Standard Details 400 Storm Drainage

Total Page:16

File Type:pdf, Size:1020Kb

Standard Details 400 Storm Drainage STANDARD DETAILS 400 STORM DRAINAGE 410 ...... Yard Drain 459 ...... Reserved 411 ...... Reserved 460 ...... Swale Biofiltration Typical Section 412 ...... Catch Basin Type 1 461 ...... Pipe Outfall Quarry Spalls 413 ...... Catch Basin Type 1L 462 ...... Pipe Outfall Gabion Type 414 ...... Catch Basin Type 2 463 ...... Pipe Outfall Mortared Quarry Spall Mat 415 ...... Drop Inlet Type 1 464 ...... French Drain Under Road 416 ...... Drop Inlet Type 2 465 ...... Pipe and Section Trash Rack 417 ...... Reserved 466 ...... Cone Trash Rack 418 ...... Reserved 467 ...... Pipe Anchors 419 ...... Reserved 468 ...... Flow Splitter Type A 420 ...... Catch Basin Installation 469 ...... Flow Splitter Type B 421 ...... Thru-Curb Inlet Frame and Grate with Vertical 470 ...... Paved Areas and Area within the Right-of-Way Curb Installation 471 ...... Unpaved Areas Outside of the Right-of-Way 422 ...... Frame and Grate (20”X24”) 472 ...... Reserved 422A .... Frame and Grate (18”X24”) 473 ...... Reserved 423 ...... Solid Cover Rectangle 474 ...... Reserved 424 ...... Vaned-Grate Rectangle 475 ...... Reserved 425 ...... Open Curb Face Frame and Grate Detail 476 ...... Reserved 426 ...... Storm Drain Locking Manhole Frame and 477 ...... Reserved Cover 478 ...... Reserved 427 ...... Frame and Cover Adjustment 479 ...... Reserved 428 ...... Reserved 480 ...... Steep Slope Sign Installation 429 ...... Reserved 481 ...... Wetland Sign Installation 430 ...... Floatable Material Separator 6” or 8” Pipe 482 ...... Stream Sign Installation 431 ...... Floatable Material Separator 12” and Larger 483 ...... Reserved 432 ...... Reserved 484 ...... Reserved 433 ...... Reserved 485 ...... Reserved 434 ...... Reserved 486 ...... Reserved 435 ...... Oil Water Separator API Vault 487 ...... Reserved 436 ...... Oil Water Separator Coalescing Plate-Sample 488 ...... Reserved 437 ...... Oil Water Separator 489 ...... Reserved 438 ...... Reserved 490 ...... Reserved 439 ...... Control Structure 54” Diameter 491 ...... Reserved 440 ...... Control Structure 72” Dia. or Larger 492 ...... Reserved 441 ...... Restrictor Riser 493 ...... Reserved 442 ...... Reserved 494 ...... Reserved 443 ...... Secondary Orifice Detail 495 ...... Outfall to Ditch Layout Small Projects 444 ...... Shear Gate 496 ...... Outfall to Ditch Detail Small Projects 445 ...... Detention Pond with Biofiltration Swale 497 ...... Footing Drain 446 ...... Reserved 498 ...... Storm Pipe Cleanout 447 ...... Reserved 499 ...... Reserved 448 ...... Reserved T400..... Model Site Plan 3 Acres and Smaller 449 ...... Reserved T401..... Sediment Trap Earth Berm 450 ...... Reserved T402..... Riser Piping Element 451 ...... Reserved T403..... Sediment Pond with Riser Element 452 ...... Reserved T404..... Stabilized Construction Entrance 453 ...... Reserved T405..... Interceptor Ditch with Rock Check Dams 454 ...... Reserved T406..... Pipe Slope Drain 455 ...... Reserved T407..... Reserved 456 ...... Detention Pond Typical Sections T408..... Storm Inlet Protection 457 ...... Reserved T409..... Silt Fence 458 ...... Reserved 8 6" SD 7 10' PRIVATE 10' SD STUB (TYP.) SD EASEMENT EASEMENT LINE 10' PRIVATE SD EASEMENT SIDEWALK AND CURB STREET CATCH BASIN YARD DRAIN W/SOLID COVER YARD DRAIN (TYP.) STUB OUT FOR ROOF AND FOOTING DRAIN CONNECTIONS (TYP.) R.O.W. LOT LINE (TYP.) NOTE: SPECIAL CAST YARD DRAIN MAY BE REQUIRED FOR MULTIPLE PIPE CONNECTIONS. DETAIL NOTES: 4 1 YARD DRAINS TO BE CONSTRUCTED FROM CONCRETE PIPE, IN ACCORDANCE WITH ASTM C 14 UNLESS OTHERWISE SHOWN ON THE PLANS OR NOTED IN THE SPECIFICATIONS. 2 CUTOUT HOLE SIZE EQUAL TO OUTLET PIPE OUTSIDE DIAMETER PLUS YARD DRAIN WALL THICKNESS. 3 CONNECTION TO OUTLET PIPE TO BE MORTARED AND MADE FLUSH WITH INSIDE OF THE YARD DRAIN WALL. 3 2 4 CAST IRON BELL GRATE. FITS INTO BELL RECESS AND EXTENDS FLUSH WITH FACE OF BELL. THE GRATE SHALL HAVE SLOTS (HOLES) THAT CONSITUTE 1 50 PERCENT OPEN AREA FOR DRAINAGE. INLET BELL SURFACE SHALL BE FINISHED TO ASSURE NON- ROCKING FIT WITH ANY COVER. 6 5 CONCRETE 4 IN. MIN. 6 12" OR 18". 5 7 CONNECT TO CITY OWNED MAINTAINED SD SYSTEM IN THE STREET. 8 UP TO 5 CONNECTIONS PER SERVICE LINE. Standard City of Bothell Detail Approved By: YARD DRAIN 410 PUBLIC WORKS DEPARTMENT City Engineer Revision Date Feb, 2012 FRAME AND GRATE, PER STD DETAILS, 422 OR 425 OR FRAME W/SOLID COVER. NOTES: 1. AS AN ACCEPTABLE ALTERNATE TO REBAR, WIRE MESH HAVING A MINIMUM AREA OF 0.12 SQUARE INCHES PER FOOT MAY BE USED. WIRE MESH SHALL NOT BE PLACED IN KNOCKOUTS. 2. THE KNOCKOUT DIAMETER SHALL NOT BE GREATER THAN 20". KNOCKOUTS SHALL HAVE A WALL THICKNESS OF 2" MINIMUM TO 2 1/2" MAXIMUM. 3. THE MAXIMUM DEPTH FROM THE FINISHED GRADE TO THE PIPE INVERT SHALL BE 5'. 4. FRAME AND GRATE MAY BE INSTALLED WITH FLANGE DOWN OR CAST INTO ADJUSTMENT SECTION. 5. THE PRECAST BASE SECTION MAY HAVE A ROUNDED FLOOR AND THE WALLS MAY BE SLOPED AT A RATE OF 1:24 OR STEEPER. 6. OPENING SHALL BE MEASURED AT THE TOP OF THE PRECAST BASE UNIT. SEE NOTE #7 7. THE 6" ADJUSTMENT SECTION SHALL HAVE ONE #3 BAR CENTERED. THE 12" ADJUSTMENT SECTION SHALL HAVE TWO #3 BARS EQUALY SPACED. RECTANGULAR ADJUSTMENT SECTION 8. GROUT ALL JOINTS INSIDE AND OUTSIDE. #3 BAR EACH CORNER #3 BAR EACH SIDE #3 BAR EACH WAY PRECAST BASE SECTION CATCH BASIN AND ALL REINFORCING STEEL TO CONFORM TO WSDOT STANDARD PLAN B-5.20-01 Standard City of Bothell Detail Approved By: CATCH BASIN 412 PUBLIC WORKS DEPARTMENT TYPE 1 City Engineer Revision Date Feb, 2012 FRAME AND GRATE, OR FRAME & SOLID COVER. NOTES: 1. AS AN ACCEPTABLE ALTERNATE TO REBAR, WIRE MESH HAVING A MINIMUM AREA OF 0.12 SQUARE INCHES PER FOOT MAY BE USED. WIRE MESH SHALL NOT BE PLACED IN KNOCKOUTS. 