Martin H. Blote Papers, 1930-1971

Total Page:16

File Type:pdf, Size:1020Kb

Martin H. Blote Papers, 1930-1971 http://oac.cdlib.org/findaid/ark:/13030/tf6q2nb2s3 No online items Inventory of the Martin H. Blote Papers, 1930-1971 Processed by Randal Brandt; machine-readable finding aid created by Gabriela A. Montoya Water Resources Collections and Archives Orbach Science Library, Room 118 PO Box 5900 University of California, Riverside Riverside, CA 92517-5900 Phone: (951) 827-2934 Fax: (951) 827-6378 Email: [email protected] URL: http://library.ucr.edu/wrca © 1998 The Regents of the University of California. All rights reserved. Inventory of the Martin H. Blote BLOTE-1 1 Papers, 1930-1971 Inventory of the Martin H. Blote Papers, 1930-1971 Collection number: BLOTE-1 Water Resources Collections and Archives University of California, Riverside Riverside, California Contact Information: Water Resources Collections and Archives Orbach Science Library, Room 118 PO Box 5900 University of California, Riverside Riverside, CA 92517-5900 Phone: (951) 827-2934 Fax: (951) 827-6378 Email: [email protected] URL: http://library.ucr.edu/wrca Processed by: Randal Brandt Date Completed: March 1998 Encoded by: Gabriela A. Montoya © 1998 The Regents of the University of California. All rights reserved. Descriptive Summary Title: Martin H. Blote Papers, Date (inclusive): 1930-1971 Collection number: BLOTE-1 Creator: Blote, Martin H. Extent: 7 linear ft. (8 boxes) Repository: Water Resources Collections and Archives Riverside, CA 92517-5900 Shelf location: This collection is stored off-campus at NRLF. Please contact the Water Resources Collections and Archives staff for access to the materials. Language: English. Access Collection is open for research. Publication Rights Copyright has not been assigned to the Water Resources Collections and Archives. All requests for permission to publish or quote from manuscripts must be submitted in writing to the Head of Archives. Permission for publication is given on behalf of the Water Resources Collections and Archives as the owner of the physical items and is not intended to include or imply permission of the copyright holder, which must also be obtained by the reader. Preferred Citation [Identification of item], Martin H. Blote Papers, BLOTE-1, Water Resources Collections and Archives, University of California, Riverside. Access Points Central Valley Project (Calif.) Inventory of the Martin H. Blote BLOTE-1 2 Papers, 1930-1971 Water Project Authority of the State of California United States. Bureau of Reclamation Water rights--California Salinity--California--Delta Region Floods--California Flood control--California Flood damage--California--Delta Region Delta Region (Calif.)--Water rights Sacramento River (Calif.)--Water rights San Joaquin River (Calif.)--Water rights Scope and Content Superintendant of Operations, Central Valley Project; Supervisor of Irrigation and Power, U.S. Bureau of Reclamation, Sacramento Region; consultant. Notes, memoranda, correspondence, speeches, reports, maps, photographs, and records relating to the U.S. Bureau of Reclamation, Central Valley Project, Sacramento-San Joaquin Delta Region, salinity, the Delta hearings, water rights, acreage limitations, the Reber Plan, fish and wildlife, USBR/CVP contracts and leases, floods and flood control, and miscellaneous power and energy issues. U.S. Bureau of Reclamation-General Box Box 1, Speeches, maps, land ownership, Sacramento River, Shasta Reservoir item 1.1-1.11 item 2 US Bureau of Reclamation Communications -Radio communication materials item 3 Evaporation notebook [1931-195-] item 4.1-4.2 Hydroelectric power item 5.1-5.4 Irrigation -sprinkler, water requirements, water users item 5.2 Water requirements discussion, Sacramento, California : April 22, 23, 1948. Sacramento, Calif.: U.S. Bureau of Reclamation, Region 2, 1948. 