1. Name of work:- Resectioning of disty RD. 0+000 to 41+556 tail. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 78548 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead)

Contractor Executive Engineer, Gujrat Division UJC Gujrat 2. Name of work:- Providing Anti porcupine poison for Gujrat Branch RD. 63+000 to 107+000.

BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Providing posion (Weltox) to kill the porcupine at Gujrat Branch. 1 24 Packet Providing portable water pump (petrol Engine) with suction pipe and 2 1 No. Delivery pipe.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 3. Name of work:- Adjusting outlets of Bhallowal disty RD. 52+000 to 86+000 during Rabi season in Section. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Construction watching and removing bund for outlets built in 1 20 No. running water upto 3.00 ft depth . 2 Adjusting Y of A.P.M outlets including dismantling rebuilding. 20 No. Extra labour for fixing of outlets including dressing of bricks. 3 20 No.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 4. Name of work:- Adjusting outlets of Bhallowal disty RD. 0+000 to 52+000 during Rabi season in Bhacher Section. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Construction watching and removing bund for outlets built in 1 24 No. running water upto 3.00 ft depth . 2 Adjusting Y of A.P.M outlets including dismantling rebuilding. 24 No. Extra labour for fixing of outlets including dressing of bricks. 3 24 No.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 5. Name of work:- Berm cutting of Bhaika minor RD. 0+000 to tail. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 18765.00 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead)

Contractor Executive Engineer, Gujrat Division UJC Gujrat 6. Name of work:- Repairing defective outlets of Section. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures

1 Dismantling outlets A.P.M. or O.F. "H" from 2.10 ft to 3.0 ft. 20 Each Extra labour in fixing A.P.M. and O.F. outlet blocks including 2 20 Each dressing of bricks.

3 Water allowance for constructing outlet when above channel is 20 Each not flowing. 4 Supplying iron Block for A.P.M outlets 3/16 inch thickness. 6 No Supplying iron Block for O.F outlets 3/16 inch thickness. 5 12 No.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 7. Name of work:- Repairing gates oiling and greasing in Busal Sub Division for the year 2019-20.

BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Repairing gearing system of gates of disty and Bhallowal 1 3.00 No disty. Repairing and welding of rusted portion of gates to control 2 5 No. leakage. 3 Repairing of hooks ties and gearing system. 3 No. Providing K-Oil for washing and cleaning of regulation machine. 4 10 Liter

5 Providing grease for lubrication of machines. 12 Kg

6 Providing good quality of M oil for oiling of machines of regulators. 16 Liter No. 7 Painting outer surface of regulators 5

8 Applying Khanki Mixture Hot to barrage gates / regulators. 283.93 Sft.

Contractor Executive Engineer, Gujrat Division UJC Gujrat

8. Name of work:- Resectioning of Jungle minor RD. 0+000 to 11+726 tail. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 45336 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead)

Contractor Executive Engineer, Gujrat Division UJC Gujrat 9. Name of work:- Desilting of Bukan minor RD. 0+000 to 14+950 tail. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Berm cutting lead upto a single throw of Kassi, Phaora or shovel 1 33730.00 %o Cft (without dressing).

Contractor Executive Engineer, Gujrat Division UJC Gujrat 10.Resectioning of Sohawa disty RD. 0+000 to 33+000 in Wasu Section. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 164075.00 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead)

Contractor Executive Engineer, Gujrat Division UJC Gujrat 11. Name of work:- STG weak & ghat sites of Mangat disty RD. 0+000 to 80+000 tail.

BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Borrowpit excavation & Transportation of earth all types when the 1 total distance. This rate will be paid inaddition to the including the 36279 %o Cft lead covered in the item of work lead 1 mile dressed. Borrowpit excavation & Transportation of earth all types This rate 2 will be paid inaddition to the including the lead covered in the 4722 %o Cft item of work lead 1/4 mile dressed. Borrowpit excavation & Transportation of earth all types . This 3 rate will be paid inaddition to the including the lead covered in the 7519 %o Cft item of work 4290 ft lead (3/4 mile) dressed. Supply and dumping at site, without boat including handling of 4 3322.6 % Cft material within three chains (90m) Brick Bats. Contractor Executive Engineer, Gujrat Division UJC Gujrat

12. Name of work:- Resectioning of Chorund minor RD. 0+000 to 31+600 tail. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 63403 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead)

Contractor Executive Engineer, Gujrat Division UJC Gujrat 13. Name of work:- Resectioning of minor at RD. 0+000 to 11+700 tail.

BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 31040 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead) Borrowpit excavation & Transportation of earth all types This rate 2 will be paid inaddition to the including the lead covered in the 3479 %o Cft item of work 4290 ft.(3/4 mile) dressed. Contractor Executive Engineer, Gujrat Division UJC Gujrat

14. Name of work:- Resectioning of Bhacher disty RD. 0+000 to 21+000 in Bhacher Section. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 154880 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead)

Contractor Executive Engineer, Gujrat Division UJC Gujrat

15. Name of work:- Providing and fixing data Board, missing Gauges and RD Marks in Sohawa Sub Division UJC (Chhimon Section). BOQ (New Data Board)

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling around structure with 1 5.48 %o Cft excavated earth, watering and ramming lead upto one chain (30 m) and lift upto 5 ft. (1.5 m) ordinary soil. Pacca brick work other than building upto 10 ft. (3 m) height. 2 14.65 %Cft Ratio (1:3). 3 Cement plaster 1:3 upto 20' (6.00 m) height 1/2" (20 mm) thick. 38.84 %Sft Providing and applying weather shield paint of approved quality on 4 external surface of building including preparation of surface, application 38.84 %Sft of primer complete in all respect, 2 coats. 5 Writing letters or figures, per letter, per inch height. 609 Per No. old data boards (Plaster & Painting).

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures

1 Removing cement or lime plaster. 38.84 %Sft 2 Cement plaster 1:3 upto 20' (6.00 m) height 1/2" thick. 38.84 %Sft Providing and applying weather shield paint of approved quality on 3 external surface of building including preparation of surface, application 38.84 %Sft of primer complete in all respect, 2 coats. 4 Writing letters or figures, per letter, per inch height (2.5" height). 609 Per No. new RD Marks.

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Cement concrete plain including placing, compacting, finishing and 1 curing complete (including screening and washing of stone aggregate) : 0.945 %Cft ratio 1:2:4. 2 Placing boundary pillars in position including digging points. 1.00 1 Cft Painting distance marks for white ground and black lettering on both 3 1.00 1 No. faces. Carriage of consignment odd job Cart load for a distance exceeding 4 to 4 1.00 1 No. 10 mile. Old RD Marks. Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Painting distance marks for white ground and black lettering on both 1 1.00 1 No. faces.

Contractor Executive Engineer, Gujrat Division UJC Gujrat

16. Name of work:- Providing and fixing data Board, missing Gauges and RD Marks in Sohawa Sub Division UJC ( Section). BOQ (New Data Board)

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling around structure with 1 5.48 %o Cft excavated earth, watering and ramming lead upto one chain (30 m) and lift upto 5 ft. (1.5 m) ordinary soil. Pacca brick work other than building upto 10 ft. (3 m) height. 2 14.65 %Cft Ratio (1:3). 3 Cement plaster 1:3 upto 20' (6.00 m) height 1/2" (20 mm) thick. 38.84 %Sft Providing and applying weather shield paint of approved quality on 4 external surface of building including preparation of surface, application 38.84 %Sft of primer complete in all respect, 2 coat. 5 Writing letters or figures, per letter, per inch height. 609 Per No. old data boards (4.00' x 3.00').

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Providing and applying weather shield paint of approved quality on 1 external surface of building including preparation of surface, application 51.82 %Sft of primer complete in all respect, 2 coat. 2 Writing letters or figures, per letter, per inch height. 609 Per No. Abstract of cost for old data boards (Plaster & Painting). 1 Removing cement or lime plaster. 38.84 %Sft 2 Cement plaster 1:3 upto 20' (6.00 m) height 1/2" thick. 38.84 %Sft Providing and applying weather shield paint of approved quality 3 on external surface of building including preparation of surface, 38.84 %Sft application of primer complete in all respect,1 coat. 4 Writing letters or figures, per letter, per inch height (2.5" height). 609 Per No. new RD Marks.