2. THE KNOCKOUT DIAMETER SHALL NOT BE GREATER THAN 20". KNOCKOUTS SHALL HAVE A WALL THICKNESS OF 2" MINIMUM TO 2 1/2" MAXIMUM. 3. THE MAXIMUM DEPTH FROM THE FINISHED GRADE TO THE PIPE INVERT SHALL BE 5'. 4. FRAME AND GRATE MAY BE INSTALLED WITH FLANGE DOWN OR CAST INTO ADJUSTMENT ONE #3 BAR SECTION. HOOP FOR 6" 6" OR 12" TWO #3 BAR 5. THE PRECAST BASE SECTION MAY HAVE HOOPS FOR 12" A ROUNDED FLOOR AND THE WALLS MAY BE SLOPED AT A RATE OF 1:24 OR STEEPER. RECTANGULAR ADJUSTMENT SECTION 6. OPENING SHALL BE MEASURED AT THE TOP OF THE PRECAST BASE UNIT. 7. THE 6" ADJUSTMENT SECTION SHALL HAVE ONE #3 BAR CENTERED. THE 12" ADJUSTMENT SECTION SHALL HAVE TWO #3 BAR EQUALY SPACED. 8. GROUT ALL JOINTS INSIDE AND OUTSIDE. REDUCING SECTION TW0 #3 BAR HOOPS #3 BAR EACH CORNER #3 BAR EACH SIDE #3 BAR EACH WAY CATCH BASIN AND ALL REINFORCING STEEL PRECAST BASE SECTION TO CONFORM TO WSDOT STANDARD PLAN B-5.40-01 Standard City of Bothell Detail Approved By: CATCH BASIN 413 PUBLIC WORKS DEPARTMENT TYPE 1L City Engineer Revision Date Feb, 2012 CATCH BASIN FRAME AND GRATE OR MANHOLE RING AND COVER RECTANGULAR ADJUSTMENT SECTION OR CIRCULAR ADJUSTMENT SECTION 16" MAX 4" MIN FLAT SLAB TOP 48", 54", 60", 72", OR 96" MORTAR (TYP) STEPS SEE STD DETAIL 643 12" (TYP) 1" MIN 2 1/2" MAX 12" MAX MORTAR REINFORCING FILLET STEEL 12" 6" 6" NOTES: SEPARATE CAST IN PRECAST BASE WITH 1. NO STEPS ARE REQUIRED PLACE BASE INTEGRAL RISER WHEN HEIGHT IS 4' OR LESS. 2. THE BOTTOM OF THE PRECAST CATCH BASIN MAY GRAVEL BACKFILL FOR BE ROUNDED. PIPE ZONE BEDDING "0" RING 3. FRAME AND GRATE MAY 6" BE INSTALLED WITH FLANGE 12" DOWN OR CAST INTO ADJUSTMENT SECTION. SEPARATE PRECAST BASE 4. KNOCKOUTS SHALL HAVE A WALL THICKNESS OF 2" MINIMUM TO 2 1/2" MAXIMUM. CATCH BASIN DIMENSION TABLE 5. GROUT ALL JOINTS INSIDE AND OUTSIDE. MINIMUM BASE REINFORCING STEEL BASE 2 WALL BASE DISTANCE IN /FT IN EACH DIRECTION DIA THICKNESS BETWEEN THICKNESS THICKNESS SIZE KNOCKOUTS INTEGRAL BASE SEPARATE BASE 48" 4" 6" 36" 8" 0.15 0.23 54" 4 1/2" 8" 42" 8" 0.19 0.19 60" 5" 8" 48" 8" 0.25 0.25 72" 6" 8" 60" 12" 0.24 0.35 96" 8" 12" 84" 12" 0.29 0.39 Standard City of Bothell Detail Approved By: CATCH BASIN 414 PUBLIC WORKS DEPARTMENT TYPE 2 City Engineer Revision Date Feb, 2012 82" 36" 6" 12" 12" 6" 4" 4" C L 4" x 3" x 1/2" L Ditch A A 1 1/2" x 2'-11 1/4" ELEVATION GRATE SUPPORT-TWO REQ'D. PER GRATE 1/4" 12" 1/4" (TYP) PLAN VIEW 3" 40" (NOM) PLAN VIEW 6" (MIN) 2" TYP 1" END VIEW 39" SECTION B-B SECTION A-A 2' MIN. 1' MIN. MATERIAL SPECIFICATIONS 10 DITCH 1 LANE PRECAST CONCRETE CLASS B CAST-IN-PLACE CONCRETE CLASS C GRATE SUPPORT STEEL ASTM A36 DIKE INSTALLATION NOTES: FOR PREFERRED SLOPE 1. ANGLES SHALL BE SET SO THAT EA. BEARING BAR ON THE 8. AMOUNT, TYPE AND GRADE OF REINFORCING STEEL IS THE GRATE SHALL HAVE FULL SEATING AT BOTH ENDS. THE RESPONSIBILITY OF THE MANUFACTURER. FINISHED TOP OF CONC. SHALL BE EVEN W/ GRATE SURFACE. THE MANUFACTURER IS RESPONSIBLE FOR THE