At Gandhinagar

Total Page:16

File Type:pdf, Size:1020Kb

At Gandhinagar BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION AT GANDHINAGAR PETITION NO. 1363 of 2013 In the matter of: Petition under Section 86(1)(a), 86 (1)(b), 86 (1)(e) and 86 (1)(f) read with Sections 61(h) and 62(1)(a) of the Electricity Act, 2003 for direction of the Commission to the Respondent to comply with the Provisions of the Central Electricity Regulatory Commission (Terms & Conditions for Recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 dated 14.1.2010 and Gujarat Electricity Regulatory Commission (Procurement of Energy from Renewable Sources) Regulations, 2010 dated 17.4.2010. Petitioners : 1. Renew Wind Energy (Rajkot) Private Limited Registered Office at 138, Ansal Chamber-II,Bikaji Cama Place, New Delhi-110066. 2. Wind Independent Power Producers Association, 6th Floor, Block 4-A, DLF Corporate Park, Mahrauli-Gurgaon Road, Gurgaon-122002. Represented by : Learned Advocate Shri Vishal Gupta with Shri P. K. Mishra for Petitioner No.1. V/s. Respondents : 1. Gujarat Urja Vikas Nigam Ltd (GUVNL) Page | 1 Sardar Patel Vidyut Bhavan, Race Course, Vadodara – 390024. 2. Madhya Gujarat Vij Company Limited (MGVCL) Vadodara. 3. Uttar Gujarat Vij Company Limited (UGVCL) Mehsana. 4. Paschim Gujarat Vij Company Limited (PGVCL) Rajkot. 5. Dakshin Gujarat Vij Company Limited (DGVCL) Surat. Represented by (1) Learned Advocate Shri M. G. Ramachandran. with S/Shri K.P.Jangid and V.T. Patel for GUVNL. (2) Shri M. L. Rabari, for MGVCL. (3) Shri R. P. Raval and Shri V. A. Patel, for UGVCL. (4) Shri J.J.Gandhi, for the PGVCL. (5) Shri B.V. Shah and B. C. Godani, for DGVCL. CORAM: Shri Pravinbhai Patel, Chairman Dr. M. K. Iyer, Member (Finance) Date: 22/04/2014 Page | 2 DAILY ORDER 1. The matter was kept for hearing on 19.04.2014. Learned Advocate Shri Vishal Gupta, on behalf of the petitioner submitted that the petitioner has filed its rejoinder in reply to the GUVNL’s submission. Some of the issues raised by the petitioner are covered under the Order dated 7.11.2013 passed by the Commission in Petition No. 1306 of 2013 in the matter of Surajbari Windfarm Development Pvt. Limited v/s. GUVNL and ors. 2. Learned Advocate Shri M. G. Ramachandran, on behalf of the respondent GUVNL, submitted the he would require some time to go through the submissions made by the petitioner, hence, the Commission may grant an adjournment. 3. Considering the submissions made by the respondent GUVNL for adjournment and petitioner having no objection to the same, we decide to grant the adjournment. 4. We order accordingly. 5. The next date of hearing will be on 13.05.2014 at 11.30 A.M. Sd/- Sd/- [Dr.M.K.IYER] [PRAVINBHAI PATEL] Member (Finance) Chairman Place: Gandhinagar Date: 22/04/2014. Page | 3 .
