World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document Procurement Plan I. General Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan [Original: April 3, 2015]: Revision 9 of Updated Procurement Plan, Mar 2, 2017] 2. Date of General Procurement Notice: October 2015 3. Period covered by this procurement plan: The procurement period of project covered from October 2015 to December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Public Disclosure Authorized Type of Procurement Prior Review Comments Threshold US$ 1. Works Above USD 10M All 2. Goods Above USD 2M All 2. Prequalification. Bidders for _more than US$ 10 million_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Reference to (if any) Project Operational/Procurement Manual: Project Operations Manual and SOPs for Procurement prepared by Planning and Public Disclosure Authorized Development Department AJK, Provincial Disaster Management Authority Punjab and Punjab Irrigation Department. III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 3. Consulting firms Above USD 1M All 4. Individual Consultants Above USD 0.3 M All Public Disclosure Authorized 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. March 30, 2017 3. Any Other Special Selection Arrangements: None March 30, 2017 PROCUREMENT Pakistan : Disaster and Climate Resilience Improvement Project PLAN General Information Country: Pakistan Bank’s Approval Date of the Original Procurement Plan: 2016-09-26 Revised Plan Date(s): (comma delineated, leave blank if none)2021-01-05 Project ID: P154036 GPN Date: Project Name: Disaster and Climate Resilience Improvement Project Loan / Credit No: IDA / 56860 Executing Agency(ies):Planning and Development Department, AJK WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned PK-PIU AJK-25294-CW-RFB / Package-01/PDO Restoration of damaged Hydro- power Houses & Flood Protection Structures of PDO Component 1: Restoring (containing three lots). Flood Protection Single Stage - One 2,090,717.1 2018-11- IDA / 56860 Post Request for Bids Open - National 2,242,790.00 Completed 2017-08-31 2017-09-05 2017-09-13 2017-10-17 2017-10-16 2017-11-01 2017-12-15 2017-11-22 2018-02-06 Lot-1 (3 sub-Projects of Infrastructure and Upgrading Envelope 8 22 Districts Hattian & 1 of Mzd) Flood Management Systems Lot-2 (2 sub-Projects of District Bagh) Lot-3 (2 sub-Projects of District Haveli) PK-PIU AJK-25302-CW-RFB / Package-02/PDO Restoration of damaged Hydro- power Houses & Flood Protection Structures of PDO Component 1: Restoring (containing three lots). Flood Protection Single Stage - One 1,476,227.0 2018-12- IDA / 56860 Post Request for Bids Open - National 1,852,390.00 Signed 2017-09-15 2017-09-20 2017-09-13 2017-11-01 2017-12-01 2017-12-29 2018-04-23 Lot-1 (2 sub-Projects of Infrastructure and Upgrading Envelope 0 29 Districts Neelum) Flood Management Systems Lot-2 (3.0 MW Sharda HP in District Neelum) Lot-3 (3 sub-Projects of District Poonch) PK-PIU AJK-30058-CW-RFB / Restoration of Flood Component 1: Restoring Protection Structures of Flood Protection Single Stage - One 2018-12- Package-1 (PP&H) at Bandi IDA / 56860 Post Request for Bids Open - National 989,160.00 810,291.85 Signed 2017-10-06 2017-10-11 2017-11-08 2017-11-22 2017-11-10 2017-12-06 2017-12-14 2018-01-01 2018-01-26 Infrastructure and Upgrading Envelope 31 Bagh near Nisar