The Second Report

Total Page:16

File Type:pdf, Size:1020Kb

The Second Report The Second Report Watershed Stewardship Grant Program (Spring 2006, Fall 2006, Spring 2007) AENV Grant: #06GREA29 Sarah Hipkin & Kevin Wirtanen Grant Administrators 2006-2008 Alberta Stewardship Network Special thanks to: Alberta Environment Members of the Stewardship Grant Committee: Margaret Glasford, ASN Chair / Past Chair and Grant Committee Chair (all grant cycles) Petra Rowell, Alberta Environment (all) Jeff McCammon, Lac La Nonne Watershed and Lake Stewardship Society (all) Shirley Pickering, Highwood Water Management Plan Public Advisory Committee (all) Ernie Ewaschuk and Sarah Primeau, Land Stewardship Centre of Canada & ASN Secretariat Ken Lewis and Dale Chrapko, Alberta Agriculture and Food /AESA Diana Rung, Alberta Conservation Association (all) Kelsey Spicer-Rawe, Alberta Riparian Habitat Management Society (Cows & Fish) (all) Wendy Devent, Stephanie Palechek and Leda Kozak, Oldman Watershed Council Kent Lyle, Sylvan Lake Watershed Stewardship Society (Spring 2006) Frank Vagi, North Saskatchewan Watershed Alliance (Fall 2006) Jacqueline Nelson, ASN Chair (2007/8 on) and Foothills Land Trust (Spring 2008) Jodi Miller, Volunteer Steward (Spring 2008) Additional appreciation is extended to the ASN’s other partnering organizations. The delivery of the range of ASN services is dependent on their ongoing support. 2 CONTENTS The Ripple Reaches Further: The Second Report on the Watershed Stewardship Grant Program ..............................................................................6 Highlights Reach .............................................................................................................................................. 6 Geographical Distribution ................................................................................................................ 7 Projects Summary .......................................................................................................................... 7 Financial Summary.......................................................................................................................... 9 Learning from the Showcase......................................................................................................... 11 Grant Recipients by Watershed.......................................................................12 Peace River watershed.....................................................................................13 Project Category: Tool-Building........................................................................................ 13 Heart River Watershed Advisory Committee .................................................................... 13 West County Watershed Group ............................................................................................ 14 Project Category: Biophysical & Social Monitoring .......................................................... 15 Clear Hills Watershed Initiative ........................................................................... 15 Athabasca River watershed .............................................................................15 Project Category: Awareness & Knowledge..................................................................... 16 Borealis Canoe Club............................................................................................ 16 Crooked Creek Conservancy Society of Athabasca ........................................... 17 West Athabasca Bioregional Society.................................................................................17 Project Category: Tool-Building........................................................................................ 18 Baptiste, Island, & Skeleton Lakes Watershed Management and Lake Stewardship Council............................................................................................. 18 Lac La Nonne Watershed Stewardship Society ........................................................19 Skeleton Lake Stewardship Association.....................................................................19 Peace Country Beef & Forage Association................................................................20 Project Category: Biophysical & Social Monitoring .......................................................... 21 Smoky Applied Research & Demonstration Association..........................................21 Lac La Nonne Enhancement & Protection Association........................................ 21 Lac La Nonne Watershed Stewardship Society................................................... 22 Project Category: Community-Based Action.................................................................... 22 Driftpile First Nation........................................................................................................... 23 Beaver River watershed ...................................................................................23 Project Category: Awareness & Knowledge..................................................................... 24 Crane Lake Advisory and Stewardship Society ................................................... 24 Moose Lake Watershed Society........................................................................... 24 Lakeland Watershed Steering Committee ........................................................... 26 North Saskatchewan River watershed ............................................................26 Project Category: Awareness & Knowledge..................................................................... 27 Wizard Lake Watershed & Lake Stewardship Assoc. .................................................. 27 Project Category: Tool-Building........................................................................................ 27 Rocky Riparian Group ..................................................................................................... 27 Project Category: Team-Building...................................................................................... 28 Wizard Lake Watershed & Lake Stewardship Assoc. .............................................................. 28 Project Category: Biophysical & Social Monitoring .......................................................... 29 Lac Sante Watershed Society................................................................................... 