PROGRESS REPORT up to MARCH 2016 Status of Powergrid Projects

Total Page:16

File Type:pdf, Size:1020Kb

PROGRESS REPORT up to MARCH 2016 Status of Powergrid Projects PROGRESS REPORT UP TO MARCH 2016 Rs. in Crore Annexure_I(A) Status of Powergrid Projects: Transmission Lines PART - I : पारेषण लाईनस TRANSMISSION LINES लंबाई भा.स./िन. लागत संपूित मांक पारेषण लाईन का नाम Remarks / Constraints & assistance (सीकेएम) मं (अनुमोिदत ल Sl. No. Name of the Trans line required. Length अनुमोदन ) /ािशत Completi Sch. IA / ा./ BPTA* वा. whichever Ant./ Act. later EASTERN REGION Transmission System for Development of Gen. project delayed Pooling Station in Northern region Part of (ant. in 2017 -18). Works slowed down 1. 168 Apr'10 4404.57 Jan'15 Mar'17 West Bengal and Transfer of Power from to the extent feasible to match BHUTAN to NR/WR. Genaration. LILO of Bishwanath Chariali - Agra HVDC line at Work under progress. 1.1 New Pooling Station in Alipurduar for parallel 24 Sep'16 Commissioning matching with operation of the HVDC stn. associated HVDC terminal. LILO of 400KV D/C Bongaigaon - Siliguri line Completion matching with Alipurduar 1.2 (Pvt. Sector line) at New Pooling Station in 13 Sep'16 PS. Alipurduar LILO of 400KV D/C Tala - Siliguri line at New 1.3 SCOPE DELETED. Pooling Station in Alipurduar Wild life sanctuary involved. Case 400KV D/C Punatsangchu-1 (Gen. Proj. in processed at NBWL & forwarded to 1.4 Bhutan) - Alipurduar line (HTLS Cond.) India 128 Mar'17 State for further processes. Portion. Gen. expected beyond 2017-18. LILO of 220KV D/C Birpara - Salakati line at Completion matching with Alipurduar 1.5 3 Sep'16 New Pooling Station in Alipurduar PS. POWERGRID TL - Page 1 of 5 CEA Mar'16 PROGRESS REPORT UP TO MARCH 2016 Rs. in Crore लंबाई भा.स./िन. लागत संपूित मांक पारेषण लाईन का नाम Remarks / Constraints & assistance (सीकेएम) मं (अनुमोिदत ल Sl. No. Name of the Trans line required. Length अनुमोदन ) /ािशत Completi Sch. IA / ा./ BPTA* वा. whichever Ant./ Act. later Transmission System for Transfer of Power May'10/ Jan'13/ 2. from Generation Project in SIKKIM to 52 390.51 May'16 ICT-II expected by May'16 Mar'16 Mar'16 NR/WR Part - A. LILO of Siliguri (Existing) - Purnea 400KV D/C 2.1 16 Mar'16 Line commissioned in Mar'16. line (Q) at New Pooling station at Kishanganj LILO of Siliguri - Dalkhola 220KV D/C line at 2.2 36 Mar'16 Line commissioned in Mar'16. New Pooling station Kishanganj July'10/ Nov'12/ 3. Eastern Region Strengthening Scheme - III 716 1731.1 Mar'17 Mar'16 Dec'16 Completion matching with Daltanganj S/s delayed due to non-availibility of 3.1 400KV D/C Sasaram - Deltonganj line 392 Mar'17 sub station land (land acquired in May'15). LILO of 400KV D/C Baripada - Mendhasal at Completion matching with Pandiabil sub 3.2 Pandiabil 56 May'16 station. (In place of 400KV D/C Mendhasal-Uttra line) LILO of 400KV D/C Kahalgaon - Biharshariff line 3.3 64 Mar'14 Line commissioned in Mar'14 (Ist line) at Lakhisarai LILO of 400KV D/C Kahalgaon - Biharshariff line 3.4 56 Nov'12 Line commissioned in Nov'12. (2nd line) at Banka LILO of 400KV S/C Meramundali - Jeypore line 3.5 42 Aug'12 Line commissioned in Aug'12. at Bolangir LILO of 400KV S/C Rengali - Baripada line at 3.6 18 Jan'13 Line commissioned in Jan'13. Keonjhar POWERGRID TL - Page 2 of 5 CEA Mar'16 PROGRESS REPORT UP TO MARCH 2016 Rs. in Crore लंबाई भा.