POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in

No.07-05/SG-9B-II/30 Jabalpur, dated:06.01.2020

To

As per distribution list

Sub: Minutes of 72nd meeting of Operation and Coordination Committee of MP. …

The Minutes of 72nd meeting of the Operation and Coordination Committee of MP held on

19th November 2019 at Conference Hall, SLDC, MPPTCL, Jabalpur has been uploaded on the

website of SLDC ‘www.sldcmpindia.com’ and can be downloaded.

(R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur Distribution List

1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email- [email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email- [email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. Email- [email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, . 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura, , email- [email protected].

6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email- [email protected]

7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email – [email protected] 8. The Chief Engineer(EHT:Const.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2661618, E-mail- [email protected]. 9. The Chief Engineer(EHT:Maint&insp.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2665593, E-mail- [email protected]. 10. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749, Email- [email protected], Email- [email protected] 11. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 12. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected] 13. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]. 14. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur, Fax No- 0761-2668503, Email – [email protected]. 15. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal, Fax No-0755-2580611,Email- [email protected]. 16. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]. 17. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email – [email protected]. 18. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email – [email protected] 19. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046, [email protected]

20. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal – 462013., Fax No- 0755-4030130,Email – [email protected] [email protected]

21. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected], [email protected], M- 9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR).

22. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected]

23. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected] , [email protected] .

24. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected]

25. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected] [email protected], 26. The Chief Executive Officer, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, Email – [email protected] 27. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :[email protected]

28. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row, Email- [email protected], Indore – 452010, [email protected] MINUTES OF 72nd MEETING OF OPERATION & COORDINATION COMMITTEE OF MP HELD ON 19th NOVEMBER 2019 AT 11:00 AM AT Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur.

The 72nd meeting of Operation & Coordination Committee of MP was held on 19th November 2019 at 11:00 AM at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur. The list of participants is enclosed at Annexure -1.0.

Shri K.K.Parbhakar, C.E.(SLDC) & Chairman OCC welcomed all the guests & participants to 72nd OCCM of MP. Chairman OCC stated that in the month of October 2019, the demand of all of the states of , except J&K and Uttrakhand demand, was less compared to previous year demand. Demand of some of the states have been reduced by 40% and even the demand of Industrial states like Maharashtra, Gujarat, Haryana, Punjab etc. has also reduced. The average demand of India for October 2019 is about 30% less compared to last year demand of October 2018, this feature required to be analyzed. In MP also the demand has not increased as expected and stated that Discoms can forecast the expected increase in demand and its pattern in a better way as Discoms can calculate and have the records of pump connections and expected to be connected in near future. Further he added that the installed capacity of state is not sufficient to meet the rabi season demand, hence MPPMCL & SLDC will require correct forcasting from Discoms so that arrangement for required power can be made accordingly by power purchase, banking etc. Chairman OCC also shown concern about coal shortage in Generating company and informed the committee that the available coal stock has to be used optimally so that the grid parameters may be maintained within limit for safe & secure grid operation. He further requested generators to arrange for coal and maintain sufficient coal stock. Further he requested all the departments to review the power flow after commissioning of new elements in the system in prevailing circumstances and emphasized for better coordination between EHT and T&C for availing shut down on elements. Thereafter he requested Shri. R.A.Sharma, Addl. CE, SLDC & Member Secretary OCCM to take up the agenda points. ShriR.A.Sharma, Addl. CE, SLDC has further added that now days the power system is not technical subject only but it is techno-commercial. The Discoms shall explore possibilities to improve their demand forecasting method so as to further reduce the deviation charges payable by Discoms. The requisition for drawl schedule of Discoms must be given by MPPMCL, matching with the actual drawl of Discoms. By maintaining MP drawl as per schedule, shall reduce the deviation charges payable by Discoms & with the help in safe grid operation. Thereafter the agenda points were taken up, which are narrated here under:-

ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 71st meeting of Operation & Coordination Committee of MP held on 09th July 2019 at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/2886 Jabalpur dated 31.09.2019. No comments have been received. Committee confirms the minutes.

ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTHS AUGUST 2019 TO SEPTEMBER 2019.

2.1. Frequency Particulars: The committee was apprised that during AUGUST 2019 the system frequency was below 49.90 Hz for 7.28% of time against 4.57% of time during SEPTEMBER 2019. The system frequency was above 50.05 Hz for 20.03% of time during AUGUST 2019 against 20.18 % of time during SEPTEMBER 2019. The system frequency was within the IEGC range of 49.90-50.05 Hz for 72.69 % of the time during AUGUST 2019 against 75.25 % of time during SEPTEMBER 2019. The average monthly frequency was 50.00 Hz during month of AUGUST 2019 and 50.01 Hz during month of SEPTEMBER 2019.

The detailed frequency particulars for the month of AUGUST 2019 and SEPTEMBER 2019 are enclosed at Annexure-2.1. The brief detail of frequency profile is given here under:- Minimum Maximum Instantaneous Instantaneous Average Integrated integrated Month Minimum Maximum frequency frequency over frequency over an Frequency Frequency an hour hour AUGUST 50.00 Hz 49.81 Hz 50.26 Hz 49.55 Hz 50.32 Hz 2019 SEPTEMBER 50.01 Hz 49.80 Hz 50.14 Hz 49.62 Hz 50.27 Hz 2019

2.2 Operational Matters

2.2.1 Operational Discipline : The committee was apprised that System operated in terms of frequency profile for the months AUGUST 2019 & SEPTEMBER 2019 is as given below for discussion by the committee : % of time % of time frequency % of time Frequency Average monthly Month Frequency within the permissible above 50.05 Hz frequency Below 49.90 Hz range of 49.90-50.05 Hz. AUGUST 7.28% 20.03% 72.69% 50.00 Hz 2019 SEPTEMBER 4.57% 20.18% 75.25% 50.01 Hz 2019

2.2.2 Voltage Profile: During the months AUGUST 2019 & SEPTEMBER 2019 the maximum and minimum voltage as recorded at following important 400 KV s/s in MP Grid:-

AUGUST 2019 SEPTEMBER 2019 Max. Voltage Min. Voltage Max. Voltage Min. Voltage Sr. Name of Observed Observed Observed Observed No. 400 KV Substation Voltage Voltage Voltage Voltage Date Date Date Date KV KV KV KV

1 Bhopal 420.09 15.08.19 400.18 18.08.19 418.89 29.09.19 401.53 30.09.19 2 Bina 418.99 15.08.19 398.21 18.08.19 417.39 29.09.19 397.42 13.09.19 3 414.94 15.08.19 388.23 18.08.19 414.33 20.09.19 390.14 02.09.19 4 Indore 418.75 15.08.19 403.46 19.08.19 417.95 21.09.19 403.28 13.09.19 5 ISP 420.3 07.08.19 407.1 05.08.19 420.9 13.09.19 408.7 13.09.19 6 Julwaniya 429.15 10.08.19 412.47 19.08.19 431.7 10.09.19 403.47 13.09.19 7 Katni 425.25 08.08.19 403.26 18.08.19 426.14 13.09.19 405.63 13.09.19 8 423.04 15.08.19 391.08 02.08.19 421.77 29.09.19 403.28 13.09.19 9 Pithampur 419.24 15.08.19 403.72 19.08.19 419.99 13.09.19 403.66 13.09.19 10 Birsinghpur 430.43 15.08.19 413.35 18.08.19 427.38 29.09.19 409.68 13.09.19 11 Singhaji 422.33 27.08.19 409.5 19.08.19 424.53 22.09.19 405.59 13.09.19 12 Satpura 426.14 16.08.19 413.84 18.08.19 427.31 12.09.19 410.9 13.09.19 13 Itarsi 424.97 15.08.19 407.39 18.08.19 424.97 29.09.19 409.73 30.09.19 14 Ashta 426.42 15.08.19 410.84 18.08.19 427.58 21.09.19 410.55 30.09.19 15 Chhegaon 424.82 10.08.19 410.74 19.08.19 427.88 12.09.19 412.63 30.09.19 16 Kirnapur 447.53 08.08.19 419.8 08.08.19 439.67 29.09.19 427.36 27.09.19 Badnawar 425.15 15.08.19 408.15 18.08.19 425.33 21.09.19 410.95 06.09.19 17 The committee was intimated that at 400kv Kirnapur the high voltage is persisting and measures for controlling the voltage is being taken at EHV level and installation of reactor at Kirnapur & Seoni(PG) end is also being planned at EHV level. Further Discoms shall also check the status of the capacitor banks installed at 33kv and ensure that the voltage is maintained at Discom level by switching off the capacitor banks during high voltage conditions. East Discom was requested to provide the status of capacitor banks installed at in Balaghat & Kirnapur regions during high voltage period. Representative from P&D MPPTCL informed the committee that the reactor at 400 KV S/s Kirnapur is planned and is in the proposal stage. Thereafter, Member Secretary OCC stated that P&D shall expedite the work of reactor installation. Chairman OCC stated that the generators shall also provide their support by absorbing MVAR during High voltages in the system, especially JP Bina and Singhaji TPS which are observed to inject MVAr during high voltages.

2.2.3 Status of Capacitor Banks in sub-transmission system: The committee was apprised that the updated information of the status of capacitor banks in sub-transmission system as on 31th MAY 2019 as submitted by DISCOMs is detailed below:

Capacitor bank Capacitor Capacitor bank Require Requiremen Capacitor Balance installed in good Banks healthy installed but ment of t against banks already capacitor condition (No) but not in defective & are repair non- covered under banks to be service due to repairable (No) against repairable ADB T-V covered in DISCOM control ckt each capacitor other problem unit (No) banks schemes 600 1200 1500 600 1200 1500 600 1200 1500 No of 100 600 1200 600 1200 600 1500 KVAR KVAR KVAR KVA KVA KVA KVAR KVAR KVAR KVAR KVAR KVAR KVAR KVAR KVAR KVAR R R R Units required EZ 449 156 75 3 5 3 5 6 0 25 32 6 0 0 0 0 CZ 1 685 875 - - - 0 0 0 3 0 0 0 0 0 0

WZ 613 550 725 10 3 1 23 12 15 207 08 16 - - - 0 The matter was discussed in the meeting and all the Discoms were requested to ensure healthiness of the capacitor banks during rabi season for maintaining quality supply to consumers.

2.2.4 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The committee was apprised about the updated information of the status of installed capacitor banks (in MVAR) in EHV transmission system as on 31.10.2019 as submitted by MPPTCL is given below:- Voltage Capacitor bank Capacity Added Capacitor banks TOTAL Capacitor Bank Class installed as on after Last OCC already covered CAPACITY AS Installed but 31.08.19(MVAR) Meeting (MVAR) under ADB T-V ON 31.10.19 defective & are not (MVAR) repairable (No & MVAR) 220 KV 100.00 0.00 - 100.00 All in Service 132 KV 1238.00 0.00 - 1238.00 33 KV 5399.50 36.00 - 5435.50 Total 6737.50 0.00 - 6773.50

The matter was discussed in the meeting.

2.2.5 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: The committee was apprised about the various ongoing Transmission Schemes completed during the financial year 2019-2020 (up to MAY 2019) and plan for completion of various ongoing Transmission Schemes for the Year 2019-2020 is enclosed as Annexure 2.2.5(i) and 2.2.5(ii) respectively.

2.2.6 U/F and df/dt Relay Operation

(i) U/F and df/dt Relay Operation: The committee was apprised that the Frequency did not touch 49.20 Hz during AUGUST 2019 and SEPTEMBER 2019. There was no df/dt operation during the same period. MPPTCL informed that under Frequency Plan for all the stages have been implemented and in operation.

(ii) Defective u/f, df/dt relays: The committee was apprised that MPPTCL has informed that all the df/dt and U/F relays are in operation, where the U/F relays are not available, the numerical relays programmed for under frequency operation.

2.3 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to 33 KV feeders:

(i) The committee was apprised about the details of DISCOM wise Power supply given to various domestic categories during the period AUGUST 2019 and SEPTEMBER 2019 is enclosed at Annexure 2.3(i).

(ii) Group Allocation to Newly Commissioned existing EHV substations:- The committee was apprised about the region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV substations for which groups have not been allocated is given in Annexure 2.3 (ii). The DISCOM wise details of pending group allocation to 33 KV feeders is given below:-

SN DISCOM Region No of 33 KV feeders for which groups to be allocated 01 Jabalpur 21 02 Sagar 00 EAST 03 00 04 Total 21 05 Indore 05 06 WEST 04 07 Total 09 08 Bhopal 17 CENTRAL 09 Gwalior 00 10 Total 17 TOTAL Grand Total 47

The matter was discussed.

ITEM NO. 3 : OPERATIONAL PLANNNING:

3.1 Generating Units under planned outage and proposed maintenance programme: The committee was apprised about the annual maintenance /outages of thermal generating units of MPPGCL for FY 2019-2020 as intimated by ED(O&M:Gen.) is NIL for the month OCT-19 to DEC-19.

3.2 Proposed shutdown programme of Transmission lines / Transformers: The committee was apprised about the proposed shutdown of transmission elements for the period 01.09.2019 to 31.12.2019 as submitted by T&C, MPPTCL is enclosed as Annexure-3.2.

3.3 Long Outages of transmission elements and protections: The committee was apprised about the status submitted by MPPGCL /MPPTCL are given below:- Sr. Line/Transformer/ etc Outage date Reason Response from Utility No under long Outage X’mer was taken under for pre monsoon maintenance and testing work on 27.03.2019. 20MVA BHEL make X’mer The transformer is replaced by 1. 27.03.2019 Shutdown is continue at 132KV S/S . 50MVA transformer on 23-09-19. as the tan-delta values of transformer windings are measured considerably high.

Transformer declared failed, and 20MVA BBL X’mer at 220 X’mer tripped on replaced by another 20MVA 2 30.05.2019 KV S/s Rajgarh(Biora). differential indication transformer, spared from 220KV S/S Ganjbasoda on Dt. 01-10-2019.

Transformer tripped on Differential trip 40 MVA BBL, 132/33KV X’mer tripped on 3 07.07.2019 indications and declared failed after Transformer at 132KV S/S differential trip indication. testing. Transformer replaced by Sagar 50MVA X’mer on Dt. 19-10-19.

Transformer tripped on Differential trip 63 MVA GEC, 132/33KV X’mer tripped on 4 10.07.2019 indications and declared failed after Transformer at 220KV S/S differential trip indication. testing. Transformer replaced by Mahalgaon, Gwalior 63MVA transformer on Dt. 16-09-19

The 220/132KV, 160MVA BHEL B-Phase bushing & Transformer Sl.No. 6005055 tripped OLTC selector switch 5 160MVA, 220/132KV BHEL 14.08.2019 on Differential trip indications due to X’mer – 2 at 220KV S/s . failed due to heavy failure of 132KV R phase bushing, lightening. declared failed. Transformer installed on 14.11.2019. Tripped on Differential & 160MVA CGL X’mer declared failed 160MVA CGL, 220/132KV PRV trip indication due to fire. MPPTCL informed that the 6 X’mer at 220KV S/S . 31.08.2019 during heavy rains and X’mer is expected to be Sl. No. T-8318-3 lightning. commissioned by Feb-2020.

12.5MVA EMCO X’mer found 12.5MVA EMCO, 132/33KV defective in testing and is being X’mer Tripped on X’mer at 132KV S/S replaced by 20MVA transformer by 7 11.09.2019 Differential Trip Chanderi (Sl.No. 1023- Nov-19 end. Latest status may please indications 10789) be intimated by MPPTCL in the meeting. 12.5MVA BHEL X’mer found defective in testing and is being 12.5MVA BHEL, 132/33KV X’mer Tripped on replaced by 16MVA transformer 8 at 132KV S/S Bhanegaon 25.09.2019 Differential Trip by Nov-19 end. Latest status may (Sl.No. 6000191) indications please be intimated by MPPTCL in the meeting. X’mer tripped at 21:55 Dismanteling & shifting work of 500 Hrs. due to LA Burst. MVA ICT bank has been completed. Emergency shutdown Presently civil work is under progress. 500 MVA, 400/220 KV 9 19.04.2018 taken for 15 days from The work is expected to be completed X’mer at STPS. 21.04.18 to 05.05.18 for by June 2020. MPPGCL intimated CPRI oil filtering and that X’mer winding is under inspection RLA testing work. at Company. Under outage since M/s GE(T&D) India (OEM) deputed 31.03.18 due to their team on dtd-30.10.2019 for 50 MVAR (Make GE) Line concentration of internal inspection of reactor. 10 Reactor at 400KV Sarni- 31.03.2018 Acetylene gas. DGA test Presently work is under progress. Asta Ckt-I. of transformer oil of MPPGCL intimated that inspection reactor was carried out has been completed and busing need by M/s CPRI, Bhopal. to be replaced.

The matter was discussed.

ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF AUGUST 2019 AND SEPTEMBER 2019:

The committee was apprised about the actual generation, Schedule from Central Sector, demand etc. are given in the following Annexures:

Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of MPPGCL & NHDC Hydel Units. Annex. 4.2 Power Supply Position(Energy Balance Sheet). POWER SUPPLY POSITION FOR THE MONTH : Aug 19 All Fig in MW Averag Max Dem Met Average Average Average e Particulars on : 12-Aug-19 01-10 Aug 11-20 Aug 21-31 Aug Monthl AT : 07-30 y STATE PEAK DEMAND MET 8606 7443 6978 7195 7205 BREAKUP :- STATE THERMAL (Actual Gen) 1807 2315 1283 1228 1596 STATE THERMAL (RSD) Total 730 229 1542 1778 1202 MW STATE HYDEL 1586 386 1657 1823 1306 IPP (STATE) 327 285 326 330 314 CENTRAL SECTOR (Schedule) 3270 3017 2562 2944 2844 CENTRAL SECTOR 96 352 849 574 591 (Surrender) IPP (INTER STATE) 2102 1761 1500 1630 1630 RAILWAY 222 235 228 199 220 RENEWABLE ENERGY 873 777 986 623 790 OTHERS -303 -154 -292 -254 -234 BANKING / PURCHASE / SALE -1520 -901 -1112 -1195 -1073 DEVIATION 242 -62 -160 -133 -119 Between Between Between Between DEVIATION (AVERAGE) (-828 to (-877 to (-804 to 782) (-877 to 282) 541) 782) ENERGY SUPPLY STATE 1909.77 (LU)

POWER SUPPLY POSITION FOR THE MONTH : Sep 19 All Fig in MW Max Dem Met Average Average Average Average Particulars on : 06-Sep- 21-31 01-10 Sep 11-20 Sep Monthly 19 AT : 19-15 Sep STATE PEAK DEMAND MET 8685 7544 6939 6060 6822 BREAKUP :- STATE THERMAL (Actual Gen) 2099 1667 1282 927 1280 STATE THERMAL (RSD) Total 1705 1899 2875 3064 2627 MW STATE HYDEL 1985 1759 1801 1840 1802 IPP (STATE) 341 330 321 274 307 CENTRAL SECTOR (Schedule) 2984 2664 2396 2332 2460 CENTRAL SECTOR 7 525 800 886 737 (Surrender) IPP (INTER STATE) 1851 1684 1790 1694 1722 RAILWAY 229 217 211 198 209 RENEWABLE ENERGY 197 387 737 366 492 OTHERS -10 -230 -277 -262 -256 BANKING / PURCHASE / SALE -879 -811 -1197 -1208 -1077 DEVIATION -113 -124 -126 -100 -116 Between Between Between Between DEVIATION (AVERAGE) (-741 to (-741 to (-601 to 509) (-565 to 335) 543) 543) ENERGY SUPPLY STATE 1903.32 (LU)

Annex. 4.3 Hourly Average of Availability and Demand. Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs.

ITEM NO. 5 : SYSTEM DISTURBANCE IN MP DURING OF AUGUST 2019 AND SEPTEMBER 2019: The committee was apprised about the Grid Disturbances and Grid Incidents in MP during these months are given in Annexure 5. MPPTCL was requested to submit the details/report of tripping at 400KV S/s Ashta on 21.09.2019 at 14:50Hrs. due to PT failure.

ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:-

6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS / TRANSMISSION ELEMENTS:- The committee was apprised about the present status regarding schedule and commissioning of reactors / transmission elements is as below:-

S.No. 400 KV S/s Size MVAR Implementi Expected Date of Commissioning ng Agency as intimated in last OCC In 66th OCC MPPGCL informed that Line Reactor the price bid has to be opened and the reactor will be commissioned by June 1. on 400 kV 50 MVAR MPPGCL Sapura–ISP 2019. MPPGCL informed that previous line at STPS tender was dropped & new tendering is under process. Work will be carried out under PSDF as intimated by MPPGCL in 62nd OCC in 66th OCC MPPGCL informed the committee that the drawing has been approved and reactor is expected to be commissioned by March 2019. In 68th OCC, MPPGCL informed the committee that reactor will be Bus Reactor at commissioned by October 2019. 2. 125 MVAR MPPGCL SSTPS MPPGCL was apprised that considering commissioning of unit 3 and 4 at SSTPS stage II, early commissioning of 125 MVA reactor is required to ensure secure operation of grid. MPPGCL informed the committee that the civil work is completed and reactor is expected to be commissioned soon.

6.2 EXCESSTIVE TRIPPING OF 33 KV FEEDERS RADIATING FROM EHV SUB STATIONS:- The committee was apprised that CE(T&C), MPPTCL vide letter no-1972 dtd-19.09.2019 informed about the excessive tripping of 33KV Discome feeders emanating from EHV-substation. It was also mentioned that due to lack of maintenance of these lines, during faults these lines trips along with 33KV incomers of 132/33KV EHV X’mers, resulting in supply failures in the entire area fed by respective X’mer/EHV Sub-station. MPERC also monitors these tripping and MD, MPPTCH has showed the concern about such excessive tripping of 33KV feeders. A sub-station wise list of 33KV & 11KV feeders under the control of Discoms on which excessive tripping (10 & more that 10) is enclosed as Annexure-6.2. In view of the above it is to mention that proper maintenance of these lines shall be shall be carried out regularly by Discoms to reduce fault tripping for safe & secure grid operation. Further it is also requested to issue suitable instruction to field officer to take necessary and corrective action so that the tripping may be reduced which will improve the performance of company and increase revenue. Representative from West Discom informed the committee that the reason for excessive tripping was the bad weather and extended rainy season. Further the maintenance is being carried out regularly and resulting in reduced trippings. The matter was discussed in the meeting.

6.3 IMPLEMENTATION OF PILOT PROJECT OF RRAS IN THE STATE OF MP:- The committee was apprised that Hon’ble Central Electricity Regulatory Commission (CERC) vide order dated 13th Oct 2015 in petition no 11/SM/2015 has given a roadmap for operationalization of generation reserves in the country. To accelerate the implementation of Ancillary Services at State level a sub-group on “Reserves and Ancillary Services at State Level” under FOR standing Technical Committee was formed. MP SLDC, MPPTCL, Jabalpur and MPERC, Bhopal are also members of the sub-group. The task given by the committee to the state SLDCs was to get hands on experience on Security Constraint Economic Despatching (SCED) through “Solver” of MS Excel. MP SLDC had demonstrated the use of this model for economic dispatching in the meetings of the committee. In the third meeting of the sub-group the committee has opined and suggested MP SLDC to go ahead in the matter to implement the system of SCED at MP State level on pilot basis. In the demonstrations it was found that the application of SCED system may reduce the cost of operation considerably. Specially during low demand period in different seasons of year or at different times of the day. It is, therefore, beneficial to implement the SCED system at SLDC, MPPTCL, Jabalpur. In fifth meeting of the committee, the representative of CERC has opined that instead of pilot projects in various states it would be more prudent to bring a regulation for implementation of SCED. MP SLDC is ready to take up the project, whenever related regulation is issued by CERC. After issuance of the regulation, It is expected that the implementation of the SCED system at MP shall take place in the FY 2020-21, as implementation time of the system is approx. 6 months. For information to the members. Member Secretary OCC stated that to bring the state close to techno-commercial scheduling and dispatch and hence reduce the financial losses beard by the consumers. Thereafter Chairman OCC briefed about the process.

6.4 DATA FOR WRPC OCCM OUTAGE APPROVAL:- WEB BASED OCC OUTAGES SOFTWARE FOR REPLACING THE EXISTING GOOGLE SHEET:- The committee was apprised that discussed in various MP-OCC, WRLDC has prepared Web Based Application Software for planned outage coordination that would replace the existing coordination through Google Sheet. The Software comprising following features and process:- a) The proposed outages for upcoming OCC uploaded in web based portal before 5th of every month. b) Compiled OCC outage could be viewed and commented before the OCC meeting. c) Outage after approval in OCC, will be used for further processing. d) The readiness of D-3 days will be filled in Web portal by concerned utilities through their login credentials. e) Non-OCC outages will be updated and same is presented to WRPC for approval, before being considered for approval. f) Anyone could comment and give their feedback before D-3 days. g) The necessary utility concurrence may be availed before processing any outage. h) The outage considered for approval could be viewed on D-2 days. i) The outage approved by WRLDC on D-2 days could be viewed on web portal. j) The final approved outage after NLDC concurrence is available on D-1 days in individual login credential. k) The re-schedule of outages is also done as per the approved guideline. l) Everyone could view the outage approval status online. The matter was discussed.

6.5 IMPLEMENTATION OF AUTOMATIC GENERATION CONTROL (AGC) AT SSTPP, STAGE-I, KHANDWA:- The committee was apprised that Hon’ble Central Electricity Regulatory Commission (CERC) vide order dated 13th Oct 2015 in petition no 11/SM/2015 has given a roadmap for operationalization of generation reserves in the country. The objective of the Order was to provide a vision to introduce Spinning Reserves in the country, which is one of the components for ensuring grid security, quality and reliability by achieving adequacy of supply and maintaining load-generation balance Essentially, AGC delivers reserve power to bring back the frequency and the area interchange schedules to their target values and restores the delivered primary control reserves. In view of the above MP SLDC has also planned and proposed to implement AGC in Singhaji STPP, Khandwa Stage-I. The criteria for identification of SSTPP for AGC is similar to approach adopted by NLDC for NTPC Generating Plants. The SSTPP has comparatively high variable cost, which will enable to keep Spinning Reserves in the same, due to high chances of surrender of power by the beneficiaries. Further, the plant has 100% capacity allocation tied up with MPPMCL and is having updated technology because of it’s latest inception. For information to the members. The matter was discussed.

6.6 FREQUENT TRIPPING OF 132 KV VSTPS – WAIDHAN CKT – I AND 132 KV VSTPS – WAIDHAN – MORWA CKT – II:- The committee was apprised that 132 KV VSTPS – Waidhan Ckt – I & 132 KV VSTPS – Waidhan – Morwa Ckt – II is tripping frequently as detailed below:- NAME OF ELEMENT OCT 2019

132 KV VSTPS – WAIDHAN CKT – I 12:00/16.10.2019 10:05/24.10.2019 132 KV VSTPS – WAIDHAN – 10:40/13.10.2019 MORWA CKT – II It is to intimate that the above mentioned circuits are inter-state circuits and frequent tripping of these circuits causes interruption Waidhan, Morwa &Rajmilan substations. MPPTCL is requested to kindly investigate the reason for frequent tripping of these circuits and address the issue so that the tripping of these circuits is not repeated in future. T&C and EHT-M MPPTCL was requested to kindly investigate the issue of frequent tripping of the above mentioned elements. EHT-M MPPTCL informed the committee that tree cutting & chopping has been done after rainy season and it is expected that the tripping of these circuits will be reduced. The matter was discussed.