Recommended publications
  • (Appellate Jurisdiction) IA No.231 Of
    I.A. No.231 of 2012 in DFR No.1092 of 2012 Appellate Tribunal for Electricity (Appellate Jurisdiction) I.A. No.231 of 2012 IN DFR No.1092 of 2012 Dated: 20th July, 2012 Present : HON’BLE MR. JUSTICE M KARPAGA VINAYAGAM, CHAIRPERSON HON’BLE MR. RAKESH NATH, TECHNICAL MEMBER In the Matter of: Indian Oil Corporation Ltd. Pipelines Division A-1, Udyog Marg, Sector-1 NOIDA -201 301(U.P) …Appellant/Applicant Versus 1. Gujarat Electricity Regulatory Commission(GERC) 1ST Floor, Neptune Tower Ashram Road, Ahemedabad-380009. 2. Paschim Gujarat Vij Company Ltd., (PGVCL) Registered and Corporate Office at Laxim Nagar, Nana Mava Main Road Rajkot Gujarat – 360 004 Page 1 of 6 I.A. No.231 of 2012 in DFR No.1092 of 2012 3. Uttar Gujarat Vij Company Ltd., (UGVCL), Registerd and Corporate office at Visnagar Road Mehasana – 384 001 4. Gujarat Energy Transmission Corporation Ltd., (GETCO) Corporate office at Sardar Patel Vidyut Bhawan Race Course Vadodara – 390 007 ...Respondent(s) Counsel for the Appellant(s) : Mr. V.N. Koura Ms. Mona Aneja Counsel for the Respondent(s):- O R D E R PER HON’BLE MR. JUSTICE M. KARPAGA VINAYAGAM, CHAIRPERSON 1. This is an Application filed by the Appellant/Applicant to condone the delay of 715 days in filing the Appeal as against the impugned order dated 13.5.2010. 2. The explanation of this huge delay has been given by the Applicant/Appellant, which is follows:- Page 2 of 6 I.A. No.231 of 2012 in DFR No.1092 of 2012 “ (a) The Applicant filed the Petition No.1004 of 2010 praying for direction to the Distribution Licensee Respondents to pay the applicable tariff to the Applicant as determined by the State Commission.
    [Show full text]
  • Analysis on Indian Power Supply Situation and Policies
    IEEJ:July 2018 © IEEJ2018 Analysis on Indian Power Supply Situation and Policies National Expansion of Successful Electric Power Reform “Gujarat State Model” Jun Makita* Summary India features robust demand for the development of infrastructure including electric power and is expected to drive the world economy as a manufacturing base and a giant market. However, about 240 million people, close to one-fifth of the Indian population, live without electric power. Blackouts are frequent, indicating an unstable electric power supply environment. Narendra Modi, who was elected India’s 18th prime minister in May 2014, has vowed to supply electric power 24 hours a day, seven days a week, indicating his determination to promote domestic electric power development. Cited as the largest factor behind his election as prime minister are an electric power reform and other successful policies in Gujarat state when he served as the state’s chief minister from 2001 to 2014. Particularly, the electric power reform is called the Gujarat state model, gaining high ratings. In response to people’s strong wish to see the expansion of the reform’s fruits throughout India, Prime Minister Modi is now tackling the national expansion of the reform. Stable power supply is such an important policy challenge supporting national development. In this paper, Chapter 1 reviews India’s present situation and future outlook regarding economy, energy, electric power supply and demand, and an existing supply-demand gap. Chapter 2 summarizes India’s present electric power business arrangements, power supply conditions and numerous challenges facing India. Chapter 3 analyzes the Gujarat state model cited in the subtitle, delving into the electric power reform that Modi as chief minister of Gujarat state promoted to eliminate blackouts and into the reform’s fruits such as electric power quality improvements.
