New Melones Lake Area Resource
Total Page:16
File Type:pdf, Size:1020Kb
6218 Federal Register / Vol. 75, No. 25 / Monday, February 8, 2010 / Notices DEPARTMENT OF THE INTERIOR this notice, to solicit input from implemented and will discuss all factors potentially impacted groups and leading to the decision. National Park Service organizations. ADDRESSES: Send requests for a compact Public Availability of Comments: disc or a bound copy of the Final RMP/ Notice of Availability of Draft Director’s Before including your address, phone EIS to Melissa Vignau, Natural Order Concerning National Park number, e-mail address, or other Resources Specialist, Bureau of Service (NPS) Policies and Procedures personal identifying information in your Reclamation, 7794 Folsom Dam Road, for Recovering Costs Associated With comment, you should be aware that Folsom, CA 95630, or telephone: 916– Providing Utility Services to Non-NPS your entire comment—including your 989–7182. Copies of the Final RMP/EIS Users personal identifying information—may will be available for review at: http:// AGENCY: National Park Service, be made publicly available at any time. www.usbr.gov/mp/nepa/ Department of the Interior. While you can ask us in your comment nepa_projdetails.cfm?Project_ID=2536. See SUPPLEMENTARY INFORMATION ACTION: Modification to notice of to withhold your personal identifying availability (re-opening of public information from public review, we Section for locations where copies of the comment period). cannot guarantee that we will be able to Final RMP/EIS are available for public do so. review. SUMMARY: The National Park Service is Dated: December 9, 2009. FOR FURTHER INFORMATION CONTACT: proposing to adopt a Director’s Order Stephen E. Whitesell, Melissa Vignau, Natural Resources setting forth the policies and procedures Associate Director, Park Planning, Facilities, Specialist, Bureau of Reclamation, at under which the NPS will recover and Lands. 916–989–7182 or Dan Holsapple, Acting New Melones Resource Manager, expenses for providing utilities to non- [FR Doc. 2010–2234 Filed 2–5–10; 8:45 am] NPS entities. These expenses include, Bureau of Reclamation, at 209–536– BILLING CODE P but are not limited to, annual operating 9094. costs, cyclical repair and rehabilitation SUPPLEMENTARY INFORMATION: This costs, and capital investment cost. 16 DEPARTMENT OF THE INTERIOR planning activity encompasses U.S.C. lb(4) provides authority for the approximately 30,000 acres of publicly NPS to furnish ‘‘on a reimbursement of Bureau of Reclamation accessible water and land owned and appropriation basis, all types of utility managed by Reclamation. The RMP, services to concessioners, contractors, New Melones Lake Area Resource which will replace the New Melones permittees, or other users of such Management Plan, Tuolumne and Lake Area Master Plan of 1976, will be services, within the National Park Calaveras Counties, CA the primary management document for System’’. The Director’s Order provides AGENCY: Reclamation’s New Melones Lake Area, policies and procedures for consistent Bureau of Reclamation, Interior. providing a defined purpose, vision, application of this guidance throughout long-term goals, and management ACTION: the National Park Service. Notice of availability of the guidelines. It will be used by DATES: In recognition of obstacles Final Resource Management Plan/ Reclamation as a framework for guiding imposed by the presence of two major Environmental Impact Statement (RMP/ decision-making related to future holidays within the original public EIS). development potential, on-going comment period, and to ensure full SUMMARY: Pursuant to the National management, public health and safety, participation by all concerned entities, Environmental Policy Act of 1969 (as and public use of the New Melones Lake the period for acceptance of written amended), the Bureau of Reclamation Area. comments has been re-opened. The RMP attempts to enhance and (Reclamation) has made available for Comments will be accepted until March expand the recreation opportunities public review a Final RMP/EIS for the 6, 2010. All comments submitted while also providing more active New Melones Lake Area. The Final between the close of the initial comment protection and management of natural RMP/EIS describes and presents the period and the re-opening of the and cultural resources. The RMP is environmental effects of four comment period will be considered. intended to be implemented over an alternatives, including no action, for extended period as determined by both ADDRESSES: Draft Director’s Order #35B future use of the project area for user demand and need. To do so, the is available on the Internet at http:// recreation and resource protection and RMP provides goals and guidelines www.nps.gov/policy/DO–35Bdraft.htm. management. relating