Pudimadaka : Brief Summary : Draft

Total Page:16

File Type:pdf, Size:1020Kb

Pudimadaka : Brief Summary : Draft Pudimadaka : Brief Summary : Draft Pudimadaka Fishery Harbour Dist. Visakhapatnam Department of Fisheries Government of Andhra Pradesh The Fisheries Department, one of the important line agencies of Government of Andhra Pradesh accords top priority to fisheries development through interventions principally aimed at addressing the welfare of fishermen community and revenue generation for the State. The Department intends to establish and develop a Fishery Harbour in Pudimadaka village in Visakhapatman district which is a traditional fishing centre of the State. At present there are number of motorised and traditional boats operating from the open coast. A basin is proposed to be created for tranquillity and safe berthing of vessels apart from other harbour facilities. The Fisheries harbour will be developed with necessary infrastructure required for organized fishing in an environmentally responsible manner. This will help generate more employment opportunities and improve the quality of life of the local population. The project site geographically corresponds to latitude 17o 29’ 32” N, longitude 83o00’12”E and Is located at a distance of about 8 km from Achutapuram town under Achutapuram mandal of Visakhapatnam district. Visakhapatnam is about 45 km from the project site. The proposed project is categorized under 7(e)–‘B’, which attracts CRZ Notification of 2011 and EIA Notification of 2006 for which it is mandated for CRZ Clearance and also Environmental Clearance from SEIAA or any other extant Govt. Order/Policy relevant/ relating to the site thereof. The project is envisaged as a standalone coastal infrastructure. The total fish handling capacity of the proposed harbour is 28,700 TPA. The fishing harbour facilities have been designed to accommodate 930 vessels comprising 700 numbers of 9 metre long motorised boats, 200 trawlers of 18 metre OAL and 30 nos tuna long liners of 24 metre OAL. Construction of breakwater and harbour facilities have been proposed to be made in the inter- tidal area and on foreshore. There will be reclamation of about 2.45 lakh cu.m using dredge spoil. The Budgetary Estimation for establishing the proposed Pudimadaka Fishery Harbour is worked out to Rs.298.85 crore. .
Recommended publications
  • Studies on Coastal Geomorphology Along Visakhapatnam to Bhimunipatnam, East Coast of India M
    J. Ind. Geophys. Union ( October 2012 ) Vol.16, No.4, pp. 179-187 Studies on Coastal Geomorphology along Visakhapatnam to Bhimunipatnam, East Coast of India M. Jagannadha Rao, Greeshma Gireesh A.G., P. Avatharam1, N.C. Anil2 and T. Karuna Karudu Delta Studies Institute, 1Dept of Geology, 2Dept. of Geo-Engineering, Andhra University, Visakhapatnam. ABSTRACT An attempt has been made to study and record the diverse coastal geomorphic features along Visakhapatnam – Bhimunipatnam coast. The study area is marked by geomorphic features resulted from various coastal and land ward processes. The geomorphic units under different heads namely, features formed by present day wave action, features formed due to sea level oscillations and features formed by rock and sea water interaction have been presented. The influence of sea level oscillations and land and sea interaction forms a diverse coastal geomorphology along the coast. The details of features such as beach, dune system, inter tidal deposits, red sediments, wave cut platform, marine terrace, sea stack, sea cave, serpent hood structures, promontories, wind gap and natural bridge have been recorded and the formation as well as significance of their occurrence are presented. The coastal geomorphology of the study area clearly established not only the sea level oscillations but also variations in climatic conditions in this part of the coast. INTRODUCTION PHYSIOGRAPHY Coastal geomorphology by definition is the study of The study area is characterized by Eastern Ghat the morphological development and evolution of the mobile belt. This area covered with denudational coast as it acts under the influence of winds, waves, hills of range between 30 to 594m above mean currents and sea level changes.
