L. Backgrouhd
Total Page:16
File Type:pdf, Size:1020Kb
Section-06: Terms of Reference(TOR) l. Backgrouhd : Government of Bangladesh emphasized top priority to acceLerate the pace of electrification program throughout the countrr'. It is also a consritutional obligation to provide electric power in the rural areas. Bangladesh Rural Electrification Board has been established as a vital institution to help in improving the qualir_v ol lile of the rural multitudes and accomplish 'ast continuous advancement to $eir socio economic conditions through suppl) of stable and reliable electric power to the rural areas ofthe counh} as \lell as ro lirlfill fhe constitutional dght oflhe people to have electlicity. Based on the result of a comprehensive feasibility study in 19?6 BREB stands on the Afea Coverage Rural Electrification (ACRE) concept for ser,,ing electdcitJ, in a co-operative model. Govemment of Bangladesh's vision on the Polver sector is "to provide access to affordable and rcriabre electricity to all b) the year 2021". GOB'S 7th tlve-year plan emphasizes on the importance of elechicity for generatirg emplovment oppomrnities. Access to af'fordable and reliable electdcity is a key requirement tbr both econonic development and po!erf)- reduction. Imprcved electricity coverage, panicularh in rural areas. shall \rheal on to achieve the 7,r,five,r,ear plan. [n support ofGovernment,s vision, Bangladesh Rural lllectrification Board has been functioning with a firm aim to enhance electrification program all over the countrlside based on the concept of Area Coverage Rural Elecn-ilicatim (ACRE). Ihe ACRII concepr leads to the establishmenr ol co-operative called pally Bid:urSamit-v(PBS)todelirerelectricser\icestorheirmemberconsumers.Sinceinception,gonosof PBSs ha\e been de\eloped all o!er the counrry under dillerenr projecrs ftom ACRI phase_I to ACRE Phase-V After establishing rhe PBSs, rhe disrribution svstem ofrhose pBSs were gradually expanded and iniensified underthe differcnt Intensification and Expansion projects. At present BREB distriburioD network consists of,1,82,810 km lines (HT and LT), connecting 26.5 million consumers through irs 80 nos ot'PBSs. The major aim ofBREB is to ensure consumer services up to the mark of high satisfaction level through supply of .eliable and uninterrupted electicity at an affordable price. There is no other way but to convet BREB into a worid class renolvned modeln organization rvhich is one of the most challenging issues for the organization. BREB desires to creare Underground Disrributlon System facilitv firstly in Savar Upazila (part) in Dhaka District & Kaliakoir Upazila in Cazipur Djstricr under Dhaka pBS-t as a model like another modern city in the \\,orld Ifan) organ ofthe bod) is nor health), en the body cannot be called healihy. A srrong narion :::1T i:[: ]:il::::Il';::::,:: i:rfili,ll'i; 1i"I"j3"i'i:il::'#H:; fli:: comperitive world. As per this project $ould help BREB to adopt a financial incentive plan based on weighted average ofinputs like generation, trarsmission. distribution, collection ofaccents receivable. project implemenfation ard training as labor management relations. Not oDly would this save people fiom extreme frustration and the depression of being unemployed, it would give people a new life, rer hope and nerv mode of enjoylent. Everyone $,ould become an active and productive citizen_ Ifl the process, it iould create a ne$, econom) avoiding wastage ofhuman creativitv and saving people from state dependencv. Page 1 A BREB is the ieading electrical ener8v user in Bangladesh. Abour 50 % electricity is used by BREB consumers lately with increasing demand Government ofBangladesh is comrnitted for homogenous developnlent in each and everv part ofthe country reducing regional disparity. So, rumi consumers $ ill lead to sharc a lion portion of generating electricio, where BREB would play the role ofprime electriciO_' user b_v expanding distribution network to all the remote parts ofthe country. BREB now inrends io hire an international consulting firm fbr Feasibilit) Study, preparation of Derailed Drawing, Design and Eslimate of Underground Electric Disrribution Network in Savar Upazila (Pad) in Dhaka Districr & Kaliakoir Upazila in Gazipur Disr ct under Dhaka pBS-1. II.THE ASSIGNMENT As a parl of the "Replacement of ExistinS Disniburion Network by Undergound Distribution Nelvork" Project under Dhaka PBS-I, BRIB now intends to hire an intemational consulting firm for Detailed suNey and Feasibility Study of Sub-transmission and Distribution Network within Dhamsona, Ashulia, Yearpur, Mouchak. Chandra Savar Upazila (part) in Dhaka Distrjct & Kaliakoir Upazila in Gazipur district under Dhaka Palli Bidrur Samity-1 and preparation ofDrawing & Design, BOQ. Cost Estimate and Bidding Doeument to Establish