29 Brazeau Healthy Waterways..................................................................................... 29 Battle River sub-watershed.................................................................................30 Project Category: Awareness & Knowledge..................................................................... 30 Camrose Adult Learning Council............................................................................... 31 Project Category: Tool-Building........................................................................................ 31 Iron Creek Watershed Improvement Society.....................................................................31 3 South Saskatchewan River watershed ...........................................................32 Red Deer River sub-watershed...........................................................................32 Project Category: Awareness & Knowledge..................................................................... 33 Rosebud River Watershed Partners..................................................................... 33 Sylvan Lake Watershed Stewardship Society...................................................... 34 Butte Action Committee for the Environment ...................................................... 34 Project Category: Tool-Building........................................................................................ 35 Medicine River Watershed Society................................................................................... 35 Project Category: Biophysical & Social Monitoring ........................................................... 35 Friends of Little Red Deer River Society............................................................................35 Bow River sub-watershed ...................................................................................36 Project Category: Awareness & Knowledge..................................................................... 36 Friends Of Kananaskis Country Cooperating Association ................................... 36 Siksika First Nation .............................................................................................. 37 Friends Of Banff National Park............................................................................. 38 Project Category: Tool-Building........................................................................................ 38 Ghost Watershed Alliance Society ....................................................................... 38 Upper Tongue Creek Riparian Group ................................................................ 39 Project Category: Team-Building...................................................................................... 39 Cochrane Ecological Institute - Cochrane Wildlife Reserve Society................... 39 Nose Creek Watershed Partnership..................................................................... 39 Bighill, Jumping And Horse Creeks Watershed Partnership .............................. 40 Elbow River Watershed Partnership .................................................................... 41 Friends of Fish Creek Provincial Park
Recommended publications
  • Important Bird and Biodiversity Areas
    A NATURE ALBERTA CHECKLIST IMPORTANT AND BIRD BIODIVERSITY AREAS IMPORTANT BIRD OF ALBERTA AND BIODIVERSITY AREAS OF ALBERTA NATURE ALBERTA NATURE Use this Checklist as your guide to explore and discover the fascinating natural history and biodiversity of our province. naturealberta.ca A COMMUNITY CONNECTED BY A LOVE OF NATURE The year was 1970. Six nature clubs came together to form the Federation of Alberta Naturalists. More than four decades later, and now known as Nature Alberta, we are grateful for the clubs, the people and the history that has enabled this organization to become the voice for the greater appreciation and conservation of Alberta’s natural environment. We strive to connect Albertans with the natural world that exists all around us. By encouraging Albertans to learn more about and understand natural history and ecological processes, we help ensure that Alberta’s natural heritage and its biodiversity is widely enjoyed, deeply appreciated and thoroughly protected. ACKNOWLEDGEMENTS Nature Alberta gratefully acknowledges the many individuals and organizations who have contributed to this project. Special thanks to Rob Worona and Margot Hervieux for contributing their time and expertise to reviewing and editing this publication. Thank you also to all of the volunteer IBA Caretakers, past, present and future, who commit to monitoring and stewarding these important natural areas. This project would also not have been possible without the generous support of our partners, including TD Friends of the Environment and Alberta Conservation Association. Cover photo: Yellow-rumped Warbler, D. Godkin Copyright ©2019 Nature Alberta. All rights reserved. SOURCES Information contained within this Checklist has been compiled from the following and other sources as annotated within the publication: BirdLife IBA Important Bird Area Alberta Guide booklet ©2014 Nature Alberta Important Bird and Biodiversity Areas in Canada https://www.ibacanada.org/ Bird Life International website and Data Zone http://www.birdlife.org/ Blue-winged Teal Photo: G.
    [Show full text]
  • Northwest Territories Territoires Du Nord-Ouest British Columbia
    122° 121° 120° 119° 118° 117° 116° 115° 114° 113° 112° 111° 110° 109° n a Northwest Territories i d i Cr r eighton L. T e 126 erritoires du Nord-Oues Th t M urston L. h t n r a i u d o i Bea F tty L. r Hi l l s e on n 60° M 12 6 a r Bistcho Lake e i 12 h Thabach 4 d a Tsu Tue 196G t m a i 126 x r K'I Tue 196D i C Nare 196A e S )*+,-35 125 Charles M s Andre 123 e w Lake 225 e k Jack h Li Deze 196C f k is a Lake h Point 214 t 125 L a f r i L d e s v F Thebathi 196 n i 1 e B 24 l istcho R a l r 2 y e a a Tthe Jere Gh L Lake 2 2 aili 196B h 13 H . 124 1 C Tsu K'Adhe L s t Snake L. t Tue 196F o St.Agnes L. P 1 121 2 Tultue Lake Hokedhe Tue 196E 3 Conibear L. Collin Cornwall L 0 ll Lake 223 2 Lake 224 a 122 1 w n r o C 119 Robertson L. Colin Lake 121 59° 120 30th Mountains r Bas Caribou e e L 118 v ine i 120 R e v Burstall L. a 119 l Mer S 117 ryweather L. 119 Wood A 118 Buffalo Na Wylie L. m tional b e 116 Up P 118 r per Hay R ark of R iver 212 Canada iv e r Meander 117 5 River Amber Rive 1 Peace r 211 1 Point 222 117 M Wentzel L.
