SHIFT 2020 West Region Scores

Total Page:16

File Type:pdf, Size:1020Kb

SHIFT 2020 West Region Scores West Region Scores SHIFT 2020 Regional Score County District Item # Primary Route Project Type Cost Estimate Project Description Max 100 Warren 3 3‐8857 US 31 W MAJOR WIDENING $12,100,000 IMPROVE US‐31W FROM CAMPBELL LANE (US‐ 231) TO UNIVERSITY BOULEVARD (US‐231X). 89.0 10.561 ‐ 11.688 (14CCN)(16CCR)(18CCR) Warren3 IP20190007 US 231 SPOT $4,382,000 REDUCE CONGESTION AND IMPROVE MOBILITY 88.8 IMPROVEMENT ON US‐231 AND US‐231X BETWEEN CS‐1432 9.877 ‐ 10.455 (CAVE MILL ROAD) AND CS‐1593 (SOUTH PARK DRIVE). Marshall1 IP20110174 US 68 SPOT $4,621,000 ADDRESS SAFETY, SERVICE, AND ACCESS ISSUES 87.4 IMPROVEMENT FROM PURCHASE PARKWAY TO US 641 SOUTH 9.415 ‐ 10.032 IN DRAFFENVILLE. Hopkins2 2‐8305 US 41 MAJOR WIDENING $11,280,000 IMPROVE NORTH MAIN STREET FROM HOSPITAL DRIVE TO KY‐281. (06CCN)(12CCR)(18CCR) 86.6 16.989 ‐ 17.548 Christian2 2‐899 US 68 RECONSTRUCTION $11,740,000 ADDRESS CONGESTION AND MOBILITY OF US 68 FROM KY 91 TO KY 1007 IN HOPKINSVILLE. 86.6 9.221 ‐ 10.137 (18CCN) Daviess2 2‐8300 KY 54 MAJOR WIDENING $60,350,000 IMPROVE KY‐54 FROM WEST OF THE US‐60 BYPASS TO CR‐1021 (JACK HINTON ROAD). 85.5 2.47 ‐ 8.003 (06CCN)(10CCR)(12CCR)(14CCR)(16CCR) Marshall1 1‐398 US 62 MAJOR WIDENING $5,550,000 IMPROVE ACCESS AND REDUCE CONGESTION ON US‐62 FROM KY‐95 TO THE EXISTING FOUR‐LANE 83.6 7.2 ‐ 8.497 HIGHWAY AT LONE VALLEY RD NEAR I‐24 INTERCHANGE AND FUTURE I‐69 CONNECTION. Barren3 3‐8819.20 KY 90 MAJOR WIDENING $20,160,000 WIDEN KY 90 TO 2 + 1 ROADWAY FROM ESTES ROAD IN CAVE CITY TO THE GLASGOW OUTER 82.7 1.4 ‐ 8.754 LOOP (US68). (SECTION 2)(2016BOP) Note: Projects may extend beyond county shown. Wednesday, September 18, 2019 Page 1 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100 Warren3 3‐8904.10 US 31 W MINOR WIDENING $12,420,000 WIDEN US 31W FROM PARK AVENUE TO FAIRVIEW AVENUE MP 13.7‐14.25. (18CCN) 82.5 13.7 ‐ 14.25 Warren3 IP20190111 KY 234 SPOT $915,000 REDUCE CONGESTION AND INCREASE MOBILITY 82.3 IMPROVEMENT ON KY 234 FROM THE EXIT 26 INTERCHANGE 10.2 ‐ 10.8 WITH I 65 TO KY 880. Graves1 IP20060045 KY 303 MINOR WIDENING $12,661,000 ADDRESS SAFETY, CONGESTION AND ACCESS ISSUES FROM EAST FARTHING STREET TO 81.8 16.034 ‐ 16.807 CHARLES DRIVE IN MAYFIELD. Warren3 3‐8707 PF 9999 NEW $44,350,000 CONSTRUCT A NEW INTERCHANGE ON THE 81.5 INTERCHANGE NATCHER PARKWAY AT ELROD ROAD IN ‐ BOWLING GREEN (MP 3.4 TO MP 4.0).