Gangavaram Port Limited

Total Page:16

File Type:pdf, Size:1020Kb

Gangavaram Port Limited An ISO 9001 : 2008 Certified Company ISPS Compliant Port Facility GANGAVARAM PORT LIMITED.. _. GPLIMOEF/20 Dt.211112017 To The Director, Regional Office, Ministry of Environment, Forest and Climate Change, Regional Office (SEZ)" 1ST and IInd Floor, Handloom Export Promotion Council .M... Cathedral Garden Road, Nungambakkam, Chennai-34 Tel.No.044-28222325 . • Dear SirlMadam, Sub: EC Compliance and periodical Environmental Monitoring Reports-reg Ref: EC No:F.No.11-9112010-IA-III .Date.?" February, 2012. In compliance with EC at cited ref, Gangavaram Port is monitoring the Air, Noise, Ground water, Marine water and sediment quality at regular intervals and GPL is conforming with the standards and guidelines of the EC as well as consent order issued by the state pollution control board. Accordingly, we are submitting the compliance report ofEC along with six monthly reports including terrestrial and marine monitoring reports from April-2017 -Septernber -2017. A copy of CFO Compliance and Form-Vis enclosed. Yours Sincerely, For Gangavaram Port ltd, CIN : U45209TG2001PLC037861 Project Office PedagantyadaMandai, Gangavaram(Post), Visakhapatnam- 530 044. Andhra Pradesh, INDIA. Tel. : +918912701177,2277,2761377,2889999, Fax: +918912703377. Regd. Office "Hansa Plaza", Plot No. 798, Road No.36, Jubilee Hills, Hyderabad- 500 033. Tel: 040 2351 9999, Fax No. : 040 2351 9990. E-mail: [email protected], Web: www.gangavaram.com r Environment and CRZ Clearance o.11-9112010-IA-III dtd.07.02.2012 for Phase-II S.No Conditions Compliance as Explained by GPL Snecific Conditions:- 1. "Consent for Establishment" shall be obtained from State Pollution Control Obtained "Consent for Establishment" from State Pollution Control Board under Air and Water Board under Air and Water Act and a Act vide order number copy shall be submitted to the Ministry APPCBNSPNSP/113/CFE/HO/20 12-3923., dt. 2/3/2012 and copy was submitted on 12105/2012 to before start of any construction work at RO, MoEF, Banglore vide Lr.no.GPLlMoEFI021. the site As the development is conceived in Cargo based master plan will be finalized during the several stages to reach the full future expansion based on market need. The master designed/planned capacity of the EMP will be made basing on the cargo master plan. port, it shall be necessary to prepare and put in place a master GPL has already submitted the EMP for the present EMP for the full scale development volume of cargo handling capacities i.e up to 41 and fit in the phase-wise creations as MMTPA in EIA report. modules forming part of the entire system. This shall facilitate a harmonious planning of environmental requirements to be put in place in a phased manner in accordance with preset goal and objective as outlined in the overall environmental plan for the port in its totality. 3. The 4.88 million cum of dredged material shall be used for shore Dredging work was completed and dredged material reclamation subject to its suitability. was used for filling of low lying land within port area. Any unsuitablel excess dredged material shall be disposed at dumpsite. Port shall identify suitable dumping spot for disposal of unsuitable material offshore on the basis of appropriate modeling study. 4. The green belt area proposed is about GPL is maintaining the 50 mt width of the green belt 10 % only. Proponent shall enhance on habitation side and completed the 40 acres of the the area of green belt. Width of the green belt. green belt shall be minimum 50 m. The present stage of development of GPL has established exclusive nursery with 80,000 40 acres of land for green belt which saplings and employed 160 people to maintain and should have been completed before improve the green belt continuously. January 2011 shall be reported to the Ministry together with the About Rs.1, 75, 00,0001- per annum is being spent programme adopted for for the development of green belt. implementation. Covered nearly 300 acres of green belt in GPL area in the true spirit. " There will be a quantum jump of port Adequate Additional railway sidings are provided. traffic from the existing level of 16.54 MTPA to 41 MTPA after Second railway line is provided. completion of the proposed developments and this is likely to Silos and In-motion wagon loader are established for register further leap when full scale faster evacuation planned capacity is reached later; it is therefore necessary even now to plan National high way is being expanded to 6 lane from appropriate measures to ensure that will existing 4 lane. be no mismatch between the planned capacity and the external logistic The above facilities are sufficient to cater to the requirements in the overall transport needs of more than approved capacity of transportation chain/network 41MMT. commensurate with the demand. A long range vision would be necessary to achieve a smooth flow of cargo traffic both within and outside port limits. 6. The Company should enhance the GPL has allocated 5% of the project cost for the CSR allocation for the CSR activities activities like health camps, educational infrastructure from 2. 