STATUTORY INSTRUMENTS. S.I. No. 497 Of

Total Page:16

File Type:pdf, Size:1020Kb

STATUTORY INSTRUMENTS. S.I. No. 497 Of STATUTORY INSTRUMENTS. S.I. No. 497 of 2019 ________________ ELECTRICITY REGULATION ACT 1999 (PUBLIC SERVICE OBLIGATIONS) (AMENDMENT) ORDER 2019 2 [497] S.I. No. 497 of 2019 ELECTRICITY REGULATION ACT 1999 (PUBLIC SERVICE OBLIGATIONS) (AMENDMENT) ORDER 2019 I, RICHARD BRUTON, Minister for Communications, Climate Action and Environment, in exercise of the powers conferred on me by section 39 (amended by Regulation 22 of the European Communities (Internal Market in Electricity) Regulations 2005 (S.I. No. 60 of 2005)) of the Electricity Regulation Act 1999 (No. 23 of 1999) and the Communications, Energy and Geological Survey of Ireland (Transfer of Departmental Administration and Ministerial Functions) Order 2002 (S.I. No. 300 of 2002) (as adapted by the Communications, Energy and Natural Resources (Alteration of Name of Department and Title of Minister) Order 2016 (S.I. No. 421 of 2016)), following consultation with the Minister for Housing, Planning and Local Government (as adapted by the Housing, Planning, Community and Local Government (Alteration of Name of Department and Title of Minister) Order 2017 (S.I. 358 of 2017)), and having given a draft of this Order to the persons upon whom the obligation is to be imposed, hereby order as follows: 1. This Order may be cited as the Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2019. 2. In this Order “Order of 2018” means the Electricity Regulation Act 1999 (Public Service Obligations) (Amendment) Order 2018 (S.I. No. 403 of 2018). 3. The Electricity Regulation Act 1999 (Public Service Obligations) Order 2002 (S.I. No. 217 of 2002) is amended - (a) by the substitution of the Schedule set out in Schedule 1 to this Order for Schedule 3 (amended by Article 3(e) of the Order of 2018), (b) by the substitution of the Schedule set out in Schedule 2 to this Order for Schedule 4 (amended by Article 3(f) of the Order of 2018), and (c) by the substitution of the Schedule set out in Schedule 3 to this Order for Schedule 5 (amended by Article 3(g) of the Order of 2018). Notice of the making of this Statutory Instrument was published in “Iris Oifigiúil” of 11th October, 2019. [497] 3 SCHEDULE 1 Article 3 “Schedule 3 In this Schedule – ‘biomass’ means the biodegradable fraction of products, waste and residues from biological origin from agriculture (including vegetal and animal substances), forestry and related industries including fisheries and aquaculture, as well as the biodegradable fraction of industrial and municipal waste; ‘LFG’ means landfill gas; ‘CHP’ means combined heat and power; ‘small scale wind project’ means any wind-powered electricity generating plant with a maximum export capacity of or less than 5 MW which is connected directly to the electricity network and metered independently of any other electricity generating plant; ‘large scale wind project’ means an onshore wind project with a maximum export capacity greater than 5 MW which is connected directly to the electricity network and metered independently of any other electricity generating plant; ‘hydro project’ means any hydro-powered electricity generating plant with a maximum export capacity of or less than 5 MW which is connected directly to the electricity network and metered independently of any other electricity generating plant. 