    [Show full text]
  • NTPC Pudimadaka Public Hearing on August 12
    Search GO Home Today's Paper All Sections News National International Opinion Business Sport thREAD Features Sci-Tech Entertainment Cities Bengaluru Chennai Coimbatore Delhi Hyderabad Kochi Kozhikode Kolkata Madurai Mangaluru Visakhapatnam CIT IES » VISAKHAPAT NAM VISAKHAPATNAM, July 13, 2015 Updated: July 13, 2015 05:48 IST o2 Loop Freikarte NTPC Pudimadaka public hearing on August 12 Pro- Ject Audio Shop - Plattenspieler,HiFi Geräte,Zubehör günstig, schnell & versandfrei www.yourhifi.de/pro-ject_shop Ads by Google SANTOSH PATNAIK COMMENT · PRINT · T T Tweet 0 Four coal-based units of 1,000 MW each will be set up at one place with supercritical technology The A. P. Pollution Control Board has issued a notification for holding environmental public hearing for NTPC Pudimadaka Super Thermal Power Project on August 12. The project for which NTPC has been allotted 1,200 acres by the A. P. Industrial Infrastructure Corporation at Pudimadaka, about 60 km from here in Atchutapuram and Rambilli mandals, will involve an investment of Rs.26,828 crore — the first major investment post-bifurcation. The EIA study for the project has been done by Vimta Labs of Hyderabad. The APPCB would put everything about the project on its website on Monday, Environmental Engineer R. Lakshminarayana told The Hindu . NTPC is also scouting for suitable site near Simhadri Super Thermal Power Station at Parawada to expand its capacity from 2,000 MW to 3,600 MW. Asked to comment on the project, NTPC-Pudimadaka Group General Manager P.S. Radhakrishnan said: “It will be a green power project, as the total requirement of coal will be imported to ensure higher efficiency levels and to put emissions at bare minimum.” He said the project would not need any land acquisition as the APIIC had already handed over 1,200 acres of developed area.
    [Show full text]
  • 14/2010/L1 SUBJECT NO. 119 Sub : STATUS OF
    RC.No: 14/2010/L1 SUBJECT NO. 119 Sub : STATUS OF DEVELOPMENT PLAN TRANSPOSRT CORRIDOR FOR VUDA AREAS- Reg. *** AGENDA NOTE : It is submitted that the Govt vide GO.Ms.No: 616 MA, dt: 16.10.2009 has constituted unified metropolitan transport committee (UMTC) under the Chairmanship of Principal Secretary to Govt MA&UD Dept for effective implementation and coordination of the various traffic and transportation measures. As soon as the Govt has issued above GO, the Commissioner, GVMC Commissioners of Municipalities in VMR and the officials of other departments like Railways, DT & CP, RTC, R&B etc., are addressed vide this office letter dt: 29.01.2010 and requested to furnish the relevant issues pertaining to traffic and transportation initiating if any in their respective areas so as to enable to prepare comprehensive proposal to place the same before the committee. Further the Principal Secretary to Govt MA&UD Dept vide this office letter dt: 8.01.2012 was also requested to address the Ministry of Urban Development, Govt of India to accord sanction for comprehensive traffic and transportation study for VMR on which the Principal Secretary to Govt, MA & UD, vide letter dt: 6.02.2012 is pleased to address the Secretary, Ministry of Urban Development Govt of India to accord sanction for comprehensive traffic and transportation study for VMR under the National urban Transport policy and also grant financial assistance. Also submitted that a meeting was conducted by VUDA on Unified Metropolitan Traffic and Transportation with the Dist Collector, Visakhapatnam, Commissioner of Police, Visakhapatnam city, Superintendent of Police, Visakhapatnam (Rural) GVMC officials etc., and a PowerPoint presentation was also given on the traffic and transportation issues on 25.6.2013.
    [Show full text]
  • LHA Recuritment Visakhapatnam Centre Screening Test Adhrapradesh Candidates at Mudasarlova Park Main Gate,Visakhapatnam.Contact No
    LHA Recuritment Visakhapatnam centre Screening test Adhrapradesh Candidates at Mudasarlova Park main gate,Visakhapatnam.Contact No. 0891-2733140 Date No. Of Candidates S. Nos. 12/22/2014 1300 0001-1300 12/23/2014 1300 1301-2600 12/24/2014 1299 2601-3899 12/26/2014 1300 3900-5199 12/27/2014 1200 5200-6399 12/28/2014 1200 6400-7599 12/29/2014 1200 7600-8799 12/30/2014 1177 8800-9977 Total 9977 FROM CANDIDATES / EMPLOYMENT OFFICES GUNTUR REGISTRATION NO. CASTE GENDER CANDIDATE NAME FATHER/ S. No. Roll Nos ADDRESS D.O.B HUSBAND NAME PRIORITY & P.H V.VENKATA MUNEESWARA SUREPALLI P.O MALE RAO 1 1 S/O ERESWARA RAO BHATTIPROLU BC-B MANDALAM, GUNTUR 14.01.1985 SHAIK BAHSA D.NO.1-8-48 MALE 2 2 S/O HUSSIAN SANTHA BAZAR BC-B CHILAKURI PETA ,GUNTUR 8/18/1985 K.NAGARAJU D.NO.7-2-12/1 MALE 3 3 S/O VENKATESWARULU GANGANAMMAPETA BC-A TENALI. 4/21/1985 SHAIK AKBAR BASHA D.NO.15-5-1/5 MALE 4 4 S/O MAHABOOB SUBHANI PANASATHOTA BC-E NARASARAO PETA 8/30/1984 S.VENUGOPAL H.NO.2-34 MALE 5 5 S/O S.UMAMAHESWARA RAO PETERU P.O BC-B REPALLI MANDALAM 7/20/1984 B.N.SAIDULU PULIPADU MALE 6 6 S/O PUNNAIAH GURAJALA MANDLAM ,GUNTUR BC-A 6/11/1985 G.RAMESH BABU BHOGASWARA PET MALE 7 7 S/O SIVANJANEYULU BATTIPROLU MANDLAM, GUNTUR BC-A 8/15/1984 K.NAGARAJENDRA KUMAR PAMIDIMARRU POST MALE 8 8 S/O.