to natural, cultural and visual Requests for copies of, and written A Notice of Availability of the joint resources, water quality, circulation, comments on, the Director’s Order Draft RMP/EIS was published in the visitor services, interpretation and should be sent to Tim Harvey, Chief, Federal Register on November 2, 2009 operations. Park Facility Management Division, (74 FR 56656). The written comment 1849 C Street, NW., Washington, DC The EIS is a program-level analysis of period on the Draft RMP/EIS ended on the potential environmental impacts 20240, or to his Internet address: tim January 4, 2010. The Final RMP/EIS [email protected]. associated with adoption of the RMP. contains responses to all comments The RMP is intended to be FOR FURTHER INFORMATION CONTACT: Tim received and reflects comments and any predominantly self-mitigating through Harvey at (202) 513–7044. additional information received during implementation of RMP policies and SUPPLEMENTARY INFORMATION: When the the review period. management strategies, and the EIS will NPS adopts documents containing new DATES: Reclamation will not make a also include measures intended to policy or procedural requirements that decision on the proposed action until at reduce the adverse effects of the RMP. may affect parties outside the NPS, the least 30 days after release of the Final Copies of the Final EIS are available documents are first made available for RMP/EIS. After the 30-day waiting for public review at the following public review and comment before period, Reclamation will complete a locations: being adopted. A number of contacts Record of Decision (ROD). The ROD will • Bureau of Reclamation, Central have been made, prior to the issuance of state the action that will be California Area Office, New Melones VerDate Nov<24>2008 11:51 Feb 05, 2010 Jkt 220001 PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 E:\FR\FM\08FEN1.SGM 08FEN1 WReier-Aviles on DSKGBLS3C1PROD with NOTICES Federal Register / Vol. 75, No. 25 / Monday, February 8, 2010 / Notices 6219 Lake Office, 6850 Studhorse Flat Road, North, Range 79 West, of the Sixth Township 41 North, Range 117 West, Sonora, California 95370. Principal Meridian, Wyoming, Group Sixth Principal Meridian, Wyoming, • City of Angels Camp, City Hall, S. No. 791, was accepted October 9, 2009. Group No. 652, was accepted January Main Street, Angels Camp, CA 95222. The supplemental plat showing a 13, 2010. • Calaveras Planning Department, subdivision of certain sections, The plat and field notes representing Calaveras County Government Center, Township 54 North, Range 79 West, the dependent resurvey of a portion of 891 Mountain Ranch Road, San Sixth Principal Meridian, Wyoming, the Third Standard Parallel North, Andreas, CA 95249. was accepted October 9, 2009, and is through Range 77 West, and a portion of • San Andreas Central Library, 1299 based upon the plat accepted April 20, the subdivisional lines, and the Gold Hunter Road, San Andreas, CA 1949. subdivision of sections 22, 27 and 34, 95249. The plat and field notes representing Township 13 North, Range 77 West, • Tuolumne County Administrator’s the dependent resurvey of a portion of Sixth Principal Meridian, Wyoming, Office, Administration Building, 2 the north boundary, and the Group No. 747, was accepted January South Green St., 4th Floor, Sonora, CA subdivisional lines, Township 18 North, 13, 2010. 95370. Range 92 West, of the Sixth Principal • The plat and field notes representing Sonora Main Branch Library, 480 Meridian, Wyoming, Group No. 792, the dependent resurvey of a portion of was accepted October 9, 2009. Greenley Rd, Sonora, CA 95370. the east boundary, the west and north The plat and field notes representing Before including your name, address, boundaries and a portion of the phone number, e-mail address, or other the dependent resurvey of portions of the west boundary and subdivisional subdivisional lines, Township 55 North, personal identifying information in any Range 79 West, Sixth Principal correspondence, you should be aware lines, and the subdivision of certain sections, Township 16 North, Range 86 Meridian, Wyoming, Group No. 790, that your entire correspondence was accepted January 13, 2010. including your personal identifying West, of the Sixth Principal Meridian, The supplemental plat showing a information, may be made publicly Wyoming, Group No. 626, was accepted subdivision of certain sections, available at any time. While you can ask October 9, 2009. Township 55 North, Range 79 West, us in your correspondence to withhold The plat and field notes representing Sixth Principal Meridian, Wyoming, your personal identifying information the dependent resurvey of a portion of was accepted January 13, 2010, and is from public review, we cannot the south boundary