4 [497] (1) (2) (3) (4) (5) (6) (7) Ref. REFIT Supplier Electricity Generation plant Energy Capacity No. Power generator Description source of accepted Purchase electricity into Agreement REFIT Reference (MW) 1 REFIT Bord Gáis Jaroma Windfarm Toomyvara, Small Scale 2.550 1/5/1 Energy Limited Ltd. Ballinlough, Wind Project Co. Tipperary 2 REFIT Viridian Energy Reirk Energy Ltd. Dromdeeveen, Ballagh, Large Scale 10.500 1/5/2 Limited* Co. Limerick Wind Project 3 REFIT Bord Gáis Adeery Hydro Killybegs, Hydro Project 0.400 1/5/4 Energy Limited Co. Donegal 4 REFIT Viridian Energy Bawnmore Carriganima, Large Scale 14.990 1/5/5 Limited* Windfarm Ltd Macroom, Wind Project Co. Cork 5 REFIT Viridian Energy Muingnaminnane Muingnaminnane, Large Scale 15.300 1/5/6 Limited* Windfarms Ltd. Kielduff, Wind Project Tralee, Co. Kerry 6 REFIT ESBIE t/a Mountainlodge Mountain Lodge Large Scale 24.800 1/5/8 Electric Ireland Power Ltd. Co. Cavan Wind Project Ltd 7 REFIT Viridian Energy Tra Investments Ballincollig Hill and Large Scale 13.300 1/5/9 Limited* Ltd. Maghanknockane, Wind Project Tralee, Co. Kerry 8 REFIT SSE Airtricity Carrig Wind Farm Lacka, Carrig, Birr, Small Scale 2.550 1/5/20 Limited Ltd. Co. Offaly Wind Project 9 REFIT Viridian Energy Pallas Windfarm Pallas, Banemore, Large Scale 37.850 1/5/23 Limited* Ltd Listowel, Wind Project Co. Kerry 10 REFIT SSE Airtricity Mahon Hydro Mahon Bridge, Hydro Project 0.700 1/5/24 Limited Ltd. Kilmacthomas, Co. Waterford 11 REFIT Bord Gais Highland Wind Lurganboy, Rathmullan, Small Scale 4.980 1/5/25 Energy Limited Energy Co. Donegal Wind Project 12 REFIT Viridian Energy Corkermore Corkermore Windfarm, Large Scale 9.990 1/5/26 Limited* Windfarm Ltd Corkermore, Killybegs, Wind Project Co. Donegal 13 REFIT ESB Limerick County Gortadroma Landfill, Biomass LFG 1.300 1/5/27 Independent Council Ballyhahill, Energy Co. Limerick Limited**** 14 REFIT Viridian Energy Knocknalour Knocknalour, Bunclody, Small Scale 4.600 1/5/30 Limited* Wind Farm Ltd. Enniscorthy, Wind Project Co. Wexford 15 REFIT Gael Force Gairdini Lacka Cross, Biomass CHP 2.900 1/5/32 Power Limited Ballydesmond, Co. Cork 16 REFIT SSE Airtricity Tornado Beallough, Small Scale 1.700 1/5/33 Limited Electrical Ltd Portlaw, Wind Co. Waterford Project 17 REFIT Viridian Energy Ballybane Glanta Commons Wind Large Scale 19.550 1/5/34 Limited* Windfarms Ltd. Farm, Bantry, Wind Project Co. Cork [497] 5 (1) (2) (3) (4) (5) (6) (7) Ref. REFIT Supplier Electricity Generation plant Energy Capacity No. Power generator Description source of accepted Purchase electricity into Agreement REFIT Reference (MW) 18 REFIT SSE Airtricity Bindoo Windfarm Mountain Lodge, Large Scale 48.000 1/5/35 Limited (ROI) Ltd. Cootehill, Wind Project Co. Cavan 19 REFIT SSE Airtricity Midas Energy Inchee, Kilgarvan, Large Scale 18.000 1/5/36 Limited Ltd. Co. Kerry Wind Project 20 REFIT Viridian Energy Carrigcannon Carragraigue, Rathcoole, Large Scale 20.000 1/5/38 Limited* Wind Farm Ltd. Mallow, Wind Project Co. Cork 21 REFIT SSE Airtricity Kerry Power Ltd Foilgrenna, Kilgarvan, Small Scale 5.000 1/5/39 Limited Co. Kerry Wind Project 22 REFIT SSE Airtricity Everwind Ltd. Coom, Kilgarvan, Large Scale 6.800 