Table of Contents Denver Amendments 2006 International Codes

Total Page:16

File Type:pdf, Size:1020Kb

Table of Contents Denver Amendments 2006 International Codes TABLE OF CONTENTS FOR THE DENVER AMENDMENTS TO THE 2006 INTERNATIONAL CODES DENVER AMENDMENTS TO THE ADMINISTRATION OF THE 2006 DENVER BUILDING CODE CHAPTER 1 2 ADMINISTRATION 2 SECTION 101 2 PURPOSE AND SCOPE 2 SECTION 102 3 ORGANIZATION OF BUILDING PERMITTING AND INSPECTION SERVICES 3 SECTION 103 3 GENERAL POWERS AND DUTIES OF THE AGENCY 3 SECTION 104 4 SERVICE 4 SECTION 105 4 APPLICATION TO EXISTING BUILDINGS 4 SECTION 106 5 UNSAFE BUILDINGS OR STRUCTURES 5 SECTION 107 6 UNSAFE UTILITY 6 SECTION 108 8 NOTICE AND ABATEMENT OF UNSAFE BUILDINGS, STRUCTURES OR UTILITIES 8 SECTION 109 9 USED MATERIALS 9 SECTION 110 9 ALTERNATE MATERIALS, DESIGN AND METHODS OF CONSTRUCTION AND EQUIPMENT 9 SECTION 111 10 PROHIBITIONS, VIOLATIONS, PENALTIES AND REMEDIES 10 SECTION 112 11 BOARD OF APPEALS 11 SECTION 113 14 APPEALS 14 SECTION 114 15 APPEALS FROM DECISIONS OF THE BOARD 15 SECTION 115 15 VALIDITY OF BUILDING CODE 15 SECTION 116 15 LIABILITY 15 SECTION 120 16 LICENSING, CERTIFICATION, REGISTRATION 16 SECTION 121 16 AUTHORITY 16 SECTION 122 16 LICENSES OR REGISTRATION 16 SECTION 123 17 CLASSIFICATION OF LICENSES AND REGISTRATION 17 SECTION 124 21 LICENSE FEES 21 SECTION 125 21 LICENSE RENEWAL 21 SECTION 126 21 REISSUANCE OF LICENSE 21 SECTION 127 21 LICENSEE AND REGISTRANT RESPONSIBILITY 21 SECTION 128 22 LICENSE AND REGISTRATION CHANGES 22 SECTION 129 22 SUSPENSION OR REVOCATION OF LICENSE 22 SECTION 130 23 CERTIFICATES 23 SECTION 131 24 CLASSIFICATION OF SUPERVISOR CERTIFICATE OF QUALIFICATION 24 SECTION 132 25 - i - TABLE OF CONTENTS CLASSIFICATION OF JOURNEYMAN AND OPERATOR CERTIFICATE OF QUALIFICATION 25 SECTION 133 27 APPRENTICES AND TRAINEES 27 SECTION 134 28 CERTIFICATE FEES 28 SECTION 135 28 CERTIFICATE RENEWAL 28 SECTION 136 28 REISSUANCE 28 SECTION 137 28 CERTIFICATE HOLDER RESPONSIBILITY 28 SECTION 138 29 SUSPENSION OR REVOCATION OF CERTIFICATE 29 SECTION 139 30 EXAMINATION STANDARDS AND REVIEW 30 SECTION 150 31 PERMITS, PLANS, INSPECTIONS, CERTIFICATE OF OCCUPANCY 31 SECTION 151 33 PERMITS 33 SECTION 152 35 PERMIT FEES 35 SECTION 153 37 DRAWINGS AND SPECIFICATIONS 37 SECTION 154 38 PREPARATION OF DRAWINGS AND SPECIFICATIONS 38 SECTION 155 40 INFORMATION REQUIRED FOR PREPARATION OF DRAWINGS 40 SECTION 156 41 FIELD SURVEYS 41 SECTION 157 42 INSPECTIONS 42 SECTION 158 44 SPECIAL INSPECTIONS 44 SECTION 159 44 FINAL INSPECTION APPROVAL/CERTIFICATE OF COMPLIANCE 44 SECTION 160 44 CERTIFICATE OF OCCUPANCY 44 SECTION 161 46 ADDRESS 46 SECTION 162 46 PERMITS FOR TEMPORARY BUILDINGS 46 SECTION 163 46 FOUNDATION PERMITS 46 SECTION 164 47 PHASED CONSTRUCTION PERMITS 47 SECTION 165 47 TABLES AND FEES 47 AMENDMENTS TO THE 2006 EDITION OF THE INTERNATIONAL BUILDING CODE CHAPTER 1 