स./िन. लागत संपूित मांक पारेषण लाईन का नाम Remarks / Constraints & assistance (सीकेएम) मं (अनुमोिदत ल Sl. No. Name of the Trans line required. Length अनुमोदन ) /ािशत Completi Sch. IA / ा./ BPTA* वा. whichever Ant./ Act. later Line ready for commissioning in Jul'15 LILO of 400KV D/C (one ckt) Baripada - 3.7 32 Jul'15 & commissioned alongwith extn. of Mendhasal line at Dubri (OPTCL) Dubri (OPTCL) S/s in Aug'15 LILO of 400KV D/C (both ckt) Jamshedpur - Line charged & ready for 3.8 56 Nov'14 Rourkela line at Chaibasa commissioning in Nov'14. Transmission System for Phase-I Generation Sep'10/ Mar'13/ 4. 689 2348.37 Jan'16 Projects in ORISSA- Part- A. Feb'15 Jun'15 765KV S/C Angul Pooling station - Jharsuguda 4.1 Pooling station line -I 274 Mar'15 Line commissioned in Mar'15. (Incl. Common D/C portion -212 locs. of total line) 765KV S/C Angul Pooling station - Jharsuguda 4.2 284 Jan'16 Line commissioned in Jan'16 Pooling station line -II Ckt-I of LILO line commissioned in LILO of 400KV D/C Rourkela - Raigarh at 4.3 88 May'13 Mar'13 (44 Ckm) & Ckt-II in May'13 Jharsuguda Pooling stn. (44 Ckm). LILO of 400KV S/C Meramunali - Jeypore at 4.4 9 Mar'13 LILO line commissioned in Mar'13. Angul Pooling stn. LILO of one ckt 400KV D/C Talchar - 4.5 34 Mar'14 Line commissioned in Mar'14. Meramundali at Angul Pooling station. Transmission System for Transfer of Power 5. from Generation Project in SIKKIM to 789 Mar'11 1585.12 Nov'13 Apr'16 NR/WR Part - B. 5.1 400KV D/C Kishanganj - Patna line (Quad) 692 Mar'16 Line commissioned in Mar'16. POWERGRID TL - Page 3 of 5 CEA Mar'16 PROGRESS REPORT UP TO MARCH 2016 Rs. in Crore लंबाई भा.स./िन. लागत संपूित मांक पारेषण लाईन का नाम Remarks / Constraints & assistance (सीकेएम) मं (अनुमोिदत ल Sl. No. Name of the Trans line required. Length अनुमोदन ) /ािशत Completi Sch. IA / ा./ BPTA* वा. whichever Ant./ Act. later Ckt-I (7 Ckm) commissioned in Apr'14 LILO of 400KV D/C Teesta-V - Siliguri line at 5.2 15 Oct'14 & Ckt-II ( 8 ckm) commissioned in Rangpo (1 D/C & 1.5 M/C) Oct'14. LILO - IN portion completed & test LILO of Teesta-III - Kishanganj 400KV D/C (Q) charged in Mar'16. 5.3 at Rangpo (21 D/C+1.5 M/C) 21 Apr'16 LILO - OUT now being proposed for (being constructed under JV route) deferement due to delayed clearance/Generation. 220KV D/C Rangpo - New Melli line (twin 5.4 54 May'15 Line commissioned on 19.05.15 moose) (20.5 D/C & 1.5 M/C) Ckt-I commissioned in Apr'14 LILO of 132KV S/C Gangtok - Rangit line at 5.5 7 Nov'14 (terminated as Chuzachan)-1 Ckm. Rangpo Balance commissioned in Nov'14. Transmission System for Phase-I Generation Gen. Project delayed 6. Projects in Jharkhand and West Bengal - Part - 372 Oct'11 558.26 Nov'13 Jun'16 (ant. in 2016-17 & beyond) A1. Testing under progress. Completion 400KV D/C Ranchi - Jharkhand Pooling Stn. line 6.1 138 Jun'16 matching with Jharkhand Pool & (Quad) Jharkhand Pool bay at line. Permission to work received in May'15. 6.2 400KV D/C Jharkhand Pool - Gaya line (Quad) 234 Jun'16 Repeated stoppage of work by extremists affecting progress. Split Bus Arrangement for avrious Sub Mar'13 / Jun'14 / 7. 56 146.73 May'16 Stations in Eastern Region Jan'16 Mar'16 POWERGRID TL - Page 4 of 5 CEA Mar'16 PROGRESS REPORT UP TO MARCH 2016 Rs. in Crore लंबाई भा.