    [Show full text]
  • Internal Audit
    Annexure-1 Oraganisations who recognised CMAs for Internal Audit/Concurrent Audit S.No. Name of Organisations Central PSU 1 Airports Authority of India 2 Andaman and Nicobar Islands Integrated Development Corporation Limited 3 Andrew Yule & Company Limited 4 Artificial Limbs Manufacturing Corporation of India Limited 5 Biecco Lawrie Limited 6 Bharat Coking Coal Limited 7 Bharat Heavy Electricals Limited 8 Bharat Wagon Engineering Co. Ltd 9 BharatBroadband Network Limited 10 Bharat Sanchar Nigam Limited 11 Brahmaputra Valley Fertilizer Corporation Limited 12 Braithwaite & Co. Limited 13 Bharat Dynamic Limited 14 Burn Standard Co. Ltd 15 Central Cottage Industries of India Ltd. 16 Central Coalfields Limited 17 Central Electronics Limited 18 Central Mine Planning & Design Institute Limited 19 CENTRAL COTTAGE INDUSTRIES CORPORATION OF INDIA LIMITED 20 Coal India Limited 21 Container Corporation of India 22 Dedicated Freight Corridor Corporation of India Limited 23 Durgapur Chemicals Limited 24 Eastern Coalfields Limited 25 Fertilisers and Chemicals Travancore Limited (FACT Ltd.) 26 Ferro Scrap Nigam Ltd 27 Garden Reach Shipbuliders & Engineers Limited 28 GOA SHIPYARD LIMITED 29 Heavy Engineering Corporation Limited 30 Hindustan Aeronautics Limited 31 HIL (INDIA) LIMITED formerly known as Hindustan Insecticides Limited 32 Hindustan Newsprint Limited 33 Handicrafts & Handlooms Exports Corporations of India Ltd. 34 HLL Lifecare Ltd 34 HMT Ltd. 35 HMT MACHINE TOOLS LIMITED 36 IFCI Infrastructure Development Limited India-Infrastructure-Finance-Company-Limited
    [Show full text]
  • Merchants Where Online Debit Card Transactions Can Be Done Using ATM/Debit Card PIN Amazon IRCTC Makemytrip Vodafone Airtel Tata
    Merchants where online Debit Card Transactions can be done using ATM/Debit Card PIN Amazon IRCTC Makemytrip Vodafone Airtel Tata Sky Bookmyshow Flipkart Snapdeal icicipruterm Odisha tax Vodafone Bharat Sanchar Nigam Air India Aircel Akbar online Cleartrip Cox and Kings Ezeego one Flipkart Idea cellular MSEDC Ltd M T N L Reliance Tata Docomo Spicejet Airlines Indigo Airlines Adler Tours And Safaris P twentyfourBySevenBooking Abercrombie n Kent India Adani Gas Ltd Aegon Religare Life Insur Apollo General Insurance Aviva Life Insurance Axis Mutual Fund Bajaj Allianz General Ins Bajaj Allianz Life Insura mobik wik Bangalore electricity sup Bharti axa general insura Bharti axa life insurance Bharti axa mutual fund Big tv realiance Croma Birla sunlife mutual fund BNP paribas mutural fund BSES rajdhani power ltd BSES yamuna power ltd Bharat matrimoni Freecharge Hathway private ltd Relinace Citrus payment services l Sistema shyam teleservice Uninor ltd Virgin mobile Chennai metro GSRTC Club mahindra holidays Jet Airways Reliance Mutual Fund India Transact Canara HSBC OBC Life Insu CIGNA TTK Health Insuranc DLF Pramerica Life Insura Edelweiss Tokio Life Insu HDFC General Insurance IDBI Federal Life Insuran IFFCO Tokio General Insur India first life insuranc ING Vysya Life Insurance Kotak Mahindra Old Mutual L and T General Insurance Max Bupa Health Insurance Max Life Insurance PNB Metlife Life Insuranc Reliance Life Insurance Royal Sundaram General In SBI Life Insurance Star Union Daiichi Life TATA AIG general insuranc Universal Sompo General I
    [Show full text]
  • Before the Gujarat Electricity Regulatory Commission