1/5/40 Limited Co. Kerry Wind Project 23 REFIT Viridian Energy Mount Eagle Mount Eagle, Cordal, Small Scale 1.700 1/5/42 Limited* Windfarm Ltd. Castleisland, Wind Project Co. Kerry 24 REFIT Viridian Energy North West Wind Loughderry Duff Hill, Large Scale 7.650 1/5/43 Limited* Ltd. Ardara, Glenties, Wind Project Co. Donegal 25 REFIT SSE Airtricity Bioverda Power Arthurstown Landfill, Biomass LFG 4.260 1/5/44 Limited Systems Ltd Arthurstown, Kill, Co. Kildare 26 REFIT Electricity SWS Knockawarriga Large Scale 22.500 1/5/45 Supply Board Knockawarriga (Caherlevoy, Wind Project (ESB) Windfarm Ltd. Ballycommane and Glengort South) Mountcollins, Co. Limerick 27 REFIT SSE Airtricity Skehanagh Wind Skehanagh, Ballingarry, Small Scale 4.250 1/5/46 Limited Farm Ltd. Roscrea, Wind Project Co. Tipperary 28 REFIT Viridian Energy Airoshin Wind Meenachullalan, Large Scale 11.900 1/5/47 Limited* Energy Ltd. Killybegs, Wind Project Co. Donegal 29 REFIT SSE Airtricity Mullananalt Wind Mullananalt Windfarm, Large Scale 7.500 1/5/48 Limited Farm (ROI) Ltd. Latton, Ballybay, Wind Project Co. Monaghan 30 REFIT Viridian Energy Lackan Wind Lackan, Enniscrone, Large Scale 6.000 1/5/50 Limited* Energy Ltd. Co. Sligo Wind Project 31 REFIT BRI Sorne Wind Ltd. Sorne Hill, Buncrana, Large Scale 32.000 1/5/51 Green Energy Co. Donegal Wind Project Limited 32 REFIT SSE Airtricity Knockastanna Curraghfoil, Doon, Large Scale 7.500 1/5/53 Limited Windfarm (ROI) Co. Limerick Wind Project Ltd. 33 REFIT SSE Airtricity Limerick West Rathcahill West, Large Scale 12.500 1/5/54 Limited Windfarm Ltd Tournafulla, Wind Project Co. Limerick 34 REFIT SSE Airtricity Coomacheo Coomacheo, Millstreet, Large Scale 41.225 1/5/55 Limited Windfarm Ltd. Co. Cork Wind Project 6 [497] (1) (2) (3) (4) (5) (6) (7) Ref. REFIT Supplier Electricity Generation plant Energy Capacity No. Power generator Description source of accepted Purchase electricity into Agreement REFIT Reference (MW) 35 REFIT SSE Airtricity Richfield Richfield, Bridgetown, Large Scale 27.000 1/5/56 Limited Windfarm (ROI) Co. Wexford Wind Project Ltd. 36 REFIT SSE Airtricity Meentycat Ltd. Meentycat, Cark, Large Scale 14.000 1/5/57 Limited Co. Donegal Wind Project 37 REFIT SSE Airtricity Tournafulla Killaculleen, Large Scale 24.700 1/5/58 Limited Windfarm (ROI) Tournafulla, Wind Project Ltd. Co. Limerick 38 REFIT Viridian Energy North Tipperary Ballinveny, Toomevara, Small Scale 2.550 1/5/61 Limited* Windpower Ltd. Nenagh, Wind Project Co. Tipperary 39 REFIT Viridian Energy Killybegs Wind Cornachan Hill, Small Scale 2.550 1/5/63 Limited* Power Ltd. Killybegs, Wind Project Co. Donegal 40 REFIT SSE Airtricity Meenacloghspar Meenacloghspar, Near Small Scale 0.900 1/5/64 Limited Ltd. Donegal Town, Wind Project Co. Donegal 41 REFIT SSE Airtricity Brosna Hydro Erry Mills, Frederick Hydro Project 0.109 1/5/65 Limited Energy Street, Clara, Co. Offaly 42 REFIT Electricity Mountainlodge Mountain Lodge, Large Scale 5.820 1/5/66 Supply Board Power Ltd. Co. Cavan Wind Project (ESB) 43 REFIT Viridian Energy Holyford Hollyford Windfarm Large Scale 9.000 1/5/69 Limited* Windfarm Ltd Glenough Upper, Wind Project Hollyford, Co. Tipperary 44 REFIT SSE Airtricity Redwind Energy Meenagrauv, Ballybofey, Small Scale 3.600 1/5/70 Limited Phase 3 Ltd Stranorlar, Wind Project Co.
