M/S Bharat Petroleum Corporation Ltd., Mumbai PRE-FEASIBILITY R E P O R T FOR PROPOSED 356KM LONG, 18 INCH MULTI PRODUCT PETROLEUM PIPELINE FROM BINA TO PANKI (KANPUR) & AUGMENTATION OF TANKAGES AT RECEIPT TERMINAL, KANPUR FOR ENVIRONMENTAL CLEARANCE (VIDE MOEF GUIDELINES NO. J-11013/41/2006-IA.II(I) DATED 30TH DECEMBER 2010) OF M/S BHARAT PETROLEUM CORPORATION LTD., MUMBAI Prepared By PROJECTS & DEVELOPMENT INDIA LIMITED (A Govt. of India Undertaking) PO: Sindri - 828122, Dist: Dhanbad (Jharkhand) NABET Sl. No.- 121 as on 05.09.2017 OCT 11TH, 2017 CONTENTS CHAPTER DESCRIPTION PAGE NO. 0.0 Executive Summary 1 - 5 1.0 Introduction 6 - 6 2.0 Project Proposal 6 - 10 3.0 Project Benefits 10 - 10 4.0 Pipeline Route 11 - 13 5.0 Project & Process Description 14 - 21 6.0 Water & Power Requirement 21 - 22 7.0 Environmental Aspects 22 - 23 8.0 Land form, land use and land ownership 23 - 23 9.0 Manpower Requirement 23 - 23 10.0 R & R Plan 23 - 24 11.0 Project Schedule & Cost Estimates 24 - 26 12.0 Conclusion 27 - 27 Pre-Feasibility report for TOR of Proposed 356km long, 18 inch Multi product petroleum pipeline from Bina to Panki (Kanpur) & augmentation of tankages at receipt Terminal, Kanpurof M/S BPCL, Mumbai EXECUTIVE SUMMARY INTRODUCTION Bharat Petroleum Corporation Limited (BPCL) with an equity base of Rs.723.08 Crore, is a leading player in the Petroleum Sector in the country. BPCL has a major stake in BORL (Bharat Oman Refineries Limited) Refinery at Bina with complete marketing rights. The Bina refinery is operating at capacity of 6 MMTPA and is undergoing low cost expansion to 7.8 MMTPA. EIA CONSULTANT BPCL entrusted M/s Projects and Development India Limited (PDIL), Sindri, Dhanbad (a QCI- NABET accredited EIA consultant) for Environmental Clearance (EC) activities. PROJECT PROPOSAL BPCL proposes to lay a 356 Km long cross-country multi-product petroleum pipeline of 18” dia. from its Bina Dispatch Terminal to Panki POL terminal (Kanpur). The proposed Bina -Panki pipeline (BPPL) will replace Rail wagon transport there-by yield savings in fuel expenditure on transport as well as reduce traffic on Bina-Kanpur rail sector. The proposed BPPL will be able to supply HSD, MS, SKO & ATF to this terminal. The total volume (including 25% common carrier volume)assessed for transportation through Bina-Panki pipeline is as follows: Commissioning Year: FY 2020-21: 2.78 MMTPA Phase-1: FY 2025-26: 3.45 MMTPA The existing Panki Terminal will be augmented with a pipeline receipt terminal facilities consisting of receipt manifold, Control room, inter-tank transfer pumping facilities, Tank wagon loading facilities including pump house and automation, additional product tankage of 1,60,416 KL in Phase- I and 52,900 KL in Phase- 2. PROJECT BENEFITS Pipelines are by far the most superior mode of transportation for petroleum products,as they have considerable advantage in being able to move large quantities quickly, economically and reliably over long distances with fewer associated impacts on the environment. It is for this reason that pipeline transportation is preferred over road and railway transportation. PIPELINE ROUTE Four Alternatives A, B, C & D are proposed from Bina Dispatch Terminal, Sagar, Madhya Pradesh to Panki Receipt Terminal, Kanpur, Uttar Pradesh. Projects & Development India Limited, Sindri 1 of 27 Pre-Feasibility report for TOR of Proposed 356km long, 18 inch Multi product petroleum pipeline from Bina to Panki (Kanpur) & augmentation of tankages at receipt Terminal, Kanpurof M/S BPCL, Mumbai In view of Sand mining, more undulation, more steep terrain, Close vicinity of stone quarries and lesser distance from Wild life sanctuaries boundaries, Alternative A& C is not recommended. Alternative B & D routes are having same features except in view of road approachability for construction, Operation & Maintenance. Alternative D is having more accessibility through road than Alternative B hence, Alternative D is selected as most feasible route. Forest Crossings Sl. No. Name of Forest Length in Km State 1 Balabahat P.F. 0.98 Uttar Pradesh 2 Balabahat R.F. 5.54 UP 3 RichhaMaholi R.F. 0.80 UP 4 Gauna R.F. 1.20 UP 5 BaidauraP.F. 0.08 Madhya Pradesh Total Forest Length in MP 0.08 Total Forest Length in UP 8.52 Grand Total 8.60 Pipeline Crossings NH RAILWAY SH Other Village