स./िन. लागत संपूित मांक पारेषण लाईन का नाम Remarks / Constraints & assistance (सीकेएम) मं (अनुमोिदत ल Sl. No. Name of the Trans line required. Length अनुमोदन ) /ािशत Completi Sch. IA / ा./ BPTA* वा. whichever Ant./ Act. later 400KV D/C trans. Line for swapping of Purnea ROW problem being encountered. 7.1 baya (1&2) with Sasaram bays (#3&4) at 10 May'16 Critical. Biharshariff S/Stn. 400KV D/C trans. Line for swapping of 7.2 Kahalgaon #1 bay with Sasaram # 1 bay at 20 Apr'15 Commissioned in Apr'15. Biharshariff S/Stn. 400KV D/C trans. Line for reconfiguration of Bay at NTPC yet to be awarded. Critical 7.3 Biharshariff Ckt III&IV from its present position 26 May'16 to St.-II side of Kahalgaon Sw. yd. of NTPC 8. Eastern Region Strengthening Scheme-V 961 Oct'13 1364.52 Apr'16 Sep'16 400KV D/C Rajarhat - Purnea line (Tripal) 8.1 (with LILO of one ckt at Gokarana (WBSETCL) 953 Sep'16 Severe ROW problem in Jharkhand area. & other ckt at Farraka (NTPC). LILO of Subhashgram -Jeerat 400KV S/C line at 8.2 8 Jun'16 Rajarhat 9. Eastern Region Strengthening Scheme - XIII 86 May'14 121.38 Nov'16 Mar'16 Re- conductoring of 400KV D/C Farakka-Malda 9.1 86 Mar'16 Line charged in Mar'16 line (HTLS Cond.) with associated bays. Transmission System Associated with Darlipalli 10. 148 Jan'16 187.04 Jun'18 Jun'18 Compln Sch. 29 months from IA. TPS 765KV D/C Darlipalli TPS - Jharsuguda 10.1 148 Jun'18 Award placed in Jan'16. (Sundergarh) Pooling Stn. line POWERGRID TL - Page 5 of 5 CEA Mar'16 PROGRESS REPORT UP TO MARCH 2016 Annexure_I(B) Status of Powergrid Projects: Sub Station PART - II : सब ेशन SUBSTATION एम.वी.ए भा.स./िन.मं ईरेकशन संपूित ल अनुपात अनुमोदन ठेकेदार Completion Tgt. मांक सब ेशन का नाम MVA GoI / BoD Erection Schedule / ािशत Remarks Sl. No.
Recommended publications
  • Kishanganj Introduction
    DISTRICT PROFILE KISHANGANJ INTRODUCTION Kishanganj district is one of the thirty-eight districts of Bihar. Kishanganj district is a part of Purnea division. Kishanganj is situated in the northeastern part of Bihar and is is part of the chicken neck on the map of India. Kishanganj has an international border with Nepal and a narrow strip of 20 km land of West Bengal separates Kishanganj district from Bangladesh. Kishanganj district is surrounded by the districts of Araria and Purnea of Bihar, districts of Uttar Dinajpur and Darjeeling of West Bengal and Nepal in the north. The important rivers flowing from the district are Mahananda, Kankai, Mechi, Doictnk, Ratua, Ramzan and Sudhani. HISTORICAL BACKGROUND Kishanganj is the distortion of the name Krishna-Kunj. During the Mughal period, Kishanganj district was the part of Nepal and was known as Nepalgarh. Nepalgarh was captured during the reign of Mughal Emperor Shah Alam and renamed as Alamganj in his honour. Khagara was made the administrative headquarters and the historical "Khagra Mela" is held here every year. During the Mughal rule under Nawab Mohammed Fakiruddin, a wandering Hindu saint refused to enter Amanganj despite being very tired because the names of the place, river and Nawab were Alamganj, Ramzan and Fakiruddin respectively. When the Nawab heard this grievance of the itinerant saint, he announced that some portion of land would be renamed as Krishna-Kunj. With passage of time, the name Krishna-Kunj got distorted to Kishanganj. Kishanganj was earlier an important sub-division of the erstwhile Purnea district and became an independent district on 14th January 1990.