49 ADMINISTRATION 49 SECTION 101 49 GENERAL 49 CHAPTER 2 49 DEFINITIONS AND ABBREVIATIONS 49 SECTION 201 49 GENERAL 49 SECTION 202 49 DEFINITIONS 49 CHAPTER 3 52 - ii - TABLE OF CONTENTS USE AND OCCUPANCY CLASSIFICATION 52 SECTION 303 52 ASSEMBLY GROUP A 52 SECTION 305 52 EDUCATIONAL GROUP E 52 SECTION 308 53 INSTITUTIONAL GROUP I 53 SECTION 310 53 RESIDENTIAL GROUP R 53 SECTION 312 54 UTILITY AND MISCELLANEOUS GROUP U 54 CHAPTER 4 54 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY 54 SECTION 402 54 COVERED MALL BUILDINGS 54 SECTION 403 54 HIGH-RISE BUILDINGS 54 SECTION 405 55 UNDERGROUND BUILDINGS 55 SECTION 406 55 MOTOR-VEHICLE-RELATED OCCUPANCIES 55 SECTION 411 55 SPECIAL AMUSEMENT BUILDINGS 55 SECTION 421 55 LIVE/WORK UNITS 55 CHAPTER 5 57 GENERAL BUILDING HEIGHTS AND AREAS 57 SECTION 507 57 UNLIMITED AREA BUILDINGS 57 SECTION 508 57 MIXED USE AND OCCUPANCIES 57 CHAPTER 7 58 FIRE-RESISTANCE-RATED CONSTRUCTION 58 SECTION 704 58 EXTERIOR WALLS 58 SECTION 707 59 SHAFT ENCLOSURES 59 SECTION 716 59 DUCTS AND AIR TRANSFER OPENINGS 59 CHAPTER 9 60 FIRE PROTECTION SYSTEMS 60 CHAPTER 10 60 MEANS OF EGRESS 60 SECTION 1004 60 OCCUPANT LOAD 60 SECTION 1005 60 EGRESS WIDTH 60 SECTION 1007 61 ACCESSIBLE MEANS OF EGRESS 61 SECTION 1008 62 DOORS GATES AND TURNSTILES 62 SECTION 1009 62 STAIRWAYS 62 SECTION 1011 63 EXIT SIGNS 63 SECTION 1014 63 EXIT ACCESS 63 SECTION 1020 64 VERTICAL EXIT CLOSURES 64 SECTION 1025 64 - iii - TABLE OF CONTENTS ASSEMBLY 64 CHAPTER 11 65 ACCESSIBILITY 65 SECTION 1101 65 GENERAL 65 CHAPTER 15 66 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES 66 SECTION 1503 66 WEATHER PROTECTION 66 SECTION 1507 66 REQUIREMENTS FOR ROOF COVERINGS 66 SECTION 1510 67 REROOFING 67 CHAPTER 16 68 STRUCTURAL DESIGN 68 SECTION 1607 68 LIVE LOADS 68 SECTION 1608 72 SNOW LOADS 72 SECTION 1609 72 WIND LOADS 72 SECTION 1613 72 EARTHQUAKE LOADS 72 CHAPTER 17 73 STRUCTURAL TESTS AND SPECIAL INSPECTIONS 73 SECTION 1704 73 SPECIAL INSPECTIONS 73 CHAPTER 18 73 SOILS AND FOUNDATIONS 73 SECTION 1805 73 FOOTINGS AND FOUNDATIONS 73 SECTION 1810 74 CAST-IN-PLACE CONCRETE PILE FOUNDATIONS 74 CHAPTER 27 74 ELECTRICAL 74 SECTION 2700 74 GENERAL - DENVER 74 CHAPTER 29 74 PLUMBING SYSTEMS 74 [P] SECTION 2902 74 MINIMUM PLUMBING FACILITIES 74 CHAPTER 30 75 ELEVATORS AND CONVEYING SYSTEMS 75 SECTION 3001 75 GENERAL 75 SECTION 3002 75 HOISTWAY ENCLOSURES 75 [F] SECTION 3003 75 EMERGENCY OPERATIONS 75 SECTION 3004 75 HOISTWAY VENTING 75 SECTION 3005 76 CONVEYING SYSTEMS 76 SECTION 3007 76 ELEVATOR RECALL FOR HIGH RISE BUILDINGS WITH PRESSURIZED HOISTWAYS 76 SECTION 3008 76 ELEVATOR, ESCALATOR AND MOVING SIDEWALK ACCIDENT REPORTING 76 CHAPTER 31 77 SPECIAL CONSTRUCTION 77 SECTION 3105 77 - iv - TABLE OF CONTENTS AWNINGS AND CANOPIES 77 [CDH] SECTION 3110 77 MANUFACTURED OR FACTORY-BUILT STRUCTURES 77 CHAPTER 32 78 ENCROACHMENTS INTO THE PUBLIC