STRUCTURE UNTIL FINAL ACCEPTANCE IN PLACE WITH ALL REQUIRED 2. TOP OF INLET SHALL BE PLACED AT GROUND LEVEL TO KNOCKOUTS REMOVED. FINAL BRIDGE CONSTRUCTION IN PRESENT AN UNOBSTRUCTED DITCH OR MEDIAN SECTION. ADDITION, STRUCTURES MAY BE REJECTED BECAUSE OF 3. BEVEL OR ROUND EXPOSED CONCRETE EDGES 1/2". ANY OF THE FOLLOWING: A) FRACTURES OR CRACKS THAT EXTEND THROUGH THE 4. PIPE MAY ENTER THROUGH THE KNOCKOUTS AT ANY ENTIRE WALL FROM ANY OUTSIDE SURFACE TO THE REASONABLE ANGLE PROVIDED THE OUTSIDE OF THE PIPE KNOCKOUT OPENING. CAN BE CONTAINED WITHIN THE KNOCKOUT PROVIDED. B) ANY CONTINUOUS CRACK HAVING A SURFACE WIDTH 5. THE GRADE LINE OF THE LOWEST INLET PIPE SHALL ENTER OF 0.01" OR MORE AND EXTENDING A LENGTH OF THE STRUCTURE AT AN ELEV. EQUAL TO OR HIGHER THAN 12" OR MORE. THE GRADE LINE OF THE OUTLET PIPE. 9. GRATE SUPPORTS SHALL BE GALVANIZED AFTER FABRI- 6.
Recommended publications
  • Storm Drain Marking
    Storm Drain Marking Part of the City of Ashland Curb to Creek Campaign A STEP -BY-STEP GUIDE FOR NEIGHBORHOOD VOLUNTEER LEADERS Ashland Parks & Recreation North Mountain Park Nature Center 620 North Mountain Avenue Ashland, OR 97520 Phone: (541) 488-6606 Fax: (541) 488-6607 Email: [email protected] 1 Table of Contents What is Storm Drain Marking …………………………………………….……. Page 3 The First Steps for Neighborhood Leaders ……………………................. Page 3 Neighborhood Registration Form .......................………………............. Page 4 Getting Ready to Mark …...................…………………………….……....... Page 5 List of Materials in Marking Kits ……………………………….…………….Page 6 How to Mark the Storm Drain ..…......…....………………………………Pages 6-9 Safety First Locate and Prepare Stomp the Pad Record Activity Telling Neighbors about Curb to Creek …………………………….…….. Page 10 The Final Steps ..………...........................................………………….…Page 11 Project Report Form …………………………….………………………......... Page 12 Adult Volunteer Consent Form……………….………………………......... Page 13 Youth Volunteer Consent Form..…………….………………………......... Page 14 2 WHAT IS STORM DRAIN MARKING ? Storm drain marking is an educational program designed to inform citizens about the hazards of dumping pollutants into storm drains. The placards remind people that storm drains flow untreated, directly into local streams and creeks. Ashland’s storm drains are NOT connected to the sewage treatment plant. By placing storm drain markers, you can take an active roll in preventing pollution in your neighborhood. Volunteers may also distribute door hangers, informing citizens about the proper disposal of chemicals that could harm wildlife and pollute waterways. Storm drain marking helps build community and mobilize grass roots environmental protection. Marking also helps educate your neighbors about the importance of watershed protection. If you are interested, you can become a neighborhood leader for your own Storm Drain Stomp event.