    [Show full text]
  • Deo List Bihar
    Details of DEO-cum-DM Sl. No. District Name Name Designation E-mail Address Mobile No. 1 2 3 4 5 6 1 PASCHIM CHAMPARAN Kundan Kumar District Election Officer [email protected] 9473191294 2 PURVI CHAMPARAN Shirsat Kapil Ashok District Election Officer [email protected] 9473191301 3 SHEOHAR Avaneesh Kumar Singh District Election Officer [email protected] 9473191468 4 SITAMARHI Abhilasha Kumari Sharma District Election Officer [email protected] 9473191288 5 MADHUBANI Nilesh Ramchandra Deore District Election Officer [email protected] 9473191324 6 SUPAUL Sri Mahendra KUMAR District Election Officer [email protected] 9473191345 7 ARARIA Prashant Kumar District Election Officer [email protected] 9431228200 8 KISHANGANJ Aditya Prakash District Election Officer [email protected] 9473191371 9 PURNIA Rahul Kumar District Election Officer [email protected] 9473191358 10 KATIHAR Kanwal Tanuj District Election Officer [email protected] 9473191375 11 MADHEPURA Navdeep Shukla District Election Officer [email protected] 9473191353 12 SAHARSA Kaushal kumar District Election Officer [email protected] 9473191340 13 DARBHANGA Shri Thiyagrajan S. M. District Election Officer [email protected] 9473191317 14 MUZAFFARPUR Chandra Shekhar Singh District Election Officer [email protected] 9473191283 15 GOPALGANJ Arshad Aziz District Election Officer [email protected] 9473191278 16 SIWAN Amit Kumar Pandey District Election Officer [email protected] 9473191273 17 SARAN Subrat Kumar Sen District
    [Show full text]
  • BIHAR STATE POWER TRANSMISSION COMPANY LIMITED (Reg
    BIHAR STATE POWER TRANSMISSION COMPANY LIMITED (Reg. Office: 4th Floor, Vidyut Bhawan, Bailey Road, Patna-800021) (CIN- U40102BR2012SGC018889) (Department of Power Management Cell) Para wise reply of BSPTCL on the queries raised by Hon’ble Commission as additional information / clarification of BSPTCL – Tariff Petition for control period from FY 2019-20 to FY 2021-22 vide letter no.- 1514, dated – 19/12/2018 with reference to BERC Case No.- 51/2018 Point No. 1- The additional submission on the queries raised by Hon’ble Commission has been submitted vide letter no.- 379, dated – 20/12/2018 and Revised Business Plan as well additional information has also been submitted vide letter no.- 389, dated – 28/12/2018 Point No. 2- Scheme wise and element wise capitalization details for FY 2017-18 is as under: Sl No Scheme Particulars of Element Amount (In Rs.) DOC 132 kv Begusarai to teghara 1 State Plan 19,58,78,742.00 23-02-2018 trns line 132 kv Dalkhola to 2 State Plan 49,67,567.00 20-01-2018 kishanganj trns line 132 KV Fatuha - Gaighat - 3 State Plan 24,24,57,110.00 29-03-2018 Katra 132 KV Gaurichak to 4 State Plan 19,55,79,724.00 29-03-2018 Jakkanpur 132 KV Gaurichak to 5 State Plan 15,53,43,337.00 28-02-2018 Mithapur & Fatuha 132 kv kishanganj to Barsoi 6 State Plan 50,49,58,869.00 06-02-2018 trns line 132 kv Kishanganj to 7 State Plan 1,87,35,979.00 11-04-2017 Farbisganj trns line 132 kv Purnea to saharsha 8 State Plan 64,51,158.00 18-12-2017 trns line 132 kv Pusauli to Bhabhua 9 State Plan 16,81,12,826.00 08-09-2017 Trans line 132 kv Sonbarsha
    [Show full text]
  • Market Survey Report Year : 2011-2012