Camp, Chehla Flood Management Systems Bandi at Right Bank Neelum River , District Muzaffarabad PK-PIU AJK-56205-CW-RFB / Package-01/Irr. Rehabilitation of damaged flood protection structures of Irrigation (2 lots) Component 1: Restoring Lot-1 Flood protection at R&L Flood Protection Single Stage - One 1,246,194.3 2019-08- Bank of Jhelum River at IDA / 56860 Post Request for Bids Open - National 1,703,562.00 Signed 2018-04-10 2018-04-16 2018-04-10 2018-05-21 2018-06-25 2018-06-07 2018-08-20 2018-07-17 Infrastructure and Upgrading Envelope 0 20 Rawani Dist Mzd Flood Management Systems Lot-2 (3 sub-Projects) Ganda Salwani & Dhok Mughlan in Dist Mirpur & Dhok Panjeri in Bhimber PK-PIU AJK-56194-CW-RFB / Package-03 /PDO Restoration of Flood damaged HP House & TL/ Structures of PDO (Two lots). Component 1: Restoring Lot-1 (Restoration of Flood Protection Single Stage - One 2019-08- IDA / 56860 Post Request for Bids Open - National 1,004,133.00 737,294.92 Signed 2018-04-10 2018-04-16 2018-04-06 2018-05-21 2018-06-25 2018-06-07 2018-08-13 2018-07-17 damaged work of 1.7 MW Infrastructure and Upgrading Envelope 13 Dhannah HPP Dist Kotli) Flood Management Systems Lot-2 (2 sub-Projects of Reconstruction & Rehabilitation of 132 & 33 KV T Lines Dist Neelum PK-PIU AJK-62281-CW-RFB / Package-02/Irr. Rehabilitation of damaged flood protection structures of Irrigation (2 lots) Component 1: Restoring Lot-1 Rehabilitation of FP Flood Protection Single Stage - One 2019-06- Structures along with BASAN IDA / 56860 Post Request for Bids Open - National 1,219,152.00 488,924.83 Signed 2018-05-21 2018-05-14 2018-05-28 2018-05-22 2018-07-02 2018-06-25 2018-08-06 2018-08-29 2018-10-01 2018-10-03 Infrastructure and Upgrading Envelope 28 NULLAH at Basan Sharif in Dist Flood Management Systems Haveli Lot-2 Rehabilitation of FP Structures along with NULLAH MAHL at Bagh PK-PIU AJK-62282-CW-RFB / Package-2 (PP&H) Restoration Component 1: Restoring of Flood Protection Structures Flood Protection Single Stage - One 2019-05- along with Poonch River at IDA / 56860 Post Request for Bids Open - National 444,391.00 0.00 Canceled 2018-05-21 2018-05-28 2018-05-22 2018-07-02 2018-06-25 2018-07-16 2018-08-29 2018-09-03 Infrastructure and Upgrading Envelope 31 Dakhari Park Kotli City & Flood Management Systems Water Supply Schemes at Kotli & Nakyal , District Kotli. PK-PIU AJK-65875-CW-RFB / PP&H P-3 Rehabilitation of Flood Protection Structures of Component 1: Restoring Pacakage-2 (PP&H 03 Sub- Flood Protection Single Stage - One 2019-07- Projects ) at 1. Mang Bajri IDA / 56860 Post Request for Bids Open - National 776,857.00 437,859.45 Signed 2018-06-11 2018-06-18 2018-06-25 2018-07-23 2018-07-16 2018-08-22 2018-08-29 2018-10-10 2018-10-11 Infrastructure and Upgrading Envelope 07 Nullah Mahl , 2. Along Flood Management Systems Malwani Nullah & 3. Along Nullah Mahl at Chatter II, in District Bagh. PK-PIU AJK-65877-CW-RFB / PP&H Package -4 Component 1: Restoring ,Rehabilitation of Flood Flood Protection Single Stage - One 2019-07- Protection Structure IDA / 56860 Post Request for Bids Open - National 573,590.00 268,778.28 Signed 2018-06-11 2018-05-17 2018-06-18 2018-06-25 2018-07-23 2018-07-16 2018-08-22 2018-08-29 2018-10-10 2018-10-22 Infrastructure and Upgrading Envelope 07 Along Right Bank of Bhimber Flood Management Systems Nullah of Bhimber