28 p. item 5.4 Roster of water users. Sacramento, Calif.: U.S. Bureau of Reclamation, Region 2, 1959. 104 p. item 6 Personnel item 7.1 Estimated costs of water under state plan of immediate initial development for upper San Joaquin Valley, 1932. item 7.2-7.5 Water economics -costs, subsidies, amortization tables, financing and repayment item 8 Isothermobaths item 9 Operations & Maintenance item 10 Investigation of administration of the Bureau of Reclamation : hearing held before the Committee on Interior and Insular Affairs, October 14, 1949. Washington, D.C.: Ward & Paul, official reporters, 1949. Central Valley Project-General Box Box 1, Operation studies of Shasta Lake and other Central Valley Project power plants item 11 item 12 Speeches item 13 Final report on research regarding the origin of the Bureau's interest in the CVP:memo 1946 item 14 Central Valley Project operations -correspondence, memos, etc. item 15 Maps item 16.1 Central Valley : a pictorial review. San Francisco, Calif.: Electrical West, 1944, 7 p. item 16.2 Central Valley issue. In Reclamation era (Washington, D.C.). Vol. 37:8 (Aug. 1951) Inventory of the Martin H. Blote BLOTE-1 3 Papers, 1930-1971 Central Valley Project-General item 17.1-17.2 Historical highlights of the Central Valley Project item 18 Operating plan of the Central Valley Project, 1952 item 19 Hanson, A.J., and J.J. O'Brien. Integrated operational analysis for Shasta-Folson Reservoirs under present conditions of development for the Central Valley Project, 1952 item 20 Central Valley Project operations & maintenance costs item 21 Dominy, Floyd E. The Central Valley Project at work, 1960 item 22 Start-up problems item 23.1 Irrigation requirement data for Central Valley Project crops item 23.2-23.3 Miscellaneous agriculture item 24.1-24.5 Canals -maps, mileage, safety (drownings), capacity testing item 24.2 Blote, Martin H. Central Valley Project canal locations. Sacramento, Calif.: U.S. Bureau of Reclamation, Region 2, 1958. Box Box 2, Communications item 25 item 26.1-26.2 Power -Minority report of Central Valley Project power -Streamlined power operations item 26.3 Power transmission item 26.4 Dependable capacity item 26.5 Power control operation item 26.6 Statement by Floyd E. Dominy item 27 Distribution systems item 28.1-28.10 Water economics -costs/rates, cost allocation, miscellaneous (newsclippings) item 29 Reservoir operations item 30 American River - general item 31 Contra Costa Canal - general item 32.1-32.5 Delta Cross Channel item 32.2 Morrison, A.E. A memorandum report bearing on the capacity and timing of construction of the Delta Cross-Channel. Sacramento, Calif.: U.S. Bureau of Reclamation, Central Valley Project, Delta District, 1947. 23 p. item 33.1 Delta-Mendota Canal - general item 33.2 -water quality item 33.3 -operations & maintenance item 33.4 -map - water users item 33.5 -salinity item 33.6 -turnout construction item 33.7 -emergency repair item 34.1 Boron Delta Pumping Plant item 34.2 Photographs of the Delta pumping plant, 1951. 6 photographs. item 35 Eastside Division water requirements item 36.1-2 Folsom Reservoir & Dam -costs, general item 36.3 Folsom Dam dedication, May 5, 1956. 7 p. item 36.4 Recreation map (Folsom Lake) item 36.5 Lake Natoma item 36.6 Nimbus Dam item 37.1 Friant Reservoir -water storage/discharge/runoff item 37.2 -flow item 37.3 Friant-Kern Canal item 37.4 Friant-Kern Canal costs item 37.5 -allocations item 38.1 Sacramento Valley water users item 38.2 Hansen, A.J. Operational analysis, Sacramento River : Keswick to Verona, California. Sacramento, Calif.: U.S. Bureau of Reclamation, Region 2, 1952. Inventory of the Martin H. Blote BLOTE-1 4 Papers, 1930-1971 Central Valley Project-General item 38.3 Questions and answers about the proposedTehama-Colusa Canal. Sacramento, Calif.: U.S. Bureau of Reclamation, Region 2, 1962. 