West Region Scores

SHIFT 2020 Regional Score County District Item # Primary Route Project Type Cost Estimate Project Description Max 100

Warren 3 3‐8857 US 31 W MAJOR WIDENING $12,100,000 IMPROVE US‐31W FROM CAMPBELL LANE (US‐ 231) TO UNIVERSITY BOULEVARD (US‐231X). 89.0 10.561 ‐ 11.688 (14CCN)(16CCR)(18CCR) Warren3 IP20190007 US 231 SPOT $4,382,000 REDUCE CONGESTION AND IMPROVE MOBILITY 88.8 IMPROVEMENT ON US‐231 AND US‐231X BETWEEN CS‐1432 9.877 ‐ 10.455 (CAVE MILL ROAD) AND CS‐1593 (SOUTH PARK DRIVE). Marshall1 IP20110174 US 68 SPOT $4,621,000 ADDRESS SAFETY, SERVICE, AND ACCESS ISSUES 87.4 IMPROVEMENT FROM PURCHASE PARKWAY TO US 641 SOUTH 9.415 ‐ 10.032 IN DRAFFENVILLE.

Hopkins2 2‐8305 US 41 MAJOR WIDENING $11,280,000 IMPROVE NORTH MAIN STREET FROM HOSPITAL DRIVE TO KY‐281. (06CCN)(12CCR)(18CCR) 86.6 16.989 ‐ 17.548

Christian2 2‐899 US 68 RECONSTRUCTION $11,740,000 ADDRESS CONGESTION AND MOBILITY OF US 68 FROM KY 91 TO KY 1007 IN HOPKINSVILLE. 86.6 9.221 ‐ 10.137 (18CCN)

Daviess2 2‐8300 KY 54 MAJOR WIDENING $60,350,000 IMPROVE KY‐54 FROM WEST OF THE US‐60 BYPASS TO CR‐1021 (JACK HINTON ROAD). 85.5 2.47 ‐ 8.003 (06CCN)(10CCR)(12CCR)(14CCR)(16CCR)

Marshall1 1‐398 US 62 MAJOR WIDENING $5,550,000 IMPROVE ACCESS AND REDUCE CONGESTION ON US‐62 FROM KY‐95 TO THE EXISTING FOUR‐LANE 83.6 7.2 ‐ 8.497 HIGHWAY AT LONE VALLEY RD NEAR I‐24 INTERCHANGE AND FUTURE I‐69 CONNECTION.

Barren3 3‐8819.20 KY 90 MAJOR WIDENING $20,160,000 WIDEN KY 90 TO 2 + 1 ROADWAY FROM ESTES ROAD IN CAVE CITY TO THE GLASGOW OUTER 82.7 1.4 ‐ 8.754 LOOP (US68). (SECTION 2)(2016BOP)

Note: Projects may extend beyond county shown. Wednesday, September 18, 2019 Page 1 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Warren3 3‐8904.10 US 31 W MINOR WIDENING $12,420,000 WIDEN US 31W FROM PARK AVENUE TO FAIRVIEW AVENUE MP 13.7‐14.25. (18CCN) 82.5 13.7 ‐ 14.25 Warren3 IP20190111 KY 234 SPOT $915,000 REDUCE CONGESTION AND INCREASE MOBILITY 82.3 IMPROVEMENT ON KY 234 FROM THE EXIT 26 INTERCHANGE 10.2 ‐ 10.8 WITH I 65 TO KY 880.

Graves1 IP20060045 KY 303 MINOR WIDENING $12,661,000 ADDRESS SAFETY, CONGESTION AND ACCESS ISSUES FROM EAST FARTHING STREET TO 81.8 16.034 ‐ 16.807 CHARLES DRIVE IN MAYFIELD. Warren3 3‐8707 PF 9999 NEW $44,350,000 CONSTRUCT A NEW INTERCHANGE ON THE 81.5 INTERCHANGE NATCHER PARKWAY AT ELROD ROAD IN ‐ BOWLING GREEN (MP 3.4 TO MP 4.0).(12CCN)

Marshall1 IP20190051 US 68 RECONSTRUCTION $7,076,000 CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY, SERVICE AND CONGESTION 81.4 8.736 ‐ 9.384 ISSUES FROM KY 782 (GRIGGSTOWN ROAD) TO WESTERN I‐69 RAMPS. Simpson3 IP20190037 KY 1008 SPOT $2,182,000 IMPROVE SAFETY AND MOBILITY AT THE 81.0 IMPROVEMENT INTERSECTION OF KY 1008 AND US 31W. 2.1 ‐ 2.4

Barren3 3‐8819.10 KY 90 MAJOR WIDENING $790,000 MAJOR WIDENING ON KY 90 (5 LANES WITH CURB, GUTTER, AND SIDEWALK) FROM SANDERS 80.0 0.16 ‐ 1.4 STREET TO ESTES ROAD IN CAVE CITY. (SECTION 1)(2016BOP)

Ballard1 1‐115 US 60 MAJOR WIDENING $20,060,000 PADUCAH‐WICKLIFFE RD: IMPROVE US‐60 FROM STAFFORD ROAD TO BETHEL CHURCH ROAD 79.3 13.62 ‐ 16.937 (INCLUDES KEVIL BYPASS)(TO BE LET WITH 1‐ 115.10) (06CCR)(12CCR)(14CCR)(18CCR).

Wednesday, September 18, 2019 Page 2 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Christian2 IP20060085 KY 1007 MINOR WIDENING $26,310,000 RECONSTRUCT KY 1007 FROM LITTLE RIVER BRIDGE TO SANDERSON RD INCLUDING A NEW 78.9 0.63 ‐ 2.5 CONNECTOR FROM SANDERSON RD TO THE KY 1682 BYPASS TO INCLUDE PED./BIKE FACILITIES IN HOPKINSVILLE Todd3 3‐80001 US 79 MINOR WIDENING $15,210,000 US 79 WIDENING FROM MP 0 TO MP 3. (18CCN) 78.6 0 ‐ 3

Christian2 IP20070037 KY 115 MINOR WIDENING $14,870,000 ADDRESS SAFETY AND CONGESTION ISSUES FROM KY 911 TO I24. 78.2 1.261 ‐ 2.663

McCracken1 IP20060059 US 62 MINOR WIDENING $22,615,000 ADDRESS ISSUES WITH SERVICE, CONGESTION AND SAFETY FROM US 45 TO I‐24 IN PADUCAH. 78.0 11.837 ‐ 12.881 SEE MARCH, 2002 PADUCAH‐MCCRACKEN COUNTY TRANSPORTATION STUDY.

Christian2 IP20070029 KY 107 MAJOR WIDENING $16,028,000 RECONSTRUCT KY 107 FROM KY 380 TO JERRY CLAIBORNE WAY TO INCLUDE PED./BIKE 77.9 15.344 ‐ 17.163 FACILITIES

McCracken1 1‐115.10 US 60 MAJOR WIDENING $13,830,000 PADUCAH‐WICKLIFFE RD: IMPROVE US‐60 FROM BETHEL CHURCH ROAD TO KY‐1154 (MARTIN 77.9 0.4 ‐ 1.968 MARIETTA) (04CCR) (TO BE LET WITH 1‐ 115.00).(10CCR)(12CCR)(18CCR)

McCracken1 IP20060061 KY 305 RECONSTRUCTION $20,703,000 ADDRESS FUTURE CONGESTION, ACCESS, CONTINUITY OF THE OUTER LOOP PROJECT , AND 77.4 8.348 ‐ 9.739 ECONOMIC DEVELOPMENT ISSUES FOR WESTERN MCCRACKEN COUNTY ALONG KY 305 FROM KY 998 TO KY 1420.

Allen3 IP20060129 KY 100 MAJOR WIDENING $11,442,000 IMPROVE SAFETY AND MOBILITY ON KY 100 FROM KY 3500 TO JOHN KELLY DRIVE IN 77.1 13.1 ‐ 14.1 SCOTTSVILLE.

Wednesday, September 18, 2019 Page 3 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Barren3 3‐8821 KY 1297 MAJOR WIDENING $20,810,000 IMPROVE KY‐1297 FROM CR‐1366 (DONNELLY DRIVE) TO US‐31E (ROGER WELLS), AND 76.7 11.085 ‐ 12.806 IMPROVE CR‐1366 (DONNELLY DRIVE) FROM KY‐ 1297 TO US‐68 IN GLASGOW. (14CCN) (16CCN)

Livingston1 1‐330 US 60 RELOCATION $24,570,000 PADUCAH‐HENDERSON; RELOCATE US‐60 FROM EAST OF THE RIVER BRIDGE TO EAST 75.9 0.875 ‐ 4.2 OF RUDD‐SPEES ROAD (00CCR)(12CCR)(14CCR)

Caldwell2 IP20140022 KY 91 RECONSTRUCTION $16,410,000 TO RECONSTRUCT KY 91 FROM MP 12.433 NEAR THE I‐69 INTERCHANGE TO THE KY 139 75.4 12.433 ‐ 13.905 INTERSECTION. McCracken1 IP20180013 KY 131 SPOT $2,521,000 ADD TURN LANES AT ENTRANCES TO REIDLAND 75.2 IMPROVEMENT ELEMENTARY SCHOOL. 4.833 ‐ 5.815

Ballard1 1‐118 US 60 MAJOR WIDENING $25,540,000 IMPROVE US‐60 FROM PROPOSED SOUTHERN BYPASS OF LA CENTER TO EAST OF DENIS JONES 75.1 11.815 ‐ 13.615 ROAD. (02CCR)

Warren3 IP20170035 CS 6010 MINOR WIDENING $25,201,000 REDUCE CONGESTION AND INCREASE SAFETY AND MOBILITY ON DISHMAN LANE EXT. (CS‐ 74.4 0.57 ‐ 0.943 6010) FROM MP 0.570 TO JUST EAST OF GRIDER POND ROAD ON CAVE MILL ROAD (CS‐1432).

Hopkins2 IP20180092 PF 9999 NEW ROUTE $5,066,000 EXTEND MIDTOWN BLVD NORTH FROM THE INTERSECTION WITH NORTH AVENUE, 74.1 ‐ TO WHITTINGTON DRIVE (CS 1287). ALL DEEDED TO THE CITY OF MADISONVILLE. THIS PROJECT WILL BE A BREAKOUT SECTION OF THE 2‐804 CONNECTOR PROJECT. D2 HAS REQUESTED 804.3 FOR THIS Warren3 IP20070147 KY 622 SPOT $2,315,000 IMPROVE SAFETY AND MOBILITY ON KY 622 74.0 IMPROVEMENT FROM 0.1 MILE SOUTH OF COLLETT ROAD TO 6.454 ‐ 6.895 DEWEY LAKE ROAD.

Wednesday, September 18, 2019 Page 4 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

McCracken1 IP20080040 US 62 RECONSTRUCTION $39,916,000 IMPROVE GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY ISSUES ON US 62 FROM THE 73.3 0 ‐ 7.851 BALLARD COUNTY LINE TO THE PADUCAH COMMERCE PARK IN ORDER TO PROVIDE IMPROVED REGIONAL SYSTEM LINKAGE BETWEEN BARDWELL AND PADUCAH.

Union2 IP20060117 US 60 MAJOR WIDENING $18,571,000 ADDRESS SAFETY CONCERNS ON US 60 FROM KY 492 TO THE US 60 BYPASS OUTSIDE 73.3 13.29 ‐ 15.401 MORGANFIELD.

Graves1 IP20180073 KY 121 MAJOR WIDENING $12,352,000 UPGRADE/WIDEN KY 121 BYPASS IN MAYFIELD TO FOUR LANES. 73.2 5.499 ‐ 8.938

McLean2 2‐8812 KY 136 RECONSTRUCTION $16,570,000 REPLACE, IMPROVE ALIGNMENTS AND APPROACHES, AND ADDRESS SAFETY ISSUES 72.6 0 ‐ 19.334 WITH BRIDGES ON KY‐136 FROM KY‐56 IN MCLEAN COUNTY TO US‐231 IN OHIO COUNTY. (14CCN)

Butler3 IP20080129 KY 79 SAFETY‐HAZ‐ELM $4,724,000 LANE DEPARTURE SAFETY IMPROVEMENTS ON KY‐79 BETWEEN THE KY‐70 CROSSROADS AND 72.6 12.538 ‐ 24.901 THE GRAYSON COUNTY LINE.