6.7 REVIEW AND UPDATING LOAD DROPPING SCHEME/ SYSTEM PROTECTION SCHEMS (SPS) AT SUBSTATIONS IN M.P TO HANDLE EMERGENCY CONDITION: - The committee was apprised that the integration of new transmission elements in the grid it is to bring to the notice that the existing load drop scheme shall also be reviewed and updated timely as per the updated network. It is also to bring to the notice that at 132 KV S/s Chambal on dtd- 28.05.2019 at 13:04 Hrs. 132 KV Chambal – North Zone Ckt – I & II tripped as Y-Phase conductor of ckt – II snapped resulting in overloading & tripping of 132 KV Indore SZ – Satsai Ckt & 132 Kv Indore SZ – E.Complex ckt even after operation of load drop scheme. Hence it can be gathered that after up gradation of 132 KV North Zone S/s to 220 KV S/s North Zone the load drop scheme has not been revise accordingly. It is also to intimate that the load drop scheme shall also be reviewed according to the increasing 33 KV load. MPPTCL is requested to review the existing load drop scheme (SPS) and to implement new load drop scheme as per requirement as per undated network and submit to SLDC. In view of the above it is requested that the complete details of all SPS commissioned in MP by MPPTCL along with load shed quantum, may be submitted to SLDC so that the copy of the same could be placed in Control room of SLDC and concerned substation / power station for reference & record and the same can also be submitted to WRLDC. The matter was discussed.

6.8 WRLDC TRIPPING PORTAL:- The committee was apprised that as intimated by WRLDC in 529th WR-OCCM, that WRLDC has started a tripping portal from 01.06.2019 for uploading FIR, DR/EL and other details related to the tripping of all 400KV elements, important grid elements, inter-state/inter-regional links and lines connected to PGCIL. Further details major Grid Disturbance resulting in significant load loss/generation loss is also required to be uploaded on the WR-Portal and as per IEGC 54.2(r), utilities need to submit the data within 24 hours of the event. The link (https://portal.wrldc.in/Trippingnew/Account/Login.aspx) , common user ID & password for the entities of MP has been shared with all the entities vide this office letter No.07-05/RPC-51/ 18.06.2019. As advised in 529th WR-OCCM, all Utilities are requested to use and submit the data through the WRLDC tripping portal. Therefore, entities are requested to use and upload the FIR, DR/EL and other details related to the tripping of elements mentioned above, in the Tripping Monitoring System of WRLDC within stipulated time. It is to inform that despite of continuous reminders the DR/EL files for the tripping incidences is not being uploaded on the WRLDC tripping portal. The list of incidences for which the submission & uploading of DR/EL on WRLDC tripping portal is pending for the month of OCTOBER 2019 is as detail below:- S.NO. NAME OF ELEMENT TIME & DATE OF TRIPPING 1. 220 KV GWALIOR - GWALIOR - I 02:55HRS. ON 02.10.2019

2. 220 KV GWALIOR - GWALIOR - II 02:55HRS. ON 02.10.2019 3. 220 KV GWALIOR - MAHALGAON(MP) - II 02:55HRS. ON 02.10.2019 4. 220 KV HOSHNGABAD-ITARSI CKT-1 04:50HRS. ON 12.10.2019 5. 132KV VSTPS-WAIDHAN-2 10:40HRS. ON 13.10.2019 6. 400 KV INDIRASAGAR - SATPURA - I 20:53HRS. ON 18.10.2019

7. 400 KV INDIRASAGAR - INDORE - II 20:53HRS. ON 18.10.2019 8. INDIRASAGAR - 400KV - BUS 2 20:53HRS. ON 18.10.2019 9. 400KV SEONI - KIRNAPUR 01:57HRS. ON 24.10.2019 10. 400KV SEONI - KIRNAPUR 23:25HRS. ON 24.10.2019 11. 400KV SEONI - KIRNAPUR 13:01HRS. ON 25.10.2019 12. 400KV BHILLAI- KIRNAPUR 12:53HRS. ON 26.10.2019 13. 400KV BHILLAI- KIRNAPUR 14:59HRS. ON 26.10.2019 14. 220 KV BHANUPURA - MODAK – I 21:56HRS. ON 31.10.2019

The matter was discussed.

6.9 PROTECTION COORDINATION DURING INTEGRATION OF NEW INTRA-STATE ELEMENTS:- The committee was apprised that in compliance to the IEGC & WRLDC operating procedure the protection coordination of the existing elements & adjacent substations shall be prior to integration of new intra state elements. All the concerned entities are requested to ensure/review the protection coordination of adjacent substations/elements and confirm the same along with the firsttime charging documents for intra state elements also.

6.10 AVAILING SHUT DOWN ON NON-ISTS ELEMENTS (ELEMENTS FOR WHICH ONLY APPROVAL OF MP-SLDC IS REQUIRED) AND OUTAGE MODULE THEREOF:- The committee was apprised that parallel run of the ABT, OA & MIS system is in progress and the outage module has already been initiated (link:- http://223.31.122.117:8080/EltrixPortal/login.jsp). Further it is to inform that the User ID and Password for all the circles/generating stations/EHT-M/EHT-C along with user manual of the outage module has already been provided vide this office e-mail dtd-14.01.2019. Also vide this office letter no. No No.07-05/174-B/Kalki/131 dtd-15.01.2019 all the concerned entities/authorities were requested to communicate the User ID/Password & issue necessary directives to the respective authorities to initiate the use of web based outage module. In view of the reliability and safe & secure grid operation entities were requested to follow the outage procedure and submit the outage request well in advance i.e., on D-3 basis by 17:00 Hrs. only the emergency shut down request shall be made on D-1 day or in real time. In view of the above all the concerned entities were requested to submit/process the outage, tripping, generator outage, generator start/stop, new element charging request through web based outage module in addition to the existing practice. It is also to mention that from 01.04.2019 it will be mandatory to process the outage request through outage module only, hence all the entities shall approach for approval of shut down through outage module. In case of any queries/addition of element/etc the entities can write to us on e-mail:- [email protected], [email protected]. It is also to mention that WRLDC has developed a separate portal for WR-OCCM approval of outage of ISTS elements which shall be discussed separately. The matter was discussed.

6.11 MAPPING OF FEEDERS:- The committee was apprised it has been requested to initiate the process of mapping of AUFLS feeders in SCADA system, however no any progress in this regard noticed so far. In 8th NPC, it has been decided that WRPC would submit the details / progress of feeder mapping to NPC Secretariat on regular basis (quarterly). In view of above, it has been requested quarterly details/ progress of mapping of feeders may kindly be furnished so that same may be communicated to WRPC for onward communication.

6.12 INSPECTION OF RELAYS OF AUTOMATIC UNDER FREQUENCY LOAD SHEDDING AND CERTIFICATION THEREOF: - The committee was apprised that it is desired that for safe & secure operation of integrated system, the under frequency relay should be connected in the system in healthy condition. Accordingly, WRPC is pressing hard to provide the self-certified status of healthiness of relays of Automatic Under Frequency Load Shedding (AUFLS) and periodic checking of the same. Vide this office various correspondence. The CE (T&C) and also SE(T&Cs) were requested to provide status of healthiness of relays of Automatic Under Frequency Load Shedding on priority basis to SLDC, so that same may be communicated to WRPC. Inspite of repeated request vide various correspondence, moreover the matter had been raised in OCC meeting of MP in time to time, however the desired information are still awaited from utilities. It is therefore desired that the above matter may be treated as urgent and status of healthiness of Automatic Under Frequency Relays may be provided to SLDC and also the under frequency may be tested periodically. In this context it is also mentioned that time to time WRPC official as well as SLDC official shall visit the sub-stations to ascertain the healthiness of under frequency relay. The matter was discussed.

6.13 PROVISION OF SYNCHRONIZATION FACILITY AT EHV SUB-STATIONS OF MPPTCL AND AT ALL POWER HOUSE: - The committee was apprised that as per Grid Code, the synchronization facility should be available at all the Power Stations, 400 KV Sub-stations, 220 KV Sub-stations and 132 KV sub-stations in the path of black start. In 60TH OCC meeting MPPTCL representative informed the committee that order for 69 no. synchronization trolleys has been placed and 1 no. synchronization trolley has been delivered for checking and testing purpose at 220KV S/S Barwaha. In subsequent meetings this issue has been discussed. However, no any fruitful progress has been observed so far. In the above context it is indicated that at Manikheda HPS and Rajghat HPS synchronization facility is not available. It is felt that every Hydel Power station should be equipped with synchronization facilities invariably for system reliability and Crises Management. Also at Manikheda HPS & Rajghat HPS single bus system exists, hence MPPGCL is requested to explore the possibility for commissioning of Double Main Transfer Bus system. Thus, MPPGCL is requested to provide synchronization facility at Manikheda HPS and Rajghat HPS and MPPGCL may kindly provide status of making synchronization facility in aforesaid HPS. The MPPTCL may kindly provide the status of installation and commissioning of synchronization trolleys at different substations. Further, is also requested to indicate, whether synchronization facility could be provided at Karera & Pichhore substation on priority basis. The matter has been discussed with officers of T&C wing, it is conveyed that they are making arrangement for installation of synchronizing trolley at Pichhore S/s at the earliest. T&C may please update the position. The matter was discussed in the meeting.

ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS : Black Start mock drill of Hydel stations of MPPGCL:- During 2019-2020 the proposed / tentative dates for conducting black start mock drill at various Hydel power station of MP is detailed as mentioned below:- PROPOSED/TENTATIVE S.NO. NAME OF HPS DATE OF MOCK DRILL 1 BIRSINGHPUR HPS 28.11.2019 2 PENCH HPS 04.12.2019 3 BARGI HPS 24.12.2019 4 MANIKHEDA HPS 26.12.2019 5 ISP 6 OSP To be discussed. 7 TONS HPS All the concerned entities are requested to review the proposed tentative dates for conducting black start mock drill and confirm the readiness in the meeting. It is also requested that the generators shall intimate the Unit No. and the Bus No. on which the mock drill is to be conducted. MPPGCL confirmed the proposed dates for conducting the mock drill.

ITEM NO. 08: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES: 8.1 TESTING &CALIBRATION OF METERS AND NON-RECEIPT OF TIMELY JMR DATA: 1. SLDC representative requested CE(T&C) office to apprise about the status of testing / calibration of interface meters as per Regulations 10 and 18 of Central Electricity Authority (Installation and operation of meter) Regulation 2010 to the committee. CE(T&C) office representative informed that order for testing / calibration of all interface meters is under process.

2. SLDC representative informed that the complete load survey data of ABT meters installed at the interface points of Open Access Customers, HT Consumers, Railways TSS end and REGs is not received through AMR System and site officials are also not furnishing the load survey data timely. CE(T&C) office is requested to include these meters under AMC contract of M/s Secure Meters Ltd. and issue instructions to field offices for downloading and furnishing the missing data to SLDC on time. CE(T&C) office representative informed that letters will be issued to concerned entities for including the ABT meters installed at the interface points of Open Access Customers, HT Consumers, Railways TSS end and REGs under AMC contract of M/s Secure Meters Ltd. and also instructions will be issued to field offices for downloading and furnishing the missing data to SLDC on time.

8.2 NON RECEIPT OF ABT METER DATA OF RAILWAY TSS THROUGH AMR SYSTEM:- SLDC representative informed that ABT meter data of following TSS of Railways is not being received through AMR system: 1. Railway TSS Mansakra. 2. Railway TSS Khirkiya 3. Railway TSS Bhitoni. 4. Railway TSS Narsinghpur. 5. Railway TSS Mungaoli. 6. Railway TSS Pandurna. 7. Railway TSS Manjhgawan. 8. Railway TSS Nainpur. Railway representative informed that in above TSS, SIM’s have been replaced and problem regarding downloading of meter data shall be resolved shortly. SLDC requested the Railways to include all TSS end meters under AMC contract of M/s Secure Meters Ltd. in coordination with MPPTCL. SLDC also requested Railways to coordinate with MPPTCL for resolving the problems related with downloading of meter data of remaining TSS through AMR installed at SLDC. Railways assured for the same.

8.3 AMR FACILITY FOR THE ABT METERS INSTALLED AT MPPGCL:-SLDC representative informed that MPPGCL has provided AMR facility on 107 Nos ABT meters installed at the interface points and all the meters were successfully integrated with AMR server. He also informed that every month data of around 35-40 Nos. meters do not received through AMR to SLDC. MPPGCL requested to take up the matter with site officials and M/s Secure Meters Ltd. to resolve the problems related with non readability of meters which were integrated successfully and provide AMC of AMR facility to M/s Secure Meters Ltd. so that complete data is received by SLDC. MPPGCL representative intimated that matter is being taken up with M/s Secure Meters Ltd for providing AMC of AMR system. SLDC representative informed that 15 minutes blockwise data recorded in the meter no. XD435287 installed at GT of SSTPS PH-II unit-III do not match with midnight data i.e monthly injection data. The issue was informed to CE, SSTPP and ED(O&M:Gen), Jabalpur vide letter No.07-05/SG-11/SEM/347 dated 14.02.2019. The same problem was also observed in the meter no. XD435284 installed at GT of SSTPS PH-II unit-IV and in the meter no. XD435283 & XD435282 installed at 400KV SSTPS- Pithampur Ckt-3 &4. MPPGCL representative intimated that matter has been taken up with M/s Secure Meters Ltd. and with M/s L&T for resolving the problem.

8.4 TIME DRIFT IN ABT METER INSTALLED AT THE POOLING STATIONS OF WIND AND SOLAR GENERATING STATIONS AND SLIDING WINDOW PROBLEM:- SLDC representative stated that as already informed in previous OCCMs, the following ABT meters installed at Pooling Stations of Solar Power Projects has time drift and thus not recording the correct data. He also informed that SLDC has already requested to Generators with copy to concerned licensee vide letter no. 2353 dated 31/08/2019 for time synchronization of the ABT meters with GPS so that correct DSM account of these Wind and Solar Projects is issued by SLDC. VOLTAGE Sr.No. FEEDER NAME LOCATION NAME Location Meter No LEVEL 33 KV UJAS -2 1. 132KV S/S ICHHAWARGrid S/s End 33 MPC59975 ICHHAWAR 33KV 2. 132KV S/S Grid S/s End 33 XB593639 BHADRESH_SUSNER

3. UJAAS-1 AGAR 132KV S/S AGAR Grid S/s End 33 MPC59595

4. UJAAS-2 AGAR 132KV S/S AGAR Grid S/s End 33 MPC59596

5. 33 KV UJAAS 1 BERCHHA 132KV S/S BERCHHA Grid S/s End 33 XB571652

6. 33 KV UJAAS 1 SUSNER 132KV S/S SUSNER Grid S/s End 33 XB571653

SLDC representative further informed that ABT meters installed at the following Wind and Solar Generating Stations are recording the 15 minutes block wise data on sliding window principal thus block wise data do not match with midnight data. These meters need immediate replacement. The ABT meters installed at the following Wind and Solar Generating Stations are recording the 15 minutes block wise data on slinding window principal thus blockwise data do not match with midnight data. SLDC has requested to Generators with copy to concerned licensee vide letter no. 2353 dated31/08/2019 for immediate replacement of these ABT meters.

Sr.No. Feeder Name Substation ABT Meter No. QCA NAME

132 KV S/S XE479853 REConnect Energy Solution 1 33KV SUZLON-I SAILANA Pvt Ltd

132 KV S/S XE479854 REConnect Energy Solution 2 33KV SUZLON-II SAILANA SAILANA Pvt Ltd

132 KV S/S XE479855 REConnect Energy Solution 3 33KV SUZLON-III SAILANA SAILANA Pvt Ltd

132KV S/S REConnect Energy Solution 4 33KV SUZLON-I XE479856 Pvt Ltd

132KV S/S REConnect Energy Solution 5 33KV SUZLON- IV RATLAM JAORA XE479859 Pvt Ltd

132KV S/S REConnect Energy Solution 6 33KV SUZLON- V RATLAM JAORA XE479860 Pvt Ltd

132KV S/S REConnect Energy Solution 7 33KV SUZLON-IV AGAR AGAR XE479864 Pvt Ltd

132KV S/S 33KV SUZLON-V (SUSNER- REConnect Energy Solution 8 SUSNER XE479867 III) Pvt Ltd

132KV S/S XE479863 REConnect Energy Solution 9 33KV SUZLON-III (AGAR- I), AGAR Pvt Ltd

220 KV S/s 33KV SUZLON BEHAPUR XE479862 REConnect Energy Solution 10 DALODA DALODA-I Pvt Ltd

220 KV S/s 33KV SUZLON BEHPUR XE479861 REConnect Energy Solution 11 DALODA DALODA-II Pvt Ltd

33KV SUZLON I (SUSNER- 132KV S/S XE479866 REConnect Energy Solution 12 I), SUSNER Pvt Ltd

132KV S/S 33KV SUZLON I (SUSNER- XE479865 REConnect Energy Solution 13 SUSNER II), Pvt Ltd

132KV S/S XD595991 33KV AVP POWER INFRA REConnect Energy Solution 14 XD595994 PVT LTD., Pvt Ltd

XD522128 33KV BADONI POWER PVT. 132KV S/S MAXI REConnect Energy Solution 15 XD558031 LTD. Pvt Ltd

33 KV M P Wind Farm, 220 16 XE525393 Manikaran Analytics Ltd. Nagda Hill KVS/SDewas 33 KV Suzlon Gujrat Wind 220 KV S/S XD595984 17 Manikaran Analytics Ltd. Park , Barod Barod XD595980

SLDC representative requested to DDCs, Indore & Bhopal to take-up the issue with concerned officials for time synchronization and replacement of ABT meters. DCCs Bhopal assured to take up the issue with concerned officials of Discoms. DCCs Indore representative have not attended the meeting.

ITEM NO. 9: SCADA and E&T RELATED ISSUES:

9.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & 132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS /TRACTION FEEDERS:-

It was informed during the meeting that integration of telemetry of 132 KV VFJ with SLDC SCADA is pending. MPPTCL informed that integration work shall be completed within a week time. SLDC informed that 220 KV Sheopurkalan S/s has been charged but telemetry of this substation is not yet provided to SLDC despite various pursuances by SLDC. MPPTCL informed that the RTU has been dispatched and its integration shall be done shortly. Further, SLDC informed that telemetry of Birsinghpur HPS and Zinna HPS is also not available and same needs to be provided by MPPGCL. MPPGCL informed that the order for RTU has already been placed and drawing has been approved & RTU will be delivered within 3 months. SLDC informed that MPERC regularly monitors & enquires about the reason of RTUs pending for integration & thus SLDC requested MPPTCL & MPPGCL to take up this matter on topmost priority.

9.2 TELEMETRY OF BUS VOLTAGE IN DFE RTUS:- SLDC informed that in substations having

DFE RTUs, the telemetry of Bus voltage is extended through MFM provided for transformer telemetry. This

results in wrong Bus Voltage in case of outage of transformer. MPPTCL (T&C) informed that this work shall be done in a phased manner. Firstly, the telemetry integration of bus voltage through separate MFM shall be done for 400 KV Substations which will be completed within a month. In second phase, the same shall be done for important 220 KV S/s depending upon the availability of spare MFM. CE(T&C) office will also work out the requirement of MFM for all 220 KV S/s, for which providing separate voltage shall be taken up in second phase.

9.3 PROVIDING TELEMETRY OF ISOLATORS OF 400 KV SUBSTATIONS:- SLDC informed that telemetry of isolators is required for real time grid monitoring as well as for better functioning of EMS system. NLDC & WRLDC are constantly requesting to provide the telemetry of isolators of 400 KV, 220 KV substations & Generating Stations; and reason for non-integration of telemetry of isolator status. MPPTCL informed that auxiliary contacts are not present in isolators of MPPTCL substation & thus it is not possible to provide the telemetry of isolators. However MPPTCL informed that arrangement of auxiliary contacts & extension of telemetry of isolators will be ensured for new substations. MPPGCL informed that telemetry integration of isolators shall be done on top most priority wherever possible and in places where RTUs are under replacement, provision of isolators shall be made while procurement of new RTUs. SLDC also requested ISP to provide telemetry of isolators in response to which ISP informed that isolator signals are already available in ISP SCADA system from where telemetry to SLDC is proposed to be provided through IEC gateway. Accordingly, while commissioning of telemetry through ISP SCADA, the isolators status shall be provided to SLDC. SLDC pursued the matter with JP Bina to provide the telemetry of isolators in which JP Bina informed that their SCADA upgradation is being carried out & the telemetry of isolators will be extended to SLDC after completion of upgradation of their SCADA by end of December 2019.

9.4 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS:- SLDC informed that the telemetry discrepancies pertaining to MPPGCL generating stations is detailed below :- 1. Satpura TPS :-

Sr.No. Description Unit Pending MPPGCL MPPGCL response in 72nd OCC since response in meeting dtd.30.10.18 1 400 KV Satpura - MW 8 months - MPPGCL informed that transducer has Itarsi been replaced in 400 KV Satpura-Koradi 2 400 KV Satpura- MW 8 months - and transducers of 400 KV Satpura-Seoni Koradi & 400 KV 400 KV Satpura-Itarsi shall be 3 400 KV Satpura- MW 8 months - replaced soon. Seoni 4. Gen-7 GT MVAR More than 1 - MPPGCL informed that the unit is to be year dismantled, so procurement of transducer is not possible. SLDC requested MPPGCL to utilize the spare transducers, if any, for replacement. SLDC informed that transducers may also be arranged from MPPTCL wherein some RTU having same transducres is replaced with Dongfeng RTUS. However no progress in the matter has been observed. 5. 400 KV Astha 1 & Line Commission MPPGCL informed MPPGCL informed that engineer of service 2 Reacto ing that signals of provider will visit the site & it will be r reactor are configured at the earliest. However despite configured in continuous pursuance, the telemetry is still database of not available to SLDC. Satpura SCADA system but values are not being conveyed to SLDC. NIT has been issued for configuration of point & it shall be completed within one month. 6. Gen-8,9 MW,M One week Generating VAR Transformer

2. SGTPS :-

Sr.No. Description Unit Pending MPPGCL response in meeting MPPGCL response in since dtd.30.10.18 72nd OCC 1. STN TR 1 (220 CB More than MPPGCL informed that cabling work of MPPGCL informed that no KV) one year breaker upto RTU panel is required to work has been done. be done & shall be done within one MPPGCL is requested to month. provide current progress in the matter. 2. 220/33 KV MW/MVA More than MPPGCL informed that it shall be MPPGCL informed that all Transformer R one year provided within one month. the discrepancies will be 3. 400 KV Bus 1 Freq More than MPPGCL informed that corrective rectified after procurement ten months action including testing of of transducers. MPPGCL transducer/arrangement of new is requested to provide the transducer shall be completed within a current progress in the month. matter. No response from 4. 220 KV Bus 2 Voltage More than MPPGCL informed that procurement of MPPGCL in the matter ten months transducer is under process & it shall from MPPGCL has been be commissioned by March-19. SLDC observed. informed that recently RTU of Rajghat & Devlond has been replaced, so transducers can be arranged from Rajghat & Devlond till procurement of new transducers.

3. Gandhi Sagar HPS :- SLDC informed that restoration of telemetry of GS HPS is pending due to fault in RTU. MPPGCL informed that the problem will attended within a month.

Sr.No. Description Unit Pending MPPGCL response in meeting MPPGCL response in since dtd.30.10.18 72nd OCC 1. 33 KV MW/MVA Commission SLDC informed that the telemetry of MPPGCL informed that Rajasthan(KuakhR ing this feeder is of utmost importance as it these discrepancies shall eda) feeder is an inter-regional feeder. MPPGCL be rectified after informed that they will arrange for the upgradation of RTUs. telemetry of this feeder on priority. 2. 132 KV Bus 1 Voltage 2 months Wrong Values No response from MPPGCL 3. 132 KV Bus 2 Voltage 2 months Wrong Values No response from MPPGCL

4. Rajghat HPS :-

Sr.N Description Unit Pending MPPGCL response in meeting MPPGCL response in 72nd o. since dtd.30.10.18 OCC 1. Gen-3 CB Commission MPPGCL informed that it shall ing of new be rectified at the earliest. RTU

SLDC informed that all above issues are pending since long time creating problem in grid management. In response, MPPGCL informed that a separate meeting shall be conducted at SLDC with officers from Power Stations and SLDC, so that exact problems may be identified. SLDC requested MPPGCL to arrange the meeting on top most priority. SLDC informed the list of telemetry discrepancies pertaining to MPPTCL/IPP substations is detailed below:- (a) Transmission/ other Generating Substations :- Sl Name of Substation Name of feeders/transformers No.

1.Telemetry of 125 MVAR Bus Reactor not available.

2.Telemetered values of 400 KV Nagda MW & MVAR is 10 times of actual value.

3. Telemetered values of 400 KV Indore-1 MW.

4. MVAR values of all generators 01 400 ISP

5. Non-current data of generators in OFF condition.

6. Digital telemetry including CB status, RGMO/FGMO & SOE is not available.

02 220 KV Rajgarh Biaora 1. 220 KV TBC CB status 2. 220/132 KV Xmer 2 MVAR

03 400 KV Chhegaon Wrong CB status of :- 1. 400 KV Transfer Bus Coupler

04 400 KV Julwaniya This problem is persisting since last 8 months. No action in the matter has been taken.

1. All 132 KV CB status showing open. 2.CB of 220KV Sendhwa feeders 1,2 3. CB of 220/132 KV Xmer-1

05 400 KV Katni Wrong CB status of 400 KV -1 & 125 MVAR Bus Reactor 06 400 KV Kirnapur Wrong values of 132 KV Balaghat 1 & 2 (in case of load above 30 MW) 07 400 KV Pithampur Faulty CB status of 400 KV Singhaji Ckt-4

08 220 KV Nimrani Telemetry of 33 KV Maral is to be provided

09 220 KV Kotar Faulty CB status of 132 KV RTS

10 220 KV Panagar Faulty CB status of 220 KV Sukha

11 220 KV Ujjain 1. Faulty CB status of 132 KV Bus Coupler 2. Faulty CB status of 220/132 KV Xmer-2 12 220 KV Faulty CB status of 220 KV Bus Coupler

13 220 KV Rajgarh 1. 220 KV all feeders CB suspected 2. 132 KV all feeders CB suspected 3. 220 KV Bus-1 Voltage 14 220 KV Ratlam 1. 220 KV TBC CB faulty 2. 220 KV Daloda CB faulty 15 220 KV Julwaniya Wrong MW value of 220/132 KV Xmer

16 132 KV Umariya All Analog Values are zero (PT Burst)

ISP informed that case for addition of IEC gateway in ISP SCADA/EMS shall be completed by Dec-19. MPPTCL informed that telemetry discrepancies pertaining to substations telemetered through DFE RTUs will be attended within 1 week. The telemetry discrepancies pertaining to substations telemetered through other RTUs shall be attended within 2 weeks if possible, otherwise the telemetry of these substations will also be integrated through DFE RTUs.

9.5 EXTENSION OF RGMO/FGMO SIGNAL TO SLDC/WRLDC :- SLDC informed that extension of RGMO/FGMO signal of following generating units is still pending:- S.No. Name of Generating Unit.No. MPPGCL response Station 1 SGTPS 1,2,3,4 MPPGCL informed that integration of RGMO/FGMO status shall be done by March-2020. 2 BARGI HPS 1,2 MPPGCL informed that integration will be done by Jan-20. Wrong RGMO/FGMO signal status :- S.No. Name of Generating Unit.No. Remarks Station 1 TONS 1,2,3 MPPGCL informed that the shift officials will be instructed to manually ON/OFF the RGMO status after taking unit in/out of service. 2 ISP All units ISP informed that it will be available after commissioning of telemetry through IEC gateway.

