1 A) Involving Listed Buildings Or Within a Conservation Area

Total Page:16

File Type:pdf, Size:1020Kb

1 A) Involving Listed Buildings Or Within a Conservation Area BRIGHTON AND HOVE CITY COUNCIL WEEKLY LIST OF APPLICATIONS BRIGHTON AND HOVE CITY COUNCIL TOWN & COUNTRY PLANNING ACT 1990 PLANNING (LISTED BUILDINGS & CONSERVATION AREAS) REGULATIONS 1990 TOWN & COUNTRY PLANNING (GENERAL DEVELOPMENT PROCEDURE) ORDER 1995 PLEASE NOTE that the following planning applications were registered by the City Council during w/e 24/03/2006: (Notice under Article 8 and accompanied by an Environmental Statement where appropriate) a) Involving Listed Buildings or within a Conservation Area: BRUNSWICK AND ADELAIDE BH2006/00640 4 St Johns Road Hove BRUNSWICK TOWN Demolition of existing building and erection of 3 no. terraced live-work houses. Officer: Guy Everest 293334 Applicant: Wildcourt Limited Agent: David J Knipe RIBA 4 Rivers House 18 Braemore Court Fentiman Walk Kingsway Hertford Hove Herts, SG14 1DB BN3 4FG BH2006/00715 34-35 Western Road Hove ADJOINING COLLEGE Conversion of offices (B1) on the upper floors into 6 self-contained flats. Officer: Nicola Slater 292114 Applicant: Highgrove Real Estate Ltd Agent: Graham Johnson Designs C/o Graham Johnson Designs 37A Portland Road 37A Portland Road Hove Hove BN3 5DQ BN3 5DQ CENTRAL HOVE BH2006/00650 Flat 12 Marlborough Court 46 - 48 The Drive Hove WILLETT ESTATE Replacement UPVC windows. Officer: Jonathan Puplett 292525 Applicant: Mr Robert Cohen Flat 12 Marlborough Court 46 - 48 The Drive Hove East Sussex BH2006/00766 Flat 3 5 Medina Terrace Hove CLIFTONVILLE Replacement windows and doors to fourth floor. Officer: Clare Simpson 292454 Applicant: Ms C Henson Agent: Hawkins Fagg Partnership 13 Balgores Crescent 189 Freshfield Road Gidea Park Brighton Romford BN2 9YE Essex RM2 6AB BH2006/00808 Flat 5, 22 Third Avenue, Hove THE AVENUES Replace existing front door and all windows with white UPVC units, including the replacement of the main window in the front bay with white UPVC french doors. Officer: Jonathan Puplett 292525 Applicant: Ms Hymans Agent: Anglian Windows Flat 5 Unit 10-12 22 Third Avenue Station Road Industrial Estate Hove Hailsham BN3 2PD East Sussex BN27 2EY 1 BH2006/00827 1E St Aubyns Gardens Hove OLD HOVE Replace existing timber sash window to rear of property with white UPVC french doors and replace existing rear door with white UPVC windows. Officer: Jonathan Puplett 292525 Applicant: Ken Warren Agent: Simon Monk BHCC Housing Services Dunlop Haywwards 20-22 Oxford Street Tower Point Brighton North Road BN1 4LA Brighton BN1 1YR HANGLETON & KNOLL BH2006/00569 Hangleton Manor Hangleton Valley Drive Hove HANGLETON MANOR Single storey extension, flood lighting, new gate, illuminated post sign, internal alterations. Officer: Nicola Slater 292114 Applicant: Hall & Woodhouse Ltd Agent: HLF Planning The Brewery 20 West Mills Blandford St Mary Newbury Dorset Berkshire RG14 5HG PRESTON PARK BH2006/00722 Garton House 22 Stanford Avenue Brighton (MAJOR APPLICATION) ADJOINING PRESTON PARK Outline application for the redevelopment of Garton House to provide 3 two-bedroom flats, 8 one-bedroom flats, 8 studio flats and meeting room for family support work. Officer: Rachael Hobman 292175 Applicant: The Chichester Diocesan Agent: Mr P Witten Association For Family Support Work Church House 24 Kings Court 211 New Church Road Hill Lane Hove Crowborough BN3 4ED East Sussex TN6 1DY QUEEN'S PARK BH2006/00204 Dolphin House 2-5 Manchester Street Brighton EAST CLIFF Erect glass canopy over entrance doors. Officer: Louise Kent 292198 Applicant: CBS Ltd Mark Humphrey Lyon House 160-166 Borough High Street London SE1 1LB BH2006/00359 126 to 127 St James's Street Brighton EAST CLIFF Change of use of part of first floor from vacant storage to tanning facilities. Officer: Gemma Barnes 292265 Applicant: The Noble Organisation Agent: Mr Michael Fox 1A Dukesway Court 1A Dukesway Court Team Valley Team Valley Gateshead Gateshead Tyne and Wear NE11 0PJ Tyne and Wear NE11 0PJ REGENCY BH2006/00550 83 Western Road Brighton ADJOINING REGENCY SQUARE Illuminated fascia signs. Officer: Jonathan Puplett 292525 Applicant: Herbal Inn Agent: Northampton Signs Ltd 191 Regents Park Road Unit 5 Stour Road London Weedon Road Industrial Estate N3 3PA Northampton NN5 5AA 2 BH2006/00725 55-56 Regency Square Brighton REGENCY SQUARE Installation of lights, security cameras and doors to the front elevation and replacement of first floor fireplace and other alterations (part retrospective). Officer: Clare Simpson 292454 Applicant: Zoran Maricevic 55-56 Regency Square Brighton BN1 2FF BH2006/00794 16 Clifton Place Brighton MONTPELIER AND CLIFTON HILL Demolition of existing orchid house and construction of summerhouse. Officer: Jonathan Puplett 292525 Applicant: Dr John Riddington 16 Clifton Place Brighton East Sussex BN1 3FN BH2006/00878 The Rock Shop 55 Kings Road Brighton OLD TOWN Alterations to shop front. Officer: Clare Simpson 292454 Applicant: Mr C Burt Agent: Grummitt Wade Chartered Surveyors The Rock Shop Maritime House West Pier Basin Road North Kings Road hove Brighton BN41 1WR East Sussex BH2006/00901 6 to 8 Consecutive Preston Street Brighton REGENCY SQUARE Replacement of two rear ventilation grills with one grill. Officer: Jason Hawkes 292153 Applicant: Stanley Casinos Ltd Agent: Farrell Bass Prichard 14 Linden Square Harefield Middlesex UB9 6TQ ST. PETER'S & NORTH LAINE BH2006/00360 Rear of Buckingham Lodge Buckingham Place Brighton WEST HILL Construction of a terrace of 3 two-bedroom two-storey mews houses. Officer: Victor Grayson 293990 Applicant: Colin Brace Agent: Lomax Cassidy & Edwards C/O Agent 164 - 165 Western Road 164 - 165 Western Road Brighton Brighton BN1 2BB BN1 2BB BH2006/00466 London Road Methodist Church 88 London Road Brighton (MAJOR APPLICATION) ADJOINING LISTED BUILDING / OUTSIDE CONSERVATION AREA Demolition of existing church and ancillary buildings. Construction of a four-storey building comprising ground floor/part first floor shop unit with cafe, and 16 one-bedroom and 2 two- bedroom flats at first, second and third floor levels. Officer: George Allpress 292138 Applicant: The Methodist Church Agent: Overton-Hart Brighton & Hove Methodist Circuit 4 English Business Park c/o 38 Raphael Road English Close Hove Hove BN3 5QQ BN3 7EE 3 BH2006/00864 44-47 Gardner Street Brighton NORTH LAINE Display of illuminated signage comprising fascia sign and 2 hanging signs. Officer: George Allpress 292138 Applicant: Gourmet Burger Kitchen Agent: Cotton Thompson Cole Wisconsin UK Ltd Tuition House PO Box 37240 27-37 St Georges Road London London SW11 4YQ SW19 4EU BH2006/00890 Methodist Church 88 London Road Brighton ADJOINING LISTED BUILDING Demolition of existing church and ancillary buildings. Construction of a four storey building comprising residential flats and shop unit with cafe. Redevelopment works affecting listed building at 87 London Road. Officer: George Allpress 292138 Applicant: The Methodist Church Agent: Overton-Hart Brighton & Hove Circuit 4 English Business Park c/o 38 Raphael Road English Close Hove BN3 5QQ Hove BN3 7EE BH2006/00890 Methodist Church 88 London Road Brighton OUTSIDE CONSERVATION AREA Demolition of existing church and ancillary buildings. Construction of a four storey building comprising residential flats and shop unit with cafe. Redevelopment works affecting listed building at 87 London Road. Officer: George Allpress 292138 Applicant: The Methodist Church Agent: Overton-Hart Brighton & Hove Circuit 4 English Business Park c/o 38 Raphael Road English Close Hove BN3 5QQ Hove BN3 7EE STANFORD BH2006/00889 6 Tongdean Road Hove