.#' -KW Anncx:2
Speclfica on Deskiop pC lnG#iifi;rjii i;E.M;ii6-;; ro["i-r,rie1q-ft' Elq @|e ls 6ri ii
ndowsTi larEEnil;,iE Drir'er iivo-l ffi
ffifiw:r' ,rt}-,lq,i**,r;..!".iliius, license fi"1{.,i?i3Y-'Y:!ty-/Ullv lo. 1 vo:r F uLu ------..
ficatlon of UpS tor pCi
Y.898&qBra nd e-!e-tlo.Ii9!d.ly b.,d.!ei
lull lood
s5 4rs ll\4ax- Lo6d o6id. Errs to S0% ,itul" t ltv oisE i-l_=--_
1of2
\"-i' 11 +4t,n*P Anner.z si*Jt,i::J:l:ffi[x prolecllon& Surge Protectlon. ISO 9001 lo' la Lnadu'e' !y*" loiyg'.["r's$ 2"q ! 3'q verEiliq6-!-dv]
tion of Printar:
ioIefrfrGnqd bY uiaaer
tlE {gP.pr,li! xii;'iiirciitmm-Mln 128 MB
cO Graphlc dl on{rjseitec!!g! -ln.lant ad usB 2.0 PS 3 &PPOS A4 8,!9s4--- , j ,!",i11'jjoiHffiiff_ffi 3.3 Design and Drswing ol Proposed Underground Distribution Network must be on the basis ofvoltage drop calcrhtion & system loss analysis: (i) PreparatioD of design for proposed ll/0.:l kV fansformers (Pad Mounted,/ Four leg Mounted Unit/Kiosk substadonlbuilt-in RMU *,hen necessary), 11 kV Ring Main Unit (Drawings with Detailed Specification) and 0.4 kV Switchgear,Distribution Box considering all protection scheme, the roads ard space limitation of Savar Upazila (Part) in Dhaka District & Kaliakoir Upazila in Gazipur district under Dhaka Palli BidFt samity- 1. (ii) Preparation of detail Drawing, Design. work plan, estimation etc. for consuuction of unde€round elecirical distribution network of Savar Upazila (Part) in Dhaka District & Kaliakoir Upazila in Gazipur district under Dhaka Palli Bid)'ut Samity-l like modem underground system in the developed country. (iii)Undergound s-vsten should be designed considering probable Earthquakes and any other disasters.
(iv) Preparation of Drawing, Design. work plan BOQ estimalion etc. for Convelsion of all existing Overhead network of Savar Upazila (Pa() in Dhaka District & Kaliakoir Upazila in Cazipur district under Dhaka Palli Bidyut Samity-l in to Undergound Distdbution Network.
(v) Preparation of existing underground Distribution Network diagram (with rcute map) of BREB area showing in the geographical map.
3.4 Preparation of M|ster Plan, Work Plan, BOQ' Cost Estimation, Bid Documelts for appoitrtinB contractor etc. for the Proposed Underground Distribution Network: (i) Master Plan, Work Plan estimation etc for conversion ofall Existing Overhead networks of Savar Upazila (Pa() in Dhaka District & Kaliakob Upazila in Gazipur district under Dhaka Palli Bidyut Samitr-1 into Underground Distribution Network. (ii) F-eeder to l'eeder interlink (11 kV.) and future 11 kV feeder split up must be considered during Design of ll kV RMUS. Provision for sufficient 0.4 kV and 0.22 kV sen'ice connections should be arailable in the Distribution Box. (iii)Submission oi proposal lbr new l3/ll kV substations and rcplacement of eristing Ovefiead Disrributbn Net$ork b) Underground Distribution Network System analyzing the system demand data, load cur\e. consumer grc\r'th, consumption growth, per capita consumption, historical demand gro*,th and load centeis for proper design ofUnderground Distribution Net\\,ork considering Master Plan of BREB and Govemment ofthe People's Republic ofBangladesh up to year 2041. (i\') The entire area shall be divided into several zones and preparation of Priority List for implementatioD of the mentioned Underground Elect c Distribution N€twork considerinS load growlh, Iocation, voltage level, consum$ pattem, revenue income, existing road netrvork and rcad size and preparation of time bound detailed implementation schedule. (v.i Cost estimation lor design, drawing, work Plan, BOQ, Bid Documents for appointing JUnnacror erc. Preparalior oithg f,ropo.ed Undergound Distribution Ner$orL. (! i) Anl other scope felt essential bj the consultant for successful completion ofthe study.
