Week Ending 21 May 2021

Total Page:16

File Type:pdf, Size:1020Kb

Week Ending 21 May 2021 City Development and Regeneration Hove Town Hall Norton Road Hove BN3 3BQ WEEKLY LIST OF APPLICATIONS RECEIVED BY BRIGHTON & HOVE CITY COUNCIL The following applications were registered by the City Council between 5/17/2021 and 5/23/2021 a) Affecting Listed Buildings and Conservation Areas BRUNSWICK AND ADELAIDE BH2021/01802 Embassy Court Kings Road Brighton BN1 2PX Replacement of existing cast-iron downpipes with black uPVC downpipes, concealed within internal boxing within properties. CENTRAL HOVE BH2021/01414 10 - 11 Seafield Road Hove BN3 2TN Part conversion from student hostel (C1) to create 4no one- bedroom flats (C3) at lower ground floor. Internal alterations to existing guest rooms and common areas, removal of rear extract ductwork and associated works. BH2021/01526 44B Church Road Hove BN3 2FN Erection of two storey rear extension to second and third floor with emergency exit. BH2021/01782 Flat 12 Victoria Court 16 Grand Avenue Hove BN3 2NH Replacement of 6no existing aluminium windows with new aluminium windows. EAST BRIGHTON BH2021/01308 Flat 2 Chesham Mansions 25-27 Eaton Place Brighton BN2 1EG Replacement of 2no existing single glazed timber sash windows to front and 1no single glazed timber sash window to rear with double glazed timber framed sash windows. GOLDSMID BH2021/01464 Hove Station Goldstone Villas Hove BN3 3RU Internal alterations to relocate 3no existing customer information display screens and install 1no additional screen. Page 1 of 11 HOVE PARK BH2021/01777 49 Tongdean Avenue Hove BN3 6TN Variation of Condition 3 of application BH2020/03686 (Erection of first floor rear extensions, replacement roof with rooflights to side extension, changes to fenestration, formation of a 2-car garage with sedum roof, and associated works.) to allow alterations to permitted materials and finishes. PRESTON PARK BH2021/01450 199 Ditchling Road Brighton BN1 6JB Replacement of existing windows to front elevation and first floor rear & side elevation with timber framed double glazed sash windows. QUEEN'S PARK BH2021/01786 Hot Potato Cafe 71 St James's Street Brighton BN2 1PJ Conversion of basement store (E class) to a studio flat (C3) with associated alterations. BH2021/01818 7 East Drive Brighton BN2 0BQ Demolition of existing conservatory and erection of single storey rear extension with associated alterations. Page 2 of 11 REGENCY BH2021/01586 24C Sussex Heights 14 St Margarets Place Brighton BN1 2FR Replacement of existing balcony windows and installation of new windows incorporating enclosure of balcony (retrospective). BH2021/01703 5 Bartholomews And 18 Regent Arcade Brighton BN1 1HG Internal alterations to ground floor layout and installation of staircase between basement and ground floor shop units. BH2021/01722 30 Clifton Terrace Brighton BN1 3HB Erection of an extension to existing ground floor rear terrace incorporating iron balustrading and external staircase to provide access to lower ground floor (retrospective). BH2021/01723 30 Clifton Terrace Brighton BN1 3HB Erection of an extension to existing ground floor rear terrace incorporating iron balustrading and external staircase to provide access to lower ground floor (retrospective). BH2021/01744 Fortune Of War 156 -157 Kings Road Arches Brighton BN1 1NB Installation of extract ductwork to front (south) elevation. BH2021/01789 26 - 27 Regency Square Brighton BN1 2FH Replacement of existing front door. BH2021/01840 The Old Ship Hotel 31 - 38 Kings Road Brighton BN1 1NR Replacement of 6no existing telecommunications antennas on roof with 6no new antennas, replacement of existing support pole with new support pole measuring 28.6m to top of proposed antennas (from ground level), installation of remote radio units, upgrade of equipment within existing equipment cabinet and ancillary works. Page 3 of 11 ROTTINGDEAN COASTAL BH2021/01334 Gate Cottage Bazehill Road Rottingdean Brighton BN2 7DB Erection of single storey rear extension. BH2021/01813 Flat 9 13 Lewes Crescent Brighton BN2 1FH Internal alterations to layout of flat. BH2021/01835 Second Floor Flat 3 Lewes Crescent Brighton BN2 1FH Replacement of existing lead roof