
<p><strong>1. Name of work:- Resectioning of Murala disty RD. 0+000 to 41+556 tail. </strong><br><strong>BOQ </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li></ul><p></p><p>Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, slush, daldal, and underwater) including its disposal and preparation of working pad for operation of Machinery. (Rate includes 100 ft lead) <br>1</p><p>78548 </p><p>%o Cft </p><p></p><ul style="display: flex;"><li style="flex:1">Contractor </li><li style="flex:1">Executive Engineer, </li></ul><p>Gujrat Division UJC <br>Gujrat </p><p><strong>2. Name of work:- Providing Anti porcupine poison for Gujrat Branch RD. 63+000 to 107+000. </strong></p><p><strong>BOQ </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li></ul><p></p><p>Providing posion (Weltox) to kill the porcupine at Gujrat Branch. <br>1</p><p>2</p><p>24 </p><p>Packet </p><p>No. <br>Providing portable water pump (petrol Engine) with suction pipe and Delivery pipe. <br>1</p><ul style="display: flex;"><li style="flex:1">Contractor </li><li style="flex:1">Executive Engineer, </li></ul><p>Gujrat Division UJC <br>Gujrat </p><p><strong>3. Name of work:- Adjusting outlets of Bhallowal disty RD. 52+000 to 86+000 during </strong><br><strong>Rabi season in Rukkan Section. </strong><br><strong>BOQ </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li></ul><p></p><p>Construction watching and removing bund for outlets built in running water upto 3.00 ft depth . Adjusting Y of A.P.M outlets including dismantling rebuilding. <br>123<br>20 20 20 <br>No. No. No. <br>Extra labour for fixing of outlets including dressing of bricks. </p><p></p><ul style="display: flex;"><li style="flex:1">Contractor </li><li style="flex:1">Executive Engineer, </li></ul><p>Gujrat Division UJC <br>Gujrat </p><p><strong>4. Name of work:- Adjusting outlets of Bhallowal disty RD. 0+000 to 52+000 during </strong><br><strong>Rabi season in Bhacher Section. </strong><br><strong>BOQ </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li></ul><p></p><p>Construction watching and removing bund for outlets built in </p><ul style="display: flex;"><li style="flex:1">1</li><li style="flex:1">24 </li><li style="flex:1">No. </li></ul><p>running water upto 3.00 ft depth . </p><p>Adjusting Y of A.P.M outlets including dismantling rebuilding. <br>2</p><p>3<br>24 24 <br>No. No. <br>Extra labour for fixing of outlets including dressing of bricks. </p><p></p><ul style="display: flex;"><li style="flex:1">Contractor </li><li style="flex:1">Executive Engineer, </li></ul><p>Gujrat Division UJC <br>Gujrat </p><p><strong>5. Name of work:- Berm cutting of Bhaika minor RD. 0+000 to tail. </strong><br><strong>BOQ </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li></ul><p></p><p>Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, <br>1 slush, daldal, and underwater) including its disposal and preparation of working pad for operation of Machinery. (Rate includes 100 ft lead) </p><p>18765.00 </p><p>%o Cft </p><p>Contractor <br>Executive Engineer, Gujrat Division UJC <br>Gujrat </p><p><strong>6. Name of work:- Repairing defective outlets of Busal Section. </strong><br><strong>BOQ </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li></ul><p></p><p>Dismantling outlets A.P.M. or O.F. "H" from 2.10 ft to 3.0 ft. Extra labour in fixing A.P.M. and O.F. outlet blocks including dressing of bricks. <br>12</p><p>20 </p><p>Each </p><ul style="display: flex;"><li style="flex:1">Each </li><li style="flex:1">20 </li></ul><p>Water allowance for constructing outlet when above channel is not flowing. </p><p>Supplying iron Block for A.P.M outlets 3/16 inch thickness. </p><p></p><ul style="display: flex;"><li style="flex:1">3</li><li style="flex:1">20 </li></ul><p>6<br>Each </p><ul style="display: flex;"><li style="flex:1">No </li><li style="flex:1">4</li></ul><p>5</p><p>Supplying