(vii) ldentii barriers and challenges for implementation of the proposed underground Distribution Network Projects (Savar Upazila (Part) in Dhaka Distrjct & Kaliakoir Upazila in Gazipur disrict under Dhaka Palli Bid)ut Samil}--l) considering ductitrg slstem. lde.til] bar.iers and challenges ibr other areas also.
(\'iii) Prcparation of plans and sffategies to mitiSate lhe barriers and challenges for implementation of Underground Distribution Network in Savar Upazila (Part) in Dhaka District & Kaliakoir Upazila in Gazipur district under Dhaka Palli Bidyut Samit)--1.
(ix) Preparation ot' a priorig list for implementation of Underground Elect c Dist bution Neruorl' cgr.rderirrg load gro\{h locarion.VoltaEe le\el. cosumer pane{. re\enue income. -;a' -.;' ' , -,N,-,rq .- existing network. road size etc.
(x) Underground s_vstem should be designed considering probable Earthquakes and any other disaster.
(\i) Environmenral Impact on implementalion of U/C system or conveision of O/H system into U.iG slstem rvill be included in the feasibility study.
(xii) Preparation oftime bound detailed implementation schedule.
(xiiil Re-.enlemenr plan lo be considered.
Transfer of Technology: (i) Transfer of necessary technology to BREB (including tools, models. training & capacity development ofBREB Engineen etc).
3.6 GIS Survey works d€tails: Consuitant have to sune-v existing elecfical disffibution network such as distribution lines & poles including all details (e.g.-incoming and outgoing details, location, rype, size, environmenl, conductors. fittings. sen ice connection etc. on poles as per GIS Inventory sheet appendix no-1) *ith accurate geo-coordinate (latitude-loagitude), based on the stardards pro.jection (BTM. BUTM, wGS-84). Details of the GIS sun-ey works and database preparation are as lbllo\s:
Sl. \o. Description Unit Quantity l Preparation ofDesktop based GIS Map Total area to be covercd Sq.Km 250 Base map feature extraction, Building, Road, wB Sq.Km 250 GIS Database & Elec[isity line drawing Pole 21978 2 Surveying, Preparation ofData base and GIS Mapping Ground-trothing for Base Map Sq.Km 250 Total pole suney Pole 21978 Populating Electric database Pole 2)978 Consumer Reconciliation Pole 2).978
3,6.1 Details of the GIS Survey Works & Database Preparation:
Features Format Description Administrative Polygon PBS Boundary, District Boundary, Upazila Boundary,
Boundades & Line Paurashava/L]nion Boundaxy etc. ; Structue Infomation [Structure Tlpe-Pucca, Semi- Structure Polygon pucca, Katcha) Structure use (As per filed survey), Building Height, Structure Name]: +50 CM Road Name. Road Numbcr, Road Type (Pucca, Semi- Pulr uon Roxd &line pucca. Kalcha), Road width, Footpath Width, Railway, No. ol Railr\ay tracks, RoW: Bridge,/Culven Polygon L-ength. Width, Location (Address); S."o-tYn *b6Etv^.,.n Features Format; Description Accuracy Watcr Supply Line. O.uin/Se*e.age & its & l-ine width; I Name. l-ocarion. Type (Graveyard, Crematorium, Cemetery, Eidgah, Restricted Area, Airport, B ck Ficld, Monlunent, Ope[ Space, paxks, playground, lmportant Polt gon Stadium, Botanical Garden. Zoological patk, pou,er Areailand Mark & Poini Plant/Station" Bus Terminal. Truck, Teminal, Water Trcahent Plant, Waste Disposal plant, Railway Station, Forest Land, Swimming pool, Slum, Embanl(Inent, Homestead); Tlpe (River, Khal, Irrigation Canal, Lake, pond, Water bodies Polygon Ditcl
Location of PBS's HQ. Zonal Otfice, Sub-zon.al
PBS Details Point