to courtyard with roof terrace and screening. BH2021/01836 Second Floor Flat 3 Lewes Crescent Brighton BN2 1FH Replacement of existing lead roof to courtyard with roof terrace and screening. ST. PETER'S AND NORTH LAINE BH2021/01819 53 Clifton Street Brighton BN1 3PG Erection of single storey rear extension. WITHDEAN BH2021/01822 99 Preston Drove Brighton BN1 6LD Variation of condition 1 of application BH2020/02341 (Change of use of the first floor from ancillary storage in connection with private tuition (D1) to form 1no two bedroom flat (C3). External alterations including new rear access stairs down to garden from first floor; installation of a new front door in existing shopfront; and installation 3no rear rooflights.) to allow amendments to approved drawings. Applications Not Previously Advertised for Part a) Regency BH2021/01299 37A Upper North Street Brighton BN1 3FG Erection of rear dormer with juliette balcony and associated alterations. b) Other applications registered Page 4 of 11 GOLDSMID BH2021/01727 Ridgeland House 165-167 Dyke Road Hove BN3 1TL Display of 2no. internally illuminated and 1no. non illuminated fascia signs, and 1no. internally illuminated projecting sign. BH2021/01731 Brighton And Hove Bus Garage 43 Conway Street Hove BN3 3LT Major Demolition of existing buildings and the erection of new four storey bus garage building including office and engineering floorspace, external bus parking provision and new boundary treatment. BH2021/01751 15 Newtown Road Hove BN3 6AA Erection of a single storey rear & side extension connecting existing garage to main dwellinghouse and erection of first floor extension above garage incorporating conversion of garage into habitable space. BH2021/01799 6 Burton Villas Hove BN3 6FN Erection of single storey rear extension with part flat, part glazed roof. BH2021/01815 20 Addison Road Hove BN3 1TP Erection of single storey rear extension. HANGLETON AND KNOLL BH2021/01804 Hove Park Valley Campus Hangleton Way Hove BN3 8AA Erection of single storey detached outbuilding for use as classroom. HANOVER AND ELM GROVE BH2021/01780 76 Southover Street Brighton BN2 9UE Roof of existing rear outrigger changed from pitched to flat roof, raising the eaves height. Alterations to outrigger windows. Page 5 of 11 HOLLINGDEAN AND STANMER BH2021/01814 4 Coldean Lane Brighton BN1 9GD Change of use from residential (C3) to mixed use residential and hot food takeaway (Sui Generis). (Retrospective) BH2021/01824 298 Ditchling Road Brighton BN1 6JG Change of use from betting shop (sui generis) to a mixed use: retail (E class) and drinking establishment (sui generis). BH2021/01846 First Floor Flat 2 Hollingbury Terrace Brighton BN1 7JE Erection of an extension to existing rear dormer, with installation of Juliette balcony and replacement window. NORTH PORTSLADE BH2021/01826 1 Crest Way Portslade BN41 2EY The installation of weatherboard cladding on existing rear dormer and fenestration alterations to loft (Part Retrospective). BH2021/01830 25 Truleigh Drive Portslade BN41 2YQ Erection of single storey rear extension. PATCHAM BH2021/01773 26 Barrhill Avenue Brighton BN1 8UF Erection of single story rear extension, roof alterations incorporating hip to gable extension, front rooflights, side window and rear dormer and associated alterations. BH2021/01827 10 Eastfield Crescent Brighton BN1 8EL Erection of single storey rear extension. QUEEN'S PARK BH2021/01647 26A And 26B Sussex Terrace Brighton BN2 9QJ Erection of two storey rear extension with associated alterations. Page 6 of 11 REGENCY BH2021/01783 187 Western Road Brighton BN1 2BA Major Refurbishment of existing building and erection of additional storey in the form of a mansard roof providing office floorspace (Use Class E) to part of ground floor and at first, second and third floor level. Development includes conversion of 2no house in multiple occupation units and retail storage areas into office space, plant enclosure on roof and associated alterations. ROTTINGDEAN COASTAL BH2021/01754 24 Roedean Crescent Brighton BN2 5RH Application for variation of condition 5 of BH2020/01762 that detail of 1.8m high opaque privacy screens to be installed on the western side of the first floor balcony shall