weekly, within 24 hours after the end of any storm that produces 0.5 inches or more rainfall at the project site, and daily during prolonged rainfall.
Recommended publications
  • New Fayette County Prison Volume 2 Divisions 03
    SECTION 03 1000 CONCRETE FORMING AND ACCESSORIES PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of contract, including General and Supplementary Conditions and other Division 01 specification sections, apply to requirements of this Section. 1.02 SECTION INCLUDES A. Formwork for cast-in place concrete, with shoring, bracing and anchorage. B. Openings for other work. C. Form accessories. D. Form stripping. 1.03 RELATED REQUIREMENTS A. Section 03 2000 - Concrete Reinforcing. B. Section 03 3000 - Cast-in-Place Concrete. C. Section 04 2001 - Masonry Veneer: Spacing for veneer anchor reglets recessed in concrete. 1.04 REFERENCE STANDARDS A. ACI 117 - Specifications for Tolerances for Concrete Construction and Materials. B. ACI 301 - Specifications for Structural Concrete. C. ACI 318 - Building Code Requirements for Structural Concrete and Commentary. D. ACI 347R - Guide to Formwork for Concrete. E. ASTM B221 - Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes. F. ASTM B221M - Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric). G. PS 1 - Structural Plywood. 1.05 SUBMITTALS A. Shop Drawings: Indicate pertinent dimensions, materials, bracing, and arrangement of joints and ties. B. Designer's Qualification Statement. C. Design Data: As required by authorities having jurisdiction. 1.06 QUALITY ASSURANCE A. Designer Qualifications: Design formwork under direct supervision of a Professional Structural Engineer experienced in design of concrete formwork and licensed in the State in which the Project is located. 1.07 DELIVERY, STORAGE, AND HANDLING A. Deliver prefabricated forms and installation instructions in manufacturer's packaging.
    [Show full text]
  • USG Levelrock® 2500 Floor Underlayment Architectural Spec
    SECTION 03540 [03 54 13] ® Cementitious Underlayment LEVELROCK ™ 2500 Specification PART 1 - GENERAL ***Notes to Architect are highlighted in red**** 1.01 SUMMARY A. Description of Work: Work of this sections includes self leveling underlayment for interior finish flooring but is not limited to, the following: ® 1. LEVELROCK 2500™ Floor Underlayment covering normal project conditions and applications. 2. Division 3 Section “Concrete Toppings” applied over various substrates. 3. Division 9 Section sound control, patching, and leveling compounds applied with finish flooring. 1.02 REFERENCES A. ASTM C472 Compressive Strength B. ASTM C33 Sand Aggregate C. ASTM D4263 Standard test method for indicating moisture in concrete D. ASTM F2419 Standard test method for installation of thick poured Gypsum concrete and preparation of surface to receive resilient flooring E. ASTM E492 Impact Insulation Class (IIC) F. ASTM E90 Sound Transmission Class (STC) 1.03 RELATED WORK SPECIFIED ELSEWHERE A. See Section 9 for acceptable flooring materials including vinyl, tile, wood, and laminates. 1.04 SUBMITTALS A. Product Data: Submit manufacturer’s specifications and installation instructions with project conditions and materials clearly identified or detailed for each required product or system. B. Acoustical Data: Submit sound tests according to IBC code criteria ASTM E492 (IIC) and ASTM E90 (STC) 1. Submit in writing that all sound tests or data provided has been tested according to UL (Underwriters Laboratory) fire resistance design number. ® ™ Cementitious 03540 - 1 LEVELROCK 2500 Underlayment Floor Underlayment Updated 9/6/06 1.05 SYSTEM REQUIREMNETS A. Performance Requirements: ® 1. LEVELROCK 2500™ Floor Underlayment a. Minimum compressive strength 2,500 psi.