iron Block for O.F outlets 3/16 inch thickness. </p><p></p><ul style="display: flex;"><li style="flex:1">12 </li><li style="flex:1">No. </li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1">Contractor </li><li style="flex:1">Executive Engineer, </li></ul><p>Gujrat Division UJC <br>Gujrat </p><p><strong>7. Name of work:- Repairing gates oiling and greasing in Busal Sub Division for the year 2019-20. </strong></p><p><strong>BOQ </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li></ul><p></p><p>Repairing gearing system of gates of Kakowal disty and Bhallowal disty. </p><ul style="display: flex;"><li style="flex:1">1</li><li style="flex:1">3.00 </li><li style="flex:1">No </li></ul><p>Repairing and welding of rusted portion of gates to control leakage. Repairing of hooks ties and gearing system. <br>234<br>53<br>No. No. <br>Providing K-Oil for washing and cleaning of regulation machine. </p><ul style="display: flex;"><li style="flex:1">10 </li><li style="flex:1">Liter </li></ul><p></p><ul style="display: flex;"><li style="flex:1">5 Providing grease for lubrication of machines. </li><li style="flex:1">12 </li></ul><p>16 <br>Kg Liter <br>6 Providing good quality of M oil for oiling of machines of regulators. </p><p>No. </p><p>Sft. </p><ul style="display: flex;"><li style="flex:1">7 Painting outer surface of regulators </li><li style="flex:1">5</li></ul><p></p><ul style="display: flex;"><li style="flex:1">8 Applying Khanki Mixture Hot to barrage gates / regulators. </li><li style="flex:1">283.93 </li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1">Contractor </li><li style="flex:1">Executive Engineer, </li></ul><p>Gujrat Division UJC <br>Gujrat </p><p><strong>8. Name of work:- Resectioning of Jungle minor RD. 0+000 to 11+726 tail. </strong><br><strong>BOQ </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p>Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, slush, daldal, and underwater) including its disposal and preparation of working pad for operation of Machinery. (Rate includes 100 ft lead) </p><p>1</p><p>45336 </p><p>%o Cft </p><p></p><ul style="display: flex;"><li style="flex:1">Contractor </li><li style="flex:1">Executive Engineer, </li></ul><p>Gujrat Division UJC <br>Gujrat </p><p><strong>9. Name of work:- Desilting of Bukan minor RD. 0+000 to 14+950 tail. </strong><br><strong>BOQ </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li></ul><p></p><p>Berm cutting lead upto a single throw of Kassi, Phaora or shovel (without dressing). <br>1</p><p>33730.00 </p><p>%o Cft </p><p></p><ul style="display: flex;"><li style="flex:1">Contractor </li><li style="flex:1">Executive Engineer, </li></ul><p>Gujrat Division UJC <br>Gujrat </p><p><strong>10.Resectioning of Sohawa disty RD. 0+000 to 33+000 in Wasu Section. </strong><br><strong>BOQ </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li></ul><p></p><p>Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, slush, daldal, and underwater) including its disposal and preparation of working pad for operation of Machinery. (Rate includes 100 ft lead) </p><p>164075.00 </p><p>1</p><p>%o Cft </p><p></p><ul style="display: flex;"><li style="flex:1">Contractor </li><li style="flex:1">Executive Engineer, </li></ul><p>Gujrat Division UJC <br>Gujrat </p><p><strong>11. Name of work:- STG weak & ghat sites of Mangat disty RD. 0+000 to 80+000 tail. </strong><br><strong>BOQ </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li></ul><p></p><p>Borrowpit excavation & Transportation of earth all types when the <br>1 total distance. This rate will be paid inaddition to the including the </p><p>36279 </p><p>%o Cft %o Cft lead covered in the item of work lead 1 mile dressed. Borrowpit excavation & Transportation of earth all types This rate <br>2 will be paid inaddition to the including the lead covered in the