be submitted to and approved in writing by the Local Planning Authority prior to occupation. BH2021/01755 28 Eley Drive Rottingdean Brighton BN2 7FH Erection of single storey rear extension with rooflight and revised fenestration. BH2021/01790 1 Winton Avenue Saltdean Brighton BN2 8FN Hip to gable roof alterations incorporating rear dormer, erection of single storey rear extension, creation of terrace and retaining wall at rear, revised fenestration, entrance porch with access steps, widening of existing crossover with associated alterations. BH2021/01800 3 Tumulus Road Saltdean Brighton BN2 8FR Formation of additional storey incorporating side dormers and rear Juliet balconies. BH2021/01852 58 Greenways Brighton BN2 7BL Erection of single storey rear extension and roof alterations including increased ridge height, installation of 8no rooflights and associated alterations. Page 7 of 11 ST. PETER'S AND NORTH LAINE BH2021/01761 146A Upper Lewes Road Brighton BN2 3FD Erection of single storey rear extension. BH2021/01764 Smart House Ditchling Road Brighton BN1 4SE Erection of a single storey self-contained one-bedroom/studio dwellinghouse (C3) with basement. New pedestrian
Recommended publications
  • East Sussex, South Downs and Brighton & Hove, Local Aggregate
    East Sussex, South Downs and Brighton & Hove Local Aggregate Assessment December 2016 East Sussex, South Downs and Brighton & Hove, Local Aggregate Assessment, December 2016 Contents Executive Summary 2 1 Introduction 7 2 Geology and mineral uses 9 3 Demand 11 4 Supply 17 5 Environmental constraints 29 6 Balance 31 7 Conclusions 35 A Past and Future Development 37 B Imports into plan area 41 Map 1: Geological Plan including locations of aggregate wharves and railheads, and existing mineral sites 42 Map 2: Origin of aggregate imported, produced and consumed in East Sussex and Brighton & Hove during 2014 44 Map 3: Sand and gravel resources in the East English Channel and Thames Estuary (Source: Crown Estate) 46 Map 4: Recycled and secondary aggregates sites 48 2 East Sussex, South Downs and Brighton & Hove, Local Aggregate Assessment, December 2016 Executive Summary Executive Summary Executive Summary The first East Sussex, South Downs and Brighton & Hove Local Aggregate Assessment (LAA) was published in December 2013. The LAA has been updated annually and is based on the Plan Area for the East Sussex, South Downs and Brighton & Hove Waste & Minerals Plan which was adopted in February 2013. This document represents the fourth LAA for the mineral planning authorities of East Sussex County Council, Brighton & Hove City Council and the South Downs National Park Authority and examines updates to the position on aggregates supply and demand since the time of last reporting in 2015. The first three LAAs concluded that a significant proportion of local consumption was derived from either marine dredged material, crushed rock or land won aggregates extracted from outside the Plan Area.
    [Show full text]
  • Housing Provision Paper
    Housing Provision May 2018 SCAPE Carden Avenue and Norton Road pilot projects ITT exhibition feedback report 0 Contents 1. Introduction ........................................................................................................................ 1 2. Background ......................................................................................................................... 2 b) Updated information on housing land supply ................................................................ 3 c) Site allocations in City Plan Part Two .............................................................................. 4 3. Assessment of Housing Delivery against the City Plan Target ........................................... 5 a) Large Identified Sites (6+ dwellings) in Development Areas .......................................... 5 b) Large Identified Sites (6+ dwellings) in the Rest of the City ........................................... 6 c) Small Sites (5 or less dwellings) ...................................................................................... 7 d) Other Sources of Housing Supply ................................................................................... 7 e) Housing supply summary ................................................................................................ 8 4. Conclusion .......................................................................................................................... 9 Appendices Appendix 1: City Plan Part 2 Housing delivery against City Plan targets Appendix
