Report on Solid Waste Management in the Urban Local Bodies in

in pursuance of orders of Honourable National Green Tribunal (NGT) dated 15/01/2015 Submitted by Commissioner cum Secretary, H&UD Department, Government of Odisha

Government of Odisha Housing and Urban Development Department

Action Plan for SWM in ULBs of Odisha 2

Contents 1 Current status ...... 7 1.1 Background ...... 7 1.2 Current Status ...... 8 1.3 Site Authorisation for SWM Projects ...... 8 2 Initiatives for SWM Implementation in Odisha ...... 9 2.1 State Government initiative ...... 9 2.1.1 Octroi Grant & Budgetary Support ...... 9 2.1.2 State Plan for MSW ...... 9 2.1.3 12th Finance Commission Grant ...... 9 2.2 PPP initiatives ...... 10 2.3 Integrated Coastal Zone Management Project (ICZMP) Initiatives ...... 11 2.4 Odisha Urban Infrastructure Development Fund (OUIDF) initiatives ...... 11 2.5 Initiative for ...... 13 2.6 On-going Initiatives by some ULBs ...... 13 2.6.1 Composting Plant-NALCO and Jindal Townships ...... 13 2.6.2 TSU- Municipal Corporation ...... 13 2.7 Potential ULBs for CSR initiatives ...... 13 2.8 Other Initiatives ...... 14 2.8.1 Technical Assistance -DFID ...... 14 2.8.2 Project e-Municipality Programme ...... 14 2.9 Swachh Bharat Initiative ...... 14 3. Proposed Strategic Intervention ...... 17 3.1. Door to door collection of MSW and segregation at source ...... 17 3.2. Transportation of MSW to the processing site in a scientific manner ...... 20 3.3. Processing of MSW in a scientific manner ...... 20 3.4. Disposal through common Sanitary Landfill Sites (SLF) ...... 20 3.5. Reclamation of old dumps ...... 21 3.6. Provision of safety equipment ...... 21 3.7. Involvement of rag pickers and Khabadiwallahs ...... 21 3.8. Involvement of NGOs, Self Help Groups and Community Participation ...... 22 3.9. Enforcement of MSW Rules 2000 ...... 22 4. Investment Plan and cost recovery ...... 23

Action Plan for SWM in ULBs of Odisha 3

4.1. Project Cost and Means of Finance ...... 23 4.2. Proposed Capital Expenditure-Year Wise ...... 23 4.3. User charges and O&M costs ...... 23 4.4. Proposed Consolidated Cost-Year Wise ...... 24

Action Plan for SWM in ULBs of Odisha 4

Annexures

1. Urban Map of Odisha 2. Details of the ULBs Cluster Wise 3. Details of the ULBs Standalone 4. Proposed user charges for SWM services by Bhubaneswar Municipal Corporation Concept Note on State Urban Sanitation Strategy for the State of Odisha – Part A, Part B, 5. Part C

Annexure 2- List of Clusters

1 , BRAJRAJNAGAR, 2 , VYASANAGAR 3 , 4 , ATHAGARH 5 ATABIRA, & 6 , , 7 KHURDA, JATNI, &BHUBANESHWAR , GOPALPUR, CHATRAPUR, , 8 9 ASKA, KABI SURYA NAGAR, PURUSOTAMPUR & HINJLICUT 10 PARALAKHEMENDI, KASINAGAR 11 , & BURLA 12 SORO, BASUDEVPUR 13 SONEPUR &

Annexure 3- List of ULBs

1 MUNICIPALITY, DIST-KEOJHARGARH, ODISHA 2 MUNICIPALITY, DIST-ANGUL, ORISSA 3 ATHAMALLIK NAC, DIST- ANGUL, ORISSA 4 NAC, DIST-, ORISSA 5 NAC, DIST-KHURDA, ORISSA 6 BANKI NAC, DIST-CUTTACK, ORISSA 7 NAC, DIST-KHURDA, ORISSA 8 NAC, DIST-, ORISSA 9 NAC, DIST-GANJAM, ORISSA 10 NAC, DIST-DHENKANAL, ORISSA 11 NAC, DIST-SUBARNAPUR, ORISSA 12 BOUDHGARH NAC, DIST-, ORISSA 13 NAC, DIST GANJAM-, ORISSA 14 MUNICIPALITY, DIST-BALASORE, ORISSA 15 MUNICIPALITY, DIST-MAYURBHANJ, ORISSA 16 MUNICIPALITY, DIST-BHADRAK, ORISSA 17 MUNICIPALITY, DIST-KALAHANDI, ORISSA

Action Plan for SWM in ULBs of Odisha 5

18 MUNICIPALITY, DIST-, ORISSA 19 BOLANGIR MUNICIPALITY, DIST-BOLANGIR, ORISSA 20 MUNICIPALITY, DIST-CUTTACK, ORISSA 21 DEOGARH MUNICIPALITY, DIST- DEOGARH, ORISSA 22 G.UDAYAGIRI NAC, DIST-, ORISSA 23 GANJAM NAC, DIST-GANJAM, ORISSA 24 GUDARI NAC, DIST-, ORISSA 25 GUNPUR NAC, DIST-RAYAGADA, ORISSA 26 MUNICIPALITY, DIST- JAGATSINGHPUR, ORISSA 27 NAC, DIST-BALASORE, ORISSA 28 JUNAGARH NAC, DIST-KALAHANDI, ORISSA 29 KEONJHARGARH MUNICIPALITY, DIST-KEONJHAR, ORISSA 30 KAMAKSHYANAGAR NAC, DIST-DHENKANAL, ORISSA 31 NAC, DIST-, ORISSA 32 NAC, DIST-MAYURBHANJA, ORISSA 33 NAC, DIST-KALAHANDI, ORISSA 34 NAC, DIST-GANJAM, ORISSA 35 KHANDAPARA NAC, DIST-, ORISSA 36 ROAD NAC, DIST-, ORISSA 37 KHARIAR NAC, DIST- NUAPADA, ORISSA 38 NAC, DIST-GANJAM, ORISSA 39 NAC, DIST-PURI, ORISSA 40 NAC, DIST-KORAPUT, ORISSA 41 NAC, DIST-SAMBALPUR, ORISSA 42 MUNICIPALITY, DIST-KENDRAPARA, ORISSA 43 MALKANAGIRI NAC, DIST-MALKANAGIRI, ORISSA 44 NAWARANGPUR MUNICIPALITY, DIST-NAWARANGPUR, ORISSA 45 NAYGARH NAC, DIST-NAYAGARH, ORISSA 46 NAC, DIST-BALASORE, ORISSA 47 NIMAPARA NAC, DIST-PURI , ORISSA 48 MUNICIPALITY, DIST-JAGATSINGHPUR, ORISSA 49 PHULBANI MUNICIPALITY, DIST-PHULBANI, ORISSA 50 PURI MUNICIPALITY, DIST-PURI, ORISSA 51 PADAMPUR NAC, DIST-BARGARH, ORISSA 52 NAC, DIST-BALANGIR, ORISSA 53 NAC, DIST-KENDRAPARA, ORISSA 54 NAC, DIST-PURI , ORISSA 55 NAC, DIST-GANJAM, ORISSA 56 MUNICIPALITY, DIST-SUNDERGARH, ORISSA 57 RAYAGADA MUNICIPALITY, DIST-RAYAGADA, ORISSA 58 MUNICIPAL CORPORATION, DIST-SUNDERGARH, ORISSA 59 RAIRANGAPUR NAC, DIST-MAYURBHANJA, ORISSA 60 NAC, DIST-GANJAM, ORISSA 61 REDHAKHOL NAC, DIST-SAMBALPUR, ORISSA 62 SUNDERGARH MUNICIPALITY, DIST-SUNDERGARH, ORISSA 63 SURUDA NAC, DIST-GANJAM, ORISSA

Action Plan for SWM in ULBs of Odisha 6

64 MUNICIPALITY, DIST-ANGUL, ORISSA 65 NAC, DIST-BOLANGIR, ORISSA 66 UDALA NAC, DIST-MAYURBHANJA, ORISSA 67 NAC, DIST-NAWRANGPUR, ORISSA 68 RECENTLY FORMED NACS – NUAPADA, ATABIRA, HINDOL, TUSURA, DHARMGARH, DASPALA, RANPUR

Abbreviations

DPR Detailed Project Report CPHEEO Central Public Health and Environmental Engineering Organisation ECI Empowered Committee on Infrastructure GoI Government of

GoO Government of Odisha HPEC High Powered Expert Committee H&UD Housing and Urban Development

ICZMP Integrated Coastal Zone Management Project IEC Information, Education and Communication IFC International Finance Corporation MoUD Ministry of Urban Development MSW Municipal Solid Waste MT Metric Tonne NAC Notified Area Council NARC National Advisory Review Committee NGO Non-Governmental Organisation OUIDF Odisha Urban Infrastructure Development Fund PPP Public Private Partnership RDF Refuse Derived Fuel SBM Swachh Bharat Mission SHG Self Help Group SLF Sanitary Land Fill SWM Solid Waste Management TPD Tonnes Per Day ULB Urban Local Body

Action Plan for SWM in ULBs of Odisha 7

1 Current status

1.1 Background Solid waste is the unwanted or useless solid materials generated from combined residential, industrial and commercial activities in a given area. It may be categorized according to its origin (domestic, industrial, commercial, construction or institutional); according to its contents (organic material, glass, metal, plastic paper etc.); or according to hazard potential (toxic, non-toxin, flammable, radioactive, infectious etc.). Management of solid waste reduces or eliminates adverse impacts on the environment and human health and supports economic development and improved quality of life. A number of processes are involved in effectively managing waste for a municipality. These include source-segregation, door-to-door collection, collection from community bins, transportation, processing, recycling and disposal. Solid Waste Management is one of the key functions of the ULBs. The management and disposal of MSW is not satisfactory across towns and cities in India. The HPEC Report on Indian Urban Infrastructure and Services prepared under guidance of Dr. Isher Judge Ahluwalia, Chairperson, Indian Council for Research on International Economic Relations presents the status on compliance with MSW Rules 2000 in India as given below.

Solid Waste Management Report Card %

Primary collection 38

Segregation of recyclables 72

Transportation 52

Processing 09

Disposal 01

Across towns and cities in India, neither the households nor the municipal authorities practice segregation of biodegradable waste from the rest, and public awareness on the benefits of segregation is low. The collection of the garbage from dump-sites is infrequent, processing is not done in most cases, and disposal rules are not followed more in the breach. According to MoUD, GoI scientific disposal of waste is almost never practiced. The scenario in Odisha is no different from the rest of the country. Odisha has a total population of 4.2 Crore, as per Census 2011. There are 111 Urban Local Bodies in Odisha comprising of 5 Municipal Corporations, 45Municipalities and 61 Notified Area Councils in the state with a total population of 59.8 lakhs accounting for about 14%of the total population of the State. The urban map of Odisha is given in Annexure-1 & details of ULBs are given in Annexure –2& 3).These ULBs generate approximately 1800 TPD of municipal waste. The MSW generated in these ULBs are not managed properly resulting in degradation of the environment. Efficient MSW management is essential in maintaining hygienic conditions leading to: . Lesser health issues of the inhabitants . Better living environment . Improved economic prosperity . Cleaner surroundings with cleaner drains for storm water flow . Cleaner water sources and safer neighborhoods

Action Plan for SWM in ULBs of Odisha 8

1.2 Current Status In most of the ULBs in Odisha, until very recently, collection of MSW from market places and community bins, street sweeping, bush cutting and drain cleaning, transportation and disposal at the dump yard had been carried out by ULBs on their own. However, started with the Bhubaneswar Municipal Corporation and being replicated in many other towns of the state for about last five years door to door collection of waste and all aforesaid activities are carried out more efficiently by involving SHGs, NGOs and by engaging private operators. It has been a gradual transition from fully ULB-operated sanitation to mix of ULB and Public-Private-Community Participation model. However, scientific disposal is yet to occur and the waste is dumped at the dump yard without any processing or treatment. This has led to environmental degradation, air pollution, ground water table pollution and poses grave health hazards. MSW Rules 2000 designates the Urban Local Bodies as solely responsible to manage solid waste in their area and dictates that “within the territorial area of the municipality, be responsible for the implementation of the provisions of these rules, and for any infrastructure development for collection, storage, segregation, transportation, processing and disposal of municipal solid wastes”. However, the ULBs of Odisha are yet to fully comply with MSW Rules 2000. Among all the ULBs of the state, Puri is the first town to have arrangements since 1998 for scientist disposal and mechanized processing of solid waste in to bio-fertilizer in a scientific manner. Under the Indo-Norwegian Development Corporation support and with the active participation of Govt. of Odisha, a 100 TPD bio-compost plant has been operational in Puri. This initiative assumes importance since Puri is the District headquarters and prime pilgrimage and tourist centre of Odisha. A private firm is engaged to manage the plant. But this plant is facing difficulty for lack of source segregation of the MSW.

1.3 Site Authorisation for SWM Projects State Government has initiated various steps for implementation of integrated Solid Waste Management projects in various ULBs as per MSW Rules 2000. As a first step towards it, land was allotted to ULBs to gradually implement the SWM project involving processing of bio- degradable and scientific disposal of processed and inert non-recyclable waste. Most of the ULBs have provided approach road to the sites and have secured the site with a compound wall. However, processing facility has not been set up in any of the ULBs. The waste is dumped in the site without processing and scientific land fill. At present, 100% of the sanitation budget is utilized only for collection and transportation. Many of the ULBs have obtained site authorization from Pollution Control Board for setting up processing plant and sanitary land fill. At present, waste is directly dumped in these sites without processing. The summary of status of site authorization is given below. Site Authorization No. of ULBs No. of ULBs to whom authorization granted 70 No. of ULBs having valid authorization 38 . No. of ULBs who have applied for renewal of authorization 13 . No. of ULBs not applied for renewal 19 No. of ULBs whose applications are under consideration for grant of 12 authorization (new) No. of ULBs to whom authorization refused 1 No. of ULBs not applied for authorization 25 Total 108 Total no. of ULBs (Dhamnagar NAC, Champua NAC and Baliguda 111 NAC have been constituted recently)

Action Plan for SWM in ULBs of Odisha 9

2 Initiatives for SWM Implementation in Odisha

2.1 State Government initiative

2.1.1 Octroi Grant & Budgetary Support In Odisha, Octroi Compensation Grant is the main stay for the ULBs to meet expenditure on salary personnel, contribution to CPF, repayment of loan, electricity and water charges and sanitation including solid waste management. In practice, the ULBs spend about 40% of the octroi grant on O&M cost of SWM services. The octroi grant disbursed to ULBs in the last 8 years is given below.

07 08 09 10 11 12 13 14

15*

------Year -

2006 2007 2008 2009 2010 2011 2012 2013

2014

Octroi Grant (Rs. Cr.) 143 171 206 233 259 279 307 338 500

Approx. amount of Octroi Grant spent on SWM 57 69 82 93 103 112 123 135 200 services (Rs. Cr.) *Budgeted amount As mentioned earlier, collection and transportation of MSW is carried out by ULB on its own or by engaging private operators or a combination of both. About 60% of the wards are outsourced and balance managed by ULBs. ULBs employ over 4500 sanitary workers for SWM services.

2.1.2 State Plan for MSW Year Fund disbursement under State Plan 2010 - 11 1.00 Cr. 2011 - 12 0.88 Cr. 2012 – 13 1.00 Cr. 2013 – 14 3.00 Cr. 2014 – 15 1.33 Cr.

2.1.3 12th Finance Commission Grant A detailed study on the collection and transportation infrastructure requirement of 103 ULBs in the State was carried out in 2004 by Orissa Renewable Energy Development Agency (OREDA). Further, the report also suggested appropriate technologies for treatment and disposal of MSW by ULBs. The report covered tools and equipment requirement of each ULB such as –  Auto tipper, tricycle, push cart  Long handle broom, shovel, gloves, gun boot, metal trays, small brooms  Road side bins, additional bins  Dumper bin of various sizes

 Tractor with attachment, tipper lorry The details of the above equipment and vehicles ULB-wise are given in Annexure 2 & 3

Action Plan for SWM in ULBs of Odisha 10

Based on the report, Rs. 98.59 Cr. was disbursed to ULBs during the period 2005-06 to 2009-10 under the 12th Finance Commission Grant.

Year 2005-06 2006-07 2007-08 2008-09 2009-10 Total Disbursement 19.76 19.76 19.72 19.14 20.20 98.59 (Rs. in Cr.)

The ULB wise disbursement is given in Annexure 2 & 3.

2.2 PPP initiatives The State Government had undertaken various initiatives to implement SWM projects in various ULBs. In the following four Municipal Corporations viz. Bhubaneswar& Cuttack, Berhampur and Sambalpur, SWM projects are proposed to be implemented on PPP basis. Concession Agreements have already been signed with PPP partner by Bhubaneswar & Cuttack Municipal Corporations and Berhampur Municipal Corporation.

Corporations Bhubaneswar & Cuttack Berhampur Sambalpur Sambalpur – Bhubaneswar – 886000 183147 Population 355000 Cuttack - 606000 Burla – 42625 Hirakud - 30177 Estimated waste 550 138 100 generation (TPD) Estimated project cost 58.47 40.60 28.75 (Rs. Cr.) PPP Partner Status of PPP PPP Partner Selected Selected (UPL partner (Essel Infrastructure Projects Under process Environmental selection Ltd.) Engineers Ltd.) Concession 20 years + 2 years 20 years 20 years period (construction period) Regional landfill + waste to Model Integrated Integrated energy Technology Waste To Energy Composting Composting for processing SPV formed. SPV formed. In process of RFP for selection In process of obtaining Current status obtaining various of PPP partner various approvals and approvals and has been floated clearances clearances

The Municipalities adjacent to these Municipal Corporations may avail the processing and land fill facility set up by the PPP partner through a separate agreement.

