Procurement Plan

I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan [Original: April 3, 2015]: Revision 9 of Updated Procurement Plan, Mar 2, 2017] 2. Date of General Procurement Notice: October 2015 3. Period covered by this procurement plan: The procurement period of project covered from October 2015 to December 2017

II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement:

Public Disclosure Authorized Type of Procurement Prior Review Comments Threshold US$ 1. Works Above USD 10M All 2. Goods Above USD 2M All

2. Prequalification. Bidders for _more than US$ 10 million_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines.

3. Reference to (if any) Project Operational/Procurement Manual: Project Operations Manual and SOPs for Procurement prepared by Planning and Public Disclosure Authorized Development Department AJK, Provincial Disaster Management Authority Punjab and Punjab Irrigation Department.

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Selection Method Prior Review Comments Threshold 3. Consulting firms Above USD 1M All 4. Individual Consultants Above USD 0.3 M All Public Disclosure Authorized 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. March 30, 2017 3. Any Other Special Selection Arrangements: None

March 30, 2017 PROCUREMENT : Disaster and Climate Resilience Improvement Project PLAN General Information Country: Pakistan Bank’s Approval Date of the Original Procurement Plan: 2016-09-26 Revised Plan Date(s): (comma delineated, leave blank if none)2021-01-05 Project ID: P154036 GPN Date: Project Name: Disaster and Climate Resilience Improvement Project Loan / Credit No: IDA / 56860 Executing Agency(ies):Planning and Development Department, AJK

WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

PK-PIU AJK-25294-CW-RFB / Package-01/PDO Restoration of damaged Hydro- power Houses & Flood Protection Structures of PDO Component 1: Restoring (containing three lots). Flood Protection Single Stage - One 2,090,717.1 2018-11- IDA / 56860 Post Request for Bids Open - National 2,242,790.00 Completed 2017-08-31 2017-09-05 2017-09-13 2017-10-17 2017-10-16 2017-11-01 2017-12-15 2017-11-22 2018-02-06 Lot-1 (3 sub-Projects of Infrastructure and Upgrading Envelope 8 22

Districts Hattian & 1 of Mzd) Flood Management Systems Lot-2 (2 sub-Projects of District Bagh) Lot-3 (2 sub-Projects of District Haveli)

PK-PIU AJK-25302-CW-RFB / Package-02/PDO Restoration of damaged Hydro- power Houses & Flood Protection Structures of PDO Component 1: Restoring (containing three lots). Flood Protection Single Stage - One 1,476,227.0 2018-12- IDA / 56860 Post Request for Bids Open - National 1,852,390.00 Signed 2017-09-15 2017-09-20 2017-09-13 2017-11-01 2017-12-01 2017-12-29 2018-04-23 Lot-1 (2 sub-Projects of Infrastructure and Upgrading Envelope 0 29

Districts Neelum) Flood Management Systems Lot-2 (3.0 MW Sharda HP in District Neelum) Lot-3 (3 sub-Projects of District )

PK-PIU AJK-30058-CW-RFB / Restoration of Flood Component 1: Restoring Protection Structures of Flood Protection Single Stage - One 2018-12- Package-1 (PP&H) at Bandi IDA / 56860 Post Request for Bids Open - National 989,160.00 810,291.85 Signed 2017-10-06 2017-10-11 2017-11-08 2017-11-22 2017-11-10 2017-12-06 2017-12-14 2018-01-01 2018-01-26 Infrastructure and Upgrading Envelope 31 Bagh near Nisar Camp, Chehla Flood Management Systems Bandi at Right Bank , District

PK-PIU AJK-56205-CW-RFB / Package-01/Irr. Rehabilitation of damaged flood protection structures of Irrigation (2 lots) Component 1: Restoring Lot-1 Flood protection at R&L Flood Protection Single Stage - One 1,246,194.3 2019-08- Bank of at IDA / 56860 Post Request for Bids Open - National 1,703,562.00 Signed 2018-04-10 2018-04-16 2018-04-10 2018-05-21 2018-06-25 2018-06-07 2018-08-20 2018-07-17 Infrastructure and Upgrading Envelope 0 20 Rawani Dist Mzd Flood Management Systems Lot-2 (3 sub-Projects) Ganda Salwani & Dhok Mughlan in Dist Mirpur & Dhok Panjeri in Bhimber

PK-PIU AJK-56194-CW-RFB / Package-03 /PDO Restoration of Flood damaged HP House & TL/ Structures of PDO (Two lots). Component 1: Restoring Lot-1 (Restoration of Flood Protection Single Stage - One 2019-08- IDA / 56860 Post Request for Bids Open - National 1,004,133.00 737,294.92 Signed 2018-04-10 2018-04-16 2018-04-06 2018-05-21 2018-06-25 2018-06-07 2018-08-13 2018-07-17 damaged work of 1.7 MW Infrastructure and Upgrading Envelope 13

Dhannah HPP Dist ) Flood Management Systems Lot-2 (2 sub-Projects of Reconstruction & Rehabilitation of 132 & 33 KV T Lines Dist Neelum

PK-PIU AJK-62281-CW-RFB / Package-02/Irr. Rehabilitation of damaged flood protection structures of Irrigation (2 lots) Component 1: Restoring Lot-1 Rehabilitation of FP Flood Protection Single Stage - One 2019-06- Structures along with BASAN IDA / 56860 Post Request for Bids Open - National 1,219,152.00 488,924.83 Signed 2018-05-21 2018-05-14 2018-05-28 2018-05-22 2018-07-02 2018-06-25 2018-08-06 2018-08-29 2018-10-01 2018-10-03 Infrastructure and Upgrading Envelope 28 NULLAH at Basan Sharif in Dist Flood Management Systems Haveli Lot-2 Rehabilitation of FP Structures along with NULLAH MAHL at Bagh

PK-PIU AJK-62282-CW-RFB / Package-2 (PP&H) Restoration Component 1: Restoring of Flood Protection Structures Flood Protection Single Stage - One 2019-05- along with Poonch River at IDA / 56860 Post Request for Bids Open - National 444,391.00 0.00 Canceled 2018-05-21 2018-05-28 2018-05-22 2018-07-02 2018-06-25 2018-07-16 2018-08-29 2018-09-03 Infrastructure and Upgrading Envelope 31 Dakhari Park Kotli City & Flood Management Systems Water Supply Schemes at Kotli & Nakyal , District Kotli.

