
West Region Scores SHIFT 2020 Regional Score County District Item # Primary Route Project Type Cost Estimate Project Description Max 100 Warren 3 3‐8857 US 31 W MAJOR WIDENING $12,100,000 IMPROVE US‐31W FROM CAMPBELL LANE (US‐ 231) TO UNIVERSITY BOULEVARD (US‐231X). 89.0 10.561 ‐ 11.688 (14CCN)(16CCR)(18CCR) Warren3 IP20190007 US 231 SPOT $4,382,000 REDUCE CONGESTION AND IMPROVE MOBILITY 88.8 IMPROVEMENT ON US‐231 AND US‐231X BETWEEN CS‐1432 9.877 ‐ 10.455 (CAVE MILL ROAD) AND CS‐1593 (SOUTH PARK DRIVE). Marshall1 IP20110174 US 68 SPOT $4,621,000 ADDRESS SAFETY, SERVICE, AND ACCESS ISSUES 87.4 IMPROVEMENT FROM PURCHASE PARKWAY TO US 641 SOUTH 9.415 ‐ 10.032 IN DRAFFENVILLE. Hopkins2 2‐8305 US 41 MAJOR WIDENING $11,280,000 IMPROVE NORTH MAIN STREET FROM HOSPITAL DRIVE TO KY‐281. (06CCN)(12CCR)(18CCR) 86.6 16.989 ‐ 17.548 Christian2 2‐899 US 68 RECONSTRUCTION $11,740,000 ADDRESS CONGESTION AND MOBILITY OF US 68 FROM KY 91 TO KY 1007 IN HOPKINSVILLE. 86.6 9.221 ‐ 10.137 (18CCN) Daviess2 2‐8300 KY 54 MAJOR WIDENING $60,350,000 IMPROVE KY‐54 FROM WEST OF THE US‐60 BYPASS TO CR‐1021 (JACK HINTON ROAD). 85.5 2.47 ‐ 8.003 (06CCN)(10CCR)(12CCR)(14CCR)(16CCR) Marshall1 1‐398 US 62 MAJOR WIDENING $5,550,000 IMPROVE ACCESS AND REDUCE CONGESTION ON US‐62 FROM KY‐95 TO THE EXISTING FOUR‐LANE 83.6 7.2 ‐ 8.497 HIGHWAY AT LONE VALLEY RD NEAR I‐24 INTERCHANGE AND FUTURE I‐69 CONNECTION. Barren3 3‐8819.20 KY 90 MAJOR WIDENING $20,160,000 WIDEN KY 90 TO 2 + 1 ROADWAY FROM ESTES ROAD IN CAVE CITY TO THE GLASGOW OUTER 82.7 1.4 ‐ 8.754 LOOP (US68). (SECTION 2)(2016BOP) Note: Projects may extend beyond county shown. Wednesday, September 18, 2019 Page 1 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100 Warren3 3‐8904.10 US 31 W MINOR WIDENING $12,420,000 WIDEN US 31W FROM PARK AVENUE TO FAIRVIEW AVENUE MP 13.7‐14.25. (18CCN) 82.5 13.7 ‐ 14.25 Warren3 IP20190111 KY 234 SPOT $915,000 REDUCE CONGESTION AND INCREASE MOBILITY 82.3 IMPROVEMENT ON KY 234 FROM THE EXIT 26 INTERCHANGE 10.2 ‐ 10.8 WITH I 65 TO KY 880. Graves1 IP20060045 KY 303 MINOR WIDENING $12,661,000 ADDRESS SAFETY, CONGESTION AND ACCESS ISSUES FROM EAST FARTHING STREET TO 81.8 16.034 ‐ 16.807 CHARLES DRIVE IN MAYFIELD. Warren3 3‐8707 PF 9999 NEW $44,350,000 CONSTRUCT A NEW INTERCHANGE ON THE 81.5 INTERCHANGE NATCHER PARKWAY AT ELROD ROAD IN ‐ BOWLING GREEN (MP 3.4 TO MP 4.0).(12CCN) Marshall1 IP20190051 US 68 RECONSTRUCTION $7,076,000 CORRECT GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY, SERVICE AND CONGESTION 81.4 8.736 ‐ 9.384 ISSUES FROM KY 782 (GRIGGSTOWN ROAD) TO WESTERN I‐69 RAMPS. Simpson3 IP20190037 KY 1008 SPOT $2,182,000 IMPROVE SAFETY AND MOBILITY AT THE 81.0 IMPROVEMENT INTERSECTION OF KY 1008 AND US 31W. 2.1 ‐ 2.4 Barren3 3‐8819.10 KY 90 MAJOR WIDENING $790,000 MAJOR WIDENING ON KY 90 (5 LANES WITH