(12CCN) Marshall1 IP20190051 US 68 RECONSTRUCTION $7,076,000 CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY, SERVICE AND CONGESTION 81.4 8.736 ‐ 9.384 ISSUES FROM KY 782 (GRIGGSTOWN ROAD) TO WESTERN I‐69 RAMPS. Simpson3 IP20190037 KY 1008 SPOT $2,182,000 IMPROVE SAFETY AND MOBILITY AT THE 81.0 IMPROVEMENT INTERSECTION OF KY 1008 AND US 31W. 2.1 ‐ 2.4 Barren3 3‐8819.10 KY 90 MAJOR WIDENING $790,000 MAJOR WIDENING ON KY 90 (5 LANES WITH CURB, GUTTER, AND SIDEWALK) FROM SANDERS 80.0 0.16 ‐ 1.4 STREET TO ESTES ROAD IN CAVE CITY. (SECTION 1)(2016BOP) Ballard1 1‐115 US 60 MAJOR WIDENING $20,060,000 PADUCAH‐WICKLIFFE RD: IMPROVE US‐60 FROM STAFFORD ROAD TO BETHEL CHURCH ROAD 79.3 13.62 ‐ 16.937 (INCLUDES KEVIL BYPASS)(TO BE LET WITH 1‐ 115.10) (06CCR)(12CCR)(14CCR)(18CCR). Wednesday, September 18, 2019 Page 2 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100 Christian2 IP20060085 KY 1007 MINOR WIDENING $26,310,000 RECONSTRUCT KY 1007 FROM LITTLE RIVER BRIDGE TO SANDERSON RD INCLUDING A NEW 78.9 0.63 ‐ 2.5 CONNECTOR FROM SANDERSON RD TO THE KY 1682 BYPASS TO INCLUDE PED./BIKE FACILITIES IN HOPKINSVILLE Todd3 3‐80001 US 79 MINOR WIDENING $15,210,000 US 79 WIDENING FROM MP 0 TO MP 3. (18CCN) 78.6 0 ‐ 3 Christian2 IP20070037 KY 115 MINOR WIDENING $14,870,000 ADDRESS SAFETY AND CONGESTION ISSUES FROM KY 911 TO I24. 78.2 1.261 ‐ 2.663 McCracken1 IP20060059 US 62 MINOR WIDENING $22,615,000 ADDRESS ISSUES WITH SERVICE, CONGESTION AND SAFETY FROM US 45 TO I‐24 IN PADUCAH. 78.0 11.837 ‐ 12.881 SEE MARCH, 2002 PADUCAH‐MCCRACKEN COUNTY TRANSPORTATION STUDY. Christian2 IP20070029 KY 107 MAJOR WIDENING $16,028,000 RECONSTRUCT KY 107 FROM KY 380 TO JERRY CLAIBORNE WAY TO INCLUDE PED./BIKE 77.9 15.344 ‐ 17.163 FACILITIES McCracken1 1‐115.10 US 60 MAJOR WIDENING $13,830,000 PADUCAH‐WICKLIFFE RD: IMPROVE US‐60 FROM BETHEL CHURCH ROAD TO KY‐1154 (MARTIN 77.9 0.4 ‐ 1.968 MARIETTA) (04CCR) (TO BE LET WITH 1‐ 115.00).(10CCR)(12CCR)(18CCR) McCracken1 IP20060061 KY 305 RECONSTRUCTION $20,703,000 ADDRESS FUTURE CONGESTION, ACCESS, CONTINUITY OF THE OUTER LOOP PROJECT , AND 77.4 8.348 ‐ 9.739 ECONOMIC DEVELOPMENT ISSUES FOR WESTERN MCCRACKEN COUNTY ALONG KY 305 FROM KY 998 TO KY 1420. Allen3 IP20060129 KY 100 MAJOR WIDENING $11,442,000 IMPROVE SAFETY AND MOBILITY ON KY 100 FROM KY 3500 TO JOHN KELLY DRIVE IN 77.1 13.1 ‐ 14.1 SCOTTSVILLE. Wednesday, September 18, 2019 Page 3 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100 Barren3 3‐8821 KY 1297 MAJOR WIDENING $20,810,000 IMPROVE KY‐1297 FROM CR‐1366 (DONNELLY DRIVE) TO US‐31E (ROGER WELLS), AND 76.7 11.085 ‐ 12.806 IMPROVE CR‐1366 (DONNELLY DRIVE) FROM KY‐ 1297 TO US‐68 IN GLASGOW. (14CCN) (16CCN) Livingston1 1‐330 US 60 RELOCATION $24,570,000 PADUCAH‐HENDERSON; RELOCATE US‐60 FROM EAST OF THE TENNESSEE RIVER BRIDGE TO EAST 75.9 0.875 ‐ 4.2 OF RUDD‐SPEES ROAD (00CCR)(12CCR)(14CCR) Caldwell2 IP20140022 KY 91 RECONSTRUCTION $16,410,000 TO RECONSTRUCT KY 91 FROM MP 12.433 NEAR THE I‐69 INTERCHANGE TO THE KY 139 75.4 12.433 ‐ 13.905 INTERSECTION. McCracken1 IP20180013 KY 131 SPOT $2,521,000 ADD TURN LANES AT ENTRANCES TO REIDLAND 75.2 IMPROVEMENT ELEMENTARY SCHOOL. 