    [Show full text]
  • State City Hospital Name Address Pin Code Phone K.M
    STATE CITY HOSPITAL NAME ADDRESS PIN CODE PHONE K.M. Memorial Hospital And Research Center, Bye Pass Jharkhand ​Bokaro NEPHROPLUS DIALYSIS CENTER - BOKARO 827013 9234342627 Road, Bokaro, National Highway23, Chas D.No.29-14-45, Sri Guru Residency, Prakasam Road, Andhra Pradesh Achanta AMARAVATI EYE HOSPITAL 520002 0866-2437111 Suryaraopet, Pushpa Hotel Centre, Vijayawada Telangana Adilabad SRI SAI MATERNITY & GENERAL HOSPITAL Near Railway Gate, Gunj Road, Bhoktapur 504002 08732-230777 Uttar Pradesh Agra AMIT JAGGI MEMORIAL HOSPITAL Sector-1, Vibhav Nagar 282001 0562-2330600 Uttar Pradesh Agra UPADHYAY HOSPITAL Shaheed Nagar Crossing 282001 0562-2230344 Uttar Pradesh Agra RAVI HOSPITAL No.1/55, Delhi Gate 282002 0562-2521511 Uttar Pradesh Agra PUSHPANJALI HOSPTIAL & RESEARCH CENTRE Pushpanjali Palace, Delhi Gate 282002 0562-2527566 Uttar Pradesh Agra VOHRA NURSING HOME #4, Laxman Nagar, Kheria Road 282001 0562-2303221 Ashoka Plaza, 1St & 2Nd Floor, Jawahar Nagar, Nh – 2, Uttar Pradesh Agra CENTRE FOR SIGHT (AGRA) 282002 011-26513723 Bypass Road, Near Omax Srk Mall Uttar Pradesh Agra IIMT HOSPITAL & RESEARCH CENTRE Ganesh Nagar Lawyers Colony, Bye Pass Road 282005 9927818000 Uttar Pradesh Agra JEEVAN JYOTHI HOSPITAL & RESEARCH CENTER Sector-1, Awas Vikas, Bodla 282007 0562-2275030 Uttar Pradesh Agra DR.KAMLESH TANDON HOSPITALS & TEST TUBE BABY CENTRE 4/48, Lajpat Kunj, Agra 282002 0562-2525369 Uttar Pradesh Agra JAVITRI DEVI MEMORIAL HOSPITAL 51/10-J /19, West Arjun Nagar 282001 0562-2400069 Pushpanjali Hospital, 2Nd Floor, Pushpanjali Palace,
    [Show full text]
  • Terms of Reference Fishery
    TERMS OF REFERENCE FISHERY HARBOUR AT PUDIMADAKA VISAKHAPATNAM DISTRICT Fish Catch and Handling Capacity: 28,700 TPA Dredging; 2.45 lakh m3 DEPEPARTMENT OF FISHERIES GOVT. OF ANDHRA PRADESH TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT & ENVIRONMENTAL MANAGEMENT PLAN Department of Fisheries (DoF),Government of Andhra Pradesh intends to establish and develop a Fishery Harbour in Pudimadaka village in Achutapuram Mandal under Narsipatnam revenue division in Visakhapatnam district. Pudimadaka is a traditional fish landing centre of the district. At present fish landing and related activities are done on open beach without having proper infrastructure / harbour facilities. The fishery harbour will be developed with necessary infrastructure required for organized fishing in an environmentally responsible manner. This will help generate more employment opportunities and improve the quality of life of the local population in addition to improving the environmental condition of the landing centre.. Environmental Impact Assessment studies will be conducted towards EIA/EMP report for the construction of fishery harbour in Pudimadaka with proposed fish handling capacity for 28,700 TPA. In order to ensure safe navigation of fishing vessels and boats, dredging of 2.45 lakh cu m is proposed and the same will be reused for shoreline stabilization and land reclamation required within the harbour complex. The Project is proposed by Department of Fisheries (DoF) to essentially address the requirements and demands of the local fishing community for adequate infrastructure facilities as is well known for its fishery resources. At present there being no harbour facility, bigger vessels like trawlers and purse seine boats cannot land their harvest and have to depend on transference of catch to smaller boats for final landing.