5 to 5 % of the total cost facilities in the schools, drinking water supply for and item-wise details along with time bound action plan shall be prepared surrounding villages, community green belt and submitted to the Ministry's development programme (green visakha), women Regional Office at Bangalore. empowerment programme, promoting sports, Development of temples, community halls and skill Implementation of such program shall development programs. be ensured accordingly in a time bound manner. Action plan was submitted to MoEF, Chennai on 04/09/2015 vide Lr. No. GPLlMoEF/024. Accordingly, GPL is implementing the CSR activities in the surrounding areas. 7. All the recommendation of the EMP and GPL is complying with the recommendation of EMP DMP shall be complied with letter and and DMP. spirit. Prescribed monthly reports are being submitted to PCB on terrestrial as well as marine water monitoring activities. Environment Audit Statement (FORM- V) is being submitted during September every year. The half yearly reports are being submitted regularly to Regional Office, MoEF along with above reports. Mock drills for Marine !Land activities are being taken up periodically. 8. Construction activity shall be carried No construction activity was taken up other than out strictly as per the provisions of permitted activity according to the CRZ clearance. CRZ Notification, 2011. No construction work other than those permitted In Coastal Regulation Zone Notification shall be carried out in Coastal Regulation Zone area 9. The project shall be executed in The project was executed without any disturbance to such a manner that there shall not be the fishing activity. any disturbance to the fishing activity During the construction period, the quality of marine waters / sediment ( for Physicall chemicallMarine biology/ Benthic !Faunal Diversity / Heavy metals ) was monitored through a 3rd party every week (during Hide Tide and Low Tide) at 4 locations i.e l.Harbour basin 2.EnranceChennel 3.South brake wall outside 4. North brake wall outside. The reports were within specified limits indicating that the construction activities have not polluted the shore waters of the Gangavaram coast. Copies were submitted to RO, MoEF. During operations, as detailed above, the marine water quality is being monitored every fortnightly through the 3rd party and all the marine parameters are within the specified limits. Copies are being submitted to RO, MoEF and APPCB regularly. 10. It shall be ensured that there is no No displacement of any kind took place as the displacement of people, houses or Expansion works were taken up within the Port fishing activity as a result of the project premises only. 11. The project proponent shall set up A separate environment management cell headed by separate environmental management cell Assistant Vice President is set up. for effective implementation of the stipulated environmental safeguards The Cell consists of eight executives and supporting under the supervision of a Senior staff under the supervision of Director (Operations). Executive 12. The funds earmarked for environment Funds are included in the budget and GPL is not management plan shall be included in diverting any funds from the budget earmarked for the budget and this shall not be diverted EMP statement enclosed in Annexure- -E. for any other purposes. General Conditions:- 1. Appropriate measures must be GPL is not drawing any ground water from the port taken while undertaking digging area or its surroundings. activities to avoid any likely degradation of water quality The ground water quality is being monitored every month through the 3rd party at 2 locations i.e 1. Gangavaram. 2. Port Premises (Open well) for its physical/ chemical parameters and all the parameters are within the specified limits. GPL is submitting the monthly monitoring reports to the APPCB, RO, VSP and six monthly reports to the regional Office, MoEF, Bangalore/Chennai. Reports are conforming to the statutory limits. 2. Full support shall be extended Full support is being extended and all the to the officers of this details / action plan and reports are being Ministry/Regional Office at submitted during the inspections. Bangalore by the project proponent during inspection of the project for monitoring purposes by furnishing full details and action plan including action taken reports in respect of mitigation measures and other environmental protection activities 3. A six-Monthly monitoring report shall Six monthly monitoring reports are being submitted to need to be submitted by the project the RO,ChennailBangloreas follows: proponents to the Regional Office of GPLlMoEF/005; this Ministry at Bangalore regarding GPLlMoEF/006; the implementation of the stipulated GPLlMoEF/009;dated 26/7/2012; conditions GPLlMoEF/010;dated 8/3/2013; GPLlMoEF/Oll;dated 8/8/2013; GPLlMoEF/O12;dated27/01/2014, GPLlMoEF/013;dtd16/07/2014 GPLlMoEF/014; GPLlMoEF/015; GPLlMoEFI016; dated 21110/2015; GPLlMoEFI017; dated 20104/2016 GPLlMoEFl018;dated 06110/2016 GPLlMoEFl019;dated 19104/2017 4.