River Canal Nala Foreign Roads Roads Pipeline 3 6 6 143 229 11 65 68 1 PROJECT FACILITIES a) Dispatch station at Bina including booster pumps (1Working + 1 Stand by), mainline pumps (1Working+ 1Stand by), basket filter, metering, Corrosion Inhibitor dosing and scrapper launcher along with associated facilities. b) Intermediate pigging station (IPS) including scrapper Receiver/Launcher, filter, metering, Corrosion Inhibitor dosing and associated facilities. c) 355km (approx.) Cross Country pipeline from Bina to Panki. d) Receipt terminal at Panki including scrapper receiver, filter, metering and associated facilities. e) Sectionalizing Valve Stations as per code and profile requirement. f) Providing SCADA (Supervisory Control & Data Acquisition), LDS (Leak Detection System),CP (Cathodic Protection) & ESD (Emergency Shut Down), Telecom and Instrumentation system etc. PROCESS DETAILS Operation & Control Philosophy a) Instrumentation and Control system shall be provided for safe and efficient control of petroleum products pipeline. Projects & Development India Limited, Sindri 2 of 27 Pre-Feasibility report for TOR of Proposed 356km long, 18 inch Multi product petroleum pipeline from Bina to Panki (Kanpur) & augmentation of tankages at receipt Terminal, Kanpurof M/S BPCL, Mumbai b) PLC (programmable logic control) based control system shall be provided at Dispatch stations, Receipt stations for the process interlocks / shutdown logic / MOV’s (motor operated valve) operation and station monitoring whereas panel based monitoring/ control system (Working on 48V DC) shall be provided at intermediate pigging station. Control panels are provided for mounting the flow computers & other instruments. c) SCADA (Supervisory Control and Data Acquisition) system is envisaged to ensure effective and reliable control, management and supervision of pipeline from centralized location using Remote Telemetry Units (RTU) along the pipeline route. d) All essential control parameters of receipt terminals shall be integrated suitably inSCADA system and PLC control. e) All supply operations for the pipeline system shall be under the control of dispatch stations which shall ensure the supply of the product at normal operating conditions. The dispatch station shall make all necessary arrangements for the petroleum products dispatch and ensure proper lining up of the system in conjunction with the receipt terminal. f) The main pumping units will be shutdown automatically in the event of low suction pressure or high discharge pressure, mechanical seal failure, high vibration, high casing temperature etc. g) Unit Control Panels (UCP) is envisaged at pumping stations. Pump start / stop / interlocks / trip functions will be implemented in the pump UCP and this UCP will be interfaced to the station PLC system for stop / trip / ESD from station / SMC and for status monitoring. h) Corrosion Inhibitor dosing facilities shall be provided at dispatch station & IPS for controlling corrosion in the pipeline. Electric Resistance probe for corrosion monitoring shall also be provided. i) The sump pump and / or slop transfer pump will be tripped in case of low liquid level in the sump tank. j) Thermal relief / safety valves shall be provided as per the requirement / standards such as API 521 and shell DEP equivalent. Fire Fighting Facilities i) Existing fire water network of the plant shall be extended to cover the facilities at DT and RT under this project. ii) Existing Fire water system is designed to fight two major fires anywhere within the plant as per the provisions of OISD-116/OISD-117. Adequacy of existing fire water system has been done to meet the OISD-116/OISD-117 requirements. Projects & Development India Limited, Sindri 3 of 27 Pre-Feasibility report for TOR of Proposed 356km long, 18 inch Multi product petroleum pipeline from Bina to Panki (Kanpur) & augmentation of tankages at receipt Terminal, Kanpurof M/S BPCL, Mumbai iii) Hydrant & Monitors: Double outlet hydrants and monitors shall be provided at 30M interval around proposed area. The ring main shall be provided above ground around proposed areas on independent concrete sleepers. iv) Fire fighting facilities for Mainline pump house: The mainline pump houses are provided with fixed water spray system as per requirement of