TONGDEAN AREA Proposed roof infill of existing valley. Officer: Clare Simpson 292454 Applicant: Mr & Mrs Peachey Agent: BPM 6 Tongdean Road 31A Warmdene Road Hove Brighton East Sussex BN1 8NL BN3 6QB WITHDEAN BH2006/00584 Homeleigh South Road Brighton PRESTON VILLAGE Demolition of existing North boundary wall and the rebuilding of the wall to the same specification and appearance as the existing wall. Officer: Jonathan Puplett 292525 Applicant: Mark Willett Homeleigh South Road Brighton East Sussex BN1 6SB 4 Re-advertisements CENTRAL HOVE BH2005/05594 King Alfred/RNR Site Kingsway Hove MAJOR ADJOINING CLIFTONVILLE ADJOINING PEMBROKE AND PRINCES AREA ADJOINING OLD HOVE ADJOINING LISTED BUILDING Mixed use development comprising new public sports centre, 752 residential units (including affordable housing) in two towers and eight other buildings, with ground floor commercial uses within use classes A1 (retail), A3 (restaurants & cafés) and A4 (drinking establishments), with basement parking and doctors surgery. This application is accompanied by an Environmental Statement. Officer: Luke Perkins 292178 Applicant: Karis (King Alfred Developments) Limited Care of: Hepher Dixon Bridewell Gate 9 Bridewell Place London EC4V 6AW Agent: Hepher Dixon Bridewell Gate 9 Bridewell Place London EC4V 6AW PRESTON PARK BH2006/00186 Downs Junior School Rugby Road Brighton PRESTON PARK Demolition of existing dining hall and construction of new dining hall with covered walkway glazed link to main building. Alterations to existing toilet block to form central access to new dining hall. Officer: Steve Lewis 292321 Applicant: Brighton & Hove City Council Finance and Property Room 210 Corporate Services Kings House Grand Avenue Hove BN3 2SR BH2006/00187 Downs Junior School Rugby Road Brighton PRESTON PARK Demolition of existing dining hall and construction of new dining hall with covered walkway glazed link to main building. Alterations to existing toilet block to form central access to new dining hall. Officer: Steve Lewis 292321 Applicant: Brighton
Recommended publications
  • East Sussex, South Downs and Brighton & Hove, Local Aggregate
    East Sussex, South Downs and Brighton & Hove Local Aggregate Assessment December 2016 East Sussex, South Downs and Brighton & Hove, Local Aggregate Assessment, December 2016 Contents Executive Summary 2 1 Introduction 7 2 Geology and mineral uses 9 3 Demand 11 4 Supply 17 5 Environmental constraints 29 6 Balance 31 7 Conclusions 35 A Past and Future Development 37 B Imports into plan area 41 Map 1: Geological Plan including locations of aggregate wharves and railheads, and existing mineral sites 42 Map 2: Origin of aggregate imported, produced and consumed in East Sussex and Brighton & Hove during 2014 44 Map 3: Sand and gravel resources in the East English Channel and Thames Estuary (Source: Crown Estate) 46 Map 4: Recycled and secondary aggregates sites 48 2 East Sussex, South Downs and Brighton & Hove, Local Aggregate Assessment, December 2016 Executive Summary Executive Summary Executive Summary The first East Sussex, South Downs and Brighton & Hove Local Aggregate Assessment (LAA) was published in December 2013. The LAA has been updated annually and is based on the Plan Area for the East Sussex, South Downs and Brighton & Hove Waste & Minerals Plan which was adopted in February 2013. This document represents the fourth LAA for the mineral planning authorities of East Sussex County Council, Brighton & Hove City Council and the South Downs National Park Authority and examines updates to the position on aggregates supply and demand since the time of last reporting in 2015. The first three LAAs concluded that a significant proportion of local consumption was derived from either marine dredged material, crushed rock or land won aggregates extracted from outside the Plan Area.