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Cement concrete plain including placing, compacting, finishing and 1 curing complete (including screening and washing of stone aggregate) : 0.945 %Cft ratio 1:2:4. 2 Placing boundary pillars in position including digging points. 1.00 1 Cft Painting distance marks for white ground and black lettering on both 3 1.00 1 No. faces. Carriage of consignment odd job Cart load for a distance exceeding 4 to 4 1.00 1 No. 10 mile. Old RD Marks.

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Painting distance marks for white ground and black lettering on both 1 1.00 1 No. faces.

Contractor Executive Engineer, Gujrat Division UJC Gujrat

17. Name of work:- Providing and fixing data Board, missing Gauges and RD Marks in Sohawa Sub Division UJC (Wasu Section). BOQ(New Data Board)

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling around structure with 1 5.48 %o Cft excavated earth, watering and ramming lead upto one chain (30 m) and lift upto 5 ft. (1.5 m) ordinary soil. Pacca brick work other than building upto 10 ft. (3 m) height. 2 14.65 %Cft Ratio (1:3). 3 Cement plaster 1:3 upto 20' (6.00 m) height 1/2" (20 mm) thick. 38.84 %Sft Providing and applying weather shield paint of approved quality on 4 external surface of building including preparation of surface, application 38.84 %Sft of primer complete in all respect, 2 coats. 5 Writing letters or figures, per letter, per inch height. 609 Per No. old data boards (4.00' x 3.00').

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Providing and applying weather shield paint of approved quality on 1 external surface of building including preparation of surface, application 51.82 %Sft of primer complete in all respect, 1 coat.(old surface) 2 Writing letters or figures, per letter, per inch height. 609 Per No. old data boards (Plaster & Painting). 1 Removing cement or lime plaster. 38.84 %Sft 2 Cement plaster 1:3 upto 20' (6.00 m) height 1/2" thick. 38.84 %Sft Providing and applying weather shield paint of approved quality 3 on external surface of building including preparation of surface, 38.84 %Sft application of primer complete in all respect,1 coat.(old surface) 4 Writing letters or figures, per letter, per inch height (2.5" height). 609 Per No. new RD Marks. Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Cement concrete plain including placing, compacting, finishing and 1 curing complete (including screening and washing of stone aggregate) : 0.945 %Cft ratio 1:2:4. 2 Placing boundary pillars in position including digging points. 1.00 1 Cft Painting distance marks for white ground and black lettering on both 3 1.00 1 No. faces. Carriage of consignment odd job Cart load for a distance exceeding 4 to 4 1.00 1 No. 10 mile. Old RD Marks.

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Painting distance marks for white ground and black lettering on both 1 1.00 1 No. faces.

Contractor Executive Engineer, Gujrat Division UJC Gujrat

18. Name of work:- Resectioning of Khumb minor RD. 0+000 to 34+002 tail. BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 106920 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead)

Contractor Executive Engineer, Gujrat Division UJC Gujrat

19. Name of work:- Resectioning of Bhikhi minor RD. 5+000 to 36+180 tail. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 108760 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead)

Contractor Executive Engineer, Gujrat Division UJC Gujrat 20. Name of work:- Regulation Karries at fall RD. 63+000 of Gujrat Branch tail. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Plain wood work for regulation Karries needles etc, including

1 sawing, planning, wroughting wood and providing and fixing still 33 Cft

parts of karries, i.e. strip and rods etc. (Shesham wood)

Contractor Executive Engineer, Gujrat Division UJC Gujrat 21. Name of work:- Resectioning of Kot Islam disty RD. 0 to 8+480 tail. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Berm cutting lead upto a single throw of Kassi, Phaora or shovel 1 13071 %o Cft (without dressing). 2 Uprooting Sarkanda growth and disposal within 100 ft. (30 m) 13250 % Cft

Contractor Executive Engineer, Gujrat Division UJC Gujrat 22. Name of work:- Desilting of Nihal Singhwala minor RD. 0+000 to 24+000 tail. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures

1 Uprooting Sarkanda growth and disposal within 100 ft. (30 m) 16000.00 % Sft Earth work excavation undressed lead up to a single throw of Kasi 2 33180.00 %o Cft Phaorah or shovel in ordinary soil.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 23. Name of work:- Desilting of Rasul Direct minor RD. 0+00 to 5+250 tail.

BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 45179 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead) Transportation of earth all types when the total distance including 2 45179 %o Cft the lead covered in the item of work, is more than 1/2mile.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 24. Name of work:- Strengthening right bank of Mianwal disty RD. 0+000 to 89+000.

BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Borrowpit excavation & Transportation of earth all types when the 1 total distance. This rate will be paid inaddition to the including the 22234 %o Cft lead covered in the item of work lead 1 mile undressed. Borrowpit excavation & Transportation of earth all types.This rate 2 will be paid inaddition to the including the lead covered in the 24555 %o Cft item of work lead 1/4 mile undressed. Borrowpit excavation & Transportation of earth all types.This rate 3 will be paid inaddition to the including the lead covered in the 20953 %o Cft item of work 4290 ft (0.8125 mile) undressed.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 25. Name of work:- Berm Trimming for lined reach RD. (89490 to 110+000) of Mianwal disty. BOQ Rate Rate quoted by S.# Description Quantity Unit quoted by contractor in words contractor Berm trimming both sides of channels upto 3.5 ft depth. 1 3884.000 1 mile

Contractor Executive Engineer, Gujrat Division UJC Gujrat 26. Name of work:- Resectioning of Kakowal disty RD. 33+000 to 52+000. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 166760 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead)

Contractor Executive Engineer, Gujrat Division UJC Gujrat 27. Name of work:- Desilting of Pindi Rawan minor RD. 0+000 to 18+757.

BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 67349 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead) Berm cutting lead upto a single throw of Kassi, Phaora or shovel 2 21229 %o Cft (without dressing).

Contractor Executive Engineer, Gujrat Division UJC Gujrat 28. Name of work:- Berm cutting & Desilting of Kakowal disty RD. 10+000 to 24+500. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 132638 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead)

Contractor Executive Engineer, Gujrat Division UJC Gujrat 29. Name of work:- Repg D/S Head of Haslanwala disty & Nawan lok disty. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Cement concrete brick or stone ballast 1.50 to 2.50 gauges, in 1 foundation and plinth Ratio 1: 4: 8 981 % Cft

Cement concrete plan 1:2:4. 460 % Cft 2

3 Pacca brick work 1:5 other than building upto 10' hight. 641 % Cft

Contractor Executive Engineer, Gujrat Division UJC Gujrat 30. Name of work:- Repg brick pitching D/S head of disty. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures

1 Formation, dressing and preparing Sub grade on slope. 1458 % Sft

2 Cement plaster 1:5 upto 20' height 3/4 inch thick. 1458 % Sft 3 570 % Cft Pacca brick work 1:5 other than building upto 10' hight.

4 Brick lining 9" X4.50X3' in 1:3 cement sent mortor. 846 % Cft

5 Credit to work old and used bricks. 5000 %0 Nos

Contractor Executive Engineer, Gujrat Division UJC Gujrat 31. Name of work:- Restoration of side protection wall at RD 7-8/L & R of minor near Grave yard. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Pacca brick work other than building upto 10ft. (3 m) height. 1 cement, sand mortar:- Ratio 1:4 381.78 % Cft

Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone 2 49.69 % Cft aggregate): Ratio 1: 2: 4

Borrowpit excavation dressed dressed lead upto 100 ft (30 metre). 3 2168 %0 Cft Dismantling Brick work in lime or cement marter 4 19.69 % Cft Contractor Executive Engineer, Gujrat Division UJC Gujrat

32. Name of work:- Restoration of side protection wall at RD 6-7/L & R of Pahrianwali minor near Grave yard.

BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling around structure with 1 excavated earth, watering and ramming lead upto one chain (30 570.00 % 0Cft m) and lift upto 5 ft. (1.5 m) in ordinary soil.

Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 50 2 mm) gauge, in foundation and plinth:- Ratio 1: 4: 8 570.00 % Cft

Pacca brick work in foundation and plinth in Cement, sand mortar:- 3 Ratio 1:4 342.00 % Cft Pacca brick work other than building upto 10ft. (3 m) height. 4 cement, sand mortar:- Ratio 1:4 1634.73 % Cft

Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone 5 96.75 % Cft aggregate): Ratio 1: 2: 4

Borrowpit excavation dressed dressed lead upto 100 ft (30 metre). 6 2869 %0 Cft Dismantling Brick work in lime or cement marter 7 21.37 % Cft

Contractor Executive Engineer, Gujrat Division UJC Gujrat 33. Name of work:- Resectioning of Chillianwala disty RD. 0+000 to 61+000. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 212076 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead)

Contractor Executive Engineer, Gujrat Division UJC Gujrat 34. Name of work:- Stg weak & ghat sites of Rerka minor RD. 0+000 to 22+000 tail. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Borrowpit excavation & Transportation of earth all types when the 1 total distance. This rate will be paid inaddition to the including the 8947 %o Cft lead covered in the item of work lead 1 mile undressed. Borrowpit excavation & Transportation of earth all types.This rate 2 will be paid inaddition to the including the lead covered in the 14912 %o Cft item of work lead 1/2 mile undressed. Borrowpit excavation & Transportation of earth all types.This rate 3 will be paid inaddition to the including the lead covered in the 8265 %o Cft item of work 4290 ft (0.8125 mile) undressed. Supply and dumping at site, without boat including handling of 4 1480 % Cft material within three chains (90m) Brick Bats. Contractor Executive Engineer, Gujrat Division UJC Gujrat

35. Name of work:- Resectioning of Bhacher Disty RD. 47+000 to 64+500 tail BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Berm cutting lead upto a single throw of Kassi, Phaora or shovel 1 45773 %o Cft (without dressing)

Contractor Executive Engineer, Gujrat Division UJC Gujrat 36. Name of work:- Resectioning of Rerka minor RD. 0+000 to 22+000 tail. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 46498 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead) Berm cutting lead upto a single throw of Kassi, Phaora or shovel 2 18993 %o Cft (without dressing)

Contractor Executive Engineer, Gujrat Division UJC Gujrat 37. Name of work:- Desilting of Chillianwala disty RD. 62+000 to 105+310 tail. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 61892 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead) Berm cutting lead upto a single throw of Kassi, Phaora or shovel 2 1328 %o Cft (Undressed). Extra for slush or daldal including dewatering. Transportation of earth work all types including the lead upto 3 28053 %o Cft 1.00 mile for RD (62+000 to 75+000) Berm cutting lead upto a single throw of Kassi, Phaora or shovel 4 17674 %o Cft (Undressed).

Contractor Executive Engineer, Gujrat Division UJC Gujrat

38. Name of work:- Desilting of minor RD. 0+000 to 14+280 tail. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Berm cutting lead upto a single throw of Kassi, Phaora or shovel 1 36540 %o Cft (without dressing)

Contractor Executive Engineer, Gujrat Division UJC Gujrat 39. Name of work:- Resectioning of Kakowal disty RD.52+000 to 118+850 tail in Busal section.

BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 211525 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead) Contractor Executive Engineer, Gujrat Division UJC Gujrat

40. Name of work:- Berm cutting and desilting of Busal disty RD. 0+000 to 42+000. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 198300 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead) Contractor Executive Engineer, Gujrat Division UJC Gujrat

41. Name of work:- Berm cutting of Mianwal disty RD.57+000 to 110+000. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 155870 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead) Berm cutting lead upto a single throw of Kassi, Phaora or shovel 2 2741.90 %o Cft (without dressing)

Contractor Executive Engineer, Gujrat Division UJC Gujrat

42. Name of work:- Re- Construction of outlets at RD. 1+850/R & 4+061/R of Rasul Direct minor. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earthwork for outlets, excavation refilling, ramming and pudding 1 1 Job Job channels, discharge upto 50 Cs. 2 Providing & fixing APM or O.F machine (Market rate) 1 No. No./Each Cement concrete brick or stone ballast 1/1" to '2 gauge in foundation & 3 30.21 %Cft plinth ratio 1:4:8. Pacca brick work other than building upto 10ft. height. cement, 4 133.56 %Cft sand mortar:- Ratio 1:3 (3x80 = 240).