an Underground Distribution Network Replacing the existirrg Overhead Sub-transmission and Distribution Network in the area Savar Upazila (Pan) in Dhaka District & Kaliakoir Upazila in Gazipur district under Dhaka palli Bid],ut Samit)' l. The purpose ofConsultancy Services are as follows: i. lnventory ofExisting Dist bution S),stem. Preparation of fitring assembly unit, material lists Line Sketch, Single Line Diagram erc. as per BREB standard and specification. ii. Ieasibilin Stud) of Proposed Underground Disrribution NeFvork of Dhamsona, Ashulia, Yearpur, Mouchak, Chandra of Savar Upaz ila (Pan) in Dhaka District & Kaliakoir Upazila in Gazipur district under Dhaka Palli Bidyut Samity-1 iii. Design and Dmwing of Proposed Underground Distriburion Network \1ith fittings: material specitication, catalog number, voltage drop study, technical loss study & charging current calculation etc. iv Preparafion of Master Plan. Work Plan, BOe, Cost Estimation, Bid Documents for appoinljng contractor etc. for the existing distribution ne !ork removal and proposed Underground Distribution Network with proper documents. Transler of Technology. vi. Consideration of environlnenfal issues and proposed mitigation measures. vii. Consideration ofsocial issues ard pfaposed resefilement plan. viii Probable faults & faulf detection system & maintenance schedule. ix. GIS Survey $ork details. Prepare Frame works, ESMF and O&M Manual. t_0 Objectives of the Project: The major objectives ofrhe study are; (i) Ensure qualit], reliable, unintemrpted polver supply etc. for the consum€rs; (iD Meet up future load demand and changing needs of the customers through development ofrequired distdbution infrastructures in planned and ec"r?iljfl?p,q (ii0 Determine the requirement! location, capacit\' etc. of undergound disfibution network of Dhamsona, Ashulia, Yearpur, Mouchak, Chandra of Savar Upazila (Part) in Dhaka District & Kaliakoir Upazila in Gazipur district under Dhaka Palli Bid)'ut Sanity- I are to meet up the projected demand up to 2041 (iv) Io prepare plan for modern ard automated underground Electriciry Distribution Nehvork of Dhamsona. Ashulia, Yearpur, Mouchak, Chandra of Savar Upazila (Pan) in Dhaka Districl & Kaiiakoit Upazila in Gazipur district under Dhaka Palli Bid1rut Samii-v- I are a like modem cit) in the \rorld (v) Ensure financial sustainabiliq ol the BREB/PBS to implement lhe Underground Disnibution Net$ork pro.ject. (vi) Necessary 'Iechnology Transfer to Dhaka PBS-1 will be carried out during the study. (vii) Loss Reduction ofthe dist bution neNvork. (viii) Voltage drop study ofrhe distriburion network. (ix) Charging current calculation ofthe underground distribution system. (x) Reqlrired study for smooth operation & mainlenance ofthe system. 2.0 ProjectDescription Dhaka PBS-lx,il1 cover partly geographical area of Savar Upazila(Part) under Dhaka District & some area ofKaliakoir Upazila under Gazipur District. These two Upazila are major inter-road hub in lransponation system !o the capital clty. Hundreds ofbuses, trucks and other cars from nordr Bengal, Benapaland middle pad ofBangladesh goes rhrough lhis area before enternrg Dhaka and Gazipur Meiropolitan area. A large number of industries arc situatcd iD thcsc arca fbr casc of lran spofial ion. alailabiljt) ofland and labor force. Power in this area is supplied ltlrougl 0,1 Nos 132,33KV Grid Substalions and 02 Nos Generating Stations via 24 Nos PBS Substation. l'his PBS supplies around 140 MW to its consumers which is quite high in all PBS syslem. Most of the sub-lransmjssion and disrriburion Iines are installed based on mulri-circuired nanow profile construction- Some information ofSavar(Pan) & Kaliakoir Upazila are given below: No. of N',.ot No. of No. of Lines Cons: Sl. Name of No.of included Electrified Elcctrified Staked Under No. Thanrs Included ' Ilni.nr Unions Villages Kn. Staked Villages Line I Savar(Part) 154 6 6 211 217 1613.85 297954 2 Kaliakoir 3t6.25 9 9 284 1828.9',7 t75t42 Total 410.25 15 15 501 501 3442.83 413096 ffi*'ss* ffiu*.'* Page-3 Ih€ Zonal OIfice wise, Length of O/H Lines (Existing) in Km. and Length underground tines fristing (Approx)in the considered area sre given below: Length of U/G Lines Nane of sl. Total No Lcngth ofO/H Lincs (Existing) in KM (Approx) (E sting) Nocs/Z.O N in KM (Exist.) 1t/ tt/ 11 6.3 0.4 0.23 33 KV 0.10.,t .23 33 II KV KV i KV KV KV KV KV KV I01 HQ 4037 32 12 63 4 3 72 27 02 4442 45 53 56 6 4 29 ZonalOiice 38 Ashulia Zonal 34A9 26 49 49 3 2 2L 49 Office 04 Sreepxr Zonal 2442 22 15 48 5 4 29 46 Office 05 Kaliakoir 2477 11 36 42 7 6 27 2A Zonal Office 2762 21 32 39 11 8 19 32 Zonal Ofice Mouchak 7941 28 19 80 2 6 29 Zonal Office I otal 2197A 185 276 377 39 30 137 249 Total Km. =1293 Km .-^-ffi:** *'P.-$"st Page-4 There are Iire Zonal Offices under Savar(Part)