    [Show full text]
  • Housing Provision Paper
    Housing Provision May 2018 SCAPE Carden Avenue and Norton Road pilot projects ITT exhibition feedback report 0 Contents 1. Introduction ........................................................................................................................ 1 2. Background ......................................................................................................................... 2 b) Updated information on housing land supply ................................................................ 3 c) Site allocations in City Plan Part Two .............................................................................. 4 3. Assessment of Housing Delivery against the City Plan Target ........................................... 5 a) Large Identified Sites (6+ dwellings) in Development Areas .......................................... 5 b) Large Identified Sites (6+ dwellings) in the Rest of the City ........................................... 6 c) Small Sites (5 or less dwellings) ...................................................................................... 7 d) Other Sources of Housing Supply ................................................................................... 7 e) Housing supply summary ................................................................................................ 8 4. Conclusion .......................................................................................................................... 9 Appendices Appendix 1: City Plan Part 2 Housing delivery against City Plan targets Appendix
    [Show full text]
  • S:\Environment\Exchange HTH\Jo Thompson\Edward Street Quarter\ESQ Brief V2.Doc Edward Street Quarter Planning Brief September 2013
    S:\Environment\Exchange HTH\Jo Thompson\Edward Street Quarter\ESQ Brief v2.doc Edward Street Quarter Planning Brief September 2013 Fig 1: Edward Street Quarter – development area 1 Edward Street Quarter Planning Brief September 2013 CONTENTS PART 1 1. Introduction Page 3 2. Reason for the brief Page 3 3. Status of the brief Page 4 4. Stakeholder consultation Page 5 5. Planning policy context Page 5 PART 2 6. Development area Page 9 7. Planning history Page 11 8. Vision and development principles Page 12 9. Land use and development quantum Page 13 10. Heritage Page 15 11. Scale, massing and building heights Page 17 12. Amenity issues and construction Page 18 13. Transport Page 18 14. Public realm Page 20 15. Community infrastructure and facilities Page 26 16. Sustainability Page 26 17. Phasing Page 30 18. Infrastructure and planning obligations Page 31 2 Edward Street Quarter Planning Brief September 2013 PART 1 1. Introduction The vision of this planning brief is… … to create a dynamic first class business and residential district with a strong sense of place, distinguished by high quality townscape, architecture and public realm. The brief has been prepared to guide the future redevelopment of land in the vicinity of the new American Express building on John Street and Carlton Hill in Brighton, including the former American Express building. For the purpose of this document, the area covered by the brief is referred to as the Edward Street Quarter (ESQ) or the development area. American Express is the largest private sector employer in Brighton & Hove. The decision by the company to construct a new “fit for purpose” building for their European operations in 2012, consolidates American Express’ operations and future in the city.
    [Show full text]
  • Week Ending 21 May 2021
    City Development and Regeneration Hove Town Hall Norton Road Hove BN3 3BQ WEEKLY LIST OF APPLICATIONS RECEIVED BY BRIGHTON & HOVE CITY COUNCIL The following applications were registered by the City Council between 5/17/2021 and 5/23/2021 a) Affecting Listed Buildings and Conservation Areas BRUNSWICK AND ADELAIDE BH2021/01802 Embassy Court Kings Road Brighton BN1 2PX Replacement of existing cast-iron downpipes with black uPVC downpipes, concealed within internal boxing within properties. CENTRAL HOVE BH2021/01414 10 - 11 Seafield Road Hove BN3 2TN Part conversion from student hostel (C1) to create 4no one- bedroom flats (C3) at lower ground floor. Internal alterations to existing guest rooms and common areas, removal of rear extract ductwork and associated works. BH2021/01526 44B Church Road Hove BN3 2FN Erection of two storey rear extension to second and third floor with emergency exit. BH2021/01782 Flat 12 Victoria Court 16 Grand Avenue Hove BN3 2NH Replacement of 6no existing aluminium windows with new aluminium windows. EAST BRIGHTON BH2021/01308 Flat 2 Chesham Mansions 25-27 Eaton Place Brighton BN2 1EG Replacement of 2no existing single glazed timber sash windows to front and 1no single glazed timber sash window to rear with double glazed timber framed sash windows. GOLDSMID BH2021/01464 Hove Station Goldstone Villas Hove BN3 3RU Internal alterations to relocate 3no existing customer information display screens and install 1no additional screen. Page 1 of 11 HOVE PARK BH2021/01777 49 Tongdean Avenue Hove BN3 6TN Variation of Condition 3 of application BH2020/03686 (Erection of first floor rear extensions, replacement roof with rooflights to side extension, changes to fenestration, formation of a 2-car garage with sedum roof, and associated works.) to allow alterations to permitted materials and finishes.