Union2 IP20070108 US 60 MAJOR WIDENING $25,065,000 ADDRESS SAFETY AND SERVICE CONCERNS OF US‐ 60 FROM THE KY‐950 TO KY‐492. 72.2 10.52 ‐ 13.29

Webster2 IP20070127 KY 630 RECONSTRUCTION $12,516,000 ADDRESS SERVICE CONCERNS OF KY 630 FROM KY 132 IN DIXON TO THE HOPKINS COUNTY LINE 72.2 0 ‐ 0.965

Hancock2 2‐226 US 60 MINOR WIDENING $8,860,000 IMPROVE THE WESTBOUND LANES OF US‐60 FROM KY‐1957 TO 0.2 MILE WEST OF KY‐6106. 72.0 4.8 ‐ 8.5 (12CCR)(14CCR)(18CCR)

Wednesday, September 18, 2019 Page 5 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

McCracken1 1‐1115.10 / 1‐ US 60 RELOCATION $18,510,000 RELOCATION AND MINOR WIDENING OF US‐60 1115.20 FROM CLARKS RIVER TO US‐62 71.5 18.65 ‐ 20.1 JCT.(10CCR)(14CCR)(LET W/ 1‐1115.20)(16CCR)

Daviess2 IP20080062 KY 298 RECONSTRUCTION $9,705,000 OLD HARTFORD RD ‐ ADDRESS POOR PAVEMENT CONDITIONS AND CONGESTION DUE TO 71.2 8.986 ‐ 9.927 INCREASED VOLUMES AND TURN MOVEMENTS. PROJECT BEGINS AT BURLEW BLVD (KY 1432) AND ENDS AT BRECKENRIDGE ST (KY 2155 NB).

Metcalfe3 IP20080131 US 68 SAFETY‐HAZ‐ELM $948,000 IMPROVE SAFETY AT THE INTERSECTION SPLIT OF US 68 AND KY 80 IN EDMONTON. 71.0 8.77 ‐ 9.24

Hopkins2 2‐384 KY 281 MAJOR WIDENING $2,960,000 IMPROVE KY‐281 FROM ISLAND PARK DRIVE TO CARRIAGE LANE (KY‐2281). 69.8 0.996 ‐ 1.759 Warren3 IP20190110 US 231 SPOT $14,914,000 REDUCE CONGESTION AND INCREASE MOBILITY 69.6 IMPROVEMENT AT THE US 231 INTERSECTION WITH US 68 AND 13.832 ‐ 13.882 US 68X.

Ohio2 2‐8951 KY 54 MINOR WIDENING $11,780,000 IMPROVE SAFETY ON KY 54 BY UPGRADING MP 7.0 TO MP 8.0 TO THREE LANES INCLUDING 69.3 7.047 ‐ 7.995 CURB AND GUTTER AND ADDRESSING TWO SHARP TURNS. (16CCN)(18CCN)

Christian2 IP20170056 KY 272 MINOR WIDENING $23,134,000 RECONSTRUCT KY 272 FROM KY 1007 (EMP 10.151) TO KY 164 (NEWSTEAD RD) (BMP 6.82) 68.6 6.82 ‐ 10.151 WITH PED‐BIKE FACILITIES.

Muhlenberg2 2‐8802 KY 181 MINOR WIDENING $6,180,000 WIDEN KY‐181 BY FOUR FEET ON EACH SIDE FROM INTERSECTION 601 TO WENDELL FORD 67.5 12.767 ‐ 15.751 CENTER. (14CCN)(18CCN)

Wednesday, September 18, 2019 Page 6 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Warren3 IP20190040 US 231 SPOT $443,000 IMPROVE SAFETY ON US 231 AT THE EXIT 22 67.4 IMPROVEMENT INTERCHANGE WITH I 65. 8.97 ‐ 9.18

Henderson2 IP20040010 US 41 A MINOR WIDENING $43,768,000 RECONSTRUCT GREEN STREET TO IMPROVE SAFETY AND LEVEL OF SERVICE THROUGHOUT 67.3 13.235 ‐ 17.397 THE CORRIDOR.

Lyon1 1‐187.60 US 641 RELOCATION $31,550,000 RELOCATE US‐641 FROM SOUTH OF THE LYON/CALDWELL COUNTY LINE TO FREDONIA, 67.2 4.548 ‐ 5.715 4.5 MILES.

Warren3 IP20150086 US 31 W RECONSTRUCTION $2,935,000 IMPROVE SAFETY AND MOBILITY ON NASHVILLE ROAD (US 31W) AT THE INTERSECTIONS WITH 67.0 10.9 ‐ 11 HIGHLAND WAY AND EMMETT AVENUE.

Graves1 IP20080027 KY 131 RECONSTRUCTION $25,467,000 CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY AND TRUCK ACCESS ISSUES 66.1 0 ‐ 4.555 FROM KY 58 TO KY 483.

Metcalfe3 IP20190107 KY 90 MINOR WIDENING $19,769,000 IMPROVE SAFETY AND MOBILITY ON KY 90 BETWEEN THE BARREN COUNTY LINE AND KY 65.6 0 ‐ 3.283 640 IN SUMMER SHADE.

Daviess2 IP20080076 CS 1770 MINOR WIDENING $8,696,000 18TH STREET (CS 1770) ‐ RECONSTRUCT TO ALLOW FOR CENTER TURN LANES WHERE 65.4 0.159 ‐ 0.864 NEEDED. PROJECT BEGINS AT BRECKENRIDGE ST (KY 2155 NB) AND ENDS AT LEITCHFIELD RD (CS 1033).

Warren3 IP20110203 US 31 W MINOR WIDENING $23,613,000 IMPROVE SAFETY AND MOBILITY ON US 31W FROM OLD PORTER PIKE (MP 16.559) TO KY 957 65.4 16.558 ‐ 18.085 (MP 18.085), INCLUDING THE RECONSTRUCTION OF THE INTERCHANGE WITH KY 446.

Wednesday, September 18, 2019 Page 7 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Calloway1 1‐8952 KY 748 SAFETY $8,180,000 IMPROVE N 16TH STREET FROM KY 1327 (5 POINTS) TO KY 121. (16CCN) 65.0 0 ‐ 0.307

Ballard1 IP20080003 US 62 RECONSTRUCTION $11,928,000 IMPROVE ROADWAY GEOMETRICS, SAFETY, MOBILITY AND TRAVEL TIME RELIABILITY TO US 64.7 0 ‐ 1.754 62 NEAR LOVELACEVILLE, FROM CARLISLE COUNTY LINE TO MCCRACKEN COUNTY LINE.

Daviess2 2‐8854 KY 3143 MINOR WIDENING $15,230,000 IMPROVE KY‐3143 FROM KY‐3335 TO KY 54. (14CCN) 64.5 1.829 ‐ 2.958 Edmonson3 3‐7030.10 KY 259 SPOT $11,030,000 RECONSTRUCT KY‐70/KY‐259 FROM 0.36 MILE 64.5 IMPROVEMENTS NORTH GREEN RIVER BRIDGE AT BROWNSVILLE 11.676 ‐ 12.096 TO 0.42 MILE NORTH OF THE KY‐70/KY‐259 INTERSECTION.(06CCR)(2004BOPC)(12CCR)(14CC R)(18CCN)

Henderson2 2‐383 CS 1372 RECONSTRUCTION $9,550,000 IMPROVE SAFETY AND REDUCE CONGESTION ON CS‐1372 (WATSON LANE). (18CCR) 63.8 0.309 ‐ 1.395

Webster2 IP20080121 KY 132 RECONSTRUCTION $11,207,000 ADDRESS SAFETY AND SERVICE CONCERN OF KY 132 FROM KY 1340 TO KY 857. 63.4 10.101 ‐ 12.379

Simpson3 3‐8856 US 31 W MAJOR WIDENING $20,830,000 IMPROVE US‐31W FROM KY‐1008 TO KY‐621. (14CCN)(16CCR) 62.8 8.477 ‐ 11.937

McCracken1 IP20120011 KY 998 MINOR WIDENING $5,659,000 WIDEN FROM KY 1286 TO VILLAGE SQUARE DRIVE TO IMPROVE LEVEL OF SERVICE AND 62.8 1.718 ‐ 2.17 SAFETY. SEE 2013 PLANNING STUDY (PRIORITY 6).

Christian2 IP20170054 KY 695 MINOR WIDENING $16,736,000 RECONSTRUCT KY 695 FROM STERLING DR. TO GARY LN. TO INCLUDE PED/BIKE FACILITIES 62.4 9.695 ‐ 12.179

Wednesday, September 18, 2019 Page 8 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

McLean2 2‐8400 US 431 SPOT $1,420,000 SPOT IMPROVEMENTS AT THE INTERSECTION OF 61.8 IMPROVEMENTS US‐431 AND KY‐250. (08CCN)(12CCR)(18CCN) 9.8 ‐ 9.9

Hopkins2 IP20150342 CS 1287 RECONSTRUCTION $7,808,000 RECONSTRUCT WHITTINGTON DRIVE (CS 1847) BEGINNING AT THE PROPOSED NEW 61.8 0 ‐ 0.32 INTERSECTION OF MIDTOWN BOULEVARD AND WITTINGTON DRIVE AND ENDING AT THE INTERSECTION OF WHITTINGTON DRIVE (CS 1287) AND ISLAND FORD ROAD (KY 281), INCLUDING THE RECONSTRUCTION OF THE K

Muhlenberg2 IP20190021 US 431 MINOR WIDENING $2,288,000 RECONSTRUCTION OF ROCKY CREEK BRIDGE ON US 431 AND NORTHERN APPROACH TO THE 61.8 3.4 ‐ 3.7 BRIDGE.

Monroe3 IP20060185 KY 100 RECONSTRUCTION $9,588,000 IMPROVE SAFETY AND MOBILITY AND ADDRESS DEFICIENCIES WITH TOWN CREEK BRIDGE ON KY‐ 61.7 14.402 ‐ 14.902 100 FROM KY‐163 TO KY‐3144 IN TOMPKINSVILLE. INCLUDES BRIDGE ID 086B00005

Fulton1 IP20080016 KY 125 RECONSTRUCTION $19,011,000 CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY AND FREIGHT ACCESS ISSUES 61.7 1.659 ‐ 5.386 FROM KY 166 TO KY 1099 IN HICKMAN.

Lyon1 1‐187.50 US 641 RELOCATION $26,920,000 RELOCATE US‐641 FROM US‐62 NEAR EDDYVILLE TO SOUTH OF THE LYON/CALDWELL COUNTY 60.8 0 ‐ 5.715 LINE.

Calloway1 1‐8502 PF 9999 NEW ROUTE $6,240,000 CITY OF MURRAY BUSINESS LOOP FROM GLENDALE TO INDUSTRIAL ROAD. (SEE 1‐120 FOR 60.8 ‐ D, R, & U FUNDING)(08CCN)(10CCR)(LET BY CITY) Warren3 IP20190109 US 31 W SPOT $1,249,000 REDUCE CONGESTION AND INCREASE MOBILITY 60.6 IMPROVEMENT ON US 31W AT THE EXIT 6 INTERCHANGE WITH 8.85 ‐ 9.05 THE NATCHER PARKWAY.

Wednesday, September 18, 2019 Page 9 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Christian2 IP20060079 US 68 MINOR WIDENING $26,804,000 WIDEN US 68/80 FROM KY 1007 TO THE US 68 BYPASS IN HOPKINSVILLE 59.1 7.137 ‐ 10.137

Hopkins2 IP20070078 KY 260 SAFETY‐HAZ‐ELM $10,448,000 IMPROVE SAFETY AND MOBILITY OF KY 260 FROM THE APPROACHES AT THE RAILROAD 59.0 1.396 ‐ 1.864 CROSSING IN HANSON TO THE SOUTHBOUND ON AND OFF RAMPS OF I 69.

McCracken1 IP20120012 KY 1286 MINOR WIDENING $9,241,000 WIDEN FROM NEW HOLT ROAD TO KY 998 TO IMPROVE LEVEL OF SERVICE AND SAFETY. SEE 59.0 6.423 ‐ 6.916 2013 PLANNING STUDY (PRIORITY 5).

Hopkins2 IP20080100 US 41 RECONSTRUCTION $2,744,000 REMOVE THE MEDIAN ON US 41 (SOUTH MAIN STREET) FROM MP 13.646 TO MP 15.521 57.4 13.646 ‐ 15.521

Hancock2 2‐197 KY 69 RELOCATION $6,930,000 IMPROVE CONNECTION BETWEEN US‐60 AND CANNELTON BRIDGE APPROACH AT 56.7 13.08 ‐ 13.568 HAWESVILLE. (06CCR) (08CCR) (10CCR)(12CCR)

Hickman1 IP20190054 US 51 RECONSTRUCTION $4,857,000 IMPROVE SAFETY, ACCESS, GEOMETRIC DEFICIENCIES AND ECONOMIC DEVELOPMENT 55.2 6.866 ‐ 7.264 ISSUES FROM EZELL LANE TO CLAYTON STREET Barren3 IP20190042 KY 249 SPOT $2,118,000 IMPROVE SAFETY AND MOBILITY ON KY 249 54.7 IMPROVEMENT NEAR TROJAN TRAIL FROM MP 15.47 TO MP 15.47 ‐ 15.65 15.65.