8 p. item 38.4 Yolo-Zamora Unit item 38.5 Sacramento River water use item 38.6 Corning Canal Pumping Plant Box Box 3, Hill, L.K. Estimated water requirement of lands adjacent to the San Joaquin River item 39 from Friant to Gravelly Ford for present and ultimate conditions. Sacramento, Calif.: U.S. Bureau of Reclamation, Region 2, 1952. 22 p. item 40.1 San Luis Unit - general item 40.2 Evaporation stations item 40.3 Turnouts item 40.4 Description manual for San Luis Pumping/Generating Plant. Sacramento, Calif.: Dept. of Water Resources, 1967. item 40.5 Operation agreement item 40.6 Miscellaneous -maps & drawings item 40.7 Canal maps item 41.1 Shasta Reservoir releases item 41.2 Miscellaneous item 41.3 Operations item 41.4 Keswick Dam & Powerplant item 41.5 Keswick Dam - general item 41.6 Keswick Dam - miscellaneous item 42 Sly Park Unit (American River) item 43 Tracy Pumping Plant item 44.1-44.5 Trinity River Division - general item 45.1-45.9 State acquisition of Cenral Valley Project item 46 Mud Mountain Dam. Seattle: U.S. Army Engineers, Seattle District, 1939. 4 p. item 47 Dams under California state supervision item 48 Sacramento River flood control project item 49.1-49.3 Reber Plan -correspondence, reprints, newsclippings, maps, etc. item 49.4 Reber Plan - hearings by Senators Sheridan Downey & Robert S. Kerr, March 1, 1950 item 50.1-50.7 Miscellaneous speeches on California water development item 50.1 Carr, James K. A speech ... before the California Municipal Utilities Association Convention, Feb. 26, 1960. 15 p. item 50.2 Haley, John M. Programs of the Northern Branch, State Department of Water Resources, 1962. 4 p. item 50.3 Head, Ivan P. Statement ... before the Regional Water Conference, Sacramento Valley Concil, California State Chamber of Commerce, Chico, Feb. 2, 1962. 10 p. item 50.4 McCullough, Charles A. California water program in the San Francisco Bay Area, 1962. 3 p. item 50.5 Warne, William E. Cooperation in water development, 1962. 13 p. item 50.6 Werner, Carl A. Measuring flow in the Delta, 1962. 13 p. item 50.7 Stetson, Carl L. Statement on San Joaquin Valley drainage investigations, 1962. 9 p. item 51 Delta-Buena Vista operating plan item 52 Department of Water Resources Division of Operations item 53.1-2 The north coast role : California's water development.
Recommended publications
  • Warren Act Contract for Kern- Tulare Water District and Lindsay- Strathmore Irrigation District
    Environmental Assessment Warren Act Contract for Kern- Tulare Water District and Lindsay- Strathmore Irrigation District EA-12-069 U.S. Department of the Interior Bureau of Reclamation Mid Pacific Region South-Central California Area Office Fresno, California January 2014 Mission Statements The mission of the Department of the Interior is to protect and provide access to our Nation’s natural and cultural heritage and honor our trust responsibilities to Indian Tribes and our commitments to island communities. The mission of the Bureau of Reclamation is to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public. EA-12-069 Table of Contents Section 1 Introduction ........................................................................................................... 1 1.1 Background ......................................................................................................................... 1 1.2 Need for the Proposed Action............................................................................................. 1 1.3 Relevant Legal and Statutory Authorities........................................................................... 2 1.3.1 Warren Act .............................................................................................................. 2 1.3.2 Reclamation Project Act ......................................................................................... 2 1.3.3 Central Valley Project Improvement Act ..............................................................