Recommended publications
  • Socio-Economic Impact Assessment Scoping Study Proposed Argyll Offshore Wind Farms Argyll Renewables Communities (ARC) 5Th February 2010
    Socio-economic Impact Assessment Scoping Study Proposed Argyll Offshore Wind Farms Argyll Renewables Communities (ARC) 5th February 2010 Source: The Crown Estate Socio-economic Impact Assessment Scoping Study Argyll Renewables Communities (ARC) Contents Foreword ................................................................................................................................1 Executive Summary...............................................................................................................3 1: Introduction .......................................................................................................................9 2: Scoping Study Approach and Context ..........................................................................11 3: The development of offshore wind farms......................................................................17 4: Electricity Generation ..................................................................................................... 25 5: Issues to be considered in offshore wind farm development......................................33 6: Community Benefits........................................................................................................46 7: Tiree Offshore Wind Farm Development ....................................................................... 52 8: Islay Offshore Wind Farm Development........................................................................59 9: Kintyre Offshore Wind Farm Development....................................................................65
    [Show full text]
  • CER 2015 National Report to the EC
    CER 2015 National Report to the EC Regulator’s 2015 National Report to the European Commission Commission for Energy Regulation (CER) Ireland August 2016 1 CER 2015 National Report to the EC 1. Foreword Introduction to the report signed by the Commissioners Chairperson Garrett Blaney Commissioner Paul McGowan Commissioner Aoife MacEvilly The Commission for Energy Regulation (“the CER”) is Ireland's independent energy and water regulator. Since its establishment in 1999, the CER’s remit has expanded significantly to encompass a range of economic, customer protection and safety responsibilities in both the energy and water sectors. As an economic regulator, the CER strives to ensure a stable and predictable regulatory regime in Ireland to support efficient investment, competition and consumer protection for energy customers. As the country’s energy safety regulator our core focus is on protecting lives and having a world-class safety record. The CER’s economic role and associated energy policy developments are detailed in this annual report to the European Commission. We report here on the progress made in various areas including wholesale and retail markets regulation, networks regulation and energy safety oversight. Building on our achievements to date and looking forward to new challenges, the CER will continue to endeavour to provide a first-class regulatory service to all its customers in a cost- effective manner. Garrett Blaney Paul McGowan Aoife MacEvilly Chairperson Commissioner Commissioner 2 CER 2015 National Report to the EC 2. Main developments in the gas and electricity markets1 Electricity Networks Revenue Review Project In 2015, the CER completed its five-yearly review of electricity network revenues and charges under the Price Review 4 (PR4) project.
    [Show full text]
  • Great Britain and Northern Ireland Regulatory Authorities Reports 2017
    Great Britain and Northern Ireland Regulatory Authorities Reports 2017 Regulatory Authorities Report pursuant to section 5ZA of the Utilities Act 2000 and section 6A of the Energy (Northern Ireland) Order 2003 Ofgem/Ofgem E-Serve 9 Millbank, London SW1P 3GE www.ofgem.gov.uk Great Britain and Northern Ireland Regulatory Authorities Reports 2017 Ofgem 2017 National Report to the European Commission Overview The Great Britain (GB) report covers: Developments in the GB energy markets in the calendar year 2016 and the first six months of 2017. In some cases, data is only available for a subset of this period (eg the 2016 calendar year only). Where this is the case, it is clearly stated. The regulation and performance of the GB electricity and gas markets along the themes of network regulation, promoting competition, and security of supply Our compliance with the Electricity and Gas Directives on consumer protection and dispute settlement. Since GB energy markets have been fully liberalised and the regulatory structures in place for a number of years, this report is intended as an updated version of the submissions made since 2007. Finally, for further information on Ofgem’s wider activities, please consult our Annual Report. The 2016-17 Ofgem Annual Report is available at the link below.1 Legal Basis All National Regulatory Authorities (NRAs) are obliged to report annually to the European Commission, in accordance with Directives 2009/72/EC (Electricity Directive) and 2009/73/EC (Gas Directive). The structure of the report is agreed at the Council of European Energy Regulators (CEER). Ofgem is the GB Office of Gas and Electricity Markets.