Union2 2‐310.21 KY 56 MINOR WIDENING $15,690,000 ADDRESS SAFETY, CONDITION AND SERVICE CONCERN FROM KY 109 TO WEST OF KY 360 TO 54.3 2.723 ‐ 7.726 ESTABLISH TRUCK NETWORK CONNECTION TO SHAWNEETOWN BRIDGE.(14CCR) (SAME AS ITEM NO. 2‐310.20 IN 2014 SYP)

Wednesday, September 18, 2019 Page 10 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Ohio2 2‐8705 US 231 SAFETY $2,020,000 ADDRESS LEFT TURN LANE ISSUES ON US‐231 AT SOUTHERN ELEMENTARY SCHOOL, MP 5.15 TO 53.9 5.15 ‐ 5.25 5.25.(12CCN) Logan3 IP20110197 US 79 BRIDGE $2,641,000 IMPROVE SAFETY ON US 79 AT VICKS BRANCH 53.9 REPLACEMENT FROM MP 2.7 TO MP 3.1. 2.7 ‐ 3.1

Lyon1 IP20190152 US 62 SAFETY‐HAZ‐ELM $270,000 TURN LANE ON WESTBOUND US 62 AT KUTTAWA SPRINGS RD INTERSECTION 53.3 8.67 ‐ 8.7

Henderson2 IP20040011 CS 1014 MINOR WIDENING $8,978,000 RECONSTRUCT ATKINSON ST TO IMPROVE LEVEL OF SERVICE AND REDUCE CONGESTION. 52.3 0.248 ‐ 0.856

Metcalfe3 IP20140051 US 68 RECONSTRUCTION $4,303,000 IMPROVE SAFETY AND REDUCE CONGESTION ALONG US‐68 FROM ROGERS CREEK BRIDGE TO 52.0 7.26 ‐ 7.697 KY‐861.

Henderson2 IP20080098 CS 1115 RECONSTRUCTION $9,777,000 RECONSTRUCTION ELM ST TO IMPROVE LEVEL OF SERVICE AND PEDESTRIAN SAFETY AND 51.7 1.573 ‐ 2.898 MOBILITY.

Christian2 IP20070038 I 24 LIGHTING $875,000 ADDRESS SAFETY ISSUES BY INSTALLING INTERCHANGE LIGHTING. 51.1 88.459 ‐ 89.113

Daviess2 IP20110168 KY 2831 RECONSTRUCTION $6,083,000 LOOK AT ACCESS MANAGEMENT AND MAKE INTERSECTION IMPROVEMENTS ALONG THIS 50.8 0 ‐ 1.641 SECTION

Calloway1 IP20060011 KY 822 RECONSTRUCTION $7,719,000 CORRECT SUBSTANDARD ROADWAY GEOMETRICS AND ADDRESS SAFETY, SERVICE 50.8 0 ‐ 0.73 AND ACCESS ISSUES ON KY 822 (16TH ST.) BETWEEN KY 1550 (GLENDALE ROAD) AND KY 821 (SYCAMORE STREET)

Wednesday, September 18, 2019 Page 11 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Allen3 3‐320 KY 100 RECONSTRUCTION $17,010,000 IMPROVEMENTS TO KY 100: CURVE, BRIDGE, AND INTERSECTION IMPROVEMENTS FROM 50.7 3.1 ‐ 4.2 NEAR THE STONY POINT ROAD INTERSECTION TO EAST OF THE ALONZO LONG HOLLOW ROAD INTERSECTION (12CCR)(18CCN)

Warren3 IP20070134 US 31 W RECONSTRUCTION $7,926,000 IMPROVE SAFETY AND MOBILITY ON US 31W BYPASS FROM UNIVERSITY BLVD TO FAIRVIEW 50.1 11.905 ‐ 13.412 AVE (KY 234) IN BOWLING GREEN.

Warren3 IP20190106 US 31 W MAJOR WIDENING $14,351,000 REDUCE CONGESTION AND INCREASE MOBILITY WITH URBAN SECTION FROM PARK ST. TO 48.9 14.25 ‐ 14.669 LOUISVILLE RD. (US‐31W) IN BOWLING GREEN.

Warren3 IP20150072 US 31 W RECONSTRUCTION $3,845,000 IMPROVE SAFETY AND MOBILITY AT THE US 31W INTERSECTION WITH BROADWAY AVENUE. 47.2 12.789 ‐ 12.834

Marshall1 IP20080045 US 641 RECONSTRUCTION $16,755,000 CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY, SERVICE, AND CONGESTION 46.8 11.147 ‐ 12.862 ISSUES FROM BENTON BAPTIST TEMPLE ROAD / HAPPY HOLLOW RD TO US 68 IN DRAFFENVILLE.

McCracken1 IP20070001 KY 731 RECONSTRUCTION $14,386,000 ADDRESS CONGESTION, SAFETY AND INTERSECTION ALIGNMENT ISSUES FROM US 46.7 0 ‐ 0.447 45/US 62 TO BROADWAY/BUCKNER LN/32ND STREET INTERSECTION.

Simpson3 IP20060199 KY 1008 MAJOR WIDENING $27,639,000 REDUCE CONGESTION AND IMPROVE MOBILITY ALONG KY‐1008 FROM US‐31W SOUTH OF 46.4 0 ‐ 2.276 FRANKLIN TO KY‐100 WEST OF FRANKLIN.

Wednesday, September 18, 2019 Page 12 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Christian2 IP20170058 KY 107 MINOR WIDENING $9,993,000 RECONSTRUCT KY 107 FROM THE KY 107/KY 507 INTERSECTION (BMP 19.841) NORTH TO THE KY 46.3 19.841 ‐ 21.642 1683 INTERSECTION (EMP 21.642). THIS ALSO INCLUDES A NEW CONNECTOR FROM NEAR THE KY 107/KY 507/ROZELLE CT. INTERSECTION (EMP 0.2) SOUTHWARD TO US 68/80. (BMP 0.0)

Christian2 2‐8954 KY 115 SAFETY $14,710,000 IMPROVE AND WIDEN KY 115 FROM I‐24 (MP 2.901) TO ANDERSON ROAD (MP 6.87).(16CCN) 46.2 2.901 ‐ 6.87

Hopkins2 2‐8634 KY 70 MAJOR WIDENING $9,510,000 WIDEN KY‐70 (PRINCETON ROAD) FROM US‐41 WESTERLY TO SEMINARY STREET. (10CCN) 46.2 18.412 ‐ 18.653

Butler3 IP20170034 KY 70 SAFETY‐HAZ‐ELM $5,386,000 LANE DEPARTURE SAFETY IMPROVEMENTS ON KY‐70 BETWEEN THE KY‐79 CROSSROADS AND 45.7 15.15 ‐ 29.977 THE EDMONSON COUNTY LINE.

Warren3 3‐80052 KY 234 MINOR WIDENING $3,980,000 EXTEND THE 5 LANE SECTION ON KY‐234 FROM MP 11.9 TO 12.4. IMPROVEMENTS MAY INCLUDE 45.0 11.9 ‐ 12.4 A ROUNDABOUT, TURN LANE, AND A SIGNAL AT HAMPTON DR.(18CCN)

Butler3 IP20060151 KY 70 MAJOR WIDENING $18,729,000 IMPROVE SAFETY AND MOBILITY ALONG KY‐70 FROM THE INTERSECTION OF US‐231 TO THE 44.8 12.83 ‐ 14.419 NATCHER PARKWAY.

Christian2 2‐8703 KY 107 MINOR WIDENING $4,860,000 IMPROVE KY‐107 FROM GATEWAY LANE TO KY‐ 380.(12CCN)(14CCR) 44.8 16.823 ‐ 17.169

Todd3 IP20190029 US 79 RECONSTRUCTION $1,166,000 IMPROVE SAFETY AND MOBILITY AT THE US‐ 79/KY‐181, US‐79/US‐41, AND US‐41/KY‐181 44.2 0.2 ‐ 0.6 INTERSECTIONS ("GUTHRIE KNOT").

Wednesday, September 18, 2019 Page 13 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Butler3 IP20190009 KY 185 RECONSTRUCTION $9,773,000 IMPROVE SAFETY AND MOBILITY ON KY 185 FROM MP 3 TO MP 4.8. 44.2 3 ‐ 4.8

Warren3 IP20060208 CS 1334 MINOR WIDENING $22,767,000 IMPROVE SAFETY AND MOBILITY ON SMALLHOUSE ROAD (CS‐1334/CR‐1235) FROM 43.9 0.656 ‐ 0.879 CAVE MILL ROAD (CS‐1401) TO CAMPBELL LANE (US‐231). Graves1 IP20190186 US 45 SPOT $1,233,000 ADDRESS SAFETY, SERVICE, AND ACCESS ISSUES 43.9 IMPROVEMENT FROM THE INTERSECTION AT JIMTOWN ROAD 19.333 ‐ 20.232 (19.333 MP) TO THE BRIDGE OVER KEY CREEK (20.232 MP)(042B00008N).

Warren3 3‐8818 KY 884 MINOR WIDENING $16,530,000 THREE SPRINGS ROAD EXTENSION FROM FLEALAND TO THE NATCHER PARKWAY 43.8 7.302 ‐ 8.622 INCLUDING BRIDGE OVER PARKWAY. (14CCN)(18CCN)

Warren3 3‐80051 KY 3225 SAFETY $2,900,000 SAFETY IMPROVEMENTS AND REHABILITATION ON KY‐3225. KEEP EXISTING FOOTPRINT BY 41.9 0 ‐ 1 REPLACING CURBLINE IN SAME LOCATION FROM MP 0 TO MP 1(18CCN)

Ohio2 IP20150399 KY 69 MINOR WIDENING $31,302,000 RECONSTRUCT KY 69 FROM CENTERTOWN TO HARTFORD. (14CCN) 41.7 7.556 ‐ 13.317

Allen3 IP20110176 KY 101 SAFETY‐HAZ‐ELM $10,616,000 IMPROVE SAFETY ON KY 101 FROM KY 234 TO THE WARREN COUNTY LINE. 41.2 5.862 ‐ 13.347

Warren3 IP20160011 US 68 X RECONSTRUCTION $4,263,000 REDUCE CONGESTION AND INCREASE MOBILITY ON RUSSELLVILLE ROAD (US 68X) FROM OLD 41.1 1.196 ‐ 1.724 MORGANTOWN ROAD (US 231X) TO UNIVERSITY DRIVE (US 231X/US 68X).

Wednesday, September 18, 2019 Page 14 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Hopkins2 IP20080103 KY 70 SPOT $6,206,000 IMPROVE CONGESTION AT THE INTERSECTION 41.0 IMPROVEMENT OF KY 70 AND KY 254. 19.78 ‐ 20

Webster2 IP20080117 KY 56 MINOR WIDENING $18,644,000 ADDRESS SERVICE AND SAFETY CONCERN OF KY‐ 56 FROM US‐41A IN POOLE TO KY 283. 39.5 5.332 ‐ 9.241

Butler3 IP20140044 US 231 MINOR WIDENING $1,113,000 INCREASE SAFETY AND MOBILITY FOR MOTOR VEHICLES AND PEDESTRIANS ON US 231 FROM 39.5 10.683 ‐ 10.95 THE INTERSECTION WITH BELL STREET TO THE INTERSECTION WITH KY 2161 IN MORGANTOWN.

Warren3 3‐8854 KY 234 MAJOR WIDENING $14,560,000 MAJOR WIDENING/RECONSTRUCTION OF CEMETERY ROAD (KY‐234) FROM FOUNTAIN 39.3 7.878 ‐ 9.553 TRACE TO ROGER PORTER ROAD (MP 7.878 TO MP 9.625).(14CCN)(16CCR)

Muhlenberg2 IP20080112 KY 181 MAJOR WIDENING $9,363,000 ADDRESS TRAFFIC FLOW ISSUES AND GEOMETRIC DEFICIENCIES FROM US 62 IN 38.2 11.881 ‐ 12.767 GREENVILLE TO KY 601

Daviess2 IP20080056 KY 56 RECONSTRUCTION $12,058,000 KY 56 ‐ IMPROVE TRAFFIC FLOW AND SAFETY. PROJECTS BEGINS AT KY 279 SOUTH AND ENDS 38.0 11.863 ‐ 14.088 AT KY 81.

Muhlenberg2 IP20070094 KY 70 RECONSTRUCTION $76,222,000 RECONSTRUCTION FROM HOPKINS C/L TO KY 277 IN CENTRAL CITY 37.8 0 ‐ 14.709

Warren3 3‐8853 US 31 W MINOR WIDENING $19,470,000 MINOR WIDENING (2 + 1 CONCEPT) FROM WARREN/SIMPSON COUNTY LINE TO BUCHANON 37.7 0 ‐ 4.258 PARK.(14CCN)

Wednesday, September 18, 2019 Page 15 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Barren3 IP20110177 US 68 RECONSTRUCTION $19,005,000 IMPROVE SAFETY AND MOBILITY ISSUES RELATED TO GEOMETRIC DEFICIENCIES ON US 68 37.6 7.9 ‐ 9.52 FROM HIGHLAND GLEN INDUSTRIAL PARK TO KY 2189.