    [Show full text]
  • IJCIET), ISSN 0976 –AND 6308 (Print), ISSN 0976 – 6316(Online)TECHNOLOGY Volume 4, Issue (IJCIET) 3, May - June (2013), © IAEME
    INTERNATIONALInternational Journal of Civil JOURNAL Engineering OFand TechCIVILnology ENGINEERING (IJCIET), ISSN 0976 AND– 6308 (Print), ISSN 0976 – 6316(Online)TECHNOLOGY Volume 4, Issue (IJCIET) 3, May - June (2013), © IAEME ISSN 0976 – 6308 (Print) ISSN 0976 – 6316(Online) IJCIET Volume 4, Issue 3, May - June (2013), pp. 168-175 © IAEME: www.iaeme.com/ijciet.asp Journal Impact Factor (2013): 5.3277 (Calculated by GISI) © IAEME www.jifactor.com THE EFFECT OF GYPSUM COMPENSATIVE ON MORTAR COMPRESSIVE STRENGTH Alaa Abdul Kareem Ahmad Advanced Chief Engineer, College of Engineering, University of Al-Anbar,Al-Ramadi, Iraq. ABSTRACT The gypsum concrete is a new type of concrete and has its usage. This study aimed to know the effect of the gypsum on the compressive strength using 2 inch. or 50 mm cube specimen. They compensated 5%, 15% and 25% of the cement by the gypsum respectively for making six specimens for each treatment of the gypsum had been studied. Comparing their compressive strength at age (3) days and at age (7) days with a control mortar mix at the same ages. The results shown that the compressive strength for cement mortar is decrease whenever the compensated 5%, 15% and 25% of the cement by the gypsum 38.8%, 60.5% and 68.5% respectively for (3) days age specimens. The compressive strength for cement mortar is decrease whenever the compensated 5%, 15% and 25% of the cement by the gypsum 38.1%, 58.4% and 66.1% respectively for (7) days age specimens. Through that we determined the limitation of gypsum concrete in building works.
    [Show full text]
  • Proportioning the Key to Achieving a Strong, Durable Concrete Rests in the Careful Proportioning and Mixing of the Ingredients
    Wej-it Fastening Systems Technical Manual Note: the information and data contained herein was current as of November 2008. However, the material is subject to change and is updated as needed. Wej-it Fastening Systems reserves the right to change designs and specifications without notice or liability for such changes. Please contact Wej-it Fastening Systems or look us up on www.wejit.com for the most current data available. BASE MATERIAL CONCRETE In its simplest form, concrete is a mixture of paste and aggregates. The paste, composed of Portland cement and water, coats the surface of the fine and coarse aggregates. Through a chemical reaction called hydration, the paste hardens and gains strength to form the rock-like mass known as concrete. Within this process lies the key to a remarkable trait of concrete: it's plastic and malleable when newly mixed, strong and durable when hardened. These qualities explain why one material, concrete, can build skyscrapers, bridges, sidewalks, superhighways, houses and dams. Proportioning The key to achieving a strong, durable concrete rests in the careful proportioning and mixing of the ingredients. A concrete mixture that does not have enough paste to fill all the voids between the aggregates will be difficult to place and will produce rough, honeycombed surfaces and porous concrete. A mixture with an excess of cement paste will be easy to place and will produce a smooth surface; however, the resulting concrete is likely to shrink more and be uneconomical. A properly designed concrete mixture will possess the desired workability for the fresh concrete and the required durability and strength for the hardened concrete.