    BEFORE THE GUJARAT ELECTRICITY REGULATORY COMMISSION GANDHINAGAR Petition No 1712 of 2018 In the matter of: Petition under the provision of Electricity Act, 2003 read with GERC (Terms and Conditions of Intra- State Open Access) Regulations, 2011 and in the matter of seeking refund of amount of transmission wheeling charges paid by the Petitioner company Under Protest and in the matter of decision/ order dated 10.05.2017 passed by the Respondent authority rejecting the request/application of refund of amount paid towards Exit Option Charge for Wind Mill No. ADO-36 made by the Petitioner company. Petitioner: Gokul Refoils and Solvent, Gokul House, 43, Shreemali Co-Operative Housing Soc. Ltd., Opp. Shikhar Building, Navrangpura, Ahmedabad. Co-Petitioner: Gokul Agri International Ltd, State Highway No. 41, Near Sujanpur Patia, Sidhpur, District: Patan, Pin Code – 384151 Represented by: Learned Advocate Shri Satyan Thakkar and Shri Nisarg Rawal V/s. Respondent: Gujarat Energy Transmission Corporation Ltd. Sardar Patel Vidyut Bhavan, Race Course, Vadodara- 390 007. Represented by: Learned Sernior Advocate Shri M. G. Ramchandran with Advocate Ms. Ranjitha Ramchandran and Ms. Venu Birappa CORAM: Shri Anand Kumar, Chairman Shri P. J. Thakkar, Member Date: 09/03/2020 ORDER 1 1 The present petition has been filed by M/s Gokul Refoils & Solvent Limited and M/s Gokul Agri International Limited seeking following prayer: “The Commission may be pleased to quash and set aside the impugned decision/order dated 10.05.2017 passed by the Additional Engineer (R&C), Gujarat Energy Transmission Corporation Limited and further be pleased to direct the Gujarat Energy Transmission Corporation Limited i.e.
    [Show full text]
  • 09 List of Abbreviations.Pdf
    Abbreviations AAD - ADVANCED AGAINST DEPRECIATION ABT - AVAILABILTY BASED TARIFF ACS - AVERAGE COST OF SUPPLY ADB - ASIAN DEVELOPMENT BANK ADMS - DVANCED DISTRIBITION MANAGEMENT SYSTEM AECO - AHMEDABAD ELECTRICITY COMPANY ALDC - AREA LOAD DISPATCH CENTRE ANOVA - ANALYSIS OF VARIANCE. APM - ADVANCE POWER MANAGEMENT APPC - AVERAGE POWER PURCHASE COST APSEB - ANDHAR PRADESH STATE ELECTRICITY BOARD. APTEL - APPELLATE TRIBUNAL FOR ELECTRICITY ARR - AVERAGE REVENUE REALISED AT&C - AGGREGATE TECHNICAL & COMMERCIAL LOSSES AUX - AUXILIARY BECL - BHAVNAGAR ENERGY COMPANY LIMITED BEE - BUREAU OF ENERGY EFFICIENCY BFP - BOILER FEED PUMP BHEL - BHARAT HEAVY ELECTRICALS LIMITED BOP - BALANCE OF PLANTS. BRICS - BRAZIL RUSSIA INDIA CHINA & SOUTH AFRICA BTG - BOILER TURBINE GENERATOR CAGR - COMPOUND ANNUAL GROWTH RATE CAPEX - CAPITAL EXPENDITURE CBDT - CENTRAL BOARD OF DIRECT TAXES CDM - CLEAN DEVELOPMENT MECHANISM CEA - CENTRAL ELECTRICITY AUTHORITY. CEICED - CHIEF ELECTRICAL INSPECTOR. CENVAT - CENTRALIZED VALUE ADDED TAX CER - CERTIFIED EMMISSION REDUCTION CERC - CENTRAL ELECTRICITY REGULATORY COMMISSION. CMIE - CENTRAL FOR MONITORING INDIA ECONOMY. XI CNG - COMPRESSED NATURAL GAS COC - COST OF CAPITAL COD - COMMERCIAL OPERATION DATE COGS - COST OF GOODS SOLD COP - COST OF PRODUCTION CPCB - CENTRAL POLLUTION BOARD CPL - COASTAL POWER LIMITED CPP - CAPTIVE POWER PLANT CPPs - CAPTIVE POWER PLANTS CRISIL - CREDIT RATING INFORMATION SERVICES OF INDIA LIMITED CSS - CROSS SUBSIDY SURCHARGE CST - CENTRAL SALES TAX CTU - CENTRAL TRANSMISSION UTILITY. CVPF
    [Show full text]
  • Presentation (State Updates)