5 Brick on edge flooring laid in 1:6 cement mortar over a bed of 3/4" thick 48.75 %Sft cement mortar 1:6 6 Providing & laying RCC in roof slabs ratio 1:2:4. 5.00 Cft Fabrication of mild steel for reinforcement of cement concrete 7 13.59 % KG deformed bars. 8 Dismantling temporary outlets. 1 No. No./Each 9 Extra labout in fixing APM or OF block 1 No. No./Each

Contractor Executive Engineer, Gujrat Division UJC Gujrat

43. Name of work:- Improving Inner Prism of Sultanpur minor RD. 0+000 to 15+392 tail. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures 1 Uprooting Sarkanda growth and disposal within 100 ft. (30 m) 92500 % Sft Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 2 slush, daldal, and underwater) including its disposal and 36888 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead)

Contractor Executive Engineer, Gujrat Division UJC Gujrat

44. Name of work:- Resectioning of Sohawa disty RD. 33+000 to 52+000. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 209019 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead)

Contractor Executive Engineer, Gujrat Division UJC Gujrat

45. Name of work:- Improving Inner prism of Dhole minor RD. 0+000 to RD. 6+053 tail.

BOQ Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 10265 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead)

Contractor Executive Engineer, Gujrat Division UJC Gujrat

46. Name of work:- Berm cutting of Sohawa disty RD. 53+000 to 73+500. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures 1 Uprooting Sarkanda growth and disposal within 100 ft. (30 m) 62190 % Sft Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 2 slush, daldal, and underwater) including its disposal and 191260 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead)

Contractor Executive Engineer, Gujrat Division UJC Gujrat

47. Name of work:- Resectioning of Mianwal disty RD. 0+000 to 57+000. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, 1 slush, daldal, and underwater) including its disposal and 176285 %o Cft preparation of working pad for operation of Machinery. (Rate includes 100 ft lead)

Contractor Executive Engineer, Gujrat Division UJC Gujrat 48. Name of work:- Stg. Banks of Gujrat Branch D/S railway bridge RD 36+641 BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Supplying bamboos 8' to 10.0' (2.46 to 3.05m) long, 2 ½" to 5" 1 335 % No (63mm to 125 mm) Dia Sharpening one end of 8'-1" to 10.0' (2.46 to 30.5mm) long 2 335 % No Bomboos, 2 ½" to 5' (63mm to 125mm) dia Driving Bamboos 8'-1" to 10.0' (2.46 to 30.5 mm) long Bomboos, 2 ½" to 5" (63mm to 125mm) Dia, driven 2.5' below the available 3 335 % No bed or ground (average the available bed or ground (average) as per item No 1 Tying Bamboos 8'.1" to 10.0' (2.46 to 30.5mm) long Bomboos, 2 4 ½" to 5' (63mm to 125mm) dia 2.5' below the available bed or 11 1 Chail ground (average) the available bed or ground (average) Cutting and supplying brushwood from canal plantation or from any 5 4950 % Cft other source, within one mile (1.6km) Earth work Borropwpit excavation Transportation of earth all type 6 when the total distance including the lead covered in the item of 59259 %0 Cft work lead 1/2 mile dressed.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 49. Name of work:-- Repairing banks of Gujrat Branch D/S Bridge RD. 44+204 BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Supplying bamboos 8' to 10.0' (2.46 to 3.05m) long, 2 ½" to 5" 1 320 % No (63mm to 125 mm) Dia Sharpening one end of 8'-1" to 10.0' (2.46 to 30.5mm) long 2 320 % No Bomboos, 2 ½" to 5' (63mm to 125mm) dia Driving Bamboos 8'-1" to 10.0' (2.46 to 30.5 mm) long Bomboos, 2 ½" to 5" (63mm to 125mm) Dia, driven 2.5' below the available 3 320 % No bed or ground (average the available bed or ground (average) as per item No 1 Tying Bamboos 8'.1" to 10.0' (2.46 to 30.5mm) long Bomboos, 2 4 ½" to 5' (63mm to 125mm) dia 2.5' below the available bed or 10 1 Chail ground (average) the available bed or ground (average) Cutting and supplying brushwood from canal plantation or from any 5 4320 % Cft other source, within one mile (1.6km) Earth work Borropwpit excavation Transportation of earth all type 6 when the total distance including the lead covered in the item of 59969 %0 Cft work lead 1 mile dressed.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 50. Name of work:--Checking erosion bank of Gujrat Branch U/S & D/S Bridge at RD. 50+000 /L of Gujrat Branch BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Supplying bamboos 8' to 10.0' (2.46 to 3.05m) long, 2 ½" to 5" 1 285 % No (63mm to 125 mm) Dia Sharpening one end of 8'-1" to 10.0' (2.46 to 30.5mm) long 2 285 % No Bomboos, 2 ½" to 5' (63mm to 125mm) dia Driving Bamboos 8'-1" to 10.0' (2.46 to 30.5 mm) long Bomboos, 2 ½" to 5" (63mm to 125mm) Dia, driven 2.5' below the available 3 285 % No bed or ground (average the available bed or ground (average) as per item No 1 Tying Bamboos 8'.1" to 10.0' (2.46 to 30.5mm) long Bomboos, 2 4 ½" to 5' (63mm to 125mm) dia 2.5' below the available bed or 9.50 1 Chail ground (average) the available bed or ground (average) Cutting and supplying brushwood from canal plantation or from any 5 3825 % Cft other source, within one mile (1.6km) Earth work Borropwpit excavation Transportation of earth all type 6 when the total distance including the lead covered in the item of 60893 %0 Cft work lead 1 mile dressed.