city, District Bhimber. Page 1 PK-PIU AJK-70018-CW-RFB / Package-04/Irrigation Component 1: Restoring Restoration of the Irrigation Flood Protection Single Stage - One 2019-08- IDA / 56860 Post Request for Bids Open - National 640,428.00 0.00 Canceled 2018-07-23 2018-07-30 2018-08-28 2018-09-03 2018-10-08 2018-11-26 Infrastructure & Flood Infrastructure and Upgrading Envelope 23 Mitigation at Khani Da Phal Flood Management Systems District Bhimber PK-PIU AJK-70016-CW-RFB / Package-03/Irrigation Component 1: Restoring Rehabilitation of Flood Flood Protection Single Stage - One 1,280,999.2 2019-11- Damaged Irrigation IDA / 56860 Post Request for Bids Open - National 2,203,238.00 Signed 2018-07-23 2018-07-30 2018-08-28 2018-09-03 2018-09-25 2018-09-24 2018-12-24 2018-11-12 2019-02-08 Infrastructure and Upgrading Envelope 7 12 Infrastructure at Kardala Flood Management Systems (Package-5) District Muzaffarabad PK-PIU AJK-87166-CW-RFB / Procurement of Works i.e. Package-1 Forest "Restoration Component 1: Restoring of Soil Conservation Flood Protection Single Stage - One 2019-12- Structures in Tariqabad, IDA / 56860 Post Request for Bids Open - National 1,031,000.00 770,837.91 Signed 2018-11-16 2018-11-18 2018-11-21 2018-11-23 2019-01-02 2019-01-07 2019-02-01 2019-02-12 2019-03-08 2019-04-16 Infrastructure and Upgrading Envelope 07 Maakri, Gulshan Colony and Flood Management Systems Surrounding Creeks at Muzaffarabad City District Muzaffarabad" PK-PIU AJK-70018-CW-RFB- Component 1: Restoring 2 / Restoration of the Flood Protection Single Stage - One 2019-12- Irrigation Infrastructure & IDA / 56860 Post Request for Bids Open - National 640,428.00 333,381.64 Signed
Recommended publications
  • NW-49 Final FSR Jhelum Report
    FEASIBILITY REPORT ON DETAILED HYDROGRAPHIC SURVEY IN JHELUM RIVER (110.27 KM) FROM WULAR LAKE TO DANGPORA VILLAGE (REGION-I, NW- 49) Submitted To INLAND WATERWAYS AUTHORITY OF INDIA A-13, Sector-1, NOIDA DIST-Gautam Buddha Nagar UTTAR PRADESH PIN- 201 301(UP) Email: [email protected] Web: www.iwai.nic.in Submitted By TOJO VIKAS INTERNATIONAL PVT LTD Plot No.4, 1st Floor, Mehrauli Road New Delhi-110074, Tel: +91-11-46739200/217 Fax: +91-11-26852633 Email: [email protected] Web: www.tojovikas.com VOLUME – I MAIN REPORT First Survey: 9 Jan to 5 May 2017 Revised Survey: 2 Dec 2017 to 25 Dec 2017 ACKNOWLEDGEMENT Tojo Vikas International Pvt. Ltd. (TVIPL) express their gratitude to Mrs. Nutan Guha Biswas, IAS, Chairperson, for sparing their valuable time and guidance for completing this Project of "Detailed Hydrographic Survey in Ravi River." We would also like to thanks Shri Pravir Pandey, Vice-Chairman (IA&AS), Shri Alok Ranjan, Member (Finance) and Shri S.K.Gangwar, Member (Technical). TVIPL would also like to thank Irrigation & Flood control Department of Srinagar for providing the data utilised in this report. TVIPL wishes to express their gratitude to Shri S.V.K. Reddy Chief Engineer-I, Cdr. P.K. Srivastava, Ex-Hydrographic Chief, IWAI for his guidance and inspiration for this project. We would also like to thank Shri Rajiv Singhal, A.H.S. for invaluable support and suggestions provided throughout the survey period. TVIPL is pleased to place on record their sincere thanks to other staff and officers of IWAI for their excellent support and co-operation through out the survey period.