3. SSTPS Phase II 3,4 MPPGCL informed that it will be completed within a month time.

9.6(A) NON AVAILABILITY/ UNRELIABLE TELEMETRY OF HYDEL POWER STATIONS :- SLDC informed that the telemetry of Hydel Power Stations is very unreliable & frequent long outage with abnormal delay in restoration of same is observed. The RTU availability of MPPGCL HPS is as detailed here under :-

RTU AVAILABILITY SEP AVAILABILITY OCT RAJGHAT HPS 90 95 BARGI HPS 86 85 MADIKHEDA HPS 80 79 GANDHI SAGAR HPS 0 0 PENC HPS 98 99 DEOLOND HPS 84 79 TONS HPS 82 80

SLDC informed that in hydel power stations, skilled manpower is not available for attending the telemetry issues & considerable time is taken for restoration of telemetry. SLDC further informed that the matter regarding arrangement of RTU/PLCC spares, measuring instruments & adequate trained manpower at MPPGCL stations has been discussed in last various OCC meetings. However MPPGCL has not taken any actions regarding this matter. MPPGCL was thus again requested to take following measures to ensure round the clock availability of real time data to SLDC:- 1. Arrangement of essential spares at power stations and one set of all spares at centralized location with intimation to all power stations 2. Arrangement of training to persons looking after telemetry work. 3. Arrangement of measuring instruments like level meters wherever not available. 4. Ensuring availability of RTU configuration at all power stations.

MPPGCL agreed to look into the matter on highest priority. Further, it was decided to discuss these issues in separate meeting proposed at SLDC with power station officers.

9.6(B) NON AVAILABILITY/ UNRELIABLE VOICE COMMUNICATION BETWEEN SLDC TO THERMAL/ HYDEL POWER STATIONS :- SLDC informed that despite constant pursuance most of the PLCC voice communication of various power stations to SLDC is out since long time. The details of outage are here as under:-

Sr.No Name of 2 wire PLCCMPPGCL response in meetingRemark HPS/TPS channel dtd.30.10.18

PLCC voiceMr.Vinay, AE, Tons HPS informedRestoration of PLCC 1. Bansagar- IV communication is notthat he will visit Bansagar-IV forchannel is still established restoration of voice communication ofpending.NO action in Bansagar-IV at the earliest. the matter is initiated by MPPGCL.

2. Madikheda PLCC voice channel Restoration of PLCC is not working since channel is still pending. last two and half In last two OCCM, years. MPPTCL was requested to arrange for extension of voice channel utilizing Mahalgaon wideband node in coordination with Madikheda HPS.

PLCC voice channelAE Birsinghpur informed thatRestoration of voice 3 Birsinghpur HPS is not working sincepresently voice communicationchannel is still pending. /TPS long time due to faultybetween SLDC to thermal power PLCC exchange athouse is proper & the commissioning Birsinghpur. of EPAX at site is under progress. AE Birsinghpur assured that the voice channel of Birsinghpur HPS shall be restored within one month. SLDC informed that matter regarding Non Availability/ Unreliable voice communication Between SLDC to Thermal/ Hydel Power Stations was discussed in last various OCC meeting & special meeting on 30.10.18, however 2 wire voice facility extension of Singhaji 1 & 2 TPS, Madikheda HPS is still pending. MPPGCL agreed to arrange for the same. Further, it was decided that the matter shall be discussed in the proposed meeting with MPPGCL filed officers.

9.6(C) REPLACEMENT OF RTUS IN THERMAL POWER STATIONS:- SLDC informed that large no. of discrepancies pertaining to MPPGCL Thermal Power Station are pending since long time. The various discrepancies are due to non-availability of desired spares, non renewal of AMC contract of RTUs, Modems, PLCC equipments. The replacement of RTUS in thermal power stations is required to be arranged to ensure round the clock availability of telemetry. SLDC informed that it was requested earlier to arrange the replacement of RTUs. However, no feedback in the matter is provided to SLDC. SLDC has also pursued the matter vide UO dtd.12.09.19. MPPGCL was thus again requested to arrange for replacement of RTUs in Thermal Power Stations. MPPGCL informed that matter shall be discussed in proposed separate meeting with MPPGCL field officers.

9.7 DUAL DATA CHANNEL CONNECTIVITY FOR POWER STATIONS:- SLDC informed that presently most of the Power Stations to SLDC/Backup SLDC only single channel is established. Looking the data availability of Power Stations and recently implemented CERC new DSM regulation w.e.f. 1st January, 2019 it is required that each Power Station shall have dual data channel to avoid any outage/discrepancy in real time data of Generation Station. Therefore to reduce outage due to single data channel failure, MPPGCL & NHDC were requested to arrange / ensure dual data channel from each Power Stations so that continuity of real time data to SLDC/Backup SLDC SCADA all the time may be achieved. MPPGCL representative informed that the matter shall be discussed in proposed separate meeting with MPPGCL field officers.

9.8 NON AVAILABLITY & WRONG TIME STAMPING OF SOE AT SLDC SCADA:-SLDC informed that on some instances, it has been observed that the SOE was not received or wrong time stamping of SOE was received in SLDC SCADA system. The matter was taken up with field for verification for proper configuration /connections of SOE data in RTUs & after long pursuance, the matter was investigated and it was found that the settings “inf code 2” & “inf code 4” were not correct in Dongfeng make RTUs. These settings have now verified and changed in some of the RTUs and SOE with correct time stamping from RTUS where settings were modified is now receipt in SLDC SCADA/EMS system. Further SLDC informed that the SOE verification of all RTUs is being done & out of 175 RTUs, SOE verification of 165 RTUs has been done & requested MPPTCL to expedite the SOE verification of balance RTUs at the earliest. MPPTCL informed that they have instructed all the field offices to coordinate with SLDC for SOE verification.

9.9 UTILIZATION OF W.B NODE AT BIRSINGHPUR TPS :- SLDC informed that despite constant pursuance utilization of node at Birsingpur TPS is still pending since last two years due to pending work of laying of cable form W.B node location to PLCC room, Exchange room and RTU. It was informed by SLDC that complete scheme to extend wideband facility upto RTU was prepared by SLDC and forwarded to SGTPS around two years back. The matter is pursued by SLDC constantly. However, required converter and laying of fiber optic cable is still pending. MPPGCL informed that matter shall be discussed in proposed separate meeting with MPPGCL field officers.

9.10 MAINTENANCE OF OPGW NETWORK :- SLDC informed that under the MP portion of Master Telecom project executed by PGCIL,36 No. of wideband nodes has commissioned. As per agreement between MPPTCL and PGCIL, the subsequent maintenance of these links is to be looked after by MPPTCL. While execution of the project, it was informed by PGCIL that the AMC of the terminal equipments is covered under the equipments contract. However, modalities for AMC payment is to be finalised by MPPTCL with PGCIL. Further, separate arrangement towards maintenance of OPGW cable (upto FODP) involving OPGW restoration, OPGW LILO work, OTDR testing, OPGW shifting during line diversion etc is to be made by MPPTCL, the details for which has already been forwarded by SLDC. SLDC further informed that as per order of CERC, the expenditure towards maintenance under the project shall be done by MPPTCL. SLDC informed that due to non-availability of maintenance plan, the restoration of any fault is taking long time. SLDC informed that recently due to fiber cut issue is 220 KV Bina-Shivpuri ckt, the telemetry was out for more than 15 days. MPPTCL informed that the matter shall be finalised on top most priority.

9.11 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS & INTERMITTENT TELEMETRY DUE TO NOISE IN COMMUNICATION CHANNEL :- The long outage of telemetry & substations having intermittent telemetry due to heavy noise in communication channel was discussed in detail:- Sl No. Name of Sub Station Out from /Remark

01 220 KV Chichli The telemetry was out since last 5 months 02 132 KV Gadarwara due to outage in 220 KV Jabalpur-Narsinghpur Ckt 1 & 2. However both the circuits has now 03 132 KV Pondar been charged but the telemetry of substations 04 BLA TPS is still not available.

05 GandhiSagar HPS Out since last 3 months

06 132 KV Out since last 1 month

07 Satpura TPS Very intermittent

MPPTCL & MPPGCL ensured that they will arrange for round the clock availability of telemetry of these RTUs to SLDC.

9.12 TELEMETRY OF RAILWAY TSS SUB STATIONS: - SLDC informed that the telemetry of existing 38 Nos railway Traction Sub Stations & upcoming 25 new railway TSS is required to be provided by railway for monitoring of drawal by each TSS and also monitoring of demand of railway in MP. SLDC further informed that testing of telemetry for 2 Railway TSS has been done in SLDC SCADA, however it is currently offline due to non-availability of UPS in Railway Zonal Office. Railways further informed that currently they have extended the telemetry of 8 TSS upto Railway Zonal Office & telemetry integration of all Railway TSS with SLDC shall be done within 6 months. SLDC requested Railways to extend the telemetry of TSS which have been integrated upto Railway Zonal Office to SLDC and also arrange UPS on highest priority. Railways agreed for the same.

ITEM NO 10 : DATE AND VENUE OF NEXT OCC MEETING : It is proposed to hold 73rd Operation and Coordination Committee meeting of MP on 17.12.2019. The host and venue of the same shall be decided in the meeting. [Action :- All the concerned entities]

***********

Annexure-2.1

FREQUENCY PARTICULARS

S. No. Particulars Aug-18 Sep-19

1 INTEGRATED OVER AN-HOUR

Between 10.00 Between 13.00 hrs 1.1 Maximum Frequency 50.26 Hz hrs & 11.00 Hrs 50.14 Hz & 14.00 Hrs on on 15.08.19 29.09.19

Between 00.00 Between 18.00 hrs 1.2 Minimum Frequency 49.81 Hz hrs & 01.00 Hrs 49.8 Hz & 19.00 Hrs on on 18.08.19 18.09.19

1.3 Average Frequency 50 Hz 50.01 Hz

2 INSTANTANEOUS FREQUENCY AT 09.34.10 AT 08.04:40 HRS 2.1 Maximum Frequency 50.32 Hz HRS ON 50.27 Hz ON 05.09.19 15.08.19 AT 14.04:00 AT 18.50:20. HRS 2.2 Minimum Frequency 49.55 Hz HRS ON 49.62 Hz ON 09.09.19 04.08.19 3 Percentage of time when frequency was :-

%age of time when frequency was Aug-18 Sep-19

3.1 Below 48.5 Hz 0.00 0

3.2 Between 48.50 Hz and 48.8 Hz 0.00 0

3.3 Between 48.80 Hz and 49.2 Hz 0.00 0

3.4 Between 49.20 Hz and 49.5 Hz 0.00 0

3.5 Between 49.50 Hz and 49.7 Hz 0.00 0

3.6 Between 49.70 Hz and 49.9 Hz 7.28 4.57

3.7 Between 49.9 Hz and 50.05 Hz 72.69 75.25

3.8 Between 50.05 Hz AND 51.5 Hz 20.03 20.18

3.9 Above 51.5 Hz 0.00 0.00

4 No. of times frquency touched 48.80 Hz 0 0

4.1 No. of times frquency touched 48.60 Hz 0 0

4.2 No. of times frquency touched 51.0 Hz 0 0

Agenda of 72nd OCCM of MP 29 ANNEXURE - 2.2.5.i M.P POWER TRANSMISSION COMPANY LIMITED TRANSMISSION WORKS COMPLETED DURING 2019-20 (UP TO 31.10.2019) I EHV TRANSMISSION LINES 1 2 3 4 5 6 7 A. 400 KV TRANSMISSION LINES 1 Nill B. 220 KV TRANSMISSION LINES 220kV DCDS line from Betul 220kV S/s - Gudgaon Test charged 1 DCDS 46.77 93.542 June'2019 220kV S/s (2x46.771) (GEC) on 12.06.2019 2nd Ckt of 220kv Satna - Chhatarpur line (152) charged on 2 2nd ckt 160.00 160 Aug'2019 (JICA-I) 29.08.2019 C. 132 KV TRANSMISSION LINES 132 KV 2 phase 2 wire DCSS line for PS to 132/25 charged on 1 KV 5 MVA RTS at Sausar from 132 KV S/s Boregaon DCSS 17.413 17.413 May'2019 25.05.2019 (RTS) 132 KV Shyampur - Pilukhedi DCSS line (1x22.834) charged on 2 DCSS 22.83 22.834 June'2019 (UBI) 28.06.2019 2nd ckt of 132 KV Sheopur- Baroda line & LILO of its 5.131 cktkm both ckt at 220 KV S/s Sheopur for 132 KV 3 DCDS 5.13 5.131 June'2019 charged on interconnection of 132 KV S/s Sheopur & 220 KV 29.06.2019 S/s Sheopur. (2nd ckt- 34 cktkm+2x1+4x5) (UBI) charged on 4 132 kv DCSS Karakbel - Belkheda (1x24.93) (ADB-III) DCSS 24.93 24.93 June'2019 30.06.2019 LILO of 2ND CIRCUIT OF 132KV Gwalior- Pichhore at 132Kv S/s Dabra (2X0.108) (ADB-III) (balance comm on 5 DCDS 0.11 0.216 June'2019 work) (Note: LILO at Chinour 27.364 cktkm charged 03.06.2019 on 04.08.2017)(ADB-III) 132 KV line 2 phase 2 wire Nainpur - RTS Nainpur 6 DCSS 4.176 4.176 June'2019 12.06.2019 line (4.176) (CCW) LILO of 132kV Betul - Gudgaon at 220kV S/s Gudgaon (2x9.825)(132kV interconnector between 2nd ckt 7 Gudgaon 220 kV S/s & Gudgaon 132kV S/s DCDS 4.73 9.466 June'2019 charged on (Note:LILO 1st ckt(2x5.092) charged on 20.06.2019 24.01.2019)(2nd ckt 2x4.733) (GEC)

LILO of Satna 220kV-Kymore 132kV DCSS line for comm on 8 DCDS 1.8 3.60 July'2019 Uchehara (2x1.8) (JICA-II) 18.07.2019 132Kv DCSS line from GWSTPP to upcoming Make comm on 9 up Water Pump House river Narmada (Line- DCSS 24.52 24.515 July'2019 11.07.2019 II)(1x24.515) (CCW)

LILO of Both circuit of 132 kv DCDS charged on 10 Gwalior(Mahalgaon) - Dabra/Karera line at 220 KV DCDS 7.26 26.472 Aug'2019 29.08.2019 S/s Gwalior II) (2x2x5.95+2x1.278) (Transco/UBI)

2nd ckt of 132 KV Sheopur- Baroda line & LILO of its both ckt at 220 KV S/s Sheopur for 132 KV interconnection of 132 KV S/s Sheopur & 220 KV 2nd charged on 11 38.54 45.011 Aug'2019 S/s Sheopur. (2nd ckt- 33.410 cktkm +1x1.896 ckt+DCDS 24.08.2019 +3x3.235) (Note- 5.131 cktkm charged on 29.06.2019) (UBI)

132Kv DCSS 2 phase 2wire line from 132Kv s/s charged on 12 to RTS Niwadi for p/s to RTS Niwadi DCSS 22.71 22.712 Aug'2019 09.08.2019 (1x22.712) (RTS) LILO of one circuit of 132 kv Neemuch220 - chared on 13 Ratangarh DCDS line at 132 KV S/s Morwan 0.56 1.12 Sept'2019 16.09.2019 (2x0.56) (UBI) LILO of 132 kv Bhikangaon Khargone line at Biston charged on 14 18.997 37.994 Sept'2019 132 KV S/s (2x18.997) (ADB-III) 14.09.2019 charged on 132Kv DCSS 2 phase 2wire line from 132Kv s/s 09.09.2019 15 20.80 20.8 Sept'2019 Beohari for PS to RTS Beohari (1x20.8) (CCW) (upto dead end) 132kv DCSS Gautampur -Depalpur line (1x19.609) charged on 16 19.609 19.609 Oct'19 (JICA) 30.10.2019 part line (1x16.8 17 133 KV Datiya- Bhitarwar DCSS line (1x35.296) (UBI) 16.8 16.8 Oct'19 cktkm) charged on 31.10.2019 132 kv DCSS Narsinghpur - Devnagar (1x23) (ADB- charged on 18 III) (Note-1x24.43 + 1x11.33 muiti ckt NSP Karakbel 35.76 35.76 Oct'19 26.10.2019 line) balance 132kV DCSS line Chichli - Palohabada (1x25.606) 15.110 cktkm 19 (Note: charged Part line 10.776 on 28.03.2019) 15.11 15.11 Oct'19 charged on (ADB-III S) 23.10.2019

Agenda of 72nd OCCM of MP 30 1 2 3 4 5 6 7 II. EHV SUB - STATIONS No.OF EFFECTIVE MONTH OF DATE OF S. NAME OF SUBSTATION / (DISTRICT) / (FINANCED VOLTAGE X-mer & CAPACITY COMPL- COMMI- No. BY) RATIO (KV) Cap. MVA ETION SSIONING (MVA) A. 400 KV SUBSTATIONS 1 Nill B. 220 KV SUBSTATIONS a. 220 KV NEW SUBSTATIONS 1 Nill C. 132 KV SUBSTATIONS a. 132KV NEW SUBSTATIONS charged on 1 Bada malehra 132kv s/s 1x40MVA (ADB-III) 132/33 kV 1x40 40 May'2019 30.05.2019 charged on 2 Pilukhedi 132kV S/s with 1x50 MVA (UBI) 132/33 kV 1x50 50 June'2019 28.06.2019 Karakbel 132kv s/s1x40 MVA (Dist. Narsinghpur) comm on 3 132/33 kV 1x40 40 July'2019 (ADB-III) 25.07.2019 Belkheda 132kv s/s 1x40 MVA (Dist- comm on 4 132/33 kV 1x40 40 July'2019 Jabalpur)(ADB-III) 04.07.2019 Test charged 5 Biston 132kv s/s1x40 MVA (ADB-III) 132/33 kV 1x40 40 Sept'2019 on 20.09.2019 charged on 6 Morwan 132kV S/s with 1x40 MVA (UBI) 132/33 kV 1x40 40 Oct'19 25.10.2019

Agenda of 72nd OCCM of MP 31 Annexure-2.2.5.ii EHV TRANSMISSION WORKS UNDER PROGRESS AS ON 31.10.2019 PROGRESS IN CKT. S. No. NAME OF THE TRANSMISSION LINE % KMS. (Oct'2019) A. 400 KV TRANSMISSION LINES 1 400 kV DCDS line from Nagda 400 kV S/s to 400 kV S/s 137.32 58.00% 400 kV DCDS line for LILO of one ckt of Satna(PGCIL) - Bina(PGCIL) 400 kV at 2 56 85.00% Sagar 400 kV S/s 3 400 kV DCDS line from Ashta 400 kV S/s to Ujjain 400 kV S/s 179.474 42.00% 4 400 kV DCDS line from Indore (PGCIL) 765 kV S/s to Ujjain 400 kV S/s 84.528 86.00% 5 400 kV DCDS line from Nagda 400 kV S/s to Ujjain 400 kV S/s 53.2 56.00% 6 LILO of one ckt of 400 KV Khandwa - Rajgarh PGCIL line at Chhegaon 400 kV S/s 3.78 14.00% B. 220 KV TRANSMISSION LINES LILO of one Ckt of 220kv DCDS Ashta - line at 220kv S/S (DCDS) 1 66 51.00% (2x32.782) 2 220Kv DCDS line from Pithampur-Depalpur line (2X31) 62 71.00% 220Kv FCFS line for LILO of both Ckt. Of -Ratlam D/C line at 400Kv S/s 3 27.55 95.00% Badnawar (2x1.453+4x6.161) 4 220Kv DCDS Julwaniya- Kukshi (2X58) 116 23.00% 5 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) 44 32.00% 6 LILO of one circuit of Bhopal-Hoshangabad DC line at 220kV S/s Adampur 5.84 28.00% Part (b).LILO of 220kV Sarni - Pandhurna at 220kV S/s Betul (2x38.864) (Note: 7 77.728 60.00% Betul220 & Betul400 I/C line 3.76 cktkm. charged on 21.07.2017) 8 220kV DCDS line from Kanwan 220kV S/s - Dhar 220kV S/s 62.78 90.00% LILO of both ckt Nagda - 220kV line at 400Kv S/s Mandsore() 9 101.136 54.00% (2x22.787+4x2.229+2x23.323) 220kV DCDS line from Mandsaure(Sitamau) 400kV S/s - Maruti Shakti Pool 10 92.294 51.00% 220kV S/s 11 220kV DCDS line from Neemuch 220kV S/s to Ratangarh 400kV S/s 85.016 81.00% 12 2nd circuiting of Ratlam switching - Daloda 220kV DCSS line 72 56.00% 13 LILO of Ratlam - Daloda 220kV line at 220Kv S/s Jaora (2x3.51) 7.02 68.00%

14 LILO of both ckt of Ujjain - 220 kV line at Ujjain 400 Kv S/s (2x6.4+2x5.691) 24.182 78.00%

15 LILO of both ckt of Ujjain - Nagda 220 kV line at Ujjain 400 Kv S/s (2x2x11.766) 47.064 56.00% 16 220kV DCDS line from Ujjain 400kV S/s to Susner () 220kV S/s 156.00 9.00% 17 220kV DCDS line from Badod 220kV S/s to Susner (Nalkheda) 220kV S/s 104.55 28.00% 18 220kV DCDS line from Rajgarh(B) 220kV S/s to Susner (Nalkheda) 220kV S/s 124.00 8.00% 19 220 kV Sabalgarh - Sheopur line (2x110) 220 67.00% 20 220kV Chhatarpur- DCSS line 110 9.00% 21 220 KV DCDS UMSP Rewa - Rewa 53.416 22 220 KV DCDS UMSP Rewa - Sidhi 114.998 6.00% 23 220 KV DCDS line from 400 kV Itarsi (PGCIL) to 220 KV S/s Budhni (2x29.942) 59.884 1.00% 220Kv DCDS line from 220kV Pooling S/s RUMS at Goojarkhedi, Suwasara (For 86.852 24 interconnection of Solar PV Plant of RUMS) (2X43.426) b) Tap point to 400 kV S/s Sitamau (2x34.613) 69.226 93.00% 220kV DCDS Badwar (220kV Pooling S/s) - 400kV Grid S/s PGCIL line) (2X1.134) 25 2.268 (ckt-I charged on 28.03.2019) 132 KV TRANSMISSION LINES 1 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) 64 61% 2 132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV Itarsi s/s (1x53.209) 53.209 82.00% 3 LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S Seoni (2x20) 40 88.00% 4 132 kv DCSS Guna-Eshagarh line (1x72) 72 41.00% 5 132 kv Sirmour - Katra DCDS line (2x37.67) 75.34 77.00% 6 LILO of 132 kv Jaora - Khachrod line at Bhesola 132 KV S/s (2x0.729) 1.458 100.00% 7 132 kV DCSS line from 132kV Mandla - Bichhiya (1x43.54) 43.54 5.00% 8 132 kV DCSS line from 132kV Dindori - Gorakhpur 132kv S/s (1x49.4) 49.4 8.00%

Agenda of 72nd OCCM of MP 32 9 132 KV Gourjhamar - Deori DCSS line (1x27.493) 27.493 66.00% 132kV DCDS line from 400 kV Ujjain to 132KV Vikram Udyogpuri (Narwar) 10 42.86 95.00% (2x21.43) 91% part line 11 133 KV Datiya- Bhitarwar DCSS line (1x35.296) 35.296 (1x16.8 cktkm) charged on 31.10.2019 12 132 kv DCSS - Khimlasa line (1x20.937) 20.937 99.00% 13 132 kv DCSS Panagar - Patan line (1x22.749) 22.749 36.00% 132 kv DCSS Badnagar - Chhayan Line (1x28.26) ADB-III 7.291 14 100.00% (Part line 20.969 ckt charged on 05.11.2018 by tapping arrangement) Balance 15 132 kv DCSS Dhar - Teesgaon line (1x15.35) 15.35 95.00% 16 LILO of 132 kv Ratlam - Meghnagar line at 132Kv S/s Petlawad (2x7.4) 14.8 100.00% 17 132 kv DCDS Narsinghpur - Karakbel line (2x23) 46 98.00% LILO of 132 kv Satna- line at Satna-II S/s (2x11.047)(ADB-III Saving) (Part 18 22.094 32.00% line 0.50 CktKm charged on 05.12.2018) 19 132kv DCDS line Guna-Bhonra (2x21.394) 21 84.00% 20 132kV DCDS line from Sendhwa 220 kV S/s - Pansemal 132kV line 95.69 70.00% 21 2nd ckt of 132kV Rajgarh(Dhar)220 kV S/s - Jhabua 132kV line 68.8 88.00% LILO of both ckt of 132kV Neemuch - Mandsore at Mandsore(Sitamau) 400 kV 22 142.928 51.00% S/s (2x71.464) 2nd Circuiting of Sidhi 220 Mauganj 132 kV DCSS line (new line 6 km 23 52 34.00% involved)(2x8.285+ 35.922 ckm 2nd ckt) (Note:35.922 charged on 27.03.2019) LILO of both ckt. of 132kV Neemuch - Ratangarh DCDS line at 220kV S/s 24 Ratangarh (2x3.094)(132kV interconnector between Ratangarh 400 kV S/s & 6.188 26.00% Ratangarh 132kV S/s 25 2nd circuiting of Sabalgarh - Vijaypur 132KV DCSS line (31.39) 31.39 100.00% 26 2nd circuiting of Ashta - Ichhawar 132KV DCSS line (34.64) 34.64 55.00% 27 2nd circuiting of Nalkheda - Moman Badodiya 132KV DCSS line (28.34) 28.34 84.00% 28 LILO of both ckt of Ujjain - 132KV line at Ujjain 400 KV S/s (4x0.198) 0.792 39.00% 29 LILO of Susner - Jeerapur 132kV line at Susner (Nalkheda) 34.922 18.00% 30 2nd Circuiting of Susner - Jeerapur 132 kV DCSS line (30.256) 30.256 53.00% LILO of both ckt of Ujjain 220 KV - Agar 132kV line at Makdon 132KV S/s 31 120.208 27.00% (2x2x30.052) 32 2nd circuiting of Agar-Susner 132kV DCSS line 31.603 78.00% 33 2nd circuiting of Tarana-Makdon 132kV DCSS line 23.05 69.00% 34 132kV DCDS -Zarda line 49.92 52.00% LILO of one circuit of Susner 132 KV - Agar 132KV line at Susner (Nalkheda) 35 34 11.00% 220kV (2x18) 36 2nd ckt of 132 KV shahdol 220 - Dindori132 line (2nd ckt-61.71) 61.71 66.00% 37 2nd ckt of 132 KV Gorabazar 220 - Maneri 132 line (2nd ckt-21.175) 21.75 132kV Julwaniya400 - Shahpura DCSS line (2nd ckt-28 + 1x47.008) 38 74.866 99.00% (Note:1x47.008 charged on 29.03.2019) 39 132 Kvline from Sailana to Shivgarh (1x25) 25 8.00% LILO of one ckt of Chhegaon- Nepanagar 132 Kv DCDS line at Jhirniya 40 80 1.00% (Marugarh) (2x40) 41 132 Kv DCSS line from 220kV Ganjbasoda to Gyaraspur (1x37.393) 37.393 2.00% 42 132 Kv DCSS line from Mandla to Dindori (1x110) 110 4.00% 2nd ckt of 220 KV Mandideep to 132 KV Mandideep line & LILO for HEG (2nd ckt- 11.5 50.00% 43 6.5 + 2x2.5) 44 2nd ckt of 132 KV Birsingpur - Umariya line (2nd ckt-35.50) 35.5 78.00% 45 Julwania 400kV-Pati(Silawad) 132kV DCSS line 40.69 10.00% 46 Panagar 220kV-Dheemarkheda 132kV DCSS line 62.50 40.00% 47 132kV Prithvipur- DCSS line 33.50 32.00% 48 132kV Udaipura-Tendukheda DCSS line 36.78 72.00% 49 132 kV - Gormi DCSS line (1x21.187) 21.187 4.00% 50 132kV Narsinghgarh-Suthaliya DCSSline 29.05 49.00% 51 Mugaliyachhap 220 kV - Mahawadia 132KV DCDS line(2x7.661) 15.32 1.00% 52 132kV Sirmour-Atraila DCDSline 70.50 5.00% 53 132kV Sidhi-Sinhawal DCSS line 58.47 7.00% 54 132kV Maneri-Mandla DCSS line 77.59 3.00% Agenda of 72nd OCCM of MP 33 132Kv DCSS 2 phase 2wire line from 220Kv s/s Kotar for PS to RTS 55 26.938 63.00% kaima1x26.938) 56 132kV DCSS Sirmore - RTS Dabhaura line (1x56.1) 56.1 96.00% 132Kv DCSS 2 phase 2wire line from 220Kv s/s Sidhi for PS to RTS 57 51.341 81.00% Marwasgram(1x51.341) 132Kv DCSS 2 phase 2wire line from 132Kv s/s Dongrital for PS to RTS Gajra 58 17.435 29.00% Bahara (1x17.435)