PK-PIU AJK-65875-CW-RFB / PP&H P-3 Rehabilitation of Flood Protection Structures of Component 1: Restoring Pacakage-2 (PP&H 03 Sub- Flood Protection Single Stage - One 2019-07- Projects ) at 1. Mang Bajri IDA / 56860 Post Request for Bids Open - National 776,857.00 437,859.45 Signed 2018-06-11 2018-06-18 2018-06-25 2018-07-23 2018-07-16 2018-08-22 2018-08-29 2018-10-10 2018-10-11 Infrastructure and Upgrading Envelope 07 Nullah Mahl , 2. Along Flood Management Systems Malwani Nullah & 3. Along Nullah Mahl at Chatter II, in District Bagh.

PK-PIU AJK-65877-CW-RFB / PP&H Package -4 Component 1: Restoring ,Rehabilitation of Flood Flood Protection Single Stage - One 2019-07- Protection Structure IDA / 56860 Post Request for Bids Open - National 573,590.00 268,778.28 Signed 2018-06-11 2018-05-17 2018-06-18 2018-06-25 2018-07-23 2018-07-16 2018-08-22 2018-08-29 2018-10-10 2018-10-22 Infrastructure and Upgrading Envelope 07 Along Right Bank of Bhimber Flood Management Systems Nullah of Bhimber city, District Bhimber.

Page 1 PK-PIU AJK-70018-CW-RFB / Package-04/Irrigation Component 1: Restoring Restoration of the Irrigation Flood Protection Single Stage - One 2019-08- IDA / 56860 Post Request for Bids Open - National 640,428.00 0.00 Canceled 2018-07-23 2018-07-30 2018-08-28 2018-09-03 2018-10-08 2018-11-26 Infrastructure & Flood Infrastructure and Upgrading Envelope 23

Mitigation at Khani Da Phal Flood Management Systems District Bhimber

PK-PIU AJK-70016-CW-RFB / Package-03/Irrigation Component 1: Restoring Rehabilitation of Flood Flood Protection Single Stage - One 1,280,999.2 2019-11- Damaged Irrigation IDA / 56860 Post Request for Bids Open - National 2,203,238.00 Signed 2018-07-23 2018-07-30 2018-08-28 2018-09-03 2018-09-25 2018-09-24 2018-12-24 2018-11-12 2019-02-08 Infrastructure and Upgrading Envelope 7 12 Infrastructure at Kardala Flood Management Systems (Package-5) District Muzaffarabad

PK-PIU AJK-87166-CW-RFB / Procurement of Works i.e. Package-1 Forest "Restoration Component 1: Restoring of Soil Conservation Flood Protection Single Stage - One 2019-12- Structures in Tariqabad, IDA / 56860 Post Request for Bids Open - National 1,031,000.00 770,837.91 Signed 2018-11-16 2018-11-18 2018-11-21 2018-11-23 2019-01-02 2019-01-07 2019-02-01 2019-02-12 2019-03-08 2019-04-16 Infrastructure and Upgrading Envelope 07 Maakri, Gulshan Colony and Flood Management Systems Surrounding Creeks at Muzaffarabad City District Muzaffarabad"

PK-PIU AJK-70018-CW-RFB- Component 1: Restoring 2 / Restoration of the Flood Protection Single Stage - One 2019-12- Irrigation Infrastructure & IDA / 56860 Post Request for Bids Open - National 640,428.00 333,381.64 Signed 2018-12-24 2018-12-31 2018-12-27 2019-01-31 2019-01-29 2019-03-04 2019-02-12 2019-04-09 2019-04-02 Infrastructure and Upgrading Envelope 31 Flood Mitigation at Khani Da Flood Management Systems Phal District Bhimber

PK-PIU AJK-100790-CW-RFB / Irrigation Package-5 Component 1: Restoring "Rehabilitation And Flood Protection Single Stage - One 2019-12- IDA / 56860 Post Request for Bids Open - National 221,582.00 105,012.22 Signed 2019-02-18 2019-02-18 2019-02-25 2019-02-25 2019-03-28 2019-03-27 2019-04-22 2019-04-13 2019-05-28 2019-05-10 Improvement of Dandli to Roli Infrastructure and Upgrading Envelope 31

Water Channel Flood Management Systems Kotli"

PK-PIU AJK-101742-CW-RFB / Package-7 of Irrigation Component 1: Restoring Under Sector "Restoration of Flood Protection Single Stage - One 2019-12- IDA / 56860 Post Request for Bids Open - National 565,217.00 0.00 Implementat 2019-02-28 2020-07-29 2019-03-07 2020-07-31 2019-04-11 2019-05-02 2019-06-20 Damaged Flood Protection at Infrastructure and Upgrading Envelope 31 ion Baramulla and AAHI District Flood Management Systems Bhimber AJK

PK-PIU AJK-101759-CW-RFB / Package-6 of Irrigation " Component 1: Restoring Pending Restoration of Damaged Flood Flood Protection Single Stage - One 2019-12- IDA / 56860 Post Request for Bids Open - National 708,750.00 0.00 Implementat 2019-02-28 2019-03-07 2019-04-11 2019-05-02 2019-06-20 Protection of Majhoi, Kud Infrastructure and Upgrading Envelope 31 ion Bandway and Dhani Sayidan" Flood Management Systems District Muzaffarabad AJK.

PK-PIU AJK-62282-CW-RFB- 2 / PP&H Package-3 i.e. Restoration of Flood Component 1: Restoring Protection Structures along Flood Protection Single Stage - One 2019-12- IDA / 56860 Post Request for Bids Open - National 444,391.00 212,073.24 Signed 2019-04-08 2019-04-08 2019-04-15 2019-04-12 2019-05-15 2019-06-14 2019-05-29 2019-06-26 2019-07-03 2019-08-29 with Poonch River at Dakhari Infrastructure and Upgrading Envelope 31

Park Kotli City & Water Supply Flood Management Systems Schemes at Kotli & Nakyal , District Kotli.