    State Updates – Presentations • Andhra Pradesh • Delhi • Gujarat • Haryana • Karnataka • Maharashtra • Tamil Nadu 1 Andhra Pradesh Power Sector Status and Issues Ahead Presentation by People’s Monitoring Group on Electricity Regulation (PMGER) Hyderabad, Andhra Pradesh 22nd- 23rd March 2007, Mumbai 1 Reform Milestones 2 1 Reform Milestones in AP APSEB Unbundling Financial autonomy Bulk supply & AP Reforms Unbundled into provided to Discoms. trading vested Bill passed into APGenco / Distribution Citizens charter with Discoms in Assembly APTransco Companies introduced as per EA 2003 Apr’98 Feb’99 Apr’00 Apr’02 June 05’ Tripartite agreement with employees on reform program Feb’97 Mar’99 Oct’02 Dec 05’ Employees 7th ARR & Govt. APERC allocated to Tariff filing policy establish all companies made as statement ed through per ACT issued options 2003 Key statistics 4 2 KEY STATISTICS APTRANSCO & DISCOMs APTRANSCO NPDCL Headquarters HYD Headquarters Warangal Consumers 3.47m ADILABAD SRIKAKULAM NIZAMABAD KARIMNAGAR VIJAYNAGARAM WARANGAL MEDAK VISHAKAPATNAM KHAMMAM EAST RANGAREDDY GODAVARI NALGONDA WEST GODAVARI EPDCL CPDCL MAHABOOB NAGAR KRISHNA GUNTUR Headquarters Vizag Headquarters HYD Consumers 3.57m PRAKASAM Consumers 5.61m KURNOOL BAY OF BENGAL ANANTAPUR NELLORE CUDDAPAH SPDCL CHITTOOR Headquarters Tirupati Consumers 5.20m 5 A snapshot of the AP Power Sector Structure Percentage procured from various Key Statistics of Power Sector in sources AP 49% 33% 14% 4% Total Number of 1.73 Cr APGENCO CGS IPPs / JVs NCEs Consumers Per Capita Consumption
    [Show full text]
  • Uttar Gujarat Vij Company Ltd. Well Comes
    Uttar Gujarat Vij Company Ltd. Well Comes Vibrant Gujarat Global Investors Summit-2007 SUPPLY VOLTAGE Contract Supply Demand Voltage Up to At 11 KV/ 22KV 4000 KVA Above At 66 KV 4000 KVA and above Where to apply for Power Connection Name of DISCOM Name of Districts Madhya Gujarat Vij Company Ltd. Vadodara, Anand, Kheda, (MGVCL) Vadodara Panchmahal, Dahod Uttar Gujarat Vij Company Ltd. Ahmedabad (except city), (UGVCL) Mehsana Gandhinagar (except city), Mehsana, Banas Kantha, Patan, Sabar Kantha Paschim Gujarat Vij Company Ltd. Rajkot, Porbandar, Junagadh, (PGVCL) Rajkot Jamnagar, Kutch, Bhavnagar, Amreli, Surendranagar Dakshin Gujarat Vij Company Ltd. Surat except city, Bharuch, (DGVCL) Surat Narmada, Dang,Valsad, Navsari Processing and releasing Authority of HT connection UP TO CIRCLE 275 KVA OFFICE Above CORPORATE 275 KVA OFFICE Procedure for Registration of Application for HT Power Supply Application for supply of power shall be made in the prescribed form. The requisition for supply of electrical energy shall be accompanied by registration charges as under. HT and EHT supply @ Rs.10 per KVA with a ceiling of Rs.25000.00 Checklist- Submission of Documents for Power Supply • Prescribed Application Form in Four (4) Copies • Site plan with key map indicating point of supply in Four (4) Copies. • Land documents – Plot Allotment letter OR 7/12 and 8A Abstract, OR Sale deed in Two (2) Copies. • Memorandum of Articles • Resolution authorizing the person(s) to sign Application and Agreement • Short Description of process • Certificate regarding Industrial use of land from Collector (Before work is taken up on hand.) • NOC of Gujarat Pollution Control Board (Before actual release of power supply.) Estimate [1] • On registration of demand, the DISCOM shall furnish an estimate including Security Deposit and charges for providing electric line/infrastructure as per technical feasibility report.