Action Plan for SWM in ULBs of Odisha 11

2.3 Integrated Coastal Zone Management Project (ICZMP) Initiatives Under ICZMP, it is proposed to implement integrated SWM project under ICZMP in Paradeep Municipality on PPP mode. The estimated project cost is Rs. 29 Cr. The concession period for the project is 25 years. Paradeep Municipality is in discussion with Paradeep Port Trust for land acquisition. Selection of private partner for the project is in progress. In addition, it is proposed to prepare DPR for SWM projects for implementation in the following coastal towns viz. Bhadrak, Jagatsingpur, Konark, Gopalpur and Balugaon. The scope of work for all these projects includes full cycle SWM - source segregation, collection, transportation and scientific disposal. All the projects are proposed to be done through public private partnership (PPP) under the direct supervision of the respective ULBs and overall supervision of the Integrated Coastal Zone Management Project (ICZMP) authorities. The population and estimated waste generation in these ULBs are given below. Estimated waste ULB Population generation (TPD) Bhadrak 121247 36 Jagatsingpur 33639 10 Konark 21347 6 Gopalpur 7221 2 Balugaon 17635 5

The above does not include the floating population. 2.4 Odisha Urban Infrastructure Development Fund (OUIDF) initiatives OUIDF is a dedicated fund for financing urban infrastructure projects in the State of Odisha. OUIDF extends support to ULBs in the form of loan and grant for urban infrastructure project financing besides offering project development assistance such as preparation of DPR, capacity building etc. OUIDF is extending concessional loan assistance and grant to private developers selected for implementation of SWM projects at Bhubaneswar & Cuttack and Berhampur. OUIDF shall also extend concessional loan assistance to PPP partner who will be selected for integrated SWM project for Sambalpur. OUIDF also intends to assist ULBs to undertake SWM projects in their towns. OUIDF conducted workshop to create awareness amongst the ULBs regarding the need to implement SWM projects in compliance with MSW Rules 2000 in their respective towns. OUIDF has identified about 37 towns for implementation of SWM projects between 2015-16 and 2016-17.

Proposed SWM Clusters Estimated waste No. of generation (TPD) @ Possible Regional Cluster Population ULBs 300 gms/day per Landfill Site capita Cluster 1 - Jharsuguda, Brajrajnagar/ 3 217126 65 Brajrajnagar, Belpahar Jharsuguda Cluster 2 -Jajpur, 2 86369 26 Vyasnagar Vyasanagar, Cluster 3 -Barbil, Joda 2 113171 34 Joda

Cluster 4 -Dhenkanal, 2 84718 25 Dhenkanal Athagarh

Action Plan for SWM in ULBs of Odisha 12

Proposed SWM Clusters Estimated waste No. of generation (TPD) @ Possible Regional Cluster Population ULBs 300 gms/day per Landfill Site capita Cluster 5 -Atabira, 3 117874 35 Bargarh Bargarh, Barapali Cluster 6 – Jeypore, 3 182692 55 Koraput Sunabeda, Koraput Cluster 7 –Khurda, Jatni, Cuttack, & 4 1553153 466 Bhubaneswar Bhubaneshwar Cluster 8-Berhampur, Gopalpur, Chatrapur, 5 410681 123 Berhampur Chikiti, Digapahandi

Cluster 9 -Aska, Kabi Surya Nagar, 4 88895 27 Aska Purusotampur & Hinjlicut

Cluster 10 - Paralakhemendi, 2 54153 16 Paralakhemendi Kasinagar

Cluster 11 - Sambalpur, 3 260905 78 Sambalpur Hirakud & Burla

Cluster 12 -Soro, 2 66221 20 Soro Basudevpur Cluster 13 –Sonepur & 2 29104 9 Sonepur Tarbha

Total 37 32,65,062 980

The ULBs have been grouped into various clusters such that the distance between ULBs within a cluster does not exceed 50 Km. In most of the ULBs in the cluster, the distance is between 25 and 35 Km. It is proposed to upgrade the collection and transportation infrastructure of each of the ULBs. Further, where the waste generation is more than 10 TPD standalone processing facility will be set up in each of the ULBs. If the waste generation is less than 10 TPD, processing facility proposed to be set up in nearest neighbouring ULB shall be utilized. Landfill will be common for all the ULBs within a cluster. For processing of bio-degradable waste mechanical composting is proposed. RDF facility will be set up wherever commercially feasible on a standalone basis. Recyclables will be segregated and by engaging SHGs, rag pickers and Khabadiwallas. Balance waste from the composting plant, inert and other waste will be sent to landfill.

The density of population is very low in Odisha at 269/ Sq.Km. This makes it

difficult to develop common facilities for processing and landfill encompassing more number of municipalities per cluster.

Action Plan for SWM in ULBs of Odisha 13

In addition to the above clusters, OUIDF will also initiate SWM projects at following ULBs on stand-alone basis.

ULB Population Estimated Waste Generation (TPD) Bolangir 98211 29 Balasore 118162 35 Keonjhar 60690 18 Rayagada 71208 21 Total 348271 104

2.5 Initiative for Puri IFC has undertaken site identification for setting up processing plant and landfill site at Puri Municipality as the previously identified sites were found unsuitable owing to opposition by local people/ because of their location in the sweet-water zone. Collector cum District Magistrate, Puri has identified an alternative location in Mouza Bangar under Ramchandi Police Station. ECI has advised IFC to undertake site visit to assess the suitability of the site.

2.6 On-going Initiatives by some ULBs

2.6.1 Composting Plant-NALCO and Jindal Townships Mechanical composting plants of 15 TPD each are operational at NALCO Township at Damanjodi and Jindal Township at Angul. This clearly shows that smaller capacity plants can be set up in various ULBs for processing of biodegradable waste. 2.6.2 TSU- Bhubaneswar Municipal Corporation Bhubaneswar Municipal Corporation has taken the initiative to set up a Technical Support Unit for smooth management of Solid Waste Management in Bhubaneswar Municipal Corporation. The proposed team comprises of Solid Waste Management Expert, Procurement Expert, MIS Expert, Communication, Grievance Redressal Officer, Documentation Executive, Social Mobilization Expert, Environmental Engineers. The recruitment procedure is in process and the team shall be mobilized shortly. Such initiatives shall be replicated elsewhere in the State for capacity building of the Municipalities. 2.7 Potential ULBs for CSR initiatives Odisha is rich in mineral deposits such as bauxite, chromite, iron ore and coal. Many large scale industries dependent on these mineral resources have been set up in the State. Some of these industrial units have been supporting the local ULBs in their area through their CSR funds by procuring vehicles, bins etc. for SWM services. The District Collectors will be requested to approach these PSUs and private corporates for channelizing a portion of their CSR funds for SWM capital expenditure and operating expenditure. An indicative list of large industrial units located near various towns is given below.

ULBs PSUs Private Corporates

Rourkela Rourkela Steel Plant Indian Detonators Ltd.

Rajgangpur - Orissa Cements Ltd., L&T

Action Plan for SWM in ULBs of Odisha 14

ULBs PSUs Private Corporates Bhushan Steel, Vedanta, Jharsuguda - Lafarge Mahanadi Coalfields Ltd. Sambalpur Bhushan Steel, Hindalco (MCL) Brajrajnagar - Orient Paper Mills

Belpahar - Tata Refractories Ltd.

Bargarh - ACC

Sunabeda HAL, NALCO -

Angul, Talcher MCL, NALCO, NTPC Jindal Steel & Power

Rayagada - JK Paper Paradeep Phosphates Ltd., Paradeep Indian Oil Ltd., Paradeep POSCO Port Trust Orissa Stevedores Ltd., Gopalpur/ Chatrapur Indian Rare Earth Jayashree Chemicals Joda, Barbil Odisha Mining Corporation Tata Steel

Barmitrapur - Tata Steel

Bhubaneswar, Cuttack Indian Oil Ltd. -

2.8 Other Initiatives

2.8.1 Technical Assistance -DFID The Department for International Development (DFID), United Kingdom has agreed in-principle to provide £5 million (Rs 48.327 crore) as technical assistance for the ‘Orissa Support to Urban Infrastructure Development Programme’ project. The DFID assistance would enable creation of a municipal reforms implementation cell in the Directorate of Municipal Administration (DMA), capacity building of ULBs in an overall project management cycle and overall municipal financial management and creating a Regional Institute for Urban Management and governance for policy support design.

2.8.2 Project e-Municipality Programme Initiative on smart way of cleaning the city through solid waste management module via e- Municipality Project is operational in 45 ULBs of the State since July 2009. The Broad objective of the programme is the application of electronic means to improve the efficiency and effectiveness in the interaction between local Government and its citizens as well as other interest groups like NGOs, CBOs, RWAs, private sector, etc. It also aims at boosting internal Government operations to support and stimulate good governance.

2.9 Swachh Bharat Initiative Under the Swachh Bharat Mission (SBM) of the Central Government, ULBs can avail funding for project development and implementation of SWM projects. The process for availing grant under SBM is given below.

Action Plan for SWM in ULBs of Odisha 15

. ULB’s are to prepare DPR for solid waste management of their city in consultation with state governments. Smaller cities can form clusters to become viable entities to attract private investment. 100% cost reimbursement for preparing the DPR shall be done by GoI as per unit cost and norms set up by National Advisory Review Committee (NARC). . State governments may handhold ULB’s in quickly preparing DPR’s for SWM by empanelling /shortlisting /identifying private or government agencies for the same. . The DPR’s should be bankable, having a viable financial model. These will be prepared emanating from the needs identified in the City Sanitation Plan. DPRs should be aligned with Govt. of India’s goals outlined in the NUSP 2008, SWM rules, advisories, CPHEEO manuals (including cost-recovery mechanisms), O&M practices and Service-level Benchmark advisories released by MoUD from time to time. Street Sweeping and litter control interventions will be part of DPR which is essential for a clean city. . The State High Powered Committee (HPC) will authorize institutes of national repute for appraisal of DPRs for the technical and economic appraisal of DPRs for projects recommended by ULBs. No appraisal will be done by MoUD. The cost of DPR appraisal by these institutes shall be an admissible component under administrative costs, subject to norms as approved by MoUD. . The performance and quality of appraisal by these identified and authorized institutes will be evaluated and monitored by HPEC as well as NARC and corrective actions taken wherever necessary. . The State Level high power committee will approve the DPR as well as the financial model of solid waste management. . The implementation of SWM projects will be as per directions of State Level High Power Committee. . Central government incentive for the SWM projects will be in the form of a maximum of 20% Grant / VGF for each project. The remaining funds have to be generated through – o Private Sector Participation o Additional Resources from State Government/ULB o Beneficiary Share o User Charges o Land Leveraging o Innovative revenue streams o Swachh Bharat Kosh o Corporate Social Responsibility o Market Borrowing o External Assistance . While considering projects under MSWM it will be ensured that there isno duplication in terms of funding under any other scheme or programme. . Detailed technical and financial appraisal of the DPRs will be carried out. O&M arrangements for the project shall necessarily be an integral part of the project in the DPR. . SWM projects will be sanctioned by the State level HPC which shall include a representative of the MoUD. In the entire project approval and procurement process, all provisions and procedures as prescribed by respective State Governments must be followed in their entirety.

Action Plan for SWM in ULBs of Odisha 16

The entire approval procedure for MSW projects except for release of Central funds will end at the State Level. . The States shall be free to choose the technology for SWM projects, toilets and street sweeping. The Ministry of Urban Development shall, from time to time, bring to the notice of the States, through advisories and manuals, and other consultative mechanisms, various options available in these fields. . States will contribute a minimum of 25% funds for SWM projects to match 75% Central Share.

The State Government will initiate DPR preparation for the ULBs not covered under other initiatives of the Government and will pursue implementation of SWM projects in various ULBs in the next 3 years. The State Government has set up SBM Directorate for implementation of the program and appointed a Mission Director. OWSSB has been declared as the State Level Nodal Agency for the Mission. A High Powered Committee is being set up under the Chairmanship of Chief Secretary. A Program Management Unit is being set up at the State Level. A concept paper based on the SBM guidelines to be submitted to GoI is given in Annexure 5.

Action Plan for SWM in ULBs of Odisha 17

3. Proposed Strategic Intervention

At present most of the ULBs in Odisha lack the financial strength and institutional capacity to manage municipal solid waste in compliance with MSW Rules 2000 and implement and manage SWM projects. Hence State Government intervention is necessary to tackle the sanitation issue arising due to MSW in a systematic, coordinated and time bound manner. The State Government has drawn up an action plan for ensuring compliance of MSW Rules 2000 by the ULBs in a time bound manner. The MSW projects will be implemented across various ULBs between 2015-16 and 2019-20.

3.1. Door to door collection of MSW and segregation at source . Organizing door-to-door collection of waste to be the irreversible strategic approach to prevent residents from dumping their garbage out. The waste collected from door-to-door should be source segregated and collected separately in wet and dry waste from all sources. Two bin system to be strictly followed and each household shall be given 2 bins by the ULB. Door to door collection in Bhubaneswar

Action Plan for SWM in ULBs of Odisha 18

. Community level large and unsightly garbage bins to be withdrawn from streets and ‘ Litter Bins’ to be limited to busy commercial areas and public places.Bulk generators such as vegetable/ fruit markets, shall be provided with closed large size containers with lid for easy collection of waste. These bulk waste generators shall not dispose waste other than in the bins provided. . Municipal Solid Waste to be segregated at source into groups of organic, inorganic, recyclables and hazardous waste. MSW constituents like metal, plastics, glass and paper wastes are to be segregated and recycled at the collection point through involvement of rag pickers, social entrepreneurs, NGOs and Self Help Groups. . Route mapping of door to door collection activities on city wide scale for improved coverage. Primary vehicles to be used to collect and transport waste from lanes and by- lanes to the main roads synchronizing with bulk transportation vehicles. Entire town to be divided into zones and further sub-divided into beats staffed with adequate sanitary workers for proper door to door collection. . Daily collection of waste from slums and open squatter areas, hotels/restaurants/office complexes and commercial areas Collection of waste from community bins in Denkanal

Action Plan for SWM in ULBs of Odisha 19

Collection of waste from community bins in Bhubaneswar

. Construction/demolition wastes/debris to be separately collected and disposed off following proper norms . Road sweeping and drain cleaning periodically

Road cleaning in Bhubaneswar

Though, ULBs have been carrying out door to door collection either on their own or by engaging private operators, the performance is far from satisfactory in most of the ULBs and strict enforcement is needed. ULBs shall target daily door to door collection and 100% segregation at source in a period of next 3 years. State Government shall constitute awards for ULBs which successfully implement source segregation in their

towns. Competitions shall be organized at schools and awareness created amongst school children so that households gradually adopt source segregation.

Action Plan for SWM in ULBs of Odisha 20

3.2. Transportation of MSW to the processing site in a scientific manner . The waste should be transported in a segregated form (wet and dry) by vehicles, at the primary collection and secondary/ bulk collection systems. . Waste to be handled mechanically across the MSW value chain with minimum human contact with waste. Modernize fleet management services with covered transportation system to be adopted for transportation of the waste. 3.3. Processing of MSW in a scientific manner Waste received at the processing site shall be segregated mechanically as far as possible depending on the quantum of waste generated. Suitable technology option for processing shall be adopted. Common technology options for processing of MSW are given below. . Composting: Composting process is quite commonly used in MSW management in India and results in production of a stable bio-fertilizer product known as bio-compost. This bio-compost, depending upon its quality can be used as a useful manure and soil conditioner element. Compost can be produced by either of the two processes viz. vermi-composting and mechanical composting. Mechanical composting has been found to be suitable in most of the ULBs due to the ease in handling and management of mechanical composting plant. Mechanical composting is most suitable and is proposed to be adopted across ULBs in the State with MSW generation of 5 TPD and above. . Waste to Energy: It is the process of direct burning of wastes in the presence of excess air (oxygen) to produce power. These plants require MSW of 300 TPD and above.

Waste to Energy is not suitable for the ULBs in Odisha except Bhubaneswar

. Anaerobic Bio-Methanisation facility: Bio-Methanation technology can also be used for treatment of garbage as decentralized plants for treating limited quantity of municipal garbage. The process involves biological decomposition of organic wastes in the absence of air to produce bio-gas (methane) which can be directly used by the consumer or can be used to generate electricity. This technology is most suitable in de-centralised locations like canteens, large restaurants and large housing colonies. The State Government will promote this technology in universities and colleges in the State. . Refuse Derived Fuel (RDF): In RDF plant, the combustible waste is shredded into a smaller, more uniform particle size for burning. It involves the process of conversion of garbage into fuel pellets involves primarily drying, separation of combustibles from garbage, size reduction and pelletisation after mixing with binder and/or additives as required. RDF plant will be set up in ULBs/ cluster of ULBs depending on commercial viability and market for RDF in the vicinity of the ULB. 3.4. Disposal through common Sanitary Landfill Sites (SLF) The final inert material will be disposed in the common sanitary landfill facility. Landfill sites shall be used sparingly and only as a last resort in waste management hierarchy and shall not exceed 20% of the total municipal solid waste generated. Common landfill sites shall be developed by adopting a cluster approach for ULBs within a distance of less than 50 Km between each other. Land filling of mixed waste must be avoided, unless the waste is found unsuitable for waste processing. Under unavoidable circumstances or till installation of alternate facilities, land-filling shall be done following proper norms. The major components of the MSW landfill site are- . A liner system at the base and sides of the landfill, which prevents migration of leachate or gas to the surrounding soil.