PK-PIU AJK-109337-CW-RFB / Irrigation Package-2 Lot-I Component 1: Restoring i.e. Rehabilitation of damaged Flood Protection Single Stage - One 2019-12- IDA / 56860 Post Request for Bids Open - National 195,708.00 109,887.02 Signed 2019-04-08 2019-04-01 2019-04-13 2019-04-12 2019-05-13 2019-05-14 2019-06-12 2019-05-16 2019-07-17 2019-06-25 flood protection structures Infrastructure and Upgrading Envelope 31 along Basan Nullah at Basan Flood Management Systems Sharif in District Haveli.

PK-PIU AJK-199666-CW-RFB / Package-7 of Irrigation- Lot- I: Restoration of Damaged Flood Protection Structure at Component 1: Restoring Under Stadium and Allied Area of Flood Protection Single Stage - One 2021-07- IDA / 56860 Post Request for Bids Open - National 370,000.00 0.00 Implementat 2020-10-19 2020-10-28 2020-10-24 2020-11-10 2020-11-26 2020-12-26 2021-01-30 Stadium at Nullah Mahal Bagh Infrastructure and Upgrading Envelope 29 ion and Lot-II Rehabilitation of Flood Management Systems Damaged Flood Protection Structure along Nullah Mahl at Bani Pasri in District Bagh

PK-PIU AJK-199668-CW-RFB / Package-8 Lot-I: Rehabilitation of Damaged Flood Protection Structure at Component 1: Restoring Majhoi Lawasi and Dani Under Flood Protection Single Stage - One 2021-07- Sayidan District Muzaffarabad IDA / 56860 Post Request for Bids Open - National 270,000.00 0.00 Implementat 2020-10-19 2020-10-28 2020-10-24 2020-11-10 2020-11-27 2020-12-27 2021-01-31 Infrastructure and Upgrading Envelope 30 and Lot-II: Rehabilitation of ion Flood Management Systems Damaged Flood Protection at Hattian Bala Zalal Lake Nullah & Baghsar, at District Jhelum Velley

PK-PIU AJK-199673-CW-RFB / Package-9 of Irrigation Sector- Lot-I: Rehabilitation of Flood Damaged Protection Component 1: Restoring Under Structure at Pindi Jhunja Flood Protection Single Stage - One 2021-07- IDA / 56860 Post Request for Bids Open - National 610,000.00 0.00 Implementat 2020-10-19 2020-10-28 2020-10-24 2020-11-10 2020-11-25 2020-12-25 2021-01-29 District Bhimber and Lot-II Infrastructure and Upgrading Envelope 28 ion Rehabilitation Flood Damaged Flood Management Systems Protection Structures at Aahi, Kulyan and Barnala Bazar District Bhimber.

PK-PIU AJK-199677-CW-RFB / Package-5- PP&H- Reh of Damaged Flood Protec Stru at Lot-I: Left Bank of River Component 1: Restoring Neelum from Govt. Jinnah Under Flood Protection Single Stage - One 2021-09- High School to Sahaili Sarkar IDA / 56860 Post Request for Bids Open - National 844,000.00 0.00 Implementat 2020-10-19 2020-10-28 2020-10-24 2020-11-10 2020-11-25 2020-12-25 2021-01-29 Infrastructure and Upgrading Envelope 26 Bridge Mzd Lot-II: At Malwani ion Flood Management Systems Nullah Bagh Lot-III: Pindi Chowk, Punjab College, Mujahid Center, Primary School Bhimber

Page 2 PK-PIU AJK-199680-CW-RFB / Package-4 of PDO i.e. Restoration of Hydro Power Stations (HPS) at (Lot-I) Component 1: Restoring Sharda HPS Dist Neelum (Lot- Under Flood Protection Single Stage - One 2021-09- II) Sharian HPS, Kathai HPS & IDA / 56860 Post Request for Bids Open - National 552,500.00 0.00 Implementat 2020-10-19 2020-10-28 2020-10-24 2020-11-10 2020-11-25 2020-12-25 2021-01-29 Infrastructure and Upgrading Envelope 26 Leepa HPS Dist Hattian (Lot- ion Flood Management Systems III) Qadirabad HPS & Rehra HPS District Bagh (Lot-IV) Battar HPS & Hillan HPS District Haveli

GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

Component 1: Restoring Email dated January 20, 2016 Flood Protection Request for / NOL for Procurement of IDA / 56860 Prior Open - International 17,000.00 65.05 Terminated 2016-01-25 Infrastructure and Upgrading Quotations Furniture Flood Management Systems

Component 1: Restoring Email dated June 2, 2016 / Flood Protection Request for Procurement of Office IDA / 56860 Prior Open - International 18,000.00 20,378.11 Completed 2016-06-09 2016-06-15 Infrastructure and Upgrading Quotations Furniture for PIU Flood Management Systems

PK-PIU AJK-3735-GO-RFQ / Component 3: Project Request for Single Stage - One Purchase of IT equipment for IDA / 56860 Post Open - National 46,000.00 44,458.81 Completed 2016-12-03 2017-01-28 2016-06-16 2017-07-27 2016-06-28 Management Quotations Envelope PIU

PK-PIU AJK-3736-GO-RFQ / Component 3: Project Request for Single Stage - One Office Equipment (Electric) for IDA / 56860 Post Open - National 34,000.00 28,606.84 Completed 2016-12-03 2017-01-28 2016-06-27 2017-07-27 2016-07-11 Management Quotations Envelope PIU

PK-PIU AJK-2394-GO-RFQ / Component 3: Project Request for Single Stage - One IDA / 56860 Prior Open - National 280,144.00 270,479.40 Completed 2016-12-19 2017-01-30 2017-02-27 2017-04-24 2017-10-22 Office ( PIU) Vehicles (7) Management Quotations Envelope

PK-PIU AJK-6694-GO-RFQ / Component 2: Managing Request for Single Stage - One Procurement & erection of IDA / 56860 Disasters and Climate Post Open - National 19,230.00 11,928.05 Completed 2017-03-23 2017-04-10 2017-04-25 2017-05-10 2017-05-25 2017-05-24 Quotations Envelope Generator for PIU-DCRIP AJK Variability