Recommended publications
  • Studies on Coastal Geomorphology Along Visakhapatnam to Bhimunipatnam, East Coast of India M
    J. Ind. Geophys. Union ( October 2012 ) Vol.16, No.4, pp. 179-187 Studies on Coastal Geomorphology along Visakhapatnam to Bhimunipatnam, East Coast of India M. Jagannadha Rao, Greeshma Gireesh A.G., P. Avatharam1, N.C. Anil2 and T. Karuna Karudu Delta Studies Institute, 1Dept of Geology, 2Dept. of Geo-Engineering, Andhra University, Visakhapatnam. ABSTRACT An attempt has been made to study and record the diverse coastal geomorphic features along Visakhapatnam – Bhimunipatnam coast. The study area is marked by geomorphic features resulted from various coastal and land ward processes. The geomorphic units under different heads namely, features formed by present day wave action, features formed due to sea level oscillations and features formed by rock and sea water interaction have been presented. The influence of sea level oscillations and land and sea interaction forms a diverse coastal geomorphology along the coast. The details of features such as beach, dune system, inter tidal deposits, red sediments, wave cut platform, marine terrace, sea stack, sea cave, serpent hood structures, promontories, wind gap and natural bridge have been recorded and the formation as well as significance of their occurrence are presented. The coastal geomorphology of the study area clearly established not only the sea level oscillations but also variations in climatic conditions in this part of the coast. INTRODUCTION PHYSIOGRAPHY Coastal geomorphology by definition is the study of The study area is characterized by Eastern Ghat the morphological development and evolution of the mobile belt. This area covered with denudational coast as it acts under the influence of winds, waves, hills of range between 30 to 594m above mean currents and sea level changes.
    [Show full text]
  • NTPC Pudimadaka Public Hearing on August 12
    Search GO Home Today's Paper All Sections News National International Opinion Business Sport thREAD Features Sci-Tech Entertainment Cities Bengaluru Chennai Coimbatore Delhi Hyderabad Kochi Kozhikode Kolkata Madurai Mangaluru Visakhapatnam CIT IES » VISAKHAPAT NAM VISAKHAPATNAM, July 13, 2015 Updated: July 13, 2015 05:48 IST o2 Loop Freikarte NTPC Pudimadaka public hearing on August 12 Pro- Ject Audio Shop - Plattenspieler,HiFi Geräte,Zubehör günstig, schnell & versandfrei www.yourhifi.de/pro-ject_shop Ads by Google SANTOSH PATNAIK COMMENT · PRINT · T T Tweet 0 Four coal-based units of 1,000 MW each will be set up at one place with supercritical technology The A. P. Pollution Control Board has issued a notification for holding environmental public hearing for NTPC Pudimadaka Super Thermal Power Project on August 12. The project for which NTPC has been allotted 1,200 acres by the A. P. Industrial Infrastructure Corporation at Pudimadaka, about 60 km from here in Atchutapuram and Rambilli mandals, will involve an investment of Rs.26,828 crore — the first major investment post-bifurcation. The EIA study for the project has been done by Vimta Labs of Hyderabad. The APPCB would put everything about the project on its website on Monday, Environmental Engineer R. Lakshminarayana told The Hindu . NTPC is also scouting for suitable site near Simhadri Super Thermal Power Station at Parawada to expand its capacity from 2,000 MW to 3,600 MW. Asked to comment on the project, NTPC-Pudimadaka Group General Manager P.S. Radhakrishnan said: “It will be a green power project, as the total requirement of coal will be imported to ensure higher efficiency levels and to put emissions at bare minimum.” He said the project would not need any land acquisition as the APIIC had already handed over 1,200 acres of developed area.
