PROGRESS REPORT UP TO MARCH 2016 Rs. in Crore Annexure_I(A) Status of Powergrid Projects: Transmission Lines PART - I : पारेषण लाईनस TRANSMISSION LINES लंबाई भा.स./िन. लागत संपूित मांक पारेषण लाईन का नाम Remarks / Constraints & assistance (सीकेएम) मं (अनुमोिदत ल Sl. No. Name of the Trans line required. Length अनुमोदन ) /ािशत Completi Sch. IA / ा./ BPTA* वा. whichever Ant./ Act. later EASTERN REGION Transmission System for Development of Gen. project delayed Pooling Station in Northern region Part of (ant. in 2017 -18). Works slowed down 1. 168 Apr'10 4404.57 Jan'15 Mar'17 West Bengal and Transfer of Power from to the extent feasible to match BHUTAN to NR/WR. Genaration. LILO of Bishwanath Chariali - Agra HVDC line at Work under progress. 1.1 New Pooling Station in Alipurduar for parallel 24 Sep'16 Commissioning matching with operation of the HVDC stn. associated HVDC terminal. LILO of 400KV D/C Bongaigaon - Siliguri line Completion matching with Alipurduar 1.2 (Pvt. Sector line) at New Pooling Station in 13 Sep'16 PS. Alipurduar LILO of 400KV D/C Tala - Siliguri line at New 1.3 SCOPE DELETED. Pooling Station in Alipurduar Wild life sanctuary involved. Case 400KV D/C Punatsangchu-1 (Gen. Proj. in processed at NBWL & forwarded to 1.4 Bhutan) - Alipurduar line (HTLS Cond.) India 128 Mar'17 State for further processes. Portion. Gen. expected beyond 2017-18. LILO of 220KV D/C Birpara - Salakati line at Completion matching with Alipurduar 1.5 3 Sep'16 New Pooling Station in Alipurduar PS. POWERGRID TL - Page 1 of 5 CEA Mar'16 PROGRESS REPORT UP TO MARCH 2016 Rs. in Crore लंबाई भा.स./िन. लागत संपूित मांक पारेषण लाईन का नाम Remarks / Constraints & assistance (सीकेएम) मं (अनुमोिदत ल Sl. No. Name of the Trans line required. Length अनुमोदन ) /ािशत Completi Sch. IA / ा./ BPTA* वा. whichever Ant./ Act. later Transmission System for Transfer of Power May'10/ Jan'13/ 2. from Generation Project in SIKKIM to 52 390.51 May'16 ICT-II expected by May'16 Mar'16 Mar'16 NR/WR Part - A. LILO of Siliguri (Existing) - Purnea 400KV D/C 2.1 16 Mar'16 Line commissioned in Mar'16. line (Q) at New Pooling station at Kishanganj LILO of Siliguri - Dalkhola 220KV D/C line at 2.2 36 Mar'16 Line commissioned in Mar'16. New Pooling station Kishanganj July'10/ Nov'12/ 3. Eastern Region Strengthening Scheme - III 716 1731.1 Mar'17 Mar'16 Dec'16 Completion matching with Daltanganj S/s delayed due to non-availibility of 3.1 400KV D/C Sasaram - Deltonganj line 392 Mar'17 sub station land (land acquired in May'15). LILO of 400KV D/C Baripada - Mendhasal at Completion matching with Pandiabil sub 3.2 Pandiabil 56 May'16 station. (In place of 400KV D/C Mendhasal-Uttra line) LILO of 400KV D/C Kahalgaon - Biharshariff line 3.3 64 Mar'14 Line commissioned in Mar'14 (Ist line) at Lakhisarai LILO of 400KV D/C Kahalgaon - Biharshariff line 3.4 56 Nov'12 Line commissioned in Nov'12. (2nd line) at Banka LILO of 400KV S/C Meramundali - Jeypore line 3.5 42 Aug'12 Line commissioned in Aug'12. at Bolangir LILO of 400KV S/C Rengali - Baripada line at 3.6 18 Jan'13 Line commissioned in Jan'13. Keonjhar POWERGRID TL - Page 2 of 5 CEA Mar'16 PROGRESS REPORT UP TO MARCH 2016 Rs. in Crore लंबाई भा.स./िन. लागत संपूित मांक पारेषण लाईन का नाम Remarks / Constraints & assistance (सीकेएम) मं (अनुमोिदत ल Sl. No. Name of the Trans line required. Length अनुमोदन ) /ािशत Completi Sch. IA / ा./ BPTA* वा. whichever Ant./ Act. later Line ready for commissioning in Jul'15 LILO of 400KV D/C (one ckt) Baripada - 3.7 32 Jul'15 & commissioned alongwith extn. of Mendhasal line at Dubri (OPTCL) Dubri (OPTCL) S/s in Aug'15 LILO of 400KV D/C (both ckt) Jamshedpur - Line charged & ready for 3.8 56 Nov'14 Rourkela line at Chaibasa commissioning in Nov'14. Transmission System for Phase-I Generation Sep'10/ Mar'13/ 4. 