PK-PIU AJK-6695-GO-RFQ / Component 3: Project Request for Single Stage - One Procurement of Photocopier IDA / 56860 Post Open - National 18,270.00 12,309.75 Completed 2017-03-24 2017-04-10 2017-04-18 2017-05-10 2017-05-18 2017-06-22 Management Quotations Envelope (Single Unit) for PIU-DCRIP AJK

PK-PIU AJK-6696-GO-RFQ / Component 2: Managing Request for Single Stage - One Procurement of 3 Motorcycles IDA / 56860 Disasters and Climate Post Open - National 3,847.00 3,317.91 Completed 2017-03-23 2017-04-10 2017-04-17 2017-05-10 2017-05-17 2017-06-08 Quotations Envelope for PIU-DCRIP AJK Variability

PK-PIU AJK-6697-GO-RFQ / Component 2: Managing Procurement & installation of Request for Single Stage - One IDA / 56860 Disasters and Climate Post Open - National 2,695.00 1,982.89 Completed 2017-03-23 2017-04-10 2017-04-20 2017-05-10 2017-05-20 2017-06-09 CC TV System for PIU-DCRIP Quotations Envelope Variability AJK

PK-PIU AJK-11473-GO-RFQ / Component 2: Managing Request for Single Stage - One Package-5 (Procurement of IT IDA / 56860 Disasters and Climate Post Open - National 31,327.00 54,540.28 Completed 2017-04-19 2017-06-14 2017-06-06 2017-07-14 2017-07-18 Quotations Envelope Equipment for SDMA &DDMA) Variability

PK-PIU AJK-11482-GO-RFQ / Package-6 Procurement of Component 2: Managing Request for Single Stage - One Electrical Equipment (11Nos IDA / 56860 Disasters and Climate Post Open - National 19,231.00 14,870.99 Completed 2017-04-19 2017-05-24 2017-06-06 2017-06-23 2017-07-27 Quotations Envelope Generators &UPS ) for SDMA & Variability DDMA

PK-PIU AJK-11522-GO-RFQ / Component 2: Managing Package-7 (Procurement of Request for Single Stage - One IDA / 56860 Disasters and Climate Post Open - National 12,260.00 32,380.41 Completed 2017-04-19 2017-05-24 2017-06-06 2017-06-23 2017-08-01 Office Furniture for SDMA & Quotations Envelope Variability DDMA)

PK-PIU AJK-12515-GO-RFB / Component 2: Managing Package-4 (Procurement of Single Stage - One IDA / 56860 Disasters and Climate Post Request for Bids Open - National 141,635.00 0.00 Canceled 2017-04-12 2017-04-14 2017-05-13 2017-05-26 2017-06-02 2017-06-12 2017-09-10 Communication Equipment Envelope Variability for SDMA & DDMA)

PK-PIU AJK-11471-GO-RFQ / Component 2: Managing Package-1 (Procurement of (6 Request for Single Stage - One IDA / 56860 Disasters and Climate Post Open - National 230,769.00 225,153.84 Completed 2017-04-30 2017-05-13 2017-06-11 2017-06-09 2017-10-09 2018-09-27 Nos) 4x4 Operational Vehicles Quotations Envelope Variability for SDMA )

PK-PIU AJK-25305-GO-RFQ / Establishment of Video Conferencing System along Component 3: Project Request for Single Stage - One with Installation and IDA / 56860 Post Open - National 46,100.00 15,815.59 Completed 2017-09-26 2017-12-05 2017-11-30 2018-02-23 2018-01-02 Management Quotations Envelope Configuration and allied hardware & Software for PIU Office

PK-PIU AJK-25309-GO-RFQ / Procurement & Installation of Component 3: Project Request for Single Stage - One Telephone Exchange with IDA / 56860 Post Open - National 3,350.00 2,532.14 Completed 2017-09-20 2017-11-06 2017-10-02 2018-01-05 2017-12-05 Management Quotations Envelope main console and (14) Telephone Sets for PIU Office

PK-PIU AJK-12514-GO-RFB / Package-3 (Procurement of Component 2: Managing Single Stage - One (5Nos) Rescue & Life Care IDA / 56860 Disasters and Climate Post Request for Bids Open - National 312,500.00 0.00 Canceled 2017-04-12 2017-04-14 2017-05-13 2017-05-26 2017-06-02 2017-06-12 2017-10-10 Envelope Ambulances for SDMA,1122 & Variability DDMA)

PK-PIU AJK-12513-GO-RFB / Package-2 (Procurement of Component 2: Managing Rescue Response Vehicles Single Stage - One IDA / 56860 Disasters and Climate Post Request for Bids Open - National 894,231.00 0.00 Canceled 2017-04-12 2017-04-14 2017-05-13 2017-05-26 2017-06-02 2017-06-12 2017-10-10 (3Nos Road Truck Cranes & Envelope Variability 3Nos Fire Tenders) For SDMA , DDMA & Rescue 1122 )

Page 3 PK-PIU AJK-37588-GO-RFB / Supply and conversion of (3) brand new (4x2) Truck chassis (RHD) with manual Component 1: Restoring transmission diesel engine 4 Flood Protection Single Stage - One stroke, 6 cylinder vertical in IDA / 56860 Post Request for Bids Open - National 375,000.00 316,789.98 Completed 2017-11-30 2017-12-05 2018-01-16 2018-01-30 2018-06-04 2018-02-20 2018-08-17 2018-06-20 2018-12-07 Infrastructure and Upgrading Envelope line, water cooled, Direct Flood Management Systems injection, power steering, engine displacement (7500- 8300) cc into Fire Fighting Vehicle.