    [Show full text]
  • National Assessment of First Nations Water and Wastewater Systems
    National Assessment of First Nations Water and Wastewater Systems Alberta Regional Roll-Up Report FINAL Department of Indian Affairs and Northern Development January 2011 Neegan Burnside Ltd. 15 Townline Orangeville, Ontario L9W 3R4 1-800-595-9149 www.neeganburnside.com National Assessment of First Nations Water and Wastewater Systems Alberta Regional Roll-Up Report Final Department of Indian and Northern Affairs Canada Prepared By: Neegan Burnside Ltd. 15 Townline Orangeville ON L9W 3R4 Prepared for: Department of Indian and Northern Affairs Canada January 2011 File No: FGY163080.4 The material in this report reflects best judgement in light of the information available at the time of preparation. Any use which a third party makes of this report, or any reliance on or decisions made based on it, are the responsibilities of such third parties. Neegan Burnside Ltd. accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this report. Statement of Qualifications and Limitations for Regional Roll-Up Reports This regional roll-up report has been prepared by Neegan Burnside Ltd. and a team of sub- consultants (Consultant) for the benefit of Indian and Northern Affairs Canada (Client). Regional summary reports have been prepared for the 8 regions, to facilitate planning and budgeting on both a regional and national level to address water and wastewater system deficiencies and needs. The material contained in this Regional Roll-Up report is: preliminary in nature, to allow for high level budgetary and risk planning to be completed by the Client on a national level.
    [Show full text]
  • Foothills Regional Water and Wastewater Collaborative (Frwwc)
    Final Report for: FOOTHILLS REGIONAL WATER AND WASTEWATER COLLABORATIVE (FRWWC) REGIONAL WASTEWATER TREATMENT FEASIBILITY STUDY Date: July 11, 2016 2210-047-00 Proud of Our Past… Building the Future www.mpe.ca Suite 320, 6715 –8 Street NE Calgary, AB T2E 7H7 Phone: 403-250-1362 1-800-351-0929 Fax: 403-250-1518 Foothills Regional Water and Wastewater Collaborative July 11, 2016 c/o Town of Okotoks Municipal Center File: N:\2210\047-00\L02-1.0 5 Elizabeth Street Okotoks, AB T1S 1K1 Attention: Matt Rockley, FRWWC Co-Chair Suzanne Oel, FRWWC Co-Chair Dear Mr. Rockley and Ms. Oel: Re: Regional Wastewater Feasibility Study Final Report We are pleased to submit a final copy of the “Regional Wastewater Feasibility Study” Final Report as requested by the Foothills Regional Water and Wastewater Collaborative (FRWWC). This study is completed in conjunction with Urban Systems Ltd. to provide the FRWWC with an assessment of viable sub-regional alternatives that were beyond that considered in the higher level Calgary Regional Partnership (CRP) work for the South Region. Please contact the undersigned with any questions that you may have. Yours truly, MPE ENGINEERING LTD. Sarah Fratpietro, P.Eng. Project Manager SF/pm Enclosure FRWWC Regional Wastewater Treatment Feasibility Study CORPORATE AUTHORIZATION This report has been prepared by MPE Engineering Ltd. and Urban Systems Ltd. under authorization of Foothills Regional Water and Wastewater Collaborative. The material in this report represents the best judgment of MPE Engineering Ltd. and Urban Systems Ltd. given the available information. Any use that a third party makes of this report, or reliance on or decisions made based upon it is the responsibility of the third party.