    [Show full text]
  • Facilitating Public Private Partnership for Accelerated Infrastructure Development in India Regional Workshops of Chief Secretaries on Public Private Partnership
    Facilitating Public Private Partnership for Accelerated Infrastructure Development in India Regional Workshops of Chief Secretaries on Public Private Partnership Workshop Report December 2006 Facilitating Public–Private Partnership for Accelerated Infrastructure Development in India Regional Workshops of Chief Secretaries on Public–Private Partnership Workshop Report December 2006 Department of Economic Affairs (DEA) Ministry of Finance, Government of India and Asian Development Bank (ADB) Asian Development Bank India Resident Mission (INRM) 4 San Martin Marg, Chanakyapuri New Delhi 110021, India © 2006 Asian Development Bank This report has been prepared under TA 4780–IND: Knowledge Management and Capacity Building, to document the insights and messages that emerged from the series of regional workshops of Chief Secretaries on public–private partnership. The views presented in it do not necessarily reflect the views and policies of the Asian Development Bank (ADB) or its Board of Directors or the governments they represent. The ADB does not guarantee the source, originality, accuracy, completeness, or reliability of any statement, information, data, finding, advice, opinion, or views presented. Foreword The Department of Economic Affairs (DEA), Ministry of Finance, Government of India, and the Asian Development Bank (ADB) organized four Regional Workshops of Chief Secretaries on Public–Private Partnership (PPP) for Accelerated Infrastructure Development in India. The workshops were held between June and September 2006 in Bangalore (June 12), Delhi (July 26), Kolkata (August 31), and Goa (September 2). This report summarizes the principal themes, issues, and messages that emerged during the workshops. It draws on the workshop presentations and the discussions that ensued. The contributions of the presenters, panelists, discussants, and workshop participants from the DEA, the ADB, the private sector, and the states and Union territories are gratefully acknowledged.
    [Show full text]
  • Feasibility Report on Revamping of Eq2 to Eq5 Berths by Construction a Multipurpose Purpose Terminal in the Inner Harbour at Port of Visakhapatnam
    FEASIBILITY REPORT ON REVAMPING OF EQ2 TO EQ5 BERTHS BY CONSTRUCTION A MULTIPURPOSE PURPOSE TERMINAL IN THE INNER HARBOUR AT PORT OF VISAKHAPATNAM INDIAN PORTS ASSOCIATION 1st Floor, South Tower, NBCC Place, Bhisham Pitamah Marg, Lodi Road, New Delhi-110003 APRIL, 2015 CONTENTS Chapter Description Page No. Executive Summary i - v 1 Project Background 1 2 Present Setting & Traffic Profile 5 3 Traffic Forecast 17 4 Development Strategy 59 5 Site Information 64 6 Berth Position and Alignment 70 7 Preliminary Design and Evaluation of Alternatives 72 8 Equipment Requirement 82 9 Capital cost estimate and Implementation schedule 88 10 Operation and Maintenance Cost 91 11 Revenue Estimates 94 12 Viability and Sensitivity Analysis 99 Revamping of EQ2 TO EQ5 berths by construction a Multipurpose Purpose Terminal in the Inner Harbour at Port of Visakhapatnam CHAPTER1 PROJECT BACKGROUND 1.1 The Port The Port of Visakhapatnam, situated on the East Coast of India, is one of the five pre- independence Ports of the country and was opened to commercial shipping on 7th October, 1933. Strategically located on the East Coast, the Port is endowed with deep water basins, naturally protected to provide tranquil water frontage to accommodate large size ships. The Port has two harbour basins namely the inner harbour and the outer harbour. At present, the inner harbour channel and turning circle can cater to 12.5m draft vessels. To meet the dynamic changing needs of cargo carriers, the port is making relentless efforts to augment its infrastructure facilities. As a part of this endeavour, the inner harbour turning circle and entrance channel are being deepened to cater to fully laden panamax vessels of 14.0 m draft.