4.833 ‐ 5.815 Ballard1 1‐118 US 60 MAJOR WIDENING $25,540,000 IMPROVE US‐60 FROM PROPOSED SOUTHERN BYPASS OF LA CENTER TO EAST OF DENIS JONES 75.1 11.815 ‐ 13.615 ROAD. (02CCR) Warren3 IP20170035 CS 6010 MINOR WIDENING $25,201,000 REDUCE CONGESTION AND INCREASE SAFETY AND MOBILITY ON DISHMAN LANE EXT. (CS‐ 74.4 0.57 ‐ 0.943 6010) FROM MP 0.570 TO JUST EAST OF GRIDER POND ROAD ON CAVE MILL ROAD (CS‐1432). Hopkins2 IP20180092 PF 9999 NEW ROUTE $5,066,000 EXTEND MIDTOWN BLVD NORTH FROM THE INTERSECTION WITH NORTH KENTUCKY AVENUE, 74.1 ‐ TO WHITTINGTON DRIVE (CS 1287). ALL DEEDED TO THE CITY OF MADISONVILLE. THIS PROJECT WILL BE A BREAKOUT SECTION OF THE 2‐804 CONNECTOR PROJECT. D2 HAS REQUESTED 804.3 FOR THIS Warren3 IP20070147 KY 622 SPOT $2,315,000 IMPROVE SAFETY AND MOBILITY ON KY 622 74.0 IMPROVEMENT FROM 0.1 MILE SOUTH OF COLLETT ROAD TO 6.454 ‐ 6.895 DEWEY LAKE ROAD. Wednesday, September 18, 2019 Page 4 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100 McCracken1 IP20080040 US 62 RECONSTRUCTION $39,916,000 IMPROVE GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY ISSUES ON US 62 FROM THE 73.3 0 ‐ 7.851 BALLARD COUNTY LINE TO THE PADUCAH COMMERCE PARK IN ORDER TO PROVIDE IMPROVED REGIONAL SYSTEM LINKAGE BETWEEN BARDWELL AND PADUCAH. Union2 IP20060117 US 60 MAJOR WIDENING $18,571,000 ADDRESS SAFETY CONCERNS ON US 60 FROM KY 492 TO THE US 60 BYPASS OUTSIDE 73.3 13.29 ‐ 15.401 MORGANFIELD. Graves1 IP20180073 KY 121 MAJOR WIDENING $12,352,000 UPGRADE/WIDEN KY 121 BYPASS IN MAYFIELD TO FOUR LANES. 73.2 5.499 ‐ 8.938 McLean2 2‐8812 KY 136 RECONSTRUCTION $16,570,000 REPLACE, IMPROVE ALIGNMENTS AND APPROACHES, AND ADDRESS SAFETY ISSUES 72.6 0 ‐ 19.334 WITH BRIDGES ON KY‐136 FROM KY‐56 IN MCLEAN COUNTY TO US‐231 IN OHIO COUNTY. (14CCN) Butler3 IP20080129 KY 79 SAFETY‐HAZ‐ELM $4,724,000 LANE DEPARTURE SAFETY IMPROVEMENTS ON KY‐79 BETWEEN THE KY‐70 CROSSROADS AND 72.6 12.538 ‐ 24.901 THE GRAYSON COUNTY LINE. Union2 IP20070108 US 60 MAJOR WIDENING $25,065,000 ADDRESS SAFETY AND SERVICE CONCERNS OF US‐ 60 FROM THE KY‐950 TO KY‐492. 72.2 10.52 ‐ 13.29 Webster2 IP20070127 KY 630 RECONSTRUCTION $12,516,000 ADDRESS SERVICE CONCERNS OF KY 630 FROM KY 132 IN DIXON TO THE HOPKINS COUNTY LINE 72.2 0 ‐ 0.965 Hancock2 2‐226 US 60 MINOR WIDENING $8,860,000 IMPROVE THE WESTBOUND LANES OF US‐60 FROM KY‐1957 TO 0.2 MILE WEST OF KY‐6106. 72.0 4.8 ‐ 8.5 (12CCR)(14CCR)(18CCR) Wednesday, September 18, 2019 Page 5 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100 McCracken1 1‐1115.10 / 1‐ US 60 RELOCATION $18,510,000 RELOCATION AND MINOR WIDENING OF US‐60 1115.20 FROM CLARKS RIVER TO US‐62 71.5 18.65 ‐ 20.1 JCT.(10CCR)(14CCR)(LET W/ 1‐1115.20)(16CCR) Daviess2 IP20080062 KY 298 RECONSTRUCTION $9,705,000 OLD HARTFORD RD ‐ ADDRESS POOR PAVEMENT CONDITIONS AND CONGESTION DUE TO 71.2 8.986 ‐ 9.927 INCREASED VOLUMES AND TURN MOVEMENTS.