Overhead Line lAlt type of :- ftT 1:: fV ar t f!, 1-O LT (6.35 KV, 0.,100 Electric Lines Line KV & 0.230 KVI and Underground Line from Souce Grid to Consumer end including Consumer counting in each service pole; Unique pole nunber with feedei name/lD. Latitude. Longitude, Pole Size, Mateiials. Type, Firtings, Environmenl. Conductor Size/T)Te, phase Electrlc Pole Point Sequence. I ine Volrage. I ranslormer Capacirl & phase Connection. Gu) unir. Jumper Si/e. Deviccs. As per CIS Inventon sheer- Proposed UG Linc Feeder Name/ID, Connecred 132/33 KV Grid S/S, Line 13111 KV Sub-Srarion, RMU Unit, Inspecrion Pit, Disr bution Transformer, Voltagc Level & Total No. ofConsumer in a single Feeder. IRMU Unir Location (Laritude & tongit"G;, Locat[nal address, Translbrmer Unique ID, Cdnnected 132133 KV Grid S/S, 33/11 KV Point +50 CM Inspcction Pit Sub-Station, RMU Unit, Distribution Transformer. lnspection Pit & Fecder. 6,,-* Point Location (Latilude & Longitude). Localional Address, Connected Feedcr, Distribution Trans{brmer. 33/11KV Sub-Station, 132/33 KV Grid S/S, RMU Unit & Inspection Pit. W** 3.6.2 Geo-refercncing:
fhe CIS Data must be geo-teferenced in respect to Bangladesh,s coordinate system. For this purposc. consultants ma) usc RTK GPS. DGPS. Level Machine & Total Station for 'femporary establishing Ground Control Poinr (GCP) and Control point (TCp) on Bench Mark (BNI). These GCP and TCP rvill be used as Geo-rel'erence point. Consultants will establish a concrete based Cround Contiol Point (GCp) in pBS He & every Zonal Office in relatcd PBS and required no. ofTCP for maintaining desired accuracy (+50 CM).
3.6.3 Data Processing & Mapping Software: . GIS Data Processing & Map: Arc GIS 10x; . Electrical Analysisr ETAP/CYME,tsently & ary other Equivalent Internationally Standard software. CYME or Equivalent software preferable because it is mainly used for Electrical Analysis such as load flow. balance/unblarce, contingency, s\r'itching optimization ctc.
3.6.J format [or Submission of ],laps: sL. No. of Copies to be Description No. of Map Scale Submitted, Draft Fitral Detail Maps of Existing Electrical Disrribution 1 Net\r'ork 2 Detail Maps of Proposed Underground Desig;l l:1000 As pe. art 5.1 , 1 Final Master plan
Notc:
. Ail Maps to bc submirted in 120gm Matt paper (Colour) and Sheet size 3O',x40,,; . Digital copies for all reports and maps to be submitted in each submissjon (Draft & Final). One copies each ofcompact disk (CD) & anolher pen drive. 3.6.5 Format for Map and Digital Information: 1 GtS Shape file. gdb file. coverage hle with accuraie attribute information & Database: MXD file; 2 Projection BTM/BUTM & WGS-84: S)stem 3 Map: PDF format. All printed Map must be WGS-84 projection System. One set Maps Soff copy will submit in BTM/BUTM projection System; 4 Drawing: Shape, DWG; 5 Analysis: Access, Excel, DOC and Ottrers (with graph/chart); 6 I{eports: DOC & PDF (Maps in report in separately pDF fomat); 7 Image: IMG/JPEG/TIFF; 8 Presentatior: PPT,?PTX; 9 Electrical Inlemational Sld. Soft ware. Anah sis data: qubmil l0 Dara u ill on CD D^\O a onc pen orir< uilh mdrkins.co[r(nrs and darr,\ 3.6.6 System Specification of Hardrvare & Software Tools & Technology: The following hardu,are and software(at least one Iicense) requirements will be provided as part of the contract:
3.6.6.1 Hardrvare: SL No. Description of Item(s) Specifrcation Utrit Otv. GIS Hardware
1 PC (Deskop), i7 Annex-2. Table-2-1 Nos. 5
2. UPS for PC 1 KVA Annex-2- Table-2.2 Nos. 5 3. Prinrer (A3, Color) Annex-2. Table-2.3 Nos. 2
3.6.6.2 Software: l. Arc CTS latest rersion Sofiware 2. Electrical Analysis Software (CYMI) or any other equivalent Intemationally Standard sol'tware).
Comprehensive survey of Disrribution Slstem under BREB \\.ith Preparation ofDatabase ofExisting Net\\ork Flemenfs and Prepararion ol shor tenn. mid{erD and long-term plan lor Renovation and lxpansion of Distribuiion Ne \ork up to 20,11.