Metcalfe3 3‐8859 PF 9999 RECONSTRUCTION $21,020,000 RECONSTRUCT KY 163 AS A NEW ROUTE ON WEST SIDE OF EDMONTON FROM KY 163 AT 37.4 ‐ GARY BELL RD (MP 10.0) S OF EDMONTON CROSSING US 68 (STOCKTON ST) 2000 FT WEST OF THE COURTHOUSE SQ, TO US 68 (GREENSBURG ST) AT I‐CHNG WITH NUNN PKWY (MP 9.8).(14CCN)(16CCR)(18CCN)

McCracken1 IP20080041 KY 131 RECONSTRUCTION $22,842,000 IMPROVE SAFETY, TRUCK MOBILITY, AND ACCESS AND ADDRESS GEOMETRIC DEFICIENCIES FROM 37.4 0 ‐ 3.603 GRAVES C/L TO KY284 IN REIDLAND.

Lyon1 IP20060054 US 62 MINOR WIDENING $1,150,000 CONSTRUCT EAST BOUND TURN LANE ON US 62 AT LYON CO INDUSTRIAL PARK 37.3 12.9 ‐ 13.066

Christian2 2‐136 PF 9999 NEW ROUTE $40,960,000 EXTEND KY‐1682 FROM THE E.T. BREATHITT PARKWAY TO US‐68/KY‐80 EAST OF 37.2 ‐ HOPKINSVILLE (HOPKINSVILLE NORTHEAST BYPASS). (16CCR) (18CCN)

Christian2 2‐8953 KY 115 MINOR WIDENING $16,360,000 IMPROVE AND WIDEN KY 115 FROM ANDERSON ROAD (MP 6.87) TO JUST SOUTH OF PEMBROKE 37.1 6.87 ‐ 9.635 (MP 9.625)(16CCN)(18CCN)

Butler3 IP20060148 US 231 MAJOR WIDENING $5,954,000 IMPROVE SAFETY AND MOBILITY ON US 231 FROM KY 79 TO WN 9007. 37.0 8.199 ‐ 8.947

Wednesday, September 18, 2019 Page 16 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Ballard1 IP20060004 US 60 MAJOR WIDENING $26,490,000 ADDRESS CONDITION, SAFETY, CONGESTION AND FUTURE CAPACITY ISSUES FROM PROPOSED 37.0 7.14 ‐ 9.73 BARLOW EASTERN BYPASS TO PROPOSED LACENTER SOUTHERN BYPASS. (SEE SEGMENT 4 IN APRIL 1998 ADVANCE PLANNING STUDY)

Daviess2 IP20080068 KY 2117 MINOR WIDENING $5,623,000 SOUTHEASTERN PKWY ‐ RECONSTRUCT TO ADDRESS SAFETY, ADD CURB/GUTTER, INSTALL 36.9 0 ‐ 0.61 SIDEWALKS, REALIGN THE CURVES, AND INSTALL TURN LANES WHERE NEEDED. PROJECT BEGINS AT NEW HARTFORD RD (US 231) AND ENDS AT OLD HARTFORD RD (KY 298).

Daviess2 IP20050032 KY 144 RECONSTRUCTION $18,125,000 KY 144 ‐ RECONSTRUCT TO PROVIDE 12 FOOT DRIVING LANES AND TURN LANES WHERE 36.5 2.09 ‐ 4.966 NEEDED. PROJECT BEGINS NEAR US 60 INTERCHANGE AT REID RD (KY 1456) AND ENDS AT JONES RD (KY 1389).

Hopkins2 IP20060101 KY 1069 RECONSTRUCTION $11,654,000 RECONSTRUCT KY 1069 FROM US 41A TO 0.2 MILES NORTH OF BROWN BADGETT LOOP 36.4 0 ‐ 1.8 INTERSECTION NEAR HANSON.

Hopkins2 2‐8501 US 62 MINOR WIDENING $1,960,000 US‐62; THREE LANES FROM BOARD OF EDUCATION TO CITY PARK IN DAWSON SPRINGS. 35.7 0.829 ‐ 1.35 (08CCN)(10CCR)(12CCR)(16CCN)

Christian2 2‐227 KY 1007 RECONSTRUCTION $11,150,000 RECONSTRUCT KY 1007 FROM US 68 TO SANDERSON ROAD IN 35.4 0.785 ‐ 2.509 HOPKINSVILLE.(12CCR)(14CCR)(16CCR)(18CCN) Marshall1 IP20190023 KY 58 SPOT $1,383,000 RECONSTRUCT INTERSECTION OF US 641 S AND 35.4 IMPROVEMENT KY 58. 8.136 ‐ 8.236

Wednesday, September 18, 2019 Page 17 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Metcalfe3 IP20080135 KY 163 RECONSTRUCTION $3,465,000 IMPROVE SAFETY AND SIGHT DISTANCE ISSUES ON KY 163 FROM MP 8.98 TO MP 9.58. 35.4 8.98 ‐ 9.58 Metcalfe3 3‐8955 KY 163 CONGESTION $69,510,000 IMPROVE HIGHWAY SAFETY AND SYSTEMS 35.1 MITIGTN MOBILITY IN THE KY 163 CORRIDOR BETWEEN KY 2.907 ‐ 9.777 90 (MP 2.907) AND THE PROPOSED WEST EDMONTON BYPASS (MP 9.777). (16CCN)(18CCN) McCracken1 1‐8003 PF 9999 NEW $44,230,000 I‐24; CONSTRUCT NEW INTERCHANGE AT KY‐994 34.7 INTERCHANGE (OLD MAYFIELD ROAD) SE OF PADUCAH. ‐ (00CCN)(14CCN)

Trigg1 IP20170023 KY 139 MINOR WIDENING $24,909,000 CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY, MOBILITY AND ACCESS ISSUES 34.7 17.905 ‐ 24.62 ALONG KY 139 FROM THE INTERSECTION OF KY 124 NORTH OF CADIZ TO THE I‐24 INTERCHANGE IN CALDWELL CO (EMP 0.348)

Daviess2 IP20080063 KY 298 MINOR WIDENING $20,579,000 OLD HARTFORD RD ‐ WIDEN TO IMPROVE TRAFFIC FLOW AND SAFETY. PROJECT BEGINS AT 34.7 7.042 ‐ 8.986 HARRIET LN (CR 1120H) AND ENDS AT BURLEW BLVD (KY 1432).

Caldwell2 IP20060073 US 62 RECONSTRUCTION $3,115,000 NORTH JEFFERSON ST. ‐ RECONSTRUCT THE INTERSECTION AT EAST GREEN STREET IN 34.6 7.245 ‐ 7.345 PRINCETON.

Trigg1 IP20100025 PF 9999 NEW ROUTE $23,152,000 NEW NORTHEAST CONNECTOR FROM US 68 APPROX 2.5 MI W OF I‐24 TO KY 778 N. OF CADIZ. 34.3 ‐ Edmonson3 3‐7030.50 KY 259 SPOT $36,900,000 RECONSTRUCT KY‐259 FROM 0.42 MILE NORTH 34.3 IMPROVEMENTS OF THE KY‐70 INTERSECTION TO NORTH OF THE 12.096 ‐ 15.633 KYROCK ELEMENTARY SCHOOL (PRIORITY SECTION). (2004BOPC)

Wednesday, September 18, 2019 Page 18 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Calloway1 IP20070256 CS 1047 MINOR WIDENING $12,917,000 ADDRESS CONGESTION, GEOMETRIC DEFICIENCIES, AND ACCESS ISSUES FROM KY121 34.3 0 ‐ 1.079 TO UTTERBACK ROAD IN MURRAY.

McCracken1 1‐8702 PF 9999 NEW ROUTE $26,190,000 NEW ACCESS ROAD FROM KY‐305 NEAR KY‐998, EXTENDING WEST TO THE OHIO RIVER 34.2 ‐ MEGAPARK. (2‐LANE INITIAL, 4‐LANE ULTIMATE)(12CCN)(14CCR)(18CCN)

Warren3 3‐8858 PF 9999 NEW ROUTE $7,620,000 EXTEND SHIVE LANE TO LOVERS LANE (KY 880) IN BOWLING GREEN. (14CCN)(16CCR) 34.2 ‐

McCracken1 IP20080042 KY 1310 RECONSTRUCTION $19,078,000 CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY, MOBILITY AND ACCESS ISSUES 34.1 0 ‐ 1.055 FROM US 45 (LONE OAK ROAD) TO KY 994 (OLD MAYFIELD ROAD) IN PADUCAH.

Calloway1 IP20080008 KY 783 MINOR WIDENING $9,169,000 IMPROVE ROADWAY GEOMETRICS AND ADDRESS ACCESS ISSUES TO THE MURRAY‐ 33.6 8.1 ‐ 10.44 CALLOWAY COUNTY AIRPORT FROM KY 121 TO KY 1509.

Christian2 IP20170057 US 68 MAJOR WIDENING $17,141,000 RECONSTRUCT US 68/80 (EAST OF PKWY) FROM PENNYRILE PKWY TO THE US 68 BYPASS TO 33.5 11.419 ‐ 14.107 INCLUDE PED/BIKE FACILITIES.

Barren3 IP20150092 KY 1297 RECONSTRUCTION $7,298,000 IMPROVE SAFETY AND MOBILITY ALONG KY 1297 FROM THE GLASGOW OUTER LOOP NEAR THE 33.5 9.681 ‐ 11.085 LOUIE B NUNN PKWY OVERPASS TO DONNELLEY DRIVE.

McLean2 IP20070082 KY 56 MINOR WIDENING $21,688,000 ADDRESS CONDITION AND SERVICE ISSUES OF KY‐ 56 FROM WEBSTER CO LINE TO KY‐136 AT BEECH 33.3 0 ‐ 5.516 GROVE.

Wednesday, September 18, 2019 Page 19 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Hancock2 IP20060089 KY 69 RECONSTRUCTION $37,707,000 ADDRESS SAFETY CONCERNS OF KY‐69 FROM KY‐ 144 TO US‐60 AT HAWESVILLE. 33.3 4.627 ‐ 13.08

Henderson2 IP20070066 KY 351 RECONSTRUCTION $7,348,000 IMPROVE SAFETY AND LEVEL OF SERVICE IN THE AREA OF GRAHAM HILL 33.1 2.582 ‐ 3.567

Edmonson3 IP20080130 KY 259 SAFETY‐HAZ‐ELM $2,665,000 IMPROVE SAFETY AND MOBILITY ON KY 259 FROM NORTH OF KYROCK ROAD TO THE 33.0 15.633 ‐ 22.24 GRAYSON COUNTY LINE.

Graves1 IP20080029 KY 131 RECONSTRUCTION $24,302,000 CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY AND TRUCK ACCESS ISSUES 33.0 9.445 ‐ 12.887 FROM KY 849 TO KY 348 IN SYMSONIA.

Ohio2 IP20060112 KY 69 RECONSTRUCTION $48,252,000 ADDRESS THE SAFETY CONCERNS OF KY‐69 FROM SUNNYDALE ROAD TO KY‐54 AT 32.9 22 ‐ 31.623 FORDSVILLE.

Marshall1 IP20080044 US 641 RECONSTRUCTION $16,141,000 CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY, SERVICE AND CONGESTION 32.6 10.002 ‐ 11.147 ISSUES FROM THE CLARKS RIVER BRIDGE IN BENTON TO BENTON BAPTIST TEMPLE ROAD / HAPPY HOLLOW ROAD.

Henderson2 IP20190168 KY 1539 RECONSTRUCTION $6,187,000 RECONSTRUCT KY 1539/ZION LARUE RD FROM KY 351 TO HENDERSON CITY LIMITS 32.4 0 ‐ 0.727

Christian2 IP20170059 KY 109 MINOR WIDENING $9,715,000 RECONSTRUCT KY 109 FROM US 68/80 (BMP 10.945) TO SPAIN LANE (EMP 12.552) WITH 32.2 10.945 ‐ 12.552 PED./BIKE FACILITIES

Wednesday, September 18, 2019 Page 20 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Lyon1 IP20170024 US 62 SAFETY‐HAZ‐ELM $2,876,000 ON US 62 WHERE THE P&L RAIL OVERPASS MEETS THE TWO (2) KY 810 INTERSECTIONS, 31.9 3.57 ‐ 3.836 RECONSTRUCT US 62/KY 810 (NORTH AND SOUTH) INTERSECTIONS WITH TURN LANES OR OTHER MEASURE TO IMPROVE LINE OF SIGHT AND SAFETY ISSUES.