Recommended publications
  • Data Sheet United States Department of the Interior National Park Service National Register of Historic Places Inventory - Nomination Form
    Form No. 10-300 (Rev. 10-74) 36 DATA SHEET UNITED STATES DEPARTMENT OF THE INTERIOR NATIONAL PARK SERVICE NATIONAL REGISTER OF HISTORIC PLACES INVENTORY - NOMINATION FORM SEE INSTRUCTIONS IN HOW TO COMPLETE NATIONAL REGISTER FORMS ____________TYPE ALL ENTRIES - COMPLETE APPLICABLE SECTIONS______ I NAME HISTORIC , Sesse Whltesell?House Same LOCATION U> C^(j STREET & NUMBER Route #5, Box 391 —NOT FOR PUBLICATION CITY, TOWN CONGRESSIONAL DISTRICT Fulton f>\.A,, *> £. , . VICINITY OF 01 STATE CODE COUNTY CODE Kentucky 021 Fulton 075 UCLA SSIFI c ATI ON CATEGORY OWNERSHIP STATUS PRESENT USE —DISTRICT _ PUBLIC XLOCCUPIilD —AGRICULTURE —MUSEUM ^BUILDING(S) ^.PRIVATE — UNOCCUPIED —COMMERCIAL —PARK —STRUCTURE —BOTH _ WORK IN PROGRESb —EDUCATIONAL X.PRIVATE RESIDENCE —SITE PUBLIC ACQUISITION ACCESSIBLE —ENTERTAINMENT —RELIGIOUS —OBJECT —IN PROCESS —YES: RESTRICTED —GOVERNMENT —SCIENTIFIC —BEING CONSIDERED — YES: UNRESTRICTED —INDUSTRIAL —TRANSPORTATION XNO —MILITARY —OTHER. OWNER OF PROPERTY NAME Hunter Whites ell STREET & NUMBER Route # 5, Box 391 CITY. TOWN STATE Fulton VICINITY OF Kentucky LOCATION OF LEGAL DESCRIPTION COURTHOUSE, REGISTRY OF DEEDS,ETC Fulton County Courthouse, County Clerkfs Office, STREET & NUMBER CITY, TOWN STATE Hickman Kentucky 1 REPRESENTATION IN EXISTING SURVEYS TITLE Survey of Historic Sites in Kentucky (Supplement) DATE 1974 —FEDERAL X.STATE —COUNTY ._LOCAL DEPOSITORY FOR SURVEY RECORDS Kentucky Heritage Commission CITY, TOWN STATE Frankfort Kentucky CONDITION CHECK ONE CHECK ONE —EXCELLENT —DETERIORATED ^UNALTERED ^ORIGINAL SITE X.GOOD —RUINS —ALTERED —MOVED DATE———————— _FAIR __UNEXPOSED DESCRIBETHE PRESENT AND ORIGINAL (IF KNOWN) PHYSICAL APPEARANCE The Whites ell House is located on State Route 116 approximately 1/2 mile west of the town of Fulton in the extreme southwestern section of the state.
    [Show full text]
  • A Community to Live, Work, & Play
    A Community to Live, Work, & Play 2015 Comprehensive Plan for the City of Fulton, KY Acknowledgements The City of Fulton Comprehensive Plan was made possible by a multitude of civic leaders, city department heads, and staff members who have given generously of their time, passion and expertise to collaborate on this vision. First and foremost, we would like to thank the Fulton City Commission, Fulton Planning Commission for their trust and support. In addition, significant input was provided by the Fulton County- Hickman County Economic Development Partnership, Housing Authority of Fulton, and the West Kentucky Workforce Investment Board. The time and effort on the part of many to provide this input is appreciated. This study has been funded with local funds contracted from the City of Fulton, Kentucky. The plan was created by the Purchase Area Development District and does not necessarily reflect the official position of the City of Fulton, Kentucky. The City of Fulton makes no guarantees, warranties, or assurances of any kind, express or implied, with respect to such information, including any information on linked sites and including, but not limited to, accuracy of the information or its completeness, timeliness, usefulness, adequacy, continued availability, or ownership. This plan is copyrighted by the organization that created it. Internal use by an organization and/or personal use by an individual for non-commercial purposes is permissible. All other uses require the prior authorization of the copy- right owner. Note to the Reader: Where there is a permanent URL to the source document online, that URL has been included in this report.