item of work lead 1/4 mile dressed. <br>4722 <br>Borrowpit excavation & Transportation of earth all types . This <br>3</p><p>4</p><ul style="display: flex;"><li style="flex:1">7519 </li><li style="flex:1">%o Cft </li></ul><p>% Cft rate will be paid inaddition to the including the lead covered in the item of work 4290 ft lead (3/4 mile) dressed. Supply and dumping at site, without boat including handling of <br>3322.6 material within three chains (90m) Brick Bats. </p><p></p><ul style="display: flex;"><li style="flex:1">Contractor </li><li style="flex:1">Executive Engineer, </li></ul><p>Gujrat Division UJC <br>Gujrat </p><p><strong>12. Name of work:- Resectioning of Chorund minor RD. 0+000 to 31+600 tail. </strong><br><strong>BOQ </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li></ul><p></p><p>Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, <br>1 slush, daldal, and underwater) including its disposal and preparation of working pad for operation of Machinery. (Rate includes 100 ft lead) </p><p>63403 </p><p>%o Cft </p><p></p><ul style="display: flex;"><li style="flex:1">Contractor </li><li style="flex:1">Executive Engineer, </li></ul><p>Gujrat Division UJC <br>Gujrat </p><p><strong>13. Name of work:- Resectioning of Kuthiala Sheikhan minor at RD. 0+000 to 11+700 tail. </strong></p><p><strong>BOQ </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li></ul><p></p><p>Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, <br>1 slush, daldal, and underwater) including its disposal and preparation of working pad for operation of Machinery. (Rate </p><p>31040 </p><p>%o Cft %o Cft includes 100 ft lead) Borrowpit excavation & Transportation of earth all types This rate </p><p>2 will be paid inaddition to the including the lead covered in the item of work 4290 ft.(3/4 mile) dressed. <br>3479 </p><p></p><ul style="display: flex;"><li style="flex:1">Contractor </li><li style="flex:1">Executive Engineer, </li></ul><p>Gujrat Division UJC <br>Gujrat </p><p><strong>14. Name of work:- Resectioning of Bhacher disty RD. 0+000 to 21+000 in Bhacher </strong><br><strong>Section. </strong></p><p><strong>BOQ </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li></ul><p></p><p>Earth work in excavation of drains, irrigation channels through Excavator/ drag lines in all kinds of soil and condition (Dry, wet, slush, daldal, and underwater) including its disposal and preparation of working pad for operation of Machinery. (Rate includes 100 ft lead) </p><p>154880 </p><p>1</p><p>%o Cft </p><p></p><ul style="display: flex;"><li style="flex:1">Contractor </li><li style="flex:1">Executive Engineer, </li></ul><p>Gujrat Division UJC <br>Gujrat </p><p><strong>15. Name of work:- Providing and fixing data Board, missing Gauges and RD Marks in Sohawa Sub </strong><br><strong>Division UJC (Chhimon Section). </strong></p><p><strong>BOQ (New Data Board) </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li></ul><p></p><p>Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling around structure with excavated earth, watering and ramming lead upto one chain (30 </p><p>1</p><p>5.48 </p><p>%o Cft m) and lift upto 5 ft. (1.5 m) ordinary soil. Pacca brick work other than building upto 10 ft. (3 m) height. Ratio (1:3). </p><p>23</p><p>%Cft %Sft </p><p>14.65 38.84 </p><p>Cement plaster 1:3 upto 20' (6.00 m) height 1/2" (20 mm) thick. Providing and applying weather shield paint of approved quality on external surface of building including preparation of surface, application of primer complete in all respect, 2 coats. <br>45<br>38.84 </p><p>609 </p><p>%Sft </p><p>Per No. </p><p>Writing letters or figures, per letter, per inch height. </p><p><strong>old data boards (Plaster & Painting). </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li></ul><p></p><p>12</p><p>38.84 38.84 <br>%Sft %Sft </p><p>Removing cement or