McLean2 IP20070083 KY 56 MINOR WIDENING $15,100,000 ADDRESS CONDITION AND SERVICE ISSUES OF KY‐ 56 FROM KY‐136 AT BEECH GROVE TO THE 31.6 5.516 ‐ 9.363 DAVIESS C/L.

Christian2 IP20170012 KY 272 RECONSTRUCTION $4,730,000 TO IMPROVE SAFETY BY ADDRESSING GEOMETRIC DEFICIENCIES OF INTERSECTION 31.5 8.1 ‐ 8.4 AND IMPROVING TRAFFIC CONTROL THROUGH THE INTERSECTION WITH PYLE/MAJOR LANE BY CONSTRUCTING A ROUNDABOUT.

Webster2 IP20080122 KY 132 RECONSTRUCTION $18,600,000 ADDRESS SAFETY AND SERVICE CONCERNS OF KY 132 FROM KY 857 TO US 41A. 31.2 12.379 ‐ 16.452

Marshall1 IP20060067 US 68 RECONSTRUCTION $1,898,000 IMPROVE SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES AT THE Y‐INTERSECTION WITH 31.0 7.745 ‐ 7.845 KY95.

Hopkins2 IP20190166 KY 1069 RECONSTRUCTION $13,760,000 RECONSTRUCT KY 1069 FROM 0.2 MILES NORTH OF BROWN BADGETT LOOP TO KY 260 NEAR 31.0 1.8 ‐ 3.9 HANSON

Ballard1 IP20170075 US 51 RELOCATION $33,099,000 ADDRESS CONDITION, ACCESS AND FUTURE CONGESTION ISSUES FROM APPROX 1 MILE 30.9 4.644 ‐ 7.327 NORTH OF WICKLIFFE TO OHIO RIVER BRIDGE.(SECTION L ‐ 1993 SCOPING STUDY)

Wednesday, September 18, 2019 Page 21 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Union2 2‐8955 US 60 RECONSTRUCTION $5,910,000 IMPROVE ROADWAY TO REDUCE FLOODING ON US‐60 FROM EAST OF HOUSE BRIDGE ROAD (CR‐ 30.8 23.8 ‐ 25.2 1027) TO UNION/HENDERSON COUNTY LINE. (16CCN)

Christian2 2‐381 PF 9999 NEW ROUTE $7,590,000 CONSTRUCT NEW CONNECTOR FROM US 41 NEAR THE INDUSTRIAL PARK TO KY 115 SOUTH 30.7 ‐ OF PEMBROKE. (16CCR)(18CCN)

Calloway1 IP20120084 CR 1401 MINOR WIDENING $10,451,000 IMPROVE MOBILITY, ADDRESS GEOMETRIC DEFICIENCIES, AND REDUCE CONGESTION 30.7 0.811 ‐ 1.132 ALONG BRINN RD (CR1401) BETWEEN KY 80 AND UTTERBACK ROAD (CR1552) IN MURRAY. Metcalfe3 3‐8706 US 68 SPOT $12,130,000 SPOT IMPROVEMENTS ON US‐68 FROM THE 30.6 IMPROVEMENTS TO THE 17.835 ‐ 20.016 GREEN/METCALFE COUNTY LINE.(12CCN)(16CCN)(18CCN)

McCracken1 IP20190050 KY 998 MINOR WIDENING $25,383,000 IMPROVE MOBILITY, SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES ON KY 998 (OLIVET 30.4 0 ‐ 1.718 CHURCH ROAD) FROM KY 1286 (FRIENDSHIP ROAD) TO US 62.

Carlisle1 IP20060015 US 62 RECONSTRUCTION $4,515,000 IMPROVE SAFETY, MOBILITY AND CONNECTIVITY, AND ADDRESS GEOMETRIC DEFICIENCIES ALONG 30.3 8.09 ‐ 8.932 US 62 BETWEEN HOBBS RD / BOSWELL RD TO KY 307.

Graves1 IP20080030 KY 131 RECONSTRUCTION $9,792,000 CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY AND TRUCK ACCESS ISSUES 30.2 12.887 ‐ 14.44 FROM KY 348 IN SYMSONIA TO MCCRACKEN COUNTY LINE. Monroe3 IP20190104 KY 100 BRIDGE $2,420,000 IMPROVE SAFETY AND MOBILITY ON KY 100 AT 30.2 REPLACEMENT THE NARROW BRIDGE OVER EAST FORK BARREN 13.5 ‐ 13.6 RIVER.

Wednesday, September 18, 2019 Page 22 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Union2 IP20070113 KY 109 RECONSTRUCTION $16,730,000 ADDRESS SAFETY AND SERVICE CONCERNS OF KY 109 FROM KY 130 TO KY 56 AT THE ROCKS. 30.2 9.079 ‐ 13.692

Barren3 IP20060137 US 31 E MAJOR WIDENING $29,528,000 REDUCE CONGESTION AND INCREASE MOBILITY ON US 31E FROM ABERDEEN DRIVE TO TROJAN 30.1 12.3 ‐ 12.6 TRAIL, INCLUDING RECONSTRUCTION OF THE INTERCHANGE WITH NUNN PARKWAY. Logan3 IP20190098 US 68 SPOT $568,000 IMPROVE SAFETY AND MOBILITY ON US 68 AT 30.1 IMPROVEMENT THE TRUCK STOP ON W. H. BROWN ROAD. 11.35 ‐ 11.55

Muhlenberg2 IP20060107 KY 176 RECONSTRUCTION $14,824,000 RECONSTRUCTION FROM GREENVILLE TO SOUTH HIGH SCHOOL 30.1 0 ‐ 3 Barren3 IP20060145 KY 249 SPOT $2,641,000 IMPROVE SAFETY AND MOBILITY OF KY‐249 29.9 IMPROVEMENT FROM ELMO ROAD TO 0.3 MILE SOUTH OF KY 8.3 ‐ 8.75 1318, INCLUDING A NEW BRIDGE OVER ROSE CREEK.

Graves1 IP20190056 KY 303 RECONSTRUCTION $640,000 IMPROVE SAFETY AND ROADWAY GEOMETRICS AT INTERSECTION WITH E TUCKER/W TUCKER 29.9 14.7 ‐ 14.9 ROAD.

Allen3 3‐8902 KY 98 RECONSTRUCTION $3,130,000 RECONSTRUCT 1.0 MILE EAST OF BRIDGE OVER BARREN RIVER LAKE TO CORRECT VERTICAL AND 29.8 10 ‐ 10.1 HORIZONTAL DEFICIENCIES.(16CCN) Logan3 IP20180095 US 79 SPOT $736,000 IMPROVE SAFETY AT THE INTERSECTION OF US‐ 29.8 IMPROVEMENT 79 AND JOE MONTGOMERY ROAD. 9.588 ‐ 9.688

Wednesday, September 18, 2019 Page 23 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Muhlenberg2 2‐8803 KY 2533 RECONSTRUCTION $9,210,000 STRAIGHTEN DEAN ROAD INTERSECTION OF 189 BYPASS TO KY 181 NORTH NEAR THE 29.7 0 ‐ 2.023 INTERSECTION WITH THE WKY PARKWAY, WENDELL FORD NATIONAL GUARD CENTER, AND JOB CORP. (14CCN)(18CCN)

Simpson3 IP20060197 KY 585 RECONSTRUCTION $6,606,000 IMPROVE SAFETY BY ADDRESSING VERTICAL ALIGNMENT DEFICIENCIES ON KY‐585 FROM THE 29.5 0 ‐ 1.165 INTERSECTION WITH KY‐73 TO THE INTERSECTION WITH ROARK ROAD. Graves1 IP20080021 KY 58 DRAINAGE $1,647,000 ADDRESS GEOMETRIC DEFICIENCIES AND 29.5 IMPROVEMENT DRAINAGE ISSUES ALONG KY58 BETWEEN TICE 6.116 ‐ 6.444 ROAD TO KY121 BYPASS.

Carlisle1 IP20080011 US 51 RECONSTRUCTION $37,633,000 CORRECT ROADWAY GEOMETRICS AND IMPROVE SAFETY, ACCESS AND REGIONAL 29.4 0 ‐ 6.134 CONNECTIVITY FROM HICKMAN COUNTY LINE TO KY 1377 SOUTH OF BARDWELL.

Graves1 IP20080024 KY 121 RECONSTRUCTION $16,176,000 ADDRESS SAFETY, CONGESTION AND FUTURE CAPACITY ISSUES TO ACCOMMODATE INCREASE 29.4 11 ‐ 14.024 TRUCK TRAFFIC FROM .041 MILES SOUTH OF HARRIS LANE TO KY 945.

Allen3 IP20060132 KY 98 RECONSTRUCTION $1,188,000 IMPROVE SAFETY AT THE INTERSECTION OF KY 98 AND KY 3499 IN SCOTTSVILLE. 29.3 0.3 ‐ 0.4

Union2 IP20140039 KY 492 SAFETY‐HAZ‐ELM $13,743,000 ADDRESS SAFETY CONCERNS OF NARROW BRIDGES, BOX CULVERTS AND LACK OF 29.3 2.482 ‐ 5.154 SHOULDERS ON KY 492 FROM US 60 TO KY 109.

Simpson3 3‐8855 KY 1008 MAJOR WIDENING $7,010,000 IMPROVE KY‐1008 FROM KY‐73 TO NORTH FRANKLIN STREET. (14CCN) 28.8 3.688 ‐ 4.333

Wednesday, September 18, 2019 Page 24 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Simpson3 IP20060194 KY 73 SPOT $2,727,000 IMPROVE SAFETY AND MOBILITY ON KY 73 FROM 28.8 IMPROVEMENT NEW SALEM ROAD TO GLEN VAUGHN ROAD. 14.911 ‐ 15.581

Calloway1 IP20080009 KY 822 RECONSTRUCTION $2,114,000 IMPROVE SAFETY, GEOMETRIC DEFICIENCIES, AND REDUCE CONGESTION AT THE 28.8 0.68 ‐ 0.78 INTERSECTION WITH KY 821 IN MURRAY.

Livingston1 IP20040006 KY 453 SAFETY‐HAZ‐ELM $3,524,000 RECONSTRUCTION OF KY 453 ALONG "S" CURVES FROM BMP 13.100 TO EMP 13.600. 28.7 13.1 ‐ 13.6

Hickman1 IP20080032 US 51 RECONSTRUCTION $11,903,000 CORRECT GEOMETRIC DEFICIENCIES, AND IMPROVE SAFETY, ACCESS AND REGIONAL 28.6 4.508 ‐ 6.65 CONNECTIVITY FROM BAYOU DE CHEIN BRIDGE TO MARTIN ROAD.

Union2 IP20000007 US 60 MINOR WIDENING $38,440,000 RECONSTRUCT US 60 FROM PROPOSED WAVERLY BYPASS TO PROPOSED CORYDON 28.5 23.86 ‐ 26.069 BYPASS. SEE SEGMENT 28 IN APRIL, 1998 ADVANCE PLANNING STUDY.

Christian2 2‐898 EB 9004 RECONSTRUCTION $13,740,000 RECONSTRUCT THE BREATHITT PARKWAY INTERCHANGE AT KY 1682 NORTH OF 28.5 11.39 ‐ 11.99 HOPKINSVILLE. (BREATHITT PARKWAY/FUTURE INTERSTATE SPUR PROJECT) (16CCR)(18CCN)

Daviess2 IP20080075 CS 1770 MINOR WIDENING $4,162,000 18TH STREET ‐ RECONSTRUCT TO ALLOW FOR CENTER TURN LANES WHERE NEEDED. PROJECT 28.4 0.864 ‐ 1.387 BEGINS AT JR MILLER BLVD (CS 1262) AND ENDS AT BRECKENRIDGE ST (KY 2155 NB).

Crittenden1 IP20190133 KY 120 RECONSTRUCTION $1,953,000 ON KY 120 RECONSTRUCT SUBSTANDARD CURVE BETWEEN HERMAN TRAVIS RD INTERSECTION 28.3 8.9 ‐ 9.1 AND PINEY CREEK

Wednesday, September 18, 2019 Page 25 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Butler3 IP20140043 US 231 MINOR WIDENING $3,741,000 IMPROVE SAFETY AND MOBILITY ALONG US‐231 IN MORGANTOWN FROM THE INTERSECTION 28.3 11.521 ‐ 11.688 WITH KY‐70 TO NORTH OF THE INTERSECTION WITH NORTH MAPLE STREET.

Barren3 IP20170095 KY 249 MINOR WIDENING $17,634,000 IMPROVE MOBILITY ON KY 249 FROM THE PROPOSED INTERCHANGE WITH LN 9008 TO 28.3 14.95 ‐ 16.05 SOUTH LEWIS STREET IN GLASGOW.