    [Show full text]
  • S:\Environment\Exchange HTH\Jo Thompson\Edward Street Quarter\ESQ Brief V2.Doc Edward Street Quarter Planning Brief September 2013
    S:\Environment\Exchange HTH\Jo Thompson\Edward Street Quarter\ESQ Brief v2.doc Edward Street Quarter Planning Brief September 2013 Fig 1: Edward Street Quarter – development area 1 Edward Street Quarter Planning Brief September 2013 CONTENTS PART 1 1. Introduction Page 3 2. Reason for the brief Page 3 3. Status of the brief Page 4 4. Stakeholder consultation Page 5 5. Planning policy context Page 5 PART 2 6. Development area Page 9 7. Planning history Page 11 8. Vision and development principles Page 12 9. Land use and development quantum Page 13 10. Heritage Page 15 11. Scale, massing and building heights Page 17 12. Amenity issues and construction Page 18 13. Transport Page 18 14. Public realm Page 20 15. Community infrastructure and facilities Page 26 16. Sustainability Page 26 17. Phasing Page 30 18. Infrastructure and planning obligations Page 31 2 Edward Street Quarter Planning Brief September 2013 PART 1 1. Introduction The vision of this planning brief is… … to create a dynamic first class business and residential district with a strong sense of place, distinguished by high quality townscape, architecture and public realm. The brief has been prepared to guide the future redevelopment of land in the vicinity of the new American Express building on John Street and Carlton Hill in Brighton, including the former American Express building. For the purpose of this document, the area covered by the brief is referred to as the Edward Street Quarter (ESQ) or the development area. American Express is the largest private sector employer in Brighton & Hove. The decision by the company to construct a new “fit for purpose” building for their European operations in 2012, consolidates American Express’ operations and future in the city.
    [Show full text]
  • 1 A) Involving Listed Buildings Or Within a Conservation Area
    BRIGHTON AND HOVE CITY COUNCIL WEEKLY LIST OF APPLICATIONS BRIGHTON AND HOVE CITY COUNCIL TOWN & COUNTRY PLANNING ACT 1990 PLANNING (LISTED BUILDINGS & CONSERVATION AREAS) REGULATIONS 1990 TOWN & COUNTRY PLANNING (GENERAL DEVELOPMENT PROCEDURE) ORDER 1995 PLEASE NOTE that the following planning applications were registered by the City Council during w/e 24/03/2006: (Notice under Article 8 and accompanied by an Environmental Statement where appropriate) a) Involving Listed Buildings or within a Conservation Area: BRUNSWICK AND ADELAIDE BH2006/00640 4 St Johns Road Hove BRUNSWICK TOWN Demolition of existing building and erection of 3 no. terraced live-work houses. Officer: Guy Everest 293334 Applicant: Wildcourt Limited Agent: David J Knipe RIBA 4 Rivers House 18 Braemore Court Fentiman Walk Kingsway Hertford Hove Herts, SG14 1DB BN3 4FG BH2006/00715 34-35 Western Road Hove ADJOINING COLLEGE Conversion of offices (B1) on the upper floors into 6 self-contained flats. Officer: Nicola Slater 292114 Applicant: Highgrove Real Estate Ltd Agent: Graham Johnson Designs C/o Graham Johnson Designs 37A Portland Road 37A Portland Road Hove Hove BN3 5DQ BN3 5DQ CENTRAL HOVE BH2006/00650 Flat 12 Marlborough Court 46 - 48 The Drive Hove WILLETT ESTATE Replacement UPVC windows. Officer: Jonathan Puplett 292525 Applicant: Mr Robert Cohen Flat 12 Marlborough Court 46 - 48 The Drive Hove East Sussex BH2006/00766 Flat 3 5 Medina Terrace Hove CLIFTONVILLE Replacement windows and doors to fourth floor. Officer: Clare Simpson 292454 Applicant: Ms C Henson Agent: Hawkins Fagg Partnership 13 Balgores Crescent 189 Freshfield Road Gidea Park Brighton Romford BN2 9YE Essex RM2 6AB BH2006/00808 Flat 5, 22 Third Avenue, Hove THE AVENUES Replace existing front door and all windows with white UPVC units, including the replacement of the main window in the front bay with white UPVC french doors.