    [Show full text]
  • Preliminary Soil Survey of the Peace River-High Prairie-Sturgeon Lake
    PROVINCE OF ALBERTA Research Council of Alberta. Report No. 31. University of Alberta, Edmonton, Alberta. SOIL SURVEY DIVISION Preliminary Soi1 Survey of The Peace River-High Prairie- Sturgeon Lake Area BY F. A. WYATT Department of Soils University of Alberta, Edmonton, Alberta (Report published by the University of Alberta at the request of Hon. Hugh W. Allen, Minister of Lands and Mines) 1935 Price 50 cents. LETTER OF TRANSMITTAL. , DR. R. C. WALLACE, Director of Research, Resedrch Cowuil of Alberta, University of Alberta, Edmonton, Alberta. Sir:- 1 beg to submit a report entitled “Preliminary Soi1 Survey of the Peace River-High Prairie-Sturgeon Lake Area,” prepared in co- operation with Dr. J. L. Doughty, Dr. A. Leahey and Mr. A. D. Paul. A soi1 map in colors accompanies this report. This report is compiled from five adjacent surveys c,onducted between the years 1928 and 1931. It includes a11 of two and parts of the other three surveys. The area included in the report is about 108 miles square with McLennan as the approximate geographical tenter. Respectfully submitted, F. A. WYATT. Department of Soils, University of, Alberta, Edmonton, Alberta, April 15th, 1935. .-; ‘- TABLE OF CONTENTS PAGE Description of area ...............................................................................................................................................1 Drainage ........................................................................................................................................................................2 Timber
    [Show full text]
  • RURAL ECONOMY Ciecnmiiuationofsiishiaig Activity Uthern All
    RURAL ECONOMY ciEcnmiIuationofsIishiaig Activity uthern All W Adamowicz, P. BoxaIl, D. Watson and T PLtcrs I I Project Report 92-01 PROJECT REPORT Departmnt of Rural [conom F It R \ ,r u1tur o A Socio-Economic Evaluation of Sportsfishing Activity in Southern Alberta W. Adamowicz, P. Boxall, D. Watson and T. Peters Project Report 92-01 The authors are Associate Professor, Department of Rural Economy, University of Alberta, Edmonton; Forest Economist, Forestry Canada, Edmonton; Research Associate, Department of Rural Economy, University of Alberta, Edmonton and Research Associate, Department of Rural Economy, University of Alberta, Edmonton. A Socio-Economic Evaluation of Sportsfishing Activity in Southern Alberta Interim Project Report INTROI)UCTION Recreational fishing is one of the most important recreational activities in Alberta. The report on Sports Fishing in Alberta, 1985, states that over 340,000 angling licences were purchased in the province and the total population of anglers exceeded 430,000. Approximately 5.4 million angler days were spent in Alberta and over $130 million was spent on fishing related activities. Clearly, sportsfishing is an important recreational activity and the fishery resource is the source of significant social benefits. A National Angler Survey is conducted every five years. However, the results of this survey are broad and aggregate in nature insofar that they do not address issues about specific sites. It is the purpose of this study to examine in detail the characteristics of anglers, and angling site choices, in the Southern region of Alberta. Fish and Wildlife agencies have collected considerable amounts of bio-physical information on fish habitat, water quality, biology and ecology.