    [Show full text]
  • Uttar Gujarat Vij Company Limited (UGVCL)
    GUJARAT ELECTRICITY REGULATORY COMMISSION Tariff Order Truing up for FY 2018-19 and Determination of Tariff for FY 2020-21 For Uttar Gujarat Vij Company Limited (UGVCL) Case No. 1839 of 2019 31st March, 2020 6th Floor, GIFT ONE, Road 5C, Zone 5, GIFT CITY Gandhinagar-382 355 (Gujarat), INDIA Phone: +91-79-23602000 Fax: +91-79-23602054/55 E-mail: [email protected] : Website www.gercin.org GUJARAT ELECTRICITY REGULATORY COMMISSION (GERC) GANDHINAGAR Tariff Order Truing up for FY 2018-19, and Determination of Tariff for FY 2020-21 For Uttar Gujarat Vij Company Limited (UGVCL) Case No. 1839 of 2019 31st March, 2020 Uttar Gujarat Vij Company Limited Truing up for FY 2018-19 and Determination of Tariff for FY 2020-21 CONTENTS 1 Background and Brief History....................................................................................... 11 1.1 Background........................................................................................................... 11 1.2 Uttar Gujarat Vij Company Limited (UGVCL) ........................................................ 11 1.3 Commission’s Orders for Approval of final ARR for FY 2016-17 and Approval of Multi- Year ARR for FY 2016-17 to FY 2020-21 ........................................................................ 12 1.4 Commission’s Order for Approval of True Up for FY 2016-17 and Determination of Tariff for FY 2018-19 ....................................................................................................... 13 1.5 Commission’s order for Approval of True up for FY 2017-18, Mid-Term
    [Show full text]
  • Biller Name Adani
    Biller Name Adani Gas - Gujarat Adani Gas - Haryana BSES Rajdhani Power Limited BSES Yamuna Power Limited Connect Broadband Delhi Jal Board India Power Corporation - Bihar India Power Corporation - West Bengal Jamshedpur Utilities Maharashtra State Electricity Distbn Co Ltd Mahanagar Gas Limited Meghalaya Power Dist Corp Ltd M.P. Paschim Kshetra Vidyut Vitaran MTNL Mumbai Noida Power Reliance Energy Siti Energy - Delhi Siti Energy - Haryana Siti Energy - Uttar Pradesh Tata Power - Delhi Tikona Digital Networks Private Limited Torrent Power - Agra Torrent Power - Ahmedabad Torrent Power - Bhiwandi Torrent Power - Surat Tripura Electricity Corp Ltd Uttarakhand Jal Sansthan Uttarakhand Power Corporation Limited Muzaffarpur Vidyut Vitran Limited SNDL Nagpur Calcutta Electric Supply Corporation (CESC) BSNL Landline - Corporate BSNL Landline - Individual BSNL Mobile Postpaid Aircel Postpaid Gujarat Gas Limited NESCO, Odisha SOUTHCO, Odisha Urban Improvement Trust (UIT) - Bhiwadi Kota Electricity Distribution Limited (KEDL) Tripura Natural Gas Municipal Corporation of Gurugram Reliance Postpaid Eastern Power Distribution Co Ltd (APEPDCL) Southern Power Distribution Co Ltd (APSPDCL) Bharatpur Electricity Services Ltd. (BESL) Jaipur Vidyut Vitran Nigam (JVVNL) Uttar Pradesh Power Corp Ltd (UPPCL) - URBAN Daman and Diu Electricity Indraprastha Gas Bikaner Electricity Supply Limited (BkESL) Haryana City Gas Sabarmati Gas Limited (SGL) Tata Power - Mumbai TP Ajmer Distribution Ltd (TPADL) ACT Broadband AIRCEL POSTPAID Airtel Landline AIRTEL POSTPAID
    [Show full text]
  • Energy News Monitor