    [Show full text]
  • East Sussex, South Downs and Brighton & Hove, Local Aggregate
    East Sussex, South Downs and Brighton & Hove Local Aggregate Assessment December 2017 East Sussex, South Downs and Brighton & Hove, Local Aggregate Assessment, December 2017 NOTE In September 2017 East Sussex County Council, Brighton & Hove City Council and the South Downs National Park Authority commenced a Review of their Waste and Minerals Local Plan. This year's LAA has been drafted for consideration by SEEAWP before the end of the consultation period for the Call for Evidence and Sites. In addition, adoption of the LAA is planned before formal consideration of the responses to the Call for Evidence and Sites. It would not therefore be appropriate to pre-empt possible changes in aggregate supply in this document and so discussion of future demand and supply scenarios will not be included. These details will be assessed at the next stage of the Waste and Minerals Local Plan Review process in 2018. East Sussex, South Downs and Brighton & Hove, Local Aggregate Assessment, December 2017 Contents Executive Summary 3 1 Introduction 9 2 Geology and mineral uses 12 3 Demand 14 4 Supply 20 5 Environmental constraints 32 6 Balance 34 7 Conclusions 37 A Past and Future Development 39 B Imports into plan area 44 C LAA Requirements 45 Map 1: Geological Plan including locations of aggregate wharves and railheads, and existing aggregate sites 48 Map 2: Origin of aggregate imported, produced and consumed in East Sussex and Brighton & Hove during 2014 50 Map 3: Sand and gravel resources in the East English Channel and Thames Estuary (Source: Crown Estate) 52 Map 4: Recycled and secondary aggregates sites 2016/17 54 East Sussex, South Downs and Brighton & Hove, Local Aggregate Assessment, December 2017 3 Executive Summary Executive Summary Executive Summary The first East Sussex, South Downs and Brighton & Hove Local Aggregate Assessment (LAA) was published in December 2013.
    [Show full text]
  • Brighton & Hove City Plan Part
    City Plan Part 1 Foreword It is my pleasure to introduce the City Plan Part One as adopted by Brighton & Hove City Council on 24th March 2016. The City Plan Part 1 strategy reflects the importance the Council places on protecting and enhancing the city’s unique built and natural environment whilst ensuring needed homes and jobs are provided together with the right infrastructure and community facilities to support the city’s residents, businesses and visitors. The policies in the City Plan will help to make sure that there are better links for our communities and neighbourhoods to employment and skills opportunities and adequate housing provision whilst also meeting the demands of businesses and visitors. The Plan seeks to create genuinely sustainable communities through encouraging mixed use developments, high-quality and well-designed places; and developments that enable people to make better choices about their need for travel. The City Plan will also help to ensure that new development is supported by necessary infrastructure that protects and promotes communities, the city’s economy and the environment. The City Plan Part One will provide the overarching strategy for emerging Neighbourhood Plans and will be supported in due course by the City Plan Part Two which will contain the remaining site allocations and development management policies. This Plan replaces a number of policies in the adopted Brighton & Hove Local Plan (2005), and this is set out in Annex 4 of the Plan. I would like to express my thanks on behalf of Brighton & Hove City Council to all those who contributed to the preparation of this plan through its many stages and I look forward to its implementation.
    [Show full text]
  • 112,000 Ft2 of Office Space in Brighton Coming Autumn 2021 Outdoor Spaces to Relax in 3 112,000 Ft2 of Office Space in Brighton Coming Autumn 2021
    112,000 ft2 of office space in Brighton Coming Autumn 2021 Outdoor spaces to relax in 3 112,000 ft2 of office space in Brighton Coming Autumn 2021 Edward Street Quarter is the beating heart of Brighton’s creative and commercial centre Intentionally designed to suit the needs of innovators, pioneers and disruptors, Edward Street Quarter is the place to unleash creativity. Communal spaces and amenities are part of the package, from restaurants and coffee shops to cultural spots. Spaces to work, live and enjoy, Edward Street Quarter is an entire new neighbourhood. One that celebrates the spirit of the city of Brighton & Hove: independent, creative, diverse, entrepreneurial and welcoming. WORK LIFE 4 Space to grow your business Grade A workspace, tall windows, high Designed without compromise or ceilings, large floorplates – perfect to complexity. Simple, efficient floors grow your business. maximising useable space and a big focus on health and wellbeing. 5 Active and engaging spaces to enjoy 6 Being beside the seaside Anyone who has lived or worked in With so much talent, and so many Brighton will tell you it’s a special fast-growing businesses, premium place. A forward-leaning city by the sea office space is in short supply. where anything goes and anything can Edward Street Quarter could not happen (and usually does). have arrived at a better time. Innovative and inclusive in equal It will be home to an eclectic measure, it’s a hotbed for start-ups community of ambitious, confident, where tech and new media flourish leading-edge businesses and alongside performance, culture and entrepreneurs, all ready to embrace independent shops.