CURB, GUTTER, AND SIDEWALK) FROM SANDERS 80.0 0.16 ‐ 1.4 STREET TO ESTES ROAD IN CAVE CITY. (SECTION 1)(2016BOP) Ballard1 1‐115 US 60 MAJOR WIDENING $20,060,000 PADUCAH‐WICKLIFFE RD: IMPROVE US‐60 FROM STAFFORD ROAD TO BETHEL CHURCH ROAD 79.3 13.62 ‐ 16.937 (INCLUDES KEVIL BYPASS)(TO BE LET WITH 1‐ 115.10) (06CCR)(12CCR)(14CCR)(18CCR). Wednesday, September 18, 2019 Page 2 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100 Christian2 IP20060085 KY 1007 MINOR WIDENING $26,310,000 RECONSTRUCT KY 1007 FROM LITTLE RIVER BRIDGE TO SANDERSON RD INCLUDING A NEW 78.9 0.63 ‐ 2.5 CONNECTOR FROM SANDERSON RD TO THE KY 1682 BYPASS TO INCLUDE PED./BIKE FACILITIES IN HOPKINSVILLE Todd3 3‐80001 US 79 MINOR WIDENING $15,210,000 US 79 WIDENING FROM MP 0 TO MP 3. (18CCN) 78.6 0 ‐ 3 Christian2 IP20070037 KY 115 MINOR WIDENING $14,870,000 ADDRESS SAFETY AND CONGESTION ISSUES FROM KY 911 TO I24. 78.2 1.261 ‐ 2.663 McCracken1 IP20060059 US 62 MINOR WIDENING $22,615,000 ADDRESS ISSUES WITH SERVICE, CONGESTION AND SAFETY FROM US 45 TO I‐24 IN PADUCAH. 78.0 11.837 ‐ 12.881 SEE MARCH, 2002 PADUCAH‐MCCRACKEN COUNTY TRANSPORTATION STUDY. Christian2 IP20070029 KY 107 MAJOR WIDENING $16,028,000 RECONSTRUCT KY 107 FROM KY 380 TO JERRY CLAIBORNE WAY TO INCLUDE PED./BIKE 77.9 15.344 ‐ 17.163 FACILITIES McCracken1 1‐115.10 US 60 MAJOR WIDENING $13,830,000 PADUCAH‐WICKLIFFE RD: IMPROVE US‐60 FROM BETHEL CHURCH ROAD TO KY‐1154 (MARTIN 77.9 0.4 ‐ 1.968 MARIETTA) (04CCR) (TO BE LET WITH 1‐ 115.00).(10CCR)(12CCR)(18CCR) McCracken1 IP20060061 KY 305 RECONSTRUCTION $20,703,000 ADDRESS FUTURE CONGESTION, ACCESS, CONTINUITY OF THE OUTER LOOP PROJECT , AND 77.4 8.348 ‐ 9.739 ECONOMIC DEVELOPMENT ISSUES FOR WESTERN MCCRACKEN COUNTY ALONG KY 305 FROM KY 998 TO KY 1420. Allen3 IP20060129 KY 100 MAJOR WIDENING $11,442,000 IMPROVE SAFETY AND MOBILITY ON KY 100 FROM KY 3500 TO JOHN KELLY DRIVE IN 77.1 13.1 ‐ 14.1 SCOTTSVILLE. Wednesday, September 18, 2019 Page 3 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100 Barren3 3‐8821 KY 1297 MAJOR WIDENING $20,810,000 IMPROVE KY‐1297 FROM CR‐1366 (DONNELLY DRIVE) TO US‐31E (ROGER WELLS), AND 76.7 11.085 ‐ 12.806 IMPROVE CR‐1366 (DONNELLY DRIVE) FROM KY‐ 1297 TO US‐68 IN GLASGOW. (14CCN) (16CCN) Livingston1 1‐330 US 60 RELOCATION $24,570,000 PADUCAH‐HENDERSON; RELOCATE US‐60 FROM EAST OF THE TENNESSEE RIVER BRIDGE TO EAST 75.9 0.875 ‐ 4.2 OF RUDD‐SPEES ROAD (00CCR)(12CCR)(14CCR) Caldwell2 IP20140022 KY 91 RECONSTRUCTION $16,410,000 TO RECONSTRUCT KY 91 FROM MP 12.433 NEAR THE I‐69 INTERCHANGE TO THE KY 139 75.4 12.433 ‐ 13.905 INTERSECTION. McCracken1 IP20180013 KY 131 SPOT $2,521,000 ADD TURN LANES AT ENTRANCES TO REIDLAND 75.2 IMPROVEMENT ELEMENTARY SCHOOL. 