    [Show full text]
  • About Apsez Infrast Ruct Ure How T O Set up Policies Indust Ries at Apsez Dta
    HOME ABOUT APIIC ABOUT APSEZ INFRAST RUCT URE HOW T O SET UP POLICIES INDUST RIES AT APSEZ DTA CONTACT US About APSEZ Announcements APSEZ is a Multi-Product SEZ developed over an area of 5595.47 acres of land at Atchutapuram and Rambilli mandals of Visakhapatnam District. The Government of India notified the SEZ on 12/04/2007 in the Gazette. It is the major SEZ in the State of Andhra Pradesh. Location : Atchutapuram and Rambilli (M), Visakhapatnam Extent :5595.47 Acres APIIC ONLINE APPLICAT ION Close Proximity To Submit an Online Application form, please click here. Road Connectivity : A 4-lane Major District Road from Atcutapuram junction to Pudimadaka – 3 Kms from Atcutapuram junction. National Read more Highway connectivity from Atcutapuram junction to Anakapalle – 17 Kms. Port Connectivity : Visakhapatnam Port - 50 Kms Gangavaram Port - 30 Kms Important Contact Details Air Conenctivity : Visakhapatnam Airport - 40 Kms Vice Chairman & Managing Rail : Nearest Railway station - Anakapalle – 17 Kms. From Director APSEZ. Sri. B.R. Meena, IAS Ph: +9140-23230234 / 23233596 Fax:+9140-23240205 Email: [email protected] Lease Premium Development Commissioner S.Kishore, IAS Rs.35.00 lakhs per acre (Valid upto 31/03/12) (payable in Lease premium per acre : APSEZ, Development Commissioner, 90 days) 9th Floor, Udyog Bhavan(VUDA Building), 2% on total lease premium with 5% escalation on Annual Lease rentals : cumulative basis every year, payable per annum in advance Siripuram Road, Visakahaptnam. Ph:+91-9948888400 Lease Tenor : 33 years Fax:+91891-2558678 Email: [email protected] Water Provision : Water supply - 10 KL per acre per day. F o r additional water supply - Shall pay an amount of Rs.15000.00 per each additional KL per day.
    [Show full text]
  • Preparation of Master Plan & Upgradation for Mudasarlova Park
    RFP Visakhapatnam Urban Development Authority. 17TH March 2017 [SELECTION OF ARCHITECTURAL LANDSCAPE CONSULTING AGENCY FOR “PREPARATION OF MASTER PLAN & UPGRADATION FOR MUDASARLOVA PARK AS INTERNATIONAL TOURIST DESTINATION IN VISAKHAPATNAM, ANDHRA PRADESH.”] ISSUED BY: VISAKHAPATNAM URBAN DEVELOPMENT AUTHORITY ANDHRA PRADESH INDIA Selection of Consulting Agency for “Preparation of Master Planning and Upgradation of Mudasalova 1. DISCLAIMER Park, Visakhapatnam, Andhra Pradesh.” The information contained in the Request for Proposal document (“RFP”) is provided to Bidders on the terms and conditions set out in this RFP and such other terms and conditions subject to which such information is provided. The RFP is not an agreement and is neither an offer nor invitation by the Authority to the prospective Bidders or any other person. The purpose of the RFP is to provide interested parties with information that may be useful to them in the formulation of their Proposals pursuant to this RFP. The RFP includes statements, which reflect various assumptions and assessments arrived at by the Authority in relation to the Consultancy. Such assumptions, assessments and statements do not purport to contain all the information that each Bidder may require. The RFP may not be appropriate for all persons, and it is not possible for the Authority, its employees or advisers to consider the objectives, technical expertise and particular needs of each party who reads or uses the RFP. The assumptions, assessments, statements and information contained in the RFP, may not be complete, accurate, adequate or correct. Each Bidder should, therefore, conduct its own investigations and analysis and should check the accuracy, adequacy, correctness, reliability and completeness of the assumptions, assessments and information contained in the RFP and obtain independent advice from appropriate sources.