    [Show full text]
  • SHLAA Update 2018
    SHLAA Update 2018 February 2019 2018 SHLAA Update Contents Page 1. Introduction 2 2. The 2018 SHLAA Assessment 2 3. 2018 SHLAA Update Results 3 4. Housing Trajectory 5 5. Five Year Housing Land Supply 2018-2023 6 6. 2018 SHLAA Update Data Tables 6.1 Housing Supply Summary Tables 8 6.2 Table A: Identified Housing Supply (6+ Units) in 10 Development Areas (DAs) 6.3 Table B: Identified Housing Supply (6+ Units) outside 12 Development Areas 6.4 Table C: Small Identified Sites (<6 units net) 18 6.5 Table D: Prior Approvals for Conversion to Residential 19 6.6 Table E: Housing Supply from Estate Regeneration 19 Programme 6.7 Table F: Small Site Windfall Allowance 20 6.8 Chart A: Housing Trajectory 21 1 1. Introduction 1.1 This report presents the 2018 annual review of the council’s Strategic Housing Land Availability Assessment (SHLAA). It incorporates the latest information regarding housing land supply in the city and presents an updated housing trajectory and five year housing land supply position. 1.2 During the past year national planning policy has been updated through the publication of a revised National Planning Policy Framework (NPPF)1 in July 2018. This has been accompanied by updated Planning Practice Guidance (PPG) 2 relating to the assessment of housing land supply and the introduction of the Housing Delivery Test. 1.3 The purpose and role of the SHLAA remains unchanged in the revised NPPF; that is to identify a future supply of land which is suitable, available and achievable for housing over the local plan period.
    [Show full text]
  • Education Development Trust LMI Bulletin No. 54 – February 2019
    LMI Bulleti n Produced by Education Development Trust in South for the National Careers Service delivery network Issue No 54 – February 2019 CONTENTS • National news • Regional news • Cornwall • Devon • Dorset, Bournemouth and Poole • Hampshire and the Isle of Wight • Somerset • Surrey • West Sussex, Brighton and Hove • LEP News • Useful websites • Future events NATIONAL NEWS Higher and Degree Apprenticeships A complete guide to higher and degree apprenticeships is available in addition to the simplified guide highlighted previously. This guide includes a listing of universities and employers offering apprenticeships, subjects available, information on how to apply and some application tips. Success at interview An interesting article in Business Insider highlighting interview responses which would impress Traci Wilk, Senior Vice President at The Learning Experience and former HR executive at Starbucks. Traci wants to see evidence of a 'growth mindset' where candidates are able to reflect on how they would do things differently as a result of experience and have good self-awareness. In essence, the focus is more about an ability to demonstrate how a candidate has learned from their mistakes. 1 Construction training hubs to boost skills With 158,000 new construction workers needed over the next five years in the UK, the Government have set up 26 'hubs' based on construction sites across the country to train over 17,000 people to be job ready by March next year. The Creative Sector receives Government funding In recognition of the large contribution to the UK economy, £20m government investment has been received by the UK creative industry, part of which will be used to create a Creative Careers Programme to highlight employment opportunities within the sector to schools and colleges.
    [Show full text]
  • Edward St Brief
    12 news update Issue 6 | June 2013 | www.regencysociety.org The Regency Society of Brighton and Hove – registered charity no. 210194 Edward St brief – not good enough At the heart of the draft planning brief for the new Edward Street Quarter is the demolition of Amex House – a building the Regency Society has already proposed for inclusion in the new local list of buildings of interest (see page 4). It would be replaced by a series of buildings of up to six storeys, separated by narrow alleys that converge on a pedestrian square, which is likely to be dark and uninviting – no replacement, we think, for the existing south-facing piazza. We have therefore asked the council to reconsider whether Amex House can be retained and refurbished. A successful building Here are some further reasons: • It’s one of the most successful buildings of its era in the city • It’s less than 40 years old • Its demolition would not represent sustainable development, given that its construction involved the removal of 100,000 tonnes of chalk and the use of 45,000 tonnes of concrete and 2,000 tonnes of steel • Its 28,000 square metres of floor space would more than meet the planning target for office space and could house either business units or a single major occupant, such as Brighton Law Courts, Brighton University or the police station But Amex House is not the only reason we summarised the brief as “disappointing and inadequate”. Retail units The brief also calls for retail units on the site. We question whether this is desirable, given that nearby St James’ Street and the George Street area are in need of an economic boost.