    [Show full text]
  • Northern Calfornia Water Districts & Water Supply Sources
    WHERE DOES OUR WATER COME FROM? Quincy Corning k F k N F , M R , r R e er th th a a Magalia e Fe F FEATHER RIVER NORTH FORK Shasta Lake STATE WATER PROJECT Chico Orland Paradise k F S , FEATHER RIVER MIDDLE FORK R r STATE WATER PROJECT e Sacramento River th a e F Tehama-Colusa Canal Durham Folsom Lake LAKE OROVILLE American River N Yuba R STATE WATER PROJECT San Joaquin R. Contra Costa Canal JACKSON MEADOW RES. New Melones Lake LAKE PILLSBURY Yuba Co. W.A. Marin M.W.D. Willows Old River Stanislaus R North Marin W.D. Oroville Sonoma Co. W.A. NEW BULLARDS BAR RES. Ukiah P.U. Yuba Co. W.A. Madera Canal Delta-Mendota Canal Millerton Lake Fort Bragg Palermo YUBA CO. W.A Kern River Yuba River San Luis Reservoir Jackson Meadows and Willits New Bullards Bar Reservoirs LAKE SPAULDING k Placer Co. W.A. F MIDDLE FORK YUBA RIVER TRUCKEE-DONNER P.U.D E Gridley Nevada I.D. , Nevada I.D. Groundwater Friant-Kern Canal R n ia ss u R Central Valley R ba Project Yu Nevada City LAKE MENDOCINO FEATHER RIVER BEAR RIVER Marin M.W.D. TEHAMA-COLUSA CANAL STATE WATER PROJECT YUBA RIVER Nevada I.D. Fk The Central Valley Project has been founded by the U.S. Bureau of North Marin W.D. CENTRAL VALLEY PROJECT , N Yuba Co. W.A. Grass Valley n R Reclamation in 1935 to manage the water of the Sacramento and Sonoma Co. W.A. ica mer Ukiah P.U.
    [Show full text]
  • Insights from the Sacramento–San Joaquin Delta, Technical Appendix
    A New Approach to Accounting for Environmental Water Insights from the Sacramento–San Joaquin Delta Technical Appendices CONTENTS Appendix A: A Brief Review of Regulatory Assignment of Water in the Sacramento–San Joaquin Delta Greg Gartrell and Brian Gray Appendix B: Water Assigned to Meeting Environmental Standards in the Delta from 1980–2016 Greg Gartrell, Jeffrey Mount, Ellen Hanak, Alvar Escriva-Bou, Brian Gray Supported with funding from the Dirk and Charlene Kabcenell Foundation, the S. D. Bechtel, Jr. Foundation, the US Environmental Protection Agency (with partial support from Assistance Agreement No.83586701), and the Water Foundation Appendix A Introduction In this appendix, we review the history of the water quality and flow standards that have governed the impoundment and diversion of water from the Sacramento–San Joaquin River and Delta system. Although most of the responsibility for complying with these standards falls on the two largest water-right holders—the federal Central Valley Project (CVP) and the California State Water Project (SWP)—this history begins well before their creation. It includes the early development of irrigated agriculture in the Delta and upstream in the Sacramento and San Joaquin River basins. It incorporates the design and operation of the two great water projects. And it concludes with the modern era of ecological protection and multifaceted water quality administration. Pre-Project Water Quality Issues Delta water salinity has posed challenges for water users—both within and upstream of the Delta—since the late 19th century. The Delta is an estuary.1 Salt moves from the San Francisco Bay into the Delta with the action of the tides; fresh water from the Sacramento and San Joaquin Rivers mixes with and dilutes brackish water in the western Delta and flows into the Carquinez Strait.
    [Show full text]
  • Floods, Droughts, and Lawsuits: a Brief History of California Water Policy
    1Floods, Droughts, and Lawsuits: A Brief History of California Water Policy MPI/GETTY IMAGES The history of California in the twentieth century is the story of a state inventing itself with water. William L. Kahrl, Water and Power, 1982 California’s water system might have been invented by a Soviet bureaucrat on an LSD trip. Peter Passell, “Economic Scene: Greening California,” New York Times, 1991 California has always faced water management challenges and always will. The state’s arid and semiarid climate, its ambitious and evolving economy, and its continually growing population have combined to make shortages and conflicting demands the norm. Over the past two centuries, California has tried to adapt to these challenges through major changes in water manage- ment. Institutions, laws, and technologies are now radically different from those brought by early settlers coming to California from more humid parts of the United States. These adaptations, and the political, economic, technologic, and social changes that spurred them on, have both alleviated and exacerbated the current conflicts in water management. This chapter summarizes the forces and events that shaped water man- agement in California, leading to today’s complex array of policies, laws, and infrastructure. These legacies form the foundation of California’s contemporary water system and will both guide and constrain the state’s future water choices.1 1. Much of the description in this chapter is derived from Norris Hundley Jr.’s outstanding book, The Great Thirst: Californians and Water: A History (Hundley 2001), Robert Kelley’s seminal history of floods in the Central Valley, Battling the Inland Sea (Kelley 1989), and Donald Pisani’s influential study of the rise of irrigated agriculture in California, From the Family Farm to Agribusiness: The Irrigation Crusade in California (Pisani 1984).