    GOVERNMENT OF WEST BENGAL AGRICULTURAL MARKET DIRECTORY MARKET SURVEY REPORT YEAR : 2011-2012 DISTRICT : UTTAR DINAJPUR THE DIRECTORATE OF AGRICULTURAL MARKETING P-16, INDIA EXCHANGE PLACE EXTN. CIT BUILDING, 4 T H F L O O R KOLKATA-700073 THE DIRECTORATE OF AGRICULTURAL MARKETING Government of West Bengal LIST OF MARKETS Uttar Dinajpur District Sl. No. Name of Markets Block/Municipality Page No. 1 Andraguri Hat Chopra 1 2 Bhaispitta Hat - do - 2 3 Butijhari Hat - do - 3 4 Chopra Hat - do - 4 5 Daspara Hat - do - 5 6 Dhanish Hat - do - 6 7 Dhumdangi Hat - do - 7 8 Dighabara Hat - do - 8 9 Dighalgao Hat - do - 9 10 Doluya Hat - do - 10 11 Gendagachh Hat - do - 11 12 Goabari Hat - do - 12 13 Haptiyagachh Hat - do - 13 14 Kachakhati Hat - do - 14 15 Kaliganj Hat - do - 15 16 Katchakai Hat - do - 16 17 Lakhipur Bazar & Hat - do - 17 18 Lalbazar Hat - do - 18 19 Malingram Hat - do - 19 20 Nandhigach Hat - do - 20 21 Narayanpur Hat - do - 21 22 Sonarpur Hat - do - 22 23 Tinmail Road Bazar - do - 23 24 Dalkhola Market Municipality Dalkhola Municipality 24 25 Dhankoil Hat - do - 25 26 Biprit Hat Goalpokher- I 26 27 Debiganj Hat - do - 27 28 Dharmpur Hat - do - 28 29 Goda Hat - do - 29 30 Goti Hat - do - 30 31 Jhiljhili Hat - do - 31 32 Kulauitta Hat - do - 32 33 Nando Hat - do - 33 34 Pamal Hat - do - 34 35 Panjipara Hat - do - 35 36 Sahapur Hat - do - 36 37 Showlpara Hat - do - 37 38 Verestran Hat - do - 38 39 Chakulia Hat Goalpokher- I I 39 40 Godasimul Hat - do - 40 41 Goudal Hat - do - 41 42 Jhitakia Hat - do - 42 43 Kanki Hat - do - 43 44 Manora Hat - do - 44 45 Samspur - do - 45 46 Sisabari Hat - do - 46 47 Surjapur Hat - do - 47 48 Agdimti Hat Islampur 48 49 Amalihjhari Hat - do - 49 50 Ataldanghi Bazar - do - 50 51 Bhadrakali Hat - do - 51 52 Bhotaldangi Bazar - do - 52 53 Bhujaganj Hat - do - 53 54 Dhantala Hat - do - 54 55 Digirpara Bazar - do - 55 Sl.
    [Show full text]
  • Central Electricity Regulatory Commission New Delhi
    CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Petition No. 258/TT/2015 Coram: Shri A.S. Bakshi, Member Dr. M.K. Iyer, Member Date of Hearing : 29.04.2016 Date of Order : 26.05.2016 In the matter of: Determination of transmission tariff for 2014-19 for LILO-I of Siliguri - Purnea 400 kV D/C line at new pooling station Kishanganj and associated bays at Kishanganj, LILO-II of Siliguri - Purnea 400 kV D/C line at new pooling station Kishanganj and associated bays at Kishanganj, LILO-I of Siliguri - Dalkhola 220 kV D/C line at new pooling station Kishanganj and associated bays at Kishanganj, LILO-II of Siliguri - Dalkhola 220 kV D/C line at new pooling station Kishanganj and associated bays at Kishanganj, 500 MVA, 400/220/33 kV ICT II along with associated bays at Kisanganj Substation, 125 MVAR Bus reactor I at Kisanganj Substation, 500 MVA, 400/220/33 kV ICT I along with associated bays at Kisanganj Substation, 125 MVAR Bus reactor II at Kisanganj Substation under ―Transmission System for ―Transfer of Power from Generation Projects in Sikkim to NR/WR Part-A‖ in Eastern Region‖ for the 2014-19 tariff period under Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014 and Regulation 86 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999. And in the matter of: Power Grid Corporation of India Ltd. ‗SAUDAMINI‘, Plot No-2, Sector-29, Gurgaon -122 001 (Haryana). ………Petitioner Versus 1. Gati Infrastructure Chuzachen Ltd. 1-7-293, MG Road, 268 Udyog Vihar, Phase-IV, Secunderabad, Andhra Pradesh – 500003 2.