RIGHT-OF-WAY 78 [PW] SECTION 3202 78 ENCROACHMENTS 78 CHAPTER 33 79 SAFEGUARDS DURING CONSTRUCTION 79 SECTION 3301 79 GENERAL 79 SECTION 3302 79 CONSTRUCTION SAFEGUARDS 79 SECTION 3303 79 DEMOLITION 79 SECTION 3306 80 PROTECTION OF PEDESTRIANS 80 SECTION 3307 80 PROTECTION OF ADJOINING PROPERTY 80 SECTION 3308 81 TEMPORARY USE OF STREETS, ALLEYS AND PUBLIC PROPERTY 81 SECTION 3313 81 MOVING AND RELOCATION OF STRUCTURES 81 CHAPTER 34 82 EXISTING STRUCTURES 82 [EB] SECTION 3401 82 GENERAL 82 [EB] SECTION 3406 82 CHANGE OF OCCUPANCY 82 SECTION 3410 82 COMPLIANCE ALTERNATIVES 82 CHAPTER 61 83 REHABILITATION OF EXISTING BUILDING 83 SECTION 6101 83 GENERAL 83 SECTION 6102 83 COMMITTEE 83 SECTION 6103 84 COMMITTEE ACTIVITIES 84 \SECTION 610 84 APPLICATION AND FEE 84 SECTION 6105 84 APPLICATION REVIEW PROCEDURE 84 SECTION 6106 85 DECISION OF THE COMMITTEE 85 APPENDICES 86 APPENDIX ADOPTION STATUS 86 IBC APPENDICES 86 STATUS OF APPENDICES ON ADOPTION 86 APPENDIX H 86 SIGNS 86 [Z] SECTION H101 86 GENERAL 86 [Z] SECTION H102 87 DEFINITIONS 87 APPENDIX I 88 PATIO COVERS 88 SECTION I104 88 STRUCTURAL PROVISIONS 88 APPENDIX K 88 - v - TABLE OF CONTENTS CONSTRUCTION IN DESIGNATED SPECIAL CONSTRUCTION ZONES 88 SECTION K101 88 GENERAL 88 SECTION K102 88 GENERAL PROVISIONS 88 SECTION K103 88 HAZARDOUS GASES GENERATED BY LANDFILLS 88 APPENDIX L 90 ACCESS CONTROL 90 SECTION L101 90 INTRODUCTION 90 SECTION L102 91 DEFINITIONS 91 SECTION L103 93 GENERAL REQUIREMENTS 93 SECTION L104 95 ACCESS CONTROL SYSTEMS WITH MAGNETIC LOCKS 95 SECTION L105 96 DELAYED EGRESS SYSTEMS 96 SECTION L106 97 SECURING AN ELEVATOR LOBBY WITH AN ACCESS CONTROL SYSTEM 97 SECTION L107 98 SECURING EXIT ENCLOSURE (STAIR TOWER) DOORS 98 SECTION L108 101 CONTRACTOR LICENSING REQUIREMENTS FOR ACCESS CONTROL SYSTEMS 101 SECTION L109 102 ACCESS CONTROL SYSTEM PERMIT REQUIREMENTS 102 SECTION L110 105 ACCESS CONTROL SYSTEM PERMIT INSPECTION PROCESS 105 SECTION L111 105 ACCESS CONTROL SYSTEM TESTING AND MAINTENANCE 105 SECTION L113 106 ACCESS CONTROL – SAMPLE DRAWINGS 106 APPENDIX M 113 COLORADO TITLE 9 ARTICLE 5 - STANDARDS FOR ACCESSIBILE HOUSING 113 9-5-101.DEFINITIONS. 113 9-5-102. DISABILITIES COVERED - PURPOSE. 114 9-5-103. APPLICABILITY OF STANDARDS - ENFORCEMENT. 114 9-5-104. RESPONSIBILITY FOR ENFORCING STANDARDS. 115 9-5-105. EXEMPTIONS FOR CERTAIN PRIVATELY FUNDED PROJECTS. 115 9-5-106. IMPLEMENTATION PLAN. 116 APPENDIX N 116 CONSTRUCTION OF AIRPORT BUILDINGS AND STRUCTURES 116 SECTION N101 116 GENERAL 116 SECTION N102 116 DEFINITIONS 116 SECTION N103 117 TYPE OF CONSTRUCTION 117 SECTION N104 117 OCCUPANCY 117 SECTION N105 118 MEANS OF EGRESS 118 SECTION N106 119 AIRPORT RAMP DRAINAGE 119 SECTION N107 119 AIRPORT SMOKE CONTROL AND DETECTION 119 SECTION N108 120 AIRPORT LIFE SAFETY SYSTEMS 120 SECTION N109 122 - vi - TABLE OF CONTENTS AIRPORT MECHANICAL 122 SECTION N110 122 AIRPORT