Chongqing Longxi River Basin Integrated Flood and Environmental Risk Management Project – Land Use Right Transfer Plan for Dianjiang Subproject (Contract Nos
Total Page:16
File Type:pdf, Size:1020Kb
Resettlement Plan February 2021 People’s Republic of China: Chongqing Longxi River Basin Integrated Flood and Environmental Risk Management Project – Land Use Right Transfer Plan for Dianjiang Subproject (Contract Nos. DJ-C01, DJ-C03, DJ-C04, and DJ-C05) Prepared by the Dianjiang County Government for the Asian Development Bank. This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the terms of use section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Contents 1 BACKGROUND ........................................................................................................................... 1 1.1 OVERVIEW ...................................................................................................................................... 1 1.2 DESCRIPTION OF CONTRACTS AND OVERVIEW OF LAND USE IMPACTS ....................................... 6 1.3 THIS REPORT ............................................................................................................................... 14 2 LAND USE RIGHTS TRANSFER ............................................................................................. 17 2.1 IMPACTS OF LURT ....................................................................................................................... 17 2.2 LURT IMPACT ANALYSIS ............................................................................................................. 20 2.3 GROUND ATTACHMENTS.............................................................................................................. 21 2.4 LAND ATTRIBUTES ....................................................................................................................... 27 3 LURT POLICIES AND COMPENSATION RATES .................................................................. 36 ........................................................................................................................................................ 36 3.1 POLICES AND RENT FOR LURT ................................................................................................... 36 3.2 ENTITLEMENT MATRIX ................................................................................................................. 38 4 LIVELIHOOD RESTORATION .................................................................................................. 41 5 LAND USE ORGANIZATIONS ................................................................................................. 42 5.1 ORGANIZATIONAL STRUCTURE .................................................................................................... 42 5.2 INSTITUTIONAL CAPACITY AND TRAINING .................................................................................... 42 6 PUBLIC PARTICIPATION AND GRIEVANCE REDRESS ...................................................... 44 6.1 PUBLIC PARTICIPATION ................................................................................................................ 44 6.2 GRIEVANCE REDRESS ................................................................................................................. 49 7 LURT COST ................................................................................................................................ 50 7.1 ESTIMATED BUDGET .................................................................................................................... 50 7.2 ANNUAL DISBURSEMENT PLAN .................................................................................................... 55 7.3 FUND MANAGEMENT .................................................................................................................... 56 8 IMPLEMENTATION AND M&E ................................................................................................. 57 8.1 IMPLEMENTATION ......................................................................................................................... 57 8.2 MONITORING AND EVALUATION (M&E) ....................................................................................... 57 I APPENDIX ..................................................................................................................................... 60 APPENDIX 1 OFFICE OF PEOPLE'S GOVERNMENT OF DIANJIANG COUNTY ...................................... 60 APPENDIX 2 CASE OF LURT AGREEMENT IN THE PROJECT AREA .................................................... 67 APPENDIX 3 LETTER FROM DIANJIANG COUNTY LAND RESOURCES AND HOUSING ADMINISTRATION ............................................................................................................................................................ 78 APPENDIX 4 LAND LEASE AGREEMENT OF THE FIRST VILLAGER GROUP OF MINZHU VILLAGE ...... 79 II List of Tables TABLE1-1 TENTATIVE SCHEDULE OF SUBMISSION OF UPDATED PLANNING DOCUMENTS ON LAND USE FOR CONTRACT PACKAGES ............................................................................................................................................ 4 TABLE 1-2 CONTENTS OF THE CONTRACT AND MAIN LAND USE RIGHTS TRANSFER COVERAGE .................................. 9 TABLE 1-3 MAIN CHANGES IN THIS LURTP AND CORRESPONDING JUSTIFICATIONS .............................................. 16 TABLE 2-1 LURT LAND AREA AND INVOLVED PERSONS .................................................................................... 17 TABLE 2-2 ANALYSIS OF LURT AREA AND NO. OF HHS ................................................................................. 22 TABLE 2-3 LIST OF GROUND ATTACHMENTS ................................................................................................... 25 TABLE 2-4 DJ-C01 LAND TYPE IN PUSHUN TOWN .......................................................................................... 28 TABLE 2-5 DJ-C03 LAND TYPE IN GAOAN TOWN ............................................................................... 30 TABLE 2-6 DJ-C04 LAND TYPE ......................................................................................................... 31 TABLE 2-7 DJ-C05 LAND TYPE IN GAOFENG TOWN .......................................................................... 33 TABLE 3-1 COMPENSATION RATES OF GROUND ATTACHMENTS ........................................................ 38 TABLE 3-2 ENTITLEMENT MATRIX ........................................................................................................ 39 TABLE 6-1 CONSULTATIONS CONDUCTED DURING DMS ................................................................................... 47 TABLE 6-2 INFORMATION DISCLOSURE AND PUBLIC PARTICIPATION PLAN ........................................ 49 TABLE 6-3 CONTACT INFORMATION OF APPEAL ACCEPTING AGENCIES ............................................ 49 TABLE 7-1 ESTIMATED BUDGET ........................................................................................................... 50 TABLE 7-2 ANNUAL DISBURSEMENT PLAN .......................................................................................... 55 TABLE 8-2 EXTERNAL M&E OF DJ-C01, DJ-C03, DJ-C04 AND DJ-C05 ......................................... 58 List of Figures FIGURE 1-1 CONSTRUCTION LAYOUT OF PUSHUN TOWN .................................................................... 7 FIGURE 1-2 CONSTRUCTION LAYOUT OF GAO'AN TOWN (UPSTREAM OF HUATAN BRIDGE) ................. 7 FIGURE 1-3 CONSTRUCTION LAYOUT OF GAO'AN TOWN (DOWNSTREAM OF HUATAN BRIDGE) ........... 8 FIGURE 1-4 CONSTRUCTION LAYOUT OF GAOFENG TOWN .................................................................................. 8 FIGURE 2-1 LAND TO BE TRAINED AND LAND TO BE OCCUPIED(JULY 30, 2020) .................................................... 19 FIGURE 2-2 SURVEY OF LURT CONFIRMED BY HHS(JULY 31, 2020) ............................................. 20 I FIGURE 5-1 LEADERS OF CHONGQING PMO DISCUSS RESETTLEMENT / LAND USE ISSUES WITH STAFF ....................... 43 FIGURE 6-1 DMS ON SITE(JULY 31, 2020) .............................................................................................. 45 II 1 Background 1.1 Overview A loan for $150 million was approved by ADB Board on 17 September 2018 for the Chongqing Longxi River Basin Integrated Flood and Environmental Risk Management Project (Loan No. 3704-PRC) (herein after referred as the Project). The Project is located in Liangping, Dianjiang and Changshou counties/districts, consisting of four outputs, which are (i) flood risk management infrastructure constructed; (ii) wastewater management and pollution control infrastructure developed; (iii) ecological conservation facilities improved; and (iv) flood and environmental risk management (FERM) capacity enhanced. Dianjiang Subproject, one of subprojects of the Project , is composed of 6 components as following: (1) Pushun, Zhoujia Town ecological embankment and ecological landscape, emergency square; (2) River dredging, plant ecological restoration and coastal ecological landscape in Xinmin Town; (3) Ecological embankment and ecological landscape in Gao’an town (upstream of Huatan bridge); and riverside ecological landscape zones; (4)