    [Show full text]
  • Study and Analysis of Vehicular Trip Generation: a Case Study
    International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 03 Issue: 10 | Oct -2016 www.irjet.net p-ISSN: 2395-0072 Study and Analysis of Vehicular Trip Generation: A Case Study K. Blessy Babu1, Dr.G.Venkata Rao2, K.S.B.Prasad3 1P.G Student, Dept. of Civil Engineering, GMR Institute of Technology, Rajam, Andhra Pradesh 2Professor, Dept. of Civil Engineering, GMR Institute of Technology, Rajam, Andhra Pradesh 3Assistant Professor, Dept. of Civil Engineering, GMR Institute of Technology, Rajam, Andhra Pradesh ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - With fast-growing economy and spatial counts. Enumerators can execute manual counts if the distribution of major activities, travel needs of people traffic is found to be low. But the data obtained may not be increase at a rapid pace. Increased transport activity can precise. On the other hand, in automatic methods, sensors however lead to an increase in pollution, congestion and are used in order to collect the traffic data, which will be accidents. In this way it’s important to give consideration precise. There are three cyclic variations of the traffic towards transportation and study, expressing traffic volume namely: Hourly pattern, day-to-day pattern and volume, as numbers of vehicles crossing a section of road per monthly/seasonal pattern. The traffic volume unit time. Traffic volume studies are conducted to collect characteristics vary during the mornings and evenings, data on the number of vehicles that pass a point during a which can be found highest which can be termed as peak specified time period. This present study executes the hours. estimation of traffic volume using exponential growth and Traffic forecasting is defined as the process of service flow rate by converting the traffic stream of different predicting the future traffic volume based on the growth types of vehicles into traffic stream consisting of only rate trends in the previous years.
    [Show full text]
  • About Apsez Infrast Ruct Ure How T O Set up Policies Indust Ries at Apsez Dta
    HOME ABOUT APIIC ABOUT APSEZ INFRAST RUCT URE HOW T O SET UP POLICIES INDUST RIES AT APSEZ DTA CONTACT US About APSEZ Announcements APSEZ is a Multi-Product SEZ developed over an area of 5595.47 acres of land at Atchutapuram and Rambilli mandals of Visakhapatnam District. The Government of India notified the SEZ on 12/04/2007 in the Gazette. It is the major SEZ in the State of Andhra Pradesh. Location : Atchutapuram and Rambilli (M), Visakhapatnam Extent :5595.47 Acres APIIC ONLINE APPLICAT ION Close Proximity To Submit an Online Application form, please click here. Road Connectivity : A 4-lane Major District Road from Atcutapuram junction to Pudimadaka – 3 Kms from Atcutapuram junction. National Read more Highway connectivity from Atcutapuram junction to Anakapalle – 17 Kms. Port Connectivity : Visakhapatnam Port - 50 Kms Gangavaram Port - 30 Kms Important Contact Details Air Conenctivity : Visakhapatnam Airport - 40 Kms Vice Chairman & Managing Rail : Nearest Railway station - Anakapalle – 17 Kms. From Director APSEZ. Sri. B.R. Meena, IAS Ph: +9140-23230234 / 23233596 Fax:+9140-23240205 Email: [email protected] Lease Premium Development Commissioner S.Kishore, IAS Rs.35.00 lakhs per acre (Valid upto 31/03/12) (payable in Lease premium per acre : APSEZ, Development Commissioner, 90 days) 9th Floor, Udyog Bhavan(VUDA Building), 2% on total lease premium with 5% escalation on Annual Lease rentals : cumulative basis every year, payable per annum in advance Siripuram Road, Visakahaptnam. Ph:+91-9948888400 Lease Tenor : 33 years Fax:+91891-2558678 Email: [email protected] Water Provision : Water supply - 10 KL per acre per day. F o r additional water supply - Shall pay an amount of Rs.15000.00 per each additional KL per day.