    [Show full text]
  • Auths Issued and Not Revoked
    Authorisations to Construct issued Report Generated on: 02 July 2014 Type Company Name Address Ref Auth Power Station Address Size (MW) Issue Date Biomass Kerry County Council Aras an Chontae Rathass Tralee Co. Kerry Auth 2001/11-15 North Kerry Landfill, Kerry 1.0 26/07/2002 Muingnaminnane, Tralee Wexford County Council County Hall Spawell Road Co. Wexford Auth 2001/11-12 Killurin Landfill, Crossabeg Wexford 1.0 12/08/2002 Irish Softfoods Limited SWS Group, Shinagh House, Bandon, Co. Cork Auth 2003/04-32 Derrigra, Enniskeane Cork 1.8 14/10/2003 (Independent Biomass Systems) CCGT Dublin Bay Power 26 Upper Pembroke Street Dublin 2 Auth 2000/01-01 Pigeon House Road, Dublin 408.0 24/04/2000 Ringsend Huntstown Power Mill House Ashtown Gate Navan Road Dublin 15 Auth 2000/06-07 Huntstown & Johnstown, Dublin 343.0 23/08/2000 Company Ltd Finglas, Dublin 11 Tynagh Energy Limited The Crescent Building, Northwood Park, Santry, Dublin 9 Auth 2003/10-01 Derryfranch, Tynagh, Galway 404.0 11/12/2003 (Homemount Limited) Viridian Power Limited Mill House Ashtown Gate Navan Road Dublin 15 Auth 2003/09-01 Mill House, Ashtown Gate, Dublin 396.7 16/07/2004 Navan Road Electricity Supply Board 27 Lower Fitzwilliam Street Dublin 2 Auth 2006/01-02 Ballincarroonig, Whitegate, Cork 431.6 29/03/2007 Midleton Bord Gáis Eireann PO Box 51 Gasworks Road Co. Cork Auth 2007/07-01 ConocoPhillips Oil Refinery, Cork 445.0 27/08/2007 Corkbeg, Whitegate SSE Generation Ireland 3 Grand Canal Plaza 5th Grand Canal St Upr D4 Auth 2010/08-02 Great Island, Camplie, New Wexford 469.0 22/10/2010 Limited Floor Ross CCP Johnson & Johnson Vision Janssen Pharmaceuticals Little Island Co.
    [Show full text]
  • SSE Airtricity Privacy Notice
    SSE Airtricity Privacy Notice At SSE, we’re committed to ensuring your privacy is protected. This privacy notice applies to the SSE Airtricity Retail business, which is operated by the following data controllers. (all of which are members of the SSE Group): • SSE Airtricity Limited operating under the trading name SSE Airtricity; • SSE Airtricity Energy Supply (NI) Limited and SSE Airtricity Gas Supply (NI) Limited; and • SSE Airtricity Home Energy Services and Fusion Heating Ltd our dedicated Boiler and Home Services Division. When we refer to “SSE”, “we”, “us”, and “our”, we mean any of those data controllers, as appropriate. By “you” or “your” we mean any individual, sole trader and/or partnership that receives services from us, uses our website or otherwise interacts with the SSE Airtricity Retail business. Please read this notice carefully as it provides important information about how we handle your personal information and the steps you can take to control it. If you have any questions, comments or concerns about any aspect of this notice, please contact us using the details set out in section 11. This privacy notice is divided into the following sections: 1. What information do we collect and how do we do it? 2. How do we use your personal information? 3. How do we use your sensitive personal information? 4. What information do we receive from third party sources? 5. Legal bases for processing 6. Who do we share your personal data with? 7. How is your personal information transferred outside of the EEA? 8. How long do we hold your personal information? 9.