    [Show full text]
  • East Sussex, South Downs and Brighton & Hove, Local Aggregate
    East Sussex, South Downs and Brighton & Hove Local Aggregate Assessment December 2017 East Sussex, South Downs and Brighton & Hove, Local Aggregate Assessment, December 2017 NOTE In September 2017 East Sussex County Council, Brighton & Hove City Council and the South Downs National Park Authority commenced a Review of their Waste and Minerals Local Plan. This year's LAA has been drafted for consideration by SEEAWP before the end of the consultation period for the Call for Evidence and Sites. In addition, adoption of the LAA is planned before formal consideration of the responses to the Call for Evidence and Sites. It would not therefore be appropriate to pre-empt possible changes in aggregate supply in this document and so discussion of future demand and supply scenarios will not be included. These details will be assessed at the next stage of the Waste and Minerals Local Plan Review process in 2018. East Sussex, South Downs and Brighton & Hove, Local Aggregate Assessment, December 2017 Contents Executive Summary 3 1 Introduction 9 2 Geology and mineral uses 12 3 Demand 14 4 Supply 20 5 Environmental constraints 32 6 Balance 34 7 Conclusions 37 A Past and Future Development 39 B Imports into plan area 44 C LAA Requirements 45 Map 1: Geological Plan including locations of aggregate wharves and railheads, and existing aggregate sites 48 Map 2: Origin of aggregate imported, produced and consumed in East Sussex and Brighton & Hove during 2014 50 Map 3: Sand and gravel resources in the East English Channel and Thames Estuary (Source: Crown Estate) 52 Map 4: Recycled and secondary aggregates sites 2016/17 54 East Sussex, South Downs and Brighton & Hove, Local Aggregate Assessment, December 2017 3 Executive Summary Executive Summary Executive Summary The first East Sussex, South Downs and Brighton & Hove Local Aggregate Assessment (LAA) was published in December 2013.
    [Show full text]
  • Brighton & Hove City Plan Part
    City Plan Part 1 Foreword It is my pleasure to introduce the City Plan Part One as adopted by Brighton & Hove City Council on 24th March 2016. The City Plan Part 1 strategy reflects the importance the Council places on protecting and enhancing the city’s unique built and natural environment whilst ensuring needed homes and jobs are provided together with the right infrastructure and community facilities to support the city’s residents, businesses and visitors. The policies in the City Plan will help to make sure that there are better links for our communities and neighbourhoods to employment and skills opportunities and adequate housing provision whilst also meeting the demands of businesses and visitors. The Plan seeks to create genuinely sustainable communities through encouraging mixed use developments, high-quality and well-designed places; and developments that enable people to make better choices about their need for travel. The City Plan will also help to ensure that new development is supported by necessary infrastructure that protects and promotes communities, the city’s economy and the environment. The City Plan Part One will provide the overarching strategy for emerging Neighbourhood Plans and will be supported in due course by the City Plan Part Two which will contain the remaining site allocations and development management policies. This Plan replaces a number of policies in the adopted Brighton & Hove Local Plan (2005), and this is set out in Annex 4 of the Plan. I would like to express my thanks on behalf of Brighton & Hove City Council to all those who contributed to the preparation of this plan through its many stages and I look forward to its implementation.
    [Show full text]
  • 112,000 Ft2 of Office Space in Brighton Coming Autumn 2021 Outdoor Spaces to Relax in 3 112,000 Ft2 of Office Space in Brighton Coming Autumn 2021
    112,000 ft2 of office space in Brighton Coming Autumn 2021 Outdoor spaces to relax in 3 112,000 ft2 of office space in Brighton Coming Autumn 2021 Edward Street Quarter is the beating heart of Brighton’s creative and commercial centre Intentionally designed to suit the needs of innovators, pioneers and disruptors, Edward Street Quarter is the place to unleash creativity. Communal spaces and amenities are part of the package, from restaurants and coffee shops to cultural spots. Spaces to work, live and enjoy, Edward Street Quarter is an entire new neighbourhood. One that celebrates the spirit of the city of Brighton & Hove: independent, creative, diverse, entrepreneurial and welcoming. WORK LIFE 4 Space to grow your business Grade A workspace, tall windows, high Designed without compromise or ceilings, large floorplates – perfect to complexity. Simple, efficient floors grow your business. maximising useable space and a big focus on health and wellbeing. 5 Active and engaging spaces to enjoy 6 Being beside the seaside Anyone who has lived or worked in With so much talent, and so many Brighton will tell you it’s a special fast-growing businesses, premium place. A forward-leaning city by the sea office space is in short supply. where anything goes and anything can Edward Street Quarter could not happen (and usually does). have arrived at a better time. Innovative and inclusive in equal It will be home to an eclectic measure, it’s a hotbed for start-ups community of ambitious, confident, where tech and new media flourish leading-edge businesses and alongside performance, culture and entrepreneurs, all ready to embrace independent shops.