    [Show full text]
  • HA T·.Hesis Eubn:Lt.T:Ed L:1 Ra:R:I
    CALH'ORI:\IIA S'l'ATE UNIVERSITY 1 NORI'HIUDGE 'l'IIE HIS'l'ORY 0'"' CONCRB1'E FROH ROI-.!AN 'I'JJ,!E.S H TO 'l'HE EIGH'l.'BEl\!TH CEl\'l'URY A t·.hesis EUbn:Lt.t:ed L:1 ra:r:i:·.J..al sat:i.sfacti..on of the :t··f~(Jnix·enlC~!·~:.s fer t.£~·2 d.E:g~~c;e of X1la.st.er oE A.rt.s i~1 1\Tt hy Jum:>. 1979 The 'l'hes:i.s of Janet Irene Atkinson is approved: -;.=:----~-~r-------:.--r---:::_-.--.-~- -- -~ ~-'r. Rpqer [,_t,Jul_~.o •" Dr. Jean-LtlC Bordeaux. ---------~~·---· Dr. Donald S. Strong, Chairman -~~-----· California State University, Northrid<Jc ACKNOWLEDGMENTS I wish to thank my Father from whom I heard my first stories regarding concrete construction; Dr. Strong for his tireless patience; Charlotte Oyer, Librarian, loTho was able to locate many rare references; and Linda Hartman for t.yping this paper. iii TABLE OF' CONTENTS Page J~IST OF' ILLUSTRATIONS • v GLOSSARY viii ABSTRAC'r xvii INTRODUCTION . •. .. " . 1 Chapter I. THE :LEGl~CY OF' ROME 9 II. THE \1\JA:'NING OF' CONCRETE AECHITECTURE 46 III. THE REVIVAL OF CONCRE'rE IN EUROPEAN AECHITEC'lUHI~ 83 136 BIBLIOGRhPHY 146 iv LIST OF ILLUSTRATIONS Figure Page 1. Map . • . 6 .2. Specimen of Mortars from Egypt:, Greece, Italy and Cyprus, 18 65 . • . ~ • • • • 13 3. Map of Italy 18 4. "Example of Poured Concrete 24 5. Use of Iron in Antiquity 27 6. ~l'emple of Castor 30 7. 'I'emple of 117 B.C.
    [Show full text]
  • USG Rehabilitation Guidelines for Damaged Gypsum Underlayments Technical Guide (English)
    USG Tile & GUIDELINES Flooring Solutions USG REHABILITATION GUIDELINES FOR DAMAGED GYPSUM UNDERLAYMENTS POURED GYPSUM FLOORS IN The use of poured gypsum floors began in the early 1970s as a substitute for light-weight concrete. MULTI-FAMILY STRUCTURES The need for either gypsum or light-weight concrete is based on building codes that require all multi-family wood-frame buildings provide a one-hour fire rating. Both gypsum and light-weight concrete products act as a heat sink that in turn delivers a one- or two-hour rated assembly. Poured gypsum concrete is beneficial for a few reasons: 1. Reduction in thickness. Poured gypsum can be poured at a minimum of ¾ in. (19 mm) instead of the 1-1/2 in. (38 mm) that light-weight concrete requires. 2. Poured gypsum sets and develops strength very quickly which can allow trade traffic to resume in as little as one day. All multi-family structures must be designed in accordance with the requirements of Underwriters Laboratory (UL) for fire-resistance. UL has created a library of floor-ceiling assembly specifications that are used by architects and code bodies to identify the exact methodology needed to construct the floor-ceiling assembly. Therefore, it is imperative that any repair/rehabilitation performed on a multi-family dwelling conform to UL standards. This means that the minimum thickness of the poured gypsum underlayment must be maintained at no less than ¾ in. (19 mm) using a UL Classified product. There are no maximum thickness limits specified by UL. Gypsum floors are installed by adding water and sand to a specially formulated gypsum binder powder at the jobsite.
    [Show full text]
  • Heat-Insulating Gypsum Based Plaster Compositions
    Lyashenko, T.; Kersh, V.; Kolesnikov, A. Heat-insulating gypsum based plaster compositions 1. Introduction When developing lightened heat-insulating materials on the base of calcium sulphate (increasingly important in construction) the possibilities to introduce various lightweight aggregates and the limits of their content have been studied [1, 2]. The purpose of this particular study has been to develop the compositions for interior plaster coverings, with fine perlite as basic filler. It is known that entering of perlite grains (of low thermal conductivity) in gypsum matrix can significantly improve heat and sound insulation properties of the composite, with not only its density being lowered, but, unfortunately, its strength as well. To strengthen the composite a part of perlite could be replaced with cenospheres. These hollow alumina-silica microspheres (formed as a part of fly ash) are known [3-6] as efficient filler due to their form, waterproofness, low density and thermal conductivity. The preliminary experiments showed that certain dosages of metakaolin, plasticiser and latex could improve gypsum matrix, structure and properties of the composite. 2. Preliminary trials To determine the upper limit of the content of heat-insulating component the method of electro-thermal analogy was used in preliminary model experiments. The method helps to establish the proportions in "conductor − insulator" systems, at which the electrical conductivity changes abruptly; percolation conductivity jump takes place (or percolation resistance jump at certain content of insulator). The conductive media was modelled with carbon powder, lightweight filler particles served as the insulator. The estimated value of percolation threshold for perlite grains (and for cenospheres as well), near 80 volume percents (Fig.