    [Show full text]
  • Gas Licensees
    All Gas Licensee's 15/06/2021 Licensee Company no Licence Type Gas Interconnector BBL Company 2085020 Gas Interconnector Gas Networks Ireland 555744 Gas Interconnector GNI (UK) Limited 02827969 Gas Interconnector Interconnector (UK) Limited 02989838 Gas Interconnector Premier Transmission Limited NI026421 Gas Interconnector Gas Shipper Acorn Peach Energy Ltd 10117252 Gas Shipper AES Ballylumford Limited NI026040 Gas Shipper Aikafour Limited HE169886 Gas Shipper AIK Energy Austria GmbH FN515016b Gas Shipper AIK Energy Ltd 08636666 Gas Shipper AIK Energy Romania S.R.L. J40/16277/2017 Gas Shipper Alfa Smart Energy Ltd 10833778 Gas Shipper Alpha Fuels Limited 07258567 Gas Shipper Alpherg S.p.A. MI-2531173 Gas Shipper Alpiq Ltd CH-249.3.00.044-9 Gas Shipper Antargaz 572126043 Gas Shipper AOT Energy Switzerland AG CHE-102.285.624 Gas Shipper Aughinish Alumina Limited 59982 Gas Shipper Avanti Gas Limited 0481121 Gas Shipper AvantiGas On Limited 10430843 Gas Shipper Avro Commercial Shipping Limited 11130819 Gas Shipper Axpo UK Limited 06600942 Gas Shipper Barclays Bank Plc 1026167 Gas Shipper Barrow Shipping Limited 08172858 Gas Shipper Bayerngas Energy GmbH HRB 163683 Gas Shipper BE 2020 Limited 09135084 Gas Shipper BG Gas Services Limited 03299002 Gas Shipper BGI Trading Limited 10971802 Gas Shipper BNP Paribas 662 042 449 4CS Gas Shipper Bonroy Petchem Co Limited 11351915 Gas Shipper Bord Gais Energy Limited 463078 Gas Shipper BP Exploration Operating Company Limited 0305943 Gas Shipper BP Gas Marketing Limited 0908982 Gas Shipper British Gas
    [Show full text]
  • RHODE GREEN ENERGY PARK Opportunity Assessment Report
    RHODE GREEN ENERGY PARK Opportunity Assessment Report MDE1222 Rhode Green Energy Park Opportunity Assessment Report F01 19 November 2020 rpsgroup.com REPORT Document status Contents Version Purpose of document Authored by Reviewed by Approved by Review date EXECUTIVE SUMMARY ................................................................................................................................... 1 Conall Boland, 1 INTRODUCTION ..................................................................................................................................... 2 Conall Boland A01 For Client Issue Mel Reynolds, Ciaran Butler 12/10/2020 Alan Curran Mark Hanlon 2 ENERGY SECTOR IN RHODE – PAST, PRESENT AND FUTURE ...................................................... 5 F01 For Client Issue Mel Reynolds Conall Boland Ciaran Butler 19/11/2020 3 RHODE BUSINESS PARK ..................................................................................................................... 6 4 PLANNING CONTEXT ............................................................................................................................ 9 Approval for issue 5 CONNECTIVITY AND ENABLING INFRASTRUCTURE ..................................................................... 11 Ciaran Butler 19 November 2020 6 ENERGY PARK MODELS .................................................................................................................... 15 © Copyright RPS Group Limited. All rights reserved. 7 EVALUATION OF INDUSTRIAL SYMBIOSIS & EMERGING TECHNOLOGY
    [Show full text]
  • Sse Plc Annual Report 2020 About This Report