59 132kV 2Phase 2Wire Lalbarra-Samnapur RTS line. (Earlier 132kV 2 Phase 2 wire Kirnapur- 18.643 33.00% RTS Hatta Road line ) 132Kv DCSS 2 phase 2wire line from 132 Kv s/s Nowgaon for PS to RTS 60 49.851 86.00% (1x49.851) 61 132 KV line from Seoni 220 KV S/s - Nainpur 132 KV S/s 82.659 97.00% 62 132Kv DCSS 2 phase 2wire line NainpurRTs - Ghansor line (1x34.413) 34.413 26.00% 63 132Kv 2ph 2 wire DCSS Neemuch - RTS Neemuch line 12.188 59.00% 132 KV 2 phase 2wire DCSS line from 132 KV S/s to RTS Sindpan 64 14.86 59.00% (earliar 132 KV 2 phase 2wire DCSS Mandsore - RTS Mandsore (Sindpan) line) 65 132Kv 2ph 2 wire line from 220KV S/s - Mandla - RTS Mandla Fort 8.102 39.00% 66 132Kv Rajgarh - Biora RTS line 23.512 12.00% EFFECTIVE S. NAME OF THE SUBSTATION CAPACITY No. MVA A. 400 KV SUBSTATIONS

Badnawar 400 KV sub-station with 2x315MVA 400/220 KV X-mer (1x315MVA 1 630 85.00% charged on 07.03.2019 & 1x125MVAR Bus reactor charged on 11.03.2019)

2 Mandsore 400 KV sub-station with 2x315MVA 400/220 KV X-mer + 2x160 MVA 630 28.00%

78% 2nd unit 315 MVA charged 3 Sagar 400 KV sub-station with 2x315MVA 400/220 KV X-mer 630 on 25.08.2019 from 220 kv side

4 Ujjain 400 KV sub-station with 2x315MVA 400/220 KV X-mer+ 2x160 630 55.00%

5 400KV 1x125 MVAR Reactor at 400KV S/s Chhegaon(Torni) 11.00% B. a 220 KV SUBSTATIONS 1 Gorabazar 220/132kv with 1x160MVA + 40MVA 160 15.00% 2 Chapda 220 Kv S/s (Upgradation) with 1x160MVA 160 56.00% 3 Upgradation of Depalpur 132Kv S/s to 220kv with 1x160MVA 160 60.00% 4 Adampur 220/33kv S/s 2x50MVA 100 57.00% 5 Kukshi 220 Kv S/s Upgradation)with 1x160MVA 160 47.00% Sailana 220/132kV S/s (2x160MVA + 1x63) (Note:63 MVA charged on 6 320 65.00% 12.03.2019) 79% 1st 160 MVA Jaora 220/132kV S/s (Upgradation) (2x160MVA + 1x40) (Note:40 MVA X-mer charged on 7 320 charged on 17.02.2019) 14.08.2019 from 132 KV side Gudgaon 220/132kV S/s (1x160MVA + 1x63) (Note:63 MVA charged on 8 160 70.00% 24.01.2019) 9 Ratangarh 220/132kV S/s (2x160MVA + 1x63) 320 55.00% 10 Nalkheda 220/132kV S/s (2x160MVA + 1x63) 320 6.00%

North Zone Substation at Indore to 220kV (Upgradation )(Note- 1x160MVA 11 320 77.00% charged on 30.07.2018)

38% 63 Mva charged on 12 Sheopurkala 220kv S/s with 2x160MVA+ 1x63MVA 320 30.06.2019 & CB charged on 10.07.2019

Agenda of 72nd OCCM of MP 34 13 Upgradation of 220 kV S/s at Udaipura 160 7.00% 14 33/220kV Pooling Sub-station at Ramnagar 3x100 (1st & 2nd X-mer charged) 300 100.00% 74% 1st 100 MVA charged on 15 33/220kV Pooling Sub-station at Badwar (3x100) (1st charged) 300 29.03.2019 & 2nd on 04.07.2019 C. 132 KV SUBSTATIONS (a) NEW SUBSTATIONS 1 Khimlasa 132kv s/s 1x40 MVA 40 59.00% 2 Narsinghgarh 132kv s/s with 1x40 MVA 40 39.00% 100% charged on 3 Devnagar 132kv s/s 1x40 MVA (Dist- Narsighpur) (ADB-III) 40 30.03.2019 from 33 KV

4 Bhesola 132kV S/s with 1x50 MVA 50 53.00% 5 Deori 132kV S/s with 1x50 MVA 50 60.00% 6 Vikram Udyogpuri 132kV S/s with 1x63 MVA 63 58.00% 7 Bhitarwar 132kV S/s with 1x50 MVA 50 59.00% 8 Pati 132kV S/s with 1x50 MVA 50 1.00% 9 Orchha 132kV S/s with 1x50 MVA 50 11.00% 10 Madwas 132kV S/s with 1x50 MVA 50 1.00% 11 Unchehera 132kV S/s with 1x50 MVA 50 40.00% 12 Tendukheda 132kV S/s with 1x50 MVA 50 8.00% 13 Suthaliya 132kV S/s with 1x50 MVA 50 1.00% 14 Atraila 132kV S/s with 1x50 MVA 50 2.00% 15 Shivgarh 132kV S/s with 1x50 MVA 50 9.00% 16 Bichhiya 132kV S/s with 1x50 MVA 50 7.00% 17 Gyaraspur 132 Kv S/s, with 1x50 MVA 50 3.00%

Agenda of 72nd OCCM of MP 35 Annexure-2.3(i)

Discoms wise Average Supply Hours

East Zone Central Zone PARTICULARS Aug-19 Sep-19 Aug-19 Sep-19

Commissinary HQ 23:54 23:49 23:47 23:42

District HQ 23:52 23:46 23:38 23:40

Tehsil HQ 23:50 23:45 23:45 23:42

Rural -Mixed 23:44 23:39 23:34 23:28

Rural -DLF 23:44 23:40 23:31 23:28

Rural -Irrigation 9:56 9:55 9:53 9:54

West Zone MP PARTICULARS Aug-19 Sep-19 Aug-19 Sep-19

Commissinary HQ 23:53 23:52 23:51 23:47

District HQ 23:52 23:47 23:47 23:44

Tehsil HQ 23:47 23:39 23:48 23:42

Rural -3Phase - - 23:40 23:35

Rural -1Phase 23:40 23:29 23:40 23:34

Total Rural 9:48 9:43 9:53 9:51

Agenda of 72nd OCCM of MP 36

Annexure-2.3(ii)

LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR (For which group to be allocated) JABALPUR REGION

Date of Date of Name of EHV commission- commission Name of 33KV feeder Substation ing of feeder -ing of bay feeder 400KV 33 KV Hatta 11.11.2018 11.11.2018 400 KV Kirnapur 33 KV Kirnapur 12.11.2018 12.11.2018 33 KV Rajegaon 12.112018 12.11.2018 220KV 220 KV Seoni 33 KV Karirat 21.08.2007 06.01.2016

132KV 132 KV Ponder 33 KV NSPL 19.01.2018 19.01.2018 33 KV Bilthari 01.04.2019 01.04.2019 132 KV 33 KV Sadumar 02.04.2019 02.04.2019 Palohabada

132 KV 28.02.2018 33 KV Nagar Palika 02.11.2018 Narsinghpur 33 KV Karapgaon 29.12.2017 24.02.2018 132 KV 33 KV Bansadehi 29.12.2017 27.01.2018 Karapgaon 33 KV Kareli 29.12.2017 27.01.2018 33 KV Aamgaon 29.12.2017 28.01.2018 33 KV Dongarmali 10.10.2018 10.10.2018 132 KV 33 KV Waraseoni 06.12.2018 06.12.2018 Waraseoni 33 KV Kochevahi 06.12.2018 06.12.2018 33 KV Khairlanji 08.12.2018 08.12.2018 132 KV Nainpur 33 KV Keolari-II 22.01.2018 28.03.2018 33 KV Saori 05.10.2018 12.11.2018 33 KV Lawaghogri 05.10.2018 13.11.2018 132 KV Saori 33 KV Mujawar 06.11.2018 12.11.2018 33 KV Bhutai 06.11.2018 30.01.2019

LIST OF 33KV FEEDERS UNDER MPPKVVCL, INDORE (For which group to be allocated) INDORE REGION Name of EHV Name of 33KV feeder Date of Date of Substation commissioning commissioning of feeder bay of feeder 220KV 220KV Pithampur 33KV SRF 03.09.2013 03.09.2013 (Sec-III) 132KV

132KV Chandrawatiganj 33KV Chandrawatiganj 27.04.2015 27.04.2015

132KV Electronic 33KV AKVN (Namkeen 31.03.2016 31.03.2016 Cluster)

132KV Raukhedi 33KV DLF-I 03.01.2014 15.09.2018 33KV DLF-II 03.01.2014 15.09.2018 UJJAIN REGION Name of EHV Name of 33KV feeder Date of Date of Substation commissioning Charging of feeder bay of feeder

Agenda of 72nd OCCM of MP 220KV37 220KV Barnagar 33KV Bangred 23.10.2017 20.10.2018

132KV

132KV Agar 33KV Agar Town-II 03.12.2012 24.05.2018

132KV Arniyakalan 33KV Designco 01.05.2018 01.05.2018 Manufacture & Exporter (5MW Solar Power Plant) 132KV Agrod 33KV Madhopur 30.06.2018 26.07.2018

LIST OF 33KV FEEDERS UNDER MPPKVVCL, BHOPAL (For which group to be allocated)

BHOPAL REGION

Date of Date of Name of EHV charging charging of Name of 33KV feeder Substation of feeder feeder bay 220 KV 220 KV Ganjbasoda 03.11.2016 03.11.2016 33 KV Simcon-I 31.08.2017 09.09.2017 33 KV Simcon-II 220 KV Pipariya 33 KV Food Park (AKVN) 19.06.2017 25.06.2017

132 KV 132 KV Tamot 33 KV Obedullaganj 05.05.2016 02.02.2017 33 KV AKVN-1 05.10.2016 05.10.2016 33 KV AKVN-2 05.10.2016 05.10.2016

132 KV Lateri 33 KV Anantpura 15.06.2017 22.05.2018

132 KV Salamatpur 33 KV Dewanganj 04.12.2017 04.12.2017 33 KV Aamkheda 04.12.2014 04.12.2017 33 KV Salamatpur Industrial 25.11.2017 10.01.2019

132 KV Udaipura 33 KV Thaladigawan 26.04.2018 04.06.2018 33 KV Boras 04.06.2018 06.06.2018 33 KV Udaipura 04.06.2018 07.01.2019

132 KV Ayodhya Nagar 33 KV Maholi 30.10.2018 30.10.2018

132 KV Nasrullaganj 33 KV Kankariya 15.05.2004 15.09.2017

132 KV Khirkiya 33 KV Killod 07.12.2017 10.01.2018

132 KV Bilquisganj 33 KV Uljhawan 07.01.2018 20.07.2018

Agenda of 72nd OCCM of MP 38 ANNEXURE-3.2 72nd OCCM : PROPOSED SHUTDOWN OF TRANSMISSION ELEMENTS FOR THE PERIOD 01-12-19 TO 31-01-20

From To Basis Sr- KV Line / Transformer / Reactor / Bay (Daily/ Reason No Date Time Date Time Continue)

A- 400 KV TRANSFORMERS

1 400 315MVA BHEL Transformer at 400KV S/s Katni 05-Dec-19 9:00 06-Dec-19 17:00 Continue For post monsoon maintenance work

2 400 315MVA TELK Transformer at 400KV S/s Katni 02-Dec-19 9:00 03-Dec-19 17:00 Continue For post monsoon maintenance work

3 400 400KV ICT-II Tie Bay at 400KV S/s Nagda 08-Jan-20 08:00 08-Jan-20 18:00 Daily For Bay maintenance and testing work

4 400 315MVA EMCO Transformer at 400KV S/s Bina 17-Jan-20 08:00 27-Jan-20 17:00 Continue For replacement of 3 Nos Isolators

5 400 315 MVA TransformerI at 400KV S/S Bhopal 04-Dec-19 08:00 04-Dec-19 18:00 Daily For post monsoon maintenance work

B- 400 KV REACTORS 1 400 125MVAR BHEL Reactor at 400KV S/s Katni 09-Dec-19 9:00 09-Dec-19 17:00 Daily For post monsoon maintenance work

2 400 50MVAR Bus reactor -I at 400KV S/s Nagda 09-Dec-19 08:00 09-Dec-19 18:00 Daily For post monsoon maintenance work

3 400 125 MVAR Bus- reactor-II at 400KV S/s Nagda 10-Dec-19 08:00 10-Dec-19 18:00 Daily For post monsoon maintenance work

4 400 50MVAR Nagda-ISP Line Reactor 12-Dec-19 08:00 12-Dec-19 18:00 Daily For post monsoon maintenance work

For Circuit breaker replacement work of 5 400 400KV Nagda-Badnawar-II line Reactor 23-Dec-19 08:00 28-Dec-19 18:00 Continue 400KV line Reactor

6 400 80 MVAR Bus Reactor-I at 400KV S/S Bhopal 09-Dec-19 08:00 16-Dec-19 18:00 Continue PRV Replacement and Testing work

7 400 80 MVAR Bus Reactor-II at 400KV S/S Bhopal 18-Dec-19 08:00 24-Dec-19 18:00 Continue PRV Replacement and Testing work

8 400 80 MVAR Bus Reactor-I at 400KV S/S Bhopal 06-Jan-20 08:00 13-Jan-20 18:00 Continue PRV Replacement and Testing work

C- 400 KV FEEDER & BAYS OF 400 KV- S/S-

1 400 400KV Main Bus No- I at 400KV S/s Katni 10-Dec-19 9:00 10-Dec-19 17:00 Daily For post monsoon maintenance work

2 400 400KV Main Bus No- II at 400KV S/s Katni 12-Dec-19 9:00 12-Dec-19 17:00 Daily For post monsoon maintenance work

3 400 400KV Badanawar-Pithampur-I 09-Dec-19 09:00 09-Dec-19 18:00 Daily For Bay maintenance and testing work

4 400 400KV Badanawar-Pithampur-II 20-Dec-19 09:00 20-Dec-19 18:00 Daily For Bay maintenance and testing work

For replacement of Line Gantry Beam (FGB- 5 400 400kv Nagda-Badnawar-I with reactor 16-Dec-19 08:00 18-Dec-19 18:00 Continue 2)

6 400 400KV ISP Tie Bay at 400KV S/s Nagda 06-Jan-20 08:00 06-Jan-20 18:00 Daily For Bay maintenance and testing work

For CB replacement work (CB erection , 7 400 400KV Bina-Bhopal-I (Main CB bay only) 02-Dec-19 08:00 11-Dec-19 17:00 Continue commissioning and testing)

8 400 400KV Main bus-II at 400KV S/s Bina 16-Dec-19 08:00 23-Dec-19 17:00 Continue For PG Isolator repalcement work

9 400 400KV Bina-Bhopal-I 01-Jan-20 08:00 08-Jan-20 17:00 Continue For line isolator replacement work

10 400 400KV Bina-Bhopal-I I 09-Jan-20 08:00 16-Jan-20 17:00 Continue For line isolator replacement work

For Bay equipment maintenance and 11 400 400KV Indore-ISP-I 02-Dec-19 09:00 02-Dec-19 18:00 Daily testing work For Bay equipment maintenance and 12 400 400KV Indore-ISP-II 03-Dec-19 09:00 03-Dec-19 18:00 Daily testing work For Bay equipment maintenance and 13 400 400KV Indore-Nagda 04-Dec-19 09:00 04-Dec-19 18:00 Daily testing work For Bay equipment maintenance and 14 400 400KV TBC at 400KV S/s Indore 05-Dec-19 09:00 05-Dec-19 18:00 Daily testing work For Bay equipment maintenance and 15 400 400KV Indore-ISP-I 01-Jan-20 09:00 01-Jan-20 18:00 Daily testing work For Bay equipment maintenance and 16 400 400KV Indore-ISP-II 02-Jan-20 09:00 02-Jan-20 18:00 Daily testing work For Bay equipment maintenance and 17 400 400KV TBC at 400KV S/s Indore 03-Jan-20 09:00 03-Jan-20 18:00 Daily testing work For Bay equipment maintenance and 18 400 400KV Bhopal-Itarsi circuit No.-I 04-Dec-19 08:00 04-Dec-19 18:00 Daily testing work For Bay equipment maintenance and 19 400 400KV Bhopal-Bina circuit No-II 05-Dec-19 08:00 05-Dec-19 18:00 Daily testing work For Bay equipment maintenance and 20 400 400KV Bhopal-Itarsi circuit No.-II 06-Dec-19 08:00 06-Dec-19 18:00 Daily testing work For Bay equipment maintenance and 21 400 400KV Bhopal-Itarsi circuit No.-II 28-Jan-20 08:00 28-Jan-20 18:00 Daily testing work D- 220 KV FEEDER & BAYS-

1 220 220KV ICT-I at 220KV S/s Sukha 04-Dec-19 9:00 05-Dec-19 17:00 Continue For maintenance and testing work

2 220 220KV ICT-I at 220KV S/s Sukha 03-Jan-20 9:00 04-Jan-20 17:00 Continue For maintenance and testing work

3 220 220KV ICT-II at 220KV S/s Sukha 09-Dec-19 9:00 10-Dec-19 17:00 Continue For maintenance and testing work Agenda of 72nd OCCM of MP 39 From To Basis Sr- KV Line / Transformer / Reactor / Bay (Daily/ Reason No Date Time Date Time Continue)

4 220 220KV ICT-II at 220KV S/s Sukha 07-Jan-20 9:00 08-Jan-20 17:00 Continue For maintenance and testing work

For Bay equipment maintenance and testing 5 220 220KV Pandhurna-Kamleshwar 10-Dec-19 09:00 10-Dec-19 00:00 Daily work For Bay equipment maintenance and testing 6 220 220KV Chhindwara-PGCIL-I 12-Dec-19 09:00 12-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 7 220 220KV Chhindwara-PGCIL-II 13-Dec-19 09:00 13-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 8 220 220KV Pandhurna-Kamleshwar 13-Jan-20 09:00 13-Jan-20 18:00 Daily work For Bay equipment maintenance and testing 9 220 220KV Chhindwara-PGCIL-I 09-Jan-20 09:00 09-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 10 220 220KV Chhindwara-PGCIL-II 10-Jan-20 09:00 10-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 11 220 220KV Seoni-PGCIL-I 10-Dec-19 09:00 10-Dec-19 18:00 Daily work For Bay equipment maintenance and testing 12 220 220KV Seoni-PGCIL-II 12-Dec-19 09:00 12-Dec-19 18:00 Daily work For Bay equipment maintenance and testing 13 220 220KV Seoni-PGCIL-II 08-Jan-20 09:00 08-Jan-20 18:00 Daily work 220KV Bus Tie & Main Bus-I at 400KV S/s For Bay equipment maintenance and testing 14 220 09-Jan-20 09:00 09-Jan-20 17.:00 Daily Badnawar work For Bay equipment maintenance and testing 15 220 Bus Tie & Main Bus-II at 400KV S/s Badnawar 14-Jan-20 09:00 14-Jan-20 17.:00 Daily work For Bay equipment maintenance and testing 16 220 220KV Ujjain-Hatuniya PGCIL -I 16-Dec-19 09:00 16-Dec-19 17.:00 Daily work For Bay equipment maintenance and testing 17 220 220KV Ujjain-Hatuniya PGCIL -II 17-Dec-19 09:00 17-Dec-19 17.:00 Daily work For Bay equipment maintenance and testing 18 220 220KV Ujjain-Hatuniya PGCIL -I 14-Jan-20 09:00 14-Jan-20 17.:00 Daily work For Bay equipment maintenance and testing 19 220 220KV Ujjain-Hatuniya PGCIL -II 15-Jan-20 09:00 15-Jan-20 17.:00 Daily work For Bay equipment maintenance and testing 20 220 220KV Shujalpur-PGCIL CKT-I 03-Dec-19 09:00 03-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 21 220 220KV Shujalpur-PGCIL CKT-I I 04-Dec-19 09:00 04-Dec-19 17:00 Daily work For commissioning of 2nd DPR at 220KV 22 220 220KV -Modak 12-Dec-19 10:00 12-Dec-19 17:00 Daily S/s Bhanpura For commissioning of 2nd DPR at 220KV 23 220 220KV Bhanpura-Ranpur 13-Dec-19 10:00 13-Dec-19 17:00 Daily S/s Bhanpura For Bay equipment maintenance and testing 24 220 220KV Sagar-Damoh(PGCIL)-I 19-Dec-19 09:00 19-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 25 220 220KV Sagar-Damoh(PGCIL)-I 04-Jan-20 09:00 04-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 26 220 220KV Sagar-Damoh(PGCIL)-II 23-Dec-19 09:00 23-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 27 220 220KV Sagar-Damoh(PGCIL)-II 13-Jan-20 09:00 13-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 28 220 220KV Sagar-Damoh(PGCIL)-I 26-Dec-19 09:00 26-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 29 220 220KV Sagar-Damoh(PGCIL)-I 18-Jan-20 09:00 18-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 30 220 220KV Sagar-Damoh(PGCIL)-II 30-Dec-19 09:00 30-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 31 220 220KV Sagar-Damoh(PGCIL)-II 20-Jan-20 09:00 20-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 32 220 220KV Sagar-Damoh(PGCIL)-III 25-Jan-20 09:00 25-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 33 220 220KV Damoh-Katni 09-Dec-19 09:00 09-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 34 220 220KV Damoh-Katni 02-Jan-20 09:00 02-Jan-20 17:00 Daily work 220KV Barwaha-Indore-I (at 220KV S/s For Bay equipment maintenance and testing 35 220 09-Dec-19 10:00 09-Dec-19 17:00 Daily Barwaha) work 220KV Barwaha-Indore-II (at 220KV S/s For Bay equipment maintenance and testing 36 220 10-Dec-19 10:00 10-Dec-19 17:00 Daily Barwaha) work 220KV Nimrani-Maheshwar-I (at 220KV S/s For Bay equipment maintenance and testing 37 220 11-Dec-19 10:00 11-Dec-19 17:00 Daily Nimrani) work 220KV Nimrani-Julwaniya (at 220KV S/s For Bay equipment maintenance and testing 38 220 15-Dec-19 10:00 15-Dec-19 17:00 Daily Nimrani) work 220KV Barwaha-Handiya (at 220KV S/s For Bay equipment maintenance and testing 39 220 06-Jan-20 10:00 06-Jan-20 17:00 Daily Barwaha) work 220KV Nimrani-Maheshwar-II (at 220KV S/s For Bay equipment maintenance and testing 40 220 07-Jan-20 10:00 07-Jan-20 17:00 Daily Nimrani) work For Bay equipment maintenance and testing 41 220 220KV Mahalgaon-PGCIL-I 11-Dec-19 10:00 11-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 42 220 220KV Mahalgaon-PGCIL-II 12-Dec-19 10:00 12-Dec-19 17:00 Daily work

Agenda of 72nd OCCM of MP 40 From To Basis Sr- KV Line / Transformer / Reactor / Bay (Daily/ Reason No Date Time Date Time Continue)

For Bay equipment maintenance and testing 43 220 220KV Mahalgaon-Bina 18-Dec-19 10:00 18-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 44 220 220KV Mahalgaon-Datia 19-Dec-19 10:00 19-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 45 220 220KV Mehgaon-Adani 03-Dec-19 09:00 03-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 46 220 220KV Mehgaon-Auraiya 07-Dec-19 09:00 07-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 47 220 160MVA transformer-I At 220KV s/s Mehgaon 10-Dec-19 09:00 10-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 48 220 160MVA transformer-II At 220KV s/s Mehgaon 16-Dec-19 09:00 16-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 49 220 220KV Datia- Bina 20-Dec-19 09:00 20-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 50 220 220KV Datia- Gwalior 24-Dec-19 10:00 24-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 51 220 160MVA Transformer-I at 220 KV S/S Datia 27-Dec-19 09:00 27-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 52 220 160MVA Transformer-II at 220 KV S/S Datia 30-Dec-19 09:00 30-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 53 220 220KV Bus Tie at 220 KV S/s Shivpuri 16-Dec-19 10:00 16-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 54 220 220KV Mahalgaon-PGCIL-I 08-Jan-20 10:00 08-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 55 220 220KV Mahalgaon-PGCIL-II 13-Jan-20 10:00 13-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 56 220 220KV Mahalgaon-Bina 18-Jan-20 10:00 18-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 57 220 220KV Mahalgaon-Datia 23-Jan-20 10:00 23-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 58 220 220KV Shivpuri-Sabalgarh-I 20-Jan-20 10:00 20-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 59 220 220KV Shivpuri-Sabalgarh-II 23-Jan-20 10:00 23-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 60 220 220KV Mehgaon-Adani 03-Jan-20 09:00 03-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 61 220 220KV Mehgaon-Auraiya 06-Jan-20 09:00 06-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 62 220 160MVA transformer-I At 220KV s/s Mehgaon 11-Jan-20 09:00 11-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 63 220 160MVA transformer-II At 220KV s/s Mehgaon 14-Jan-20 09:00 14-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 64 220 220KV Datia- Bina 21-Jan-20 09:00 21-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 65 220 220KV Datia- Gwalior 25-Jan-20 10:00 25-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 66 220 160MVA Transformer-I at 220 KV S/S Datia 28-Jan-20 09:00 28-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 67 220 160MVA Transformer-II at 220 KV S/S Datia 31-Jan-20 09:00 31-Jan-20 17:00 Daily work For Bay equipment maintenance and testing 68 220 220KV Ashoknagar-Guna bay 02-Dec-19 09:00 02-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 69 220 220KV Guna-Ashoknagar bay 03-Dec-19 09:00 03-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 70 220 220KV Indore-South Zone-I 09-Dec-19 09:00 09-Dec-19 18:00 Daily work For Bay equipment maintenance and testing 71 220 220KV Indore-South Zone-II 10-Dec-19 09:00 10-Dec-19 18:00 Daily work For Bay equipment maintenance and testing 72 220 220KV Indore-Pithampur 11-Dec-19 09:00 11-Dec-19 18:00 Daily work For Bay equipment maintenance and testing 73 220 220KV Indore-Barnagar 12-Dec-19 09:00 12-Dec-19 18:00 Daily work For Bay equipment maintenance and testing 74 220 220KV Indore-Dewas 13-Dec-19 09:00 13-Dec-19 18:00 Daily work For Bay equipment maintenance and testing 75 220 220KV Indore-Jetpura 16-Dec-19 09:00 16-Dec-19 18:00 Daily work For Bay equipment maintenance and testing 76 220 220KV Indore-Mangliya 17-Dec-19 09:00 17-Dec-19 18:00 Daily work For Bay equipment maintenance and testing 77 220 220KV Indore-Barwaha-I 19-Dec-19 09:00 19-Dec-19 18:00 Daily work For Bay equipment maintenance and testing 78 220 220KV Indore-Barwaha-II 20-Dec-19 09:00 20-Dec-19 18:00 Daily work For Bay equipment maintenance and testing 79 220 220KV Indore-Indore-East 21-Dec-19 09:00 21-Dec-19 18:00 Daily work For Bay equipment maintenance and testing 80 220 220KV Rajgarh(Dhar)-PGCIL –I 19-Dec-19 10:00 19-Dec-19 17:00 Daily work For Bay equipment maintenance and testing 81 220 220KV Rajgarh(Dhar)-PGCIL –II 20-Dec-19 10:00 20-Dec-19 17:00 Daily work