ELECTRICAL 122 SECTION N111 123 SUBSURFACE TUNNELS 123 SECTION N112 123 LIQUID FUEL LINES 123 SECTION N113 123 STANDARDS 123 DENVER AMENDMENTS TO THE 2006 EDITION OF THE INTERNATIONAL FIRE CODE CHAPTER 1 127 ADMINISTRATION 127 SECTION 101 127 GENERAL 127 SECTION 102 128 APPLICABILITY 128 SECTION 103 128 DEPARTMENT OF FIRE PREVENTION 128 SECTION 104 128 GENERAL AUTHORITY AND RESPONSIBILITIES 128 SECTION 105 131 PERMITS 131 SECTION 106 142 INSPECTIONS 142 SECTION 107 143 MAINTENANCE 143 SECTION 108 144 BOARD OF APPEALS 144 SECTION 109 144 VIOLATIONS 144 SECTION 110 145 UNSAFE BUILDINGS 145 SECTION 112 145 LICENSES 145 SECTION 113 146 PUBLIC FIRE EDUCATION 146 SECTION 114 146 EMERGENCY PLANS AND PROCEDURES 146 SECTION 115 146 FIRE ALARM MONITORING - PERMITS AND LICENSES 146 CHAPTER 2 148 DEFINITIONS 148 SECTION 202 148 GENERAL DEFINITIONS 148 CHAPTER 3 149 GENERAL PRECAUTIONS AGAINST FIRE 149 SECTION 301 149 GENERAL 149 SECTION 304 149 COMBUSTIBLE WASTE MATERIAL 149 SECTION 308 149 OPEN FLAMES 149 SECTION 309 150 POWERED INDUSTRIAL TRUCKS 150 SECTION 315 151 MISCELLANEOUS COMBUSTIBLE MATERIALS STORAGE 151 CHAPTER 4 151 EMERGENCY
Recommended publications
  • Solutions for Network Closets and Server Rooms the Most Manageable, Most Adaptable Infrastructure for Small IT Environments
    Solutions for network closets and server rooms The most manageable, most adaptable infrastructure for small IT environments Integrating management into our product solutions, Schneider Electric™ provides the answer to your customers’ rising energy costs and lack of on-site resources. Our highly manageable power infrastructure allows energy usage monitoring, outlet control and automation, and we keep installation costs down with our ready-to-install, easy-to- configure products, making our solutions truly “plug and play.” Table of contents NetShelter™ SX solutions ......................................................................Page 3 NetShelter SX cable management .................................................Page 7 Shelves and mounting hardware ..................................................Page 10 Rack components ..................................................................................Page 11 Open frame racks ..................................................................................Page 12 NetShelter CX enclosure ...................................................................Page 14 Specialty enclosures ............................................................................Page 16 Rack cooling and airflow management .....................................Page 16 Rack power distribution ......................................................................Page 18 NetBotz™ security and environmental monitoring ............... Page 22 StruxureWare™ Central ......................................................................