OISD-116/OISD-117 and NFPA-15. v) Adequate no. of portable fire extinguishers shall be provided at all strategic locations. WATER & POWER REQUIREMENT Water requirement for the proposed BPPL project is very minimal to the tune of 20 KLD, mainly for potable use by workers across the pipeline length, dispatch & receipt terminals and SV & IP stations en-route. There will be one time requirement of 71,000 KL of water for hydro-testing of the pipeline and tank augmentation at Panki, Kanpur. Two nos. of HT plant feeder from existing HV switchboard (HT-223 at Substation No. 7) from Bina Refinery shall be provided by Owner/BPCL to the battery limit of Dispatch Terminal at Bina to meet the total power requirement (of new 6.6kV switchboard) at the Dispatch Terminal. At Panki receiving terminal (RT), the incoming power shall be fed from existing emergency switchboard so that there shall be no separate new Emergency DG for RT. ENVIRONMENTAL ASPECTS The design approach built into the FEED to avoid/minimize emissions to the air is as follows: · Fugitive emissions from valves will be avoided or minimized by selection of suitable valve packing, seals etc. · Fugitive emissions from pumps will be minimized by use of dual seals or seal-less pumps when handling high vapour pressure and hazardous material · Fugitive emissions from flanged connections will be reduced by minimizing the number of flanged connections in high pressure service.
Recommended publications
  • State of Environment (Soe)
    STATE OF ENVIRONMENT (SOE) REPORT – TIKAMGARH Executive Summary Welcome to the Tikamgarh State of Environment Report. The State of Environment Report provides a summary of the environmental attributes and condition of the district and the human impacts on the environment. It also provides a public record of district authority, industry and community activities and achievements in responding to pressures on the environment. State of the Environment Reports can therefore be considered as a mechanism for reporting on progress towards Environmentally Sustainable Development (ESD). State of the Environment (SoE) Reporting will be an annual requirement of district authority, coinciding with Annual Plan and prepared for each financial year. It involves looking at: the various pressures on the environment; the state or condition of the environment at the time of reporting; and any responses that has been or will be made to better manage environmental pressures or impacts to improve environmental conditions. So the main objective of the SoE Report of Tikamgarh is to bring out an overview of the environmental scenario of the district to serve as a baseline document and assist in logical and information based decision making. It is recognized that to achieve ESD within district the activities of annual plan require a shift in priorities, which involves the integration of environmental considerations into the development of community goals/targets, strategies, economic policies, and decision-making in every sphere of activity. The SoE Report provides a mechanism for identifying sustainability issues and trends, and therefore provides a mechanism for assisting the prioritization of district plan in achieving ESD The State of the Environment Report prepared for Tikamgarh covers the state and trends of the environmental issues like Agriculture, Forest, Land degradation, Water quantity, and Water quality.
    [Show full text]
  • 72Nd OCC Meeting Minutes
    MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in No.07-05/SG-9B-II/30 Jabalpur, dated:06.01.2020 To As per distribution list Sub: Minutes of 72nd meeting of Operation and Coordination Committee of MP. … The Minutes of 72nd meeting of the Operation and Coordination Committee of MP held on 19th November 2019 at Conference Hall, SLDC, MPPTCL, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email- [email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email- [email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. Email- [email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura, Bhopal, email- [email protected]. 6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email- [email protected] 7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email – [email protected] 8. The Chief Engineer(EHT:Const.), MP Power Transmission Co.