Agenda of 72nd OCCM of MP 41 From To Basis Sr- KV Line / Transformer / Reactor / Bay (Daily/ Reason No Date Time Date Time Continue)

For Bay equipment maintenance and testing 82 220 220KV Indore-Pithampur 04-Jan-20 09:00 04-Jan-20 18:00 Daily work For Bay equipment maintenance and testing 83 220 220KV Indore-Barnagar 06-Jan-20 09:00 06-Jan-20 18:00 Daily work For Bay equipment maintenance and testing 84 220 220KV Indore-Dewas 07-Jan-20 09:00 07-Jan-20 18:00 Daily work For Bay equipment maintenance and testing 85 220 220KV Indore-Jetpura 08-Jan-20 09:00 08-Jan-20 18:00 Daily work For replacement of Wave trap, Line will be 86 220 220KV Indore-Mangliya 09-Jan-20 09:00 09-Jan-20 18:00 Daily kept OFF For Bay equipment maintenance and testing 87 220 220KV Indore-Barwaha-I 10-Jan-20 09:00 10-Jan-20 18:00 Daily work For Bay equipment maintenance and testing 88 220 220KV Indore-Barwaha-II 13-Jan-20 09:00 13-Jan-20 18:00 Daily work For Bay equipment maintenance and testing 89 220 220KV Indore-Indore-East 14-Jan-20 09:00 14-Jan-20 18:00 Daily work

Agenda of 72nd OCCM of MP 42 Annexure-4.1

Unitwise / Stationwise Genration in MU A. Thermal Ann 4.1 Capacity Stn. Name UNIT No. MW Aug-19 Sep-19 N 5 210 145.80 140.70 PH III 210 145.80 140.70

AMARKA TOT 210 145.80 140.70 6 200 7.22 0.00 7 210 34.83 0.00 PH II 410 42.05 0.00 8 210 35.03 0.00 9 210 32.75 0.00 PH III 420 67.78 0.00

SATPURA 10 250 87.86 82.88 11 250 128.72 95.26 PH IV 500 216.58 178.14 TOT 1330 326.41 178.14 1 210 66.82 85.86 2 210 68.88 31.63 PH I 420 135.70 117.49 3 210 33.34 25.18 4 210 123.00 67.11 PH II 420 156.34 92.28 5 500 0.00 244.53 SANJAY GANDHI SANJAY PH III 500 0.00 244.53 TOT 1340 292.04 454.31 1 600 311.34 139.02 2 600 0.00 65.07 PH1 1200 311.34 204.09 3 660 140.22 63.54

SSTPS 4 660 88.28 0.00 PH II 1320 228.50 63.54 TOT 1860 539.84 267.63 MPPGCL THERMAL 4740 1304.09 1040.77 Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014. 2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015. B. Hydel Station Name Capacity MW Aug-19 Sep-19 GANDHISAGAR 115.0 9.30 19.21 R.P.SAGAR 172.0 9.28 45.14 J.SAGAR 99.0 33.45 46.21 CHAMBAL 386.0 52.02 110.57 M.P.CHAMBAL 193.0 26.01 55.28 PENCH 160.0 1.68 81.96 M.P.PENCH 107.0 1.12 54.64 BARGI 90.0 55.54 62.58 TONS 315.0 122.75 179.37 BIRSINGHPUR 20.0 12.45 13.67 B.SGR(DEOLONDH) 60.0 20.48 26.85 B.SGR(SILPARA) 30.0 0.15 6.05 RAJGHAT 45.0 10.67 19.35 M.P.RAJGHAT 22.5 6.37 11.55 B.SGR(JINHA) 20.0 0.14 6.85 MADIKHEDA 60.0 22.20 42.88 TOTAL HYDEL 1186.0 298.08 550.14 MPPGCL Hydel 915.0 255.36 458.78 MPSEB HYDEL Share 917.5 267.21 459.73

C. NHDC (Ex-Bus) Station Name Capacity Aug-19 Sep-19 MW Indira Sagar Hydel Project 1000 510.23 702.68 Omkareshwar Hydel Project 520 212.73 216.09

Agenda of 72nd OCCM of MP 43 ENERGY BALANCE SHEET Year : 2019 - 20 All figures in Million Unit S No. Source Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Total 30 31 30 31 31 30 0 0 0 0 0 0 183 A. M.P. Availability 1 Thermal 2278.56 1929.45 1635.59 1915.93 1213.68 963.02 0.00 0.00 0.00 0.00 0.00 0.00 9936.24 2 Hydel 125.69 135.30 79.20 66.15 263.64 455.97 0.00 0.00 0.00 0.00 0.00 0.00 1125.96 3 Total 2404.26 2064.75 1714.78 1982.08 1477.33 1419.00 0.00 0.00 0.00 0.00 0.00 0.00 11062.20 B. Exchange with other States / Systems 1 Indira Sagar 81.66 94.10 42.03 78.42 507.37 699.26 0.00 0.00 0.00 0.00 0.00 0.00 1502.83 2 Omkareshwar 43.59 43.18 17.74 51.33 212.73 216.09 0.00 0.00 0.00 0.00 0.00 0.00 584.66 3 MPPMCL Schedule from Central Sector of WR 1777.61 1845.11 1849.93 1786.51 1529.83 1172.16 0.00 0.00 0.00 0.00 0.00 0.00 9961.16 4 MPPMCL Schedule from Central Sector ER 31.16 30.60 38.99 34.68 32.01 19.40 0.00 0.00 0.00 0.00 0.00 0.00 186.84 5 Total MPPMCL Schedule from Central Sector (WR+ER) 1808.77 1875.71 1888.92 1821.19 1561.84 1191.56 0.00 0.00 0.00 0.00 0.00 0.00 10148.00 6 Deviation Energy of (WR+ER) -23.86 1.07 -25.22 -21.74 -112.89 -108.38 0.00 0.00 0.00 0.00 0.00 0.00 -291.03 7 NET NR ISGS POWER SCH to MP 26.28 60.97 70.71 81.98 41.50 17.28 0.00 0.00 0.00 0.00 0.00 0.00 298.71 8 RUMS SOLAR REWA (Scheduled Energy) 89.06 83.32 82.07 66.59 78.12 72.78 0.00 0.00 0.00 0.00 0.00 0.00 471.94 9 Schedule From Sugen 0.00 0.24 5.07 13.80 2.08 0.47 0.00 0.00 0.00 0.00 0.00 0.00 21.66 10 LANCO Amk 162.90 174.72 166.39 124.22 131.15 68.30 0.00 0.00 0.00 0.00 0.00 0.00 827.68 11 SASAN 962.78 1016.20 944.63 880.82 794.41 932.61 0.00 0.00 0.00 0.00 0.00 0.00 5531.46 12 ESSAR (STOA against LTA) 0.00 6.16 5.47 4.46 3.62 2.92 0.00 0.00 0.00 0.00 0.00 0.00 22.64 13 J P Nigri 315.28 324.01 311.95 162.24 145.83 266.78 0.00 0.00 0.00 0.00 0.00 0.00 1526.09 14 MB Power 215.07 230.68 202.23 179.76 142.30 44.13 0.00 0.00 0.00 0.00 0.00 0.00 1014.18 15 JHABUA Power 70.02 86.00 80.24 77.37 32.78 3.63 0.00 0.00 0.00 0.00 0.00 0.00 350.04 16 Other Open Access Schedule other than MPPMCL Incl. Seci -188.35 -93.64 -71.91 -76.23 -165.01 -178.04 0.00 0.00 0.00 0.00 0.00 0.00 -773.16 17 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18 BARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19 Schedule from Sardar Sarovar 14.26 11.94 13.14 26.13 398.75 555.46 0.00 0.00 0.00 0.00 0.00 0.00 1019.68 20 SCH to Railway from RGPPL_ebid 176.29 183.11 173.39 180.41 168.71 160.33 0.00 0.00 0.00 0.00 0.00 0.00 1042.23 21 Schedule from SEZ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22 Schedule from Rihand+Matatila 3.86 2.81 2.58 6.00 3.25 5.17 0.00 0.00 0.00 0.00 0.00 0.00 23.67 23 MTOA / STOA FROM RAJASTHAN 0.00 41.28 41.54 43.06 44.55 43.08 0.00 0.00 0.00 0.00 0.00 0.00 213.51 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA 24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CSPDCCL dtd. 18.09.2012 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25 18.09.2012 Including Short term purchase against MTOA 26 Additional Power Purchase 0.00 0.00 0.00 32.40 0.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.44 27 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28 Banking of Energy -393.14 -468.76 -393.51 -593.40 -564.04 -584.15 0.00 0.00 0.00 0.00 0.00 0.00 -2997.00 29 Sale of Power -469.81 -61.02 -40.63 -215.50 -239.14 -221.85 0.00 0.00 0.00 0.00 0.00 0.00 -1247.96 30 Total MP Schedule (Including Railway) 2793.28 3473.75 3482.28 2815.30 2580.76 2380.45 0.00 0.00 0.00 0.00 0.00 0.00 17525.82 31 Total MP Drawal (Including Railway) 2769.41 3474.82 3457.06 2793.56 2467.87 2272.07 0.00 0.00 0.00 0.00 0.00 0.00 17234.79 32 Wheeled Energy of Tawa HEG 0.00 0.00 0.00 0.00 6.48 11.87 0.00 0.00 0.00 0.00 0.00 0.00 18.34 33 Wheeled Energy of Wind Farm 10.15 11.63 9.91 13.63 6.94 3.61 0.00 0.00 0.00 0.00 0.00 0.00 55.87 34 Wheeled Energy of Solar Plant 67.16 64.39 55.62 28.72 35.74 31.24 0.00 0.00 0.00 0.00 0.00 0.00 282.87 35 Wheeled Energy of Bio-Mass 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36 Wheeled Energy of Ascent Hydro +SAS Hydel Hatta 1.34 1.27 1.02 2.49 2.49 5.70 0.00 0.00 0.00 0.00 0.00 0.00 14.32 37 Export to MSEB (Nepa-Dharni) Wheeling -7.23 -6.99 -5.77 -4.96 -4.48 -4.70 0.00 0.00 0.00 0.00 0.00 0.00 -34.13 38 Deviation Energy of MPPGCL Thermal + Infirm Energy of Singajil -30.89 -38.40 -35.05 -25.15 -29.92 -29.28 0.00 0.00 0.00 0.00 0.00 0.00 -188.69 39 Energy Purchased by MP from Wind Farm 403.98 579.40 555.30 644.20 490.23 257.89 0.00 0.00 0.00 0.00 0.00 0.00 2931.00 40 Energy Purchased by MP from Solar Plant 163.30 166.07 135.61 109.56 85.64 78.75 0.00 0.00 0.00 0.00 0.00 0.00 738.92 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. 41 187.15 101.90 86.30 87.04 176.83 192.05 0.00 0.00 0.00 0.00 0.00 0.00 831.27 purchase by MP +Wheeled enrgy of CPP / IPP Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green 42 2.66 2.98 3.06 1.59 0.90 1.64 0.00 0.00 0.00 0.00 0.00 0.00 12.83 Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW 43 Deviation Energy of ISP 1.41 1.64 1.70 1.83 2.85 3.41 0.00 0.00 0.00 0.00 0.00 0.00 12.85 44 Schedule Energy of BLA Power against LTOA 0.66 4.45 2.27 4.30 1.14 0.44 0.00 0.00 0.00 0.00 0.00 0.00 13.26 45 Schedule Energy of JP BINA Power against LTOA 34.61 150.56 147.57 54.21 54.84 35.95 0.00 0.00 0.00 0.00 0.00 0.00 477.74 46 Import from bargi Left Bank Canal Power House + ISP NVDA 0.59 -0.01 0.00 0.00 1.36 1.47 0.00 0.00 0.00 0.00 0.00 0.00 3.40 47 Chambal Complex Excess / less Overshare by MP -1.17 -1.09 1.27 -1.96 -16.60 -17.90 0.00 0.00 0.00 0.00 0.00 0.00 -37.44 48 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.03 0.00 -0.02 -0.02 2.14 2.96 0.00 0.00 0.00 0.00 0.00 0.00 5.03 49 State Supply (Ex-Power stn. Bus) 6132.61 6714.64 6190.39 5820.86 5481.89 5181.52 0.00 0.00 0.00 0.00 0.00 0.00 35521.92 50 AVERAGE DAILY (Ex-Bus) 204.42 216.60 206.35 187.77 176.84 172.72 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 194.11 51 MINIMUM DAILY (MP Periphery) 147.90 194.22 166.40 149.59 136.89 150.30 0.00 0.00 0.00 0.00 0.00 0.00 136.89 52 MAXIMUM DAILY (MP Periphery) 214.82 221.89 221.88 223.94 190.98 190.33 0.00 0.00 0.00 0.00 0.00 0.00 223.94 53 State Supply (Ex-Power st. Bus):- YEAR : 2018-19 6180.81 7257.46 5559.67 5521.99 6028.06 6017.96 9509.89 10724.63 10506.69 10038.55 7907.95 7319.25 36565.95 54 Year ((19-20)-(18-19))*100/Year (18-19) -0.78 -7.48 11.34 5.41 -9.06 -13.90 -100.00 -100.00 -100.00 -100.00 -100.00 -100.00 -2.86 55 Unshedule L/S : Year-2019-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56 Frequency Correction 2.76 3.66 3.72 2.48 2.44 1.66 0.00 0.00 0.00 0.00 0.00 0.00 16.72 57 Restricted Requirement : Year-2019-20 6135.38 6718.30 6194.11 5823.34 5484.33 5183.19 0.00 0.00 0.00 0.00 0.00 0.00 35538.64 58 Shedule L/S : Year-2019-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 59 Un-Restricted Requirement : Year-2019-20 6135.38 6718.30 6194.11 5823.34 5484.33 5183.19 0.00 0.00 0.00 0.00 0.00 0.00 35538.64

Agenda of 72nd OCCM of MP 44

29 ENERGY BALANCE SHEET : Demand & Sypply Hours Year : 2019 - 20 S.NO. Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Yr 19-20 C. MORNING PEAK (MAX) 1 DEMAND MET 9738 9880 9955 9845 8606 8545 0 0 0 0 0 0 9955 2 LOAD RELIEF 000000000000 0 3 LOAD SHEDDING 000000000000 0 D. EVENING PEAK (MAX) 1 DEMAND MET 9235 9475 9480 9746 8526 8685 0 0 0 0 0 0 9746 2 LOAD RELIEF 000000000000 0 3 LOAD SHEDDING 000000000000 0 F. REGISTERED MAXIMUM 9738 9880 9955 9845 8606 8685 0 0 0 0 0 0 9955 G. COMPUTED MAXIMUM DEMAND 9738 9891 9961 9845 8606 8887 0 0 0 0 0 0 9961 H. UNRESTRICTED MAXIMUM DEMAND 9738 9891 9955 9845 8606 8887 0 0 0 0 0 0 9955 I. Average Power Supply per day to 1. Div. Head Quarters 23:52 23:54 23:48 23:48 23:51 23:47 0:00 0:00 0:00 0:00 0:00 0:00 23:50 2. District Head Quarters 23:54 23:55 23:48 23:48 23:47 23:44 0:00 0:00 0:00 0:00 0:00 0:00 23:49 3. Tahsil Head Quarters 23:50 23:53 23:43 23:44 23:48 23:42 0:00 0:00 0:00 0:00 0:00 0:00 23:47 4. Rural -Mixed 23:36 23:46 23:34 23:29 23:40 23:35 0:00 0:00 0:00 0:00 0:00 0:00 23:37 5. Rural -DLF 23:40 23:48 23:35 23:34 23:40 23:34 0:00 0:00 0:00 0:00 0:00 0:00 23:38 6. Rural -Irrigation 9:54 9:57 9:53 9:53 9:53 9:51 0:00 0:00 0:00 0:00 0:00 0:00 9:54 J LOAD FACTOR % 100.29 111.80 107.44 92.07 100.54 65.85 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 96.33 FREQUENCY ANALYSIS YEAR 2019-20 S.N PARTICULARS Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Yr 19-20 A. INTGRATED FREQUENCY 1MAXIMUM 50.21 50.16 50.23 50.16 50.26 50.14 0.00 0.00 0.00 0.00 0.00 0.00 50.26 2 MINIMUM 49.81 49.81 49.80 49.83 49.81 49.80 0.00 0.00 0.00 0.00 0.00 0.00 49.80 B. INSTANTANEOUS FREQUENCY 1MAXIMUM 50.29 50.33 50.31 50.32 50.32 50.27 0.00 0.00 0.00 0.00 0.00 0.00 50.33 2 MINIMUM 49.65 49.65 49.63 49.64 49.55 49.62 0.00 0.00 0.00 0.00 0.00 0.00 49.55 C. AVG FREQUENCY 50.00 50.00 50.00 50.01 50.00 50.01 0.00 0.00 0.00 0.00 0.00 0.00 50.00 D. % TIME WHEN FREQUENCY WAS 1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 50.05 TO 51.5 Hz 20.14 19.14 19.79 24.64 20.03 20.18 0.00 0.00 0.00 0.00 0.00 0.00 20.66 3 49.9 TO 50.05 Hz 72.76 72.60 70.34 68.27 72.69 75.25 0.00 0.00 0.00 0.00 0.00 0.00 71.97 4 49.7 TO 49.9 Hz 7.10 8.26 9.87 7.09 7.28 4.57 0.00 0.00 0.00 0.00 0.00 0.00 7.36 5 49.5 TO 49.7 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Agenda of 72nd OCCM of MP 45

29 Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- August 2019 FIGURES IN MW

Own Generation Schedule from Load Shedding

RUMS Expor REST. (SOLA Rihan MTOA / Tot DEMAND Total Total SCH Act. Devia - UNREST. Hrs. FREQ. THER. THER. Net R) Jhabu d+Ma STOA t to DEMAN IPPs CPPs Suge Essa JP MB to Avl. Drl tion MET UN DEMAND DEMAND Incl Excl HYD. ISP OSP Total CSS NR to Lanco Sasan REWA a SSP SEZ Banking Sale Pur STOA tatila- FROM Total MS SCH TOTAL D Injectio Injectio n r Nigri Power Railw SCH Check Aux Aux MP TO Power Rajgh RAJAST MET n n ay MPPM at HAN CL

1:00 50.02 1749 1593 328 671 281 307 755 3934 2231 54 5 178 1075 6 182 0 216 57 521 229 0 -1089 -188 1 -194 1 58 3344 7278 3291 -53 -6 7218 0 0 0 7219 7219 7218 0

2:00 50.02 1747 1591 323 661 275 309 770 3930 2213 66 2 180 1070 6 178 0 195 54 519 220 0 -1089 -159 0 -198 1 58 3316 7246 3228 -88 -6 7151 0 0 0 7153 7153 7151 0

3:00 50.02 1742 1586 311 649 275 308 767 3895 2143 48 0 161 1062 5 185 0 152 47 516 212 0 -1089 -73 0 -213 1 58 3215 7110 3223 8 -6 7112 0 0 0 7114 7114 7112 0

4:00 50.02 1748 1592 312 657 276 305 760 3901 2131 55 0 161 1052 5 188 0 142 47 514 217 0 -1032 -60 0 -213 1 58 3268 7169 3161 -107 -6 7057 0 0 0 7058 7058 7057 0

5:00 50.00 1760 1603 322 653 277 304 755 3913 2006 45 0 154 1030 5 189 0 168 35 515 218 0 -842 -77 0 -214 1 58 3291 7203 3163 -128 -6 7069 0 0 0 7072 7072 7069 0

6:00 50.00 1766 1609 323 652 283 306 720 3892 2030 43 0 165 1042 4 185 8 173 35 515 229 0 -547 -217 0 -204 1 58 3521 7413 3482 -39 -6 7369 0 0 0 7372 7372 7369 0

7:00 49.98 1799 1639 353 680 287 311 738 4008 2239 59 0 187 1077 5 184 24 222 58 515 221 0 -547 -278 0 -209 1 58 3817 7825 3709 -107 -6 7711 0 0 0 7719 7719 7711 0

8:00 50.05 1769 1611 357 667 292 306 811 4045 2113 86 0 169 1069 3 183 101 194 47 516 213 0 -547 -208 0 -240 1 58 3759 7804 3538 -220 -6 7577 0 0 0 7578 7578 7577 0

9:00 50.03 1716 1563 335 653 291 302 920 4064 1930 79 0 157 1055 1 183 202 141 38 519 220 0 -532 -155 0 -271 1 58 3628 7692 3505 -123 -6 7563 0 0 0 7564 7564 7563 0

10:00 50.04 1671 1522 343 652 293 304 1005 4118 1931 75 0 160 1000 0 183 278 132 18 519 220 0 -531 -374 0 -302 1 58 3368 7486 3229 -139 -5 7342 0 0 0 7343 7343 7341 0

11:00 50.04 1657 1509 326 660 291 305 1037 4128 1819 69 0 152 953 0 183 340 137 11 520 226 0 -531 -425 0 -312 1 58 3200 7328 2965 -235 -5 7089 0 0 0 7089 7089 7089 0

12:00 50.01 1614 1469 315 658 288 302 1071 4102 1715 49 0 150 920 0 183 384 101 11 516 218 0 -530 -512 0 -318 1 58 2946 7049 2765 -181 -5 6863 0 0 0 6866 6866 6863 0

13:00 50.03 1589 1447 323 652 287 297 1059 4066 1605 25 0 143 924 0 184 376 99 8 517 213 0 -592 -431 0 -322 1 58 2809 6874 2715 -93 -5 6777 0 0 0 6778 6778 6777 0

14:00 50.01 1603 1459 317 661 286 300 1039 4062 1620 25 0 151 940 0 184 321 93 12 517 218 0 -593 -377 0 -321 1 58 2850 6912 2602 -248 -4 6660 0 0 0 6663 6663 6660 0

15:00 50.01 1644 1497 305 663 287 301 972 4026 1735 22 0 158 947 1 185 258 126 13 518 219 0 -595 -654 0 -306 1 58 2685 6711 2662 -22 -5 6684 0 0 0 6686 6686 6684 0

16:00 50.00 1685 1535 291 667 286 300 864 3942 1817 21 0 167 977 1 185 161 134 21 521 229 0 -595 -549 0 -285 1 58 2862 6805 2766 -96 -5 6703 0 0 0 6707 6707 6703 0

17:00 49.98 1696 1544 299 667 288 300 726 3825 1912 21 0 157 1005 0 185 63 157 30 523 219 0 -611 -386 0 -280 1 58 3054 6879 3034 -20 -5 6855 0 0 0 6861 6861 6855 0

18:00 49.99 1729 1575 324 678 287 304 605 3773 2010 23 0 162 1025 0 191 15 162 32 521 213 0 -538 -239 0 -266 1 58 3369 7142 3257 -112 -6 7024 0 0 0 7031 7031 7024 0

19:00 49.97 1891 1724 365 707 287 347 544 3974 2222 96 5 199 1067 12 201 0 270 62 518 220 0 -550 -490 0 -160 1 58 3731 7704 3566 -165 -7 7533 0 0 0 7543 7543 7533 0

20:00 50.00 1942 1771 461 762 302 372 549 4218 2341 53 24 204 1091 15 207 0 319 85 528 221 0 -1027 -373 0 -114 1 58 3631 7849 3587 -44 -7 7798 0 0 0 7804 7804 7798 0

21:00 49.98 1944 1773 410 738 299 359 569 4148 2285 57 12 202 1096 15 209 0 304 82 536 230 0 -1011 -406 0 -114 1 58 3555 7703 3419 -136 -7 7560 0 0 0 7568 7568 7560 0

22:00 50.04 1909 1740 384 724 297 346 594 4085 2275 59 7 200 1110 15 209 0 278 75 542 219 0 -1064 -440 0 -118 1 58 3428 7513 3328 -99 -7 7406 0 0 0 7408 7408 7406 0

23:00 50.02 1893 1726 377 723 300 330 639 4096 2265 85 7 197 1113 14 208 0 283 78 546 212 0 -1059 -378 0 -100 1 58 3532 7628 3391 -142 -7 7479 0 0 0 7481 7481 7479 0

24:00 50.03 1794 1635 354 717 295 317 683 4000 2215 78 5 188 1098 8 196 0 262 74 551 221 0 -869 -307 0 -193 1 58 3586 7586 3323 -263 -7 7316 0 0 0 7318 7318 7316 0

Avg. 50.01 1752 1596 340 678 288 314 790 4006 2033 54 3 171 1033 5 190 105 186 43 523 220 0 -750 -323 0 -228 1 58 3324 7330 3205 -119 -6 7205 0 0 0 7208 7208 a a

00 TO 06 50.01 1752 1596 320 657 278 306 754 3911 2126 52 1 167 1055 5 184 1 174 46 517 221 0 -948 -129 0 -206 1 58 3326 7237 3258 -68 -6 7163 0 0 0 7165 7165 HRS.

06 TO 12 50.02 1704 1552 338 662 290 305 930 4078 1958 69 0 163 1012 2 183 222 154 30 518 220 0 -537 -325 0 -275 1 58 3453 7531 3285 -168 -5 7357 0 0 0 7360 7360 HRS.

12 TO 18 50.00 1658 1510 310 665 287 300 878 3949 1783 23 0 156 970 0 186 199 129 19 520 218 0 -587 -439 0 -297 1 58 2938 6887 2840 -99 -5 6784 0 0 0 6788 6788 HRS.

06TO 18 50.01 1681 1531 324 663 289 303 904 4013 1870 46 0 159 991 1 185 210 141 25 519 219 0 -562 -382 0 -286 1 58 3196 7209 3062 -133 -5 7071 0 0 0 7074 7074 HRS.

18 TO 24 50.01 1896 1728 392 729 297 345 597 4087 2267 71 10 198 1096 13 205 0 286 76 537 221 0 -930 -399 0 -133 1 58 3577 7664 3436 -141 -7 7515 0 0 0 7520 7520 HRS.