    [Show full text]
  • SHLAA Update 2018
    SHLAA Update 2018 February 2019 2018 SHLAA Update Contents Page 1. Introduction 2 2. The 2018 SHLAA Assessment 2 3. 2018 SHLAA Update Results 3 4. Housing Trajectory 5 5. Five Year Housing Land Supply 2018-2023 6 6. 2018 SHLAA Update Data Tables 6.1 Housing Supply Summary Tables 8 6.2 Table A: Identified Housing Supply (6+ Units) in 10 Development Areas (DAs) 6.3 Table B: Identified Housing Supply (6+ Units) outside 12 Development Areas 6.4 Table C: Small Identified Sites (<6 units net) 18 6.5 Table D: Prior Approvals for Conversion to Residential 19 6.6 Table E: Housing Supply from Estate Regeneration 19 Programme 6.7 Table F: Small Site Windfall Allowance 20 6.8 Chart A: Housing Trajectory 21 1 1. Introduction 1.1 This report presents the 2018 annual review of the council’s Strategic Housing Land Availability Assessment (SHLAA). It incorporates the latest information regarding housing land supply in the city and presents an updated housing trajectory and five year housing land supply position. 1.2 During the past year national planning policy has been updated through the publication of a revised National Planning Policy Framework (NPPF)1 in July 2018. This has been accompanied by updated Planning Practice Guidance (PPG) 2 relating to the assessment of housing land supply and the introduction of the Housing Delivery Test. 1.3 The purpose and role of the SHLAA remains unchanged in the revised NPPF; that is to identify a future supply of land which is suitable, available and achievable for housing over the local plan period.
    [Show full text]
  • Education Development Trust LMI Bulletin No. 54 – February 2019
    LMI Bulleti n Produced by Education Development Trust in South for the National Careers Service delivery network Issue No 54 – February 2019 CONTENTS • National news • Regional news • Cornwall • Devon • Dorset, Bournemouth and Poole • Hampshire and the Isle of Wight • Somerset • Surrey • West Sussex, Brighton and Hove • LEP News • Useful websites • Future events NATIONAL NEWS Higher and Degree Apprenticeships A complete guide to higher and degree apprenticeships is available in addition to the simplified guide highlighted previously. This guide includes a listing of universities and employers offering apprenticeships, subjects available, information on how to apply and some application tips. Success at interview An interesting article in Business Insider highlighting interview responses which would impress Traci Wilk, Senior Vice President at The Learning Experience and former HR executive at Starbucks. Traci wants to see evidence of a 'growth mindset' where candidates are able to reflect on how they would do things differently as a result of experience and have good self-awareness. In essence, the focus is more about an ability to demonstrate how a candidate has learned from their mistakes. 1 Construction training hubs to boost skills With 158,000 new construction workers needed over the next five years in the UK, the Government have set up 26 'hubs' based on construction sites across the country to train over 17,000 people to be job ready by March next year. The Creative Sector receives Government funding In recognition of the large contribution to the UK economy, £20m government investment has been received by the UK creative industry, part of which will be used to create a Creative Careers Programme to highlight employment opportunities within the sector to schools and colleges.
    [Show full text]
  • Edward St Brief
    12 news update Issue 6 | June 2013 | www.regencysociety.org The Regency Society of Brighton and Hove – registered charity no. 210194 Edward St brief – not good enough At the heart of the draft planning brief for the new Edward Street Quarter is the demolition of Amex House – a building the Regency Society has already proposed for inclusion in the new local list of buildings of interest (see page 4). It would be replaced by a series of buildings of up to six storeys, separated by narrow alleys that converge on a pedestrian square, which is likely to be dark and uninviting – no replacement, we think, for the existing south-facing piazza. We have therefore asked the council to reconsider whether Amex House can be retained and refurbished. A successful building Here are some further reasons: • It’s one of the most successful buildings of its era in the city • It’s less than 40 years old • Its demolition would not represent sustainable development, given that its construction involved the removal of 100,000 tonnes of chalk and the use of 45,000 tonnes of concrete and 2,000 tonnes of steel • Its 28,000 square metres of floor space would more than meet the planning target for office space and could house either business units or a single major occupant, such as Brighton Law Courts, Brighton University or the police station But Amex House is not the only reason we summarised the brief as “disappointing and inadequate”. Retail units The brief also calls for retail units on the site. We question whether this is desirable, given that nearby St James’ Street and the George Street area are in need of an economic boost.