    [Show full text]
  • Detailed Information Is Available on Khasra Area Sr No Name Mobile No Zone Circle Sub Station Tehsil Village (Acar) 65
    Khasra Area Sr No Name Mobile No Zone Circle Sub Station Tehsil Village (Acar) 1.66 EAST ZONE Tikamgarh 33/11KV KARI Tikamgarh KARI 0.07 EAST ZONE Tikamgarh 33/11KV KARI Tikamgarh KARI 0.11 EAST ZONE Tikamgarh 33/11KV KARI Tikamgarh KARI 0.13 EAST ZONE Tikamgarh 33/11KV KARI Tikamgarh KARI 0.06 EAST ZONE Tikamgarh 33/11KV KARI Tikamgarh KARI 0.41 EAST ZONE Tikamgarh 33/11KV KARI Tikamgarh KARI 0.44 EAST ZONE Tikamgarh 33/11KV KARI Tikamgarh KARI 0.43 EAST ZONE Tikamgarh 33/11KV KARI Tikamgarh KARI 59. Mamta Mishra 9981403947 3.15 EAST ZONE Tikamgarh 33/11KV BANDHA Mohangarh BANDHA 3 EAST ZONE Tikamgarh 33/11KV BANDHA Mohangarh BANDHA 1.26 EAST ZONE Tikamgarh 33/11KV BANDHA Mohangarh BANDHA 60. jalaj tiwari 9425474318 1.65 EAST ZONE Tikamgarh 33/11KV HIRDAY NAGAR Tikamgarh HIRDAY NAGAR 4.23 EAST ZONE Tikamgarh 33/11KV HIRDAY NAGAR Tikamgarh HIRDAY NAGAR 61. Suresh Prasad Chaturvedi 9589041064 2.99 EAST ZONE Tikamgarh 33/11KV PRITHVIPUR PRITHVIPUR PRITHVIPUR 62. SHRINARAYAN RICHHARIYA 9450296346 5.16 EAST ZONE Tikamgarh 33/11KV TEHARKA NIWARI TEHARKA 63. JITENDRA SINGH KHANGAAR 8959650848 4 EAST ZONE Tikamgarh 33/11KV NAYAKHERA (PPR) NIWARI NAYAKHERA 64. MR. SUNEEL KUMAR S/o. 9926934588 0.44 EAST ZONE Tikamgarh 33/11KV PRITHVIPUR PRITHVIPUR PRITHVIPUR PHOOLCHANDRA RAWAT 1.35 EAST ZONE Tikamgarh 33/11KV PRITHVIPUR PRITHVIPUR PRITHVIPUR 0.51 EAST ZONE Tikamgarh 33/11KV PRITHVIPUR PRITHVIPUR PRITHVIPUR Note - Detailed information is available on www.cmsolarpump.mp.gov.in Khasra Area Sr No Name Mobile No Zone Circle Sub Station Tehsil Village (Acar) 65.
    [Show full text]
  • Madhya Pradesh)
    SOCIAL SAFEGUARD COMPLIANCE REPORT June 2013 IND: RURAL CONNECTIVITY INVESTMENT PROGRAM Batch 2 Roads (Madhya Pradesh) Prepared by the Ministry of Rural Development, Government of India for the Asian Development Bank ABBREVIATIONS ADB : Asian Development Bank APs : Affected Persons BPL : Below Poverty Line FFA : Framework Financing Agreement GOI : Government of India GRC : Grievances Redressal Committee IA : Implementing Agency MFF : Multitranche Financing Facility MORD : Ministry of Rural Development MOU : Memorandum of Understanding NC : Not Connected NGO : Non-Government Organization NRRDA : National Rural Road Development Agency MGNREGA : Mahatma Gandhi National Rural Employment Guarantee Act MPRRDA : Madhya Pradesh Rural Road Development Agency PIU : Project Implementation Unit PIC : Project Implementation Consultants PFR : Periodic Finance Request PMGSY : Pradhan Mantri Gram Sadak Yojana RCIP : Rural Connectivity Investment Program ST : Scheduled Tribes TA : Technical Assistance TOR : Terms of Reference TSC : Technical Support Consultants VAP : Vulnerable Affected Person WHH : Women Headed Households GLOSSARY Affected Persons (APs): Affected persons are people (households) who may lose their land or source of livelihood due top the project. It may be all or part of their physical and non-physical assets, irrespective of legal or ownership titles. Encroacher: A person, who has trespassed government land, adjacent to his/her own land or asset, to which he/she is not entitled, by deriving his/her livelihood there. Such act is called “Encroachment.” Gramsabha Resolution: A resolution drawn up by unanimous and collective decision of villagers. The resolution drawn up for the purpose of the project refers to identification of the affected persons, extent of their losses by unique identification and signed consent of the affected persons to donate voluntarily the identified assets for the project purpose.