    [Show full text]
  • Preparation of Master Plan & Upgradation for Mudasarlova Park
    RFP Visakhapatnam Urban Development Authority. 17TH March 2017 [SELECTION OF ARCHITECTURAL LANDSCAPE CONSULTING AGENCY FOR “PREPARATION OF MASTER PLAN & UPGRADATION FOR MUDASARLOVA PARK AS INTERNATIONAL TOURIST DESTINATION IN VISAKHAPATNAM, ANDHRA PRADESH.”] ISSUED BY: VISAKHAPATNAM URBAN DEVELOPMENT AUTHORITY ANDHRA PRADESH INDIA Selection of Consulting Agency for “Preparation of Master Planning and Upgradation of Mudasalova 1. DISCLAIMER Park, Visakhapatnam, Andhra Pradesh.” The information contained in the Request for Proposal document (“RFP”) is provided to Bidders on the terms and conditions set out in this RFP and such other terms and conditions subject to which such information is provided. The RFP is not an agreement and is neither an offer nor invitation by the Authority to the prospective Bidders or any other person. The purpose of the RFP is to provide interested parties with information that may be useful to them in the formulation of their Proposals pursuant to this RFP. The RFP includes statements, which reflect various assumptions and assessments arrived at by the Authority in relation to the Consultancy. Such assumptions, assessments and statements do not purport to contain all the information that each Bidder may require. The RFP may not be appropriate for all persons, and it is not possible for the Authority, its employees or advisers to consider the objectives, technical expertise and particular needs of each party who reads or uses the RFP. The assumptions, assessments, statements and information contained in the RFP, may not be complete, accurate, adequate or correct. Each Bidder should, therefore, conduct its own investigations and analysis and should check the accuracy, adequacy, correctness, reliability and completeness of the assumptions, assessments and information contained in the RFP and obtain independent advice from appropriate sources.
    [Show full text]
  • 48434-003: Visakhapatnam-Chennai
    Land Acquisition and Resettlement Due Diligence Report Document stage: Final Project Number: 48434-003 Loan and Grant Numbers: L3430; G0495 September 2018 India: Visakhapatnam-Chennai Industrial Corridor Development Program (VCICDP) - Project 1 Subproject: Development and Rejuvenation of Mudasarlova Reservoir Catchment Area Prepared by Greater Visakhapatnam Municipal Corporation, Government of Andhra Pradesh for the Asian Development Bank This due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CURRENCY EQUIVALENTS (as of 01 September 2018) Currency unit = Rupee (INR) INR 1.00 = USD 0.0141 USD 1.00 = INR 70.6800 ABBREVIATIONS ADB – Asian Development Bank BRTS – Bus Rapid Transit System DPR – Detailed Project Report DDR – Due diligence report DoI – Department of Industries GHG – Green House Gas GoAP – Government of Andhra Pradesh GVMC – Greater Visakhapatnam Municipal Corporation MFF – Multitranche Financing Facility PIU – Project Implementation Unit PMU – Project Management Unit R&R – Rehabilitation and Resettlement UCCRTF – Urban Climate Change Resilience Trust Fund VCICDP – Visakhapatnam Chennai Industrial Corridor Development Program CONTENTS Page I. INTRODUCTION 1 A. Background 1 B. Scope of this report 1 II. SUBPROJECT DESCRIPTION 2 A. Proposed components 2 III. FIELD WORK AND CONSULTATION 4 A.