    [Show full text]
  • Kentucky Parkway System
    KENTUCKY PARKWAY SYSTEM D. H. Bray, President Brighton Engineering Company Frankfort, Kentucky Before discussing the Kentucky Parkway System, I want to touch first on the historical background of turnpikes, both those in general use and also those in Kentucky before 1952. My objective in saying anything about this historical background is because I think it will be interest­ ing_for you to see what parallels there are between the necessities and practices of turnpike con­ struction in those times compared with what we are now doing in Kentucky. I think this will give you a better perspective of this subject of toll roads. Following this historical statement, I will describe briefly the toll roads that have been built in Kentucky since 1952 under the two different legislative Acts, which pertain to the method of financing and the handling of the work. Then for the rest of my presentation and the part which is particularly fitting to the subject matter, in which those of you attending this committee ses­ sion on planning and research may be most interested, I will discuss the Kentucky toll roads con­ structed since 1952, their planning and location, special design and research features, and some maintenance experiments on them. Then in conclusion I will state the advantages, as I see them, of Kentucky's modern toll road program. Some 500 years ago there emerged in England a common law whereby the inhabitants of the parishes were bound to keep all roads in their parishes in repair. The local residents found this duty a real burden, especially for the up-keep of those roads that carried a considerable volume of through traffic.
    [Show full text]
  • I-69 Final Eis Document 6-28-06
    FHWA-TN-EIS-04-01F INTERSTATE 69, SECTION OF INDEPENDENT UTILITY #9 From the Interstate 55/MS State Route 304 Interchange in Hernando, Mississippi to the Intersection of U.S. 51 and State Route 385 in Millington, Tennessee DeSoto and Marshall Counties, Mississippi Shelby and Fayette Counties, Tennessee Final Environmental Impact Statement Submitted Pursuant to the National Environmental Policy Act of 1969 42 U.S.C. 4332(2) U.S. Department of Transportation Federal Highway Administration, Tennessee Department of Transportation and Mississippi Department of Transportation Cooperating Agency Tennessee Valley Authority U.S. Army Corps of Engineers, Memphis District U.S. Army Corps of Engineers, Vicksburg District U.S. Department of Interior, Fish and Wildlife Service This document identifies and assesses the environmental impacts associated with the construction of an interstate facility from Hernando, Mississippi to Millington, Tennessee. The project is a segment of Corridor 18, a Congressionally-designated High Priority transportation Corridor that will be designated as Interstate 69. Segments of the roadway are proposed for new locations, while other segments will follow existing interstates and state highways built to interstate standards. The length of the proposed improvement is approximately 44 miles. __________________ ______________________________________________________________ Date of Approval For Federal Highway Administration __________________ ______________________________________________________________ Date of Approval For
    [Show full text]
  • Road-Plan-1521835694.Pdf
    2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 ADAIR 1068 KY-704 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 704 PL (11.909) OVER PETTY'S FORK. (001B00078N) DN BR 175,000 (SD) RW UT CN BR 490,000 Project Cost: 0 175,000 490,000 ADAIR 80003 KY 55 CONGESTION MITIGTN(O) KY 55 NEW TURNING LANE AT BETTY'S OK PL COUNTRY COOKING DN SPP 250,000 RW UT CN Project Cost: 0 0 250,000 Total for ADAIR county PL DN 175,000 250,000 RW UT CN 490,000 Total Amounts: 0 175,000 740,000 ALLEN 320 KY-100 RECONSTRUCTION(O) IMPROVEMENTS TO KY 100: CURVE, BRIDGE, PL AND INTERSECTION IMPROVEMENTS FROM DN NEAR THE STONY POINT ROAD INTERSECTION RW SPP 1,880,000 TO EAST OF THE ALONZO LONG HOLLOW UT ROAD INTERSECTION (12CCR) CN Project Cost: 0 0 1,880,000 ALLEN 8305 KY-100 RECONSTRUCTION(O) IMPROVE KY-100 (OLD GALLATIN ROAD) FROM PL SOUTH OF KY-2160 TO KY-980. (06CCN) DN RW UT CN SPP 1,250,000 Project Cost: 1,250,000 0 0 Page 3 of 214 2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020 ALLEN 8901 ECONOMIC DEVEL(O) IMPROVE ACCESS ROAD ON EACH END OF PL INDUSTRIAL ACCESS ROAD IN SCOTTSVILLE DN RW UT CN SPP 300,000 Project Cost: 0 0 300,000 ALLEN 10000 KY-3499 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-3499 BRIDGE PL OVER BAYS FORK.