    [Show full text]
  • 'Hydrogeological Report'
    ATAL BHUJAL YOJANA (ATAL JAL ) STATE : MADHYA PRADESH DEPARTMENT : WATER RESOURCE DEPARTMENT ‘HYDROGEOLOGICAL REPORT’ BLOCK : Niwari DISTRICT : Niwari YEAR : 2019-20 Towards partial fulfilment of requirements for Disbursement of incentives under DLI-1 DATE OF DISCLOUSER 01 APRIL 2020 Approved By Prepared & Submitted By Project Director Senior Geohydrologist SPMU, Atal Bhujal Yojana, M.P. Divisional Ground Water Survey Unit No. 3, Sagar, M.P. HYDROGEOLOGICAL REPORT (YEAR: 2019-20) STATE : Madhya Pradesh DISTRICT : Niwari BLOCK / TALUK : Niwari BLOCK / TALUK HQs : Niwari A - GENERAL INFORMATION 1. Geographical Area : 668.00 Sq. Km. 2. No. of Gram Panchayats : 71 3. No. of Towns : 2 4. No. of Villages : 140 5. Population (Census 2011) : Male Female Total : 90706 81636 172342 6.Rainfall (mm) : Monsoon Non-Monsoon Annual : 1209.50 324.50 1534 River Basin : Ganga Basin / Yamuna Sub Basin Major soil types : Black Humus Granite type, yellowish, gray colour kankar B. LAND USE 1. Forest Area (Ha) : 22126 2. Culturable Area ( Ha ) : 43720 3. Net sown Area (Ha) : 39284 4. Gross Cropped Area ( Ha) : 61115 C. CROPPING PATTERN ( As in 2019-20 ) 1. Major Crops grown Kharif Rabi Summer Perennial Soyabean Wheat Moong Seasam Mustard Groundnut Grams Urad Barley Maize Peas D. IRRIGATION FACILITIES (As in 2019-20 ) 1. Net irrigated Area (Ha) 38768 2. Gross Irrigated Area ( Ha) 46046 TANK/ DW BW/TW CANALS OTHERS 3. Area under irrigation (Ha) Source PONDS wise 22163 7038 3932 10110 2803 E. GEOLOGY & HYDROLOGY Predominant Rock type : Hard Rock- Bundelkhand Granite Major Geological formation : Bundelkhand Granite and Gniesses of Archean Age Important water-bearing formation : Fractured / Weathered Granite Status of coverage under NAQUIM : Covered F GROUND WATER RELATED CONDITION 1 No.
    [Show full text]
  • District Disaster Management Plan Tikamgarh
    District Disaster Management Plan Tikamgarh Prepared By Ummed Singhoya (MBA 2011-13) Indian Institute of Technology Kanpur In Consultation with School of Good Governance & Policy Analysis, Bhopal Seeds Technical Services Government of Madhya Pradesh District Administration, Tikamgarh District Disaster Management Plan Tikamgarh M.P. Government ACKNOWLEDGMENT I express my sincere and heartfelt gratitude to School of Good Governance & Policy Analysis, Bhopal, for giving the opportunity to take this unique experience of developing the District Disaster Management Plan for the Tikamgarh district. I would also like to thank the administrative department of Tikamgarh – Mr Raghuraj Rajendran (Collector) and Mr F.D. Jadhav (Deputy Collector) for their kind support. Special thanks to Mr P.S. Solanki (CEO, District Panchayat), whose continuous support made this project possible. I would also like to thank Mr. A.S. Kashyap (Dist. Commandant, Home Guard). I would like to thank all the line departments for cooperating and providing me with the necessary data. I would like to extend my gratitude towards Mr Gaurav Khare, Project Manager, SGGPA, Bhopal for his kind help and undying support. I would also thank SEEDS Technical Team – Mr Amit Tuteja and Mr Sunish Jose for providing me with all possible resources, guidance and support during the course of my study. Finally, I thank all those who supported me directly or indirectly and which has left an everlasting memory in my mind. ________________ Ummed Singhoya 2 District Disaster Management Plan Tikamgarh M.P. Government PREFACE District Disaster Management Plan, Tikamgarh is a part of multi-level planning advocated by the Madhya Pradesh State Disaster Management Authority (MPSDMA) under DM Act of 2005 to help the District administration for effective response during the disaster.