    [Show full text]
  • Pir Panjal Regional Festival Integrating the Isolated Border Districts in J&K & Building Peace from Below*
    No 142 IPCS ISSUE BRIEF No 142 APRIL 2010 APRIL 2010 Building Peace & Countering Radicalization Pir Panjal Regional Festival Integrating the Isolated Border Districts in J&K & Building Peace from Below* D. Suba Chandran Deputy Director, IPCS, New Delhi This essay focus on two districts in the Jammu sub region of J&K—Rajouri and Poonch, along the Pir Panjal range of the outer Himalayas. The primary objective is to highlight the conflict transformation (both positive and negative) in this region during the recent years; to explore the opportunities of an Pir Panjal festival bringing the various communities together and build peace from below; integrate the border districts with the national mainstream; and improve the physical and psychological connectivity of the Pir Panjal region with the rest and remove the feeling of physical isolation. Idea of using a festival to promote tourism in J&K is not a new one; those who have witnessed the Ladakh festival, in all its colorful glory and culturally rich historical past, would agree how it has brought the region, its people and culture to the limelight. Of course, there are other places – from Dal lake to Gulmarg and from Bhaderwah to Basohli, which can easily boast the same – in terms of their rich culture, colorful people and beautiful places. The irony of J&K, however has been - there are numerous such regions in J&K, unfortunately remaining in the periphery, physically isolated and psychologically looking inward. Ladakh festival, now celebrated during August every year, attracts global attention and tourists who visit the land of moon, as it is popularly referred, to enjoy the culture, people and places.
    [Show full text]
  • Listen to the River
    2 - LESSONS FROM A GLOBAL REVIEW OF ENVIRONMENTAL FLOW SUCCESS STORIES 3 ACKNOWLEDGEMENTS Citation: Harwood, A., Johnson, S., Richter, B., Locke, A., Yu, X. and Tickner, D. 2017. We would like to thank the following participants who generously donated their time to participate in Listen to the river: Lessons from a global review of environmental flow success stories, the oral case study interviews and provide written comments on the interview notes and case study WWF-UK, Woking, UK synopses. Their viewpoints and input are fundamental to this report and we are grateful for their time and expertise: Eric Krueger (The Nature Conservancy), Harry Shelley (Savannah River Basin Advisory Council), ABOUT WWF Stan Simpson (United States Army Corps of Engineers), Andy Warner (CDM Smith, formerly The At WWF, we believe that a living planet – from the global climate to local environments – is vital Nature Conservancy), Ian Atkinson (International River Foundation, formerly Nature Foundation not only for wildlife, but also as the source of our food, clean water, health and livelihoods. And as South Australia), Andrew Beal (Department of Environment, Water and Natural Resources, South a source of inspiration, now and for future generations. So we’re tackling critical environmental Australia), John Foster (Commonwealth Environmental Water Office, Australia), Tom Rooney challenges and striving to build a world with a future where people and nature thrive. (Waterfind Australia and Healthy Rivers Australia), Hilton Taylor (Commonwealth Environmental Water Office, Australia), Jin Chen (Changjiang Water Resources Commission), Hai Wang (China To do this, we’re educating, inspiring, influencing and engaging the public, policy-makers, business Three Gorges Corporation), the Office of Fisheries Law Enforcement for the Yangtze River Basin leaders and influencers.