    [Show full text]
  • 48434-003: Visakhapatnam-Chennai
    Land Acquisition and Resettlement Due Diligence Report Document stage: Final Project Number: 48434-003 Loan and Grant Numbers: L3430; G0495 September 2018 India: Visakhapatnam-Chennai Industrial Corridor Development Program (VCICDP) - Project 1 Subproject: Development and Rejuvenation of Mudasarlova Reservoir Catchment Area Prepared by Greater Visakhapatnam Municipal Corporation, Government of Andhra Pradesh for the Asian Development Bank This due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CURRENCY EQUIVALENTS (as of 01 September 2018) Currency unit = Rupee (INR) INR 1.00 = USD 0.0141 USD 1.00 = INR 70.6800 ABBREVIATIONS ADB – Asian Development Bank BRTS – Bus Rapid Transit System DPR – Detailed Project Report DDR – Due diligence report DoI – Department of Industries GHG – Green House Gas GoAP – Government of Andhra Pradesh GVMC – Greater Visakhapatnam Municipal Corporation MFF – Multitranche Financing Facility PIU – Project Implementation Unit PMU – Project Management Unit R&R – Rehabilitation and Resettlement UCCRTF – Urban Climate Change Resilience Trust Fund VCICDP – Visakhapatnam Chennai Industrial Corridor Development Program CONTENTS Page I. INTRODUCTION 1 A. Background 1 B. Scope of this report 1 II. SUBPROJECT DESCRIPTION 2 A. Proposed components 2 III. FIELD WORK AND CONSULTATION 4 A.
    [Show full text]
  • ROADS & BUILDINGS DEPARTMENT From
    ROADS & BUILDINGS DEPARTMENT From : To Sri M.Venugopala Rao The Chief Engineer, (R&B), M.Tech. M.D., APRDC Superintending Engineer (R&B) Errummunzil, Seethammadhara, Andhra Pradesh, Visakhapatnam – 530 013, Hyderabad. e-mail : [email protected] Fax : 0891-2553265 Lr.No.3042/AP second Highway Report/2005, dated: 10 -12-2005. Sir, Sub:- A. P. Second Highway Project-Justification for qualifying the roads- Particulars submitted-Reg. Ref:- 1. Circular Memo.No.AP SM.II/RR/GM.I/2002 dt.29.11.2005 of Chief Engineer(R&B) & M.D.,APRDC, Hyderabad ### I submit herewith the particulars in the prescribed Proforma (a) to (k) of roads identified under Ist phase of A.P. Second High way Project pertaining to (R&B) circles (i) Visakhapatnam (ii) Vizianagaram (iii) Srikakulam for favour of taking further necessary action. Yours faithfully Sd/- Superintending Engineer(R&B) Visakhapatnam Encl: Project Report for For six roads along With maps and combined map INDEX S.No Name of the Road Page No. 1 Narsipatnam-Sabbavaram-Kottavalasa- 1 to 6 Vizianagaram-Palakonda-Haddubangi 2 Polavaram-Narsipatnam-Tallapalem 7 to 9 3 Calingapatnam-Parlakhemudi 10 to 11 4 Nrsipatnam-Devipatnam 12 to 13 5 Anakapalli-Anandapuram 14 to 15 6 Kakinada - Polamanipeta,Venkatanagaram- 16 to 19 Pentakota-Pudimadaka-Atchutapuram- Gajuwaka-Visakhapatnam(Item 7 of C E.Circular dt.24.11.05) 7 Combined Map 20 1) NARSIPATNAM- SABBAVARAM- KOTHAVALASA - VIZIANGARAM- PALAKONDA-HADDUBANGI ROAD A.P. SECOND HIGHWAY PROJECT - PARTICULARS ON ROADS Pavement Traffic values Constraints Classifica- Land Pavement Road Sections Distances from Major river and in terms of S. regarding tion of Homogeneous part of road/ acquisition roughness sections Name of the Road requiring four NH or improved crossings/ ROBs/ shoulder Commercial No.