PK-PIU AJK-37611-GO-RFB / Supply and conversion of (05 Nos) Brand New Wagon type Component 1: Restoring Van having wide body (Supper Flood Protection Single Stage - One long) High Roof with Dual Air IDA / 56860 Post Request for Bids Open - National 480,700.00 0.00 Canceled 2017-11-30 2017-12-05 2018-01-16 2018-01-30 2018-02-20 2018-06-20 Infrastructure and Upgrading Envelope Conditioner Model 2018 into Flood Management Systems Emergency Service Rescue Ambulance for SDMA, DDMA & Rescue 1122 (Package-3)

PK-PIU AJK-37616-GO-RFB / Supply of (02 Nos) 35-40 Component 1: Restoring Tons versatile truck mounted Flood Protection Single Stage - One IDA / 56860 Post Request for Bids Open - National 962,000.00 0.00 Canceled 2017-11-30 2017-12-05 2018-01-16 2018-02-07 2018-01-30 2018-09-10 2018-02-20 2018-06-20 fully foreign assembled Track Infrastructure and Upgrading Envelope crane for SDMA & Rescue Flood Management Systems 1122 (Package-2b)

PK-PIU AJK-37628-GO-RFB / Procurement of High Resolution Satellite Imageries at 0.31m Resolution (4 Bands) Component 1: Restoring for 2500 Sq.Km and Flood Protection Single Stage - One IDA / 56860 Post Request for Bids Open - National 130,500.00 135,698.57 Completed 2017-12-05 2017-12-08 2018-01-19 2018-02-02 2018-03-02 2018-03-02 2018-04-06 2018-05-31 2018-07-04 Procurement & Upgradation of Infrastructure and Upgrading Envelope

ERDAS IMAGINE, ArcGIS Basic Flood Management Systems to Enterprise, ESRI City Engine Licenses and Firewall Software for LUP, P&DD

PK-PIU AJK-37660-GO-RFB / Procurement of Heavy-duty Workstation for GIS modelling and DTM Component 1: Restoring generation/processing, Large Flood Protection Single Stage - One Format Scanner (62 Inch), IDA / 56860 Post Request for Bids Open - National 111,250.00 96,375.40 Completed 2017-12-05 2017-12-10 2018-01-21 2018-02-04 2018-02-28 2018-04-06 2018-05-29 2018-07-06 Infrastructure and Upgrading Envelope Laptop Core i7, GNSS System Flood Management Systems (Base + Rover) for Topographical surveying and Soil testing equipment for LUP P&DD

PK-PIU AJK-79757-GO-RFB / Procurement of Lot-I : World view-3 satellite Imageries with 8 bands Geo-area of Mirpur & Component 1: Restoring Bhimber 2250 Sq.Km. Lot-II : Flood Protection Single Stage - One IDA / 56860 Post Request for Bids Open - National 254,096.00 170,884.61 Completed 2018-10-10 2018-10-15 2018-11-22 2018-12-04 2018-12-06 2019-03-04 2019-01-03 2019-04-02 2019-04-03 2020-05-15 High resolution Digital Terrian Infrastructure and Upgrading Envelope

Model DEM at 5m resolution Flood Management Systems or less Geo-area of Neelum & some portion of Mzd. 3500Sq.Km for LUP, P&DD

PK-PIU AJK-79759-GO-RFQ / Component 1: Restoring Procurement of 25 Nos. Water Flood Protection Request for Single Stage - One IDA / 56860 Post Open - National 23,511.00 0.00 Canceled 2018-10-12 2018-11-28 2019-01-07 Suction Pumps along with Infrastructure and Upgrading Quotations Envelope

1125 Rf Pipe for SDMA Flood Management Systems

PK-PIU AJK-86684-GO-RFB / Communication Equipment for SDMA/DDMAs (Lot-I) Component 2: Managing Procurement of i. VHF Base Single Stage - One IDA / 56860 Disasters and Climate Post Request for Bids Open - National 115,500.00 69,328.70 Completed 2018-11-19 2018-11-05 2018-11-24 2018-11-21 2019-01-05 2018-12-19 2019-02-04 2019-01-30 2019-03-11 2019-03-21 2019-09-07 2019-05-20 Sets ii. VHF Mobile Sets iii. Envelope Variability VHF Walkie Talkie Sets & (Lot- II) Procurement of 50 No Satellite Phones.

PK-PIU AJK-93488-GO-RFB / Supply of Five (05) Imported Completely Foreign Finished Rescue & Emer Serv Component 1: Restoring Ambulances (Dies or Petr) Flood Protection Single Stage - One Fully Equipped on the Latest IDA / 56860 Post Request for Bids Open - National 480,700.00 0.00 Canceled 2019-01-03 2019-01-27 2019-01-08 2019-02-19 2019-02-11 2019-03-13 2019-03-18 2019-05-15 2019-04-15 2019-08-13 Infrastructure and Upgrading Envelope 2019 Model of Wagon Type Flood Management Systems High Roof Vehicle with Dual Air Conditioner and other accessories for Pakistan market.

PK-PIU AJK-37616-GO-RFB- 2 / Supply of (03 Nos) Component 1: Restoring Versatile Truck Mounted fully Flood Protection Single Stage - One IDA / 56860 Post Request for Bids Open - National 1,272,534.00 1,154,190.68 Completed 2019-05-06 2019-04-29 2019-05-11 2019-05-07 2019-06-22 2019-06-12 2019-07-06 2019-07-10 2019-07-27 2019-08-29 2019-11-24 2019-10-17 Foreign Assembled mobile Infrastructure and Upgrading Envelope

Cranes for SDMA & Rescue Flood Management Systems 1122 (Complete Job)

PK-PIU AJK-112103-GO-RFQ / Procurement of Lot-I- Conference Chairs (Revolving/Fixed) and 03 Component 2: Managing Request for Single Stage - One Seaters Visitors Bench & Lot-II- IDA / 56860 Disasters and Climate Post Open - National 17,650.00 12,098.33 Signed 2019-05-05 2019-05-06 2019-07-03 2019-06-17 2019-09-30 Quotations Envelope Photocopier Machine and Variability Multimedia with wall mounted and fixed Screen for SDMA/DDDMA Muzaffarabad.

PK-PIU AJK-135158-GO-RFB / FIVE (5) AMBULANCE VEHICLES Component 2: Managing Brand New Wagon Type Single Stage - One IDA / 56860 Disasters and Climate Post Request for Bids Open - National 382,531.08 329,296.58 Completed 2019-09-23 2019-09-27 2019-09-28 2019-09-30 2019-11-09 2019-10-31 2019-12-09 2019-11-05 2020-01-13 2019-12-20 2020-07-11 2020-03-19 (Model 2019) High Roof Envelope Variability SDMA/Emergency Service Rescue 1122 (Complete Job) Package-03 of SDMA

Page 4 PK-PIU AJK-165242-GO-DIR / Procurement of Equipment & Component 2: Managing Supplies for Health IDA / 56860 Disasters and Climate Post Direct Selection Direct 500,000.00 241,982.50 Completed 2020-03-23 2020-03-19 2020-03-28 2020-03-21 2020-05-02 2020-03-29 2020-10-29 2020-05-11 Department GoAJK to manage Variability COVID-19.