    [Show full text]
  • Directory of Lakes and Waterbodies of J&K State Using Remote Sensing
    DIRECTORY OF LAKES AND WATERBODIES OF J&K STATE Using Remote Sensing & GIS Technology Dr.Hanifa Nasim Dr.Tasneem Keng DEPARTMENT OF ENVIRONMENT AND REMOTE SENSING SDA COLONY BEMINA SRINAGAR / PARYAWARAN BHAWAN, FOREST COMPLEX, JAMMU Email: [email protected]. DOCUMENT CONTROL SHEET Title of the project DIRECTORY OF LAKES AND WATERBODIES OF JAMMU AND KASHMIR Funding Agency GOVERNMENT OF JAMMU AND KASHMIR. Originating Unit Department of Environment and Remote Sensing, J&K Govt. Project Co-ordinator Director Department of Environment and Remote Sensing,J&K Govt. Principal Investigator Dr. Hanifa Nasim Jr. Scientist Department of Environment and Remote Sensing, J&K Govt. Co-Investigator Dr. Tasneem Keng Scientific Asst. Department of Environment and Remote Sensing, J&K Govt. Document Type Restricted Project Team Mudasir Ashraf Dar. Maheen Khan. Aijaz Misger. Ikhlaq Ahmad. Documentation Mudasir Ashraf. Acknowledgement Lakes and Water bodies are one of the most important natural resources of our State. Apart from being most valuable natural habitat for number of flora and fauna, these lakes and Water bodies are the life line for number of communities of our state. No systematic scientific study for monitoring and planning of these lakes and water bodies was carried out and more than 90%of our lakes and water bodies are till date neglected altogether. The department realized the need of creating the first hand information long back in 1998 and prepared the Directory of lakes and water bodies using Survey of India Topographical Maps on 1:50,000.With the advent of satellite technology the study of these lakes and water bodies has become easier and the task of creating of information pertaining to these lakes and water bodies using latest high resolution data along with Survey of India Topographical Maps and other secondary information available with limited field checks/ground truthing has been carried out to provide latest information regarding the status of these lakes and water bodies.
    [Show full text]
  • War in the Western Theatre
    SCHOLAR WARRIOR War in the Western Theatre DHruv C KatocH Introduction On 3 December 1971, at about 1730h, the Pakistan Air Force crossed Indian air space and launched a series of air attacks on Indian airfields at Amritsar, Awantipur, Faridkot, Pathankot and Srinagar. These attacks did little in terms of inflicting serious damage on Indian Air Force capabilities, but with these attacks, Pakistan had started the war against India. It was Pakistan’s strategy to launch an offensive in the West, should India invade the East Wing. The Pakistani plan had two ingredients. First, formations other than those in reserve were to launch limited offensives. Second, a major counter offensive was to be launched concurrently into India. The plan was altered by Yahya Khan, who ordered that the counter offensive should take place after local operations had secured ground. This change ostensibly was made due to shortage of equipment and the deployment of a large part of the army in its East Wing. The Indian strategy had its war aims focused on the East. Strategic defence was to be maintained in the West and a counter offensive would only be launched after Pakistan initiated hostilities. This served the larger strategic purpose of ensuring that India was not accused of aggression which could have had a negative effect on its operations in the East Wing. The initiative in the West thus lay in the hands of the Pakistan military. Force Levels Pakistan In the West, Pakistan had three corps and three infantry divisions commanded directly by General Head Quarter (GHQ). The orbat was as under: l GHQ SCHOLAR WARRIOR ä SPRING 2012 ä vii SCHOLAR WARRIOR m 12 Infantry Division.
    [Show full text]
  • Annual Flood Report-2014
    GOVERNMENT OF PAKISTAN MINISTRY OF WATER RESOURCES ANNUAL FLOOD REPORT 2018 OFFICE OF THE CHIEF ENGINEERING ADVISOR & CHAIRMAN FEDERAL FLOOD COMMISSION ISLAMABAD Federal Flood Commission, Ministry of Water Resources 1 ANNUAL FLOOD REPORT-2018 Heavy Rains in Lahore (July 2018) Heavy Rains in Karachi OFFICE OF THE CHIEF ENGINEERING ADVISOR/ CHAIRMAN FEDERAL FLOOD COMMISSION ISLAMABAD Federal Flood Commission, Ministry of Water Resources 2 Table of Contents Page Executive Summary 5-10 Acknowledgement 11 Chapter 1 Floods in General Perspective 12 1.1 Flood problem in perspective 13 1.2 Pakistan’s Flood Context 13 1.3 Flood control objective and need 14 1.4 Water resources in Pakistan 16 1.5 Irrigation network of Pakistan 16 1.6 Flood protection facilities in Pakistan 17 