    [Show full text]
  • CAPSTONE 20-1 SWA Field Study Trip Book Part II
    CAPSTONE 20-1 SWA Field Study Trip Book Part II Subject Page Afghanistan ................................................................ CIA Summary ......................................................... 2 CIA World Fact Book .............................................. 3 BBC Country Profile ............................................... 24 Culture Gram .......................................................... 30 Kazakhstan ................................................................ CIA Summary ......................................................... 39 CIA World Fact Book .............................................. 40 BBC Country Profile ............................................... 58 Culture Gram .......................................................... 62 Uzbekistan ................................................................. CIA Summary ......................................................... 67 CIA World Fact Book .............................................. 68 BBC Country Profile ............................................... 86 Culture Gram .......................................................... 89 Tajikistan .................................................................... CIA World Fact Book .............................................. 99 BBC Country Profile ............................................... 117 Culture Gram .......................................................... 121 AFGHANISTAN GOVERNMENT ECONOMY Chief of State Economic Overview President of the Islamic Republic of recovering
    [Show full text]
  • Conceptual Design Dubuque County at Plaza 20
    CONCEPTUAL DESIGN Documents DUBUQUE COUNTY AT PLAZA 20 Veterans Affairs Elections Annex FEH Project No. 2020309 13 August 2020 ARCHITECTURE / ENGINEERING / INTERIORS SIOUX CITY, IA DES MOINES, IA DUBUQUE, IA OCONOMOWOC, WI 712 252 3889 / 515 288 2000 / 563 583 4900 / 262 968 2055 FEH Design 13 August 2020 Project No: 2020309 TABLE OF CONTENTS VETERANS AFFAIRS GOALS FOR SUCCESS VETERANS AFFAIRS SPACE NEEDS ASSESSMENT ELECTIONS ANNEX GOALS FOR SUCCESS ELECTIONS ANNEX SPACE NEEDS ASSESSMENT FLOOR PLAN OPTION D CONCEPTUAL BUDGET SUMMARY Table of Contents Dubuque County at Plaza 20 – Conceptual Design Dubuque, IA 951 MAIN STREET DUBUQUE, IOWA 52001 563 583 4900 DUBUQUE COUNTY VETERANS AFFAIRS GOALS FOR SUCCESS Proximity to VA Clinic Parking Access Adequate Office Space to Serve Public Fully Accessible Space (all sizes, wheelchairs) Main Level Restrooms Safety and Security (Secure Entrance, Visibility) 24 July 2020 Page 1 of 1 ARCHITECTURE / ENGINEERING / INTERIORS Dubuque County Office Space FEH DESIGN space needs assessment 13-Aug-20 Room Name/ Function of Space Existing Proposed Remarks Area Area, SQ FT Veterans Affairs Secure entry lobby space 240 12' x 20', 6-8 waiting chairs Reception/office - Tammy 118 130 Meeting room function, Visibility to lobby / entry VA Director's Office - Randy 232 175 Meeting room function office 1 - Michelle 154 125 Meeting room function office 2 - Doug 113 125 Meeting room function office 3 - Nick 86 125 Meeting room function Computer Room 110 Public Use Mail Machine and Supply Cabinet, Shredder, work Work
    [Show full text]
  • Closing the Fiber Gap to Apartments
    FierceCable Custom Publishing share: CLOSING THE FIBER GAP TO APARTMENTS Demand for fiber optic cable to carry an explosion in Indeed, fiber cable may pass an apartment building data traffic continues to be robust, driven heavily by underground or on a pole, but access to a building’s video consumption and other rich content. Verizon, wiring closet—much less to dozens or hundreds of now the owner of AOL, recently signed mega deals individual units—remains difficult, industry officials to buy fiber cable from Corning and Prysmian. said. As of 2016, half of all commercial buildings in the Of 30 million residences in Multi-Dwelling Unit U.S. were connected to fiber, up dramatically in the (MDU) buildings in the U.S., only an estimated 20% past decade, according to Vertical Systems Group. are served by fiber, according to the Fiber Broadband Association, a trade group representing dozens of Even so, a gap remains for connections of fiber to businesses including Corning, 3M, Verizon Fios, apartments and condos (known as Fiber to the Unit, Google Fiber, Xfinity Communities and equipment or FTTU), which are abundant in large city centers vendor Graybar. and house up to half of urban residents. Apartments are “clearly far more sparsely served” than commercial With such a small percentage getting access to fiber, buildings, according to veteran Vertical analyst the industry is squarely focused on provisioning new Rosemary Cochran. MDU buildings and renovated structures with fiber to each unit. July 2017 1 CLOSING THE FIBER GAP TO APARTMENTS FierceCable Custom Publishing WHY FIBER IS DEEMED ‘FUTURE PROOF’ Running fiber to apartment units makes them future New transport electronics being used today can proof, building owners and the industry officials provide up to 500-gigabit speeds, said Scott Jackson, believe.