    [Show full text]
  • ROADS & BUILDINGS DEPARTMENT From
    ROADS & BUILDINGS DEPARTMENT From : To Sri M.Venugopala Rao The Chief Engineer, (R&B), M.Tech. M.D., APRDC Superintending Engineer (R&B) Errummunzil, Seethammadhara, Andhra Pradesh, Visakhapatnam – 530 013, Hyderabad. e-mail : [email protected] Fax : 0891-2553265 Lr.No.3042/AP second Highway Report/2005, dated: 10 -12-2005. Sir, Sub:- A. P. Second Highway Project-Justification for qualifying the roads- Particulars submitted-Reg. Ref:- 1. Circular Memo.No.AP SM.II/RR/GM.I/2002 dt.29.11.2005 of Chief Engineer(R&B) & M.D.,APRDC, Hyderabad ### I submit herewith the particulars in the prescribed Proforma (a) to (k) of roads identified under Ist phase of A.P. Second High way Project pertaining to (R&B) circles (i) Visakhapatnam (ii) Vizianagaram (iii) Srikakulam for favour of taking further necessary action. Yours faithfully Sd/- Superintending Engineer(R&B) Visakhapatnam Encl: Project Report for For six roads along With maps and combined map INDEX S.No Name of the Road Page No. 1 Narsipatnam-Sabbavaram-Kottavalasa- 1 to 6 Vizianagaram-Palakonda-Haddubangi 2 Polavaram-Narsipatnam-Tallapalem 7 to 9 3 Calingapatnam-Parlakhemudi 10 to 11 4 Nrsipatnam-Devipatnam 12 to 13 5 Anakapalli-Anandapuram 14 to 15 6 Kakinada - Polamanipeta,Venkatanagaram- 16 to 19 Pentakota-Pudimadaka-Atchutapuram- Gajuwaka-Visakhapatnam(Item 7 of C E.Circular dt.24.11.05) 7 Combined Map 20 1) NARSIPATNAM- SABBAVARAM- KOTHAVALASA - VIZIANGARAM- PALAKONDA-HADDUBANGI ROAD A.P. SECOND HIGHWAY PROJECT - PARTICULARS ON ROADS Pavement Traffic values Constraints Classifica- Land Pavement Road Sections Distances from Major river and in terms of S. regarding tion of Homogeneous part of road/ acquisition roughness sections Name of the Road requiring four NH or improved crossings/ ROBs/ shoulder Commercial No.
    [Show full text]
  • THE FUTURE of Pendurthi ...For Growth Chodavaram Rushikonda Beach Sabbavaram COMMUTE Simhachalam
    www.sirivenkateswaradevelopers.com Seethammadhara, Visakhapatnam- 530013 Visakhapatnam- Seethammadhara, Opp BSNL Exchange, BSNL Opp D.No 55-8-35/3, 4th Floor, Floor, 4th 55-8-35/3, D.No Corporate Office: Corporate 15 Mins to Parawada Pharma City Pharma Parawada to Mins 15 • 10 Mins to Brandix Apperal City Apperal Brandix to Mins 10 • Pudimadaka Beach Pudimadaka 8 Mins to Kondakarla bird sanctuary bird Kondakarla to Mins 8 • AT URBAN CITY URBAN AT Brandix Brandix 5 Mins to Atchutapuram SEZ Atchutapuram to Mins 5 • ATMOSFAIR Adjacent to BARC 1000 acres Township acres 1000 BARC to Adjacent • Yellamanchili Atchutapuram ENJOY THE VILLAGE VILLAGE THE ENJOY Behind to BARC Quaters BARC to Behind • Bird Sanctuary Bird Kondakarla Paravada Steel Plant Steel Vizag Gangavaram Port Gangavaram NH 16 NH Near Atchutapuram Near Yarada Beach Yarada Pharma City Pharma Parawada Parawada LEAST EXPECT IT. EXPECT LEAST Gajuwaka Dopperla Village Dopperla Visakhapatnam Port Visakhapatnam NH 16 NH Anakapalle RK Beach RK Airport chennai srikakulam high srikakulam chennai WHERE YOU YOU WHERE Visakhapatnam Vizag NAD Jn NAD w a y Simhachalam COMMUTE Sabbavaram Rushikonda Beach Rushikonda ...for Growth ...for Chodavaram Pendurthi THE FUTURE OF FUTURE THE highway srikakulam chennai A Destination Destination A Bheemli Beach Bheemli Towards Aruku Towards Anandapuram Stay close to the nature. To begin with, you're cordoned off from the main road, by layers of green cover. From tree-lined avenues to land- scaped gardens and the adjacent lake, the whole ambi- ence here seems like a serene suburb, though your in the middle of the city. Enjoy quiet walks in solitude, amidst tweeting birds and Welcome to Visakhapatnam’s sentinel trees.