    [Show full text]
  • KY's Major Highways & Cities
    Kentucky's Major Highways Cabiinett fforr Economiic Devellopmentt !( Major Kentucky Cities Audubon Parkway Martha Layne Collins Bluegrass Parkway Ohio Hal Rogers Parkway Edward T. Breathitt Pennyrile Parkway Louie B. Nunn Cumberland Parkway Bert T. Combs Mountain Parkway Indiana Julian M. Carroll Purchase Parkway 275 ¨¦§471 Wendell H. Ford Western Kentucky Parkway ¨¦§ Florence !(Kenton Boone Campbell William N. Natcher PaIrkllwinayois Interstate ¨¦§71 Parkway Gallatin Bracken Pendleton US Highway Carroll Grant Trimble Mason State Road Lewis Greenup Ashland Owen Robertson !( Henry Harrison Boyd Oldham Fleming Carter Louisville Scott Nicholas West !( Shelby Frankfort 264 Bourbon ¨¦§265 !( Bath 64 Rowan Virginia Jefferson ¨¦§ Franklin ¨¦§ Elliott Fayette Lawrence Woodford Spencer Anderson !( Bullitt Lexington Clark Menifee Henderson Hancock Meade Montgomery Morgan Jessamine Johnson !( Owensboro Nelson Powell Martin Henderson Mercer !( Breckinridge Elizabethtown !( Richmond Wolfe Magoffin Daviess !( Union Washington Madison Estill Hardin Boyle Garrard Lee Floyd Pikeville Webster McLean Larue Marion 75 Breathitt !( Pike Ohio Grayson Lincoln ¨¦§ Jackson Owsley Crittenden Rockcastle Knott 65 Taylor Livingston Hopkins ¨¦§ Casey Perry Muhlenberg Hart Green 69 Butler Edmonson Paducah Caldwell ¨¦§ Clay Letcher !( Bowling Somerset Laurel Ballard Adair !( Pulaski Leslie McCracken Green Lyon !( Russell Virginia Missouri Hopkinsville Barren Metcalfe Marshall 24 Warren Knox Harlan Carlisle ¨¦§ !( Logan Trigg Christian Todd Wayne Graves Allen Cumberland Whitley Bell Hickman Simpson Monroe McCreary Clinton Middlesboro Fulton Calloway !( Fulton !( Tennessee North µ Carolina Kentucky Cabinet for Economic Development - Old Capitol Annex - 300 West Broadway - Frankfort, KY 40601 - 502-564-7140 (local) - 800-626-2930 (toll free) - www.thinkkentucky.com.
    [Show full text]
  • Economic Impact Study Heartland Parkway
    Economic Impact Study Performed for Heartland Parkway December 2003 Heartland Parkway Economic Impact Analysis Younger Associates has projected the annual economic impact of the Heartland Parkway when the route is completed from the Louie B. Nunn Cumberland Parkway to the Bluegrass Parkway. When the Heartland Parkway is completed, the regional economic impact from increased business output and retail sales is projected to be $2.28 billion annually. A total of 2,596 jobs are projected to be created as a result of this increased activity. To determine the magnitude of the potential economic impact of the Heartland Parkway, key indicators were compared between the economies of rural counties with parkway access and rural counties without parkway access. The counties selected are not part of a Metropolitan Statistical Area, nor are the counties to be served by the Heartland Parkway. For the comparison, a group of seven counties without parkway access were selected: Ballard, Breathitt, Carlisle, Lewis, Owen, Owsley, and Robertson. Another group of seven counties with parkway access was selected: Barren, Clay, Graves, Grayson, Ohio, Webster and Wolfe. Obviously, a vast number of physical, historical, and demographic factors influence the level of economic activity within any individual county or region. However, there is a clear variation in the level of economic activity among the group of randomly selected non-parkway counties and the group of parkway-served counties. The area to be served by the Heartland Parkway has a potential for economic expansion that is at least equal to, or possibly greater than, the increased rate of economic activity seen in rural counties with parkway access when compared to rural counties without parkway access.