PK-PIU AJK-167493-GO-DIR / Procurement of Equipment & Component 2: Managing Under Emergency Supplies for IDA / 56860 Disasters and Climate Post Direct Selection Direct 293,000.00 253,174.51 Implementati 2020-04-04 2020-04-03 2020-04-09 2020-06-24 2020-04-20 2020-05-20 Department of Health Go,AJK Variability on to manage COVID-19

PK-PIU AJK-168780-GO-DIR / Establishment of Video Conferencing System in Component 2: Managing Under Health Secretariat IDA / 56860 Disasters and Climate Post Direct Selection Direct 15,000.00 0.00 Implementati 2020-04-16 2020-04-15 2020-04-21 2020-05-02 2020-06-01 Muzaffarabad Go,AJK for Variability on emergency coordination to manage Pandemic COVID-19 Crises.

PK-PIU AJK-169684-GO-RFQ Component 2: Managing / Establishment of Video Request for Single Stage - One IDA / 56860 Disasters and Climate Post Open - National 200,000.00 0.00 Canceled 2020-04-27 2020-06-22 2020-12-19 Conferencing Systems in all Quotations Envelope Variability 10 DDMAs of Azad

PK-PIU AJK-169683-GO-RFQ Component 2: Managing / Establishment of Video Request for Single Stage - One IDA / 56860 Disasters and Climate Post Open - National 200,000.00 0.00 Canceled 2020-04-27 2020-06-29 2020-06-22 2020-12-19 Conferencing Systems at 09 Quotations Envelope Variability Secretariat's of AJK Govt

PK-PIU AJK-186161-GO-RFB Component 2: Managing / Establishment of Video Single Stage - One IDA / 56860 Disasters and Climate Post Request for Bids Open - National 240,000.00 0.00 Canceled 2020-07-29 2020-07-29 2020-08-03 2020-07-31 2020-09-14 2020-10-14 2020-11-18 2021-05-17 Conferencing Systems in all Envelope Variability 10 DDMAs of

PK-PIU AJK-190175-GO-RFB / Establishment of Video Conferencing Systems Component 2: Managing Under (i) At 10 Secretariat Offices Single Stage - One IDA / 56860 Disasters and Climate Post Request for Bids Open - National 500,000.00 0.00 Implementati 2020-08-25 2020-07-30 2020-08-30 2020-10-11 2020-11-10 2020-12-15 2021-06-13 including 1 No MCU At Envelope Variability on Muzaffarabad (ii) At all 10 District DEOCs of GoAJK

PK-PIU AJK-200662-GO-RFB / SDMA Package-11 i.e. Lot-I Component 2: Managing 04 No-Life Care Ambulances Single Stage - One IDA / 56860 Disasters and Climate Post Request for Bids Open - National 430,000.00 0.00 Canceled 2020-10-29 2020-10-25 2020-11-03 2020-11-04 2020-12-15 2020-12-02 2021-01-14 2021-02-18 2021-08-17 Hi-Roof Van & Lot-II 04 NO- Envelope Variability Life Care Ambulances 4x4 Fabricated on Pick-up

PK-PIU AJK-200664-GO-RFB / SDMA Package-12 i.e. Lot-I 10 Nos of Fire Tender Vehicle (Mini) 4000 Liters on Truck Component 2: Managing Under Single Stage - One Chassis & 06 Nos of Water IDA / 56860 Disasters and Climate Post Request for Bids Open - National 820,000.00 0.00 Implementati 2020-10-29 2020-10-26 2020-11-03 2020-11-04 2020-12-15 2021-01-14 2021-02-18 2021-08-17 Envelope Bowser (Mini) 5000 Liters on Variability on Truck Chassis & Lot-II-Small Fire Tender on Suitable Pick up Chassis

PK-PIU AJK-200667-GO-RFB / SDMA Package-13 i.e. Lot-I 02 No Scissor Lifts/Aerial platform 16 meters (50-ft) Component 2: Managing Under Single Stage - One with firefighting facility IDA / 56860 Disasters and Climate Post Request for Bids Open - National 870,000.00 0.00 Implementati 2020-10-29 2020-10-25 2020-11-03 2020-11-04 2020-12-15 2021-01-14 2021-02-18 2021-08-17 Envelope system on truck chassis & Lot- Variability on II 06 No-Disaster Rescue Vehicles (DRVs) on Truck Chassis

PK-PIU AJK-200668-GO-RFB / SDMA Package-14 i.e. Lot-I Component 2: Managing Under - 01 NO Wheel Loader(160- Single Stage - One IDA / 56860 Disasters and Climate Post Request for Bids Open - National 245,000.00 0.00 Implementati 2020-10-29 2020-10-25 2020-11-03 2020-11-04 2020-12-15 2021-01-14 2021-02-18 2021-08-17 180) HP @ 1700-1800 rpm) & Envelope Variability on Lot-II - 02 No Fork Lifter ( 3- 5 tons)

PK-PIU AJK-211725-GO-RFB / SDMA Package-11 i.e. Lot-I Component 2: Managing Pending 03 No-Life Care Ambulances Single Stage - One IDA / 56860 Disasters and Climate Post Request for Bids Open - National 430,000.00 0.00 Implementati 2020-12-31 2021-01-05 2021-02-16 2021-03-18 2021-04-22 2021-10-19 Hi-Roof Van & Lot-II 05 NO- Envelope Variability on Life Care Ambulances 4x4 Fabricated on Pick-up

NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

SDMA Capacity Assessment / Hiring of consultant firm to Component 1: Restoring undertake capacity Consultant Flood Protection assessment of State Disaster IDA / 56860 Prior Qualification Open - International 160,000.00 137,354.01 Completed 2016-09-02 2016-07-20 2017-05-22 Infrastructure and Upgrading Management Authority Selection Flood Management Systems (SDMA) and develop a capacity enhancement plan.