Action Plan for SWM in ULBs of Odisha 21

. A leachate collection facility to collect and extract leachate from within and from the base of the landfill and then treats the leachate . A gas collection facility to collect and extract gas from within and from the top of the landfill and then treat it and use it for energy recovery . A final cover system at the top of the landfill, which enhances the surface drainage, prevents infiltration of water and supports surface vegetation. . A surface water drainage system to collect and remove all surface runoff from the landfill site. . An environmental monitoring system to periodically collect and analyses air, surface water, soil gas and ground water samples around the landfill site. . A closure and post-closure plant close and secure a landfill site once the filling operation has been completed and the activities for long term monitoring, operation and maintenance of the completed landfill. 3.5. Reclamation of old dumps The MSW is being dumped at the dump yard without any processing over many years by the ULBs. Hence, apart from setting up of processing plant and scientific landfill facility, the ULBs shall reclaim the dump yard in a time bound manner. The SWM project also includes reclamation of dump yard as a key component. Reclamation process is given below. Compacted old waste is loosened and scraped off in layers by a tractor-harrow. Composting bio- culture is sprayed from a tanker-truck with high-pressure pump. It is formed into windrows & turned weekly by JCB.At each turning, hired rag-pickers retrieve buried recyclables, which partly cover their labour cost. After 3-4 weekly turnings, the waste is dry, volume-reduced & ready to sieve by either manual or motorized simple portable sieves. The reclamation process shall be completed within one year from setting up of processing plant and scientific land fill facility.

3.6. Provision of safety equipment The MSW project shall also include provision of necessary tools and tackles, adequate protective clothing and safety gears to sanitary workers. Further, ULBs to provide adequate protection and health care facilities to its sanitation workers. 3.7. Involvement of rag pickers and Khabadiwallahs The rag picker plays a very important part in the segregation of waste. In India, only 30-60% waste is collected by the ULBs, whereas waste collection by the rag pickers is estimated at 15-25%. About 1 million urban poor are engaged in informal waste management sector. However, MSW Rules 2000 & majority SWM initiatives in the country somehow side-line the informal sector in solid waste management. This is in spite of the fact that this sector, if integrated in to the mainstream SWM system of cities and towns can lead to a win-win situation of providing secured livelihoods to the urban poor and reducing expenditure on setting-up high cost energy intensive processing plants. Moreover, in states like Odisha where large numbers of small sized ULBs are dispersed across the state and density of urban population is very low and, neither cluster approach nor setting-up processing plants is a viable option. It is precisely here, there is a need to go for decentralized composting of bio-degradable waste and recycling of the non-biodegradable waste through the network of rag pickers. Thus networking Rag Pickers and Kabadiwalas in to the municipal solid waste management system in the states becomes imperative, especially in case of smaller ULBs of Odisha. The H & UD Department in the State Govt. will take steps to integrate the informal sector in to the mainstream SWM system of the ULBs through network building process.

Action Plan for SWM in ULBs of Odisha 22

3.8. Involvement of NGOs, Self Help Groups and Community Participation Solid Waste management, after the passage of the Municipal Solid Waste Rules occupies primary focus in ULBs, but suffers from lack of adequate community involvement and constraints with respect to safe disposal. Existing Municipal laws provide for punitive action against house/building owner in case of letting out waste impacting local environment. However, punitive action recommended is not a major deterrent and seldom enforced. Also, clarity on provisions to be made in places frequented by public (eating places, shopping areas) need to be detailed in the bye-laws of the ULBs. Even with the necessary legal provisions, city managers find enforceability a problem. The successful implementation and management of MSW is dependent on community participation involving the local residents of town. Through effective IEC programs awareness need to be created regarding sanitation amongst households, industries, elected body representatives and various other stakeholders. State Government shall roll out such IEC programs across ULBs in a phased manner in the next one year. State Government shall insist on deployment of a dedicated technical staff for SWM for each ULB. Encourage sound contracting practice begins with setting operational goals, defining performance or service benchmark standards and specifications and producing a document that communicates these to private, semi-private, NGO, CBO or other economic actors who would like to participate as service providers. Through NGOs and SHGs, segregation shall be strengthened. Further revenue generation through segregation of recyclables and sale of same thereby providing livelihood for rag pickers shall be encouraged.

3.9. Enforcement of MSW Rules 2000 The non-compliance of MSW Rules 2000 by the ULBs has been due to the lack of financial strength, institutional capacity of the ULBs and also lack of enforcement. ULBs are expected to submit reports periodically regarding their SWM practice and compliance with MSW Rules 2000. This include - . Submission of Annual Report in Form II to Urban Development Department with a copy to Pollution Control Board on or before 30th June every year. . Compliance with the guidelines, standards and specifications provided in Schedule II, III and IV of State Pollution Control Board . Submit within 3 months from the date of site authorisation order proposal for waste processing and landfill. However, most of the ULBs have not followed the above compliance requirements. The State Government shall enforce compliance by holding the Executive Officers of the ULBs accountable. The State Government shall also extend all technical, institutional and financial support for assisting the ULBs in SWM in compliance with MSW Rules 2000.

Action Plan for SWM in ULBs of Odisha 23

4. Investment Plan and cost recovery

As discussed in Chapter 2, various initiatives have been undertaken by the State Government for implementation of SWM projects in compliance with MSW Rules 2000. 4.1. Project Cost and Means of Finance The estimated project cost and means of finance is given below.

Source of Funding No.s Estimated Loan/ Central State Govt. Pvt. Sector project grant from Govt. Contribution investment cost (Rs. Institutions contribution (Rs. in Cr.) (Rs. Cr.) Cr.) (Rs. Cr.) (Rs. Cr.) PPP projects in 3 99.07 14 85.07 Municipal Corporations Proposed under 5 19.12 19.12 ICZMP SBM/OUIDF 103 624.33 468.25 156.08 initiative* Total 111 742.52 33.12 468.25 156.08 85.07 *ULB contribution (Rs. Cr.) shall be @10% of the Estimated Project Cost for OUIDF Funding.

4.2. Proposed Capital Expenditure-Year Wise Capital Expenditure Amount (Rs. in Cr.) 2015-16 194.73 2016-17 235.64 2017-18 252.13 2018-19 60.03 Total 742.52

4.3. User charges and O&M costs Currently user charges are not levied by ULBs for SWM. The State Government is in the process of approving user charges for SWM for Bhubaneswar Municipal Corporation (BMC). BMC has proposed Rs. 50, Rs.100, Rs.200 per month respectively for Slum/EWS/LIG, MIG and HIG respectively. The detailed user charges table is given as Annexure 4. For other ULBs, average user fee of Rs. 50/month per household and Rs. 150/month for commercial units for SWM services can be levied. It is proposed to include user fee for SWM in the holding tax bill for ease of collection. The O&M costs for management of municipal solid waste is ~Rs. 2000-2600/MT with collection and transportation cost varying between Rs. 1500 and Rs. 1800/ MT (including road sweeping and drain cleaning) and processing and landfill costs between Rs. 500 and Rs. 800/MT. Currently due to absence of processing and scientific landfill facility the ULBs incur expenditure only towards collection and transportation of municipal solid waste. To meet the additional cost associated

Action Plan for SWM in ULBs of Odisha 24

with processing and scientific disposal of waste user charges need to be levied for full cost recovery for sanitation services. On an average assuming a tipping fee of Rs. 2300/MT, the O&M costs shall be approximately Rs. 157 Cr. per annum. The O&M costs and cost recovery for services over a 10 year period is given below. Rs. in Cr.

SWM services 2015- 2016- 2017- 2018- 2019- 2020- 2021- 2022- 2023- 2024- revenue & cost 16 17 18 19 20 21 22 23 24 25 recovery Revenue 43 57 77 99 128 152 186 201 217 235 O&M / Tipping 157 167 178 189 201 214 227 242 257 274 fee Deficit -114 -110 -101 -90 -73 -62 -41 -41 -40 -38 Cost recovery 28% 34% 43% 53% 64% 71% 82% 83% 85% 86% for services

From the above table it can be seen that cost recovery for services gradually improves to 86% over the next 10 years. The assumptions underlying the projections are given below: . No. of households to increase at 3% per annum in line with population growth . Tipping fee Rs.2300/MT with 5% escalation per annum; Additional revenue for operator from compost . Per capita SWM generation @ 300 gm/day with increase of 1.3% per annum as per HPEC Report on Indian Urban Infrastructure and Services; . Commercial units assumed at 15% of the households . Average collection efficiency assumed at 40% and 25% for BMC and rest of ULBs in the first year respectively which will increase to 90% by seventh year in all the ULBs . Average user fee of Rs.90/month and Rs. 250/month assumed for residential and commercial units respectively in BMC area and Rs.50/month and Rs. 150/month assumed for residential and commercial units respectively in rest of the ULBs; User charges to increase at 5% per annum. 4.4. Proposed Consolidated Cost-Year Wise Rs. Cr.

2015- 2016- 2017- 2018- 2019- 2020- 2021- 2022- 2023- Particulars 16 17 18 19 20 21 22 23 24

Capital Expenditure 195 236 252 60 - - - - - O&M / Tipping fee 157 167 178 189 201 214 227 242 257 Total Expenditure 352 403 430 249 201 214 227 242 257

Total consolidated outlay including both capital and operating expenditure for the next five years ending 2019-20 is estimated to be Rs. 1635 Cr.

Action Plan for SWM in ULBs of Odisha 25

Assumptions

The capital outlay and the implementation schedule of SWM in various ULBs are based on the following assumptions:

. Per capita waste generation of 300 grams/day . Rs. 1500 per capita for arriving at capital cost as per SBM guidelines; Actual project cost may vary depending on the technology, site conditions etc. . The clusters have been identified based on distances between towns and will vary during implementation based on availability of suitable land o The location of regional landfill sites may vary depending on availability of suitable land . The implementation plan is assuming that the Swachh Bharat Action Plan will be approved by the Central Government and that State Budget shall be made available for implementation of SWM projects o It is assumed that all the ULBs shall apply for site allotment and shall obtain site authorization prior to implementation . The projects have been assumed to be financed out of SBM funds; ULBs may tap alternate source of funds.

Action Plan for SWM in ULBs of Odisha 26

Action Plan for SWM in ULBs of Odisha 27

Annexure 2 – SWM implementation on cluster basis

Name of the Cluster JHARSUGUDA, BRAJRAJNAGAR, BELPAHAR

Population 217126

Estimated MSW 65.54 Generation(TPD)* Jharsuguda:- Authorization granted and Valid up to 31.03.2019. Landfill Site Authorization Brajrajnagar:- Valid up to 31-03-2013. Renewal applied and is under process. Status Belpahar:- Authorization granted and Valid up to 31-03-2018. 12th Finance Commission Jharsuguda:- 134.70 Grantfor equipment and Brajrajnagar:- 108.10 vehicles procurement (Rs. in Belpahar:- 88.60 Lakhs) Door Whether collectio to Bins Segregati Qty Sanitar n spots Transporta Current Position Door Provid on of Processe y are tion facility Colle ed waste d Landfill attende ction d daily Truck-01, Truck Tipper-03, Tractor Jharsuguda Yes 126 Yes No Nil No Trailer-01, Dumper Placer-01, Tricycle-21 Tempo Tipper-04, Tractor Brajrajnagar Yes 211 Yes No Trailer-03, Nil No Tractor-04, Wheel barrow-128 Truck Tipper-02, Tractor Belpahar Yes 183 - No Trailer-05, Nil No Dumper Placer-02, Tricycle-13 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection: Proposed intervention  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation

Action Plan for SWM in ULBs of Odisha 28

Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:

Regional Land fill of non bio-degradable and inert material at Brajrajnagar/ Jharsuguda Estimated Project Cost (PC) (Rs. in Crore)** 32.569

Source Amount Rs. In Crore

Central Assistance/Grant(@75% of 24.42 Means of finance (Rs. In PC) Lakhs) State Assistance/Grant (@25% of 8.142 PC)

Total 32.569

Period of implementation 2015-16

*Based on per capita generation @300 gram per day

**Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 29

Name of the JAJPUR, VYASANAGAR Cluster

Population 86369

Estimated MSW 25.91 Generation (TPD)* Jajpur: Authorization granted was valid up to 31-03-2013. Applied for renewal. Landfill Site

Authorization Vyasanagar: Authorization granted was valid up to 31-03-2014. Renewal applied and Status is under process. 12th Finance Commission Jajpur: 49.40 Grantfor equipment and Vyasanagar: 73.20 vehicles procurement (Rs. in Lakhs) Whether Door to collection Current Bins Segregation Transportation Qty Sanitary Door spots are Position Provided of waste facility Processed Landfill Collection attended daily Auto Tipper-02, Tractor Trailer- 03,Dumper Jajpur Yes 107 Yes No Nil No Placer-02, Tricyc;e-15, Push Cart-13 Truck Tipper- 02,Tractor Trailer-03, Vyasanagar No 92 Yes No Nil No Tricycle-02, Tricycle-03, JCB-01 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019-20 Proposed  Collection from Community Bins until 100% door to door collection intervention  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:

Regional Land fill of non bio-degradable and inert material at Jajpur, Vyasanagar,

Action Plan for SWM in ULBs of Odisha 30

Estimated Project Cost (PC) 12.95 (Rs. in Crore)**

Source Amount Rs. In Crore Means of Central Assistance/Grant (@75% of PC) 9.71 finance (Rs. In Lakhs) State Assistance/Grant (@25% of PC) 3.24 Total 12.95 Period of 2015-16 implementation *Based on per capita generation @300 gram per day

**Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 31

Name of the BARBIL, JODA Cluster Population 113171 Estimated MSW 34 generation (TPD) Landfill Site Barbil: Authorization granted was valid up to 31-03-2013. Renewal applied and is under Authorization process. Status Joda: Authorization granted and valid up to 31-03-2018. 12th Finance Commission Grant for Barbil: 71.20 equipment and Joda: 64.90 vehicles procurement (Rs. in Lakhs) Whether Door to collection Current Bins Segregation Transportation Qty Sanitary Door spots are Position Provided of waste facility Processed Landfill Collection attended daily TractorTrailer- 03,Tricycle- Barbil Yes 68 Yes No 18,AutoTipper- Nil No 02,Hook Loader-01 Tractor Trailer- Joda Yes 138 Yes No 03,Auto Tipper- Nil No 02 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019-20 Proposed  Collection from Community Bins until 100% door to door collection intervention  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:

Regional Land fill of non bio-degradable and inert material at Barbil, Joda Estimated Project Cost (PC) 16.98 (Rs. in Crore)** Means of Source Amount Rs. In Crore finance (Rs. In Central Assistance/Grant (@75% of PC) 12.73 Lakhs) State Assistance/Grant (@25% of PC) 4.24

Action Plan for SWM in ULBs of Odisha 32

Total 16.98 Period of 2015-16 implementation *Based on per capita generation @300 gram per day

**Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 33

Name of the DHENKANAL, ATHAGARH Cluster Population 84718 Estimated MSW 25 generation (TPD) Landfill Site Dhenkanal: Authorization granted and Valid up to 31-03-2018. Authorization Athagarh: Not applied. Status 12th Finance Commission Grantfor Dhenkanal: 77.90 equipment and Athagarh: 29.50 vehicles procurement (Rs. in Lakhs) Whether Door to collection Current Bins Segregation Transportation Qty Sanitary Door spots are Position Provided of waste facility Processed Landfill Collection attended daily Tractor Trailer- 04, Dumper Dhenkanal Yes 238 Yes No Placer-01, Nil No Tricycle-48, Auto Tipper-05 Tractor Trailer- Athagarh No 20 No No 02, Wheel Nil No Barrow-20 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019-20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Regional Land fill of non bio-degradable and inert material at Dhenkanal, Athagarh Estimated Project Cost (PC) 12.70 (Rs. in Crore)**

Means of Source Amount Rs. In Crore finance (Rs. In Lakhs) Central Assistance/Grant (@75% of PC) 9.53

Action Plan for SWM in ULBs of Odisha 34

State Assistance/Grant (@25% of PC) 3.17

Total 12.70

Period of 2015-16 implementation *Based on per capita generation @300 gram per day

**Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 35

Name of the ATABIRA, BARGARH & BARAPALI Cluster*** Population 117874 Estimated MSW 35 generation (TPD) Landfill Site Atabira: Not applied. Authorization Bargarh: Authorization granted was valid up to 31-03-2015. Status Barapali Authorization granted was valid up to 31-03-2014. Not Applied for Renewal 12th Finance Commission Grantfor Atabira: NA equipment and Bargarh: 91.70 vehicles Barapali:37.50 procurement (Rs. in Lakhs) Whether Door to collection Current Bins Segregation Transportation Qty Sanitary Door spots are Position Provided of waste facility Processed Landfill Collection attended daily

Atabira NA NA NA NA NA NA NA

Tractor Trailer- 05, Auto Bargarh - 72 Yes Yes Nil No tipperr-03, Tricycle-10 Tractor Trailer- 02, Dumper Barapali Yes 91 - No Nil No Placer-01, Tricycle-13 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019-20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Regional Land fill of non bio-degradable and inert material at Bargarh Estimated Project Cost (PC) 17.68 (Rs. in Crore)**

Action Plan for SWM in ULBs of Odisha 36

Source Amount Rs. In Crore

Central Assistance/Grant (@75% of PC) 13.26 Means of finance (Rs. In Lakhs) State Assistance/Grant (@25% of PC) 4.42

Total 17.68

Period of 2016-17 implementation *Based on per capita generation @300 gram per day

**Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

***(Data Not available for Atabira&Barapali)

Action Plan for SWM in ULBs of Odisha 37

Name of the JEYPORE, SUNABEDA, KORAPUT Cluster Population 182692 Estimated MSW 55 generation (TPD) Landfill Site Jeypore: Authorization granted and Valid up to 31-03-2015. Authorization Sunabeda: Authorization granted and Valid up to 31-03-2015. Status Koraput: Authorization granted was valid up to 31-03-2014. Applied for Renewal. 12th Finance Commission Grantfor Jeypore: 91.20 equipment and Sunabeda:128.50 vehicles Koraput: 99.50 procurement (Rs. in Lakhs) Whether Door to collection Current Bins Segregation Transportation Qty Sanitary Door spots are Position Provided of waste facility Processed Landfill Collection attended daily Tricycle-36, Tractor Trailer- Jeypore Yes 44 Yes No 05, Push Cart- Nil No 31, Wheel Barrow-60 Dumper Placer- 02, Tractor Trailer-04, Sunabeda Yes 391 Yes No Tricycle-27, Nil No Wheel Barrow- 03, Push Cart- 23 Auto Tipper-02, Tractor Trailer- 03, Dumper Placer-02, Koraput Yes 53 Yes No Nil No Tricycle-18, Wheel Barrow- 30, Push Cart- 16 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20 Proposed  Door to door collection with Tippers/ Tricycles in phasesby FY 2019-20 intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting

Action Plan for SWM in ULBs of Odisha 38

E. Disposal:  Regional Land fill of non bio-degradable and inert material at Koraput Estimated Project Cost (PC) 27.40 (Rs. in Crore)**

Source Amount Rs. In Crore

20.55 Central Assistance/Grant (@75% of PC) Means of finance (Rs. In 6.85 Lakhs) State Assistance/Grant (@25% of PC)

Total 27.40

Period of 2015-16 implementation *Based on per capita generation @300 gram per day

**Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 39

Name of the KHURDA, JATNI, CUTTACK, &BHUBANESHWAR Cluster Population 1553153 Estimated MSW 466 generation (TPD) Khurda: Authorization granted and valid up to 31.03.2017. Landfill Site Jatni: Authorization granted and valid up to 31-03-2015 Authorization Cuttack: Authorization was valid up to 31-03-2013. Case filed. Not applied for Renewal. Status Bhubaneshwar: Authorization granted and valid up to 31-03-2018 12th Finance Commission Khurda: 65.60 Grant for Jatni: 64.20 equipment and Cuttack: 1299.90 vehicles Bhubaneshwar:1355.40 procurement (Rs. in Lakhs) Target National Current Service / Indicator for FY Benchmark Status 2018-19

HH level Coverage (%) 100 51 58.75

Efficiency of Collection (%) 100 54.25 67.5

Extent of Segregation (%) 100 10 16.25 Current Position (SLB Data) & Target Extend of MSW recovered (%) 80 27.5 35.25 for 2019-20 Extent of Scientific Disposal (%) 100 0 2.5

Efficiency in Redressal of Complaints (%) 80 73.5 78.75

Extent of Cost Recovery (%) 100 2.5 11.25

Efficiency in Collection of SWM Charges (%) 90 17.5 48.75

Whether Door to collection Current Bins Segregation Transportation Qty Sanitary Door spots are Position Provided of waste facility Processed Landfill Collection attended daily Tractor Trailer- 06, Auto Tipper- Khurda No 60 - No Nil No 02,Wheel Barror- 51, Tricycle-18 Tractor Trailer- Jatni Yes 157 Yes No 03, Auto Tipper- Nil No 03 Truck-02,Truck Tipper-10,Auto Cuttack Yes 2500 Yes Yes Tipper-20,Tractor Nil No Trailer- 68,Tricycle-

Action Plan for SWM in ULBs of Odisha 40

1500,Bob Cats- 02 Primary Collection is done by required of nos. of Tractors/Tippers for Privatized 40 nos. of wards to the temporary transfer station and primary collection for BMC managed 20 nos of wards is done by tractors (engaged by private agency Bhubaneshwar Yes 922 Yes Yes Nil No and 6 nos. of hook loader lorry and 22 nos of 9 cum capacity containers(owned by BMC). Secondary Collection from Temporary Transfer station to Landfill site is done trough the private agency by engaging required nos. of Tippers/Haiwas A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20 Proposed  Door to door collection with Tippers/ Tricycles in phasesby FY 2019-20 intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Regional Land fill of non bio-degradable and inert material at Bhubaneswar Estimated Project Cost (PC) 232.97; project proposed to be implemented on PPP basis for Bhubaneswar and Cuttack (Rs. in Crore)**

Action Plan for SWM in ULBs of Odisha 41

Period of 2015-16 implementation *Based on per capita generation @300 gram per day

**Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 42

Name of the BERHAMPUR, GOPALPUR, CHATRAPUR, CHIKITI, DIGAPAHANDI Cluster Population 410681 Estimated MSW 123 generation (TPD) Berhampur: Authorization Granted and valid upto 31.03.2018 Landfill Site Gopalpur: Not applied. Authorization Chatrapur: Not applied. Status Chikiti: Not applied. Digapahandi: Applied and is under process. 12th Finance Commission Berhampur: 740.60 Grantfor Gopalpur: 13.70 equipment and Chatrapur:26.30 vehicles Chikiti: 21.30 procurement Digapahandi:24.80 (Rs. in Lakhs) Whether Door to collection Current Bins Segregation Transportation Qty Sanitary Door spots are Position Provided of waste facility Processed Landfill Collection attended daily Tractor Trailler- 16, Refuse Collector-01, Dumper Placer- 06,Tricycle- Berhampur Yes 651 Yes No 134, Auto Tipper-11, MiniTruck-02, Front end Loader-02 Nil No Tractor Trailer- 01, Refuse Gopalpur Yes 04 Yes No Collector-01, Tricycle-03 Nil No Tractor Trailer- 03, Dumper Placer- Chatrapur Yes 130 Yes No 01,Tricycle-14, Wheel Barrow- 40, Cesspool- 01 Nil No

Tractor Trailer- Chikiti No 12 Yes No 02 Nil No

Digapahandi ------A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100% Proposed  Bush Cutting 100% intervention  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20

Action Plan for SWM in ULBs of Odisha 43

 Door to door collection with Tippers/ Tricycles in phasesby FY 2019-20  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Regional Land fill of non bio-degradable and inert material at Berhampur Estimated Project Cost (PC) 61.60; (Project awarded on PPP basis to a private developer for Berhampur town at (Rs. in estimated project cost of Rs. 40.60 Cr.) Crore)**

Period of 2015-16 implementation *Based on per capita generation @300 gram per day

**Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 44

Name of the ASKA, KABI SURYA NAGAR, PURUSOTAMPUR & HINJLICUT Cluster Population 88895 Estimated MSW 27 generation (TPD) Aska: Authorization granted and valid up to 31.03.2018. Landfill Site Kabi Surya Nagar : Authorization granted and valid up to 31.03.2018 Authorization Purusotampur: Authorization granted and valid up to 31.03.2018 Status Hinjlicut: Authorization granted was valid up to 31.03.2013. Not applied for renewal. 12th Finance Commission Aska: 27 Grantfor Kabi Surya Nagar : 35.90 equipment and Purusotampur: 52.10 vehicles Hinjlicut:33.30 procurement (Rs. in Lakhs) Whether Door to collection Current Bins Segregation Transportation Qty Sanitary Door spots are Position Provided of waste facility Processed Landfill Collection attended daily Tractor Trailer- 02, Tricycle-10, Aska No 61 Yes No Wheel Barrow- 15 Nil No Tractor Trailer- Kabi Surya 02, Refuse Yes 119 Yes No Nagar Collector-05, Tricycle-13 Nil No Tractor- 02,Tricycle-09, Purusotampur No 50 Yes No Wheel Barrow- 50, Auto Tipper-02 Nil No

Tractor- Hinjlicut No 11 Yes No 02,Tricycle-23 Nil No A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019-20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Regional Land fill of non bio-degradable and inert material at Aska

Action Plan for SWM in ULBs of Odisha 45

Estimated Project Cost (PC) 11.83 (Rs. in Crore)**

Source Amount Rs. In Crore

Central Assistance/Grant (@75% of PC) 8.87 Means of finance (Rs. In Lakhs) State Assistance/Grant (@25% of PC) 2.95

Total 11.83

Period of 2016-17 implementation *Based on per capita generation @300 gram per day

**Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 46

Name of the PARALAKHEMENDI, KASINAGAR Cluster Population 54153 Estimated MSW 16 generation (TPD) Landfill Site Paralakhemendi: Not applied. Authorization Kasinagar: Not applied. Status 12th Finance Commission Grantfor Paralakhemendi: 44.90 equipment and Kasinagar: 22.40 vehicles procurement (Rs. in Lakhs) Whether Door to collection Bins Segregation Transportation Qty Sanitary Current Position Door spots are Provided of waste facility Processed Landfill Collection attended daily Tractor- 02,Tricycle-20, Refuse Paralakhemendi No 21 Yes No Collector- 02,Wheel Barrow-30 Nil No

Kasinagar ------A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019-20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Regional Land fill of non bio-degradable and inert material at Estimated Project Cost 8.12 (PC) (Rs. in Crore)** Means of Source Amount Rs. In Crore finance (Rs. In Lakhs) Central Assistance/Grant (@75% of PC) 6.09

Action Plan for SWM in ULBs of Odisha 47

State Assistance/Grant (@25% of PC) 2.03

Total 8.12

Period of 2016-17 implementation *Based on per capita generation @300 gram per day

**Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 48

Name of the SAMBALPUR, HIRAKUD & BURLA Cluster Population 260905 *Estimated 78 MSW generation TPD) Landfill Site Sambalpur: Valid up to 31.03.2013. Not Applied for Renewal Case filed. Authorization Hirakud: Authorization granted was valid up to 31-03-2013. Not applied for Renewal. Status Burla: Authorization granted and valid up to 31.03.2018. 12th Finance Commission Grantfor Sambalpur:433.90 equipment and Hirakud:41.60 vehicles Burla: 53.50 procurement (Rs. in Lakhs) Whether Door to collection Current Bins Segregation Transportation Qty Sanitary Door spots are Position Provided of waste facility Processed Landfill Collection attended daily Dumper Placer- 02, Truck Tipper-01, Tractor Trailer- 02, Tricycle-63, Sambalpur No 260 Yes No Hydraulic Loader-01, Truck-03, Back whole Loader- 01 Nil No

Tractor Trailer- Hirakud No 03 No No 04,Tricycle-14 Nil No

Tractor Trailer- Burla No 66 No No 02 Nil No A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019-20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Regional Land fill of non bio-degradable and inert material at Sambalpur

Action Plan for SWM in ULBs of Odisha 49

Estimated Project Cost (PC) 50.36; proposed to be funded on PPP basis (Rs. in Crore)**

Period of 2016-17 implementation

Action Plan for SWM in ULBs of Odisha 50

Name of the SORO, BASUDEVPUR Cluster Population 66221 Estimated MSW 20 generation (TPD) Landfill Site Soro: Authorization granted and valid up to 31.03.2017 Authorization Basudevpur: Authorization granted was valid up to 31-03-2014. Not Applied for renewal Status 12th Finance Commission Grantfor Soro: 54.10 equipment and Basudevpur: 76 vehicles procurement (Rs. in Lakhs) Whether Door to collection Current Bins Segregation Transportation Qty Sanitary Door spots are Position Provided of waste facility Processed Landfill Collection attended daily Tricycle-15, Soro Yes 56 Yes No Wheel Barrow- 18 Nil No Tractor Trailer- 01, Wheel Basudevpur Yes 16 No No Barrow-07, Dumper Placer- 01 Nil No A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019-20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Regional Land fill of non bio-degradable and inert material at Soro Estimated Project Cost (PC) 9.93 (Rs. in Crore)**

Action Plan for SWM in ULBs of Odisha 51

Source Amount Rs. In Crore Central Assistance/Grant (@75% of PC) 7.45 Means of finance (Rs. In State Assistance/Grant (@25% of PC) 2.48 Lakhs) 9.93 Total

Period of 2016-17 implementation *Based on per capita generation @300 gram per day

**Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 52

Name of the SONEPUR&TARBHA Cluster Population 29104 Estimated MSW 9 generation (TPD) Landfill Site Tarbha: Authorization granted was valid up to 31-03-2013. Applied for renewal and Authorization is under process. Status 12th Finance Commission Grantfor Sonepur: 31.23 equipment and Tarbha:23.20 vehicles procurement (Rs. in Lakhs) Whether Door to collection Current Bins Segregation Transportation Qty Sanitary Door spots are Position Provided of waste facility Processed Landfill Collection attended daily

Tractor trailer - Sonepur Yes 112 Yes No 03, Tricycle -12 Nil No Tricycle-05, Wheel Barrow- Tarbha No 38 Yes No 05, Tractor Trailer-02 Nil No A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019-20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Regional Land fill of non bio-degradable and inert material.Regional landfill at Sonepur Estimated Project Cost 4.36 (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 3.27 Lakhs) State Assistance/Grant (@25% of PC) 1.09

Action Plan for SWM in ULBs of Odisha 53

Total 4.36

Period of 2016-17 implementation *Based on per capita generation @300 gram per day

**Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 54

Annexure 3–SWM implementation in various ULBs on standalone basis

Name of the ULB ANANDAPUR MUNICIPALITY, DIST-KEOJHARGARH, ODISHA Population 39,585 Estimated MSW 11.88 MT Generation (TPD)* Landfill Site Authorization granted and valid up to 31-03-2018. Authorization Status 12th Finance Commission Grant for 111.90 equipment &vehicles (Rs. in Lakhs) Door Whether to Bins collection Segregati Qty Transportation Sanitary Door Provid spots are on of Processe facility Landfill Colle ed attended waste d ction daily Truck tipper- Current Position 02, Tractor Trailer-02, Dumper Yes 95 Yes No Nil No Placer-02, Tricycle-16, Wheel Barrow-45 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019-20 Proposed Strategy  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material. Estimated Project Cost** 5.94 Crore Source Amount Central Assistance/Grant (@75% of PC) 4.45 Crore Means of finance State Assistance/Grant (@25% of PC) 1.49 Crore Total 5.94 Crore Period of 2017-18 implementation *Based on the calculation of the state average per capita per day MSW generation @300 gram **Based on per capita cost of Rs 1500 in accordance with the “Swachh Bharat Mission” Guidelines

Action Plan for SWM in ULBs of Odisha 55

Name of the ULB ANGUL MUNICIPALITY, DIST-ANGUL, ORISSA

Population 43,795 Estimated MSW 13.14 MT Generation (TPD)* Landfill Site Authorization granted was valid up to 31-03-2014. Applied for renewal. Authorization Status 12th Finance Commission Grant for equipment and 59.50 vehicles procurement (Rs. in Lakhs) Whether Segr Door to Bins collection egati Qty Transportation Sanitary Current Position Door Provid spots are on of Process facility Landfill Collection ed attended wast ed daily e Truck-01, Tractor Yes 184 Yes No Nil No Trailer- 04,Tricycle-30 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019-20 Proposed  Collection from Community Bins until 100% door to door collection intervention  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material. Estimated Project Cost (PC) 6.57 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (through Swachha Central Assistance/Grant (@75% of PC) 4.93 Cr Bharat Mission) State Assistance/Grant (@25% of PC) 1.64 Cr Total 6.57 Cr Period of 2016-17 implementation *Based on the calculation of the state average per capita per day MSW generation @300 gram **Based on per capita cost of Rs 1500 in accordance with the “Swachh Bharat Mission” Guidelines

Action Plan for SWM in ULBs of Odisha 56

Name of the ULB ATHAMALLIK NAC, DIST- ANGUL, ORISSA Population 12,298 Cr Estimated MSW Generation 3.69 MT (TPD)* Landfill Site Authorization Authorization valid up to 31.03.2014. Applied for renewal Status 12th Finance Commission Grant for equipment and 36.40 vehicles procurement (Rs. in Lakhs) Door Whether to Bins collection Segrega Qty Sanitar Transportation Current Position Door Provid spots are tion of Proce y facility Colle ed attended waste ssed Landfill ction daily Tractor-02, No 41 Yes No Push Cart- Nil No 05,Tricycle-08 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Bacterial Composting with Sieve Arrangement (Manual) /Bio Methanization E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 1.84 Cr (Rs. in Crore)** Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.38 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.46 CR Total 1.84 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 57

Name of the ULB BALIMELA NAC, DIST-MALKANGIRI, ORISSA Population 11,796 Estimated MSW Generation 3.54 MT (TPD)* Landfill Site Authorization Not applied for Authorization Status 12th Finance Commission Grant for equipment and 18.30 vehicles procurement (Rs. in Lakhs) Door Whether Sanit to Bins collection Segreg Qty Transportation ary Current Position Door Provi spots are ation of Proce facility Land Colle ded attended waste ssed fill ction daily Tractor Trailer- Yes 10 Yes No 01, Wheel Nil No Barrow-04 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Bacterial Composting with Sieve Arrangement (Manual) /Bio Methanization E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 1.78 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.34 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.44 Cr Total 1.78 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 58

Name of the ULB BALUGAON NAC, DIST-KHURDA, ORISSA Population 17,645 Estimated MSW Generation 5.29 MT (TPD)* Landfill Site Authorization Authorization applied for and is under process Status 12th Finance Commission Grant for equipment and 26.10 vehicles procurement (Rs. in Lakhs) Wheth er Door collect Segre to Bins ion Qty gation Transportatio Sanitary Current Position Door Provi spots Processe of n facility Landfill Colle ded are d waste ction attend ed daily Tractor Yes 10 Yes No Nil No Trailer-02 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 1.9 Cr.; proposed under ICZMP (Rs. in Crore)** Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 59