    [Show full text]
  • Project Manual Stage Lighting Upgrade At
    PROJECT MANUAL STAGE LIGHTING UPGRADE AT EISENHOWER & NIMITZ H.S. for Aldine Independent School District Issued for Competitive Bids February 15,2019 Pre-Bid Conference 9999 Veterans Memorial Dr., Houston, TX 77038 February 27, 2019 at 11:00 a.m. Bids Due March 21, 2019 at 2:00 p.m. S. Chu Architects, Inc. PROJECT MANUAL STAGE LIGHTING UPGRADE AT EISENHOWER & NIMITZ H.S. for Aldine Independent School District February 15,2019 Consultants MEP Lighting Stanton Engineering Group, LLC Bos Lighting Design 1300 W. Sam Houston Parkway S., Suite 121 1245 W 18 th Street Houston, Texas 77042 Houston, Texas 77008 713-300-9292 713-968-9559 S. Chu Architects, Inc. STAGE LIGHTING INSTRUCTIONS TO BIDDERS AISD Package No. PCKRP 18-17 SECTION 00 10 00 Aldine ISD Stage Lighting Upgrade @ Eisenhower and Nimitz H.S. Bid AE Scope Checklist This checklist is provided as reference for potential contractors and subcontractors and is not intended to be an exhaustive list or to replace bid specifications, drawings, or addenda. This list is provided to verify that these items are accounted for within the base bid scope of work for the ALDINE ISD STAGE LIGHTING UPGRADE AT EISENHOWER AND NIMISTZ H.S.. Each item should be checked and the form should be signed by the bidder acknowledging line by line, every item is accounted for in full. The checklist should be included with the proposal form in the contract documents, the bid should include this list and any additional items in the plans and specifications. Any questions regarding the list should be brought to the attention of the Architect and a resolution posted by addendum prior to bidding.
    [Show full text]
  • University of Arkansas at Little Rock
    University of Arkansas at Little Rock Policy Name: Infrastructure Cabling and Wiring Standards Policy Number: 702.1 Effective Date: September 24, 2008 Policy: University of Arkansas at Little Rock (UALR) Infrastructure Cabling and Wiring Standards The following information is provided to inform and guide University staff, consultants, contractors, and third-party personnel involved in any actions affecting or impacting UALR’s telecommunications and network critical physical infrastructure. Use of this Standard, and those codes and standards referenced within this document, is intended to increase the value of the system owner’s investment in the infrastructure by reducing the labor expense of maintaining the system, by extending the useful economic life of the system, and by providing effective service to users. Adherence will also ensure UALR is in compliance with national and State of Arkansas legal and regulatory standards, and is capable of supporting UALR’s mission and vision for growth. University of Arkansas at Little Rock (UALR) Infrastructure Cabling and Wiring Standards TABLE OF CONTENTS 1. GENERAL GUIDELINES..................................................................................... 3 1.1. Overview. 3 1.2. Specification of Criteria, Terms, Acronyms and Abbreviations 3 1.3. Major Renovation and New Construction 3 1.4. Minor Renovation and New Construction. 4 1.5. Telecommunications Room Planning. 4 2. CODES AND STANDARDS.................................................................................. 4 2.1. Adherence to Codes and Standards 4 2.2. List of Relevant Codes and Standards 4 2.3. Professional Workmanship 5 2.4. Standards Precedence and Conflict Resolution 5 2.5. Applying the Standards 6 3. SPECIFIC GUIDANCE......................................................................................... 6 3.1. General Planning Guidance for UALR Work Areas 6 3.2.
    [Show full text]
  • Cisco Compact Switches Extend Network Services White Paper
    Big Switch Networks Launches the SDN Industry Lippis Report 205: Cisco Compact Switches Extend Borderless Network Services to Furthest Network Points By Nicholas John Lippis III President, Lippis Consulting February, 2013 lippis report.com Cisco Compact Switches Extend Borderless Network Services to Furthest Network Points Cisco extended its line of Catalyst Compact cost justified based upon cable cost reduction, Switches with twelve new “fanless” models. The operational efficiency, improved security plus new Catalyst Compact Switches support PoE +, increased network performance. GbE connectivity, hardware acceleration, The Catalyst Compact Switches are based on security, energy management and most the same hardware, Cisco Network Operating importantly, zero touch configuration and remote System or IOS, and feature the same management features. These Compact management capabilities of the larger 2960-S Switches are designed to address unique and 3750-X/3560-X Catalyst access switches. requirements in the education, retail, hospitality, That is the Cisco Catalyst Compact Switches health care and manufacturing sectors, as well are engineered to be feature parity with the as conference rooms and small outpost offices larger Catalyst access switches. Because of large corporations. What’s common across Catalyst Compact Switches are low core density these industry sectors is the lack of IT staff and small form factor devices, they are deployed usually present in classrooms, retail outlets, in a multitude of verticals including doctor’s offices, hotels, etc., to support local manufacturing, retail, college dorms, hotel networking requirements, however many wish to rooms, classrooms, conference rooms, deploy the same security, power and hospitals, etc. For example, some retailers connectivity network services enjoyed at their utilized the Catalyst Compact Switches to larger facilities.