    [Show full text]
  • Allen County Storm Drain Marking Guide022510
    The Allen County Surveyor’s Office has established a storm drain marking program to involve and educate the community of the harms of dumping pollutants down the storm drains. The following guidelines are provided to assist individuals, groups or organizations in planning, implementing, and preparing a successful storm drain marking event and to provide information on what citizens can do to prevent or reduce pollution that enters our waterways through storm drains. What is a Storm Drain? A storm drain is a network of underground pipes designed to control flooding by transporting stormwater from urban areas to a waterbody. The storm drain marking program involves marking storm drain inlets. The following are typical examples of storm inlets. What is Storm Drain Marking? Storm drain marking is labeling a storm drain inlet with a pre-printed marker, tile, sticker, or stencil that reads “ Dump No Waste - Drains to River ”, "Drains to Stream ”, or a similar written message that specifies the waterbody to which the storm drain inlet drains. Allen County has chosen a vinyl marker that comes in circular or rectangular form that is applied to the inlet with an adhesive or tie straps depending on the type of inlet being marked. Why Should We Mark Storm Drains? • Storm drain marking informs others about the street-to-river connection. Allen County 1 Storm Drain Marking Guide Surveyor’s Office • Many people may not realize that water flowing into storm drains or any material that is dumped or washes into the storm drains is not treated before it empties into a river, stream, or pond.
    [Show full text]
  • Drainage Design Manual
    THE CITY OF SAN DIEGO Transportation & Storm Water Design Manuals Drainage Design Manual January 2017 Edition The City of San Diego | Drainage Design Manual | January 2017 Edition DRAINAGE DESIGN MANUAL THIS PAGE INTENTIONALLY LEFT BLANK FOR DOUBLE-SIDED PRINTING The City of San Diego | Drainage Design Manual | January 2017 Edition CONTENT Contents Contents ............................................................................................................................................................... i Figures ............................................................................................................................................................... vii Tables .................................................................................................................................................................. ix Equations ............................................................................................................................................................. x 1. Introduction.............................................................................................................................................. 1-1 Policies ............................................................................................................................................... 1-1 Basic Objectives ......................................................................................................................... 1-2 Exceptions to Design Standards .............................................................................................
    [Show full text]
  • City Wide Drainage Assessment Report
    City of Summit City Wide Drainage Assessment Report Dept. of Community Services Division of Engineering Revised - July 2020 Aaron Schrager, City Engineer Rick Matias, Assistant City Engineer Lori Toth, Assistant Engineer Page 1 of 37 Table of Contents INTRODUCTION 3 SUMMARY 5 CATEGORY I – DRAINAGE LOCATIONS 1. Golf Course Pond (Permitting Phase) 7 2. Salt Brook 8 3. West End Avenue Erosion 9 4. Railroad Culverts 10 5. Middle Avenue Culvert 11 6. Beekman Road Culvert 12 CATEGORY II – DRAINAGE LOCATIONS 7. Briant Parkway, Easements near Springfield Avenue intersection 14 8. Portland Road – At Dorchester Road 15 9. Tulip Street – Oakland Place to Linden Place 16 10. Kenneth Court and Crest Acre Court 17 11. Morris Avenue at Elm Street Condo Driveway 18 12. Martins Brook 19 CATEGORY III – DRAINAGE LOCATIONS 13. Huntley Road (Under Construction) 21 14. Gloucester Road (Design Complete – Awaiting Construction) 22 15. Wade Drive 23 16. Sweet Briar Road / Plymouth Road (Under Construction - Phased) 24 17. Dorset Lane Icing 25 18. Club Drive 26 19. Ox Bow Lane 27 20. Princeton Street 28 21. Division Avenue Bridge (Part of #2) 29 22. Beverly Road & Sheridan Road 30 Page 2 of 37 COMPLETED PROJECTS (Pages 31-37) 1. 236 Springfield Avenue “The Dell” (Designed Completed-work not to be completed) 2. Whittredge Road/Dogwood Drive (Completed Fall 2007) 3. New Providence Avenue (Completed 2007) 4. Sheffield Road (Completed Fall 2008) 5. Memorial Field Basketball Courts (Completed 2008) 6. 8 & 12 Sweet Briar Road (Completed – Fall 2009) 7. Springfield Avenue and Summit Avenue (Completed – Fall 2009) 8. Laurel Avenue (Completed – Fall 2009) 9.