1.7 Impacts of global warming and climate change on flood 20 management 1.8 Historical flood events in Pakistan 20 1.9 Integrated approach in flood management 21 1.10 Flood and the development process 22 1.11 Traditional flood management options 23 1.12 The challenges of flood management 24 1.13 Impact of rapid urbanization on flood management 25 1.14 Climate variability and change 26 Chapter 2 Federal Flood Commission 27 2.1 Historic background 28 2.2 Functions of Federal Flood Commission (FFC) 28 2.3 Achievements of FFC 28 2.4 National Flood Protection Plan –IV (NFPP-IV) 31 2.5 Normal/Emergent Flood Programme (2018-19) 33 2.6 Summary of investment on flood protection works through GOP 34 grants/Foreign Aid Chapter 3 Flood Management Mechanism 35 3.1 Organizations involved
    [Show full text]
  • Unit–3 CLIMATE
    B.S/B.Ed./MSC Level Geography of Pakistan-I CODE No: 4655 / 8663 / 9351 Department of Pakistan Studies Faculty of Social Sciences & Humanities ALLAMA IQBAL OPEN UNIVERSITY ISLAMABAD i (All rights Reserved with the Publisher) First Printing ................................ 2019 Quantity ....................................... 5000 Printer........................................... Allama Iqbal Open University, Islamabad Publisher ...................................... Allama Iqbal Open University, Islamabad ii COURSE TEAM Chairperson: Prof. Dr. Samina Awan Course Coordinator: Dr. Khalid Mahmood Writers: Mr. Muhammad Javed Mr. Arshad Iqbal Wani Mrs. Zunaira Majeed Mr. Muhammad Haroon Mrs. Iram Zaman Mrs. Seema Saleem Mr. Usman Latif Reviewer: Dr. Khalid Mahmood Editor: Fazal Karim Layout Design: Asrar ul Haque Malik iii FOREWORD Allama Iqbal Open University has the honour to present various programmes from Metric to PhD. level for those who are deprived from regular education due to their compulsions. It is obviously your own institution that provides you the education facility at your door step. Allama Iqbal Open University is the unique in Pakistan which provides education to all citizens; without any discrimination of age, gender, ethnicity, region or religion. It is no doubt that our beloved country had been facing numerous issues since its creation. The initial days were very tough for the newly state but with the blessings of Allah Almighty, it made progress day by day. However, due to conspiracy of external powers and some weaknesses of our leaders, the internal situation of East Pakistan rapidly changed and the end was painful as we lost not only the land but also our Bengali brothers. After the war of 1971, the people and leaders of Pakistan were forced to rethink the future of the remaining country.
    [Show full text]
  • Flood Emergency Reconstruction and Resilience Project Project
    Flood Emergency Reconstruction and Resilience Project (RRP PAK 49038) Project Administration Manual Project Number: 49038-001 Loan and Technical Assistance Numbers: {LXXXX; TAXXXX} June 2015 Islamic Republic of Pakistan: Flood Emergency Reconstruction and Resilience Project i Project Administration Manual Purpose and Process The project administration manual (PAM) describes the essential administrative and management requirements to implement the project on time, within budget, and in accordance with Government and Asian Development Bank (ADB) policies and procedures. The PAM should include references to all available templates and instructions either through linkages to relevant URLs or directly incorporated in the PAM. The executing and implementing agencies are wholly responsible for the implementation of ADB financed projects, as agreed jointly between the borrower and ADB, and in accordance with Government and ADB’s policies and procedures. ADB staff is responsible to support implementation including compliance by executing and implementing agencies of their obligations and responsibilities for project implementation in accordance with ADB’s policies and procedures. At Loan Negotiations the borrower and ADB shall agree to the PAM and ensure consistency with the Loan and Project agreements. Such agreement shall be reflected in the minutes of the Loan Negotiations. In the event of any discrepancy or contradiction between the PAM and the Loan and Project Agreements, the provisions of the Loan and Project Agreements shall prevail. After ADB Board approval of the project's report and recommendations of the President (RRP) changes in implementation arrangements are subject to agreement and approval pursuant to relevant Government and ADB administrative procedures (including the Project Administration Instructions) and upon such approval they will be subsequently incorporated in the PAM.