    [Show full text]
  • Initial Environmental Examination (Draft)
    Initial Environmental Examination (Draft) November 2013 IND: Madhya Pradesh Power Transmission and Distribution System Improvement Project Prepared by the Madhya Pradesh Power Transmission Corporation Ltd. (MP Transco), Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company (DISCOM-C), Madhya Pradesh Poorva Kshetra Vidyut Vitaran Company (DISCOM-E), and Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company (DISCOM-W) for the Asian Development Bank The initial environmental examination report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. TABLE OF CONTENTS Page No. EXECUTIVE SUMMARY 1.0 INTRODUCTION 1 1.1 Overview of the Project 4 1.2 The Need for an Initial Environmental Examination 6 1.3 Structure of the Report 6 2.0 POLICY, LEGAL, AND ADMINISTRATIVE FRAMEWORK 8 2.1 ADB Safeguard Policy Statement 2009 8 2.2 Applicable National and State Legislation 8 2.3 National and State Environmental Assessment Requirements 9 2.4 Applicable International Environmental Agreements 12 2.5 Other Applicable Laws and Policies 13 3.0 DESCRIPTION OF THE ENVIRONMENT 14 3.1 Physical Resources 14 3.2 Biological Resources 19 3.3 Socioeconomic Profile 22 4.0 POWER TRANSMISSION SYSTEM IMPROVEMENT 25 4.1 Project Description 25 4.2 Analysis of Alternatives 28 4.3 Anticipated Environmental Impacts and Mitigation Measures 30 4.4 Information Disclosure, Consultation, and Participation 39 4.5 Grievance Redress Mechanism 40 4.6 Environmental
    [Show full text]
  • Final Electoral Roll
    FINAL ELECTORAL ROLL - 2021 STATE - (S12) MADHYA PRADESH No., Name and Reservation Status of Assembly Constituency: 46-NIWARI(GEN) Last Part No., Name and Reservation Status of Parliamentary Service Constituency in which the Assembly Constituency is located: 6-TIKAMGARH(SC) Electors 1. DETAILS OF REVISION Year of Revision : 2021 Type of Revision : Special Summary Revision Qualifying Date :01/01/2021 Date of Final Publication: 15/01/2021 2. SUMMARY OF SERVICE ELECTORS A) NUMBER OF ELECTORS 1. Classified by Type of Service Name of Service No. of Electors Members Wives Total A) Defence Services 297 2 299 B) Armed Police Force 0 0 0 C) Foreign Service 0 0 0 Total in Part (A+B+C) 297 2 299 2. Classified by Type of Roll Roll Type Roll Identification No. of Electors Members Wives Total I Original Mother roll Integrated Basic roll of revision 298 2 300 2021 II Additions Supplement 1 After Draft publication, 2021 0 0 0 List Sub Total: 0 0 0 III Deletions Supplement 1 After Draft publication, 2021 1 0 1 List Sub Total: 1 0 1 Net Electors in the Roll after (I + II - III) 297 2 299 B) NUMBER OF CORRECTIONS/MODIFICATION Roll Type Roll Identification No. of Electors Supplement 1 After Draft publication, 2021 0 Total: 0 Elector Type: M = Member, W = Wife Page 1 Final Electoral Roll, 2021 of Assembly Constituency 46-NIWARI (GEN), (S12) MADHYA PRADESH A . Defence Services Sl.No Name of Elector Elector Rank Husband's Address of Record House Address Type Sl.No. Officer/Commanding Officer for despatch of Ballot Paper (1) (2) (3) (4) (5) (6) (7) Border Security