    [Show full text]
  • How Do Storm Drains Work?
    How do Storm Drains Work? The storm drainage system helps prevent floods by diverting rainwater into nearby waterways. During rainstorms, water runs off of buildings, roads, and other hard surfaces, picking up trash and pollutants along the way. The water and pollutants flow into storm drains and through underground pipes directly into the nearest stream, pond or water reservoir. What About the Drains in My House? The drains in your house are part of a different system, the wastewater system. Dirty water from inside your home flows into underground pipes that are connected to a wastewater treatment plant. The water from your home is cleaned before it is released back into creeks and streams. Stormwater is Not Treated? That’s right! The storm drainage system carries rainwater directly to creeks, streams, ponds and reservoirs. That is why it’s important to keep trash, motor oil, pesticides, and other chemicals from entering the storm drain – everything that goes in comes out in our waterways. Polluted water is harmful to fish, wildlife, and humans. Stormwater Provides Drinking Water to Us and Others Downstream Never pour or dump anything down a storm drain Keep streets clean Dispose of trash properly Rake leaves and debris away from storm drains Apply lawn and garden chemicals sparingly and according to directions Call Wilmington’s Wastewater Treatment Plant (below) to report pollution problems All Water is Recycled The same water that existed on earth in the beginning is still here. It continually moves around, through and above our planet as water vapor, liquid, and ice. The water that comes from our faucets may have been drinking water for the first man and woman.
    [Show full text]
  • Guide to Storm Drain Marking
    GUIDE TO STORM DRAIN MARKING TOWN OF WELLESLEY, DPW ENGINEERING DIVISION November 25, 2020 Guide to Storm Drain Marking Wellesley DPW Engineering Table of Contents Introduction .................................................................................................................................................. 2 What is Nonpoint Source? ........................................................................................................................... 2 What is a Storm Drain? ................................................................................................................................ 2 Why be Concerned with What Enters a Storm Drain System? ................................................................... 3 Why Mark Storm Drains? ............................................................................................................................. 3 Labeling Storm Drains .................................................................................................................................. 3 Types of Messages........................................................................................................................................ 4 Municipalities Role ....................................................................................................................................... 5 Planning Your Marking Project .................................................................................................................... 6 Remember ...................................................................................................................................................
    [Show full text]
  • Drainage Manual
    STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DRAINAGE MANUAL OFFICE OF DESIGN, DRAINAGE SECTION JANUARY 2017 TALLAHASSEE, FLORIDA Topic No. 625-040-002 Effective: January 2017 Drainage Manual TABLE OF CONTENTS Chapter 1 Introduction ................................................................................................ 1 1.1 Purpose ........................................................................................................... 1 1.2 Authority .......................................................................................................... 1 1.3 Scope .............................................................................................................. 1 1.4 General ........................................................................................................... 1 1.5 Documentation of Drainage Design ................................................................ 2 1.6 Appendices ..................................................................................................... 3 1.7 Distribution ...................................................................................................... 3 1.8 Procedure for Revisions and Updates ............................................................. 3 1.9 Training ........................................................................................................... 4 1.10 Forms Access ................................................................................................. 4 Chapter 2 Open Channel ...........................................................................................