Page 5 PK-PIU AJK-2396-CS-QCBS / Project proposal review, designing, planning, cost Component 2: Managing Quality And Cost- estimation, feasibility studies, IDA / 56860 Disasters and Climate Prior Open - International 1,500,000.00 1,947,974.71 Signed 2016-10-09 2016-10-12 2016-10-18 2016-10-21 2016-10-24 2016-10-30 2016-12-29 2016-11-05 2016-12-30 2019-09-30 Based Selection preparation of PC-1s, tender Variability documents, resident supervision etc

PK-PIU AJK-2397-CS-CQS / Component 2: Managing Consultant Baseline creation and third IDA / 56860 Disasters and Climate Post Qualification Open - National 290,000.00 282,252.86 Signed 2016-10-10 2016-10-13 2016-10-19 2016-10-22 2016-06-28 2016-10-28 2016-07-22 2019-09-30 party Monitoring/Validation. Variability Selection

PK-PIU AJK-2399-CS-CQS / Component 2: Managing Consultant Development of Emergency IDA / 56860 Disasters and Climate Post Qualification Open - National 250,000.00 233,538.01 Completed 2016-10-16 2016-05-12 2016-10-19 2016-10-25 2016-10-28 2016-06-28 2016-11-21 2016-07-20 2017-07-19 2017-05-31 Logistic Plan for SDMA Variability Selection

PK-PIU AJK-2400-CS-CQS / Component 2: Managing Consultant Development of Disaster Risk IDA / 56860 Disasters and Climate Post Qualification Open - National 280,000.00 276,309.34 Completed 2016-10-16 2016-05-12 2016-10-19 2016-10-25 2016-10-28 2016-06-28 2016-11-03 2016-07-22 2017-08-30 2017-06-02 Management Plans of State Variability Selection and 10 Districts

PK-PIU AJK-2402-CS-CQS / Mapping of Major Nullahs and Component 2: Managing Consultant Tributaries in AJK for IDA / 56860 Disasters and Climate Post Qualification Open - National 295,000.00 291,872.43 Completed 2016-10-16 2016-05-10 2016-10-19 2016-10-25 2016-10-28 2016-06-28 2016-11-21 2016-07-20 2017-07-19 2017-06-16 Proposing Gauging Stations Variability Selection for Flood Early Warning and Mitigation Measures

PK-PIU AJK-2398-CS-QCBS / Detailed Feasibility Study & Component 2: Managing Quality And Cost- Designing Flood Protection IDA / 56860 Disasters and Climate Post Open - International 769,231.00 519,988.54 Signed 2016-10-15 2016-10-18 2016-10-24 2016-10-27 2016-10-30 2016-12-22 2016-12-04 2017-03-10 2017-01-08 2017-03-17 2017-07-07 Based Selection Works for Mandi Kotli Variability Vulnerable Areas.

PK-PIU AJK-2404-CS-QCBS / Climate Impact , Soil erosion Impacts and landslides Component 2: Managing Quality And Cost- Assessment along with the IDA / 56860 Disasters and Climate Post Open - International 524,039.00 0.00 Canceled 2016-12-30 2017-01-20 2017-03-05 2017-04-02 2017-05-02 2017-06-06 2017-07-11 2018-07-11 Based Selection Recpmendation,Project Paper Variability and Policy Documents of AJK Climate Resilience Diagnostic

PK-PIU AJK-5915-CS-QCBS / Soil investigation, Geo- Component 2: Managing hazard, landslide Quality And Cost- IDA / 56860 Disasters and Climate Post Open - National 524,039.00 0.00 Canceled 2017-02-15 2017-09-25 2017-05-06 2017-09-27 2017-06-19 2017-07-17 2017-08-16 2017-09-20 2017-10-25 2018-10-25 susceptibility and Climate Based Selection Variability Change Resilience Studies in AJ&K

PK-PIU AJK-26781-CS-CQS / Landslide Stabilization to Component 2: Managing Consultant Safeguard Civil Population and IDA / 56860 Disasters and Climate Post Qualification Open - National 288,000.00 0.00 Canceled 2017-09-26 2017-09-07 2017-10-03 2017-09-13 2017-12-01 2017-12-15 2018-01-12 2018-09-09 Infrastructure of Variability Selection Muzaffarabad City - AJ&K

INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

Individual PK-PIU AJK-2380-CS-INDV / Component 3: Project IDA / 56860 Prior Consultant Open 80,769.00 83,655.65 Signed 2016-10-10 2016-10-19 2016-10-22 2016-12-27 2016-10-28 2015-12-01 2019-07-05 Financial Management Expert Management Selection

Individual PK-PIU AJK-2381-CS-INDV / Component 3: Project IDA / 56860 Prior Consultant Open 80,769.00 17,681.22 Terminated 2016-10-10 2016-10-19 2016-10-22 2016-12-27 2016-10-28 2016-03-18 2019-07-05 Procurement Expert Management Selection

Individual PK-PIU AJK-2383-CS-INDV / Component 3: Project IDA / 56860 Prior Consultant Open 80,769.00 37,545.53 Terminated 2016-10-10 2016-10-19 2016-10-22 2016-12-27 2016-10-28 2015-12-01 2019-07-05 Environmental Expert Management Selection

Individual PK-PIU AJK-2385-CS-INDV / Component 3: Project IDA / 56860 Post Consultant Open 80,769.00 74,757.76 Signed 2016-11-01 2016-12-20 2017-01-10 2017-04-10 2017-02-14 2017-05-11 2019-09-30 Project Manager DCRIP Management Selection

Individual PK-PIU AJK-2388-CS-INDV / Component 3: Project IDA / 56860 Post Consultant Open 34,615.00 29,712.32 Terminated 2016-11-01 2016-12-20 2017-01-10 2017-02-14 2016-06-03 2019-09-30 IT Expert Management Selection

PK-PIU AJK-2392-CS-INDV / Individual Component 3: Project AutoCAD / Drafting IDA / 56860 Post Consultant Open 2,885.00 333.95 Completed 2016-10-10 2016-10-18 2016-10-21 2016-10-27 2016-09-01 2017-04-25 2017-02-28 Management Technician Selection