    SSE PLC ANNUAL REPORT 2020 ANNUAL REPORT 2020 SSE PLC SSE PLC ANNUAL REPORT For a betterFor energy of world 2020 ABOUT THIS REPORT SSE plc is a UK-listed energy company and this Annual Report 2020 comprises a Strategic Report, a Directors’ Report and Financial Statements for the year ended 31 March 2020. In so far as possible, it also seeks to address trends and factors that could affect the future development, performance and position of SSE’s businesses. This includes taking account of events between 31 March 2020 and 16 June 2020, the date on which the Board of Directors approved this report. That period was dominated by the coronavirus emergency and the Board recognised on 16 June that it was difficult to forecast with accuracy the full extent of the pandemic’s human, social, economic and business impact. AT A GLANCE Operating profit Earnings per share Sale of SSE Energy Adjusted Adjusted Services page 17 SSE completed the sale of its GB £1,488.4m 83.6p household energy supply business. Reported Reported Progress in offshore £963.4m 40.6p wind page 19 SSE was successful in UK auctions for offshore wind capacity contracts. Dividend EBITDA Recommended full-year dividend Adjusted A commitment to decarbonisation page 21 80p £2,191.4m SSE adopted a new target to cut carbon intensity of electricity by 60% by 2030. Alternative Performance Measures Economic contribution SSE assesses the performance of the Group using a UK variety of performance measures. These measures are not all defined under IFRS and are therefore termed “non-GAAP” measures.
    [Show full text]
  • Annual Review 2006 Annual Review 2006
    Annual Review 2006 Annual Review 2006 BWEA Events 2007 15 March 2007: BWEA Marine 07 BWEA’s 4th Annual Wave and Tidal Energy Conference London, UK 7 June 2007: BWEA Offshore 07 BWEA’s 6th Annual UK Offshore Wind Conference Liverpool, UK 9-11 October 2007: BWEA29 The Industry’s 29th Annual Conference and Exhibition Glasgow, UK For further information on attending, sponsoring or speaking at BWEA events visit www.bwea.com 2 Annual Review 2006 Contents BWEA is the UK’s leading renewable energy Foreword from CEO 4-5 association. Established in 1978, BWEA now has 2006 Planning Review 6-7 Approaching the 2nd gigawatt over 330 companies in membership, active in the UK wind, wave and tidal stream industries. BWEA Record Year of Delivery 8-13 is at the forefront of the development of these Statistical overview of 14-15 wind farms sectors, protecting members’ interests and promoting their industries to Government, Onshore 16-19 business and the media. Wales 20-21 Wind energy has now started a major expansion Small Wind 22-25 in the UK and will be the single greatest Offshore 26-29 contributor to the Government’s 10% 2010 Marine 30-33 renewable energy target and 20% 2020 Grid and Technical 34-37 renewable aspiration. Together, wind, wave Health and Safety 38-40 and tidal power can supply 21% of the country’s projected electricity supplies by 2020, resulting in Communications 42-47 over £16 billion of investment in UK plc. Energy Review 48-50 Publications 51-57 Events 58-61 Finance Review 62-63 Front cover credits BWEA Staff 64 Burton Wold wind farm
    [Show full text]
  • Transmission Networks Connections Update
    Transmission Networks Connections Update May 2015 SHE-T–TO SPT–TO NG–TO/SO SHE-T–TO SPT–TO NG–TO/SO Back to Contents TNCU – May 2015 Page 01 Contents Foreword ////////////////////////////////////////////////////////////////// 02 1. Introduction /////////////////////////////////////////////////////////// 03 2. Connection timescales ///////////////////////////////////////////// 04 Illustrative connection timescales /////////////////////////////////////// 04 Connections by area /////////////////////////////////////////////////////// 05 3. GB projects by year ///////////////////////////////////////////////// 06 Contracted overall position /////////////////////////////////////////////// 08 Renewable projects status by year ///////////////////////////////////// 10 Non-Renewable projects status by year – Excluding Nuclear /// 11 Non-Renewable projects status by year – Nuclear only ////////// 12 Interconnector projects status by year //////////////////////////////// 13 4. Additional data by transmission owner ///////////////////////// 14 National Grid Electricity Transmission plc //////////////////////////// 16 Scottish Hydro Electricity Transmission plc ////////////////////////// 18 Scottish Power Transmission Limited ///////////////////////////////// 20 5. Connection locations /////////////////////////////////////////////// 22 Northern Scotland projects map //////////////////////////////////////// 25 Southern Scotland projects map /////////////////////////////////////// 28 Northern England projects map /////////////////////////////////////////