Agenda of 72nd OCCM of MP 46 Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- September 2019 FIGURES IN MW

Own Generation Schedule from Load Shedding

RUMS Expor REST. (SOLA Rihan MTOA / Tot DEMAN Total Total SCH Act. Devia - UNREST. Hrs. FREQ. THER. THER. Net R) Jhabu d+Ma STOA t to DEMAN IPPs CPPs Suge Essa JP MB to Avl. Drl tion D MET UN DEMAND Incl Excl HYD. ISP OSP Total CSS NR to Lanco Sasan REWA a SSP SEZ Banking Sale Pur STOA tatila- FROM Total MS SCH TOTAL D Injectio Injectio n r Nigri Power Railw SCH Aux Aux MP TO Power Rajgh RAJAS n n ay MPPM at THAN CL

1:00 50.01 1546 1418 592 967 301 320 452 4049 1863 20 0 93 1308 4 358 0 102 0 786 216 0 -1336 -106 0 -240 0 58 3126 7175 3002 -124 -7 7044 0 0 0 7045 7045

2:00 50.02 1526 1399 588 964 296 317 466 4029 1805 19 0 79 1307 4 358 0 55 0 786 217 0 -1345 -68 0 -240 0 58 3037 7067 2944 -93 -7 6967 0 0 0 6968 6968

3:00 50.03 1479 1355 586 957 296 317 456 3968 1751 19 0 75 1306 3 358 0 49 0 804 216 0 -1345 -55 0 -254 0 58 2987 6955 2953 -34 -7 6914 0 0 0 6915 6915

4:00 50.04 1473 1349 588 965 296 317 447 3962 1719 19 0 75 1310 2 358 0 52 0 811 216 0 -1316 -44 0 -259 0 58 3001 6964 2934 -67 -7 6890 0 0 0 6890 6890

5:00 50.00 1476 1352 589 964 298 316 419 3939 1539 20 0 75 1283 2 359 0 43 0 794 215 0 -1000 -37 0 -264 0 58 3087 7026 2989 -98 -6 6922 0 0 0 6926 6926

6:00 50.01 1459 1337 590 965 298 318 389 3896 1497 22 0 80 1311 1 354 4 33 0 764 216 0 -547 -101 0 -264 0 58 3429 7325 3323 -106 -7 7212 0 0 0 7216 7216

7:00 50.02 1498 1373 624 959 298 318 383 3954 1821 24 0 83 1323 1 354 16 60 0 763 215 0 -547 -130 0 -268 0 58 3773 7727 3680 -93 -7 7626 0 0 0 7628 7628

8:00 50.05 1447 1326 620 953 298 313 478 3988 1688 18 0 83 1311 1 353 100 36 0 784 214 0 -547 -120 0 -289 0 58 3691 7679 3459 -233 -7 7439 0 0 0 7439 7439

9:00 50.02 1387 1271 611 965 295 312 570 4026 1425 21 0 80 1296 1 353 207 3 0 778 215 0 -544 -147 0 -308 0 58 3438 7464 3348 -90 -6 7368 0 0 0 7369 7369

10:00 50.04 1362 1248 608 959 297 312 680 4103 1388 19 0 80 1279 0 354 297 0 0 718 215 0 -544 -323 0 -332 0 58 3211 7315 3036 -176 -6 7133 0 0 0 7134 7134

11:00 50.03 1324 1214 595 965 297 312 732 4114 1235 18 0 80 1222 0 354 363 0 0 721 217 0 -543 -463 0 -343 0 58 2921 7036 2727 -195 -5 6836 0 0 0 6836 6836

12:00 50.03 1302 1193 590 965 297 312 776 4133 1120 18 0 80 1120 0 354 378 0 0 723 218 0 -543 -556 0 -348 0 58 2624 6757 2517 -107 -5 6645 0 0 0 6645 6645

13:00 50.02 1267 1161 582 966 292 312 793 4106 1021 18 0 80 1066 0 354 357 0 0 740 217 0 -604 -445 0 -348 0 58 2515 6621 2427 -88 -5 6528 0 0 0 6530 6530

14:00 50.02 1246 1142 566 968 302 312 746 4036 1041 18 0 80 1066 0 354 311 0 0 730 217 0 -603 -406 0 -345 0 58 2522 6558 2400 -122 -5 6431 0 0 0 6433 6433

15:00 50.00 1264 1158 565 961 308 313 688 3992 1202 19 0 80 1094 0 354 218 0 0 720 217 0 -602 -524 0 -335 0 58 2502 6494 2442 -60 -5 6429 0 0 0 6432 6432

16:00 50.02 1306 1197 565 964 317 313 569 3925 1377 19 0 83 1195 0 354 128 5 0 721 217 0 -602 -583 0 -320 0 58 2653 6578 2542 -111 -5 6462 0 0 0 6464 6464

17:00 49.99 1363 1249 585 967 316 313 438 3869 1476 19 0 92 1244 0 355 35 14 0 721 216 0 -613 -436 0 -308 0 58 2874 6743 2802 -72 -6 6665 0 0 0 6669 6669

18:00 49.98 1453 1332 593 972 310 314 351 3871 1744 20 0 102 1279 1 360 3 28 12 722 216 0 -547 -454 0 -284 0 58 3260 7131 3187 -73 -7 7051 0 0 0 7058 7058

19:00 49.94 1607 1473 614 969 313 342 342 4053 2072 46 0 132 1305 22 371 0 182 34 721 215 0 -547 -619 0 -89 0 58 3903 7956 3798 -104 -8 7844 0 0 0 7859 7859

20:00 50.05 1615 1481 626 961 306 337 385 4096 2077 36 5 136 1306 23 375 0 241 26 753 214 0 -1008 -412 0 -37 0 58 3793 7888 3557 -236 -8 7644 0 0 0 7644 7644

21:00 50.01 1588 1456 615 972 306 328 388 4065 1963 25 0 127 1311 21 376 0 177 17 762 214 0 -992 -417 0 -86 0 58 3556 7621 3374 -182 -8 7431 0 0 0 7434 7434

22:00 50.05 1576 1445 609 954 306 318 396 4027 1970 25 0 126 1316 9 375 0 127 12 719 214 0 -1037 -405 0 -182 0 58 3328 7356 3270 -59 -8 7289 0 0 0 7289 7289

23:00 50.04 1564 1434 602 967 303 319 431 4056 1949 34 2 122 1327 8 373 0 129 12 720 215 0 -1039 -310 0 -203 0 58 3399 7456 3249 -151 -7 7298 0 0 0 7298 7298

24:00 50.04 1510 1385 595 966 301 317 435 3999 1889 29 0 89 1323 4 370 0 72 3 739 214 0 -907 -281 0 -258 0 58 3345 7344 3132 -213 -7 7124 0 0 0 7124 7124

Avg. 50.02 1443 1323 596 964 302 318 509 4011 1610 23 0 92 1259 4 360 101 59 5 750 216 0 -802 -310 0 -258 0 58 3166 7176 3046 -120 -7 7050 0 0 0 7052 7052

00 TO 06 50.02 1493 1368 589 964 297 318 438 3974 1696 20 0 80 1304 3 357 1 56 0 791 216 0 -1148 -69 0 -253 0 58 3111 7085 3024 -87 -7 6992 0 0 0 6993 6993 HRS.

06 TO 12 50.03 1387 1271 608 961 297 313 603 4053 1446 20 0 81 1259 1 354 227 16 0 748 216 0 -545 -290 0 -315 0 58 3276 7330 3128 -149 -6 7174 0 0 0 7175 7175 HRS.

12 TO 18 50.01 1316 1206 576 966 307 313 597 3966 1310 19 0 86 1157 0 355 175 8 2 726 217 0 -595 -475 0 -323 0 58 2721 6687 2634 -88 -5 6594 0 0 0 6598 6598 HRS.

06TO 18 50.02 1352 1239 592 964 302 313 600 4010 1378 19 0 84 1208 0 355 201 12 1 737 216 0 -570 -382 0 -319 0 58 2999 7008 2881 -118 -6 6884 0 0 0 6886 6886 HRS.

18 TO 24 50.02 1577 1446 610 965 306 327 396 4049 1987 33 1 122 1315 14 373 0 155 18 736 214 0 -922 -407 0 -142 0 58 3554 7603 3397 -157 -8 7438 0 0 0 7442 7442 HRS.

Agenda of 72nd OCCM of MP 47 Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) Drawal Month :- August 2019 FIGURES IN MW EZONE CZONE WZONE Railway

Hrs. FREQ. Restricte Unrestrict Restricte Unrestrict Restricte Unrestrict Demand O/U SCH Unsch Demand O/U SCH Unsch Demand O/U SCH Unsch Total SCH d ed SCH d ed SCH d ed Total Sch Met DRL LS LS Met DRL LS LS Met DRL LS LS Drawal Demand Demand Demand Demand Demand Demand

1:00 50.02 2551 2474 -77 0 0 2475 2475 2715 2637 -78 0 0 2637 2637 1842 1870 29 0 0 1871 1871 229 237

2:00 50.02 2514 2440 -74 0 0 2440 2440 2672 2607 -64 0 0 2608 2608 1831 1864 33 0 0 1865 1865 220 240

3:00 50.02 2494 2439 -55 0 0 2440 2440 2610 2568 -42 0 0 2568 2568 1822 1874 52 0 0 1875 1875 212 231

4:00 50.02 2470 2427 -43 0 0 2428 2428 2576 2533 -43 0 0 2533 2533 1855 1870 15 0 0 1870 1870 217 227

5:00 50.00 2507 2414 -93 0 0 2415 2415 2597 2520 -77 0 0 2521 2521 1897 1910 14 0 0 1911 1911 218 225

6:00 50.00 2459 2360 -98 0 0 2361 2361 2657 2642 -16 0 0 2643 2643 2086 2129 43 0 0 2130 2130 229 238

7:00 49.98 2443 2365 -78 0 0 2367 2367 2841 2773 -68 0 0 2776 2776 2328 2328 0 0 0 2330 2330 221 246

8:00 50.05 2434 2273 -161 0 0 2273 2273 2858 2699 -159 0 0 2699 2699 2322 2361 39 0 0 2361 2361 213 244

9:00 50.03 2396 2310 -86 0 0 2310 2310 2813 2714 -99 0 0 2714 2714 2319 2302 -16 0 0 2303 2303 220 237

10:00 50.04 2345 2254 -92 0 0 2254 2254 2753 2662 -91 0 0 2663 2663 2187 2190 3 0 0 2190 2190 220 236

11:00 50.04 2307 2207 -100 0 0 2207 2207 2692 2570 -122 0 0 2570 2570 2140 2081 -59 0 0 2081 2081 226 231

12:00 50.01 2303 2154 -149 0 0 2155 2155 2600 2489 -111 0 0 2490 2490 2010 1989 -21 0 0 1990 1990 218 230

13:00 50.03 2231 2149 -82 0 0 2150 2150 2512 2445 -66 0 0 2446 2446 1948 1967 19 0 0 1967 1967 213 215

14:00 50.01 2181 2072 -109 0 0 2073 2073 2505 2411 -94 0 0 2412 2412 1967 1952 -15 0 0 1953 1953 218 226

15:00 50.01 2121 2077 -44 0 0 2078 2078 2445 2398 -47 0 0 2399 2399 1957 1979 22 0 0 1980 1980 219 230

16:00 50.00 2156 2085 -71 0 0 2087 2087 2472 2404 -69 0 0 2405 2405 1973 1986 12 0 0 1987 1987 229 229

17:00 49.98 2131 2098 -33 0 0 2100 2100 2485 2468 -17 0 0 2470 2470 2025 2054 30 0 0 2056 2056 219 234

18:00 49.99 2191 2119 -72 0 0 2121 2121 2595 2505 -90 0 0 2508 2508 2153 2160 8 0 0 2162 2162 213 240

19:00 49.97 2537 2471 -65 0 0 2475 2475 2619 2558 -61 0 0 2561 2561 2326 2269 -57 0 0 2272 2272 220 235

20:00 50.00 2732 2627 -104 0 0 2629 2629 2737 2702 -35 0 0 2704 2704 2211 2214 4 0 0 2216 2216 221 254

21:00 49.98 2727 2605 -122 0 0 2608 2608 2705 2626 -79 0 0 2629 2629 2084 2096 12 0 0 2098 2098 230 233

22:00 50.04 2680 2536 -145 0 0 2536 2536 2677 2618 -59 0 0 2618 2618 1972 2022 50 0 0 2022 2022 219 231

23:00 50.02 2662 2537 -125 0 0 2538 2538 2817 2747 -70 0 0 2748 2748 1957 1971 14 0 0 1972 1972 212 224

24:00 50.03 2648 2500 -149 0 0 2500 2500 2799 2665 -134 0 0 2665 2665 1914 1891 -23 0 0 1891 1891 221 261

Avg. 50.01 2426 2333 -93 0 0 2334 2334 2656 2582 -75 0 0 2583 2583 2047 2055 9 0 0 2056 2056 220 235

00 TO 06 HRS. 50.01 2499 2426 -73 0 0 2426 2426 2638 2584 -53 0 0 2585 2585 1889 1920 31 0 0 1920 1920 221 233 06 TO 12 HRS. 50.02 2371 2260 -111 0 0 2261 2261 2759 2651 -108 0 0 2652 2652 2218 2209 -9 0 0 2209 2209 220 237 12 TO 18 HRS. 50.00 2168 2100 -68 0 0 2101 2101 2502 2438 -64 0 0 2440 2440 2004 2016 13 0 0 2018 2018 218 229 06TO 18 HRS. 50.01 2270 2180 -90 0 0 2181 2181 2631 2545 -86 0 0 2546 2546 2111 2112 2 0 0 2113 2113 219 233 18 TO 24 HRS. 50.01 2664 2546 -118 0 0 2548 2548 2726 2652 -73 0 0 2654 2654 2077 2077 0 0 0 2079 2079 221 240

Agenda of 72nd OCCM of MP 48 Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) Drawal Month :- September 2019 FIGURES IN MW EZONE CZONE WZONE Railway

Hrs. FREQ. Restricte Unrestrict Restricte Unrestrict Restricte Unrestrict Demand O/U SCH Unsch Demand O/U SCH Unsch Demand O/U SCH Unsch Total SCH d ed SCH d ed SCH d ed Total Sch Met DRL LS LS Met DRL LS LS Met DRL LS LS Drawal Demand Demand Demand Demand Demand Demand

1:00 50.01 2405 2337 -69 0 0 2337 2337 2658 2534 -125 0 0 2534 2534 1941 1947 6 0 0 1947 1947 216 227

2:00 50.02 2356 2306 -51 0 0 2306 2306 2586 2499 -86 0 0 2500 2500 1933 1942 8 0 0 1942 1942 217 220

3:00 50.03 2330 2289 -41 0 0 2290 2290 2554 2465 -89 0 0 2465 2465 1916 1942 27 0 0 1943 1943 216 218

4:00 50.04 2319 2282 -37 0 0 2282 2282 2532 2439 -92 0 0 2439 2439 1933 1956 23 0 0 1956 1956 216 212

5:00 50.00 2296 2263 -33 0 0 2264 2264 2525 2440 -85 0 0 2442 2442 1948 2001 52 0 0 2002 2002 215 218

6:00 50.01 2292 2220 -72 0 0 2221 2221 2573 2562 -11 0 0 2563 2563 2170 2216 45 0 0 2217 2217 216 214

7:00 50.02 2285 2237 -47 0 0 2238 2238 2766 2713 -53 0 0 2714 2714 2423 2447 24 0 0 2447 2447 215 229

8:00 50.05 2225 2127 -97 0 0 2127 2127 2754 2635 -119 0 0 2635 2635 2433 2451 18 0 0 2451 2451 214 226

9:00 50.02 2182 2130 -51 0 0 2131 2131 2678 2615 -63 0 0 2615 2615 2353 2389 36 0 0 2390 2390 215 233

10:00 50.04 2165 2069 -96 0 0 2070 2070 2654 2562 -93 0 0 2562 2562 2257 2282 25 0 0 2282 2282 215 220

11:00 50.03 2104 2009 -94 0 0 2010 2010 2560 2447 -114 0 0 2447 2447 2108 2161 53 0 0 2161 2161 217 218

12:00 50.03 2046 1979 -68 0 0 1979 1979 2450 2363 -87 0 0 2363 2363 1994 2089 95 0 0 2089 2089 218 215

13:00 50.02 2020 1960 -60 0 0 1960 1960 2377 2319 -58 0 0 2320 2320 1935 2042 108 0 0 2043 2043 217 207

14:00 50.02 1988 1893 -95 0 0 1894 1894 2388 2288 -100 0 0 2289 2289 1983 2037 53 0 0 2037 2037 217 213

15:00 50.00 1923 1881 -42 0 0 1882 1882 2314 2270 -44 0 0 2271 2271 2001 2049 48 0 0 2050 2050 217 229

16:00 50.02 1945 1891 -55 0 0 1891 1891 2321 2280 -41 0 0 2281 2281 2025 2077 52 0 0 2077 2077 217 214

17:00 49.99 1966 1917 -50 0 0 1918 1918 2385 2356 -29 0 0 2357 2357 2125 2165 41 0 0 2167 2167 216 227

18:00 49.98 2046 2046 0 0 0 2048 2048 2506 2476 -31 0 0 2478 2478 2270 2303 33 0 0 2306 2306 216 226

19:00 49.94 2436 2466 30 0 0 2471 2471 2759 2694 -65 0 0 2699 2699 2527 2470 -57 0 0 2474 2474 215 214

20:00 50.05 2571 2457 -113 0 0 2457 2457 2847 2666 -181 0 0 2666 2666 2279 2295 16 0 0 2295 2295 214 226

21:00 50.01 2569 2459 -110 0 0 2460 2460 2719 2584 -135 0 0 2585 2585 2126 2184 58 0 0 2184 2184 214 204

22:00 50.05 2511 2403 -107 0 0 2403 2403 2611 2560 -51 0 0 2560 2560 2022 2116 94 0 0 2116 2116 214 211

23:00 50.04 2489 2404 -84 0 0 2405 2405 2768 2631 -138 0 0 2631 2631 2023 2059 36 0 0 2059 2059 215 203

24:00 50.04 2454 2362 -92 0 0 2362 2362 2712 2527 -184 0 0 2528 2528 1951 1981 30 0 0 1981 1981 214 253

Avg. 50.02 2247 2183 -64 0 0 2184 2184 2583 2497 -86 0 0 2498 2498 2111 2150 39 0 0 2151 2151 216 220

00 TO 06 HRS. 50.02 2333 2283 -50 0 0 2283 2283 2571 2490 -82 0 0 2491 2491 1974 2001 27 0 0 2001 2001 216 218 06 TO 12 HRS. 50.03 2168 2092 -76 0 0 2092 2092 2644 2556 -88 0 0 2556 2556 2261 2303 42 0 0 2303 2303 216 224 12 TO 18 HRS. 50.01 1981 1931 -50 0 0 1932 1932 2382 2332 -50 0 0 2333 2333 2056 2112 56 0 0 2113 2113 217 219 06TO 18 HRS. 50.02 2075 2012 -63 0 0 2012 2012 2513 2444 -69 0 0 2444 2444 2159 2208 49 0 0 2208 2208 216 221 18 TO 24 HRS. 50.02 2505 2425 -80 0 0 2426 2426 2736 2610 -126 0 0 2612 2612 2154 2184 30 0 0 2185 2185 214 219

Agenda of 72nd OCCM of MP 49 ANNEXURE-5 System Disturbance / System Incidence

1. System Disturbance on 04.09.2019 at 400kv s/s Bhopal: On dated 04.09.19 at 16.00 hrs. there was heavy rains and lightening in central MP and frequency of National Grid was 50.08 Hz, at 16.06 hrs, 220 Kv Bhopal-Bairagarh 1 tripped and auto reclosed but did not trip from Bhopal end causing LBB protection to operate which tripped following feeders and X-mers of 220kv Main Bus-1:-

220kv Bhopal-Bhopal-I 220kv Bhopal-Shujalpur-I 220kv Bhopal-Mungalia Chhap ckt 220kv Bhopal-Ganj Basoda ckt 220kv Bhopal-Bairagarh 1 220kv Bus-tie 400/220kv 315 MVA Xmer 1 and 3

There was very heavy rains and lightening at the time of tripping. R Phase string at location No. 8 and R phase wavetrap at 400 Kv s/s for 220 Kv Bairagarh 1 found failed.The tripped elements has been normalized in due course of time.

No any system and areas affected as load managed by elements on 220kv Main Bus-2 and nearby network. There was no load loss and no generation loss.

2. System Disturbance on 07.09.2019 at 220kv s/s Sukha, Jabalpur: On dated 07.09.19 at 16.00 hrs. weather in East MP was normal and frequency of National Grid was 50.08 Hz, at 16.15 hrs, LBB protection of 220 Main bus 2 operated which was initiated from ICT-2 ,which tripped following feeders and X-mers of 220kv Main Bus-2:-

220kv Sukha-Jabalpur-2 220kv Sukha -Narsinghpur-2 220kv Sukha -Panagar-2 220kv Bus-tie 400/220kv 315 MVA Xmer 2

It was reported that LBB protection of 220 Main bus 2 operated due to false signal from ICT 2 cable fault. Bus 2 Successfully separated The tripped elements has been normalized in due course of time.

No any system and areas affected as load managed by elements on 220kv Main Bus-1 and nearby network. There was no load loss and no generation loss.

Agenda of 72nd OCCM of MP 50 3. System Disturbance on 21.09.2019 at 400kv s/s Ashta: On dated 21.09.19 at 14.50 hrs. weather in MP was normal and frequency of National Grid was 49.96 Hz, at 14.58 hrs 220 KV Main Bus 1 R Phase PT failed with operation of 220 KV Bus Bar Protection . This caused both 220 KV Bus dead ,which tripped following feeders and X-mers of 220kv Main Bus-2:-

220 KV Ashta-Bhopal, 220 KV Ashta-Mughaliyachhap 220 KV Ashta-Jetpura Ckt No.1 & 2 220 KV Ashta- Ckt No. 1 & 2 220 KV Ashta-Dewas Ckt No. 1 & 2 160 MVA Xmer No. 1 & 2 100 MVA 220/33 KV Xmer 220KV BUS Tie 220 KV Incoming of 315 MVA Xmer 1 & 2

It was reported that R Phase pole of 220 KV Incoming of 315 MVA Xmer 2 was found stuck and it’s both tripping coils were found burnt. Then 315MVA Xmer 2 (CGL) H/T at 15:22Hrs. After isolating defective PT, Restoration of supply was done. After replacement of both trip coils 315 MVA Xmer 2 Charged at 17:05hrs

There was a load loss of 13 MW and no generation loss.

*********

Agenda of 72nd OCCM of MP 51 Annexure-6.2

EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

NAME OF TOTAL FAULT TRIPPINGS TOTAL SL.N TESTING NAME OF SUB SATAION NAME OF FEEDER O/C+E/F TRIPPI O O/C trip E/F trip DIVISION trip NGS 12 3 4 5 JABALPUR REGION SE(T&C) JABALPUR 33KV JABALPUR NO 4 3 0 20 23 33KV JABALPUR NO 5 5 0 11 16 33KV JABALPUR NO 6 1 1 10 12 1 JABALPUR 220 33KV JABALPUR NO 7 0 1 11 12 33KV NTPC NO.1. 1 0 15 16 33KV NTPC NO.2 3 0 23 26 33KV RAMNAGARA NO 2 0 0 25 25 2 PANAGAR 220 33KV INDUSTRIAL SIHORA 8 0 23 31 3 PATAN 132 33KV KATRA-BELK 06915 33KV RICHHAI 2 5 6 13 33KV ADHARTAL 62210 4 VFJ 132 33KV SAE 1 7 2 10 33KV GOKALPUR 27211 JABALPUR-I 33KV BELK-1 3 0 17 20 5 SHAHPURA 132 33KV BELK-NO.2 0 2 15 17 33KV SHAHPURA 6 0 13 19 33KV MARHOTAL 1 0 18 19 6 MARHOTAL 132 33KV J P NAGAR 1 0 21 22 33KV SEVER PLANT 5 0 21 26 33KV GUNDRAI 0 1 15 16 33KV PARAMHANSI 812828 7 SHRINAGAR 132 33KV GOTEGAON NO.II NEW 1 16 1 18 33KV BAGASPUR 1 6 18 25 33KV KYMORI 0 7 3 10 8 KATANGI 132 33KV BORIYA 07512 33KV POLA 03811 33KV KATNI -2 3 1 6 10 9 KATNI 400 33KV PURENA 0 0 16 16 33KV DEVGAON 1 2 23 26 10 KYMORE 132 33KV BAMANGAON 1 1 17 19 33KV KATNI IC 3 2 16 21 33KV PAHARAUA 5 5 0 10 33KV BILHARI 0 0 15 15 11 KATNI 132 33KV BADWARA 0 0 28 28 33KV SLEEMNABAD 8 0 19 27 33KV KATAIGHAT 9 0 1 10 33KV NKJ 5 0 16 21 KATNI 33KV DABAR 1 0 19 20 33KV BAHORIBAND I 3 7 14 24 33KV BAHORIBAND II 1 1 17 19 12 SLEEMNABAD 132 33KV PANUMARIA-1 2 6 21 29 33KV PANUMARIA-2 3 0 23 26 33KV SLEEMNABAD 55717 33KV INDUSTRIAL 4 2 35 41 33KV SLEEMNABAD 0 0 45 45 33KV SIHORA-1 0 0 18 18 13 MANSAKRA 132 33KV MAJHOLI-2 0 0 23 23 33KV INDUSTRIAL(UROBOND) 0 0 17 17 33KV FANWAANI 0 0 31 31 33KV DEONAGAR. 5 5 0 10 33KV GOTEGAON 4 6 4 14 14 NARSINGPUR 220 33KV BACHAI 0 13 0 13 33KV JOBA 013720 33KV BASANPANI 016016 33KV CHHICHLI 0 0 14 14 33KV RUCHI SOYA (TENDUKHEDA) 0 7 6 13 15 CHHICHLI 220 33KV NTPC I (RAIPUR) 78015 33KV IMALIYA 010010 33KV UMARIYA 94922 33KV GOTEGAON 1 3 29 33 33KV THEMI 4 0 6 10 16 NARSINGPUR 132 11KV 5MVA TRANSFORMER NO.I 0 15 0 15 JABALPUR-II 11KV TOWN-I 0 10 0 10 11KV TOWN-II 0 11 0 11 33KV SALICHOUKA 10 5 2 17 33KV GADERWARA 025025 33KV SAIKHEDA 12 8 0 20 33KV ATTHAISA 011011 17 GADARWARA 132 33KV RUCHY SOYA 0 7 14 21 33KV BANSKHEDA 0151934 33KV BLA 0 21 20 41 33KV SIHORA 011011 33KV DOBHI NO.-I 0 11 6 17 33KV DOBHI NO.-II 0 19 0 19 18 BARMAN 132 33KV BEETALI-I 0 10 8 18 33KV BEETALI-II 0 7 8 15

Agenda of 72nd OCCM of MP 52 EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

NAME OF TOTAL FAULT TRIPPINGS TOTAL SL.N TESTING NAME OF SUB SATAION NAME OF FEEDER O/C+E/F TRIPPI O O/C trip E/F trip DIVISION trip NGS 12 3 4 5 33KV BARELA-I 0 39 19 58 33KV BARELA(2) 010616 19 MANERI 132 11KV INDUSTRIAL 023124 11KV MANERI GRAMIN 0 10 0 10 JABALPUR-II 33KV BICHHIYA 017017 20 MANDLA 132 33KV POUNDI 1 24 0 25 33KV PHOOLSAGER 025025 33KV KARELI 0 10 4 14 21 KARAPGAON 132 33KV KARAPGAON 0 11 0 11 Abstract of Trippings 85 1651 JABALPUR REGION SE(T&C) SEONI 33KV CHHAPARA 3 0 22 25 33KV GOPALGANJ 5 5 10 20 1 SEONI 220 33KV AKVN 01910 33KV KARIRAT 0 1 23 24 33KV KALARBAKI 51410 33KV BARGHAT 2 1 14 17 33KV KEOLARI 4 0 21 25 33KV P.H.E. 2 0 13 15 2 SEONI 132 33KV KURAI 8 4 11 23 11KV TOWN - I 1 1 15 17 11KV TOWN - II 012618 11KV MUNGWANI 1 4 44 49 33KV LALBRRA 011011 33KV KHAIRLANGI 010717 3 BALAGHAT 132 11KV BHARVELLY 0111324 11KV LINGA 019524 33KV TIRODI 0 0 20 20 4 SEONI KATANGI 132 33KV MOIL 1 0 10 11 33KV WARASEONI 3 0 13 16 5 BHANEGAON 132 33KV KARANJA 011011 33KV PARASWADA 2 1 19 22 6 BAIHER 132 33KV MOHAGAON 0 0 19 19 33KV UKWA 1 0 13 14 33KV KEOLARI 2 4 14 20 7 NAINPUR 132 33KV KEOLARI-II 6101935 33KV BHEEMGARH 20 22 4 46 33KV GHANSOUR-I 28818 8 LAKHNADON 132 33KV GHANSOUR-II 015015 33KV JHABUA 033033 33KV DHANORA 110516 9 LALBRRA 132 33KV LAMTA 4 0 13 17 33KV KHAIRLANGI 0 1 11 12 10 WARASEONI 132 33KV KOCHEWAHI 0 0 10 10 33KV DONGARMALI 2 0 10 12 11 KIRNAPUR 400 33KV KIRNAPUR 1 0 13 14 33KV ROHNA KALA 54211 33KV CHAND-I 0 0 12 12 12 CHHINDWARA 220 33KV CHAND-II 3 3 10 16 33KV BANGAON 0 0 11 11 33KV LINGA 0 0 10 10 13 PANDHURNA 220 33KV JUNEWANI 0 0 10 10 33KV NANDANWADI 02810 33KV SAORI-I 0 0 12 12 33KV SAUSAR 1 2 22 25 14 CHHINDWARA 132 33KV THISGORA 0 0 23 23 CHHINDWARA 33KV UMRANALA-II 0 2 26 28 33KV CHANDAMETA 0 2 32 34 15 KHAPASWAMI 132 33KV NAVEGAON 50611 33KV RAMAKONA 013114 16 BORGAON 132 33KV BORGAON 0 0 10 10 33KV PIPLA 22913 33KV SINGODI 0 0 13 13 17 AMARWARA 132 33KV CHHUEE 0 0 11 11 18 BICHHUA 132 33KV KHAMARPANI 0 0 13 13 19 SAORI 132 33KV LAWAGHOGRI 011718 Abstract of Trippings 55 995 Abstract of Trippings (Jabalpur Region) 140 2646