    June 24, 2016, Volume XIII, Issue 2 Energy News Monitor NATIONAL: OIL & GAS Upstream IOC-led consortium buys 24 percent stake in to May, covering a total of 31 MODUs on the west coast Russian oil field and 2 on the east coast and placing each on its respective monsoon location before the onset of the seasonal June 18, 2016. A consortium led by Indian Oil Corp adverse weather conditions. (www.rigzone.com) (IOC) oil companies IOC, BPCL and OIL signed an agreement to buy 23.9% stake in Russia's Vankor oil field Downstream from Rosneft for $2.1 billion, IOC said. ONGC Videsh RIL, IIP develop technology to reduce benzene Ltd (OVL) has recently picked up 15% stake in the levels Vankor fields for $1.27 billion. IOC and OIL will pick up 8% stake each while the remaining 7.8% stake will go to June 20, 2016. Reliance Industries Ltd (RIL) in a BRPL. The recoverable resources of the Vankor field collaboration with Indian Institute of Petroleum (IIP) stood at 361 million tonnes of oil and condensate and 138 Dehradun has developed an indigenous technology to billion cubic metres of gas. (www.business-standard.com) restrict benzene, a carcinogenic element in gasoline and naphtha. RIL carried out the construction and the ONGC sets new pre-monsoon rig move offshore 'flawless' commissioning of the Benzene Recovery Unit India (BRU). The company said that there has been an June 17, 2016. Oil and Natural Gas Corp (ONGC) has, increasing pressure on refiners around the world to with the support of Norway's Aqualis Offshore, set a new reduce the amount of benzene and other hazardous air pre-monsoon rig move record offshore India recently pollutants in the gasoline pool because of health and that involved 33 mobile offshore drilling units (MODU).
    [Show full text]
  • Gujarat's Electricity Sector Transformation
    Tim Buckley, Director for Energy Finance Studies, Australasia 1 Kashish Shah, Research Analyst August 2019 Gujarat’s Electricity Sector Transformation A Role Model of India’s Electricity Transition Executive Summary GUJARAT, LOCATED ON THE WESTERN COAST OF INDIA, IS AN ECONOMIC POWERHOUSE that contributed roughly 8% of India’s total gross domestic product (GDP) between 2011/12 and 2018/19. It is one of the most industrially focussed states in India, with three quarters of Gujarat’s state GDP coming from the industrial sector. IEEFA also identifies Gujarat as one of the five leading Indian states for renewable energy in terms of both existing generation capacity as well as future potential. There was 2 gigawatt (GW) of solar power capacity, 6GW of wind power capacity and 0.5GW of biomass capacity operational as of March 2019. India’s Ministry of New and Renewable Energy (MNRE) estimates Gujarat’s renewables potential to be 72.7GW, equally balanced between solar and wind energy potential. This includes the 5GW Dholera Solar Park, the largest proposed solar development in the world to-date. August 2019 saw NTPC announce plans for another 5GW of solar park at Kutch in Gujarat during its annual investor meet for FY2018/19. This announcement puts Gujarat ahead in the race for building renewables capacity between states such as Tamil Nadu, Karnataka, Maharashtra, Andhra Pradesh and Rajasthan with similar renewable energy potential. GUJARAT’S CURRENT ELECTRICITY MIX IS DOMINATED BY THERMAL POWER SOURCES. The 22.3GW of thermal capacity comprises 15.8GW of coal-fired and 6.6GW of gas-fired capacity.
    [Show full text]