    [Show full text]
  • Table of Contents
    Environmental and Social Management Framework (ESMF) Draft Pakistan Hydro-Meteorological and DRM Services Project Pakistan Meteorological Department National Disaster Management Authority Pakistan Hydro-Meteorological and DRM Services Project Executive Summary Background Climate change is expected to have an adverse impact on Pakistan, as it ranks 7th on the climate risk index. It continues to be one of the most flood-prone countries in the South Asia Region (SAR); suffering US$18 billion in losses between 2005 and 2014 (US$10.5 billion from the 2010 floods alone), equivalent to around 6% of the federal budget. Hydromet hazards have been coupled with rapid population growth and uncontrolled urbanization, leading to a disproportionate and growing impact on the poor. To build on recent development gains, increase economic productivity, and improve climate resilience, it will be critical to improve the quality and accessibility of weather, water, and climate information services. Climate-resilient development requires stronger institutions and a higher level of observation, forecasting, and service delivery capacity; these could make a significant contribution to safety, security, and economic well-being. The Pakistan Hydro- Meteorological and DRM Services Project (PHDSP) expects to improve hydro- meteorological information and services, strengthen forecasting and early warning systems, and improve dissemination of meteorological and hydrological forecasts, warnings and advisory information to stakeholders and end-users and strengthen the existing disaster risk management (DRM) capacity and services of the National Disaster Management Authority (NDMA). Project Description The project has three main components and will be implemented over a period of five years. Component 1: Hydro-Meteorological and Climate Services The objective of this component is to improve the capability and thereby performance of the PMD to understand and make use of meteorological and hydrological information for decision making.
    [Show full text]
  • Hydrometeorological Responses to Climate and Land Use Changes in the Jhelum River Basin, Pakistan
    Faculty of Environmental Sciences Hydrometeorological Responses to Climate and Land Use Changes in the Jhelum River Basin, Pakistan DISSERTATION To obtain the academic degree Doctor of Egineering (Dr. – Ing.) Submitted to the Faculty of Environmental Sciences Technische Universität Dresden, Germany by Naeem Saddique, M.Sc. born on December 20, 1986 in Kasur, Pakistan Reviewers: Prof. Dr. Christian Bernhofer TU Dresden, Institut für Hydrologie und Meteorologie, Professur für Meteorologie Prof. Dr. Rudolf Liedl TU Dresden, Institut für Grundwasserwirtschaft Prof. (Associate) Dr. Muhammad Adnan Shahid University of Agriculture, Faisalabad, Pakistan, Department of Irrigation and Drainage Date of defense: 03.02.2021 Erklärung des Promovenden Die Übereinstimmung dieses Exemplars mit dem Original der Dissertation zum Thema: “Hydrometeorological Responses to Climate and Land Use Changes in the Jhelum River Basin, Pakistan” wird hiermit bestätigt. Ort, Datum Unterschrift (Naeem Saddique) II Abstract Climate change and land use transition are the main drivers of watershed hydrological processes. The main objective of this study was to assess the hydrometeorological responses to climate and land use changes in the Jhelum River Basin (JRB), Pakistan. The development of proper climate information is a challenging task. To date, Global Climate Models (GCMs) are used for climate projections. However, these models have a coarse spatial resolution, which is not suitable for regional/local impact studies such as water resources management in the JRB. Therefore, different downscaling methods and techniques have been developed as means of bridging the gap between the coarse resolution global models projection and the spatial resolution required for hydrological impact studies. Statistical Downscaling Model (SDSM) and Long Ashton Research Station Weather Generator (LARS-WG) are selected in this study for downscaling of temperature and precipitation.