    [Show full text]
  • G 600 STORM DRAIN STRUCTURES This Section Delineates the Structures Used by G 602 STRUCTURAL CRITERIA the City in Storm Drain Design
    June, 1969 TABLE OF CONTENTS STORM DRAIN STRUCTURES (G 600) SECTION NO. SUBJECT DATE G 601 Design Responsibility June, 1969 G 602 Structural Criteria " G 610 CONDUITS " G 611 Applications " G 612 Configurations " G 613 Loading ant Bedding " G 620 STANDARD STRUCTURES " G 621 Manholes " G 622 Junctions " G 623 Transitions " G 624 Catch Basins " G 630 SPECIAL STRUCTURES " G 631 Inlet Structures " G 631.1 Geometric Design " G 632 Outlet Structures " G 632.1 Geometric Design " G 633 Energy Dissipator " G 634 Debris Basins " G 635 Subdrains " G 636 Flapgates " G 637 Street Culverts " G 638 Outlet Chambers " G 639 Small Curb Outlets " G 640 APPURTENANT CONSTRUCTION " G 641 Supports, Relocations, and Removals " G 642 Concrete Blankets and Encasements " G 643 Anchor Blocks and Thrust Blocks " G 644 Concrete Collars and Seals " G 645 Debris Barriers " G 646 Protection Barriers " G 647 Fences and Gates " G 648 Access Roads " G 649 Resurfacing and Remodeling " June. 1969 LIST OF FIGURES NUMBER TITLE DATE G 602 Depth-Load Relationship June, 1969 G 612 Conveyance Factor--R.C. Pipe or Box " G 612A Hydraulic Properties-C.M. Pipe Flowing Full " G 612B Hydraulic Properties for Horseshoe Arch " G 613 D-Load for Case I Bedding of R C Pipe " G 613A Gage Requirements for C.M. Pipe " G 613B Pipes Under Railroad Tracks " G 621 Summary of Manhole and Junction Structures " G 622 Geometric Layout of Junctions " G 623 Summary of Transition Structures " G 623A Geometric Design of High Velocity Expansions " G 623B Geometric Design of High Velocity Contractions " G
    [Show full text]
  • Guide to Storm Drain Marking Preventing Water Pollution in Your Community
    LAKE COUNTY STORMWATER MANAGEMENT COMMISSION Guide to Storm Drain Marking Preventing Water Pollution in Your Community Contents Introduction This manual is a how-to guide for municipalities Introduction............................................................1 interested in starting a Storm Drain Marking Program to What is Nonpoint Source Pollution?......................1 What Nonpoint Source Pollutants..........................1 reduce nonpoint source pollution. Programs have been What is a Storm Drain?..........................................1 instituted across the country and this guide is a reflection of Marking and IEPA’s NPDES II Program...............1 those programs and how-to guides. Why Be Concerned with What Enters a Storm The guide covers mainly two methods for marking storm Drain......................................................................2 drain inlets. The Lake County Stormwater Management Why Mark Drains?................................................2 Commission (SMC) does not endorse one marking Types of Labeling..................................................2 Marking Options approach over another, and the guide does not represent a Types of Messages.................................................3 complete catalog of marking products. Its purpose is to give Placement of Message...........................................3 your municipality, and groups such as schools and civic The Municipality’s Role........................................3 groups, the tools to launch a successful citizen-education
    [Show full text]
  • Stormwater Drainage Design Overview
    SECTION 4.1 STORMWATER DRAINAGE DESIGN OVERVIEW 4.1.1 Stormwater Drainage System Design 4.1.1.1 Introduction Stormwater drainage design is an integral component of both site and overall stormwater management design. Good drainage design must strive to maintain compatibility and minimize interference with existing drainage patterns; control flooding of property, structures and roadways for design flood events; and minimize potential environmental impacts on stormwater runoff. Stormwater collection systems must be designed to provide adequate surface drainage while at the same time meeting other stormwater management goals such as water quality, streambank channel protection, habitat protection and groundwater recharge. 4.1.1.2 Drainage System Components In every location there are two stormwater drainage systems, the minor system and the major system. Three considerations largely shape the design of these systems: flooding, public safety and water quality. The minor drainage system is designed to remove stormwater from areas such as streets and sidewalks for public safety reasons. The minor drainage system consists of inlets, street and roadway gutters, roadside ditches, small channels and swales, and small underground pipe systems which collect stormwater runoff and transport it to structural control facilities, pervious areas and/or the major drainage system (i.e., natural waterways, large man-made conduits, and large water impoundments). Paths taken by runoff from very large storms are called major systems. The major system (designed for the less frequent storm up to the 100-yr level) consists of natural waterways, large man-made conduits, and large water impoundments. In addition, the major system includes some less obvious drainageways such as overload relief swales and infrequent temporary ponding areas.