    [Show full text]
  • Cvp Overview
    Central Valley Project Overview Eric A. Stene Bureau of Reclamation Table Of Contents The Central Valley Project ......................................................2 About the Author .............................................................15 Bibliography ................................................................16 Archival and Manuscript Collections .......................................16 Government Documents .................................................16 Books ................................................................17 Articles...............................................................17 Interviews.............................................................17 Dissertations...........................................................17 Other ................................................................17 Index ......................................................................18 1 The Central Valley Project Throughout his political life, Thomas Jefferson contended the United States was an agriculturally based society. Agriculture may be king, but compared to the queen, Mother Nature, it is a weak monarch. Nature consistently proves to mankind who really controls the realm. The Central Valley of California is a magnificent example of this. The Sacramento River watershed receives two-thirds to three-quarters of northern California's precipitation though it only has one-third to one-quarter of the land. The San Joaquin River watershed occupies two- thirds to three-quarter of northern California's land,
    [Show full text]
  • Friant-Kern Canal Capacity Restoration
    Friant-Kern Canal Capacity Restoration Draft Environmental Assessment Draft June 2011 Table of Contents 1 Table of Contents 2 1.0 Purpose and Need for Action ............................................................................... 1-1 3 1.1 Background .................................................................................................... 1-1 4 1.1.1 Settlement and Act ............................................................................. 1-3 5 1.2 Purpose and Need .......................................................................................... 1-4 6 1.3 Reclamation’s Legal and Statutory Authorities and Jurisdiction 7 Relevant to the Proposed Action ................................................................... 1-4 8 1.4 Implementing Agency Responsibility ........................................................... 1-5 9 1.5 Purpose and Intended Use of the EA ............................................................. 1-5 10 1.6 Study Area ..................................................................................................... 1-5 11 1.7 Resources of Potential Concern ..................................................................... 1-5 12 2.0 Alternatives Including Proposed Action ............................................................. 2-1 13 2.1 No Action Alternative ................................................................................... 2-1 14 2.2 Proposed Action ............................................................................................ 2-1
    [Show full text]
  • Sites Reservoir Project Public Draft EIR/EIS
    6. Surface Water Resources 6.1 Introduction This chapter describes Existing Conditions (the environmental setting) and Sites Reservoir Project (Project)-related changes to surface water resources in the Extended, Secondary, and Primary study areas. Detailed descriptions and maps of these three study areas are provided in Chapter 1 Introduction, and summarized descriptions are included in this chapter. Surface water resources generally include reservoirs, rivers, and diversions. Permits and authorizations for surface water resources are presented in Chapter 4 Environmental Compliance and Permit Summary. The regulatory setting for surface water resources is presented in Appendix 4A Environmental Compliance. This chapter also includes a description of the surface water supply facilities operations and resulting surface water resources characteristics of California’s major water systems that are relevant to the Project: the Central Valley Project (CVP), a federal project that is operated and maintained by the Bureau of Reclamation (Reclamation), the State Water Project (SWP), operated and maintained by the California Department of Water Resources (DWR), and associated tributary rivers and streams. A schematic showing the layout of these two water systems, with the relative location of the Project, is shown in Figures 6-1A, 6-1B, and 6-1C. A comparison of these characteristics has been made between the Existing Conditions/No Project/No Action Condition, and the four action alternatives (Alternatives A, B, C, and D). Unless noted, all numbers shown related to storages, flows, exports, and deliveries in this chapter are generated from the CALSIM II computer simulation model. Appendix 6A Modeling of Alternatives, Appendix 6B Water Resources System Modeling, and Appendix 6C Upper Sacramento River Daily River Flow and Operations Modeling describe the assumptions and the analytical framework used in the surface water modeling analyses.