    [Show full text]
  • Gulpur Hydropower Project, Pakistan
    CASE STUDY: GULPUR HYDROPOWER PROJECT, PAKISTAN Pablo Cardinale Kate Lazarus Leeanne Alonso GULPUR HPP (PAKISTAN) 102 MW greenfield run-of-the-river HP project in the Kolti District, Eastern Pakistan / Azad Jammu and Kashmir (AJK) region. Main construction to begun on late 2015 Components: • dam 66 m high. • @ 1000 meter diversion tunnels. • power house and a switch yard. • 700 meters dewatered stretch. • True run-of-river, no peak generation • No new access roads. • Existing transmission line. IFC’s proposed US$ 50 million A-Loan (15% total project cost of US$332 million) and mobilization of up to US$93 million. Co-financed with ADB, CDC, MIGA and others 1/24/2018 Critical Habitat – Mahaseer National Park 2014 IUCN Strategic Environmental Assessment concluded that Poonch River is Ecologically “Highly Sensitive” IFC determined that the Gulpur HPP Is located in Critical Habitat (per PS6) based on: • Regionally important population of Endangered migratory fish, Golden Mahaseer (Tor putitora) • Critically Endangered Kashmir Catfish (Glyptothorax kasmirensis) Gulpur HPP is located within the Poonch River Mahaseer National Park 3 Golden Mahaseer PROJECT APPROACH: ALTERNATIVE ANALYSIS 4 1/24/2018 Diversion Tunnels Cofferdam Powerhou Intake se Weir and Spillway Stilling Basin Capacity: 102 MW RoR 7 Footer • Total of 62 HPPs in the AJK • Four in the Poonch River STUDY AREA – SPATIAL BOUNDARIES THE VECS ▪ Fish Fauna ▪ Sediment Load of the River ▪ Surface Water Quantity – Flow ▪ Landscape 1/24/2018 AQUATIC STUDY Extensive additional Baseline Data Collected Oct 2013 and April 2014 HYDRAULIC AND GEOMORPHOLOGY INDICATORS Minimum 5-day dry season fish breeding habitat Depth Hydraulics Minimum 5-day average velocity (across the cross- section) Active channel width Area of silt/mixed bars (regardless of level of inundation) Area of cobble bars (regardless of level of inundation) Geomorphology Median bed sediment size (armouring) Depth of pools Area of secondary channels and backwaters Suspended sediment load.
    [Show full text]
  • Tor Putitora) in Pakistan: a RAPD Based Study
    INTERNATIONAL JOURNAL OF AGRICULTURE & BIOLOGY ISSN Print: 1560–8530; ISSN Online: 1814–9596 16–290/2016/18–6–1181–1187 DOI: 10.17957/IJAB/15.0224 http://www.fspublishers.org Full Length Article Genetic Diversity in Different Populations of Mahseer (Tor putitora) in Pakistan: A RAPD Based Study Nuzhat Shafi1*, Javaid Ayub1, Nasra Ashraf1, Afsar Mian2 and Inayat ullah Malik3 1Department of Zoology, University of Azad Jammu and Kashmir, Muzaffarabad, Azad Kashmir 2Bioresource Research Center, Islamabad, Pakistan 3Government College University, Faisalabad, Pakistan *For correspondence: [email protected] Abstract Random Amplified Polymorphic DNA (RAPD) based PCR amplification of nuclear DNA was carried out from collected samples of Golden mahseer (Tor putitora: Hamilton, 1822) from Rivers Poonch, Jhelum and Mangla Reservoir of Azad Jammu and Kashmir, Rivers Swat, Indus (Khyber Pukhtunkhwa) and Hingol (Baluchistan) of Pakistan. A total of 197 bands were generated by 16 RAPD primers with 87.73% polymorphic and 43.75% unique bands. Swat River’s population exhibited the highest level of polymorphism and held the highest genetic diversity (73%) followed by population of Mangla reservoir (57%), River Indus (54.31%), River Jhelum (44.67%), River Poonch (37.06%) and River Hingol (2.03%). Heterogeneity (Ht, 0.19), genetic diversity within population (Hs, 0.13), between populations (Dst, 0.05) and genetic differentiation constant (Gst, 0.022) were low. Gene flow between populations (3.22) was high. Analysis of Molecular Variance (AMOVA) ascribed higher variability (79%) within population factors. UPGMA dendrogram based on Nei’s genetic similarities and distances separated two main clusters of populations; cluster one subdivided into two; 1) were identified the populations of Poonch River, Jhelum River and Mangla Reservoir, and 2) swat River and Indus River.
    [Show full text]