lime plaster. </p><p>Cement plaster 1:3 upto 20' (6.00 m) height 1/2" thick. Providing and applying weather shield paint of approved quality on external surface of building including preparation of surface, application of primer complete in all respect, 2 coats. </p><p>3</p><p>%Sft </p><p>38.84 </p><p>609 </p><p>Per No. </p><p>4<br>Writing letters or figures, per letter, per inch height (2.5" height). </p><p><strong>new RD Marks. </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li></ul><p></p><p>Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate) : ratio 1:2:4. </p><p>1</p><p></p><ul style="display: flex;"><li style="flex:1">0.945 </li><li style="flex:1">%Cft </li></ul><p></p><p>23</p><p>Placing boundary pillars in position including digging points. Painting distance marks for white ground and black lettering on both faces. <br>1.00 1.00 <br>1 Cft 1 No. <br>Carriage of consignment odd job Cart load for a distance exceeding 4 to 10 mile. </p><ul style="display: flex;"><li style="flex:1">4</li><li style="flex:1">1.00 </li><li style="flex:1">1 No. </li></ul><p></p><p><strong>Old RD Marks. </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li></ul><p></p><p>Painting distance marks for white ground and black lettering on both faces. </p><p>1</p><p></p><ul style="display: flex;"><li style="flex:1">1.00 </li><li style="flex:1">1 No. </li></ul><p></p><ul style="display: flex;"><li style="flex:1">Contractor </li><li style="flex:1">Executive Engineer, </li></ul><p>Gujrat Division UJC <br>Gujrat </p><p><strong>16. Name of work:- Providing and fixing data Board, missing Gauges and RD Marks in Sohawa Sub </strong><br><strong>Division UJC (Chillianwala Section). </strong></p><p><strong>BOQ (New Data Board) </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li></ul><p></p><p>Excavation in foundation of building, bridges and other structures, including dagbelling, dressing, refilling around structure with excavated earth, watering and ramming lead upto one chain (30 m) and lift upto 5 ft. (1.5 m) ordinary soil. </p><p>1</p><p>5.48 </p><p>%o Cft <br>Pacca brick work other than building upto 10 ft. (3 m) height. Ratio (1:3). </p><p>Cement plaster 1:3 upto 20' (6.00 m) height 1/2" (20 mm) thick. Providing and applying weather shield paint of approved quality on external surface of building including preparation of surface, application of primer complete in all respect, 2 coat. </p><p>23</p><p>%Cft %Sft </p><p>14.65 38.84 </p><p>45</p><ul style="display: flex;"><li style="flex:1">38.84 </li><li style="flex:1">%Sft </li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1">609 </li><li style="flex:1">Per No. </li></ul><p></p><p>Writing letters or figures, per letter, per inch height. </p><p><strong>old data boards (4.00' x 3.00'). </strong></p><p><strong>Rate quoted by contractor in figures </strong><br><strong>Rate quoted by contractor in words </strong></p><ul style="display: flex;"><li style="flex:1"><strong>Quantity </strong></li><li style="flex:1"><strong>Unit </strong></li></ul><p></p><p></p><ul style="display: flex;"><li style="flex:1"><strong>S.# </strong></li><li style="flex:1"><strong>Description </strong></li></ul><p></p><p>Providing and applying weather shield paint of approved quality on external surface of building including preparation of surface, application of primer complete in all respect, 2 coat. </p><p>51.82 <br>609 </p><p>12<br>%Sft </p><p>Per No. </p><p>Writing letters or figures, per letter, per inch height. </p><p><strong>Abstract of cost for old data boards (Plaster & Painting). </strong></p><p>12</p><p>38.84 38.84 <br>%Sft %Sft <br>Removing cement or lime plaster. Cement plaster 1:3 upto 20' (6.00 m) height 1/2" thick. Providing and applying weather shield paint of approved quality </p>
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages134 Page
-
File Size-