4.833 ‐ 5.815 Ballard1 1‐118 US 60 MAJOR WIDENING $25,540,000 IMPROVE US‐60 FROM PROPOSED SOUTHERN BYPASS OF LA CENTER TO EAST OF DENIS JONES 75.1 11.815 ‐ 13.615 ROAD. (02CCR) Warren3 IP20170035 CS 6010 MINOR WIDENING $25,201,000 REDUCE CONGESTION AND INCREASE SAFETY AND MOBILITY ON DISHMAN LANE EXT. (CS‐ 74.4 0.57 ‐ 0.943 6010) FROM MP 0.570 TO JUST EAST OF GRIDER POND ROAD ON CAVE MILL ROAD (CS‐1432). Hopkins2 IP20180092 PF 9999 NEW ROUTE $5,066,000 EXTEND MIDTOWN BLVD NORTH FROM THE INTERSECTION WITH NORTH KENTUCKY AVENUE, 74.1 ‐ TO WHITTINGTON DRIVE (CS 1287). ALL DEEDED TO THE CITY OF MADISONVILLE. THIS PROJECT WILL BE A BREAKOUT SECTION OF THE 2‐804 CONNECTOR PROJECT. D2 HAS REQUESTED 804.3 FOR THIS Warren3 IP20070147 KY 622 SPOT $2,315,000 IMPROVE SAFETY AND MOBILITY ON KY 622 74.0 IMPROVEMENT FROM 0.1 MILE SOUTH OF COLLETT ROAD TO 6.454 ‐ 6.895 DEWEY LAKE ROAD. Wednesday, September 18, 2019 Page 4 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100 McCracken1 IP20080040 US 62 RECONSTRUCTION $39,916,000 IMPROVE GEOMETRIC DEFICIENCIES AND ADDRESS SAFETY ISSUES ON US 62 FROM THE 73.3 0 ‐ 7.851 BALLARD COUNTY LINE TO THE PADUCAH COMMERCE PARK IN ORDER TO PROVIDE IMPROVED REGIONAL SYSTEM LINKAGE BETWEEN BARDWELL AND PADUCAH. Union2 IP20060117 US 60 MAJOR WIDENING $18,571,000 ADDRESS SAFETY CONCERNS ON US 60 FROM KY 492 TO THE US 60 BYPASS OUTSIDE 73.3 13.29 ‐ 15.401 MORGANFIELD. Graves1 IP20180073 KY 121 MAJOR WIDENING $12,352,000 UPGRADE/WIDEN KY 121 BYPASS IN MAYFIELD TO FOUR LANES. 73.2 5.499 ‐ 8.938 McLean2 2‐8812 KY 136 RECONSTRUCTION $16,570,000 REPLACE, IMPROVE ALIGNMENTS AND APPROACHES, AND ADDRESS SAFETY ISSUES 72.6 0 ‐ 19.334 WITH BRIDGES ON KY‐136 FROM KY‐56 IN MCLEAN COUNTY TO US‐231 IN OHIO COUNTY. (14CCN) Butler3 IP20080129 KY 79 SAFETY‐HAZ‐ELM $4,724,000 LANE DEPARTURE SAFETY IMPROVEMENTS ON KY‐79 BETWEEN THE KY‐70 CROSSROADS AND 72.6 12.538 ‐ 24.901 THE GRAYSON COUNTY LINE. Union2 IP20070108 US 60 MAJOR WIDENING $25,065,000 ADDRESS SAFETY AND SERVICE CONCERNS OF US‐ 60 FROM THE KY‐950 TO KY‐492. 72.2 10.52 ‐ 13.29 Webster2 IP20070127 KY 630 RECONSTRUCTION $12,516,000 ADDRESS SERVICE CONCERNS OF KY 630 FROM KY 132 IN DIXON TO THE HOPKINS COUNTY LINE 72.2 0 ‐ 0.965 Hancock2 2‐226 US 60 MINOR WIDENING $8,860,000 IMPROVE THE WESTBOUND LANES OF US‐60 FROM KY‐1957 TO 0.2 MILE WEST OF KY‐6106. 72.0 4.8 ‐ 8.5 (12CCR)(14CCR)(18CCR) Wednesday, September 18, 2019 Page 5 of 41 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100 McCracken1 1‐1115.10 / 1‐ US 60 RELOCATION $18,510,000 RELOCATION AND MINOR WIDENING OF US‐60 1115.20 FROM CLARKS RIVER TO US‐62 71.5 18.65 ‐ 20.1 JCT.(10CCR)(14CCR)(LET W/ 1‐1115.20)(16CCR) Daviess2 IP20080062 KY 298 RECONSTRUCTION $9,705,000 OLD HARTFORD RD ‐ ADDRESS POOR PAVEMENT CONDITIONS AND CONGESTION DUE TO 71.2 8.986 ‐ 9.927 INCREASED VOLUMES AND TURN MOVEMENTS.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages41 Page
-
File Size-