    [Show full text]
  • MDOT Drainage Manual Road Storm Drainage Systems 7-3
    CHAPTER 7 ROAD STORM DRAINAGE SYSTEMS Note: All questions and comments should be directed to the Hydraulics Unit Supervisor, Environmental Services Section. Revised November 2015 Road Storm Drainage Systems 7-2 Chapter Table of Contents 7.1 Introduction/Purpose 7-6 7.2 Definitions 7-7 7.3 Policy and Design Criteria 7-10 7.3.1 Introduction 7-10 7.3.2 Storm Sewers 7-10 7.3.3 Bridge Decks 7-11 7.3.4 Curbs, Inlets, and Flumes 7-11 7.3.5 Detention Storage 7-11 7.3.6 Gutter Flow 7-11 7.3.7 Hydrology 7-12 7.3.8 Drainage Structures and Manholes 7-12 7.3.9 Locating Storm Sewers, Manholes, and Inlets 7-12 7.3.10 Roadside and Median Ditches 7-13 7.3.11 System Planning 7-13 7.4 Design Guidance and Procedure 7-14 7.4.1 Roadways with Enclosed Drainage 7-14 7.4.2 Depressed Roadways 7-14 7.4.3 Pavement and Bridge Deck Drainage 7-14 7.4.3.1 Cross Slope 7-14 7.4.3.2 Roadside and Median Channels 7-15 7.4.3.3 Medians/Barriers 7-15 7.4.3.4 Selection of Design Storm Frequency and Spread 7-15 7.4.3.5 Curb and Gutter 7-16 7.4.3.6 Gutter Flow Calculations 7-17 7.4.3.6.1 Introduction 7-17 7.4.3.6.2 Manning’s n for Pavements 7-17 7.4.3.6.3 Uniform Cross Slope Procedure 7-18 7.4.3.6.4 Composite Gutter Sections Procedure 7-18 7.4.3.6.5 V-Type Gutter Sections Procedure 7-24 MDOT Drainage Manual Road Storm Drainage Systems 7-3 7.4.4 Drainage Structures 7-25 7.4.4.1 Grate Inlets 7-25 7.4.4.2 Curb Opening Inlets 7-26 7.4.4.3 Combination Inlets 7-26 7.4.4.4 Slotted Drain Inlets 7-28 7.4.5 Inlet Locations 7-29 7.4.6 Inlet Spacing 7-30 7.4.6.1 General 7-30 7.4.6.2 Grate
    [Show full text]
  • Drainage Manual
    STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DRAINAGE MANUAL OFFICE OF DESIGN, DRAINAGE SECTION JANUARY 2016 TALLAHASSEE, FLORIDA Topic No. 625-040-002 Effective: January 2016 Drainage Manual TABLE OF CONTENTS Chapter 1 Introduction .................................................................................................... 4 1.1 Purpose ........................................................................................... 4 1.2 Authority .......................................................................................... 4 1.3 Scope .............................................................................................. 4 1.4 General ........................................................................................... 4 1.5 Documentation of Drainage Design ................................................ 5 1.6 Appendices ..................................................................................... 5 1.7 Distribution ...................................................................................... 6 1.8 Procedure for Revisions and Updates ............................................. 6 1.9 Training ........................................................................................... 6 1.10 Forms Access ................................................................................. 6 Chapter 2 Open Channel ............................................................................................... 7 2.1 Introduction ....................................................................................
    [Show full text]