    [Show full text]
  • AN ACT Relating to Road Projects. Be It Resolved by the General Assembly
    UNOFFICIAL COPY AS OF 04/16/16 16 REG. SESS. 16 RS HJR 160/EN AN ACT relating to road projects. Be it resolved by the General Assembly of the Commonwealth of Kentucky: Section 1. This Joint Resolution in conjunction with 2016 Regular Session HB 129 shall constitute the Six-Year Road Plan. The last four years of the Six-Year Road Plan are as follows: Page 1 of 1 HJR016020.100 - 2000 - 8564 Engrossed 2018-2022 HIGHWAY CONSTRUCTION PLAN County Item No. Route Description Phase Fund FY 2019 FY 2020 FY 2021 FY 2022 ADAIR 1068 KY-704 REPLACE BRIDGE ON KY 704 (11.909) OVER PL UNNAMED STREAM (SR=53.5) (001B00078N) DN BRX 250,000 RW BRX 150,000 UT BRX 50,000 CN BRX 500,000 Project Cost: 0 250,000 200,000 500,000 Total for ADAIR county PL DN 250,000 RW 150,000 UT 50,000 CN 500,000 Total Amounts: 0 250,000 200,000 500,000 ALLEN 1088 CR-1328 REPLACE BRIDGE OVER BAYS FORK ON PL MITCHELL WEAVER ROAD (CR 1328) 2.1 MI W DN BRZ 400,000 OF KY 1332 (002C00063N)(SR=31.5) RW BRZ 150,000 UT BRZ 75,000 CN BRZ 1,655,000 Project Cost: 0 400,000 1,880,000 0 ALLEN 8802 KY-100 WIDENING OF KY 100 (FRANKLIN ROAD) TO 3 PL LANES WITH URBAN SECTION FROM OLIVER DN STREET TO US 31E TO INCREASE RW CAPACITY/SAFETY. MP 11.800-12.700 (14CCN) UT SP 670,000 CN SP 3,800,000 Project Cost: 670,000 3,800,000 0 0 ALLEN 8902 KY-98 RECONSTRUCT 1.0 MILE EAST OF BRIDGE OVER PL BARREN RIVER LAKE TO CORRECT VERTICAL DN AND HORIZONTAL DEFICIENCIES.
    [Show full text]
  • SHIFT 2020 Statewide Projects List
    Projects Under Consideration for Statewide Funding SHIFT Statewide Score County District Item # Primary Route Project Type Remaining Project Cost: Description Max 100 Fayette 7 7-252 / 7-252.02 KY 922 MAJOR WIDENING $27,640,000 IMPROVE NEWTOWN PIKE FROM KY-4 TO I-75. 1.65 - 3.4 73.2 Kenton 6 6-17.05 I 75 AM-BRIDGE $1,200,000,000 BRENT SPENCE BRIDGE PROJECT 187.3 - 191.777 64.8 Laurel 11 11-11 I 75 MAJOR WIDENING $85,100,000 IMPROVE I-75 FROM KY 80 AT LONDON TO SOUTH OF THE KY- 909 UNDERPASS. 41 - 48 64.1 Woodford 7 IP20080478 I 64 MAJOR WIDENING $128,251,000 IMPROVE CAPACITY ON I-64 FROM US 60 TO I-64/I-75 NORTHERN SPLIT IN FAYETTE COUNTY. 57.86 - 74.26 60.3 Jefferson 5 5-557 I 71 MAJOR WIDENING $211,280,000 IMPROVE SAFETY AND REDUCE CONGESTION ON I-71 FROM ZORN AVENUE TO I-265. 1.724 - 9 59.9 Jefferson 5 5-48.10 I 71 RECONSTRUCTION $23,750,000 NB AND SB AUXILIARY LANES ON I-71 NEAR KENNEDY INTERCHANGE, INCLUDING OPERATIONAL IMPROVEMENTS TO 59.5 0 - 2.5 THE ZORN INTERCHANGE. Monday, June 24, 2019 Revision 1 7/19/19 Page 1 of 8 SHIFT Statewide Score County District Item # Primary Route Project Type Remaining Project Cost: Description Max 100 Campbell 6 6-81 I 471 MAJOR WIDENING $1,600,000,000 IMPROVE CONGESTION ALONG THE I-471 CORRIDOR FROM US- 27 TO OHIO STATE LINE. 0 - 5 58.5 Pulaski 8 8-8901/ HR 9006 MAJOR WIDENING $500,000,000 UPGRADE ROUTE FROM SOMERSET TO LONDON TO 8-8902/ INTERSTATE STANDARDS 8-8903 58.3 11-8907 Boone 6 6-79 I 75 CONGESTION MITIGTN $300,000,000 IMPROVE SAFETY, MOBILITY, OPERATIONS, AND GEOMETRICS AT THE JUNCTION OF I-75 AND I-275 AND THE SYSTEM-TO-SYSTEM 57.9 182 - 183.312 RAMPS.