Name of the ULB BANKI NAC, DIST-CUTTACK, ORISSA Population 17,521 Estimated MSW Generation 5.26 MT (TPD)* Landfill Site Authorization Authorization Refused Status 12th Finance Commission Grant for equipment and 25 vehicles procurement (Rs. in Lakhs) Door Whether Segre to Bins Qty Sanitar collection gation Transportatio Current Position Door Provi Proce y spots are of n facility Colle ded ssed Landfill attended daily waste ction Tractor No 60 No No Nil No Trailer-03 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.63 Cr (Rs. in Crore)**

Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.97 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.66 Cr

Total 2.63 Cr

Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 60

Name of the ULB BANAPUR NAC, DIST-KHURDA, ORISSA Population 17,278 Estimated MSW Generation 5.18 MT (TPD)* Landfill Site Authorization Authorization valid up to 31.03.2014. Not applied for renewal. Status 12th Finance Commission Grant for equipment and 27.30 vehicles procurement (Rs. in Lakhs) Door Whether Qty Sanit to Bins Segrega collection Transportation Proc ary Current Position Door Provi tion of spots are facility ess Land Colle ded waste attended daily ed fill ction Tractor Trailer- Yes 68 Yes No 01, Wheel Nil No Barrow-07 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.59 Cr (Rs. in Crore)**

Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.94 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.65 Cr Total 2.59 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 61

Name of the ULB BELAGUNTHA NAC, DIST-GANJAM, ORISSA Population 11,297 Estimated MSW Generation 3.39 MT (TPD)* Landfill Site Authorization Not applied for Authorization Status 12th Finance Commission Grant for equipment and 17.80 vehicles procurement (Rs. in Lakhs) Door San Whether to Bins Segrega Transpor itar collection spots Qty Current Position Door Provi tion of tation y are attended Processed Colle ded waste facility Lan daily ction dfill Tractor Yes 12 Yes No Trailer- Nil No 01 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Bacterial Composting with Sieve Arrangement (Manual) /Bio Methanization E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 1.69 Cr (Rs. in Crore)**

Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.27 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.42 Cr Total 1.69 cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 62

Name of the ULB BHANJANAGAR NAC, DIST-GANJAM, ORISSA Population 20,482 Estimated MSW Generation 6.14 MT (TPD)* Landfill Site Authorization Not Applied Status 12th Finance Commission Grant for equipment and 26.40 vehicles procurement (Rs. in Lakhs) Door San Whether Qty to Bins Segregati itar collection Transportation Pro Current Position Door Provi on of y spots are facility ces Colle ded waste Lan attended daily sed ction dfill Tractor Trailer- No 41 Yes No 01, Wheel Nil No Barrow-08 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 3.07 Cr (Rs. in Crore)**

Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 2.30 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.77 Cr

Total 3.07 Cr

Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 63

Name of the ULB BHUBAN NAC, DIST-DHENKANAL, ORISSA Population 22,200 Estimated MSW Generation 6.66 MT (TPD)* Landfill Site Authorization Applied for Authorization and is under process Status 12th Finance Commission Grant for equipment and 38.80 vehicles procurement (Rs. in Lakhs) Door Whether San to Bins collection Segrega Qty itar Transportation Current Position Door Provi spots are tion of Proce y facility Colle ded attended waste ssed Lan ction daily dfill Tractor Trailer-01, Dumper Placer- 01, Tricycle-16, Yes 50 Yes No Nil No Auto Tipper- 01,Wheel Barrow- 20 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 3.33 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 2.50 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.83 Cr Total 3.33 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 64

Name of the ULB BINIKA NAC, DIST-SUBARNAPUR, ORISSA Population 15,765 Estimated MSW 4.73 MT Generation (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2018 Status 12th Finance Commission Grant for equipment and 37.70 vehicles procurement (Rs. in Lakhs) Door Whether Qty Sanit to Bins collection Segrega Transportation Proc ary Current Position Door Provi spots are tion of facility esse Landfi Collec ded attended waste d ll tion daily Tractor Trailer- No 21 No No 01, Power Nil No Tiller-01 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019-20  Collection from Community Bins until 100% door to door collection Proposed intervention  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Bacterial Composting with Sieve Arrangement (Manual) /Bio Methanization E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.36 Cr (Rs. in Crore)** Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.77 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.59 Cr

Total 2.36 Cr

Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 65

Name of the ULB BOUDHGARH NAC, DIST-BOUDH, ORISSA Population 20,424 Estimated MSW Generation 6.13 MT (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2016 Status 12th Finance Commission Grant for equipment and 40.80 vehicles procurement (Rs. in Lakhs) Door Whether Sanit to Bins collection Segreg Transportati Qty ary Current Position Door Provi spots are ation of on facility Processed Landfi Colle ded attended waste ll ction daily

No 42 Yes No Tractor-02 Nil No

A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 3.07 Cr (Rs. in Crore)**

Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 2.30 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.77 Cr

Total 2.37 Cr

Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 66

Name of the ULB BUGUDA NAC, DIST GANJAM-, ORISSA Population 15,176 Estimated MSW Generation 4.55 MT (TPD)* Landfill Site Authorization Not applied for Authorization Status 12th Finance Commission Grant for equipment and 21.90 vehicles procurement (Rs. in Lakhs) Door Whether Qty Sanit to Bins Segreg collection Transportation Proc ary Current Position Door Provi ation of spots are facility esse Landfi Colle ded waste attended daily d ll ction Tractor Trailer-02, Yes 68 Yes No Tricycle-09, Nil No Wheel Barrow-25 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Bacterial Composting with Sieve Arrangement (Manual) /Bio Methanization E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.28 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.71 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.57 Cr Total 2.28 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 67

Name of the ULB BALASORE MUNICIPALITY, DIST-BALASORE, ORISSA

Population 1,18,162 Estimated MSW 35.45 Generation (TPD)* Landfill Site Authorization valid up to 31.03.2014. Not applied for renewal Authorization Status 12th Finance Commission Grant for 278.30 equipment &vehicles procurement (Rs. lakhs) Whether Door to Bins collection Segrega Qty Sanitar Door Transportation Current Position Provi spots are tion of Proces y Collectio facility ded attended waste sed Landfill n daily Mini Truck -02, Tractor Tipper - 03, Tricycle-49, Wheel barrow- Yes 328 No No Nil No 141,Push Cart- 42, Refuse collector-01 Tricycle-65 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019-20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Stations through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material. Estimated Project Cost** Rs. 17.72 Cr Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 13.29 Cr Lakhs) State Assistance/Grant (@25% of PC) 4.43 Cr Total 17.72 Cr Period of 2016-17 implementation *Based on the calculation of the state average per capita per day MSW generation @300 gram **Based on per capita cost of Rs 1500 in accordance with the “Swachh Bharat Mission” Guidelines

Action Plan for SWM in ULBs of Odisha 68

Name of the ULB BARIPADA MUNICIPALITY, DIST-MAYURBHANJ, ORISSA Population 1,09,743 Estimated MSW Generation 32.92 MT (TPD)* Landfill Site Authorization Authorization valid up to 31.03.2013. Not applied for renewal. Status 12th Finance Commission Grant for equipment and 112.20 vehicles procurement (Rs. in Lakhs) Whether Door Segr collectio to Bins egati Qty n spots Transportation Sanitary Current Position Door Prov on of Proce are facility Landfill Colle ided wast ssed attende e ction d daily Hydraulic Tractor- 02, Auto Tipper-04, Tractor Trailer-02, Dumper Placcer- Yes 398 Yes No Nil No 02,Tricycle-44, Push Cart-38,Road Roller-01, Cess Pool Evacuation-01 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material. Estimated Project Cost (PC) Rs. 16.46 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 12.35 Cr Lakhs) State Assistance/Grant (@25% of PC) 4.11 Cr Total 16.46 Cr Period of implementation 2016-17 *Based on the calculation of the state average per capita per day MSW generation @300 gram **Based on per capita cost of Rs 1500 in accordance with the “Swachh Bharat Mission” Guidelines

Action Plan for SWM in ULBs of Odisha 69

Name of the ULB BHADRAK MUNICIPALITY, DIST-BHADRAK, ORISSA

Population 1,07,463 Estimated MSW Generation 32.24 MT (TPD)* Landfill Site Authorization Not applied Status 12th Finance Commission Grant for equipment and 107.30 vehicles procurement (Rs. in Lakhs) Whethe Door Bin r collecti Segre to s Qty on gation Transportation Sanitary Current Position Door Pro Processe spots of facility Landfill Colle vid d are waste ction ed attende d daily , Tractor Trailer- 03, Dumper Placers-02, No 254 Yes No Tricycle-43, Nil No Auto Tipper-04, Double Wheel Barrow-50 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material. Estimated Project Cost (PC) Rs. 16.12 Cr; proposed to be funded under ICZMP (Rs. in Crore)** *Based on the calculation of the state average per capita per day MSW generation @300 gram **Based on per capita cost of Rs 1500 in accordance with the “Swachh Bharat Mission” Guidelines

Action Plan for SWM in ULBs of Odisha 70

Name of the ULB BHAWANIPATNA MUNICIPALITY, DIST-KALAHANDI, ORISSA

Population 69,045 Estimated MSW Generation 20.71 MT (TPD)* Landfill Site Authorization Authorization valid up to 31.03.2012. Applied for renewal Status 12th Finance Commission Grant for equipment and 67.60 vehicles procurement (Rs. in Lakhs) Door Whether Segre to Bins collection Qty gation Transportation Sanitary Current Position Door Provi spots are Process of facility Landfill Colle ded attended ed waste ction daily Tricycle- 28,Tractor-05, - 137 Yes No Tractor Trailer- Nil No 03, Auto Tipper-03 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 10.36 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 7.77 Cr Lakhs) State Assistance/Grant (@25% of PC) 2.59 Cr Total 10.36 Cr Period of implementation 2016-17 *Based on the calculation of the state average per capita per day MSW generation @300 gram **Based on per capita cost of Rs 1500 in accordance with the “Swachh Bharat Mission” Guidelines

Action Plan for SWM in ULBs of Odisha 71

Name of the ULB BIRAMITRAPUR MUNICIPALITY, DIST-SUNDERGARH, ORISSA Population 33,442 Estimated MSW Generation 10.03 (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2018 Status 12th Finance Commission Grant for equipment and 52.60 vehicles procurement (Rs. in Lakhs) Door Whether Segre Sanit to Bins collection Qty gation Transportation ary Current Position Door Provi spots are Proce of facility Landfi Colle ded attended ssed waste ll ction daily Tractor Trailer-02, Wheel Barrow-35, Refuse Collector- Yes 78 Yes No Nil No 16,Tricycle-14, AutoTipper-02, AttachmentBin-02 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 5.02 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 3.76 Cr Lakhs) State Assistance/Grant (@25% of PC) 1.26 Cr Total 5.02 Cr Period of implementation 2017-18 *Based on the calculation of the state average per capita per day MSW generation @300 gram **Based on per capita cost of Rs 1500 in accordance with the “Swachh Bharat Mission” Guidelines

Action Plan for SWM in ULBs of Odisha 72

Name of the ULB BOLANGIR MUNICIPALITY, DIST-BOLANGIR, ORISSA Population 98,238 Estimated MSW Generation 29.47 (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2015. Status 12th Finance Commission Grant for equipment and 102.60 vehicles procurement (Rs. in Lakhs) Door Whether San to Bins collection Segrega Qty itar Transportation Current Position Door Provi spots are tion of Process y facility Colle ded attended waste ed Lan ction daily dfill Mini Truck -01, Tractor-05, Excavator-01, No 75 No No Nil No Auto Tipper-04, Hook Loader Lorry-01 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 14.73 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 11.05 Cr Lakhs) State Assistance/Grant (@25% of PC) 3.68 Cr Total 14.73 Cr Period of implementation 2016-17 *Based on the calculation of the state average per capita per day MSW generation @300 gram **Based on per capita cost of Rs 1500 in accordance with the “Swachh Bharat Mission” Guidelines

Action Plan for SWM in ULBs of Odisha 73

Name of the ULB CHOUDWAR MUNICIPALITY, DIST-CUTTACK, ORISSA Population 42,784 Estimated MSW Generation 12.84 (TPD)* Landfill Site Authorization Authorization granted was valid up to 31-03-2014. Applied for renewal Status 12th Finance Commission Grant for equipment and 67.32 vehicles procurement (Rs. in Lakhs) Door Whether to Bins collection Segrega Qty Transportatio Sanitary Current Position Door Provi spots are tion of Process n facility Landfill Colle ded attended waste ed ction daily Tractor Trailer-02, No 22 Yes No Nil No Wheel Barrow-70 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 6.42 Cr (Rs. in Crore)** Source Amount Rs. In Crore Central Assistance/Grant (@75% of PC) 4.82 Cr Means of finance (Rs. In Lakhs) State Assistance/Grant (@25% of PC) 1.60

Total 6.42 Cr

Period of implementation 2017-18 *Based on the calculation of the state average per capita per day MSW generation @300 gram **Based on per capita cost of Rs 1500 in accordance with the “Swachh Bharat Mission” Guidelines

Action Plan for SWM in ULBs of Odisha 74

Name of the ULB DEOGARH MUNICIPALITY, DIST- DEOGARH, ORISSA Population 22,390 Estimated MSW Generation 6.72 MT (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2015 Status 12th Finance Commission Grant for equipment and 49.90 vehicles procurement (Rs. in Lakhs) Seg Door Whether rega Sanit to Bins collection tion Transportation Qty ary Current Position Door Provi spots are of facility Processed Land Colle ded attended wast daily fill ction e Mini Truck-01, Tractor Yes 61 Yes No Nil No Trailer- 03,Tricycle-13 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 3.36 Cr (Rs. in Crore)** Source Amount Rs. In Crore Central Assistance/Grant (@75% of PC) 2.52 Cr Means of finance (Rs. In Lakhs) State Assistance/Grant (@25% of PC) 0.84 Cr

Total 3.36 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 75

Name of theULB G.UDAYAGIRI NAC, DIST-PHULBANI, ORISSA Population 11,302 Estimated MSW Generation 3.39 MT (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2018 Status 12th Finance Commission Grant for equipment and 26.70 vehicles procurement (Rs. in Lakhs) Door Whether Segre to Bins collection Sanitar gation Transporta Qty Current Position Door Provi spots are y of tion facility Processed Colle ded attended Landfill waste ction daily Tractor Yes 02 Yes No Trailer-02, Nil No Tricycle-07 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Bacterial Composting with Sieve Arrangement (Manual) /Bio Methanization E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 1.69 Cr (Rs. in Crore)** Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.27 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.42 Cr

Total 1.69 Cr

Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 76

Name of the ULB GANJAM NAC, DIST-GANJAM, ORISSA Population 11,474 Estimated MSW Generation 3.52 MT (TPD)* Landfill Site Authorization Not Applied Status 12th Finance Commission Grant for equipment and 23.40 vehicles procurement (Rs. in Lakhs) Door Whether to Bins collection Segregati Qty Sanitar Transportati Current Position Door Provi spots are on of Process y on facility Colle ded attended waste ed Landfill ction daily Tricycle-06, Wheel Yes 30 Yes No Nil No Barrow-08, Tractor-01 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Bacterial Composting with Sieve Arrangement (Manual) /Bio Methanization E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 1.76 Cr (Rs. in Crore)**

Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 3.52 Cr Lakhs) State Assistance/Grant (@25% of PC) 1.32 Cr Total 1.76 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 77

Name of the ULB GUDARI NAC, DIST-RAYAGADA, ORISSA Population 6,931 Estimated MSW Generation 2.08 MT (TPD)* Landfill Site Authorization Applied for Authorization and is under process Status 12th Finance Commission Grant for equipment and 12.50 vehicles procurement (Rs. in Lakhs) Door Whether to Bins collection Segrega Qty Sanitar Transportation Current Position Door Provi spots are tion of Proce y facility Colle ded attended waste ssed Landfill ction daily Tractor Trailer-02, Dumper No 51 Yes No Nil No Placer- 01,Animal Cart-04 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Bacterial Composting with Sieve Arrangement (Manual) /Bio Methanization E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 1.04 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 0.78 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.26 Cr Total 1.04 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 78

Name of the ULB GUNPUR NAC, DIST-RAYAGADA, ORISSA Population 24,162 Estimated MSW Generation 7.25 MT (TPD)* Landfill Site Authorization Authorization granted and valid up to 31-03-2017. Status 12th Finance Commission Grant for equipment and 35.40 vehicles procurement (Rs. in Lakhs) Door Whether Sanit to Bins Segreg Qty collection spots Transportati ary Current Position Door Provi ation of Proce are attended on facility Land Colle ded waste ssed daily fill ction Tractor Trailer- 02,Dumper Yes 117 Yes No Placer- Nil No 01,Tricycle- 14, Wheel Barrow-20 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 3.62 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 2.71 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.91 Cr Total 3.62 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 79

Name of the ULB JAGATSINGHPUR MUNICIPALITY, DIST- JAGATSINGHPUR, ORISSA Population 33,631 Estimated MSW Generation 10.09 MT (TPD)* Landfill Site Authorization Applied for Authorization and is under process Status 12th Finance Commission Grant for equipment and 45.80 vehicles procurement (Rs. in Lakhs) Door Whether Segre Sanit to Bins collection Qty gation Transportatio ary Current Position Door Provi spots are Processe of n facility Landfi Colle ded attended d waste ll ction daily Truck-01, No 70 No No Tractor Nil No Trailer-01 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 3.88 Cr. proposed under ICZMP (Rs. in Crore)**

Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 80

Name of the ULB JALESWAR NAC, DIST-BALASORE, ORISSA Population 25,747 Estimated MSW Generation 7.72 MT (TPD)* Landfill Site Authorization Not Applied Status 12th Finance Commission Grant for equipment and 39.50 vehicles procurement (Rs. in Lakhs) Door Whether Sanit to Bins collection Segregati Qty Transporta ary Current Position Door Provi spots are on of Proces tion facility Landfi Colle ded attended waste sed ll ction daily Truck Tipper-01, No 15 Yes No Nil No Animal Cart-01 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 3.86 Cr (Rs. in Crore)**

Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 2.90 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.96 Cr Total 3.86 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 81

Name of the ULB JUNAGARH NAC, DIST-KALAHANDI, ORISSA Population 19,656 Estimated MSW Generation 5.90 MT (TPD)* Landfill Site Authorization Authorization granted was valid up to 31.03.2013. Not Applied for Renewal Status Case filed. 12th Finance Commission Grant for equipment and 34.90 vehicles procurement (Rs. in Lakhs) Door Whether Segre to Bins collection Qty Sanitar gation Transportati Current Position Door Provi spots are Processe y of on facility Colle ded attended d Landfill waste ction daily Tractor Trailer-01, No 131 No No Nil No Wheel Barrow-01 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.95 Cr (Rs. in Crore)**

Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 2.21 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.74 Cr Total 2.95 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 82

Name of the ULB KEONJHARGARH MUNICIPALITY, DIST-KEONJHAR, ORISSA Population 60,590 Estimated MSW Generation 18.18 MT (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2019. Status 12th Finance Commission Grant for equipment and 71.60 vehicles procurement (Rs. in Lakhs) Door Whether Qty Sanit to Bins Segrega collection Transportation Proc ary Current Position Door Provi tion of spots are facility ess Land Colle ded waste attended daily ed fill ction Tractor Trailer- 03, Dumper Placer- Yes 325 Yes No Nil No 02,Tricycle-22, Wheel Barrow- 35 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 9.09 Cr (Rs. in Crore)**

Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 6.82 Cr Lakhs) State Assistance/Grant (@25% of PC) 2.27 Cr Total 9.09 Cr Period of implementation 2016-17 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 83

Name of the ULB KAMAKSHYANAGAR NAC, DIST-DHENKANAL, ORISSA Population 16,810 Estimated MSW Generation 5.04 MT (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2019 Status 12th Finance Commission Grant for equipment and 30.10 vehicles procurement (Rs. in Lakhs) Door Whether Segre Sanit to Bins collection Qty gation Transportation ary Current Position Door Provi spots are Process of facility Landfi Colle ded attended ed waste ll ction daily Tractor Trailer-01, Wheel Yes 62 No No Nil No Barrow-04, Power Trailer- 01 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.52 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.89 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.63 Cr Total 2.52 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 84

Name of the ULB KANTABANJI NAC, DIST-BALANGIR, ORISSA Population 21,819 Estimated MSW Generation 6.55 MT (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2015 Status 12th Finance Commission Grant for equipment and 29.40 vehicles procurement (Rs. in Lakhs) Door Whether Sanit to Bins collection Segregati Qty Transportatio ary Current Position Door Provi spots are on of Proce n facility Land Colle ded attended waste ssed fill ction daily Tractor Yes 06 Yes No Trailer-02, Nil No Tricycle-13 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 3.27 Cr (Rs. in Crore)**

Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 2.45 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.82 Cr

Total 3.27 Cr

Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 85

Name of the ULB KARANJIA NAC, DIST-MAYURBHANJA, ORISSA Population 22,865 Estimated MSW Generation 6.86 MT (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2015 Status 12th Finance Commission Grant for equipment and 42.70 vehicles procurement (Rs. in Lakhs) Door Segr Whether Sanit to Bins egati Qty collection spots Transportati ary Current Position Door Provi on of Proces are attended on facility Landfi Colle ded wast sed daily ll ction e Tractor Trailer-02, Yes 85 Yes No Tricycle- Nil No 14,Push Cart-09 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 3.43 Cr (Rs. in Crore)** Source Amount Rs. In Crore Central Assistance/Grant (@75% of PC) 2.57 Cr Means of finance (Rs. In Lakhs) State Assistance/Grant (@25% of PC) 0.85 Cr Total 3.42 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 86

Name of the ULB KESINGA NAC, DIST-KALAHANDI, ORISSA Population 19,239 Estimated MSW Generation 5.77 MT (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2018. Status 12th Finance Commission Grant for equipment and 34.70 vehicles procurement (Rs. in Lakhs) Door Whether San Qty to Bins collection Segreg itar Transportation Proc Current Position Door Provi spots are ation of y facility esse Colle ded attended waste Lan d ction daily dfill Tractor Trailer-02, Wheel Barrow-30, Dumper Placer- Yes 385 Yes No 01, Push Cart-07, Nil No Tricycle-11, Auto Tipper-01, Two wheeler-06 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.88 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 2.16 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.72 Cr Total 2.88 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 87

Name of the ULB KHALLIKOTE NAC, DIST-GANJAM, ORISSA Population 13,022 Estimated MSW Generation 3.91 MT (TPD)* Landfill Site Authorization Applied for Authorization and is under process Status 12th Finance Commission Grant for equipment and 43.70 vehicles procurement (Rs. in Lakhs) Door Whether Sanit to Bins collection Segregati Qty Transportatio ary Current Position Door Provi spots are on of Process n facility Landfi Colle ded attended waste ed ll ction daily Tractor No 51 Yes No Trailer-01, Nil No Tricycle-03 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Bacterial Composting with Sieve Arrangement (Manual) /Bio Methanization E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 1.95 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.46 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.49 Cr Total 1.95 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 88

Name of the ULB KHANDAPARA NAC, DIST-NAYAGARH, ORISSA Population 9,038 Estimated MSW Generation 2.71 MT (TPD)* Landfill Site Authorization Authorization valid up to 31.03.2014. Renewal not applied. Status 12th Finance Commission Grant for equipment and 27.50 vehicles procurement (Rs. in Lakhs) Door Whether Qty Sanit to Bins Segregati collection spots Transporta Proc ary Current Position Door Provi on of are attended tion facility esse Landfi Colle ded waste daily d ll ction Tractor Trailler- Yes 70 - No Nil No 02,Tricycle -06 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Bacterial Composting with Sieve Arrangement (Manual) /Bio Methanization E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 1.36 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.02 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.34 Cr Total 1.36 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 89

Name of the ULB NAC, DIST-NUAPADA, ORISSA Population 18,967 Estimated MSW Generation 5.69 MT (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2018. Status 12th Finance Commission Grant for equipment and 39.60 vehicles procurement (Rs. in Lakhs) Door Whether Segre Sanit to Bins Transport Qty collection spots gation ary Current Position Door Provi ation Process are attended of Landfi Colle ded facility ed daily waste ll ction Tractor Yes 34 - No Nil No Trailer-02 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.84 Cr (Rs. in Crore)**

Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 2.13 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.71 Cr

Total 2.84 Cr

Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 90

Name of the ULB KHARIAR NAC, DIST- NUAPADA, ORISSA Population 15,087 Estimated MSW Generation 4.53 MT (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2018 Status 12th Finance Commission Grant for equipment and 32.80 vehicles procurement (Rs. in Lakhs) Door San Whether to Bins Segrega Qty itar collection spots Transportatio Current Position Door Provi tion of Proce y are attended n facility Colle ded waste ssed Lan daily ction dfill Tractor Trailer-02, Dumper Yes 43 Yes No Nil No Placers(Bins) -11, Tricycle- 09 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Bacterial Composting with Sieve Arrangement (Manual) /Bio Methanization E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.26 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.70 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.56 Cr Total 2.26 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 91

Name of the ULB KODALA NAC, DIST-GANJAM, ORISSA Population 13,965 Estimated MSW Generation 4.19 MT (TPD)* Landfill Site Authorization Not applied for Authorization Status 12th Finance Commission Grant for equipment and 35.20 vehicles procurement (Rs. in Lakhs) Door Whether San Qty to Bins collection itar Segregation Transportatio Proc Current Position Door Provi spots are y of waste n facility esse Colle ded attended Lan d ction daily dfill Tricycle-08, No 8 Yes No Tractor Nil No Trailer-01 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Bacterial Composting with Sieve Arrangement (Manual) /Bio Methanization E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.09 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.57 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.52 Cr Total 2.09 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 92

Name of the ULB KONARK NAC, DIST-PURI, ORISSA Population 16,779 Estimated MSW Generation 5.03 MT (TPD)* Landfill Site Authorization Applied for Authorization and is under process Status 12th Finance Commission Grant for equipment and 52.20 vehicles procurement (Rs. in Lakhs) Wheth er Door collect Segre to Bins ion Qty gation Transportatio Sanitary Current Position Door Provi spots Processe of n facility Landfill Colle ded are d waste ction attend ed daily Tractor- No 20 Yes No 01,Wheel Nil No Barrow-10 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.88 Cr. proposed under ICZMP (Rs. in Crore)

Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 93

Name of theULB KOTPAD NAC, DIST-KORAPUT, ORISSA Population 16,326 Estimated MSW Generation 4.90 MT (TPD)* Landfill Site Authorization Authorization valid up to 31.03.2014. Renewal not applied Status 12th Finance Commission Grant for equipment and 31 vehicles procurement (Rs. in Lakhs) Door Whether Segre to Bins collection Qty gation Transportati Sanitary Current Position Door Provi spots are Processe of on facility Landfill Colle ded attended d waste ction daily Tractor Yes 04 No No Trailer-02, Nil No Tricycle-02 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Bacterial Composting with Sieve Arrangement (Manual) /Bio Methanization E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.45 Cr (Rs. in Crore)** Source Amount Rs. In Crore Central Assistance/Grant (@75% of PC) 1.84 Cr Means of finance (Rs. In Lakhs) State Assistance/Grant (@25% of PC) 0.61 Cr

Total 2.45 Cr

Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 94

Name of theULB KUCHINDA NAC, DIST-SAMBALPUR, ORISSA Population 15,576 Estimated MSW Generation 4.67 MT (TPD)* Landfill Site Authorization Not applied for Authorization Status 12th Finance Commission Grant for equipment and 33.20 vehicles procurement (Rs. in Lakhs) Door Whether Sanit to Bins collection Segrega Qty Transportation ary Current Position Door Provi spots are tion of Proce facility Land Colle ded attended waste ssed fill ction daily Tractor No 17 Yes No Nil No Trailer-01 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Bacterial Composting with Sieve Arrangement (Manual) /Bio Methanization E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.34 Cr (Rs. in Crore)**

Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.75 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.59 Cr

Total 2.34 Cr

Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 95

Name of the ULB KENDRAPARA MUNICIPALITY, DIST-KENDRAPARA, ORISSA Population 47,006 Estimated MSW Generation 14.10 MT (TPD)* Landfill Site Authorization Authorization granted and valid up to 31-03-2019. Status 12th Finance Commission Grant for equipment and 50.20 vehicles procurement (Rs. in Lakhs) Door Whether San to Bins collection Segrega Transport itar Qty Current Position Door Provi spots are tion of ation y Processed Colle ded attended waste facility Lan ction daily dfill Tractor Trailer- 04,Tricycl Yes - Yes No e-10,Auto Nil No Tipper- 02,Wheel Barrow-50 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 7.05 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 5.29 Cr Lakhs) State Assistance/Grant (@25% of PC) 1.76 Cr Total 7.05 Cr Period of implementation 2016-17 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 96

Name of the ULB MALKANAGIRI NAC, DIST-MALKANAGIRI, ORISSA Population 31,007 Estimated MSW Generation 9.30 MT (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2019 Status 12th Finance Commission Grant for equipment and 40.40 vehicles procurement (Rs. in Lakhs) Door Whether Sanit to Bins collection Segreg Qty Transportatio ary Current Position Door Provi spots are ation of Process n facility Landfi Colle ded attended waste ed ll ction daily Tractor-02, No 121 Yes No Wheel Nil No Barrow-50 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 4.65 Cr (Rs. in Crore)** Source Amount Rs. In Crore Central Assistance/Grant (@75% of PC) 3.49 Cr Means of finance (Rs. In Lakhs) State Assistance/Grant (@25% of PC) 1.16 Cr

Total 4.65 Cr

Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 97

Name of the ULB NAWARANGPUR MUNICIPALITY, DIST-NAWARANGPUR, ORISSA Population 29,960 Estimated MSW Generation 8.99 MT (TPD)* Landfill Site Authorization Authorization valid up to 31.03.2013. Renewal not applied. Status 12th Finance Commission Grant for equipment and 37.00 vehicles procurement (Rs. in Lakhs) Door Segr San Whether to Bins egati itar collection spots Transportati Qty Current Position Door Provi on of y are attended on facility Processed Colle ded wast Lan daily ction e dfill Tractor- 04,Tractor Trailer-02, No 54 Yes No Nil No Tricycle- 07,Wheel Barrow-20 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 4.49 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 3.37 Cr Lakhs) State Assistance/Grant (@25% of PC) 1.12 Cr Total 4.49 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 98

Name of the ULB NAYGARH NAC, DIST-NAYAGARH, ORISSA Population 17,030 Estimated MSW Generation 5.11 MT (TPD)* Landfill Site Authorization Authorization granted was valid up to 31-03-2012. Not applied for Renewal. Status 12th Finance Commission Grant for equipment and 34.80 vehicles procurement (Rs. in Lakhs) Door Whether Sanit to Bins collection Segrega Qty Transportatio ary Current Position Door Provid spots are tion of Proces n facility Landfi Colle ed attended waste sed ll ction daily Tractor Trailer- No 70 Yes No 03,Tricycle- Nil No 10, Wheel Barrow-19 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.55 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.91 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.64 Cr Total 2.55 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 99

Name of the ULB NILAGIRI NAC, DIST-BALASORE, ORISSA Population 17,264 Estimated MSW Generation 5.18 MT (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2015 Status 12th Finance Commission Grant for equipment and 35.50 vehicles procurement (Rs. in Lakhs) Door Whether to Bins collection Segregati Qty Sanitar Transporta Current Position Door Provi spots are on of Process y tion facility Colle ded attended waste ed Landfill ction daily Tractor Trailer-01, No 10 Yes No Nil No Wheel Barrow-06 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.59 Cr (Rs. in Crore)**

Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.94 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.65 Cr Total 2.59 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 100

Name of theULB NIMAPARA NAC, DIST-PURI , ORISSA Population 19,289 Estimated MSW Generation 5.79 MT (TPD)* Landfill Site Authorization Authorization valid up to 31.03.2012. Renewal applied and is under process Status 12th Finance Commission Grant for equipment and 34.60 vehicles procurement (Rs. in Lakhs) Door Whether Sanit to Bins collection Segrega Qty Transportati ary Current Position Door Provi spots are tion of Process on facility Land Colle ded attended waste ed fill ction daily Tractor Trailer- 01,Tricycle- No 31 No No Nil No 10,Trolley Rickshaw- 01 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.89 Cr (Rs. in Crore)** Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 2.17 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.72 Cr Total 2.89 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 101

Name of the ULB PARADEEP MUNICIPALITY, DIST-JAGATSINGHPUR, ORISSA Population 68,585 Estimated MSW Generation 20.58 MT (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2018 Status 12th Finance Commission Grant for equipment and 94.60 vehicles procurement (Rs. in Lakhs) Door Whether Segre Sanit to Bins Qty collection gation Transportatio ary Current Position Door Provi Process spots are of n facility Land Colle ded ed attended daily waste fill ction Wheel Barrow-50, Tipper-01, Tractor-05, Mini Truck- Yes 44 No No 01, Nil No Dallatempo- 01, Dumper- 01, Cesspool-01, Jeep-01 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 29.05 Cr. under ICZMP proposed to be implemented on PPP (Rs. in Crore) Period of implementation 2016-17 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 102

Name of the ULB PHULBANI MUNICIPALITY, DIST-PHULBANI, ORISSA Population 37,371 Estimated MSW Generation 11.21 MT (TPD)* Landfill Site Authorization Applied for Authorization and is under process Status 12th Finance Commission Grant for equipment and 49.50 vehicles procurement (Rs. in Lakhs) Door Whether to Bins collection Segrega Qty Sanitar Transportatio Current Position Door Provi spots are tion of Process y n facility Colle ded attended waste ed Landfill ction daily Truck-01, No 87 Yes No Tractor Nil No Trailer-02 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 5.61 Cr (Rs. in Crore)**

Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 4.21 Cr Lakhs) State Assistance/Grant (@25% of PC) 1.40 Cr

Total 5.61 Cr

Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 103

Name of the ULB PURI MUNICIPALITY, DIST-PURI, ORISSA Population 2,00,564 Estimated MSW Generation 60.17 MT (TPD)* Landfill Site Authorization Authorization granted was valid up to 31.03.2013. Status Applied for renewalCase filed. 12th Finance Commission Grant for equipment and 307.60 vehicles procurement (Rs. in Lakhs) Door Whether Segre Sanit to Bins collection Qty gation Transportation ary Current Position Door Provi spots are Proces of facility Landfi Colle ded attended sed waste ll ction daily Mini Truck-01, Truck Tipper- No 61 Yes No 01, Tractor 30 No Trailer-10, Tricycle-275 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 30.08 Cr. (Rs. in Crore)** Source Amount Rs. In Crore Central Assistance/Grant (@75% of PC) 22.56 Cr Means of finance (Rs. In Lakhs) State Assistance/Grant (@25% of PC) 7.52 Cr