    [Show full text]
  • Resolution No.01
    SUBJECT NO. 1 Sub : VUDA-VSP-Action taken report on the Minutes of the Meeting of VUDA Board held on 08-05-2012 & 15-12-2012 -Submitted for kind perusal – Reg. * * * ACTION TAKEN ON THE MINUTES OF VUDA BOARD MEETINGS SL. Date of Subject Subject Board Resolution Action Taken No. VUDA No. Board Meeting ENGINEERING WING 1. 08-05-2012 17. VUDA – Works – Engg. – The Board discussed Work taken up and Providing BT surface on the matter and completed. existing WBM surface to resolved to ratify the approach road of Pharma subject. city in E-Bonangi, RH Colony at Parawada, Visakhapatnam – Draft subject is placed before VUDA Board – Ratification – Requested – Reg. 2. 08-05-2012 18. VUDA – Works – The Board discussed This subject was not Engineering – Proposals for the matter and placed before VUDA Construction of VUDA directed the Vice- Board Meeting held on Guest House and Senior Chairman, to identify 15-12-2012. However, Citizen’s Centre in Plot the alternative land as per the decision No.”G” at T.S.982/P at for the senior citizens taken, the proposal Kirlampudi Layout, VSP – centre and put up in was cancelled. The Cancellation – Estt. of Mini the next Board request of Senior Planetarium Science meeting. Citizens for sparing of Centre – Draft subject space/area to meet placed before VUDA their requirements can Board for consideration be obliged by offering and approval – Reg. the area available in ground floor of VUDA Children Arena under construction. With regard to establishment of Mini Planetarium, schemes available under GoI are being explored and necessary proposals will be submitted by next Board Meeting.
    [Show full text]
  • Annexure to Trade Notice No. 01/2017 (General No
    Annexure to Trade Notice No. 01/2017 (General No. 1/2017) Dated. 21.06.2017 issued from F.No. V/39/16/2017-CC(VZ)Estt.P.F.I ANNEXURE - I Visakhapatnam Zone : Visakhapatnam Commissionerate and Kakinada Sub-Commissionerate No. of Sl.No. Commissionerate Name Jurisdiction Divisions Divisions This Commissionerate will have the jurisdiction over (i) Visakhapatnam North Visakhapatnam Srikakulam, Vizianagaram, (ii) Visakhapatnam Central 01 4 Commissionerate Visakhapatnam & East Godavari (iii) Visakhapatnam South Districts of Andhra Pradesh (iv) Vizianagaram Division State Kakinada Sub- This Sub-Commissionerate will (i) Kakinada Division Commissionerate have the jurisdiction over East 02 2 (ii) Rajamahendravaram (stationed at Rajamahendravaram) Godavari District of Andhra (Under Visakhapatnam Division Commissionerate) Pradesh State Page 1 of 13 Annexure to Trade Notice No. 01/2017 (General No. 1/2017) Dated. 21.06.2017 issued from F.No. V/39/16/2017-CC(VZ)Estt.P.F.I Sl. GST Division Name Jurisdiction No. of Ranges Ranges No. (i) Bheemunipatnam This Division will have jurisdiction over GVMC (Greater (ii) Madhurawada Visakhapatnam Municipal Corporation) ward Nos. 1 to 19 & (iii) Muvvalavanipalem Bheemunipatnam, Padmanabham & Anandapuram Mandals (iv) Maddilapalem Visakhapatnam (v) Akkayyapalem 01 of Visakhapatnam District. This Division will also have 10 North (vi) Seethammapeta residuary jurisdiction over any other area which is not (vii) Dwarakanagar mentioned or existing in any division under Visakhapatnam (viii) Srinagar District. (ix) Aseelmetta
    [Show full text]