    [Show full text]
  • San Joaquin River Hydrologic Region
    Volume 3 Chapter 7 San Joaquin River Hydrologic Region California Water Plan Update 2005 Chapter 7 San Joaquin River Hydrologic Region Contents Chapter 7 San Joaquin River Hydrologic Region ........................................................................................................7-1 Setting ................................................................................................................................................................7-1 Climate ...............................................................................................................................................................7-1 Population ..........................................................................................................................................................7-1 Land Use ............................................................................................................................................................7-2 Water Supply and Use .........................................................................................................................................7-5 State of the Region ..............................................................................................................................................7-8 Challenges ......................................................................................................................................................7-8 Accomplishments ..........................................................................................................................................7-10
    [Show full text]
  • Order Conditionally Approving Petition, Temporary Urgency Changes in License and Permit Terms and Conditions Requiring Compliance
    STATE OF CALIFORNIA CALIFORNIA ENVIRONMENTAL PROTECTION AGENCY STATE WATER RESOURCES CONTROL BOARD In the Matter of Specified License and Permits1 of the Department of Water Resources and U.S. Bureau of Reclamation for the State Water Project and Central Valley Project ORDER CONDITIONALLY APPROVING A PETITION FOR TEMPORARY URGENCY CHANGES IN LICENSE AND PERMIT TERMS AND CONDITIONS REQUIRING COMPLIANCE WITH DELTA WATER QUALITY OBJECTIVES IN RESPONSE TO DROUGHT CONDITIONS BY THE EXECUTIVE DIRECTOR 1.0 INTRODUCTION On January 23, 2015, the Department of Water Resources (DWR) and the United States Bureau of Reclamation (Reclamation) (hereinafter the Petitioners) jointly filed a Temporary Urgency Change Petition (TUCP) pursuant to Water Code section 1435 et seq., to temporarily change their water right permits and license for the State Water Project (SWP) and Central Valley Project (CVP) (collectively Projects). In response to the ongoing drought emergency, the Petitioners sought changes to permit and license conditions imposed pursuant to State Water Resources Control Board (State Water Board) Water Right Decision 1641(D-1641) that require the Petitioners to meet flow-dependent and operational water quality objectives designed to protect fish and wildlife and agricultural beneficial uses in the San Francisco Bay/Sacramento-San Joaquin Delta Estuary (Bay-Delta). On February 3, 2015, the Executive Director issued an order approving in part the TUCP, subject to conditions. The Executive Director modified the February 3, 2015 Order on March 5, 2015, and on April 6, 2015. On May 21, 2015, the Petitioners submitted a request to the State Water Board to modify and renew the TUCP Order pursuant to Water Code section 1441, which allows for temporary change orders to be renewed for up to 180 additional days.
    [Show full text]
  • 2002 Angler Survey
    Central Valley Salmon and Steell Harvest Monitoring Project 2002 Angler Survey State of California The Resources Agency Department of Fish and Game September 2003 Central Valley Salmon and Steelhead Harvest Monitoring Project 2002 Angler Survey Prepared by: Duane A. Massa, Fishery Biologist & Tom Schroyer, Fishery Biologist Sacramento Valley & Central Sierra Region 1701 Nimbus Road, Suite "A" Rancho Cordova, CX 95670-4599 Abstract In October 1992, the Central Valley Project Improvement Act (CVPIA) was signed into law. One objective of the CVPIA was to restore the abundance of natural fish stocks in Central Valley rivers and streams. To achieve this objective, the CVPIA required the development of restoration actions that ensure sustainable, long-term populations of native anadromous fish stocks. Section 3406@)(16) of the CVPIA specifies the development of a monitoring and assessment program to evaluate the effectiveness of implemented restoration actions. The Comprehensive Assessment and Monitoring Program (CAMP) was established for this purpose. The CAMP program recommends monitoring of both adult and juvenile fish populations. Adult monitoring was recommended to include spawner returns (escapement), as well as in-river recreational, ocean recreational and commercial harvest estimates. In 1998, the California Department of Fish and Game (Department) created the Central Valley Salmon and Steelhead Harvest Monitoring Project to help enumerate the number of adult Chinook salmon and steelhead resulting fiom natural production in Central Valley Rivers and streams. The Project's objective was to determine annual estimates of the total in-river harvest of salmon and steelhead. In addition, this project would provide limited harvest data on other anadromous and resident sport fish species.