Agenda of 72nd OCCM of MP 53 EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

NAME OF TOTAL FAULT TRIPPINGS TOTAL SL.N TESTING NAME OF SUB SATAION NAME OF FEEDER O/C+E/F TRIPPI O O/C trip E/F trip DIVISION trip NGS 12 3 4 5 SAGAR REGION SE(T&C) SAGAR 33KV MEDICAL COLLAGE 28010 1 SAGAR 220 33KV MAINPANI 1 9 0 10 33KV JAISINAGAR 132033 33KV NARIOLI 0 1 14 15 33KV MOTHI 2 3 21 26 33KV SEHORA 10910 33KV DHARAMSHREE 01910 2 SAGAR 132 33KV KAREELA 30912 33KV 0 1 13 14 33KV HOUSHING BOARD ( DD 50510 NAGAR ) 33KV CIVIL LINE 0 3 7 10 33KV CHANAUWA 0161228 3 132 33KV KEOLARI 0 15 13 28 33KV BARKOTI 7 17 4 28 33KV DEORI 6 28 10 44 4 GOURJHAMER 132 33KV MAHARAJPUR 219324 33KV KESLI -I 0 18 0 18 33KV KESLI-II 1 19 2 22 33KV BANDA 5 1 12 18 5 BANDA 132 33KV BHADRANA 80210 SAGAR 33KV DALPATPUR 3 5 10 18 33KV JABERA - I 6 0 4 10 33KV BANSA 3 4 7 14 6 DAMOH 220 33KV PATERA 25714 33KV PGCIL 56415 33KV NARSINGARH 4 4 15 23 33KV PHUTERA 4 0 14 18 7 DAMOH 132 33KV IMLAI 7 0 8 15 33KV HINOTA 19 0 43 62 33KV MARIYADEO 3 0 83 86 8 HATTA 132 33KV PHATEPUR 3 0 38 41 33KV BANGAON 41 0 9 50 33KV BAXWAHA 6 7 47 60 9 BATIYAGARH 132 33KV MAGRON 5 0 8 13 33KV TEJGARH/ HARRAI 1 0 9 10 10 TEJGARH 132 33KV TENDUKHEDA 3 7 12 22 33KV JABERA 13 3 7 23 11 132 33KV SEHORA 75012 33KV PATERA 11 0 24 35 12 PATERA 132 33KV KUNDALPUR 213520 33KV CHHIRARI 5 0 6 11 13 RAHLI 132 33KV PATNA BUJURG 13 8 9 30 33KV MOHANGARH 6 2 17 25 14 TIKAMGARH 220 33KV DIGODA - I 0 2 11 13 33KV AHAR 19 0 25 44 33KV 26 0 23 49 15 TIKAMGARH 132 33KV MAWAI 10 3 11 24 33KV DHONGA 7 2 11 20 33KV NIWARI -2 7 4 15 26 33KV NIWARI -1 14 11 16 41 33KV MADIYA 5 7 40 52 16 PRITHIVIPUR 132 33KV PRATAPPURA 3 1 27 31 33KV ZERON 1 5 31 37 33KV ORCHHA 9 3 18 30 33KV TEHARKA 18 3 4 25 33KV HRIDAY NAGAR 39214 33KV BAMORI 221427 17 132 33KV VEERPURA 11 8 322 TIKAMGARH 33KV 16 36 153 33KV DIGODA 0 12 1 13 18 DIGODA 132 33KV MOHANGARH 4 8 8 20 33KV LIDHORA 32510 33KV BALDEVGARH 3 8 53 64 33KV 20911 19 BUDERA 132 33KV 1113850 33KV BUDHERA 11 1 11 23 33KV DHARARI 9 2 9 20 20 CHHATARPUR 220 33KV GARHI MALEHARA 482436 33KV 2 8111 33KV CHHATARPUR 21 14 2 37 33KV BHAGWA 411823 21 132 33KV MATGAWAN 14 8 3 25 33KV KISHANGARH 39214 33KV GULGANJ 3 8 3 14 33KV BADAMALAHARA 318829 33KV BASARI 1 19 22 42 33KV PANNA/ 0 4 11 15 22 KHAJURAHO 132 33KV BAMITHA 0 2 911 33KV RAJNAGAR + BASARI 2414 20 33KV MES 72211 23 TIKAMGARH NOWGAON 132 33KV HARPALPUR 6 5 11 22 33KV LUGASI 6 3 20 29 33KV LAUNDI 3 0 41 44 33KV DUMRA 9182148 24 LAVKUSH NAGAR 132 33KV BASANTPURA 5 0 49 54 33KV 1 2 33 36 Abstract of Trippings 86 2247 SAGAR REGION SE(T&C) 400KV BINA 33KV KOHA (KHURAI II) 11 0 16 27 33KV MANDIBAMORA 36615 1 BINA 220 33KV KHIMLASA 9 0 12 21 33KV BORL 1 0 16 17 33KV KOHA 1 0 12 13 2 BINA 400 KHURAI 132 33KV BERI DHANORA 1 0 22 23 33KV BAHADURPUR 53917 33KV PIPRAI 28313 3 MUNGAWALI 132 33KV MUNGAOLI 2010 12 33KV SEHRAI 02012 32 Abstract of Trippings 10 190 Abstract of Trippings (Sagar Region) 96 2437

Agenda of 72nd OCCM of MP 54 EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

NAME OF TOTAL FAULT TRIPPINGS TOTAL SL.N TESTING NAME OF SUB SATAION NAME OF FEEDER O/C+E/F TRIPPI O O/C trip E/F trip DIVISION trip NGS 12 3 4 5 REWA REGION SE(T&C) SATNA 33KV 2 15 0 17 33KV MOHANDRA 127331 1 PAWAI 132 33KV 4 31 0 35 33KV GUNOR 235037 33KV RAMNAGAR 31 28 0 59 33KV TALA 2 16 0 18 33KV SATNA 215017 2 AMARPATAN 132 33KV NADAN 22 11 0 33 33KV KATHAHA 713020 33KV MUKUNDPUR 14 25 0 39 33KV AMARPATAN 8 40 0 48 33KV AMDARA 026026 3 MAIHAR 220 33KV BADERA 11 27 0 38 33KV UNCHEHRA 836044 33KV JASO 0 11 4 15 33KV SINGHPUR 011415 4 NAGOD 132 33KV NAGOD 5 10 0 15 33KV RAHIKWARA 64111 33KV BASUDHA 20 9 4 33 33KV TIKURI 3 8 5 16 33KV KOTAR 10 18 12 40 5 KOTAR 220 33KV DAGDIHA LI 7 9 10 26 SATNA 33KV BIRSINGHPUR 6 8 10 24 33KV SUKWAH 9 10 16 35 33KV BELA 1 2 12 15 33KV MADAHWGARH 2 0 24 26 33KV GORAIYA 47920 6 RAMPUR BAGHELAN 132 33KV KRISHNAGARH 0 4 58 62 33KV CHIBOURA 5131230 33KV SILPARI 9 1 10 20 33KV PAWAI 5 36 0 41 33KV AJAYGARH 32 17 0 49 7 PANNA 132 33KV DEVENDRA NAGER 222024 33KV BRIJPUR 719026 33KV 0 2 11 13 33KV CHITRAKOOT 3 3 23 29 8 MAJHGAWAN 132 33KV MAJHGAWAN 3 2 10 15 33KV KOTHI 0 6 8 14 33KV JAITWARA 2 0 32 34 9 SATNA 220 33KV UNCHEHARA 18 8 4 30 33KV KOLGAWAN 8 5 0 13 10 SATNA 132 33KV KS-1 2 14 0 16 33KV TIKURIYA TOLA 11 0 10 21 11 SATNA-II 132 33KV ANIKET MATEHNA 10910 33KV RATAHRA 1 2 10 13 33KV SGMH 1 1 23 25 12 REWA 220 33KV TEEKAR 14 0 11 25 33KV MANIKWAR 1 1 11 13 33KV GURH 1 0 18 19 33KV MADWAS 1 55 2 58 33KV SEMARIYA 6 7 14 27 13 SIDHI 220 33KV SIHAWAL( SIDHI) 10 14 2 26 33KV JP-I 5 9 8 22 33KV JP-II 5 4 4 13 33KV SIRMOUR 11 10 0 21 14 SIRMOUR 220 33KV PATEHRA 115016 33KV BANKUIYA ( AKVN) 023023 33KV SEMARIYA 031031 33KV MARTAND SCHOOL 011011 15 REWA 132 33KV MOHRA 0 20 0 20 REWA 33KV SIRMOUR 010010 33KV AIR 0 18 0 18 33KV AMIRTI 0 11 0 11 33KV CITY II 10 1 0 11 16 SIDHI 132 33KV REWA 119020 33KV PATPARA 547052 33KV SIDHI 0 2 14 16 17 MORWA 132 33KV BHIKHAJHIRIA 0 6 54 60 33KV NIGAHI 7 0 6 13 33KV WAIDHAN 3 0 30 33 33KV SASAN POWER 4204872 18 WAIDHAN 132 33KV NAVJEEVAN VIHAR 9 0 28 37 33KV NTPC 0 0 11 11 33KV JAYANT 2 0 9 11 33KV GANGEO 4 18 4 26 19 MANGAWAN 132 33KV MAUGANJ 2 11 1 14

Agenda of 72nd OCCM of MP 55 EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

NAME OF TOTAL FAULT TRIPPINGS TOTAL SL.N TESTING NAME OF SUB SATAION NAME OF FEEDER O/C+E/F TRIPPI O O/C trip E/F trip DIVISION trip NGS 12 3 4 5 33KV KATRA 1 4 11 16 33KV CHAKGHAT 1101526 33KV NAIGARHI 4 5 3 12 20 KATRA 132 33KV TEOTHAR 2 9 11 22 33KV JAWA 12 2 4 18 33KV BANSAGAR 98219 33KV HANUMANA 0 21 0 21 21 MAUGANJ 132 33KV MAUGANJ 0 14 0 14 33KV KHATKHARI 0 16 0 16 33KV KHUTAR 14 8 19 41 REWA 22 RAJMILAN 132 33KV RAJMILAN 3 4 13 20 33KV PGCIL 6 1 18 25 33KV RAIPURE 3 18 0 21 23 REWA-II 132 33KV SIRMOUR 311014 33KV MOHRA 414018 33KV DEOSAR 210012 24 DEOSAR 132 33KV BEHRI 7 47 0 54 33KV CHITRANGI 8 47 0 55 25 RAMPUR NAIKEN 132 33KV KOTHIYA 017017 26 DONGRITAL 132 33KV KHANUA KHAS 8 8 8 24 Abstract of Trippings (Rewa Region) 96 2443 SHAHDOL REGION SE(T&C) SATNA 33KV MANPUR-I 0 19 0 19 33KV CHANDIYA-I 4 17 0 21 1 UMARIYA 132 33KV CHANDIYA-II 2 31 0 33 33KV UMARIYA 10 2 0 12 33KV BANSAGAR 13 14 0 27 33KV JAISINGHNAGAR 125026 2 BEOHARI 132 33KV PAPOUNDH 7 13 0 20 33KV MADVAS 010010 33KV SHAHPURA 712019 33KV GADASARAI 49013 3 DINDORI 132 33KV SAMNAPUR 523028 33KV DINDORI 8 24 0 32 SHAHDOL 33KV SECL-I 5 29 0 34 4 BIRSINGHPUR 220 33KV SECL-II 1 11 0 12 33KV ASCENT HYDRO 118019 33KV JAITHARI 6 33 0 39 33KV D-OCM 0 25 0 25 5 ANOOPPUR 220 33KV KESHWAHI 3 41 0 44 33KV NEW DOCM 4 17 0 21 33KV JAISINGHNAGAR 12 7 0 19 33KV UMARIYA-I 8 10 0 18 6 SHAHDOL 220 33KV DCL 024024 33KVPANDAV NAGAR (SINGHPUR) 524029 33KV RAJNAGAR 15 0 0 15 7 KOTMA 132 33KV KOTMA OLD 16 0 0 16 Abstract of Trippings (Shahdol Region) 25 575

Agenda of 72nd OCCM of MP 56 EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

NAME OF TOTAL FAULT TRIPPINGS TOTAL SL.N TESTING NAME OF SUB SATAION NAME OF FEEDER O/C+E/F TRIPPI O O/C trip E/F trip DIVISION trip NGS 12 3 4 5 BHOPAL REGION SE(T&C) BHOPAL 33KV SHIVPUR 0 0 30 30 33KV DHARAM KUNDI 6 2 14 22 1 SEONI 132 33KV SURAJPUR 015116 33KV BABRI 7 1 2 10 33KV HANDIYA 4 8 25 37 33KV KANKARIYA 0 2 14 16 33KV RAHAT GAON 7 4 15 26 2 HARDA 132 33KV TIMARNI 0 8 10 18 33KV SONTALAI 4 0 37 41 33KV KARTANA 23813 33KV GWAL NAGAR 53311 33KV SOHAGPUR 64717 33KV SANDIYA 026026 3 PIPARIYA 132 33KV KANWAR 72312 33KV SHOBHAPUR 116320 33KV SHANKHANI 010010 33KV HOSHANGABAD 61310 33KV DOLARIYA 62210 HOSHANGABAD 33KV SANGAKHEDA 4 1 11 16 4 HOSHANGABAD 220 33KV MILK DAIRY 15 0 3 18 33KV TUGARIY 8 0 15 23 33KV BUDHNI 11 0 10 21 33KV PIPARIYA SOUTH 3 4 7 14 5 PIPARIYA 220 33KV PIPARPANI 0 1 13 14 33KV AKVN 4 1 20 25 33KV CHANDON 5 1 7 13 6 BANKHEDI 132 33KV MACHHIRA 43714 33KV UMARDHA 7 5 13 25 33KV MAGARDAH 2 9 19 30 7 SULTANPUR 132 33KV REHTA KALA 10 0 3 13 33KV MOHAL KALA 1 0 21 22 33KV BABAI 7 0 10 17 33KV SEMRI HARCHAND 7 2 20 29 8 SEMRI HARCHAND 132 33KV KAMTHI 5 18 13 36 33KV MOHASA 1 5 4 18 27 33KV BHATWARI 5 2 32 39 9 KHIRKIYA 132 33KV KILLOD 1 4 9 14 33KV BIAORA 0 2 10 12 33KV SUTHALIYA 0 7 11 18 33KV KACHRI 0 13 24 37 10 BIAORA 132 33KV DHOODI 0 9 10 19 33KV SILAPTI 0 6 8 14 33KV BHOORA 0311243 33KV PAGARI BANGLA 010717 33KV BODA 09110 11 PACHORE 132 33KV KARANWAS 0 10 1 11 33KV MANGLAJ 0 8 5 13 12 SARANGPUR 132 BIAORA 33KV P.MATA-II 0 9 4 13 33KV JETPURA 014317 13 ZEERAPUR 132 33KV CHHAPIHEDA 014317 33KV MACHALPUR 0 6 19 25 33KV LAKHONI 0 11 12 23 14 KHILCHIPUR 132 33KV BHOJPUR 0111021 33KV KHAJLA 0151126 33KV KALYAKHEDI 0 17 4 21 15 KHUJNER 132 33KV PALYAKHEDI 0 11 1 12 33KV PIPLODI 0 4 27 31 16 RAJGARH 220 33KV WATER WORKS 0 20 4 24 33KV ITARSI -2 0 0 11 11 33KV SPM 0 0 17 17 17 ITARSI 220 33KV JAMANI 0 0 13 13 33KV PROPLENT - 1 0 0 10 10 33KV NCDC 0 10 0 10 18 SARNI 220 33KV GHORADONGRI 1 13 0 14 33KV AMLA TOWN 0 2 12 14 19 AMLA 132 33KV PARSODI 0 5 5 10 ITARSI 33KV PADHAR 27110 20 BETUL 132 33KV HIWARKHEDI 0 1 9 10 33KV HAMLAPUR 04610 21 CHICHOLI 132 33KV SHAHPUR 2 0 15 17 33KV PRABHAT PATTAN 0 8 3 11 22 MULTAI 132 33KV INDUSTRIAL 017017 33KV DUNAWA 110011 23 GUDGAON 132 33KV GUDGAON 1 0 14 15 33KV 3 EME 0 0 13 13 24 BAIRAGARH 220 33KV NTRO 1 0 36 37 33KV ITKHEDI 0 0 11 11 33KV BHAUKHEDI 25310 25 SEHORE 132 33KV THUNA 42410 33KV DODI 0 0 13 13 26 ASHTA 132 33KV KHACHROD 3 0 15 18 33KV LASUDIA VIJAY SINGH 08513 33KV JHADLA 33410 33KV ACHHAROHI 2 3 6 11 27 KURAWAR 132 33KV JAMUNIYA GOP CHOUHAN 2 1 10 13 BHOPAL-I 33KV LASUDIYA BHAMA 0 0 11 11 33KV KOTARA 0 0 18 18 33KV KHAIKHEDA 11911 33KV AHMADPUR 2 2 10 14 28 SHYAMPUR 132 33KV KHAJURI KALA 1 0 11 12 33KV MUGAWALI 0 0 12 12 33KV SEWDA 010010 33KV JAWAR 012012 29 ASHTA 400 33KV AMLA MAJJU 0 10 0 10 33KV AMLAHA 0 18 0 18 33KV 0 18 0 18 30 BILKISHGANJ 132 33KV NIBUKHEDA 1 2 9 12 Abstract of Trippings 97 1696

Agenda of 72nd OCCM of MP 57 EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

NAME OF TOTAL FAULT TRIPPINGS TOTAL SL.N TESTING NAME OF SUB SATAION NAME OF FEEDER O/C+E/F TRIPPI O O/C trip E/F trip DIVISION trip NGS 12 3 4 5 BHOPAL REGION SE(T&C) 400KV BHOPAL 33KV ANAND NAGAR 0 0 15 15 1 CHAMBAL BHOPAL 132 33KV KILANDEV 0 0 16 16 33KV DAMKHEDA-II 2 1 14 17 2 AYODHYA NAGAR 132 33KV NARMADA 04812 33KV TIRUPATI ABHINAV 0 0 10 10 33KV VALLABHNAGAR 1 1 3 10 14 BHOPAL 400 33KV VALLABHNAGAR 2 0 3 10 13 3 AMRAWADKHURD 132 33KV AMRAWAD NO 1 0 3 12 15 33KV KATARA II 0 1 11 12 4 BHOPAL 220 33KV BHOPAL-III 8 0 4 12 33KV ENTKHEDI NO. 2 0 1 29 30 5 ENTKHEDI 132 33KV SUKHI SEWANIA 60814 33KV RATUA 4 2 17 23 33KV GAIRATGANJ 1 11 0 12 33KV BARLA 38011 6 RAISEN 132 33KV NAKTARA 214016 33KV NEEMKHEDA 015015 33KV SULTANPUR 012012 33KV BHOPAL-I 0 1 18 19 33KV BHOPAL-II 1 0 10 11 7 MANDIDEEP 132 33KV KOLAR 4 1 17 22 33KV RAMAKHEDI 0 0 11 11 33KV NJA 111315 8 MACT BHOPAL 132 33KV KOLAR 012012 33KV 0 14 3 17 33KV KUNDALI 1 9 5 15 33KV HARSLI 6 19 0 25 33KV KHARGONE 3 30 0 33 9 BARELI 132 33KV 417021 33KV BAGPIPARIYA 525030 33KV BARNA 325028 33KV CHAKALDI 3 41 4 48 BHOPAL-II 33KV REHTI 2 16 2 20 33KV LADUKI 0 9 3 12 10 NASRULLAGANJ 132 33KV NEELKANTH 2 14 2 18 33KV SEMALPANI 0 11 1 12 33KV KANKARIYA 016622 33KV BEGUMGANJ 5 50 8 63 33KV SILWANI 2 7 5 14 11 GAIRATGANJ 132 33KV DEHGAON 1 4 5 10 33KV DHANDIYA 4 9 11 24 12 MANDIDEEP 220 33KV RELIANCE 0 7 4 11 33KV NANDER 2 1 14 17 13 SHAHGANJ 132 33KV DIGWAD 3 0 20 23 14 TAMOT 132 33KV GOHAR GANJ 0 1 13 14 33KV AKVN - I 2 6 4 12 15 BAGRODA 132 33KV DURGA STEEL 1 2 12 15 33KV BORAS 2 44 0 46 16 UDAIPURA 132 33KV THALADIGWAN 5 45 0 50 33KV VIKALPUR 14 61 0 75 33KV SAI KHEDA 2 0 10 12 17 SILWANI 132 33KV BAKSHI 0 0 13 13 33KV LASHKARPUR 0 0 57 57 33KV HANSUA 06511 18 VIDISHA 220 33KV BAN 3 1 43 47 33KV KARARIA 1 0 25 26 19 BERASIA 132 33KV SAPAUA 2 0 22 24 33KV MURWAS 0 1 13 14 33KV SHAHPUR 1 0 18 19 20 SIRONJ 132 33KV CHHAPU 1 13 0 14 33KV UHAR 01910 33KV SOMWARA 0 8 21 29 21 GANJBASODA 220 33KV MASOODPUR 024832 VIDISHA 33KV UDAIPUR 09211 33KV TINSHIYAI 1 8 16 25 22 SHAMSABAD 132 33KV GHOLANA 013215 33KV RUNAHA 0 0 12 12 33KV NAZIRABAD 0 0 29 29 23 RUNAHA 132 33KV RAMGARHA 20911 33KV NAYASAMAND 0 0 16 16 33KV SAHARWASA 82212 33KV KURWAI 1 3 14 18 24 SAHARWASA 132 33KV PATHARI 0 3 12 15 33KV UDAIPUR 1 5 15 21 33KV ANNATPUR 1 0 10 11 25 LATERI 132 33KV MADAN KHEDI 3 0 16 19 VIDISHA 33KV DEWANGANJ 0 0 10 10 26 SALAMATPUR 132 33KV INDUSTRIAL 0 1 17 18 33KV BARKHEDI 0 4 32 36 Abstract of Trippings 79 1621 Abstract of Trippings (Bhopal Region) 176 3317

Agenda of 72nd OCCM of MP 58 EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

NAME OF TOTAL FAULT TRIPPINGS TOTAL SL.N TESTING NAME OF SUB SATAION NAME OF FEEDER O/C+E/F TRIPPI O O/C trip E/F trip DIVISION trip NGS 12 3 4 5 GWALIOR REGION SE(T&C) GWALIOR 33KV SAF (POLYTECNIC) 10910 33KV DABKA 1 0 14 15 33KV MELA 0 1 13 14 1 MAHALGAON 220 33KV AIR FORCE 6 0 38 44 33KV M.E.S. 0 0 20 20 33KV BANDHOLI 0 2 23 25 33KV FEEDER NO. 2 0 0 12 12 2 MALANPUR 220 33KV FEEDER NO. 4 9 0 16 25 33KV FEEDER NO.8 0 0 10 10 33KV BILAUA 11 23 9 43 33KV INDUSTRIAL CRUSHER 19 72 6 97 3 GWALIOR-II 220 MARKET 33KV CITY-I 4 5 10 19 33KV DIG NAYAGOAN 0 6 6 12 GWALIOR-I 33KV CARMEL CONVENT 0 0 15 15 4 MOTIJHEEL 132 33KV STONE PARK 0 0 14 14 33KV BARAI 8 0 53 61 33KV GOL PAHIDIYA 2 0 9 11 5 TIGHRA 132 33KV DWARIKAPURI 4 0 13 17 33KV P.T.S. TIGHRA 1 0 15 16 33KV D.D. NAGAR 3 0 10 13 33KV KALPI BRIDGE 3 0 7 10 6 MORAR 132 33KV MAHARAJPURA 3 0 21 24 33KV BHADROLI 0 0 28 28 33KV GHATIGAON 1 14 1 16 7 MOHNA 132 33KV SEHASRAM 2 14 5 21 33KV SHUBHASPURA 219021 33KV SUKHLIHARI 20 7 8 35 8 HASTINAPUR 132 33KV HASTINAPUR 40610 33KV GORMI 1 0 32 33 33KV GATA 1 0 47 48 9 MEHGAON 220 33KV PIDORA 0 0 12 12 33KV MOW 3 0 27 30 33KV MEHGAON 8 10 0 18 33KV SITAPUR 9 8 10 27 10 DATIA 220 33KV DABRA 8171742 33KV BADONI 27 17 7 51 33KV UMARI (LAHAR) 8 0 12 20 33KV PHOOP 4 1 32 37 11 BHIND 132 33KV ROOR 8 1 34 43 33KV MASOORI 1 0 9 10 33KV ITI RURAL 016016 33KV SEONDHA 82010 33KV INDERGARH MAGROL 29011 12 SEONDHA 132 33KV ALAMPUR 16 14 0 30 33KV THARET(LANCH) 54 17 0 71 33KV BHAGUAPURA (NEW BAY) 27 24 0 51 33KV DAGRAI 0 8 4 12 13 DATIA 132 33KV RAJGHAT 0 0 10 10 GWALIOR-II 33KV CHHEMAK 19 0 18 37 33KV BHITARWAR(KARAYAWATI) 10 0 33 43 33KV LOHGARH 1 0 14 15 33KV TEKANPUR 7 0 13 20 14 DABRA 132 33KV CHINORE 0 0 17 17 33KV NEW PICHHORE 0 0 19 19 33KV MASHUDPUR 0 0 15 15 33KV MAGRORA 10910 33KV MADORI 1 7 3 11 15 LAHAR 132 33KV DABOH 3 7 4 14 33KV SHYAMPURA 1 7 10 18 33KV RON 10 0 2 12 33KV MACHHAND 5 0 10 15 16 RON 132 33KV NAYAGAON 7 0 21 28 33KV GORAE 1 0 12 13 33KV GOHAD FEEDER 115319 17 GOHAD 132 33KV ANDORI 4 25 27 56 33KV CHITORA 119828 33KV PRTAPPURA 10910 18 PRATAPPURA 132 33KV CHOAMO 5 0 22 27 33KV SURPURA 21 0 7 28

Agenda of 72nd OCCM of MP 59 EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