Contractor Executive Engineer, Gujrat Division UJC Gujrat

51. Name of work:--Checking embankment D/S Bridge RD. 57+014/L of Gujrat Branch BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Supplying bamboos 8' to 10.0' (2.46 to 3.05m) long, 2 ½" to 5" 1 300 % No (63mm to 125 mm) Dia Sharpening one end of 8'-1" to 10.0' (2.46 to 30.5mm) long 2 300 % No Bomboos, 2 ½" to 5' (63mm to 125mm) dia Driving Bamboos 8'-1" to 10.0' (2.46 to 30.5 mm) long Bomboos, 2 ½" to 5" (63mm to 125mm) Dia, driven 2.5' below the available 3 300 % No bed or ground (average the available bed or ground (average) as per item No 1 Tying Bamboos 8'.1" to 10.0' (2.46 to 30.5mm) long Bomboos, 2 4 ½" to 5' (63mm to 125mm) dia 2.5' below the available bed or 9 1 Chail ground (average) the available bed or ground (average) Cutting and supplying brushwood from canal plantation or from any 5 4050 % Cft other source, within one mile (1.6km) Earth work Borropwpit excavation Transportation of earth all type 6 when the total distance including the lead covered in the item of 60551 %0 Cft work lead 1 mile dressed.

Contractor Executive Engineer, Gujrat Division UJC Gujrat

52. Name of work:- Stg. Banks of Chillianwala disty RD. 0+000 to 30+000. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Borrowpit excavation & Transportation of earth all types when the 1 total distance. This rate will be paid inaddition to the including the 66167 %o Cft lead covered in the item of work lead 1 mile dressed.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 53. Name of work:- Stg. Banks of Sohawa disty RD. 33+000 to 60+000. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Borrowpit excavation & Transportation of earth all types when the 1 total distance. This rate will be paid inaddition to the including the 66102 %o Cft lead covered in the item of work lead 1 mile dressed.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 54. Name of work:- Stg. Banks of Sohawa disty RD. 72+500 to 115+000. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Borrowpit excavation & Transportation of earth all types when the 1 total distance. This rate will be paid inaddition to the including the 66528 %o Cft lead covered in the item of work lead 1 mile dressed.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 55. Name of work:-Special repair to Busal Rest House Busal Sub Division UJC. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Brushing and scraping blisters of old paints from wood work Qty as 1 720 % Sft per SMB 686 G. Painting doors and windows any type two coats Qty as per SMB 2 1439 % Sft 686 G. 3 Scraping white washing or colour wash Qty as per SMB 686 G. 8329 % Sft Scraping ordinary distemper oil bound distemper or paint of wall 4 4724 % Sft Qty as per SMB 686 G. 5 White washing two coats on old surface Qty as per SMB 686 G. 8329 % Sft 6 Distempering two coats on old surface Qty as per item no. 4. 1119 % Sft 7 Removing cement or lime plaster. 3874 % Sft 8 Cement plaster 1:4 upto 10' (6.00 m) height ½ inch thick. 3874 % Sft 9 Repairing of doors complete in all respect market rate. 10 No Providing and fitting glazed earthen ware hand basin (22"x16") 10 1 No including bracket set waste pipe coupling, etc. 11 Providing and fixing water tank plastic type. 1 250 Gallen 12 Net doors. 2 No 13 Plastic chair set with table complete. 1 No 14 Energy saver 6 No Contractor Executive Engineer, Gujrat Division UJC Gujrat