    [Show full text]
  • Attachment 2 Sample Plan, Profiles and Books of Reference
    NOVA Gas Transmission Ltd. Edson Mainline Expansion Project Sample Notices and Plan, Project and Book of Reference Attachment 2 Attachment 2 Sample Plan, Profiles and Books of Reference TRAPPERTRAPPER TRAPPER T R 2T 2 R 6 9 2 2 6 9 12 -, BINGLEY -,11 CRIMSON LAKE -,22 Ü ST756 11 NORTH -, SASKATCHEWAN -,11 RIVER ORAS ST598 ROCKY FERRIER MOUNTAIN HOUSE 11A-, GARTH ALHAMBRA -,11 RAM RIVER ST752 -,22 STRACHAN 752 ST DOVERCOURT Edson ML Loop No. 4 (Alford Creek Section) O'CHIESE CEMETERY 203A PRAIRIE Legend CREEK BUTTE Edson ML Loop No. 4 - Alford Creek Section CHEDDERVILLE Primary Highway -,22 Secondary Highway Railways 752 Existing NGTLST System CAROLINE -,54 Licensed Pipeline (Foreign) RICINUS AIR CADET CAMP River /ST734 Creek CLEARWATER RIVER ST591 Lake / Waterbody City / Town CRAMMOND First Nations -,22 BURNSTICK Metis Reserve LAKE Military Reserve 0 2 4 8 12 16 ST734 Kilometers JAMES 1:175,000 RIVER BRIDGE Plans and Profiles of: EDSON MAINLINE EXPANSION PROJECT (Alford Creek Section) Canadian Energy Regulator Certificate of Public Convenience and Necessity (GC-133) NOVA GAS TRANSMISSION LTD. Document No: 075621-MSI-G-MP-0269_01 The information contained herein is compiled from various government and industry sources, subject to copyright, and includes but is not limited to: © Government of Alberta 2009, © Department of Natural Resources Canada, All rights reserved. Midwest Surveys Inc. and its data suppliers provide no warranty regarding the accuracy or completeness of this information, and assume no liability for the interpretation or
    [Show full text]
  • Lac La Biche County Recreation & Culture Directory
    Lac La Biche County FCSS This directory was created as an information service for the residents of this community, and the organizations and agencies working within its boundaries. We thank everyone who cooperated in providing information for this resource. If you know of corrections or changes that would help this directory become more accurate, please call the Lac La Biche County FCSS office at 623-7979 or fill out the form included at the back of this directory and mail it to the address provided. EMERGENCY 911 FOR FIRE, AMBULANCE, MEDICAL & POLICE SERVICE Child Abuse Hotline: 1-800-387-5437 Crime Stoppers: 1-800-222-8477 Addiction Services/Gambling Help Line: 1-866-332-2322 Hospital: 780-623-4404 Kids Help Line: 1-800-668-6868 Mental Health Crisis Services: 1-877-303-2642 Poison Control Centre 1-800-332-1414 Victim Services 623-7770 Women’s Shelter 780-623-3100 Lac La Biche County Community Services Directory Page 2 of 83 Population: Lac La Biche County: 9123 Incorporation: Lakeland County and the Town of Lac La Biche amalgamated in August, 2007 Health Unit: Lac La Biche Community Health Services 780-623-4471 Health Centre: W. J. Cadzow Health Centre 9110 - 93rd Street, Lac La Biche, AB T0A 2C0 Phone: 780-623-4404 R.C.M.P.: Lac La Biche Detachment #11 Nipewan Road. Lac La Biche 780-623-4380 (emergency line) 780-623-4012 (Admin.-Info) Fire: Hylo - 911 Buffalo Lake: 780-689-2170, 689-4639 or 689-1470 (cell) Les Hanson - Fire Chief; Caslan: 780-689-3911; Kikino: 780-623-7868; Rich Lake 911 Ambulance: 911 - Lac La Biche & District Regional EMS Mayor: Omer Moghrabi 780-623-1747 Administrator: Shadia Amblie 623-6803 Provincial MLA: Shayne Saskiw (Lac La Biche - St.Paul Const.) Box 1577 Unit 2, 4329– 50 Avenue St.
    [Show full text]
  • Information Package Watercourse
    Information Package Watercourse Crossing Management Directive June 2019 Disclaimer The information contained in this information package is provided for general information only and is in no way legal advice. It is not a substitute for knowing the AER requirements contained in the applicable legislation, including directives and manuals and how they apply in your particular situation. You should consider obtaining independent legal and other professional advice to properly understand your options and obligations. Despite the care taken in preparing this information package, the AER makes no warranty, expressed or implied, and does not assume any legal liability or responsibility for the accuracy or completeness of the information provided. For the most up-to-date versions of the documents contained in the appendices, use the links provided throughout this document. Printed versions are uncontrolled. Revision History Name Date Changes Made Jody Foster enter a date. Finalized document. enter a date. enter a date. enter a date. enter a date. Alberta Energy Regulator | Information Package 1 Alberta Energy Regulator Content Watercourse Crossing Remediation Directive ......................................................................................... 4 Overview ................................................................................................................................................. 4 How the Program Works .......................................................................................................................