Logan3 3‐80050 US 79 MINOR WIDENING $100,360,000 WIDEN US‐79 TO 3 LANES FROM TODD COUNTY LINE TO INTERSECTION WITH RUSSELLVILLE 28.1 0 ‐ 10.713 BYPASS.(18CCN)

Carlisle1 IP20120007 US 62 RECONSTRUCTION $5,321,000 THE PURPOSE OF THIS PROJECT IS TO ADDRESS IMPROVEMENTS IN BARDWELL FROM US 51 TO 27.9 0 ‐ 1.062 KY 1372 BY UPGRADING TO AN URBAN SECTION WITH SIDEWALKS AND TURN LANES. McCracken1 IP20190049 US 45 TRANSPORTATION $270,000 INCREASE THE DIRECTIONAL CAPACITY OF THE 27.9 STUDY ROADWAY DURING THE DAILY PEAK TRAVEL 6.338 ‐ 9.203 PERIODS.

Crittenden1 IP20140028 KY 295 SAFETY‐HAZ‐ELM $947,000 RECONSTRUCT AND ELEVATE A 0.12 MILE SECTION OF KY 295 ABOVE THE FLOODPLAIN 27.7 1.038 ‐ 1.605 FROM M.P. 1.038 TO M.P. 1.605 JUST SOUTH OF DYCUSBURG

Carlisle1 IP20060017 US 62 RECONSTRUCTION $16,204,000 CORRECT SUBSTANDARD ROADWAY GEOMETRICS ON US 62 FROM .173 MILES EAST 27.6 9.3 ‐ 12.6 OF SHELBY RD / HAYES RD TO KY 1820 TO ADDRESS ACCESS SAFETY, AND REGIONAL CONNECTIVITY ISSUES.

Fulton1 IP20080015 KY 125 RECONSTRUCTION $8,392,000 CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY ISSUES AND FREIGHT ACCESS 27.5 0 ‐ 1.659 FROM TENNESSEE STATE LINE TO KY 166.

Wednesday, September 18, 2019 Page 26 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Fulton1 IP20060038 KY 307 RECONSTRUCTION $3,054,000 ADDRESS ECONOMIC DEVELOPMENT, AND TRUCK ACCESS ISSUES TO THE FULTON 27.5 1.232 ‐ 2.096 INDUSTRIAL PARK FROM THE PURCHASE PARKWAY TO HOLLAND LANE IN FULTON. Logan3 IP20180094 US 79 SPOT $1,081,000 IMPROVE SAFETY AT THE INTERSECTION OF US‐ 27.5 IMPROVEMENT 79 AND KY‐1041. 7.3 ‐ 7.4

Marshall1 IP20180012 KY 348 RECONSTRUCTION $10,675,000 IMPROVE GEOMETRIC ALIGNMENTS AND ADDRESS ACCESS ISSUES AND SAFETY CONCERNS 27.5 5.78 ‐ 7.207 FROM KY 2206 TO THE ENTRANCE OF MARSHALL COUNTY HOSPITAL IN BENTON.

McCracken1 IP20060062 KY 339 RECONSTRUCTION $8,913,000 CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY ISSUES ON CLINTON ROAD (KY 27.2 6.13 ‐ 7.152 339) FROM 0.11 MILES SOUTH OF OLD FARM ROAD (CR‐1001F5)TO US 45. Calloway1 IP20190057 KY 94 SPOT $1,661,000 CORRECT ROADWAY GEOMETRICS AND ADDRESS 27.2 IMPROVEMENT CONGESTION AND SAFETY ISSUES AT KY 94 AND 7.598 ‐ 7.798 KY 1660 (JOHNNY ROBERTSON ROAD) NEAR MURRAY. Crittenden1 IP20120052 US 60 SPOT $2,918,000 IMPROVE THE GEOMETRIC DEFICIENCIES AND 27.2 IMPROVEMENT TRUCK MOBILITY AT THE US641/US60 9.155 ‐ 9.24 INTERSECTION IN MARION. Todd3 IP20190024 KY 181 SPOT $681,000 IMPROVE SAFETY AND MOBILITY ON KY‐181 AT 27.1 IMPROVEMENT THE INTERSECTION OF US‐68. 13 ‐ 13.1

Monroe3 IP20060179 KY 63 RECONSTRUCTION $36,913,000 IMPROVE SAFETY AND MOBILITY ON KY 63 BETWEEN THE TENNESSEE STATE LINE AND KY 27.0 0 ‐ 8.089 1366.

Wednesday, September 18, 2019 Page 27 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Christian2 IP20170055 KY 107 MINOR WIDENING $13,224,000 RECONSTRUCT KY 107 WITH PED‐BIKE FACILITIES FROM KY 345 (HUFFMAN MILL RD) (BMP 12.566) 27.0 12.566 ‐ 15.353 NORTH TO JERRY CLAIBORNE WAY (EMP 15.353).

Daviess2 2‐8801 KY 1456 SAFETY $15,950,000 ADDRESS SUBSTANDARD ROADWAY GEOMETRICS AND SAFETY CONCERNS ON KY 26.9 2.778 ‐ 4.714 1456 FROM KY 54 TO HAYDEN ROAD. MP 2.778 TO 4.714 (SEE 2‐8709.00)(14CCN)(16CCR)

Warren3 3‐8852 KY 884 MINOR WIDENING $12,730,000 RECONSTRUCT KY‐884 FROM LONG ROAD TO THE NATCHER PARKWAY (MP 5.516 TO MP 26.9 5.516 ‐ 7.438 7.438). (14CCN) (BRIDGE OVER NATCHER PKWY UNDER 3‐8818).

Warren3 3‐110.30 / 3‐ KY 185 RECONSTRUCTION $14,325,000 IMPROVE KY 185 FROM 0.24 MILES SOUTH OF 110.40 PRUITT ROAD TO 0.16 MILES SOUTH OF KY 1320. 26.7 6.54 ‐ 8.35 (2018BOP) Ballard1 IP20060001 US 51 SPOT $3,894,000 INCREASE THE INTERSECTION TURNING RADIUS 26.7 IMPROVEMENT AT US 51 & KY 121 IN WICKLIFFE TO IMPROVE 3.338 ‐ 3.4 TRUCK ACCESS. Butler3 IP20060150 KY 70 SPOT $1,154,000 IMPROVE SAFETY AT THE KY 70 ‐ KY 1117 26.6 IMPROVEMENT INTERSECTION. 9.8 ‐ 10.1 Logan3 IP20110179 US 68 X SPOT $685,000 IMPROVE SAFETY AND MOBILITY AT THE 26.6 IMPROVEMENT INTERSECTION OF US 68X AND KY 103. 4.925 ‐ 4.941 Edmonson3 IP20190148 KY 101 SPOT $1,078,000 IMPROVE SAFETY AND MOBILITY AT THE 26.5 IMPROVEMENT INTERSECTION OF KY 101 AND KY 743. 0.78 ‐ 0.88

Warren3 IP20060210 KY 622 RECONSTRUCTION $13,464,000 IMPROVE SAFETY AND MOBILITY ON KY 622 FROM PLANO‐RICHPOND ROAD TO US 231. 26.5 7.16 ‐ 8.332

Wednesday, September 18, 2019 Page 28 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Henderson2 IP20000003 US 41 RECONSTRUCTION $37,716,000 REDUCE CONGESTION AND IMPROVE THE SAFETY AND MOBILITY OF THE INTERCHANGE OF 26.5 15.883 ‐ 16.083 US 41 AND US 60 IN HENDERSON.

Union2 IP20070110 KY 56 SAFETY‐HAZ‐ELM $31,171,000 ADDRESS THE SERVICE, SAFETY AND CONDITION OF KY 56 FROM MORGANFIELD TO KY 141. 26.4 13.1 ‐ 19.662 Allen3 IP20080127 KY 100 SPOT $1,394,000 IMPROVE SAFETY AND MOBILITY ON KY 100 AT 26.4 IMPROVEMENT THE INTERSECTION WITH OLIVER STREET. 11.885 ‐ 11.985

Warren3 IP20190004 CS 1334 MINOR WIDENING $12,364,000 IMPROVE SAFETY AND MOBILITY ON SMALLHOUSE ROAD (CS‐1334) FROM 26.2 2.542 ‐ 3.227 RIDGECREST WAY (CS‐1308) TO SCOTTSVILLE ROAD (US‐231X).

Hancock2 IP20060093 KY 69 SAFETY‐HAZ‐ELM $4,356,000 ADDRESS SAFETY AND CONDITION CONCERNS OF KY‐69 NEAR TICK RIDGE RD. 26.1 12 ‐ 13

Hopkins2 IP20180060 EB 9004 RECONSTRUCTION $55,663,000 UPGRADE THE US 41 OVERPASS AND RAMPS (EXIT 30) ON THE TO MEET 26.1 29.359 ‐ 29.759 INTERSTATE STANDARDS Todd3 IP20120050 US 68 X SPOT $1,880,000 REDUCE CONGESTION AND IMPROVE SAFETY 26.0 IMPROVEMENT AND MOBILITY ON US‐68X FROM MP 2.192 TO 2.192 ‐ 2.402 2.402 IN ELKTON.

Christian2 IP20180061 EB 9004 RECONSTRUCTION $2,995,000 UPGRADE THE KY 800 INTERCHANGE ( EXIT 23) ON THE PENNYRILE PARKWAY TO MEET 25.9 22.449 ‐ 22.849 INTERSTATE STANDARDS

Edmonson3 IP20060157 KY 728 RECONSTRUCTION $14,060,000 IMPROVE SAFETY ON KY 728 FROM KY 259 TO KY 1827. 25.9 0 ‐ 6.952

Wednesday, September 18, 2019 Page 29 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Hopkins2 IP20060100 KY 336 RECONSTRUCTION $7,398,000 RECONSTRUCTION FROM E.T. BREATHITT PKY. TO KY 481. SEE AUGUST 2002 MADISONVILLE 25.8 1.9 ‐ 3.3 URBAN AREA TRANSPORTATION STUDY.

Ballard1 IP20060007 KY 121 RECONSTRUCTION $4,593,000 IMPROVE GEOMETRIC DEFICIENCIES AND TRUCK MOBILITY AT THE INTERSECTION WITH KY286 IN 25.8 8.262 ‐ 8.369 WICKLIFFE.

Henderson2 IP20080088 KY 416 RECONSTRUCTION $41,358,000 RECONTRUCT KY 416 TO IMPROVE SAFETY AND LEVEL OF SERVICE. 25.4 0 ‐ 7.363

Hopkins2 IP20070079 KY 260 RECONSTRUCTION $3,427,000 RECONSTRUCTION VETERANS DIVE (KY 260) FROM BAKER RD TO FATE LUTZ RD IN HANSON 25.3 2.108 ‐ 2.635 FROM MP 2.1 TO MP 2.6.

Fulton1 IP20060037 KY 166 RECONSTRUCTION $2,543,000 CORRECT SUBSTANDARD GEOMETRICS TO THE Y‐ INTERSECTION AT KY 166 & KY 125 TO ADDRESS 25.3 0 ‐ 0.05 SAFETY AND ACCESS ISSUES. Caldwell2 IP20190086 KY 139 SAFETY‐HAZ‐ELM $3,784,000 RECONSTRUCT ROCK SPRINGS CURVE ON KY 139 25.1 7.7 ‐ 8 Hickman1 IP20120005 US 51 SPOT $1,427,000 IMPROVE INTERSECTION GEOMETRIC 25.1 IMPROVEMENT DEFICIENCIES (LACK OF TURNING RADIUS) TO 7.2 ‐ 7.3 ADDRESS TRUCK ACCESS ISSUES AT CLAYTON STREET AND US 51 IN CLINTON.

Muhlenberg2 IP20070096 WK 9001 RECONSTRUCTION $8,197,000 WESTERN KENTUCKY PKY ‐ RECONSTRUCT INTERCHANGE AT US 431 AT CENTRAL CITY 24.8 57.947 ‐ 58.047

Wednesday, September 18, 2019 Page 30 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Calloway1 1‐8851 CS 1047 SAFETY $8,330,000 CONSTRUCT A NEW IMPROVEMENT ALLOWING FOR AN OVERPASS FOR PEDESTRIANS CROSSING 24.8 1.17 ‐ 1.179 16TH STREET GOING TO THE OTHER SIDE OF CAMPUS. MURRAY STATE AND THE CITY ARE IN AGREEMENT WITH THE NEED OF THE IMPROVEMENT. (14CCN) (16CCR)

McLean2 IP20070086 KY 85 MINOR WIDENING $3,412,000 ADDRESS THE SERVICE CONCERNS OF KY‐85 FROM KY 1412 TO THE GREEN RIVER BRIDGE IN 24.7 10.1 ‐ 12.169 MCLEAN COUNTY.