56. Name of work: Repair to Executive Engineer Residence in Canal Colony Gujrat. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures

1 Distempering 2 coats on old surface. 13139.73 % Sft 2 Scraping & brushing blisters of old paints from wood work. 1075.8 % Sft 3 Painting doors and windows any type 2 coats. 2151.5 % Sft 4 White wash 2 coat on old surface(C-13, I-4). 3618.2 % Sft 5 Painting sashes, fanlights, glazed or gauzed doors and windows. 704.5 % Sft Providing and applying weather shield of approved quality on external surface 6 1558.0 % Sft of building including preparation of surface old surface. 7 Grouting 4½" (113 mm) dry brick work with cement mortar ratio 1:5. 1684.8 % Sft Providing and fixing G.I. wire gauze 22 SWG, 12x12 meshes per square 8 inch, (5x5 meshes in cm2) fixed to steel window, complete with flat iron 24.0 1 Sft patti ½"x 1/8" (13 mmx3 mm) and machine made screws. First class deodar wood wrought joinery work in wire gauze doors and windows, with 22 SWG G.I. wire gauze,12x12 meshes per square inches (5x5 per cm2) 9 18.0 1 Sft including iron fittings etc. complete:-deodar wood framing 1½" (40 mm) thick, with wire gauze fixed in position without springs or spring hinges. Pacca brick work other than building upto 10ft. (3m) height.i) cement, sand 63.0 % Cft 10 mortar:- Ratio 1:5. 11 Cement plaster 1:5 upto 20' (6.00 mm) height b) 1/2" (13 mm) thick. 84.0 % Sft Contractor Executive Engineer, Gujrat Division UJC Gujrat

57. Name of work:-Providing Tuff tiles in Canal Colony Gujrat. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Providing and laying Tuff pavers, having 7000 PSI, crushing strength of approved manufacturer, over 2" to 3" sand cushion 1 3560 Per Sft i/cgrouting with sand in joints i/c finishing to require slope . complete in all respect(50% Grey / 50% Coloured)60-mm thick Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling around structure with 2 115 %0 Cft excavated earth, watering and ramming lead upto one chain (30 m) and lift upto 5 ft. (1.5 m) b)in ordinary soil. Pacca brick work other than building upto 10ft. (3m) height 3 125 % Cft cement, sand mortar, ratio 1:6.

Contractor Executive Engineer, Gujrat Division UJC Gujrat

58. Name of work:- Desilting of 6-R disty RD 0+000 – 35+580 Tail BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work excavation undressed lead upto a single throw of 1 104733 %o Cft Kassi, Phaora or shovel in ashes sand, soft sail or silt clearance.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 59. Name of work:- Desilting of Dinga Minor RD 0+6+516 Tail. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work excavation undressed lead upto a single throw of 1 8477 %o Cft Kassi, Phaora or shovel in ashes sand, soft sail or silt clearance.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 60. Name of work:- Desilting of 3-R dsty RD 0+000 to 33+894 Tail. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work excavation undressed lead upto a single throw of 1 69463 %o Cft Kassi, Phaora or shovel in ashes sand, soft sail or silt clearance.

Contractor Executive Engineer, Gujrat Division UJC Gujrat 61. Name of work:- Desilting of Dhulian Minor RD 0+000 to 8+800 Tail. BOQ

Rate quoted by Rate quoted by S.# Description Quantity Unit contractor contractor in words in figures Earth work excavation undressed lead upto a single throw of 1 10275 %o Cft Kassi, Phaora or shovel in ashes sand, soft sail or silt clearance.

Contractor Executive Engineer, Gujrat Division UJC Gujrat