    [Show full text]
  • A Network for Net Zero RIIO-T2 Draft Business Plan
    www.ssen-transmission.co.uk A Network for Net Zero RIIO-T2 Draft Business Plan June 2019 Scottish Hydro Electric Transmission plc 2 Introduction Five years. Five clear goals Transport the renewable electricity that powers 10 million homes Build electricity network flexibility and infrastructure that can accommodate 10GW renewable generation in the north of Scotland by 2026 100% network reliability for homes and businesses 100% transmission system reliability for homes and businesses by 2026 Every connection delivered on time Provide every network connection, tailored to meet our customers’ needs, on time and on budget One third reduction in our greenhouse gas emissions Reduce the scope 1 and 2 greenhouse gas emissions from our operations by 33% by 2026, consistent with 1.5 degree climate science pathway savings from innovation Through targeted new technology and ways of working, achieve £100 million customer benefits by 2026 Delivered for around £7 a year Introduction 3 Foreword Welcome to this first full draft of our RIIO-T2 Business Plan for the electricity transmission system in the north of Scotland between 1 April 2021 and 31 March 2026. We share this draft Plan for consultation against the background of an ongoing lively debate about the future of the GB energy industry as it goes through transformative change – to decarbonise, digitise and decentralise. We are encouraged by the democratisation of this debate, which we have experienced over the past two years as we have sought views and ideas to develop this draft Plan. In 2010, when we began consulting on our RIIO-T1 Business Plan, there was some scepticism about the scale and pace of decarbonisation that we envisaged.
    [Show full text]
  • Authorisations Issued Total No
    Authorisations Issued Total No. 407 From: 01/01/2000 Total MWs 11,300.1 MW To: 30/06/2021 Plant Type Power Station Name Company Name Power Station Address Size Auth (MW) Battery Gorman Energy Storage Scottish Power Renewables Causestown, Stackallen, 52.8 (UK) Limited Navan Co. Meath Golagh Wind Farm Scottish Power Renewables Barnesmore 3.0 (UK) Limited Co Donegal Avonbeg ESS Avonbeg Storage Limited Killabeg, Ferns, Enniscorthy 17.6 Co. Wexford Porterstown Battery Storage Porterstown Battery Storage Porterstown, Kilteel, 30.0 Facility Limited Co. Kildare Huntstown BESS Energia Power Generation Huntstown Power Station, 10.0 Limited Huntstown Quarry, Finglas Dublin 11 Aghada Battery Energy Storage ESB Aghada Power Station, 19.0 System Aghada Co. Cork Inchicore Battery Energy ESB Inchicore 220kV Substation, 30.0 Storage System Jamestown Road, Inchicore Dublin 8 Battery 162.4 Battery Ardagh South Energy Storage Avolta Storage Limited Meath Hill, Navan 33.0 Storage Facility Co Meath Shannonbridge BESS (B) Shannonbridge Power Limited Cloniffeen, Shannonbridge 50.0 Co Offaly Shannonbridge BESS (A) Shannonbridge Power Limited Cloniffeen, Shannonbridge 50.0 Co Offaly Lumcloon BESS (B) Lumcloon Power Limited Lumcloon, Cloghan 50.0 Co Offaly Kelwin Power Plant Phase 1 Ronaver Energy Limited Tullahennel North, Larha, 27.5 and 2 Ballylonford & Kilpaddoge, Tarbert Co Kerry Beenanaspuck and Winter Winds Limited Grid Services Facility in Athea 11.0 Tobertoreen Wind Farm and Upper, Athea Co Limerick Gardnershill FGS Flexilis Power Limited Stephenstown Industrial
    [Show full text]