689 2348.37 Jan'16 Projects in ORISSA- Part- A. Feb'15 Jun'15 765KV S/C Angul Pooling station - Jharsuguda 4.1 Pooling station line -I 274 Mar'15 Line commissioned in Mar'15. (Incl. Common D/C portion -212 locs. of total line) 765KV S/C Angul Pooling station - Jharsuguda 4.2 284 Jan'16 Line commissioned in Jan'16 Pooling station line -II Ckt-I of LILO line commissioned in LILO of 400KV D/C Rourkela - Raigarh at 4.3 88 May'13 Mar'13 (44 Ckm) & Ckt-II in May'13 Jharsuguda Pooling stn. (44 Ckm). LILO of 400KV S/C Meramunali - Jeypore at 4.4 9 Mar'13 LILO line commissioned in Mar'13. Angul Pooling stn. LILO of one ckt 400KV D/C Talchar - 4.5 34 Mar'14 Line commissioned in Mar'14. Meramundali at Angul Pooling station. Transmission System for Transfer of Power 5. from Generation Project in SIKKIM to 789 Mar'11 1585.12 Nov'13 Apr'16 NR/WR Part - B. 5.1 400KV D/C Kishanganj - Patna line (Quad) 692 Mar'16 Line commissioned in Mar'16. POWERGRID TL - Page 3 of 5 CEA Mar'16 PROGRESS REPORT UP TO MARCH 2016 Rs. in Crore लंबाई भा.स./िन. लागत संपूित मांक पारेषण लाईन का नाम Remarks / Constraints & assistance (सीकेएम) मं (अनुमोिदत ल Sl. No. Name of the Trans line required. Length अनुमोदन ) /ािशत Completi Sch. IA / ा./ BPTA* वा. whichever Ant./ Act. later Ckt-I (7 Ckm) commissioned in Apr'14 LILO of 400KV D/C Teesta-V - Siliguri line at 5.2 15 Oct'14 & Ckt-II ( 8 ckm) commissioned in Rangpo (1 D/C & 1.5 M/C) Oct'14. LILO - IN portion completed & test LILO of Teesta-III - Kishanganj 400KV D/C (Q) charged in Mar'16. 5.3 at Rangpo (21 D/C+1.5 M/C) 21 Apr'16 LILO - OUT now being proposed for (being constructed under JV route) deferement due to delayed clearance/Generation. 220KV D/C Rangpo - New Melli line (twin 5.4 54 May'15 Line commissioned on 19.05.15 moose) (20.5 D/C & 1.5 M/C) Ckt-I commissioned in Apr'14 LILO of 132KV S/C Gangtok - Rangit line at 5.5 7 Nov'14 (terminated as Chuzachan)-1 Ckm. Rangpo Balance commissioned in Nov'14. Transmission System for Phase-I Generation Gen. Project delayed 6. Projects in Jharkhand and West Bengal - Part - 372 Oct'11 558.26 Nov'13 Jun'16 (ant. in 2016-17 & beyond) A1. Testing under progress. Completion 400KV D/C Ranchi - Jharkhand Pooling Stn. line 6.1 138 Jun'16 matching with Jharkhand Pool & (Quad) Jharkhand Pool bay at line. Permission to work received in May'15. 6.2 400KV D/C Jharkhand Pool - Gaya line (Quad) 234 Jun'16 Repeated stoppage of work by extremists affecting progress. Split Bus Arrangement for avrious Sub Mar'13 / Jun'14 / 7. 56 146.73 May'16 Stations in Eastern Region Jan'16 Mar'16 POWERGRID TL - Page 4 of 5 CEA Mar'16 PROGRESS REPORT UP TO MARCH 2016 Rs. in Crore लंबाई भा.स./िन. लागत संपूित मांक पारेषण लाईन का नाम Remarks / Constraints & assistance (सीकेएम) मं (अनुमोिदत ल Sl. No. Name of the Trans line required. Length अनुमोदन ) /ािशत Completi Sch. IA / ा./ BPTA* वा. whichever Ant./ Act. later 400KV D/C trans. Line for swapping of Purnea ROW problem being encountered. 7.1 baya (1&2) with Sasaram bays (#3&4) at 10 May'16 Critical. Biharshariff S/Stn. 400KV D/C trans. Line for swapping of 7.2 Kahalgaon #1 bay with Sasaram # 1 bay at 20 Apr'15 Commissioned in Apr'15. Biharshariff S/Stn. 400KV D/C trans. Line for reconfiguration of Bay at NTPC yet to be awarded. Critical 7.3 Biharshariff Ckt III&IV from its present position 26 May'16 to St.-II side of Kahalgaon Sw. yd. of NTPC 8. Eastern Region Strengthening Scheme-V 961 Oct'13 1364.52 Apr'16 Sep'16 400KV D/C Rajarhat - Purnea line (Tripal) 8.1 (with LILO of one ckt at Gokarana (WBSETCL) 953 Sep'16 Severe ROW problem in Jharkhand area. & other ckt at Farraka (NTPC). LILO of Subhashgram -Jeerat 400KV S/C line at 8.2 8 Jun'16 Rajarhat 9. Eastern Region Strengthening Scheme - XIII 86 May'14 121.38 Nov'16 Mar'16 Re- conductoring of 400KV D/C Farakka-Malda 9.1 86 Mar'16 Line charged in Mar'16 line (HTLS Cond.) with associated bays. Transmission System Associated with Darlipalli 10. 148 Jan'16 187.04 Jun'18 Jun'18 Compln Sch. 29 months from IA. TPS 765KV D/C Darlipalli TPS - Jharsuguda 10.1 148 Jun'18 Award placed in Jan'16. (Sundergarh) Pooling Stn. line POWERGRID TL - Page 5 of 5 CEA Mar'16 PROGRESS REPORT UP TO MARCH 2016 Annexure_I(B) Status of Powergrid Projects: Sub Station PART - II : सब ेशन SUBSTATION एम.वी.ए भा.स./िन.मं ईरेकशन संपूित ल अनुपात अनुमोदन ठेकेदार Completion Tgt. मांक सब ेशन का नाम MVA GoI / BoD Erection Schedule / ािशत Remarks Sl. No.