    [Show full text]
  • System Application Guide TECHNICAL INFORMATION & SYSTEM APPLICATION GUIDE Table of Contents
    Technical Information and System Application Guide TECHNICAL INFORMATION & SYSTEM APPLICATION GUIDE Table of Contents A STRUCTURED CABLING DESIGN CONCEPT B BACKBONE CABLING C HORIZONTAL DISTRIBUTION D CABLING SPECIFICATIONS E APPLICATION DESIGNS F TECHNICAL APPENDIX Page 2 Structured Cabling Design Concept A Structured Cabling Design Concept 4-6 Page 3 TECHNICAL INFORMATION & SYSTEM APPLICATION GUIDE Structured Cabling Design Concept The Structured Cabling System plays a critical role in all The Structured Cabling System is physically configured as a telecommunication systems, providing the physical link Hierarchical Star, where cabling from workstations all A between sources and destinations of all information. Data, emanate from central Floor Distributors (FD) on each floor. voice, video and control signals are transmitted over this The Floor Distributors (FD) or Intermediate Distribution infrastructure linking devices across the room, throughout a Frames (IDF) in turn, all are fed from a single Building building and across several buildings. Distributor (BD) or Main Distribution Frame (MDF), which in turn is connected back to a Campus Distributor (CD) when The Structured Cabling System may be quite small and several buildings are interlinked. simple, linking just a few nodes, or it may be massive, linking several buildings with tens of thousands of nodes, or a In developing a Structured Cabling System, Molex system somewhere in between. recommends installing Unshielded Twisted Pair (UTP) cable (or Foil Screened Twisted Pair (FTP) cable where appropriate) Essentially the Structured Cabling System is a simple physical as the horizontal connection between a work station and link between active equipment, and is comprised of FD/IDF. The FD/IDF serves as a concentration point and Unshielded Twisted Pair (UTP) cable or Optical Fibre Cable or often accommodates the active LAN switching equipment.
    [Show full text]
  • Wiring Closet Ventilation Unit Rapidly Deployable Wall- and Ceiling-Mount Heat Removal for Wiring Closets
    Wiring Closet Ventilation Unit Rapidly deployable wall- and ceiling-mount heat removal for wiring closets. Rapidly deployable wall- and ceiling-mount heat removal for wiring clos- ets. Wiring closet heat loads are rising due to deployment of tech- nologies such as VoIP and Power over Ethernet. The Wiring Closet Ventilation Unit is a rapidly deployable wall and ceiling mount heat removal system designed specifically for the wiring closet environ- ment. By exhausting hot air from the closet to an adjacent space it allows conditioned air (entering through the Air Intake Grill) to cool the load. Dual fans increase availability while LED status indi- cators and dry contact outputs enhance the unit’s manageability. Features and Benefits: Selectable fan speeds allow the user to choose between maximum AV A IL A BILITY performance and quiet operation. • Dual fans: Provides fault tolerance in the event of a fan failure. • Variable speed fans: Selectable fan speed (high/low) via toggle switch provides option for max performance or quiet operation AD ap T A BILITY • Multiple mounting methods: Flexible design allows for both dry wall and ceiling mount installations. • Easy to install: Innovative design allows for fast, easy installation by almost anybody. • Hardwire capable: For installations where hard wiring is required or prefered. M A N A GE A BILITY • Predictive failure notification: Maximizes system availability by providing early warning of required fan replacement. • Dry contact output: Provides remote notification of failures when used with
    [Show full text]
  • Wadsworth Library Board of Trustees Meeting Minutes Thursday April 9, 2020
    Wadsworth Library Board of Trustees Meeting Minutes Thursday April 9, 2020 Board Present: Mike DaBramo, Tom Whitmore, Carolyn Meisel, Mark Sullivan, Julie Brocklehurst-Woods , Geoff Clough Absent: Marcia Podhorecki Staff: Debby Emerson, Sarah Matthews, Marcia Koch Guest: Alan Rudgers, Clerk of Works Call to order at 4:02 by President Mike DaBramo Adoption of the Agenda: motion by Mark, second by Julie, passed Calendar items were reviewed, we seem to be on schedule. Elections will be discussed later in this meeting. Approval of Consent Agenda to include: Adopt the minutes of the regular Board meeting on March 12, 2020; and the Special Board meeting on March 15, 2020. Treasurer’s report; Children’s Librarian reports that Story Time is being posted on YouTube, providing these patrons with comfort and continuity. Director reports that full-time staff are working at home. Michael comes in to manage the bills. PT staff work mostly at the check-out desk. At home they have been pursuing and keeping track of online educational opportunities and more familiarity with library holdings and resources. This approval was moved by Julie, second by Mark, passed. Reports a. Financial reports and approval of bills (warrants): Marcia reported that there are no real problems, but details to work out. Construction funds will be grouped together in our next report. Current funds available to pay for construction include $169,000 in checking account, $400,000 in our Money Market account, and we can access additional RACF funds. We will be paying directly for the storage pod. b. Approval of pre-audit payments from 3/13-4/10 : Motion by Tom, second by Mark, passed c.