    [Show full text]
  • Purnea Introduction
    DISTRICT PROFILE PURNEA INTRODUCTION Purnea district is one of the thirty-eight administrative districts of Bihar state. Purnea district is a part of Purnea division. Purnea is bounded by the districts of Araria, Katihar, Bhagalpur, Kishanganj, Madhepura and Saharsa and district of West Dinajpur of West Bengal. The major rivers flowing through Purnea are Kosi, Mahananda, Suwara Kali, Koli and Panar. Purnea district extends northwards from river Ganges. Purnia has seen three districts partitioned off from its territory: Katihar in 1976, and Araria and Kishanganj in 1990. Purnea with its highest rainfall in Bihar and its moderate climate has earned the soubriquet of 'Poor's man's Darjeeling’. HISTORICAL BACKGROUND Purnea has a rich history and a glorious past. It is believed that the name Purnea originates either from the Goddess Puran Devi (Kali) or from Purain meaning Lotus. The earliest inhabitants of Purnea were Anas and Pundras. In the epics, the Anas are grouped with the Bengal tribes and were the eastern most tribes known to the Aryans during the period of Atharva Samhita while the Pundras, although they had Aryan blood were regarded as degraded class of people in the Aitarya Brahmana, Mahabharata and Manu Samhita, because they neglected the performance of sacred rites. According to the legend of Mahabharata, Biratnagar which gave shelter to the five Pandava brothers during their one year incognito exile, is said to be located in Purnea. During the Mughal rule, Purnea was a military frontier province under the command of a Faujdar. The revenue from this outlying province was spent on the maintenance of troops for protecting the borders against tribes from the north and east.
    [Show full text]
  • State: Bihar Agriculture Contingency Plan for District: Araria
    State: Bihar Agriculture Contingency Plan for District: Araria KRISHI VIGYAN KENDRA, ARARIA 1.0 District Agriculture profile 1.1 Agro-Climatic/Ecological Zone Agro Ecological Sub Region (ICAR) Eastern Plain, Hot Subhumid (moist) Eco-sub region (13.1) Agro-Climatic Zone (Planning Middle Gangetic Plain Region (IV) Commission) District agriculture profile Agro Climatic Zone (NARP) North East Alluvial Plain Zone (BI-2) List all the districts or part thereof falling Begusarai, Saharsa, Supaul, Madhepura, Purnea , Kishanganj, Araria, Katihar under the NARP Zone Geographic coordinates of district Latitude Longitude Altitude headquarters 26° 8’ 59” 87° 31’ 11” 47 m above MSL Name and address of the concerned ZRS/ RRS, Agwanpur ZARS/ RARS/ RRS/ RRTTS Mention the KVK located in the district KVK Araria 1.2 Rainfall Normal RF (mm) Normal Onset Normal Cessation SW monsoon (June-Sep): 1358.2 3rd week of June 3rd week of September NE Monsoon(Oct-Dec): 92.1 Winter (Jan- March) 209.4 Summer (Apr-May) 20.5 Annual 1608 1 1.3 Land use Geographical Cultivable Forest Land under Permanent Cultivable Land Barren and Current Other pattern of the area area area non- pastures wasteland under uncultivable fallows fallows district (latest agricultural use Misc. land statistics) tree crops and groves Area (‘000 ha) 268.5 160.3 0.84 56.69 0.70 1.24 13.19 6.57 19.5 9.49 1. 4 Major Soils (common names like red Area (‘000 ha) Percent (%) of total sandy loam deep soils (etc.,)* Sandy to sandy loam 190 71 Clay loam to clay 78 29 * mention colour, depth and texture (heavy,
    [Show full text]
  • Sphere India Unified Response Strategy SITUATION REPORT NO. 1
    Sphere India Unified Response Strategy SITUATION REPORT NO. 1 15th April 2010 PART 1: SITUATION REPORT: BIHAR: The tornado, packing winds between 80 and 125 kmph, ripped through more than one lakh houses in Bihar’s Araria, Purnia, Katihar and Kishanganj districts. "From the extent of twisted trees and poles, the depth of thundercloud and volume of devastation, it appears to be a tornado," said G C Debnath, Director, Regional Meteorological Centre, Alipore. "The casualties were high because the storm struck when people had retired for the night and were caught unawares." Purnea District: According to the Government Report, 39 people died in Purnea. A compensation of Rs. 1.5 lakh was given to 14 affected families and the rest will be covered by tomorrow. There are reports of huge loss of houses. So far, no relief material is distributed by the government. Affected people have moved to temporary shelters in the village schools. The worst affected blocks include Amor and Baisi. Supaul District: The worst affected blocks include, Sarai Garh, Nirmaili,Maurana and Kishanpur. Moderately affected blocks include Chattarpur, Treveniganj and Supul. According to the government records, there were two deaths reported in Sarai Garh and one death in Maurauna. A compensation of Rs. 50,000 was released to the deceased families. Around 1000 houses were reported to be damaged. Human Loss: S.No. Name of the District Human Loss 1 Purnea 39 2 Araria 33 3 Katihar 07 4 Kishanganj 01 5 Supaul 01 Total 81 WEST BENGAL: A tornado struck parts of Uttar Dinajpur district, West Bengal, (about 400 kms north of Kolkata), at about 00.00 hours on the night of 14, April 2010.