Total 30.08 Cr Period of implementation 2016-17 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 104

Name of the ULB PADAMPUR NAC, DIST-BARGARH, ORISSA Population 17,625 Estimated MSW Generation 5.29 MT (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2018 Status 12th Finance Commission Grant for equipment and 29.68 vehicles procurement (Rs. in Lakhs) Door Seg Whether rega Qty to Bins Sanitar collection spots tion Transportation Proc Current Position Door Provi y are attended of facility esse Colle ded Landfill daily wast d ction e Tractor No 21 Yes No Trailer- Nil No 02,Tricycle-10 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.64 Cr (Rs. in Crore)**

Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.98 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.66 Cr Total 2.64 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 105

Name of the ULB PATNAGARH NAC, DIST-BALANGIR, ORISSA Population 21,024 Estimated MSW Generation 6.31 MT (TPD)* Landfill Site Authorization Authorization valid up to 31.03.2014. Not applied for renewal Status 12th Finance Commission Grant for equipment and 38.40 vehicles procurement (Rs. in Lakhs) Door Whether Qty Sanit to Bins collection Segregati Transportatio Proc ary Current Position Door Provi spots are on of n facility esse Landfi Colle ded attended waste d ll ction daily Tractor Trailer-02, Dumper Yes 25 Yes No Nil No Placer- 02,Tricycle- 06 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 3.15 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 2.36 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.79 Cr Total 3.15 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 106

Name of the ULB PATTAMUNDAI NAC, DIST-KENDRAPARA, ORISSA Population 36,528 Estimated MSW Generation 10.96 MT (TPD)* Landfill Site Authorization Applied for Authorization and is under process Status 12th Finance Commission Grant for equipment and 37 vehicles procurement (Rs. in Lakhs) Door Whether Segre Sanit to Bins Qty collection spots gation Transportatio ary Current Position Door Provi Proce are attended of n facility Land Colle ded ssed daily waste fill ction Tractor Trailer-01, No 15 Yes No Nil No Wheel Barrow-20 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 5.48 Cr (Rs. in Crore)** Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 4.11 Cr Lakhs) State Assistance/Grant (@25% of PC) 1.37 Cr Total 5.48 Cr Period of implementation 2018-19 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 107

Name of the ULB PIPILI NAC, DIST-PURI , ORISSA Population 17,623 Estimated MSW Generation 5.29 MT (TPD)* Landfill Site Authorization Authorization valid up to 31.03.2014. Renewal not applied Status 12th Finance Commission Grant for equipment and 27.10 vehicles procurement (Rs. in Lakhs) Door Whether Sanit to Bins collection Segreg Transportati Qty ary Current Position Door Provi spots are ation of on facility Processed Landfi Colle ded attended waste ll ction daily Yes 55 Yes No Tricycle-15 Nil No A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.64 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.98 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.66 Cr Total 2.64 Cr Period of implementation 2018-19 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 108

Name of the ULB POLASARA NAC, DIST-GANJAM, ORISSA Population 23,119 Estimated MSW Generation 6.94 MT (TPD)* Landfill Site Authorization Not applied for Authorization Status 12th Finance Commission Grant for equipment and 32 vehicles procurement (Rs. in Lakhs) Door Whether Qty Sanit to Bins Segrega collection spots Transportatio Proc ary Current Position Door Provi tion of are attended n facility ess Landfi Colle ded waste daily ed ll ction Tractor Trailer- No 36 Yes No Nil No 01,Tricycle- 01 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 3.47 Cr (Rs. in Crore)**

Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 2.60 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.87 Cr

Total 3.47 Cr

Period of implementation 2018-19 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 109

Name of the ULB RAJGANGPUR MUNICIPALITY, DIST-SUNDERGARH, ORISSA Population 51,362 Estimated MSW Generation 15.41 MT (TPD)* Landfill Site Authorization Not applied for Authorization Status 12th Finance Commission Grant for equipment and 66.80 vehicles procurement (Rs. in Lakhs) Whethe Door Bin r collecti Segre to s on gation Transportation Qty Sanitary Current Position Door Pro spots of facility Processed Landfill Colle vid are waste ction ed attende d daily Tractor Trailer- 02, Tricycle-20, No - Yes No Wheel Barrow- Nil No 100, Auto Tipper-02 A. CScope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 7.70 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 5.78 Cr Lakhs) State Assistance/Grant (@25% of PC) 1.92 Cr Total 7.70 Cr Period of implementation 2016-17 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 110

Name of the ULB RAYAGADA MUNICIPALITY, DIST-RAYAGADA, ORISSA Population 71,208 Estimated MSW Generation 21.36 MT (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2018 Status 12th Finance Commission Grant for equipment and 72.50 vehicles procurement (Rs. in Lakhs) Door Whether to Bins collection Segregati Qty Sanitar Transporta Current Position Door Provi spots are on of Processe y tion facility Colle ded attended waste d Landfill ction daily Tractor Trailer- 06,Tricycle Yes 58 Yes No Nil No -27, Hook loader Lorry-01 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 10.68 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 8.01 Cr Lakhs) State Assistance/Grant (@25% of PC) 2.67 Cr Total 10.68 Cr Period of implementation 2016-17 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 111

Name of the ULB ROURKELA MUNICIPAL CORPORATION, DIST-SUNDERGARH, ORISSA Population 3,10,976 Estimated MSW Generation 93.29 MT (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2018 Status 12th Finance Commission Grant for equipment and 784.40 vehicles procurement (Rs. in Lakhs) Door Whether Sanit to Bins collection Segreg Qty Transportation ary Door Provi spots are ation of Proce facility Landfi Colle ded attended waste ssed ll ction daily Truck Tipper- Current Position 05, Tractor Trailer-04, Tractor Yes 282 Yes Yes Nil No Attachment-02, Refuse collector-02, Tricycle-65 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal: Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 46.65 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 34.99 Cr Lakhs) State Assistance/Grant (@25% of PC) 11.66 Cr Total 46.65 Cr Period of implementation 2016-17 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 112

Name of the ULB RAIRANGAPUR NAC, DIST-MAYURBHANJA, ORISSA Population 25,516 Estimated MSW Generation 7.65 MT (TPD)* Landfill Site Authorization Authorization granted and valid up to 31.03.2018 Status 12th Finance Commission Grant for equipment and 20.50 vehicles procurement (Rs. in Lakhs) Door Whether Sanit to Bins collection Segreg Qty Transportation ary Current Position Door Provi spots are ation of Proce facility Land Colle ded attended waste ssed fill ction daily Tractor Trailer- 02,Tricycle- 20,Auto Yes 168 Yes No Tipper- Nil No 03,Wheeel Barrow- 07,Push Cart- 18 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 3.83 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 2.87 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.96 Cr Total 3.83 Cr Period of implementation 2018-19 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 113

Name of the ULB RAMBHA NAC, DIST-GANJAM, ORISSA Population 12,111 Estimated MSW Generation 3.63 MT (TPD)* Landfill Site Authorization Applied for Authorization and is under process Status 12th Finance Commission Grant for equipment and 52.60 vehicles procurement (Rs. in Lakhs) Door Whether Qty Sanit to Bins collection Segreg Transportation Proc ary Current Position Door Provi spots are ation of facility ess Land Colle ded attended waste ed fill ction daily Tractor Trailer-01, Tricycle-04, Wheel Yes 104 Yes No Nil No Barrow-10, Trolley- 04 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Bacterial Composting with Sieve Arrangement (Manual) /Bio Methanization E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 1.82 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.37 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.45 Cr Total 1.82 Cr Period of implementation 2018-19 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 114

Name of theULB REDHAKHOL NAC, DIST-SAMBALPUR, ORISSA Population 15,379 Estimated MSW Generation 4.61 MT (TPD)* Landfill Site Authorization Authorization granted was valid up to 31-03-2014. Not applied for renewal. Status 12th Finance Commission Grant for equipment and 40.30 vehicles procurement (Rs. in Lakhs) Door Segr Whether Sanit to Bins egati Qty collection Transportation ary Current Position Door Provi on of Proces spots are facility Land Colle ded wast sed attended daily fill ction e Tractor Trailer- Yes 15 Yes No 01, Tractor- Nil No 02,Tricycle-09 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Bacterial Composting with Sieve Arrangement (Manual) /Bio Methanization E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.31 Cr (Rs. in Crore)**

Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.73 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.58 Cr Total 2.31 Cr Period of implementation 2018-19 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 115

Name of the ULB SUNDERGARH MUNICIPALITY, DIST-SUNDERGARH, ORISSA Population 45,036 Estimated MSW Generation 13.51 MT (TPD)* Landfill Site Authorization Authorization valid up to 31.03.2013. Not applied for renewal Status 12th Finance Commission Grant for equipment and 59.50 vehicles procurement (Rs. in Lakhs) Door Whether Sanit to Bins collection Segregati Transporta Qty ary Current Position Door Provi spots are on of tion facility Processed Land Colle ded attended waste fill ction daily Tractor No 30 No No Trailer-02, Nil No Tricycle-02 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 6.76 Cr (Rs. in Crore)**

Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 5.07 Cr Lakhs) State Assistance/Grant (@25% of PC) 1.69 Cr

Total 6.76 Cr

Period of implementation 2016-17 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 116

Name of the ULB SURUDA NAC, DIST-GANJAM, ORISSA Population 14,867 Estimated MSW Generation 4.46 MT (TPD)* Landfill Site Authorization Not applied. Status 12th Finance Commission Grant for equipment and 19.90 vehicles procurement (Rs. in Lakhs) Door San Whether Transp to Bins Segreg itar collection spots ortatio Qty Current Position Door Provi ation of y are attended n Processed Colle ded waste Lan daily facility ction dfill Tractor No - - - Nil No -01 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Bacterial Composting with Sieve Arrangement (Manual) /Bio Methanization E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 2.23 Cr (Rs. in Crore)**

Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.67 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.56 Cr

Total 2.23 Cr

Period of implementation 2018-19 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 117

Name of theULB TALCHER MUNICIPALITY, DIST-ANGUL, ORISSA Population 40,841 Estimated MSW Generation 12.25 MT (TPD)* Landfill Site Authorization Applied for authoriation and is under process. Status 12th Finance Commission Grant for equipment and 61.80 vehicles procurement (Rs. in Lakhs) Door Whether Qty Sanit to Bins Segrega collection spots Transportation Proc ary Current Position Door Provi tion of are attended facility ess Land Colle ded waste daily ed fill ction Truck-01, Auto Tipper- No 133 No No 02, Tractor Nil No Trailer- 04,Tricycle-21 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal: Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 6.13 Cr (Rs. in Crore)** Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 4.60 Cr Lakhs) State Assistance/Grant (@25% of PC) 1.53 Cr Total 6.13 Cr Period of implementation 2017-18 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 118

Name of the ULB TITLAGARH NAC, DIST-BOLANGIR, ORISSA Population 31,258 Estimated MSW Generation 9.38 MT (TPD)* Landfill Site Authorization Authorization granted was valid up to 31-03-2014. Not applied for renewal. Status 12th Finance Commission Grant for equipment and 34.70 vehicles procurement (Rs. in Lakhs) Door Whether to Bins Segreg Qty Sanitar collection Transportati Current Position Door Provi ation of Proce y spots are on facility Colle ded waste ssed Landfill attended daily ction Tractor Trailer-03, Refuse Yes 06 Yes No Collector- Nil No 44,Dumper Placer-02, Tricycle-13 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 4.69 Cr (Rs. in Crore)** Source Amount Rs. In Crore Central Assistance/Grant (@75% of PC) 3.52 Cr Means of finance (Rs. In Lakhs) State Assistance/Grant (@25% of PC) 1.17 Cr Total 4.69 Cr Period of implementation 2018-19 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 119

Name of the ULB UDALA NAC, DIST-MAYURBHANJA, ORISSA Population 13,152 Estimated MSW Generation 3.95 MT (TPD)* Landfill Site Authorization Not applied for Authorization Status 12th Finance Commission Grant for equipment and 21.80 vehicles procurement (Rs. in Lakhs) Seg Door Whether rega Sanit to Bins collection Qty tion Transportation ary Current Position Door Provi spots are Process of facility Land Colle ded attended ed wast daily fill ction e Tractor Trailer-01, Refuse Collector- Yes 40 Yes No 49,Dumper Nil No Placer-01, Wheel Barrow-08 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Bacterial Composting with Sieve Arrangement (Manual) /Bio Methanization E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 1.97 Cr (Rs. in Crore)** Source Amount Rs. In Crore Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 1.48 Cr Lakhs) State Assistance/Grant (@25% of PC) 0.49 Cr Total 1.97 Cr Period of implementation 2018-19 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 120

Name of the ULB UMERKOTE NAC, DIST-NAWRANGPUR, ORISSA Population 28,993 Estimated MSW Generation 8.70 MT (TPD)* Landfill Site Authorization Authorization valid up to 31.03.2013. Applied for renewal Status 12th Finance Commission Grant for equipment and 51.20 vehicles procurement (Rs. in Lakhs) Sa Door Whether nit to Bins collection Segreg Qty Transportation ary Current Position Door Provi spots are ation of Proce facility La Colle ded attended waste ssed ndf ction daily ill Tractor-03,Truck No 175 Yes No Tipper- Nil No 02,Tricycle-12 A. Scope:  Collection, Transportation, Processing and Disposal  Road Sweeping 100%  Bush Cutting 100%  Drain Cleaning 100% B. Collection:  Source segregation in phases by FY 2019-20  Door to door collection with Tippers/ Tricycles in phasesby FY 2019- 20 Proposed intervention  Collection from Community Bins until 100% door to door collection  Segregation of Recyclable materials through networks of rag-pickers and kabadiwalas C. Transportation Transportation from Transfer Station s through Tractors/ Dumper placers D. Processing:  Mechanical Composting E. Disposal:  Sanitary Land fill of non bio-degradable and inert material Estimated Project Cost (PC) 4.35 Cr (Rs. in Crore)** Source Amount Rs. In Crore

Means of finance (Rs. In Central Assistance/Grant (@75% of PC) 3.26 Cr Lakhs) State Assistance/Grant (@25% of PC) 1.09 Cr

Total 4.35 Cr Period of implementation 2018-19 *Based on per capita generation @300 gram per day **Based on per capita cost of Rs 1500 in accordance with Swach Bharat Mission Programme

Action Plan for SWM in ULBs of Odisha 121

New NACs recently formed

ULBs Population Estimated Project Central State Govt. waste cost (Rs. Govt. Contribution generation Cr.) contribution (Rs. Cr.) TPD (Rs. Cr.) Nuapada 16708 5.0 2.5 1.9 0.6 Atabira 16399 4.9 2.5 1.8 0.6 Hindol 17387 5.2 2.6 2.0 0.7 Tusura 10638 3.2 1.6 1.2 0.4 Dharmgarh 16585 5.0 2.5 1.9 0.6 Daspala 18470 5.5 2.8 2.1 0.7 Ranpur 14715 4.4 2.2 1.7 0.6

Action Plan for SWM in ULBs of Odisha 122

Annexure 4 – Proposed user charges for SWM services by Bhubaneswar Municipal Corporation

Sr. No. Category User charges

Schedule C – Stacking of materials on public street side

Per truck load Rs. 200/- per day

Per tractor/ mini truck load Rs. 100/- per day

Schedule D – Stacking of construction/ demolition debris materials on public street side

Stacking of construction/ demolition debris Rs. 1500/- per tractor trip Rs. 3000/- per truck trip

Schedule E – User charge for littering/ dumping etc. of solid waste management

1 Residential Households

EWS/LIG Rs. 50/- Per Month

MIG Rs. 100/- Per Month

HIG Rs. 200/- Per Month

2 Shops/Shops in Shopping Malls

Up to 200 sft Rs. 100/- Per Month

201 sft to 500 sft Rs. 200/- Per Month

501 sft to 1000 sft Rs. 500/- Per Month

Any extra sft Rs. 5/- Per Sqm Per Month

3 Hat

Shop > 500 sft Rs. 500/- Per Month

Shop (200 sft to 500 sft) Rs. 200/- Per Month

Shop (Up to 200 sft) Rs. 100/- Per Month

4 Road Side Vendors (including vending zone) Rs. 10/- Per Day

5 Godowns& Warehouse

Up to 1000 sft Rs. 100/- Per Month

1000 sft to 5000 sft Rs. 200/- Per Month

More than 5000 sft Rs. 1000/- Per Month

6 Hotels, Restaurants & Open Enclosure

Restaurants & Hotels without accommodation Rs. 10/- Per Sqm Per Month

Hotel & Lodging with accommodation Rs. 5/- Per Sqm Per Month

Other places of public congregation like Marriage Halls, Rs. 8/- Per Sqm Per Month

Action Plan for SWM in ULBs of Odisha 123

Sr. No. Category User charges

Restaurants, Bars, Convention Centers etc.