    [Show full text]
  • Water Storage Opportunities in the South Saskatchewan River Basin in Alberta
    Water Storage Opportunities in the South Saskatchewan River Basin in Alberta Submitted to: Submitted by: SSRB Water Storage Opportunities AMEC Environment & Infrastructure, Steering Committee a Division of AMEC Americas Limited Lethbridge, Alberta Lethbridge, Alberta 2014 amec.com WATER STORAGE OPPORTUNITIES IN THE SOUTH SASKATCHEWAN RIVER BASIN IN ALBERTA Submitted to: SSRB Water Storage Opportunities Steering Committee Lethbridge, Alberta Submitted by: AMEC Environment & Infrastructure Lethbridge, Alberta July 2014 CW2154 SSRB Water Storage Opportunities Steering Committee Water Storage Opportunities in the South Saskatchewan River Basin Lethbridge, Alberta July 2014 Executive Summary Water supply in the South Saskatchewan River Basin (SSRB) in Alberta is naturally subject to highly variable flows. Capture and controlled release of surface water runoff is critical in the management of the available water supply. In addition to supply constraints, expanding population, accelerating economic growth and climate change impacts add additional challenges to managing our limited water supply. The South Saskatchewan River Basin in Alberta Water Supply Study (AMEC, 2009) identified re-management of existing reservoirs and the development of additional water storage sites as potential solutions to reduce the risk of water shortages for junior license holders and the aquatic environment. Modelling done as part of that study indicated that surplus water may be available and storage development may reduce deficits. This study is a follow up on the major conclusions of the South Saskatchewan River Basin in Alberta Water Supply Study (AMEC, 2009). It addresses the provincial Water for Life goal of “reliable, quality water supplies for a sustainable economy” while respecting interprovincial and international apportionment agreements and other legislative requirements.
    [Show full text]
  • Bow River Recreational Access Ghost Dam to Bearspaw Reservoirs. Introduction
    Calgary River Users’ Alliance Bow River Recreational Access Ghost Dam to Bearspaw Reservoirs. Introduction Outdoor recreational pursuits have increased in popularity in recent years with access to suitable venues close to the urban populations being one of the most important needs. Calgary and surrounding communities have access to a wide variety of outdoor pursuits with the Bow River and its tributaries offering a venue for paddle sports such as canoeing and kayak as well as fishing. But river recreational access is not without restraints. problems. Access to public waterways is often across privately owned land or under restricted access agreements within city and provincial property. In 2016 the City of Calgary addressed their concerns with the development of the Calgary River Access Strategy (RAS) (1) whereby a total of 12 designated river access sites were considered for improvements or new river access developments. To date two major projects have been completed, an upgrade to West Baker Park in the northwest quadrant of Calgary and a new boat ramp at Ogden Bridge. The Government of Alberta followed suit with the Bow River Access Plan (BRAP) (2) that addressed river access improvements between Fish Creek Provincial Park in Calgary and Johnson Island Provincial Park property at Carseland. Within the scope of the BRAP major improvements have been made to Policeman’s Flats in 2018 and a new road to McKinnon Flats in 2020. Also, the Harvie Passage Whitewater Park was developed in Calgary and other river recreational facilities are planned. Upstream of Calgary, the 50 Km reach of the Bow River between Ghost Reservoir and Bearspaw Reservoir has the potential to alleviate the ever-increasing river recreational use on the lower Bow River.
    [Show full text]
  • Artificial Drainage Report.Pdf
    HH3: Souris River Basin Artificial Drainage Impacts Review July 15, 2019 FINAL REPORT Submitted to the International Souris River Study Board by the HH3 Working Group Report prepared by Bob Harrison Executive Summary This project was undertaken as a portion of the Souris River Study. The governments of Canada and the United States asked the IJC to undertake studies evaluating the physical processes occurring within the Souris River basin which are thought to have contributed to recent flooding events. The public expressed a high interest in the issue of agricultural drainage impacts. Thus an “Artificial Drainage Impacts Review” was added to International Souris River Study Board’s (ISRSB) Work Plan to help address their questions and provide information to the public regarding wetland drainage. This report summarizes the current knowledge of artificial drainage in the Souris River basin. The study involved a review of drainage legislation and practices in the basin, the artificial drainage science, the extent of artificial drainage in the basin and the potential influence on transboundary flows Artificial drainage is undertaken to make way for increased or more efficient agricultural production by surface or/and subsurface drainage. Surface drainage moves excess water off fields naturally (i.e., runoff) or by constructed channels. The purpose of using surface drainage is to minimize crop damage from water ponding after a precipitation event, and to control runoff without causing erosion. Subsurface drainage is installed to remove groundwater from the root zone or from low-lying wet areas. Subsurface drainage is typically done through the use of buried pipe drains (e.g., tile drainage).
    [Show full text]