    [Show full text]
  • Presentations on District and Agencies' Profile
    Presentation on Review & Consultation Workshop from (6 Jan to 7 Jan, 2016) for Multi-Hazard District Disaster Management Plan By: Poorvanchal Gramin Vikas Sansthan (PGVS) B1/19 Vineet Khand, Gomti Nagar, Lucknow Uttar Pradesh-226010 Target districts of Purnia division Rivers Flowing from Nepal to Bihar PGVS team for coordination and Facilitation at top to down level Kumari Usha Ram Kishor Seven River Zones Zone iv iv) Kosi-Mahananda Zone consisting of Madhepura, Araria, Purnia, Kishanganj and Katihar districts. 1- Salient Points Covered in Inception Report and issues presented during Inception Workshop Sr. Points covered Purnea Araria Kishanganj Katihar No. 1. Hazards Mapping 1.1 Flood with rivers details 2. Social Vulnerabilities 2.1 Human losses 2.2 Total affected population in Lakh 11.28 3. Economical Vulnerabilities 3.1 Details of flood affected agriculture land 3.2 Livestock losses 4. Physical Vulnerabilities 4.1 House damage details 4.2 Details of sensitive places of the embankment 4.3 Total Flood affected G P 110 54 132 4.4 Total Flood affected Revenue 402 108 164 497 villages Continue--- Sr. Points covered Purnea Araria Kishanganj Katihar No. 5. Capacities 5.1 List of trained person on 40 80 10 (Police LS&R Person – LS&R) 5.2 Trained Motorboat drivers 36 20 10 10 5.3 Trained Swimmers 35 10 36 5.4 Tent 734 200 5.5 List of trained home guard 40 10 who are involved in security work 5.6 List of identified helipad 10 44 5.7 Communication plan 5.8 Details of Relief distribution places 5.9 List of Functional rain fall monitoring stations 5.10 List of Identified safe and 165 51 raised places 5.11 Details of flood post 32 Continue--- Sr.
    [Show full text]
  • Kishanganj District -List of Shortlisted Candidates for the Post of Uddeepika
    Kishanganj District -List of Shortlisted Candidates for the Post of Uddeepika Applicati Percentag Date Of DD/IPO on Panchayat Name Block Name Candidate Name Father's/ Husband Name Correspondence Address Ctageory Permanent Address e Of Birth Number Number Marks S .No. 1 808 Altabari Bahadurganj HEMA DEVI MUKESH KUMAR RAI HEMA DEVI, C/O-SUKDEV LAL, VILL-BARA ALTABARI, PO-GANGI HAT 10-Aug-91 SC Same as above 54.00 71G 912904- 697 Altabari Bahadurganj TABASSUM JAHAN LATE MD. JAMALUDDIN VILL-ALTABARI, PO-GANGIGHAT, VIA KISHANGANJ 10-Apr-90 GENERAL Same as above 65.00 2 05 43G 150842- 337 Altabari Bahadurganj SEEMA PRAWEEN SLAM VILL- HAFTIYA, PO.- GANGI HAT 10-Jan-89 GENERAL Same as above 61.00 3 43 4 649 Altabari Bahadurganj BIBI RAFAT BEGUM TABREZ KHA VILL-KOIMARI, PO-BANGAMA HAT, PS-BAHADURGANJ, 15-Jul-86 GENERAL Same as above 9H 735532 73.00 43G 150923- 1126 Altabari Bahadurganj SHAGUFTA BEGAM MD. ASLAM ANJER VILL- ALTABARI, PO- GANNGHAT, PS- BAHADURGANJ, PIN- 855107 15-Mar-83 GENERAL Same as above 59.00 5 24 6 964 Altabari Bahadurganj TARANNUM JAHAN MAJHIR ALAM VILL- THARAKCHPUR, PO- NATWAPARA, PIN- 855107 25-Oct-88 BC Same as above 39H 410048 75.00 159 Altabari Bahadurganj NAJMIN NAJ MD. SIKANDER AJAM VILL- KOEMARI, PO- BANGAMA, PS- BAHADURGANJ, PINCODE- 855101 31-Dec-87 BC SAME AS ABOVE 9H 737048 70.00 7 8 943 Altabari Bahadurganj FARZANA BEGAM MAHIR ALAM VILL-WEST ALTABARI, PO-GANGAI HAT, PS-BAHADURGANJ 31-Jan-83 BC Same as above 9H 735760 78.00 21 Athgachhiya Dighalbank Lalita Ganesh Sanjay Kumar Ganesh Vill- Tangtangi, PO- Padampur, PS-Gandharvdanga, Via+Dist- Kishanganj.