Daviess2 IP20080734 CS 1790 RECONSTRUCTION $4,878,000 EAST 9TH STREET ‐ RECONSTRUCT ROAD AWAY FROM THE RAILROAD TRACKS AND PROVIDE A 24.6 0.638 ‐ 0.911 CLEAR ZONE FOR VEHICLES TRAVELING ALONG THE ROAD. PROJECT BEGINS AT BRECKENRIDGE ST (KY 2155 NB) AND ENDS AT LEITCHFIELD ROAD (CS 1033).

Carlisle1 IP20060014 US 62 RECONSTRUCTION $11,845,000 CORRECT SUBSTANDARD ROADWAY GEOMETRICS ON US 62 FROM KY 1181 TO KY 408 24.5 2.868 ‐ 5.048 TO ADDRESS ACCESS ISSUES, SAFETY CONCERNS, FLOOD PRONE AREA AND REGIONAL CONNECTIVITY. Todd3 IP20110055 KY 181 SPOT $1,780,000 ADDRESS GEOMETRIC DEFICIENCIES TO IMPROVE 24.4 IMPROVEMENT SIGHT DISTANCE AND INCREASE SAFETY 19 ‐ 19.311 (VERTICAL CURVE) ON KY‐181 SOUTH OF THE INTERSECTION WITH KY‐507 NEAR NORTH TODD ELEMENTARY SCHOOL.

Hopkins2 IP20070074 KY 70 MINOR WIDENING $16,545,000 ADDRESS SAFETY AND POOR GEOMETRICS ON KY 70 FROM KY 85 TO MUHLENBERG COUNTY LINE. 24.4 23.247 ‐ 26.394

Henderson2 IP20080084 US 60 SAFETY‐HAZ‐ELM $3,208,000 IMPROVE SAFETY BY ADDRESSING SIGHT DISTANCE ISSUES AT THE INTERSECTION OF US60 24.4 15.964 ‐ 16.164 WITH KY 1078.

Wednesday, September 18, 2019 Page 31 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Daviess2 IP20170074 CS 1771 MINOR WIDENING $3,074,000 18TH STREET ‐ RECONSTRUCT TO ALLOW FOR CENTER TURN LANES AS NEEDED. PROJECT 24.2 0 ‐ 0.111 BEGINS AT FREDERICA ST (KY 2831) AND ENDS AT JR MILLER BLVD (CS 1262).

Ballard1 IP20060003 PF 9999 NEW ROUTE $1,208,000 IMPROVE TRUCK ACCESS ISSUES TO THE WICKLIFFE‐BALLARD COUNTY RIVERPORT AND 24.1 ‐ INDUSTRIAL PARK IN WICKLIFFE.

Hickman1 IP20080031 US 51 RECONSTRUCTION $14,974,000 IMPROVE SAFETY, ACCESS, AND REGIONAL CONNECTIVITY, AND ADDRESS GEOMETRIC 24.0 0 ‐ 2.4 DEFICIENCIES FROM HICKMAN C/L TO CANE CREEK BRIDGE.

Caldwell2 IP20070010 I 69 RECONSTRUCTION $10,701,000 I69‐ RECONSTRUCT INTERCHANGE AT KY 91 IN PRINCETON 23.9 79.519 ‐ 79.949

Henderson2 IP20190075 US 60 RECONSTRUCTION $3,208,000 IMPROVE INTERSECTION OF US 60 AND KY 1078. THIS IS A BREAKOUT OF IP2008083. IT 23.7 16.5 ‐ 16.7 THE EASTERN INTERSECTION AND IS NOT A DUPLICATION OF IP2008084. Edmonson3 IP20140046 KY 259 SPOT $1,775,000 IMPROVE SAFETY AND ADDRESS GEOMETRIC 23.5 IMPROVEMENT DEFICIENCIES ON KY 259 FROM MP 8.35 TO MP 8.35 ‐ 8.65 8.65.

Logan3 3‐8908 KY 2349 SAFETY $1,460,000 IMPROVE SAFETY BY IMPROVING SIGHT LINES CROSSING RAILROAD BETWEEN STOCKYARDS 23.5 0 ‐ 0.643 AND INDUSTRIAL PARK. (16CCN)(18CCN)

Christian2 IP20070039 PF 9999 NEW ROUTE $11,438,000 IMPROVE ACCESS AND REDUCE CONGESTION FROM US 41A TO KY 115 BY CONSTRUCTION A 23.4 ‐ NEW ROUTE FROM GATE 4/US 41A TO KY 115. THIS PROJECT WAS FORMERLY PIF 024 C000010.0

Wednesday, September 18, 2019 Page 32 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Christian2 IP20060076 PF 9999 NEW $14,909,000 NEW INTERCHANGE TO IMPROVE SAFETY AND 23.3 INTERCHANGE PROVIDE IMPROVED EMERGENCY ACCESS ON I‐ ‐ 24 AT KY 107. STUDY WAS COMPLETED AS 2‐ 805

Carlisle1 IP20060012 US 51 RECONSTRUCTION $16,119,000 CORRECT SUBSTANDARD ROADWAY GEOMETRICS, TO IMPROVE TRAFFIC FLOW, 23.2 6.134 ‐ 8.259 SAFETY AND ACCESS MANAGEMENT ISSUES FROM KY 1377 TO TRUMAN CREEK BRIDGE IN BARDWELL Monroe3 3‐80003 KY 100 BRIDGE $1,820,000 REPLACE BRIDGE ON KY‐100 BETWEEN MP 14.7 23.1 REPLACEMENT AND 14.9. (18CCN) 14.7 ‐ 14.9

Carlisle1 IP20060013 US 62 RECONSTRUCTION $5,481,000 CORRECT ROADWAY GEOMETRICS ON US 62 FROM KY 1372 TO COUNTY ROAD 1318 23.0 1.062 ‐ 2.105 (POLIVICK ROAD) TO ADDRESS SAFETY, ACCESS AND REGIONAL CONNECTIVITY ISSUES.

Ballard1 IP20060008 KY 286 SAFETY‐HAZ‐ELM $2,753,000 CORRECT INTERSECTION GEOMETRICS AND IMPROVE SAFETY ON KY 286 AT THE 23.0 4 ‐ 4.53 INTERSECTION WITH HERSHEL JONES ROAD/N. BALLARD CHURCH ROAD NEAR WICKLIFFE.

Henderson2 IP20190173 CS 1227 RECONSTRUCTION $6,504,000 RECONSTRUCT SOUTH MAIN ST (CS‐1227) FROM DRURY LN (CS‐1107) TO YEAMAN AV (CS‐1390) 22.8 0 ‐ 0.599 TO IMPROVE SAFETY AND LEVEL OF SERVICE. Barren3 IP20190095 KY 740 SPOT $795,000 IMPROVE SAFETY AT THE INTERSECTION OF KY 22.6 IMPROVEMENT 740 AND TICK RIDGE ROAD. 3.14 ‐ 3.19 Muhlenberg2 IP20130154 KY 1380 DRAINAGE $1,197,000 ADDRESS DITCH EROSION CONCERNS ON KY 1380 22.5 IMPROVEMENT 0.204 ‐ 0.404

Wednesday, September 18, 2019 Page 33 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Simpson3 IP20190105 KY 100 SPOT $856,000 IMPROVE SAFETY AT THE INTERSECTION OF KY 22.4 IMPROVEMENT 100 AND HENRY CLAY SMITH ROAD. 17.39 ‐ 17.49

Ohio2 IP20080115 KY 54 SAFETY‐HAZ‐ELM $3,010,000 IMPROVE TURNING RADIUS OF THE KY 54 AND KY 69 N INTERSECTION. 22.2 6.018 ‐ 6.118

Ohio2 IP20080113 US 231 SAFETY‐HAZ‐ELM $3,576,000 ADDRESS LEFT TURN LANE ISSUES ON US‐231 AT CROMWELL ROAD. 22.2 3.039 ‐ 3.189 Monroe3 IP20190100 KY 100 BRIDGE $1,171,000 IMPROVE SAFETY AND MOBILITY ON KY 100 AT 22.0 REPLACEMENT THE NARROW BRIDGE OVER SPRING CREEK. 1.72 ‐ 1.77

Graves1 IP20080028 KY 131 RECONSTRUCTION $32,386,000 CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY AND TRUCK ACCESS ISSUES 21.6 4.555 ‐ 9.445 FROM KY 483 TO KY 849. Monroe3 IP20190102 KY 100 BRIDGE $1,405,000 IMPROVE SAFETY AND MOBILITY ON KY 100 AT 21.5 REPLACEMENT THE NARROW BRIDGE OVER INDIAN CREEK. 4 ‐ 4.1

Crittenden1 IP20060029 KY 1668 MINOR WIDENING $6,033,000 RECONSTRUCT KY 1668 FROM US 60 TO THE ENTRANCE OF THE ROCK QUARRY FROM MP 0.0 21.5 0 ‐ 1.88 TO MP 1.3

Hancock2 IP20060094 KY 271 MINOR WIDENING $3,921,000 ADDRESS SAFETY CONCERNS ON KY 271 FROM KY 1847 TO US 60 IN HANCOCK COUNTY 21.2 3.161 ‐ 4.581

Hancock2 IP20060095 KY 3543 MINOR WIDENING $4,441,000 ADDRESS SAFETY CONCERNS OF KY 3543 (FORMERLY KY 271) FROM US 60 TO KY 334 IN 21.1 0 ‐ 1.405 HANCOCK COUNTY

Wednesday, September 18, 2019 Page 34 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Ohio2 IP20070099 US 62 SAFETY‐HAZ‐ELM $3,403,000 ADDRESS SAFETY CONCERNS AT THE INTERSECTION OF US 62 AND MILLER ROAD. 21.0 7.312 ‐ 7.413 Logan3 IP20190027 US 431 SPOT $1,600,000 IMPROVE SAFETY AT THE INTERSECTION OF US 20.9 IMPROVEMENT 431 AND KY 663. 4.09 ‐ 4.19 Edmonson3 IP20110032 KY 187 BRIDGE $1,659,000 IMPROVE SAFETY AND ADDRESS HORIZONTAL 20.8 REPLACEMENT GEOMETRIC DEFICIENCIES AT THE NARROW 2.15 ‐ 2.25 BRIDGE ON KY 187.

Trigg1 IP20040008 KY 1489 MINOR WIDENING $31,123,000 CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY, MOBILITY AND ACCESS ISSUES 20.8 1.884 ‐ 5.195 ALONG KY 1489 FROM US 68 TO LAKE BARKLEY STATE PARK ENTRANCE FROM MP 1.884 TO MP 5.195.

Carlisle1 IP20060018 KY 121 RECONSTRUCTION $3,627,000 GEOMETRIC CONFIGURATION IMPROVEMENTS TO THE INTERSECTION OF KY 121 AND KY 408. 20.8 1.5 ‐ 1.7 SEE SEGMENT 8 / PRIORITY 8 IN FEBRUARY 2000 KY 121 CORRIDOR PLANNING STUDY.

Webster2 IP20070125 KY 138 RECONSTRUCTION $22,163,000 ADDRESS SAFETY AND SERVICE CONDITION OF KY 138 FROM KY 132 TO KY 120 AT SLAUGHTERS. 20.5 0 ‐ 10.439

Metcalfe3 IP20060172 KY 70 RECONSTRUCTION $11,207,000 IMPROVE SAFETY AND MOBILITY ON KY 70 BETWEEN KY 869 AND US 68 NEAR SULPHUR 20.4 6.99 ‐ 8.869 WELL.

Hickman1 IP20080034 KY 58 RECONSTRUCTION $11,683,000 REPLACE FUNCTIONALLY OBSOLETE BRIDGES AND IMPROVE GEOMETRIC DEFICIENCIES TO 20.3 4.375 ‐ 6.273 ADDRESS SAFETY, TOURISM AND ECONOMIC DEVELOPMENT ISSUES FROM KY 1772 TO KY 1540.

Wednesday, September 18, 2019 Page 35 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Hickman1 IP20080036 KY 58 RECONSTRUCTION $11,683,000 IMPROVE GEOMETRIC DEFICIENCIES AND REPLACE FUNCTIONALLY OBSOLETE BRIDGES TO 20.2 7.654 ‐ 9.49 ADDRESS SAFETY, TOURISM, AND ECONOMIC DEVELOPMENT ISSUES FROM CANE CREEK TO WESTERN CITY LIMITS OF CLINTON (KY 123).