    [Show full text]
  • THE FUTURE of Pendurthi ...For Growth Chodavaram Rushikonda Beach Sabbavaram COMMUTE Simhachalam
    www.sirivenkateswaradevelopers.com Seethammadhara, Visakhapatnam- 530013 Visakhapatnam- Seethammadhara, Opp BSNL Exchange, BSNL Opp D.No 55-8-35/3, 4th Floor, Floor, 4th 55-8-35/3, D.No Corporate Office: Corporate 15 Mins to Parawada Pharma City Pharma Parawada to Mins 15 • 10 Mins to Brandix Apperal City Apperal Brandix to Mins 10 • Pudimadaka Beach Pudimadaka 8 Mins to Kondakarla bird sanctuary bird Kondakarla to Mins 8 • AT URBAN CITY URBAN AT Brandix Brandix 5 Mins to Atchutapuram SEZ Atchutapuram to Mins 5 • ATMOSFAIR Adjacent to BARC 1000 acres Township acres 1000 BARC to Adjacent • Yellamanchili Atchutapuram ENJOY THE VILLAGE VILLAGE THE ENJOY Behind to BARC Quaters BARC to Behind • Bird Sanctuary Bird Kondakarla Paravada Steel Plant Steel Vizag Gangavaram Port Gangavaram NH 16 NH Near Atchutapuram Near Yarada Beach Yarada Pharma City Pharma Parawada Parawada LEAST EXPECT IT. EXPECT LEAST Gajuwaka Dopperla Village Dopperla Visakhapatnam Port Visakhapatnam NH 16 NH Anakapalle RK Beach RK Airport chennai srikakulam high srikakulam chennai WHERE YOU YOU WHERE Visakhapatnam Vizag NAD Jn NAD w a y Simhachalam COMMUTE Sabbavaram Rushikonda Beach Rushikonda ...for Growth ...for Chodavaram Pendurthi THE FUTURE OF FUTURE THE highway srikakulam chennai A Destination Destination A Bheemli Beach Bheemli Towards Aruku Towards Anandapuram Stay close to the nature. To begin with, you're cordoned off from the main road, by layers of green cover. From tree-lined avenues to land- scaped gardens and the adjacent lake, the whole ambi- ence here seems like a serene suburb, though your in the middle of the city. Enjoy quiet walks in solitude, amidst tweeting birds and Welcome to Visakhapatnam’s sentinel trees.
    [Show full text]
  • Quarantine Centre - Andhra Pradesh
    QUARANTINE CENTRE - ANDHRA PRADESH Room rate(includi Contact Name of Number of ng meals Person(government Contact District: Type: Hotel/Quarantine Center: Rooms and taxes): Contact Number: offcial in-charge) Number: Remarks: VISAKHAPATNAM On Gratis Vikas Junior College Category Category 1:0 9052782060 Dr. Padma Priya 9052782060 1:74 VISAKHAPATNAM On Gratis Viajaya Residency Category Category 1:0 6300538289 Dr.Satyanarayana 6300538289 1:38 VISAKHAPATNAM On Payment The Park Hotel Category Category 9849121197 Anitha 9000782783 Single Occupancy for 14 1:20 1:35000 days VISAKHAPATNAM On Payment TAJ GATEWAY Category Category 7892142134 Anitha 9000782783 Single Occupancy for 14 1:40 1:35000 days VISAKHAPATNAM On Gratis Srikanth Lodge Category Category 1:0 9100064946 B.Ravikumar 9100064946 1:20 VISAKHAPATNAM On Gratis Sri Sai Brundavan grand Category Category 1:0 6300538289 Dr.Satyanarayana 6300538289 inn 1:28 VISAKHAPATNAM On Gratis SRI PALIMAR Category Category 1:0 9441207504 Dr.SUJATHA 9441207504 1:24 VISAKHAPATNAM On Gratis Post Metric Hostel G) Category 1:8 Category 1:0 9676376031 SDr.S.Vinnila 9676376031 VISAKHAPATNAM On Gratis NARAYANA IIT GIRLS Category Category 1:0 8985356024 Dr.Rajesh Naidu 8985356024 CAMPUS BLOCK 1) 1:140 VISAKHAPATNAM On Gratis Narayana IIT Category Category 1:0 8332954588 Dr.Amaleswari 8332954588 1:92 VISAKHAPATNAM On Gratis NARAYANA CAMPUS Category Category 1:0 9966994015 Dr.Dhanalakshmi 9966994015 1:93 VISAKHAPATNAM On Payment MEGHALAYA Category Category 8008200120 Anitha 9000782783 Single Occupancy for 14 1:45
    [Show full text]