    [Show full text]
  • Cadenza Document
    City Development and Regeneration Hove Town Hall Norton Road Hove BN3 3BQ WEEKLY LIST OF APPLICATIONS RECEIVED BY BRIGHTON & HOVE CITY COUNCIL The following applications were registered by the City Council between 10/06/2019 and 16/06/2019 a) Affecting Listed Buildings and Conservation Areas BRUNSWICK AND ADELAIDE BH2019/01400 83 Western Road Hove BN3 1JB Installation of louvres to existing ground floor window east elevation to provide ventilation for plant equipment. BH2019/01576 Flat 3 17 Brunswick Road Hove BN3 1DG Internal alterations including relocation of kitchen and associated services, minor reconfiguration of studwork wall, replacement of existing doors. BH2019/01580 37 Brunswick Square Hove BN3 1ED Structural remedial works to second and fourth floors. BH2019/01658 73 Western Road Hove BN3 2JQ Installation of new shop front. BH2019/01733 Basement 20 Palmeira Square Hove BN3 2JN Internal alterations to layout. BH2019/01755 Flat 5 36 Brunswick Square Hove BN3 1ED Internal alterations including moving non-original internal walls, provision of new shower room, alterations to the top flight of the stairs, and new cupboard over the stairs. BH2019/01759 Embassy Court Kings Road Brighton BN1 2PX Installation of black gas pipes to rear elevation Page 1 of 14 CENTRAL HOVE BH2019/01614 14 Vallance Gardens Hove BN3 2DD Erection of single storey rear extension, associated internal alterations. BH2019/01703 Car Park Entrance To Rear Of Bath Court And St Aubyns Mansions St Aubyns South Hove Installation of vehicle and 2no. pedestrian gates, new railings and alterations to existing planters. BH2019/01748 85 Church Road Hove BN3 2BB Erection of two storey rear extension and division of existing 1no office unit (B1) into 2no office units (B1), incorporating revised rear fenestration and associated works.
    [Show full text]
  • Environmental Impact Assessment
    Document Information Cover Sheet ASITE DOCUMENT REFERENCE: WSP-EV-SW-RP-0071 DOCUMENT TITLE: Environmental Statement Non-Technical Summary: Final version submitted for planning REVISION: F02 PUBLISHED BY: Jessamy Funnell – WSP PUBLISHED DATE: 03/10/2011 OUTLINE DESCRIPTION/COMMENTS ON CONTENT: Environmental Statement Non-Technical Summary: Final version, submitted to BHCC on 28th September as part of the planning application. BRIGHTON 3Ts: BRIGHTON 3Ts: Trust Statement Environmental Statement Non-Technical Summary September 2011 September 2011 Non-Technical Summary BSUH September 2011 Non-Technical Summary 1.1 This Non-Technical Summary (NTS) provides a summary of the findings of the Environmental Statement (ES) which is submitted on behalf of Brighton and Sussex University Hospitals (BSUH) NHS Trust for the Proposed Development of the Royal Sussex County Hospital (RSCH) site (the Site) in Brighton. 1.2 The ES and this NTS have been produced in accordance with the Town and Country Planning (Environmental Impact Assessment) (England) Regulations 2011, (the ‘EIA Regulations’) which require that, in certain cases, development proposals should be examined to measure their likely significant environmental effects upon the environment and to identify what action should be taken to mitigate those effects. SITE DESCRIPTION 1.3 The Site comprises a number of existing hospital buildings and is centred and covers an area of approximately 2.75 hectares. The Site is located on the northern side of Eastern Road, and is bordered to the west by Upper Abbey Road and Whitehawk Hill Road and to the east by Bristol Gate. The Site is situated adjacent to south of the Royal Alexandra Children’s Hospital and other hospital buildings which will be retained.
    [Show full text]