Caldwell2 IP20060075 KY 1495 RECONSTRUCTION $17,327,000 GROOMS LANE ‐ RECONSTRUCTION AND EXTENSION FROM KY KY 293 TO US 62 AT NEW 20.1 3.76 ‐ 5.517 PARKWAY CONNECTOR W OF PRINCETON

Muhlenberg2 2‐8804 KY 246 RECONSTRUCTION $1,670,000 LOWER THE ROAD AT THE INTERSECTION OF MERLE TRAVIS HIGHWAY (KY 246) AND KY 176 20.1 0 ‐ 0.04 SO THAT THE INTERSECTION IS ON THE SAME LEVEL AS 176 AND MERLE TRAVIS HIGHWAY. (14CCN)(16CCR)

Caldwell2 IP20130152 KY 293 SAFETY‐HAZ‐ELM $3,492,000 TO CORRECT SAFETY ISSUES AT THE INTERSECTION OF KY 293 AND OLNEY RD. 19.8 9.035 ‐ 9.235

Hancock2 IP20100011 KY 2181 RECONSTRUCTION $41,531,000 ADDRESS SAFETY CONCERNS OF KY 2181 FROM KY 144 TO US 60 AT HAWESVILLE. 19.8 0 ‐ 11.932

Fulton1 IP20060030 US 45 RECONSTRUCTION $4,304,000 ADDRESS GEOMETRIC ALIGNMENT ISSUES, ACCESS ISSUES AND FUTURE CAPACITY ISSUES AT 19.7 1.696 ‐ 1.868 THE US 45 / KY 307 INTERSECTION IN FULTON.

Carlisle1 IP20080012 US 51 RECONSTRUCTION $17,291,000 CORRECT ROADWAY GEOMETRICS, INADEQUATE PASSING ZONES AND IMPROVED OPERATING 19.4 8.259 ‐ 12.655 SPEEDS TO MINIMIZE DELAY AND IMPROVE CONNECTIVITY FROM TRUMAN CREEK BRIDGE IN BARDWELL TO BALLARD COUNTY LINE. Logan3 IP20170040 KY 79 SPOT $1,029,000 IMPROVE SAFETY AT THE INTERSECTION OF KY 19.1 IMPROVEMENT 79 AND KY 103. 9 ‐ 9.15

Wednesday, September 18, 2019 Page 36 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Trigg1 IP20070003 CR 1014 RECONSTRUCTION $27,829,000 ADDRESS SAFETY CONCERNS ON KINGS CHAPEL RD (CR‐1004) FROM KY 272 TO US 68/80 FROM 18.7 0 ‐ 3.7 MP 0.0 TO MP 3.7

Hopkins2 IP20050003 KY 70 SAFETY‐HAZ‐ELM $1,842,000 RECONSTRUCT THE KY 70/KY 1337 INTERSECTION AND IMPROVE SIGHT DISTANCE 18.4 12.331 ‐ 12.431 ON KY 70

McLean2 IP20190044 KY 136 MINOR WIDENING $2,539,000 ADDRESS TURNING ISSUES AT ENTRANCE OF MCLEAN COUNTY HIGH SCHOOL. 18.2 11.3 ‐ 11.45

Trigg1 1‐8951 KY 139 AIR QUALITY $1,150,000 REALIGN KY 124 APPROACH TO KY 139 TO IMPROVE INTERSECTION ANGLE AND SIGHT 17.7 17.8 ‐ 17.95 DISTANCE. (16CCN)(18CCN)

Fulton1 1‐8853 KY 1099 SAFETY $3,200,000 SAFETY IMPROVEMENT AT INTERSECTION OF KY‐ 1099 AND KY‐125. (14CCN)(18CCN) 17.4 2.25 ‐ 2.288

Monroe3 IP20080138 KY 163 MINOR WIDENING $12,269,000 IMPROVE SAFETY ALONG KY‐163 AT NED JACKSON ROAD IN THE HESTAND AREA. 17.3 2 ‐ 4.1

Hickman1 IP20080035 KY 58 RECONSTRUCTION $8,898,000 IMPROVE GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY, TOURISM AND ECONOMIC 17.3 6.273 ‐ 7.654 DEVELOPMENT ISSUES FROM KY 1540 TO CANE CREEK. Edmonson3 IP20140058 KY 259 SPOT $910,000 IMPROVE SAFETY AND ADDRESS GEOMETRIC 17.0 IMPROVEMENT DEFICIENCIES IN THE CURVE ALONG KY 259 6.75 ‐ 7 BETWEEN KINSLOW CEMETERY RD AND KY 2325 (SILENT GROVE CHURCH RD)

Daviess2 2‐229 KY 298 SAFETY $3,930,000 RECONSTRUCT INTERSECTION AT FAIRVIEW DRIVE (KY 3143) AND KY 298. (12CCR) 17.0 7.7 ‐ 7.8 (16CCR)(18CCN)

Wednesday, September 18, 2019 Page 37 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Hickman1 IP20080037 KY 307 RECONSTRUCTION $6,932,000 IMPROVE SAFETY, TRUCK MOBILITY, AND GEOMETRIC DEFICIENCIES AT THE ICR RAILROAD 16.8 0.85 ‐ 1.05 OVERPASS.

Fulton1 IP20020002 PF 9999 NEW ROUTE $16,189,000 ADDRESS ECONOMIC DEVELOPMENT ISSUES FOR FULTON COUNTY INDUSTRIAL PARK AND ACCESS 16.3 ‐ ISSUES FOR HIGH CLEARANCE VEHICLES BETWEEN KY 307 AND US 51 DUE TO THE LOW CLEARANCE RAILROAD BRIDGES LOCATED ON KY 307 & KY 94.

Calloway1 IP20080010 KY 1550 RECONSTRUCTION $1,888,000 CORRECT ROADWAY GEOMETRICS AND ADDRESS CONGESTION AND SAFETY ISSUES AT KY 1550 16.2 4.5 ‐ 4.6 (WISEWELL ROAD) AND JOHNNY ROBERTSON ROAD NEAR MURRAY. Edmonson3 IP20140045 KY 259 SPOT $2,404,000 IMPROVE SAFETY AND ADDRESS GEOMETRIC 15.6 IMPROVEMENT DEFICIENCIES AT THE INTERSECTION OF KY 259 20.614 ‐ 20.814 AND KY 2336.

Livingston1 IP20190114 KY 137 RECONSTRUCTION $6,506,000 STABILIZATION OF THE WESTERN BANK ON KY 137 DUE TO OHIO RIVER EROSION 15.2 3.4 ‐ 4.4 Warren3 IP20190113 I 65 TRANSPORTATION $541,000 PLANNING STUDY TO DETERMINE BEST 15.1 STUDY LOCATION FOR NEW INTERCHANGE ON I 65. 14.8 ‐ 19.3

Carlisle1 IP20060016 US 62 RECONSTRUCTION $4,915,000 IMPROVE ROADWAY GEOMETRICS AT Y‐ INTERSECTION OF US 62 & KY 307 TO PROVIDE 15.1 8.932 ‐ 9.127 ADEQUATE SIGHT DISTANCE AND ADDRESS SAFETY CONCERNS. Metcalfe3 IP20190099 US 68 SPOT $1,479,000 IMPROVE SAFETY AND SIGHT DISTANCE AT THE 15.0 IMPROVEMENT INTERSECTION OF US 68 AND KY 2399. 11.45 ‐ 11.55

Wednesday, September 18, 2019 Page 38 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Calloway1 IP20140030 KY 497 MINOR WIDENING $16,158,000 ADDRESS GEOMETRIC ALIGNMENT AND POTENTIAL SAFETY ISSUES TO KY 497 FROM KY 15.0 0 ‐ 2.635 94 TO THE BARGE TERMINAL ENTRANCE ON KY LAKE TO IMPROVE ACCESS FOR TRUCK TRAFFIC. Butler3 IP20060153 KY 79 SPOT $1,296,000 IMPROVE SAFETY AND SIGHT DISTANCE AT THE 14.9 IMPROVEMENT INTERSECTIONS OF KY 79 AND KY 340. 19.002 ‐ 19.446

Webster2 2‐228 KY 138 RECONSTRUCTION $1,730,000 RECONSTRUCT BETWEEN KY 120 AND RR BRIDGE AT SLAUGHTERS TO ALLEVIATE FLOODING. 14.8 10.439 ‐ 10.716 (12CCR)(18CCN)

Carlisle1 IP20180005 US 62 RECONSTRUCTION $1,919,000 IMPROVE INTERSECTION WITH US 62 AND KY 1628 / PALESTINE RD (CR 1024). 14.7 11 ‐ 11.2

Ohio2 2‐8811 PF 9999 NEW ROUTE $4,640,000 CONSTRUCT A CONNECTOR ROAD INTO BLUEGRASS CROSSINGS INDUSTRIAL PARK TO 14.2 ‐ IMPROVE ACCESS AND ELIMINATE SAFETY ISSUES. (14CCN) Logan3 IP20060164 KY 79 SPOT $603,000 IMPROVE SAFETY AT THE KY 79 ‐ MARSHALL 14.2 IMPROVEMENT ROAD INTERSECTION. 5.4 ‐ 6

Daviess2 IP20070249 PF 9999 NEW ROUTE $1,797,000 GRIMES AVE ‐ CONSTRUCT NEW CONNECTOR, 2 12‐FOOT LANES, C/G, TO ACCESS KY 603 AND 13.9 ‐ THE US 60 EXTENSION. PROJECT BEGINS AT CURRENT TERMINUS OF GRIMES AVE AND ENDS AT KY 603.

Webster2 IP20080120 KY 120 RECONSTRUCTION $2,670,000 ADDRESS SAFETY AND SERVICE CONCERNS OF THE KY 120 AND KY 630 INTERSECTION. THIS IS A 13.7 14.765 ‐ 14.865 BREAKOUT OF PROJECT 02 117 D0120 3.00

Wednesday, September 18, 2019 Page 39 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Marshall1 IP20060070 KY 95 RECONSTRUCTION $1,598,000 ADDRESS ACCESS ISSUES FOR TRUCK TRAFFIC AT KY 95 INTERSECTION WITH KY 1523 IN CALVERT 13.7 7.22 ‐ 7.32 CITY.

Trigg1 IP20070002 CR 1005 RECONSTRUCTION $14,512,000 ADDRESS SAFETY CONCERNS ON GLENWOOD RD (CR‐1005) FROM KY 272 TO US 68/80 FROM MP 13.5 0 ‐ 2.1 0.0 TO MP 2.1

McLean2 2‐8852 KY 56 RECONSTRUCTION $1,880,000 CORRECT LINE OF SIGHT WITH INTERSECTION OF KY 56 & KY 1233. (14CCN)(18CCN) 13.1 6 ‐ 6.33 Allen3 IP20190094 KY 98 SPOT $791,000 IMPROVE SAFETY AND SIGHT DISTANCE AT THE 13.0 IMPROVEMENT INTERSECTION OF KY 98 AND KY 671. 8.85 ‐ 8.95

Hancock2 IP20060091 KY 69 SAFETY‐HAZ‐ELM $2,300,000 ADDRESS SAFETY CONCERNS OF THE KY‐69 AND B. RICE ROAD INTERSECTION TO PROVIDE FOR 12.6 8.903 ‐ 9.193 BETTER SIGHT DISTANCE. Monroe3 IP20060184 KY 63 SPOT $2,004,000 IMPROVE SAFETY OF THE KY‐63 ‐ KY‐870 11.9 IMPROVEMENT INTERSECTION. 16.058 ‐ 16.258 Metcalfe3 IP20060173 KY 70 SPOT $2,168,000 IMPROVE SAFETY ON KY 70 AT THE 11.3 IMPROVEMENT INTERSECTION OF KY 869. 6.8 ‐ 7

McLean2 IP20120014 KY 140 SAFETY‐HAZ‐ELM $2,290,000 ADDRESS SAFETY CONCERNS OF INTERSECTION OF KY 140 AND KY 815 IN MCLEAN COUNTY. 11.2 7.239 ‐ 7.259

Marshall1 IP20060065 US 62 RECONSTRUCTION $15,982,000 CORRECT GEOMETRIC ALIGNMENT DEFICIENCIES AND ADDRESS ACCESS AND TRAFFIC FLOW 11.1 10.65 ‐ 11.15 ISSUES AT US 62 / US 641 / KY 282 INTERCHANGE.

Wednesday, September 18, 2019 Page 40 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Webster2 IP20060126 KY 283 RECONSTRUCTION $1,715,000 ADDRESS SAFETY CONCERN OF KY 283 AND KY 1191 INTERSECTION. 10.4 2.489 ‐ 2.589

Hancock2 IP20060096 KY 2181 SAFETY‐HAZ‐ELM $2,172,000 ADDRESS SAFETY CONCERNS OF THE INTERSECTION OF KY 2181 AND ED BROWN 10.2 2.724 ‐ 2.824 ROAD IN HANCOCK COUNTY.

Monroe3 3‐8954 KY 63 RECONSTRUCTION $2,130,000 RECONSTRUCT INTERSECTION OF KY 63 AND POPLAR LOG CHURCH ROAD. (16CCN) 10.1 10.5 ‐ 10.6

Wednesday, September 18, 2019 Page 41 of 41