    [Show full text]
  • Cadenza Document
    City Development and Regeneration Hove Town Hall Norton Road Hove BN3 3BQ WEEKLY LIST OF APPLICATIONS RECEIVED BY BRIGHTON & HOVE CITY COUNCIL The following applications were registered by the City Council between 10/06/2019 and 16/06/2019 a) Affecting Listed Buildings and Conservation Areas BRUNSWICK AND ADELAIDE BH2019/01400 83 Western Road Hove BN3 1JB Installation of louvres to existing ground floor window east elevation to provide ventilation for plant equipment. BH2019/01576 Flat 3 17 Brunswick Road Hove BN3 1DG Internal alterations including relocation of kitchen and associated services, minor reconfiguration of studwork wall, replacement of existing doors. BH2019/01580 37 Brunswick Square Hove BN3 1ED Structural remedial works to second and fourth floors. BH2019/01658 73 Western Road Hove BN3 2JQ Installation of new shop front. BH2019/01733 Basement 20 Palmeira Square Hove BN3 2JN Internal alterations to layout. BH2019/01755 Flat 5 36 Brunswick Square Hove BN3 1ED Internal alterations including moving non-original internal walls, provision of new shower room, alterations to the top flight of the stairs, and new cupboard over the stairs. BH2019/01759 Embassy Court Kings Road Brighton BN1 2PX Installation of black gas pipes to rear elevation Page 1 of 14 CENTRAL HOVE BH2019/01614 14 Vallance Gardens Hove BN3 2DD Erection of single storey rear extension, associated internal alterations. BH2019/01703 Car Park Entrance To Rear Of Bath Court And St Aubyns Mansions St Aubyns South Hove Installation of vehicle and 2no. pedestrian gates, new railings and alterations to existing planters. BH2019/01748 85 Church Road Hove BN3 2BB Erection of two storey rear extension and division of existing 1no office unit (B1) into 2no office units (B1), incorporating revised rear fenestration and associated works.
    [Show full text]
  • Environmental Impact Assessment
    Document Information Cover Sheet ASITE DOCUMENT REFERENCE: WSP-EV-SW-RP-0071 DOCUMENT TITLE: Environmental Statement Non-Technical Summary: Final version submitted for planning REVISION: F02 PUBLISHED BY: Jessamy Funnell – WSP PUBLISHED DATE: 03/10/2011 OUTLINE DESCRIPTION/COMMENTS ON CONTENT: Environmental Statement Non-Technical Summary: Final version, submitted to BHCC on 28th September as part of the planning application. BRIGHTON 3Ts: BRIGHTON 3Ts: Trust Statement Environmental Statement Non-Technical Summary September 2011 September 2011 Non-Technical Summary BSUH September 2011 Non-Technical Summary 1.1 This Non-Technical Summary (NTS) provides a summary of the findings of the Environmental Statement (ES) which is submitted on behalf of Brighton and Sussex University Hospitals (BSUH) NHS Trust for the Proposed Development of the Royal Sussex County Hospital (RSCH) site (the Site) in Brighton. 1.2 The ES and this NTS have been produced in accordance with the Town and Country Planning (Environmental Impact Assessment) (England) Regulations 2011, (the ‘EIA Regulations’) which require that, in certain cases, development proposals should be examined to measure their likely significant environmental effects upon the environment and to identify what action should be taken to mitigate those effects. SITE DESCRIPTION 1.3 The Site comprises a number of existing hospital buildings and is centred and covers an area of approximately 2.75 hectares. The Site is located on the northern side of Eastern Road, and is bordered to the west by Upper Abbey Road and Whitehawk Hill Road and to the east by Bristol Gate. The Site is situated adjacent to south of the Royal Alexandra Children’s Hospital and other hospital buildings which will be retained.
    [Show full text]