    [Show full text]
  • San Joaquin River Exchange Contractors Water Authority, 25-Year Water Transfer Program Water Resources Analysis
    Appendix B San Joaquin River Exchange Contractors Water Authority, 25-Year Water Transfer Program Water Resources Analysis Water Transfer Program for the San Joaquin River Exchange Contractors Water Authority, 2014–2038 Draft May 2012 San Joaquin River Exchange Contractors Water Authority 25-Year Water Transfer Program Water Resources Analysis Prepared for San Joaquin River Exchange Contractors Water Authority By Daniel B. Steiner, Consulting Engineer March 2012 San Joaquin River Exchange Contractors Water Authority 25-Year Water Transfer Program Water Resources Analysis 1. Introduction The San Joaquin River Exchange Contractors Water Authority1 (Exchange Contractors) proposes to transfer up to 150,000 acre-feet of substitute water to several potential users over a 25-year timeframe. The water could provide a supply for the following uses: • Temporary water supplies for Incremental Level 4 requirements for the San Joaquin Valley and Tulare Basin wildlife refuges; • Temporary water supplies for Central Valley Project (CVP) agricultural service and M&I contractors as supplemental water supplies to support agriculture and/or M&I uses when full contract deliveries cannot otherwise be made; • Temporary water supplies to Friant Division CVP repayment contractors for the production of agricultural crops or livestock because of water supply shortages or when full contract deliveries cannot otherwise be made; • Temporary water supplies to State Water Project (SWP) contractors (Kern County Water Agency - KCWA) for agricultural and/or M&I supply; and • Seasonal flexibility of deliveries to the Exchange Contractors through exchange with CVP agricultural service and M&I contractors and SWP contractors wherein water would be delivered and then returned at a later date.
    [Show full text]
  • Current and Long-Term Effects of Delta Water Quality on Drinking
    Peer Reviewed Title: Current and Long-Term Effects of Delta Water Quality on Drinking Water Treatment Costs from Disinfection Byproduct Formation Journal Issue: San Francisco Estuary and Watershed Science, 8(3) Author: Chen, Wei-Hsiang, University of California, Davis Haunschild, Kristine, University of California, Davis Lund, Jay R., University of California, Davis Fleenor, William E., University of California, Davis Publication Date: 2010 Publication Info: San Francisco Estuary and Watershed Science, John Muir Institute of the Environment, UC Davis Permalink: http://escholarship.org/uc/item/0qf4072h Keywords: drinking water, treatment cost, estuarine water quality Abstract: Sea level rise and the failure of subsided western islands are likely future conditions for the Sacramento-San Joaquin Delta. This study explores the current and long-term effects of changes in the Delta’s water quality on drinking treatment costs for alternative disinfection and additional disinfection byproduct (DBP) precursor removal. Current and likely future Delta water qualities were investigated for electrical conductivity and the concentrations of bromide, and organic carbon. With roughly 1.5 million acre-feet (af) per year of Delta water used for urban water supplies, the drinking water treatment cost differences of taking water from the south Delta and the Sacramento River upstream could amount to $30 to $90 million per year currently, and could rise to $200 to $1000 million per year in the future, with lower water quality and urban use of Delta waters rising to 2 million af annually. From these results, waters drawn directly from the Delta will likely become more difficult and expensive to treat, making the Delta less desirable as a conventional water source.
    [Show full text]