    [Show full text]
  • Gypsum Powder Recycled from Waste Drywalls As a Partial Cement Replacement in Concrete
    GYPSUM POWDER RECYCLED FROM WASTE DRYWALLS AS A PARTIAL CEMENT REPLACEMENT IN CONCRETE by Sarah Kathleen Aubierge Hansen Submitted in partial fulfilment of the requirements for the degree of Master of Applied Science at Dalhousie University Halifax, Nova Scotia March 2020 © Copyright by Sarah Kathleen Aubierge Hansen, 2020 DEDICATION I would like to dedicate this thesis to my mother, Kathy, who always encourages me to be my best and shows me immeasurable love and support. ii TABLE OF CONTENTS List of Tables ............................................................................................................ vi List of Figures ......................................................................................................... vii Abstract .................................................................................................................... x List of Abbreviations and Symbols Used .................................................................. xi Acknowledgements.................................................................................................. xiii Chapter 1 Introduction ........................................................................................ 1 1.1 General ................................................................................................................ 1 1.2 Research Objectives ............................................................................................ 1 1.3 Thesis Structure .................................................................................................
    [Show full text]
  • Background Facts and Issues Concerning Cement and Cement Data
    Background Facts and Issues Concerning Cement and Cement Data By Hendrik G. van Oss Open-File Report 2005-1152 U.S. Department of the Interior U.S. Geological Survey ii U.S. Department of the Interior Gale A. Norton, Secretary U.S. Geological Survey P. Patrick Leahy, Acting Director For product and ordering information: World Wide Web: http://www.usgs.gov/pubprod Telephone: 1-888-ASK-USGS For more information on the USGS—the Federal source for science about the Earth, its natural and living resources, natural hazards, and the environment: World Wide Web: http://www.usgs.gov Telephone: 1-888-ASK-USGS Any use of trade, product, or firm names is for descriptive purposes only and does not imply endorsement by the U.S. Government. Although this report is in the public domain, permission must be secured from the individual copyright owners to reproduce any copyrighted material contained within this report. iii Preface This report is divided into two main parts. Part 1 first serves as a general overview or primer on hydraulic (chiefly portland) cement and, to some degree, concrete. Part 2 describes the monthly and annual U.S. Geological Survey (USGS) cement industry canvasses in general terms of their coverage and some of the issues regarding the collection and interpretation of the data therein. The report provides background detail that has not been possible to include in the USGS annual and monthly reports on cement. These periodic publications, however, should be referred to for detailed current data on U.S. production and sales of cement. It is anticipated that the contents of this report may be updated and/or supplemented from time to time.
    [Show full text]
  • Cast-In-Place Concrete 033000 - 1
    JAMESTOWN CSD Lincoln Elementary Alterations 73654.01 CAST-IN-PLACE CONCRETE 033000 - 1 SECTION 033000 - CAST-IN-PLACE CONCRETE PART_1_-_GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this section. 1.2 SUMMARY: A. Extent of cast-in-place concrete work is indicated on drawings and in provisions of this section. B. Concrete work includes, but is not limited to: 1. Footings & foundation walls. 2. Concrete slabs on ground as indicated on drawings. 3. Curing compound. 4. Slots, inserts, anchors, ties. 5. Preformed expansion joint fillers. 6. Set built-in items furnished by others. 7. Other concrete work indicated on drawings and/or specified therein (except as otherwise specified). 1.3 RELATED WORK: A. Excavating,_Filling_and_Grading as specified in Division 31. B. Concrete_Reinforcement as specified in another Division 3 section. C. Unit_Masonry as specified in Division 4. D. Structural_Steel as specified in Division 5. 1.4 QUALITY ASSURANCE: A. Use latest edition, including all addenda, revisions and supplements for all specifications, standards, and codes, referred to herein. B. Applicable Standards: 1. American Society for Testing Materials (ASTM): C-31 Making and Curing Concrete Test Specimens In the Field. C-33 Specification for Concrete Aggregates. C-39 Test for Compressive Strength of Cylinder Concrete Specimens. C-42 Obtaining and Testing Drilled Cores and Sawed Beams of Concrete. C-94 Specifications for Ready-Mixed Concrete. C-138 Test for Unit Weight, Yield and Air Content (Gravimetric) of Concrete. C-143 Test for Slump of Portland Cement Concrete.