    [Show full text]
  • Data Center Physical Infrastructure for Enterprise Wireless Lans
    Data Center Physical Infrastructure for Enterprise Wireless LANs White Paper 84 Revision 1 by Viswas Purani Contents > Executive summary Click on a section to jump to it Introduction 2 Wireless LAN (WLAN) deployments can result in unexpected or unplanned power, cooling, management Wireless access points 3 and security requirements. Most wiring closets do not have uninterruptible power supplies (UPS), and they do Intermediate distribution 5 not provide adequate ventilation or cooling required to frame (IDF) prevent equipment overheating. Understanding the Main distribution frame (MDF) 8 unique data center physical infrastructure (DCPI) requirements of WLAN equipment allows planning for a Data center or server farm 10 successful and cost effective deployment. This paper explains how to plan for DCPI while deploying indoor Conclusion 12 WLANs in small, medium or large enterprise, with Resources 13 emphasis on power and cooling. Simple, fast, reliable, and cost effective strategies for upgrading old facilities or building new facilities are described. RATE THIS PAPER white papers are now part of the Schneider Electric white paper library produced by Schneider Electric’s Data Center Science Center [email protected] Data Center Physical Infrastructure for Enterprise Wireless LANs Introduction Data center physical infrastructure (DCPI) is the foundation upon which all highly available networks reside but is often ignored. It has to be resilient, scalable, highly available, and manageable. DCPI consists of: 1. Power systems such as UPS, power distribution units (PDU), and generators to pro- vide uninterrupted conditioned power to the critical loads. 2. Cooling systems that provide optimal environment by regulating temperature and humidity 3. Racks that house the critical network equipment like switches, routers, gateways, servers etc.
    [Show full text]
  • BASIS of DESIGN REPORT Hard Rock Hotel and Casino Catoosa, Oklahoma
    Mechanical/Electrical Engineering Consultants Buffalo • Rochester • Syracuse • Schenectady BASIS OF DESIGN REPORT Hard Rock Hotel and Casino Catoosa, Oklahoma ERA JCJ Architecture, Inc. 1401 South Denver Avenue - Suite B 20 Huyshope Avenue - Suite 400 Tulsa, Oklahoma 74119 Hartford, Connecticut 06106 February 2, 2018 M/E Reference 171301.00 Driven Solutions - Value www.meengineering.com HARD ROCK HOTEL AND CASINO BASIS OF DESIGN REPORT CATOOSA, OKLAHOMA FEBRUARY 2, 2018 TABLE OF CONTENTS PAGE I. FIRE PROTECTION DESIGN AND SYSTEM DESCRIPTION 1 - 3 II. LIGHTING DESIGN AND SYSTEM DESCRIPTION 4 - 7 III. LOW VOLTAGE DESIGN AND SYSTEM DESCRIPTION 8 - 10 M/E Reference 171301.00 TOC - 1 HARD ROCK HOTEL AND CASINO BASIS OF DESIGN REPORT CATOOSA, OKLAHOMA FEBRUARY 2, 2018 I. FIRE PROTECTION DESIGN AND SYSTEM DESCRIPTION A. Design Criteria 1. Systems will be designed in accordance with, but not limited to, the following Codes: a. 2015 International Fire Code b. 2015 International Building Code c. National Fire Protection Association 101, Life Safety Code 2. Standards: a. Systems shall be designed in accordance with, but not limited to, the following standards: 1) NFPA 13 Standard for the Installation of Sprinkler Systems 2) NFPA 20 Standard for the Installation of Fire Pumps 3) NFPA 24 Standard for the Installation of Private Fire Service 4) Mains and their Appurtenances 5) FM Factory Mutual 6) UL Underwriter's Laboratories, Inc. 7) LEED Version 209 New Construction 3. Equipment and Materials: a. Systems shall be designed in accordance with, but not limited to, the following manufacturers equipment: 1) Fire Pump Allis-Chalmers, Patterson, Peerless 2) Sprinkler Equipment Reliable, Viking, Victaulic b.
    [Show full text]