7 Dhabas on Highway

Up to 1000 sft Rs. 500/- Per Month

More than 1000 sft Rs. 5/- Per Sqm Per Month

8 Wine Shops Rs. 750/- Per Month

9 Big Fast Food chains like KFC, Dominos, Pizza Huts, Rs. 5000/- Per Month Café Coffee Day etc.

10 Educational Institutions

Play Schools Rs. 200/- Per Month

Coaching Center Rs. 500/- Per Month

Non-Residential School & Colleges

Up to 100 Students Rs. 500/- Per Month

From 100-500 Students Rs. 1000/- Per Month

More than 500 Students Rs. 3000/- Per Month

Residential School & colleges

Up to 100 Students Rs. 1000/- Per Month

From 100-500 Students Rs. 3000/- Per Month

More than 500 Students Rs. 5000/- Per Month

11 Health Care Unit

Medical Laboratory/Diagnostic Centers/Pathological Rs. 1000/- Per Month Centers/Doctors Clinic(Without beds)

Hospitals/Nursing Homes(With beds) Rs. 5/- Per Sqm Per Month

12 Cinema Halls & Multiplex Rs. 5/- Per Sqm Per Month

13 Beauty Parlour, Saloon & Spa

Beauty Parlour, Saloon Rs. 500/- Per Month

Spa Rs. 5/- Per Sqm Per Month

14 Showrooms, Service Centers & Garages

Small Garages Rs. 500/- Per Month

Service Centers Rs. 10/- Per Sqm Per Month

Showrooms Rs. 5/- Per Sqm Per Month

15 KalyanMandaps/Marriage Hall Rs. 10/- Per Sqm Per Month

16 Exhibition Grounds Rs. 5/- Per Sqm Per Month

17 Hostel & Paying Guest Hostels Rs. 5/- Per Sqm Per Month

18 Industries

Action Plan for SWM in ULBs of Odisha 124

Sr. No. Category User charges

Small Industry up to 1000 sft Rs. 3000/- Per Month

Industries >1000 sft Rs. 3/- Per Sqm Per Month

19 Printing Press

Up to 500 sft Rs. 300/- Per Month

More than 500 sft Rs. 3/- Per Sqm Per Month

20 Govt. &Pvt Offices

Up to 1000 sft Rs. 200/- Per Month

More than 1000 sft Rs. 2/- Per Sqm Per Month

21 Petrol Pump

Up to 500 sft Rs. 200/- Per Month

More than 500 sft Rs. 5/- Per Sqm Per Month

Schedule F – Slum houses listed under RAY Rs. 50/- month

Action Plan for SWM in ULBs of Odisha 125

Annexure 5 - Concept Note on State Urban Sanitation Strategy for the State of Odisha

PARTA: Parameters determining the existing urban sanitation situation

1 State Profile 1.1 Name of the state Odisha 1.2 Total Urban Population as per 2011Census 7003656 1.3 NumberofStatutorytowns1asperCensus2011 107 1.4 NumberofCensustowns2asperCensus2011 114 Population of statutory towns (as per 5969842 1.5 Census2011) 1.6 Population of census towns (as per Census2011) 1033814 1.7 Total number of urban households 1517073

Totalnos.as StatusofSanitationSituationasperCensus2011[FORSTATUTORY perAnnexure 2 TOWNSONLY] 1 (State)* 2.1 Number of urban households resorting to open defecation(not in premises– 409398 open) 2.2 Number of urban households having pit latrines 55453 2.3 Number of urban households having insanitary latrines 24810

Solid waste management(tentative quantity based on per capita waste 3 generation)[FORSTATUTORYTOWNSONLY] Total(State)* 1,791 3.1 Total Solid waste generated(in MT) 1,254 3.2 Total Waste collected(in MT) 1,191 3.3 Total Waste Transported(in MT) - 3.4 No. of cities with SWM Disposal Facility - 3.5 Total Waste treated(in MT) *City-wise information may also be added wherever available.

Action Plan for SWM in ULBs of Odisha 126

Part B : Institutional Mechanism for Swachh Bharat Mission (SBM) - Urban

Provide Details Name of the Nodal Agency for [Provide name of Nodal Agency; SBM elseifnotdesignated,providedetailsofpro cessbywhichnodalagencywillbeappoint Name and Designation of [edPro] vide name of Nodal Officer; else if Nodal Officer with contact no. not designated, provide details of process by which nodal officer will be appointed] Institutional Mechanism Start date (Month / End Year) date(Month/ Year) a. Constitution of the State‐ [Provide details of S‐ HPC; else if level High Powered not constituted, provide details of Committee(S‐ HPC) process by which S‐ HPC will be constituted; timeline should be max. within 1 month of submission of concept note] b. Setting up of State [Provide details of Mission Directorate; Mission Directorate Else if not constituted, provide details of process by which Mission Directorate will Be constituted; timeline should be max.within1 month of submission of concept note] c. Setting up of PMU at the [Provide details of PMU set‐up; else if state‐level under SBM not set‐up, provide details of process by which PMU will be put in place; timeline should be max. within 3 months of submission of concept note] Submission of Start date (Month / Date of State Sanitation Strategy Year) submission( as per the National Urban Month/ Year) Sanitation Policy, 2008 (please refer Ministry’s website www.moud.gov.in)

Action Plan for SWM in ULBs of Odisha 127

Part C :Component wise action plan for Swachh Bharat Mission (SBM) - Urban

PhysicalTargets

Cumulative Target

Baseline Estimated Target Target Target Target 2018-19 Cumulative Targets Target Remark 1 2014 Projection 2014-15 2015-16 2016-17 2017-18 (up toOct, (2014‐19) upto2019 2019)

A* Construction of new 327518 327518 98255 163759 65504 327518 a individual household latrines(IHL) (30%) (50%) (20%)

Conversion of pit 55453 33272 1664 9982 16636 4991 33273 Projected estimate is 60% of b latrines into sanitary baseline latrines (5%) (30%) (50%) (15%) Conversion of 24810 24810 1241 7443 12405 3721 24810 insanitary latrines into c sanitary latrines (5%) (30%) (50%) (15%) B* Construction of 1. The figures indicate the Community 251 3767 6279 2260 number of toilet seats toilets[NORM: 1 368458 12558 12557 seat/25 womenand1 (2%) (30%) (50%) (18%) 2. As per census data seat/35men] a. HH size = 4.5 b. Sex ratio is 51.7:48.3

C* Construction of Public 105 519 1557 2076 934 Toilets [NORM:1seat 7003656 5191 5191 /50women and1 seat/ (2%) (10%) (30%) (40%) (18%) 100menup to specified numbers**] D Solid waste 21 31 42 10 107 104 104 Management Ongoing projects in 3 (20%) (30%) (40%) (10%) cities E Capacity Building 107 107 107 107 107 107 107 107 Concurrent implementation in all cities F Public Awareness & 107 107 107 107 107 107 107 107 Concurrent IEC implementation in all *Efforts shall be made to construct the toilets within two years i.e.upto2016-17. cities

**Please also refer Manual on Sewerage & Sewerage Systems, Part A form for details

Action Plan for SWM in ULBs of Odisha 128

Financial Targets (RsinCrores) 2 Funding[Asper the funding pattern in the 2014‐ 2014‐15 2015‐16 2016‐17 2017‐18 2018‐ SBM Urban Guidelines] Te2019(TOTAL)ntative/ Central Tentative/ Central Tentative/ Central Tentative/ Central Tentative/ Central 19(upTentatitoOct.ve/ Ce’19)ntra l estimate Share estimated Share estimated Share estimated Share estimated Share estimated Share a. Construction of new individual household latrines (IHL) (Based on the cost per Household toilet) 982.55 131.01 - - 294.77 39.30 491.28 65.50 196.51 - - A 26.20

b. Conversion of pit latrines into sanitary latrines(based on thecost per household 66.55 13.31 3.33 0.67 19.96 3.99 33.27 6.65 9.98 - - toilets) 2.00 c. Conversion of insanitary latrines into sanitary latrines(based on the cost per 37.22 9.92 1.86 0.50 11.16 2.98 18.61 4.96 5.58 1.49 - - household toilets)

B Construction of Community toilets [NORM:1seat /25 women and1seat/35 men] 81.62 61.22 1.63 1.22 18.36 40.81 30.61 14.69 11.02 - - (based on cost per seat) 24.49 C Construction of Public Toilets[NORM:1seat/50womenand1seat/100 38.93 - 0.79 - 3.89 - 11.68 - 15.57 - 7.01 - men upto specified numbers] (Based on cost per seat)

D Solid Waste Management (based on per capita cost ofRs.1500/ capita may be 624.33 468.25 - - 126.07 94.55 186.10 139.57 252.13 189.10 60.03 45.02 considered lessor more with proper justification in a separate sheet) E Capacity Building & A&OE (5%on Central 27.35 20.51 0.10 0.07 6.37 4.78 9.89 7.42 9.19 6.89 1.80 1.35 share)

F Public Awareness & IEC (15% on 109.39 82.04 0.38 0.29 25.47 19.10 39.57 29.68 36.77 27.58 7.20 5.40 Central share) Total 1,967.94 786.26 8.09 2.74 512.18 183.06 831.21 284.40 540.43 264.28 76.04 51.78

Status of access to toilet in 107 Statutory Towns of Odisha (2011 Census)

Pit latrine Insanitary latrine Total With number Night Night slab/ Night soil Area Name of Without soil soil Open ventilate disposed househo slab/ removed service Defecati d into open ld open pit by d by on improved drain human animal pit

1 2 3 4 5 6 7 8

Padmapur (NAC) 3,797 79 15 17 - - 1,684

Barapali (NAC) 4,734 343 82 12 - 7 2,460

Bargarh (M) 17,985 347 40 153 146 168 6,322

Belpahar (M) 8,667 125 70 25 - 3 4,313

Brajarajnagar (M) 17,536 324 23 236 45 6 8,031

Jharsuguda (M) 21,424 173 35 91 16 34 9,831

Kochinda (NAC) 3,950 93 48 6 - 17 2,134

Hirakud (NAC) 7,067 150 12 236 - 48 3,043

Burla (NAC) 10,367 122 37 54 11 28 4,430

Redhakhol (NAC) 3,705 110 34 4 - - 2,442

Sambalpur (M + OG) 42,292 470 218 283 47 73 12,794

Debagarh (M) 5,431 280 32 12 - 10 2,454

Sundargarh (M) 9,979 311 19 19 - - 2,769

Rajagangapu r (M) 10,830 86 90 39 - 11 3,444

Biramitrapur (M) 7,115 34 14 18 - 4 4,148

Raurkela (M + OG) 70,810 613 399 330 200 606 19,286

Raurkela (ITS + OG) 47,010 885 250 337 249 170 14,816

Barbil (M) 15,465 103 13 26 - 105 8,493

Balagoda (Bolani) (CT) 2,704 52 - 4 - - 1,229 Action Plan for SWM in ULBs of Odisha 130

Pit latrine Insanitary latrine Total With number Night Night slab/ Night soil Area Name of Without soil soil Open ventilate disposed househo slab/ removed service Defecati d into open ld open pit by d by on improved drain human animal pit

Joda (M ) 10,742 536 58 19 42 22 5,819

Kendujhar (M) 13,316 390 105 25 87 142 4,086

Anandpur (M) 8,518 404 255 18 186 3 4,741

Rairangpur (NAC + OG) 7,580 128 28 7 - 15 4,223

Karanjia (NAC) 5,055 145 35 5 - 12 2,286

Udala (NAC) 3,014 327 188 4 27 - 751

Baripada (M + OG) 25,990 2,072 445 34 158 16 6,793

Jaleshwar (NAC) 5,548 653 331 34 - 2 2,201

Remuna (NAC) 7,568 766 435 40 192 29 3,667

Nilagiri (NAC) 3,908 293 35 23 29 3 2,467

Soro (NAC) 6,747 399 763 8 57 2 3,147

Baleshwar (M + OG) 32,124 1,576 722 178 133 50 5,522

Dhamanagar (NAC) 4,182 63 92 3 - 5 3,077

Bhadrak (M + OG) 23,098 846 620 166 615 59 8,258

Basudebpur (NAC) 6,581 241 445 142 51 18 4,429

Pattamundai (NAC) 7,276 161 85 8 26 - 4,303

Kendrapara (M) 8,664 252 58 22 43 13 2,160

Paradip (M) 18,235 58 87 127 49 14 9,275

Jagatsinghap ur (M) 6,516 250 25 5 - 17 2,509

Banki (NAC) 3,595 139 16 1 - 1 1,969

Athagad (NAC) 3,119 121 23 4 10 1 1,257

Action Plan for SWM in ULBs of Odisha 131

Pit latrine Insanitary latrine Total With number Night Night slab/ Night soil Area Name of Without soil soil Open ventilate disposed househo slab/ removed service Defecati d into open ld open pit by d by on improved drain human animal pit

Choudwar (M + OG) 11,018 313 96 276 105 9 4,697

Cuttack (MC) 116,820 2,724 349 842 653 763 13,390

Byasanagar (M + OG) 12,546 511 44 12 147 56 4,241

Jajapur (M) 8,177 294 229 11 50 4 2,037

Kamakshyan agar (NAC) 3,915 390 38 2 - - 1,839

Bhuban (NAC) 4,822 103 92 2 124 4 3,108

Dhenkanal (M) 14,353 719 81 4 172 255 3,396

Talcher (M) 9,054 84 17 17 - 3 3,492

Anugul (M) 8,674 356 69 12 11 55 1,781

Athmallik (NAC) 2,895 135 50 1 13 1 1,918

Khandapada (NAC) 1,882 95 101 28 - - 897

Nayagarh (NAC) 4,056 166 40 9 - 7 744

Khordha (M) 8,950 181 50 24 - 49 2,705

Jatani (M + OG) 13,531 177 98 96 31 5 3,661

Balugaon (NAC) 3,719 24 13 2 35 11 1,542

Banapur (NAC) 3,397 63 37 8 - 3 1,654

Bhubaneswar (MC + OG) 201,873 9,110 2,278 2,176 1,621 716 34,808

Pipili (NAC) 3,570 294 123 5 - 10 1,497

Nimapada (NAC) 3,907 127 46 3 - 3 1,291

Konark (NAC) 3,298 64 7 3 27 10 2,483

Puri (M) 39,607 2,231 472 275 122 71 5,996

Action Plan for SWM in ULBs of Odisha 132

Pit latrine Insanitary latrine Total With number Night Night slab/ Night soil Area Name of Without soil soil Open ventilate disposed househo slab/ removed service Defecati d into open ld open pit by d by on improved drain human animal pit

Buguda (NAC) 3,180 39 35 7 - - 1,466

Bhanjanagar (NAC) 4,719 194 65 126 11 44 1,301

Bellaguntha (NAC) 2,415 144 27 9 - - 1,197

Surada (NAC) 3,160 59 52 6 - 1 1,560

Asika (NAC) 4,547 109 19 11 65 1 1,423

Kabisurjyana gar (NAC) 3,548 118 71 1 - - 1,591

Polasara (NAC) 4,853 109 50 13 23 27 2,535

Kodala (NAC) 2,835 45 27 15 - 1 2,055

Khalikote (NAC) 2,774 97 20 25 - 2 1,529

Rambha (NAC) 2,434 110 29 7 12 - 1,688

Chhatrapur (NAC) 4,875 34 32 10 33 77 709

Ganjam (NAC) 2,541 53 12 5 - 8 1,247

Purusottamp ur (NAC) 3,246 205 24 27 47 65 1,621

Hinjilicut (NAC) 5,155 260 104 26 - 66 2,303

Gopalpur (NAC) 1,441 130 22 229 - 1 740

Digapahandi (NAC) 2,931 66 34 4 - - 1,189

Chikiti (NAC) 2,446 203 13 35 - - 1,103

Brahmapur (MC) 67,397 1,135 392 4,231 129 333 7,861

Kashinagar (NAC) 2,523 20 14 2 - 4 1,891

Paralakhemu ndi (M + OG) 10,390 533 96 17 17 9 2,940

Phulabani (M) 8,629 403 173 27 29 6 2,955

Action Plan for SWM in ULBs of Odisha 133

Pit latrine Insanitary latrine Total With number Night Night slab/ Night soil Area Name of Without soil soil Open ventilate disposed househo slab/ removed service Defecati d into open ld open pit by d by on improved drain human animal pit

G. Udayagiri (NAC) 2,676 145 126 1 - - 1,259

Baudhgarh (NAC) 4,488 107 38 38 72 114 2,044

Binika (NAC) 3,800 19 1 3 - 1 2,918

Sonapur (M) 4,751 68 34 7 - 37 1,977

Tarbha (NAC) 1,949 15 2 5 - 53 1,065

Balangir (M) 22,164 488 250 91 63 157 7,046

Patnagarh (NAC) 5,238 84 49 13 - 24 2,440

Kantabanji (NAC) 4,924 31 41 24 - 7 2,205

Titlagarh (NAC + OG) 8,246 112 73 7 48 88 3,542

Khariar Road (NAC) 4,423 3 6 10 - 69 2,517

Khariar (NAC) 3,603 52 25 3 - 1 1,579

Kesinga (NAC) 4,248 73 69 4 49 11 2,503

Bhawanipatn a (M) 15,364 1,493 438 195 197 255 4,720

Junagarh (NAC) 4,631 280 176 39 15 12 2,640

Rayagada (M) 16,244 136 33 22 - 157 4,999

Gunupur (NAC + OG) 6,592 154 96 19 - 81 2,872

Gudari (NAC) 1,728 22 139 15 53 3 853

Umarkote (NAC) 6,550 255 258 17 29 25 2,866

Nabarangapu r (M + OG) 8,738 115 60 51 - 89 3,456

Kotpad (NAC) 3,878 17 27 4 - 3 1,890

Koraput (NAC) 11,332 220 26 312 45 3 4,388

Action Plan for SWM in ULBs of Odisha 134

Pit latrine Insanitary latrine Total With number Night Night slab/ Night soil Area Name of Without soil soil Open ventilate disposed househo slab/ removed service Defecati d into open ld open pit by d by on improved drain human animal pit

Jeypur (M) 19,880 581 58 31 44 239 5,529

Sunabeda (NAC). 12,383 46 5 17 - 107 4,025

Malkangiri (NAC) 6,944 169 58 9 - 6 3,534

Balimela (NAC) 2,767 4 6 8 - 2 1,387

Total 1335888 41436 14017 12361 6511 5938 409398