    [Show full text]
  • District Plan
    DISTRICT PLAN FOR UMIVEK5ALI5ATION OF PRIMARY EDUCATION DI5TBICT— TIKAMQAPH MADHYA PRADESH NIEPA DC D09982 LIBRABY & OnCUMENTATIdr^ J-: S’ationil f.jstitu'e of Kducarif-ual Plaun- ^nd dministration. 17-B, b ii AurobiiKio Marl, New Dtlbj-lJ00]6 ^ Q Q j?,9 10. Mr Manoj Kumar' Englis/h Typist- Water Rtsourccd Division Tikamgarh M.P. 11. Mr. Paees Uddin Siddiki Artist Health Deptt Tikamgarh. The second meeting was held on 3.5.93 in thie .. Circuit House Tikamgarh under the presidentship of Collector TikamQarl- All the Block Education Officers were directed to furnish the statics needed by the drafting committees goal 8- strategy was also discusscd. The uptodate .progress of the draft plan wat put up before the collector Tikamgarh om 10. 5.93 The third mcctinc of the'D.G.P. was held on 13. 5.93 .in Circuit house Tikamgarh Uiider the Chairmanship of'Collector. The draft plan tablet anc remeining chapters were pcjtup for approval. The Committee discussed and approved the plan with a few ammendmsrits. On 18 th May 1*993 the Summary of the Project was put up before the D.G.P. which was approved. The district planning Group met. on 20 th in the Cif^cuit House Tikamgarh. Collector made a perusal of the plan-draft and suggested to make the charts S- dagram£ for more accurately by showing the different symbols. The collector anj^ chairman of the group gave ample time frequently in the preparing t h e d r a f t . UBRAbY 4 OUCUMtWlAriQi^ National loicjcuf* of KducatiOBaf Pl«nn>nJ ,nd Ad*,ini«trj.tion.
    [Show full text]
  • Status of Biomedical Equipment at Health Facility Division-SAGAR
    Status of Biomedical Equipment at Health Facility Division-SAGAR Entry in Stock Condemnation For equipment Register details operations Accordi ng to Fun. Status Acessorie Logboo IPHS Invoice Warra [Functional(F) Load of Date of Expiry s/Consum k Standar Name of the Facility Name of the Name of the Make & Spc. No./Bill Value/Co Source of Date of Date of nty/A /Repairable(R) Date of machine District Qty Warranty / ables Maintai Aucti Param d Remarks (CEmONC/BEmONC) department equipment Equpe. No./Vouc st (In Rs.) Purchase Supply Installation MC/C /Not breakdown per Sr. No. AMC Coverage Avaliable ned on ediacal Doctor Availab (Y/ her No. MC Examined/Con Condemnabl month in Stock (Y/N) (Y/N) done Staff availa le/Sho N) demn(C)) e since Register (Y/N) availab ble uld le not/Re quired 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Bloodbank Damoh DH-Damoh(CEmONC) & Autoclave (Electric) 1 Y R Pathology Bloodbank NOVEX, Binocular Damoh DH-Damoh(CEmONC) & Holland, s/n- 1 Y 137 N Y F Microscope Pathology 9910403 Bloodbank Binocular Damoh DH-Damoh(CEmONC) & Apex 1 Y R Microscope Pathology Bloodbank Adjustment Binocular Damoh DH-Damoh(CEmONC) & 1 Y R not moving Microscope Pathology freely Bloodbank Binocular Damoh DH-Damoh(CEmONC) & 1 Y R Microscope Pathology Bloodbank Binocular Damoh DH-Damoh(CEmONC) & Almicro 1 Y R Microscope Pathology RAYTO, Bloodbank Biochemistry Model - RT Damoh DH-Damoh(CEmONC) & 1 Y 153 N Y R Calibration Analyzer 9200 Pathology Sr.No.