NAME OF TOTAL FAULT TRIPPINGS TOTAL SL.N TESTING NAME OF SUB SATAION NAME OF FEEDER O/C+E/F TRIPPI O O/C trip E/F trip DIVISION trip NGS 12 3 4 5 33KV MELA GROUND 80412 33KV T.V TOWER 6 0 26 32 19 BHANDER 132 33KV SARSAI 1 0 27 28 GWALIOR-II 33KV PANDOKHAR 0 0 34 34 20 CHINNOR 132 33KV GHARSONDI 0 10 1 11 33KV LANCH 9 0 28 37 21 INDERGARH 132 33KV RARUA RAI 19 0 69 88 33KV RAMPUR 30811 22 SABALGARH 220 33KV JHUNDPURA 4 0 26 30 33KV BADDHPURA 3 0 11 14 33KV VIJAYPUR 23712 23 VIJAYPUR 132 33KV AGARA 235542 33KV BEERPUR 6671790 33KV GOTH 0 0 16 16 33KV ESHAH 1 0 29 30 24 AMBAH 132 33KV GUNJBADA 11 0 14 25 33KV THARA 2 23 0 25 33KV RACHHED 10 7 3 20 33KV KHERLY 2 0 9 11 25 MORENA PORSA 132 33KV MANPUR 0 0 26 26 26 MORENA 220 33KV BICHOULA 10 0 9 19 33KV INDUSTRIAL 0 0 14 14 33KV DEORI 6 1 21 28 27 MORENA 132 33KV MANDI 2 0 8 10 33KV BEERAMPUR ( BAGHCHINI) 0 0 18 18 33KV BADAGAON 14 0 15 29 28 BADAGAON 132 33KV KHADIYAHAR 13 0 4 17 33KV SUMAWALI 6 1 10 17 33KV CHINNONI 3 0 14 17 29 JOURA 132 33KV NAVODAY 1 0 12 13 33KV BAGCHINI 0 0 31 31 33KV SATANWARA 0 1 23 24 30 SHIVPURI 220 33KV BHESANA 02911 33KV BANGANGA 0 2 16 18 33KV GURUNAVADA 14 18 10 42 33KV TILLIPUR 54211 31 SHEOPURKALAN 220 33KV SOTHWA 85518 33KV DHIROLI 4 6 2 12 33KV AASHIDA 0101424 33KV BHATNAWAR 14 0 8 22 32 SHIVPURI 132 33KV PADORA 63817 33KV SHARDA SOLVENT 20810 33KV NAYA CHAURAHA 3 1 35 39 33KV MAYAPUR 13 9 2 24 33 PICHHORE 132 33KV KHOD 10 8 12 30 33KV KARARKHEDA 55212 33KV PADRA 219324 33KV BARODA 18110 33KV GORUS 12 8 15 35 33KV BAGDUA 2 6 3 11 33KV DHONTI 3 16 3 22 34 SHIVPURI SHEOPUR 132 33KV PANDOLA 23510 33KV KALARNA 62210 33KV BHOGIKA (MAYAPUR) 28010 33KV RAMBADE 520328 33KV KARERA 27918 33KV BHAGEMA 1 2 16 19 35 KARERA 132 33KV DINARA 6 2 48 56 33KV NARAUA 24 12 3 39 33KV SIRSAUD 2 0 12 14 33KV MADIKHEDA 10 10 5 25 36 KOLARAS 132 33KV BADARWAS 3131228 33KV RAI 10 5 3 18 33KV SALMANIYA 53513 33KV LALITPUR 3 0 14 17 37 BARODA 132 33KV BHURWADA 79521 33KV ALLAPURA 11 0 4 15 38 BAIRAD 132 33KV GOVRDHAN 3 4 12 19 33KV KHARE 3 0 7 10 39 MADA 132 33KV INDAR 0 0 10 10 33KV KHATORA 1 0 14 15 Abstract of Trippings 140 3313

Agenda of 72nd OCCM of MP 60 EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

NAME OF TOTAL FAULT TRIPPINGS TOTAL SL.N TESTING NAME OF SUB SATAION NAME OF FEEDER O/C+E/F TRIPPI O O/C trip E/F trip DIVISION trip NGS 12 3 4 5 GWALIOR REGION SE(T&C) 400KV BINA 33KV W/W 0 4 12 16 33KV BEHTAGHAT 17 0 31 48 33KV SINGWASA 3 1 15 19 33KV BHADORA 0 0 39 39 33KV MURADPUR 5 3 17 25 33KV UMRI 0 6 35 41 1 GUNA 220 33KV GARHA 0 0 18 18 33KV HARIPUR 0 0 16 16 33KV NOVODAY 0 0 12 12 33KV AIR 0 4 11 15 33KV NANAKHADI 1 4 21 26 33KV K.S.OIL MILL 0 0 15 15 33KV 0 1 12 13 33KV KHAJUIRY KALA 0 1 24 25 2 ASHOKNAGAR 220 33KV SEJI 0 0 15 15 33KV SEMRAHAT 0 3 23 26 33KV KAPASI 10 3 15 28 3 KAPASI 132 33KV FATHIYGARH 2 4 4 10 4 CHANDERI 132 33KV BANMORE 0 8 12 20 GUNA 33KV NAISARAI 18 10 1 29 33KV DHAKHONI 5 3 2 10 5 ESHAGARH 132 33KV ESAGARH 2 20 1 23 33KV PARSOL 014115 33KV MAKSUDANGARH 4 5 12 21 6 MAKSUDANGARH 132 33KV TALIGOAN 1 3 6 10 33KV RAMPUR 88723 33KV PANWARI HAT 0 1 10 11 7 ARON 132 33KV BAROD 0 2 8 10 33KV BHADORE 0 0 10 10 33KV SEJI 2 6 6 14 8 KOTHIYA 132 33KV MAGRANA 3 0 11 14 33KV CHAKCHOROLI 2 1 7 10 33KV GADLA 14 0 0 14 33KV NEW GADLA 13 2 0 15 9 BHONRA 132 33KV PARANT 14 0 0 14 33KV PATHI 11 1 0 12 33KV JAMNER 0 0 23 23 10 RAGHOGARH 132 33KV DHARNAWDA 0 0 10 10 33KV KUMBHARAJ-II 0 0 20 20 Abstract of Trippings 39 735 Abstract of Trippings (Gwalior Region) 179 4048

Agenda of 72nd OCCM of MP 61 EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

NAME OF TOTAL FAULT TRIPPINGS TOTAL SL.N TESTING NAME OF SUB SATAION NAME OF FEEDER O/C+E/F TRIPPI O O/C trip E/F trip DIVISION trip NGS 12 3 4 5 INDORE REGION SE(T&C) INDORE 1 RAJGARH (DHAR) 220 33KV HATOD 8 0 614 33KV AMJHERA (DHAR) 41611 33KV DATIGAON (JHABUA) 011314 2 RAJGARH (DHAR) 132 33KV ZHAKNAWAD (PETLAWAD) 25310 33KV BHARAT OMAN 1 8 6 15 33KV PHE 0 0 16 16 33KV BAGH 1 1 14 16 33KV DHOLIYA 5 0 5 10 33KV DEHRI 7 5 3 15 3 KUKSHI 132 33KV BHAVARIYA 801422 33KV DAHI 0 0 11 11 33KV PHE 2 0 20 22 33KV WATERWORK 0 0 20 20 33KV FLOROSIS 0 6 8 14 RAJGARH (DHAR) 33KV AMBUA 0111021 4 ALIRAJPUR 132 33KV NANPUR (DABADI) 08816 33KV FULMAL ( NEW SONDWA ) 03811 33KV KALAYANPURA 001717 33KV THANDLA 012021 5 MEGHNAGAR 132 33KV JHABUA 002222 33KV INDUSTRIAL 0 1 30 31 33KV JHABUA 101314 6 JHABUA 132 33KV KALIDEVI 0 11 6 17 33KV BAMANIYA 301619 7 PETLAWAD 132 33KV MAHI PHE(CHARAN KOTHRA) 1 11 9 21 33KV BUS COUPLAR 901019 33KV JOBAT 4 0 10 14 8 JOBAT 132 33KV KALIKHETIYAR 6 0 15 21 33KV PAGNIS PAGA. 6 0 4 10 33KV PITHAM PUR. 1 0 16 17 33KV DAILY COOEGE.NO. I. 7 0 7 14 33KV DAILY COOEGE.NO. II. 4 0 7 11 33KV RAU. 4 0 12 16 9 S/Z INDORE 220 33KV TILLOR. 5 0 5 10 33KV DATTODA. 1 0 10 11 33KV INDIRA COMPLEX NO. II. 3 0 12 15 33KV PALDA INDUSTRIAL. 3 0 20 23 33KV COMPEL. 1 1 12 14 INDORE 400 33KV KANADIYA 70310 33KV MANPUR 102526 33KV MHOW 5 0 7 12 10 JAMLI 132 33KV MES (KARBALA) 30912 33KV AMBEDKAR 501318 33KV MHOW 5 0 6 11 33KV HARSOLA 70512 11 RAU 132 33KV PANTHER-1 3 3 5 11 33KV SILICON CITY 11 0 3 14 12 SIMROL 132 33KV DATODA 041620 13 PITHAMPUR (SECT-I) 220 33KV MANPUR 0 3 9 12 33KV NAGIN NAGAR-I 101314 33KV NAGIN NAGAR-II 101011 14 INDORE WEST 132 33KV INDUSTRIAL 211013 33KV PLETHICO 001010 33KV AIRPORT 70613 15 BETMA 132 33KV INDUSTRIAL 311519 33KV DHAR 90211 16 INDORE-II DHAR 220 33KV TEES GAON 401014 33KV INDUSTRIAL 10910 17 GHATABILLOD 132 33KV INDUSTRIAL 101112 18 CHHAYAN 132 33KV NANDLAI 8 0 4 12 19 DEPALPUR 132 33KV BETMA 011415 33KV DCL 001010 20 MANAWAR 132 33KV KAROLI 16815 33KV AJANDA 101011 33KV SINGHANA 618226 21 SINGHANA 132 33KV LOHARI 3 11 3 17

Agenda of 72nd OCCM of MP 62 EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

NAME OF TOTAL FAULT TRIPPINGS TOTAL SL.N TESTING NAME OF SUB SATAION NAME OF FEEDER O/C+E/F TRIPPI O O/C trip E/F trip DIVISION trip NGS 12 3 4 5 INDORE-II (JAITPURA) 33KV RAMA PHSPT. 0 6 5 11 22 220 33KV INDUSTRIAL 016925 33KV VANDANA NAGAR-II 451019 33KV SANCHAR NAGER-II 45716 23 BICHOLI (INDORE EAST ) 2 33KV DUDHIYA 53614 33KV KANNOD- II 4 3 6 13 33KV H.T.INDUSTRIAL 071623 24 CHAMBAL INDORE 132 33KV GAMBHIR 10 1 3 14 INDORE-I 33KV MANORAMAGANG -I 121215 33KV SECTOR 'C' 101415 25 N/Z INDORE 220 33KV HATOD 72817 33KV MANGLIA 50712 26 SATYA SAI INDORE 132 33KV TULSI NAGAR 001212 27 ELECTONIC COMPLEX 132 33KV E.S.I. -I 001010 28 RAUKHEDI 132 33KV BHONDWAS 001414 29 SIVANI 132 33KV KHUDEL 002121 Abstract of Trippings (Gwalior Region) 82 1257 INDORE REGION SE(T&C) 400kv KHANDWA 33KV CHIRAGPURA 1 4 11 16 1 CHHEGAON (TORNI) 400 33KV BHOJAKHEDI 0 10 0 10 33KV NEPANAGAR 13 1 1 15 2 NEPANAGAR 220 33KV DABIYA 15410 33KV KHAR 3 3 20 26 33KV GUDI 0 0 11 11 33KV SIHADA 2121125 3 KHANDWA 132 33KV RANGAON 1 0 11 12 33KV CHANDEL-I 3 5 10 18 33KV INDORE ROAD 0 2 15 17 33KV KHANDWA-II 1 0 17 18 4 CHHEGAON 132 33KV DULHAR 0 0 11 11 33KV JAINABAD 6 0 13 19 33KV SHAHPUR-I 4 0 10 14 5 KHANDWA BAHADARPUR 132 33KV INDUSTRIAL 9 0 13 22 33KV CHAPORA 90312 33KV BADGAON 10 2 1 13 6 BADGAON 132 33KV MANJROD 5 17 23 45 7 MOONDI 132 33KV NARMADA NAGAR 41914 33KV ROSHANI 7 17 15 39 8 CHHANERA 220 33KV KHIRKIYA 1 5 4 10 33KV DHULKOT-I 4 2 5 11 9 PANDHANA 132 33KV INDUSTRIAL 0 0 10 10 33KV INDUSTRIAL 0 14 0 14 10 BHIKANGAON 132 33KV BHIKANGAON 8 4 1 13 33KV BAMNALA 1 20 6 27 11 SINGOT 132 33KV POKHAR 024024 12 PIPALPANI 132 33KV NIMANDHAD 0 0 16 16 33KV KHARGONE 4 0 9 13 33KV AHIRKHEDA 3 0 11 14 33KV NANDGAON 1 0 28 29 33KV GOGAWA 30710 13 KHARGONE 132 33KV MONGARGAON 1 2 11 14 33KV BHAGWANPURA 11 0 18 29 33KV NAGZIREE 92314 33KV P.F.C 6 0 4 10 33KV KASRAWAD 1 2 13 16 33KV SAWDA 2191132 14 KASRAWAD 132 33KV MAKADKHEDA 110011 33KV NTPC-II 0 1 9 10 33KV MULTHAN 0 6 5 11 15 ANDAD 132 33KV DEWLA 010717 33KV BALSMOOD 3 2 6 11 16 BARWAHA NIMARNI 220 33KV DAWANA 110617 33KV DHAMNOD 0 17 19 36 17 DHAMNOD 132 33KV INDUSTRIAL 1 4 12 17 33KV BAGOD 4 1 11 16 18 BARWAHA 220 33KV SANAWAD-II 3 0 16 19 33KV JAIMALPURA 3 0 17 20 33KV KARAHI 1 1 12 14 19 CHHOTI KHARGONE 132 33KV SUNDREL 0 0 14 14 33KV PIPALGAON 4 0 11 15 33KV BEDIYA 410923 33KV RODIYA 94013 20 SANAWAD 132 33KV NHDC 15 2 17 33KV DHAKALGAON 0 5 5 10 33KV BALWADA 0 1 11 12 21 BALWADA 132 33KV CHOURAL 3 4 16 23 22 SENDHWA 132 33KV PALSOOD 1 4 5 10 33KV PANSEMAL 73010 23 PANSEMAL 132 33KV KHETIYA 55111 33KV BADGON 0 12 0 12 33KV SURANA 1 9 10 20 24 ANJAD 132 33KV SHIVAI 0 11 4 15 JULWANIA 400 33KV BARWANI 0 12 0 12 33KV PATI 3 6 3 12 25 BARWANI 132 33KV SONDUL 013013 33KV REHGUN 1 9 2 12 SHAHPURA (BARWANI) 26 33KV BALWADI 5 0 5 10 132 Abstract of Trippings 69 1136 Abstract of Trippings (Indore Region) 151 2393

Agenda of 72nd OCCM of MP 63 EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

NAME OF TOTAL FAULT TRIPPINGS TOTAL SL.N TESTING NAME OF SUB SATAION NAME OF FEEDER O/C+E/F TRIPPI O O/C trip E/F trip DIVISION trip NGS 12 3 4 5 UJJAIN REGION SE(T&C) UJJAIN 1 BARNAGAR 220 33KV MULTHAN 0 8 2 10 33KV KHEDA KHAJURIYA 012012 2 GHONSALA 132 33KV BICHHROD 0 11 0 11 33KV BANJARI 0 14 0 14 3 MAHIDPUR 132 33KV KHUNDI KHEDA 010010 33KV MAHIDPUR ROAD 014014 4 BHERUGARH 132 33KV GARH KALIKA 25613 5 MAKDONE 132 33KV RUPAKHEDI 10 0 0 10 33KV CHANDUKHEDI 015015 6 RATADIYA 132 33KV D/A -2 0 11 0 11 33KV CHINTAMAN 0 13 0 13 33KV KANAD 29 4 0 33 33KV MADKOTA 56 1 0 57 UJJAIN 33KV MOYA KHEDA 96015 7 AGAR 132 33KV AGAR 12 0 0 12 33KV SUZLON-1 0 15 0 15 33KV ENORCON-1 8 3 0 11 33KV ENORCON-3 7 5 0 12 33KV NALKHEDA 0 0 22 22 33KV SOYAT-1 2 15 0 17 33KV AMLA 11 0 6 17 8 SUSNER 132 33KV SUZLON-3 0 2 11 13 33KV ENERCON 1 2 8 11 33KV SOYAT-2 4 2 14 20 33KV KACHNARIYA 15410 9 NALKHEDA 132 33KV DHAROLA 17412 10 UJJAIN 132 33KV WATER WORKS 6 9 0 15 33KV BHOURANSA 111921 11 DEWAS 220 33KV BALGARH 2 8 4 14 12 SHAJAPUR 220 33KV BERCHHA ROAD 911727 13 BNP DEWAS 132 33KV SIYA 60814 33KV INDUSTRIAL IV 401721 33KV STEEL INGOT 10910 14 MSP DEWAS 132 33KV INDUSTRIAL VI 001111 33KV BAIRAGARH 24410 33KV ENERCONE I 1 0 11 12 15 CHAPDA 132 33KV KAMLAPUR 0 0 10 10 33KV HAT PIPLIYA 17 1 0 18 33KV KANNOD 18 0 3 21 33KV OLAMBA () 60511 33KV MSK (KHATEGAON II) 14 0 1 15 16 KANNOD 132 33KV DEHRIYA () 1 0 18 19 33KV BIJWAD (CHAPDA ) 60814 DEWAS 33KV VIKRAMPUR 30912 33KV EKLERA MATAJI 4 0 12 16 17 SONKATCHH 132 33KV TALOD 6 0 13 19 33KV KHERIA JAGEER 0 0 11 11 33KV MURADPURA 15 0 11 26 18 SHAJAPUR 132 33KV SHANKAR PURA 14 0 3 17 33KV KANASIYA 30912 19 132 33KV MAKSI 20810 33KV 502126 33KV MSK 07714 20 KHATEGAON 132 33KV SANDALPUR 201517 33KV AJNAS 201113 33KV PALASI 1 1 15 17 21 SATWAS 132 33KV BAI JAGWADA 7 0 11 18 33KV BAROTHA 10 0 0 10 22 BAROTHA 132 33KV NEORY 0 0 19 19 33KV JETHDA 28212 23 SHUJALPUR 220 33KV RAIPUR 11 0 9 20 33KV AKODIYA 10910 24 SHUJALPUR 132 33KV JAMNER 1 0 11 12 33KV ARANDIYA 40711 33KV POCHANER 6 4 25 35 25 ARNIYAKALAN 132 33KV BERCHHA DATAR 4 0 11 15 33KV ARNIYAKALA 7 0 20 27 33KV SUNDARSI 013013 26 SHUJALPUR BERCHHA 132 33KV LAHORI 0 10 0 10 27 POLAIKALAN 132 33KV AVANTIPUR BARODIYA 13610 33KV PANWADI 1 01314 28 PANWADI 132 33KV SARANGPUR 5 0 9 14 33KV NAGZIRI 14 1 1 16 29 MOMIN BARODIYA 132 33KV MOHNA 5 4 10 19 33KV MANDODA 15 2 3 20 33KV KALAPIPAL 2 3712 30 KALAPIPAL 132 33KV NANDANI 1 11416 Abstract of Trippings 77 1216

Agenda of 72nd OCCM of MP 64 EXCESSIVE TRIPPINGS (10 & MORE THAN 10) OF 33KV 11KV FEEDERS EMANATING FROM EHV S/S'S DURING THE MONTH OF SEPTEMBER-19

NAME OF TOTAL FAULT TRIPPINGS TOTAL SL.N TESTING NAME OF SUB SATAION NAME OF FEEDER O/C+E/F TRIPPI O O/C trip E/F trip DIVISION trip NGS 12 3 4 5 UJJAIN REGION SE(T&C) NAGDA 33KV MHW ROAD 8 9 0 17 33KV SIMLAWADA 423027 33KV SHIVPUR 58013 1 RATLAM 220 33KV BILPANK 37010 33KV I.O.C.L. 10 9 0 19 33KV GANGA SAGAR 211013 33KV DHOLAWAD 2 8 0 10 33KV MILK CHILING 6 4 0 10 2 RATLAM 132 33KV DHONSWAS (OLD NAME 11 3 0 14 ) 33KV SHIVGARH 6 7 0 13 33KV DHODHAR 50611 3 JAORA 132 33KV KALUKHEDA 0 4 11 15 33KV 5 0 11 16 33KV KHARWAKALA 29011 33KV HANUMANTIYA 1 0 12 13 33KV PATAN 7 0 20 27 4 A LOT 132 33KV CLEAN SOLAR POWER-I 1 1 8 10 33KV CLEAN SOLAR POWER-II 1 1 9 11 33KV NVR CKT-I 0 0 13 13 33KV NVR CKT-II 0 0 13 13 RATLAM 33KV RAVATI ( OLD NAME 83011 SHIVGARH) 5 SAILANA 132 33KV DHAMNOD 7 9 0 16 33KV BAJANA 66012 33KV BIRMAWAL 55010 6 BILPANK 132 33KV RANISINGH 3 11 0 14 33KV BOTALGANJ 13 2 0 15 33KV SONY BOI CAM 10 5 0 15 7 MANDSAUR 132 33KV GUJARBARDIYA 82010 33KV AMLAWAD 10 6 0 16 33KV DHALPAT 33 15 0 48 8 SUWASARA 132 33KV KAYAMPUR 14 10 0 24 33KV KACHNARA 5 6 0 11 9 DALODA 220 33KV KARJOO 0 13 0 13 33KV SUZLON -I 3 7 0 10 33KV BOLIA 515020 33KV BARKHEDAGANGASA 215017 33KV BHESODA MANDI 68014 10 132 33KV BARDIYA AMARA 511016 33KV SATHAKHEDA 215017 33KV BABULDA 37010 11 SUWASARA 220 33KV KANTIYA 0 17 0 17 33KV DHANERIYA 80412 12 NEEMUCH 220 33KV NAYAGAON 28010 33KV MORVAN 62311 33KV HARKIYA KHAL 10 2 6 18 13 NEEMUCH 132 33KV SAVAN 811019 33KV RAMPURA 081119 33KV KANJARA 04913 14 MANASA 132 NEEMUCH 33KV AANTRI 10 10 9 29 33KV KUKDESHWER 85417 15 RATANGARH 132 33KV 010212 16 BHANPURA 220 33KV NEEMTHUR 20 1 20 41 33KV BUDHA 08311 17 MALHARGARH 132 33KV NARAYANGARH 23712 33KV NATARAM 28919 18 SITAMAU 132 33KV MANPURA 24713 33KV TAL 11 0 2 13 33KV MAHU MATRA 20 1 23 44 33KV 0 0 12 12 19 NAGDA 220 33KV MHETWAS 4 0 11 15 33KV HATAI PALKI 14 1 2 17 NAGDA 33KV MAHIDPUR ROAD 60612 33KV MOHANA 1 3 10 14 20 KHACHROD 132 33KV BURANABAD I 0 0 11 11 33KV LOD 3 2 10 15 21 TAL 132 33KV TAL TOWN 11 0 1 12 Abstract of Trippings 66 1043 Abstract of Trippings (Ujjain Region) 143 2259

Agenda of 72nd OCCM of MP 65 ANNEXURE-9.4 LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER SATNA CIRCLE KOTAR 220 KV S/S 1 220 KV SATNA PGCIL CB FAULTY CLOSE SATNA 220 1 220 KV KOTAR CB FAULTY CLOSE 2 132KV KYMORE CB FAULTY CLOSE KOTMA 132 1 132/33 KV XMER (PRI) CB FAULTY CLOSE UMARIYA 132 1 ALL ANALOG SHOWING 0 PROBLEM IN PT SUPPLY MANJAGAWAN 132 KV S/S 1 132 KV RTS MW/MVAR 0/0 4/1

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER KATNI 400 KV S/S 1 125 MVAR BUS REACTOR CB N/A Process connection required 2 400 KV DAMOH CB OPEN CLOSE PANAGAR 220 KV S/S 1 220 KV SUKHA 1 CB FAULTY CLOSE SHAHPURA 132 KV S/S 1 132 RTS MW /MVAR 0 7/1

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER KIRNAPUR 132 KV S/S SrDESCRIPTION Status Telemetry value at SLD Actual value at site 1 132 KV BUS BALAGHAT 1 & 2 MW/MVAR 26/16 ;-40/20

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER CHHATARPUR 220 KV S/S SrDESCRIPTION Status Telemetry value at SLD Actual value at site 1 220 KV BUS COUPLER CB FAULTY OPEN

ISP SrParameter Field value Scada value /status 1 ISP –INDORE 400 KV Feeder 1 91 908 2 ISP –NAGDA 400 KV Feeder (M 94 938 3 GENERATOR 5 & 6 MAVR 5 N /A 4 GENERATOR (OFF CONDITION) N/C 5

Name at SLDC end at site end SATPURA T P S 1 400 KV AASTHA 1 & 2 LINE REACTOR N/A 2 400 KV SEONI MW 99 85

SINGHA JI phase 2 S T P S 1 GEN NO 3 & 4 RGMO N/A S G T P S 1 220 /33 KV TR MW/MVAR NA 2 400 KV BUS 1 FREQ 49.79 49.98 3 GEN NO.1,2,3,4 RGMO N/A

Agenda of 72nd OCCM of MP 66 BARGI 1 GEN NO 1 ,2 RGMO N/A ALL CB SUSPECTED ATPS 1 220 KV SIDHI CB TRANSMIT CLOSE GANDHI SAGAR H P S TELEMETRY OUT srName of Element sldc side Field INDORE 400 KV S/S 2 220 Kv Dewas CB Faulty Close PITAMPUR 400 KV S/S 2 400kv Singhaji malwa Ckt -4 CB Faulty Close PITAMPUR 220 KV S/S Sector-III 1 132 Kv PRASRAM PURIYA CB open close RAJGRAH (DHAR) 220 KV S/S

1 220 kv all breakers suspected 2 220kv bus voltag-1 wrong 3 132kv all brekers suspected 220KV S/s Julwaniya 1 220/132Xmer HV and LV Side MW 16 24 JULWANIA 400 KV S/S 1 220/132 TR1 CB NOT COMING CLOSED 2 220 Sendhwa-I CB NOT COMING CLOSED 3 220 Sendhwa-II CB NOT COMING CLOSED NOAll 132 Kv Side brekaer is open Actually closed

132 kV S/s Khachrod NOAll 132 Kv Side brekaer is open Actually closed 220 KV S/S RATLAM 1 220 Kv TBC CB Not Coming open 2 22kV Daloda I CB Open Close 3 22kV Daloda II CB FOULTY OPEN UJJAIN 220 KV S/S 1 132KV BUS COUPLER CB FOULTY OPEN 132 KV S/S AGAR 1 132kV Buscoupler CB Faulty Close Kannod 132 KV S/S All 132 Kv side BC and 33 kv side BC not coming

04-11-2019 KHATEGAON 132 KV S/S 2 132/33KV 40MVA-XMER-2 MW/MVAR NON-CURRENT

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER 04-11-2019

ASTHA 400 KV S/S 1 400 KV BUS-COUPLER CB FAULTY 2 132 KV BUS-COUPLER CB FAULTY

RAJGARH 220 KV S/S

Agenda of 72nd OCCM of MP 67 1 220 KV MAIN BUS VOLTAGE/FREQUENCY NON CURRENT

SARNI 220 KV S/S 1 160 MVA XMER(LV SIDE) CB FAULTY CLOSE

HARDA 132 KV S/S 1 132 KV KHIRKIYA CB NON CURRENT CLOSE 2V CHANNERA(TAP KHIRKIYA RLY TR CB FAULTY CLOSE 3 132 KV KHIRKIYA RLY TRCN-1 CB FAULTY

BIORA 132 KV S/S 1 132/33 KV 40 MVA XMER-2 CB FAULTY CLOSE

ZEERAPUR 132 KV S/S 1 132 KV BUS VOLTAGE/FREQUENCY NON CURRENT 2 132 KV BUS-COUPLER MW/MVAR NON CURRENT

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER 05-11-2019

ASHOKNAGAR 220 KV S/S 1 132 KV BUS COUPLER CB FAULTY

ESAGARH 132 KV S/S 1 132 KV BUS COUPLER CB FAULTY 2 132 KV BUS COUPLER MW/MVAR NON-CURRENT

Agenda of 72nd OCCM of MP 68 ANNEXURE-9.8 SOE VERIFICATION PENDING 220 KV Mugaliyachhap 400 KV Astha 132 KV Astha 132 KV Icchwar 132 KV Harda 132 KV Picchore 132 KV Sehore 132 KV Kurawar

Agenda of 72nd OCCM of MP 69