    [Show full text]
  • Interstate 69 SIU 15 Final Environmental Impact
    Section 1: PURPOSE AND NEED This section defines the action by the Louisiana consistent with national, state, regional, and local Department of Transportation and Development needs. (DOTD), in cooperation with the Federal Highway The proposed project, hereafter referred to as the Administration (FHWA) that is the subject of this I-69 project, would provide a divided four-lane, Environmental Impact Statement (EIS) and limited access highway on new location between establishes the purpose and need for that action. US Highway 171 (US 171) near the Town of In this section, the National, Regional and Local Stonewall in DeSoto Parish, and Interstate purposes and needs for the action are presented, Highway 20 (I–20) near the Town of Haughton in including the established logical termini and Bossier Parish, a distance of approximately 35 independent utility in the event that construction of miles. The routing and logical termini are identified adjacent Sections of Independent Utility are and described in the Corridor 18 Special Issues delayed or not completed. Study (1997) and in the I-69 (Corridor 18) Special 1.1 PROJECT DESCRIPTION Environmental Study, Task C Report - Sections of The DOTD, in cooperation with the FHWA, Independent Utility (SIU) report (1999) for SIU 15. proposes to construct a segment of the proposed The Study Area encompasses portions of Bossier, Interstate Highway 69 (I–69) in Bossier, Caddo, Caddo, and DeSoto Parishes (see Exhibit 1-2). An and DeSoto Parishes, Louisiana. The proposed evaluation of social, economic, environmental, and highway is a portion of the planned improvements engineering considerations will further refine the to Congressionally-designated High Priority proposed highway location.
    [Show full text]
  • Technical Proposal Volume 2 Appendices
    TECHNICAL PROPOSAL VOLUME VOLUMEVOLUME Appendices 2 Response to the Request For Proposals ResponseTOResponse DEVELOP, to the to Request the DESIGN, Request For Proposals ForCONSTRUCT, Proposals FINANCE, OPERATE AND MAINTAIN TOI-69 DEVELOP,TO SECTION DEVELOP, DESIGN, 5DESIGN, PROJECT CONSTRUCT, CONSTRUCT, through FINANCE, a FINANCE, PUBLIC-PRIVATE OPERATE OPERATE AND AGREEMENT ANDMAINTAIN MAINTAIN SUBMITTED BY: I-69 SECTIONI-69 SECTION 5 PROJECT 5 PROJECT through through a PUBLIC-PRIVATE a PUBLIC-PRIVATE AGREEMENT AGREEMENT SUBMITTEDSUBMITTED BY: BY: DrivingDrivingDriving Section SectionSection 5 Forward 5 5Forward Forward through through through INNOVATION,INNOVATION,INNOVATION, QUALITY, QUALITY, QUALITY, & SUSTAINABILITY & SUSTAINABILITY& SUSTAINABILITY Exhibit E SUMMARY AND ORDER OF PROPOSAL CONTENTS ITP Section Technical Proposal Component Form (if any) Cross-Reference A. Executive Summary Executive Summary (Exclude price No forms are Exhibit B, Section 3.1 information) provided B. Proposer Information, Certifications & Documents Proposal Letter Form A Exhibit B, Section 3.2.1 Authorization Documents No forms are Exhibit B, Section 3.2.1 provided Identification of Proposer and Equity Form B-1 Exhibit B, Section 3.2.2 Members Information About Proposer Organization Form B-2 Exhibit B, Section 3.2.2 Information About Major Participants, Form B-3 Exhibit B, Section 3.2.2 and Identified Contractors Letter accepting joint and several liability, No forms are Exhibit B, Section 3.2.2 if applicable provided Responsible Proposer and Major Form
    [Show full text]
  • Kentucky [PDF]
    TEMPLATE ONLY – NOT FOR SUBMISSION Updated: 1/21/2020 FY 2020 National Scenic Byways Nomination Application Questions This document is for use as a template to assist with nomination application preparation. It is not the official nomination application, and will not be accepted as part of the final submission. The official nomination application can be found online at: https://www.fhwa.dot.gov/hep/scenic_byways/nominations/. Byway Name: Great River Road State(s), Indian tribe(s), or Federal land(s): Kentucky Multi-jurisdiction: YES, nine other states are submitting individual nomination applications for the Great River Road to be designated an All-American Road. If your byway traverses more than one jurisdiction (i.e., State, Indian tribe, or Federal land), you will be asked to indicate that you are submitting a nomination submission for a multi-jurisdiction nomination and applicants in each jurisdiction will be required to submit individual nomination applications. Submission Agency: Carlisle County Fiscal Court on behalf of the Kentucky Mississippi River Parkway Commission Submission Date: 04/30/2020 Desired Designation (select one): All-American Road • National Scenic Byway • All-American Road For more information about the distinctions between designations, see the Nominations Guide. Please note: Any road that fails to meet the requirements for All-American Road designation will automatically be considered for designation as a National Scenic Byway. Change in Designation: YES, from National Scenic Byway to All-American Road. If you are seeking to nominate an existing National Scenic Byway as an All-American Road, you are required to identify two (2) intrinsic qualities that are nationally significant.
    [Show full text]