    [Show full text]
  • Environmental Impact Assessment (Updated)
    Environmental Impact Assessment (Updated) September 2017 IND: Bihar New Ganga Bridge Project (Main Report) Prepared by Bihar State Road Development Corporation Limited, Government of Bihar for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 06 September 2017) Currency unit – Indian rupees (INR/Rs) Rs1.00 = $ 0.01559 $1.00 = Rs 64.122 ABBREVIATIONS AADT - Annual Average Daily Traffic AAQ - Ambient air quality AAQM - Ambient air quality monitoring ADB - Asian Development Bank AH - Asian Highway ASI - Archaeological Survey of India BDL - Below detectable limit BGL - Below ground level BOD - Biochemical oxygen demand BSRDCL - Bihar State Road Development Corporation Limited BOQ - Bill of quantity CCE - Chief Controller of Explosives CGWA - Central Ground Water Authority CITES - Convention on International Trade in Endangered Species CO - Carbon monoxide COD - Chemical oxygen demand CPCB - Central Pollution Control Board CSC - Construction Supervision Consultant DFO - Divisional Forest Officer DG - Diesel generating set DO - Dissolved oxygen DPR - Detailed project report E&S - Environment and social EA - Executing agency EAC - Expert Appraisal Committee EFP - Environmental Focal Person EHS - Environment Health and Safety EIA - Environmental impact assessment EMOP - Environmental monitoring plan EMP - Environmental management plan ESCAP - United Nations Economic and Social Commission for Asia and Pacific GHG - Greenhouse gas GIS - Geographical information system GOI - Government of India GRC - Grievance redress committee GRM - Grievance
    [Show full text]
  • Names of Trains
    NAMES OF TRAINS Agniveena Express 2341/ 2342 Howrah – Asansol (ER Howrah division) In Bangla it means “The Fiery Lute”. This is the name given to the collection of poems by the celebrated Bengali poet, musician, revolutionary and philosopher, Kazi Nazrul Islam. He was born in Burdwan district in 1899 and died in Dhaka in 1976. He is the national poet of Bangladesh, and also honoured in India. Ahilyanagari Express 6325/ 6326 Indore – Thiruvananthapuram Central (SR Thiruvananthapuram division) Rajmata Ahilyadevi Holkar (1725-1795, ruled 1767-1795) also known as the Philosopher Queen was a Holkar dynasty Queen of the Malwa kingdom. She took over reigns of the kingdom after the death of her husband and father-in-law. She moved the capital to Maheshwar south of Indore on the Narmada River. She also built temples and Dharamshalas (free lodging)at sacred sites outside her kingdom, at prominent religious places like Dwarka, Kashi Vishwanath in Varanasi, Ujjain, Nasik, Parli Vaijnath and Somnath. The city of Indore is sometimes called Ahilyanagari in her memory. Ahimsa Express 1095/ 1096 Ahmadabad – Pune (CR Pune division) The name is also sometimes given to 1087/ 1088 Veraval – Pune Express, 1089/ 1090 Jodhpur – Pune Express and 1091/ 1092 Bhuj – Pune Express, as all these trains are “derived” from 1095/ 1096. Ahimsa is a Sanskrit term meaning “to do no harm” (literally, the avoidance of violence or himsa). Ahimsa was one of the main principles which Gandhiji followed in his life. Pune was the place where Gandhiji was imprisoned and where his wife passed away, and Ahmadabad was where he set up his Ashram.
    [Show full text]