    [Show full text]
  • North Central Railway BAMOURGAONMOTI (BMZ) JHEEL 1243.92 *SANDALPUR (SLV) 1208.80 N.Rly
    T o Nazibabad To Jind To Panipat MEERUT Jn. To Kashipur 31-03-2015 rd la'kksf/kr AS ON 31-03-2015 T T o Hisar ROHTAK Jn. T o Jammutawi o Saharanpur UTTARAKHAND LEGENDS N o Lalkuan T N.Rly. T Express Way . o Lalkuan HDN Route BHIWANI Jn. NH 1 o Saharanpur o Muazzampur BG Multi line T T -Narain MURADABAD Jn. N.E.Rly N.Rly BG Multi line (Sanctioned) gfj;k.kk . N.Rly. GAJRAULA Jn. NH24 Zonal Head Quarters GHAZIABAD BUZURG Jn. (CPYZ)((GZB) 1428.99 1432.35 RAMPUR Jn. BG Three line HARYANA DELHI 1540.80 N.Rly. HAPUR Jn. AYANA N.Rly BG Third line (Sanctioned) Divisional Head Quarters CHIP NEW DELHI 1537.66 1428.50 (N.C.Rly. Limit) MARIPAT (MIU) 1422.44 . N.E.Rly H.NIZAMUDDIN 1530.41 DADRI (DER) 1415.69 Important Tourist Places BORAKI HALT (BRKY) 1411.35 N.Rly AJAIBPUR (AJR) 1406.46 . To Pilibhit DANKAUR (DKDE) 1398.02 . WAIR (WAIR) 1389.55 N.E.Rly . CHANDAUSI Jn. To Loharu FARIDABAD 1509.61 CHOLA (CHL) 1384.55 GANGRAUL HALT (GNRN) 1380.18 BHOJIPURA Jn REWARI Jn. N.Rly N.Rly SIKANDARPUR (SKQ) 1375.39 1370.47 (N.C.Rly.Limit) . IJJAT NAGAR Jn ( ) KHURJA Jn. (KRJ) 1369.82 . Diesel Shed EXPRESS BAREILI Jn N.Rly (Sanctioned/in progress) Electric Shed NH 2 KAMALPUR HALT (KAMP) 1363.87 . 153.60 GANGA RAMGANGA Jn Movement Direction at Jn. DANWAR (DAR) 1358.83 PALWAL (PWL) 1480.46 CHANETHI Jn To Palwal 1479.40 (N.C.Rly.Limit) AJHAI (AJH) 1417.87 N W .Rly W 1.48 (SOM) 1348.54 VRINDAVAN Rd.
    [Show full text]
  • Madhya Pradesh Urja Vikas Nigam Limited Page 136 241. 242. 243
    Request for Proposal for Grid Connected SPPs in Madhya Pradesh under PM KUSUM - A Scheme Final Name of Name of Location of 33 KV s/ s Injectable Sr No Name of Village with Tehsil Circle Division (Latitude and Longitude) capacity (MW) 241. SESADAWAR/ Narsinghpur Gadarwara 22°46'47.33"N 78°54'6.61"E 2 GADARAWARA 242. TENDUKHEDA(GOT)/ Narsinghpur Gadarwara 22°45'53.39"N 78°49'18.53"E 2 GADARAWARA 243. Narsinghpur Gadarwara RAIPUR/ GADARAWARA 22°50'20.08"N 78°53'36.24"E 2 244. Narsinghpur Gadarwara IMALIYA/ GADARAWARA 22°49'1.05"N 78°44'53.17"E 2 245. Narsinghpur Gadarwara BASURIYA/ GADARAWARA 22°47'50.45"N 78°41'39.86"E 4 246. BARAHABADA/ Narsinghpur Gadarwara 22°45'52.89"N 78°44'33.16"E 2 GADARAWARA 247. Narsinghpur Gadarwara SALICHOKA/ GADARAWARA 22°50'10.87"N 78°40'15.93"E 2 248. Narsinghpur Gadarwara BELKHEDI/ GADARAWARA 22°52'13.00"N 78°40'25.55"E 2 249. Narsinghpur Gadarwara PANAGER/ GADARAWARA 22°50'24.65"N 78°37'9.62"E 2 250. Narsinghpur Gadarwara DOBHI/ TENDUKHEDA 23° 6'42.97"N 78°55'44.57"E 2 251. Narsinghpur Gadarwara BILTHARI/ TENDUKHEDA 23° 4'28.48"N 78°52'10.77"E 2 252. Narsinghpur Gadarwara GUTORI/ TENDUKHEDA 23° 8'59.76"N 78°57'10.82"E 2 253. Narsinghpur Gadarwara KHURSIPAR/ GADARWARA 22°56'11.10"N 78°43'13.23"E 2 254. Narsinghpur Gadarwara KAMTI/ GADARWARA 22°54'41.73"N 78°44'18.74"E 2 255.