Individual PK-PIU AJK-5913-CS-INDV / Component 3: Project IDA / 56860 Prior Consultant Open 69,230.00 61,065.79 Signed 2017-01-26 2017-02-01 2017-03-10 2017-03-24 2017-04-07 2017-04-28 2017-04-10 2019-11-30 Procurement Expert Management Selection

Component 2: Managing Individual PK-PIU AJK-11655-CS-INDV IDA / 56860 Disasters and Climate Post Consultant Open 103,125.00 88,753.16 Signed 2017-04-05 2017-04-05 2017-04-12 2017-04-12 2017-04-30 2017-05-02 2019-11-30 / Coordinator (Based in P&DD) Variability Selection

PK-PIU AJK-11688-CS-INDV Individual Component 3: Project / Social Safeguard Expert PIU- IDA / 56860 Post Consultant Open 66,635.00 60,174.77 Terminated 2017-04-05 2017-04-10 2017-04-15 2017-03-28 2017-04-24 2017-04-24 2019-11-30 Management AJ&K Selection

Component 2: Managing Individual PK-PIU AJK-11724-CS-INDV IDA / 56860 Disasters and Climate Post Consultant Open 12,115.00 11,450.38 Completed 2017-04-05 2017-04-05 2017-04-10 2017-03-28 2017-04-17 2017-04-17 2017-10-16 2017-10-17 / Infrastructure Specialist Variability Selection

PK-PIU AJK-11728-CS-INDV Individual Component 3: Project / Monitoring and Evaluation IDA / 56860 Post Consultant Open 66,635.00 22,201.10 Terminated 2017-04-05 2017-04-05 2017-04-05 2017-04-07 2017-04-06 2017-04-07 2019-11-30 Management Expert Selection

Component 2: Managing Individual PK-PIU AJK-11730-CS-INDV IDA / 56860 Disasters and Climate Post Consultant Open 66,635.00 10,572.18 Terminated 2017-04-05 2017-04-05 2017-04-10 2017-03-29 2017-04-17 2017-04-18 2019-11-30 / GIS Specialist Variability Selection

Page 6 Component 2: Managing Individual PK-PIU AJK-2386-CS-INDV / IDA / 56860 Disasters and Climate Prior Consultant Open 103,846.00 0.00 Canceled 2016-11-01 2016-12-20 2017-01-10 2017-02-14 2019-09-30 Coordinator (Based in P&DD) Variability Selection

Individual PK-PIU AJK-2384-CS-INDV / Component 3: Project IDA / 56860 Prior Consultant Open 80,769.00 0.00 Canceled 2016-11-01 2016-12-20 2017-01-10 2017-02-14 2019-09-30 Social Safeguard Expert Management Selection

Component 2: Managing Individual PK-PIU AJK-2391-CS-INDV / IDA / 56860 Disasters and Climate Prior Consultant Open 11,538.00 0.00 Canceled 2016-11-01 2016-12-20 2017-01-10 2017-02-14 2017-08-13 Infrastructure Specialist Variability Selection

PK-PIU AJK-2387-CS-INDV / Individual Component 3: Project Monitoring and Evaluation IDA / 56860 Prior Consultant Open 80,769.00 0.00 Canceled 2016-11-01 2016-12-20 2017-01-10 2017-02-14 2019-09-30 Management Expert Selection

Component 2: Managing Individual PK-PIU AJK-2389-CS-INDV / IDA / 56860 Disasters and Climate Prior Consultant Open 11,538.00 0.00 Canceled 2016-11-01 2016-12-20 2017-01-10 2017-02-14 2018-02-14 GIS Specialist Variability Selection

PK-PIU AJK-21250-CS-INDV Component 2: Managing Individual / Environmental Expert PIU- IDA / 56860 Disasters and Climate Post Consultant Open 56,000.00 51,267.44 Signed 2017-07-24 2017-08-08 2017-08-11 2017-09-07 2017-08-15 2017-09-21 2019-11-30 DCRIP Variability Selection

Component 1: Restoring PK-PIU AJK-30285-CS-INDV Individual Flood Protection / Infrastructure Specialist PIU- IDA / 56860 Post Consultant Open 50,000.00 48,410.07 Signed 2017-09-29 2017-10-08 2017-10-13 2017-10-17 2017-10-17 2017-10-17 2019-11-30 Infrastructure and Upgrading DCRIP Selection Flood Management Systems

PK-PIU AJK-67875-CS-INDV Individual Component 3: Project / Monitoring & Evaluation IDA / 56860 Post Consultant Open 20,000.00 9,882.47 Terminated 2018-07-03 2019-01-01 2018-08-07 2019-04-24 2018-08-10 2019-04-24 2018-08-20 2019-04-30 2019-06-30 Management Expert for PIU-DCRIP Selection

PK-PIU AJK-90242-CS-INDV Individual Component 3: Project / Procurement Expert DCRIP IDA / 56860 Post Consultant Open 15,000.00 20,539.71 Signed 2018-12-17 2019-03-10 2019-01-27 2019-07-11 2019-02-11 2019-07-12 2019-02-22 2019-07-22 2019-11-30 Management AJK. Selection

PK-PIU AJK-90281-CS-INDV Individual Component 3: Project / Social Safeguard Expert for IDA / 56860 Post Consultant Open 15,000.00 9,882.47 Signed 2018-12-14 2019-01-26 2019-04-24 2019-02-11 2019-04-24 2019-02-22 2019-04-30 2019-11-30 Management PIU-DCRIP AJK Selection

PK-PIU AJK-145189-CS-INDV Individual Component 3: Project / Hiring of Monitoring & IDA / 56860 Post Consultant Open 16,645.00 13,100.29 Signed 2019-11-14 2019-11-22 2019-12-24 2020-02-17 2020-01-06 2020-02-17 2020-02-03 2020-02-26 2020-12-24 Management Evaluation (M&E) Expert Selection

PK-PIU AJK-166599-CS-CDS Component 3: Project / Hiring of Assistant IDA / 56860 Post Direct Selection Direct 9,000.00 5,565.86 Signed 2020-03-28 2020-03-31 2020-04-07 2020-04-06 2020-04-19 2020-04-15 2020-12-31 Management Procurement Expert

Page 7