    [Show full text]
  • Chapter Iud 53
    DEPT. OF INDUSTRY, LABOR & HUMAN RELATIONS 47 Structural Chapter Iud 53 STRUCTURAL REQUIREMENTS Ind 53.001 Floor, roof and side­ Ind 63.10 Non bear i ng masonry walk loads walls Ind 53.01 Wind pressure Ind 53.11 Cavity walls Ind 53.02 Foundations Ind 63.12 Bonding and anchor­ Ind 53.03 Masonry construction; ing stone and cast general requirement stone veneers Ind 53.04 Ashlar and rubble ma­ Ind 63.13 Parapet walls sonry Iud 63.14 Concrete requirements Ind 53.05 Building bricl{ Iud 63.16 Rei n for c e d gypsum Ind 63.06 Hollow building units concrete Ind 63.07 Allowable unit stresses Ind 63.16 Structural steel in masonry Ind 63.17 Steel joist construction Ind 53.08 Mortar and grout Ind 63.18 ,Vrougl1t Iron Ind 63.09 Bearing masonry walls, Ind 63.19 Cast iron bearing partitions aud Ind 53.20 Wood construction piers Ind 53.001 Floor, roof and sidewalk loads. (1) DEAD LOADS. All buildings and structures, and parts thereof, shall be designed and constructed to support in addition to the minimum superimposed live loads specified in this section, the actual dead weight of all component members; and in addition thereto, an allowance for the weight of partitions, ceiling and floor finish, and concentrated loads such as safes, mechanical apparatus and similar equipment. (2) LIVE LOADS. All buildings and structures, and parts thereof, shall be designed and constructed to support the following minimum superimposed live loads uniformly distributed in pounds per square foot of horizontal area in addition to the dead load: (a) Theaters and assembly halls with fixed seats: 1.
    [Show full text]
  • Usg Securock™ Brand Gypsum-Concrete Patch (Formerly Pyrofill®)
    USG R o o fi n g SUBMITTAL SHEET Solutions USG SECUROCK™ BRAND GYPSUM-CONCRETE PATCH (FORMERLY PYROFILL®) Great for repairing poured-in-place roof decks such as gypsum roof decks and lightweight insulating concrete surfaces. • Durable: over 500 psi compressive strength • Fast installation • Noncombustible • Feather-edge where needed DESCRIPTION USG Securock™ Brand Gypsum-Concrete Patch is mill formulated and composed of specially calcined gypsum and wood chips or shavings. It is mixed at the job site with clean water only and poured in place as a patch for existing gypsum decks. USG Securock Gypsum-Concrete Patch is noncombustible and used in several UL-approved roof deck systems. ADVANTAGES Exceptional Strength: Engineered to provide over 500 psi of compressive strength that will accept foot traffi c and fasteners within four hours of application. Fire Performance: USG Securock Gypsum-Concrete Patch is a noncombustible material that provides excellent fi re performance and is used in several UL-approved roof deck systems. Versatile: Can be used as a patch in many roof decks such as gypsum, vermiculite concrete, perlite concrete and cellular foam concrete. LIMITATIONS • Protect from moisture in storage and on the job. • Close open bags as tightly as possible; discard compromised or old open bags. • Not to be applied over moist or wet surfaces. • Must be protected from direct exposure to moisture after installed. • Shelf life of six months under protected storage conditions. INSTALLATION • Keep all equipment clean. • Use only clean water for mixing: do not add sand, aggregate or any other material. • Deck must be structurally sound and free from debris or contaminants that might prevent proper bonding of USG Securock Gypsum-Concrete Patch.
    [Show full text]