-&,ik, .7 Capacity Bdtding of BREB/PBS Personnel: 3,7.1 Local Traitring: duation of3 provide classroom training lo 10 BREB officials ill one sessioq-having To l€vels' *".ft o,t t"-tt"n"ttlaut' & sritchgear design at different^voltage Ofrl".l "ut subsotion desisn and survey in a underground distribution netu'ork slstem design' capable oi underlakin€^GlS comorehen\i!e mJnncr lo make rhe panicipanrt -'imilar ina.p"'a'nrt' lhe cons;hanr shdll pro\ide 5rate-of-the-an trarnrns ;:;,;;;;i.' pro\rdrng all necessary ana course material. tbr each panicipanr. co^st of .r..T""rr. prrce and also pay the iJ"iii,i"tri ... shall be incluJed in tht i'n'ultunt't offered tt"i""" i'irlo p" aa per rraince' A complete training schedule rr-"r"rir* i",r,. 6ri' (-on'ullant' ,t"1"* *ln" o trrriculur ro be pr5.2 Capacit-Y Building Materials 6 (Six) sets oftraiDing materials pertaining to class room training and on the job training shall be submitted to BREB apart from providing training materials to all participants within 01 months after signing the contract including CV of resource persons/trainers, schedule and course curnculam.
5.1 Primary lnventory report of Existing Dist bution System(lnventory, Staking Sheets with fitti[gs assembly unit, feeder-wise quantity of l{I, LT line, material list and and Feasibiliry Study of Proposed Underground Distribution Network(Progess Repoll-1) Primary Inventory report of the existing distribution system(lnventory, Staking Sheels with fittings assembly unit and material list as per BREB Standard) and Feasibiliry Study of Proposed Underground Distribution Nenvork lvith rnaterials Speciflcations shall be prepared by the consultant coDtaining the summary (after completing 20% ofthe survey/study)' line route sketch, single line diagram. 6 (Six) oopies of survey report shall be submitted by the consultant to BREB within 0l months aJler the eflective date ofcontmct
5.1 Intermediate Irvenlot,-\ Repot of the existing System, Feasibility Study of Proposed tjnderground DistribLrtion Nel\\'ork, Cost Benefit Analysis, Voltage Drop calculation, System Loss anal-vsis and overall Recommendation (Progess Report-2) Inventory report of the existing distribution system and Feasibility Study of Proposed Underground Distribution Net'xork with materials Specifications, Cost Benefit Analysis, Voltag; Drop calculation, System Loss analysis shall be preparcd by th€ consultant containing the summary (after completing 70% of the survey), line.oute skelch, single line diagram 6 (Six) copies of survey report shail be submitted by the consultant to BREB within 02 months after the effective date ofcontract.
5.5 GIS Map and database GIS map and daiabase ofthe exist;ng and proposed distribulion network shall be prepared (As per Ad. 3-6) by the consultant. This will be demonstrated by the consultant to BREB foi ierification within 3(Three) monthr after the effective date of cortract. BREB will verifl the $hole demonstration carcfull) and Sire consent to go ahead.
5.6 Uast€r Plan : 5.6.1 Drxft Master Plan: Draft Master Plan lor replacing existing overhead dist bution system by underground dist bution network shall be prepared (including distribution hansformer, unique lD of RMU and GIS daiabase) by the consultant and submitted to BREB within 3(Tbree) months after the effective date ofcontmctfor BREB's comments/ approval. *r*ttz,e' 5.6.2 Final Master Plan:
Final Mast€r Plan tbr replacing existing overhead distribution system b).undergound dist bution netlyork shall be prepared by the consultant incorporating tender document, O&M manual, material specilication, soil cop) of all repon, database slrape file etc and submitted to BREB within.l@our) months afierlhe eiTective date ofcontract.
5.7 Environmental Impact Assessment (EIA) with Environmental Management plan (EMp) for existing distribution Slstem and proposed U/G Disribudon Nefivork. Re-settlement issue should be included.
5.8 Completion Report (PCR), BOQ, Estimate, Bid Documetrts for lppointing contractor, Work Plan, Specifications of U/G Distribution Network m{terials: a)Preparation of BOQ and \\,ork Plan of existing Disfiburion System and proposed Undergrounding Distribuiion Neflvork. b)Materials Specilicarions of proposed U/C Distribution Network. c) Project Complerion Repor(PCR) 'lhe Consultant rvill prepare Project Completion Repofi (pCR) including comparative statement ofVoltage Drop and slstem loss ofexisting OH line and proposed U/c slstem, BOe, Estimare, Bid Documents for appourting contractor_ Work plan, material Specitications of U/G Distriburion Nen\ork and submit 6 (Si)i) copies to BREB within 6 (six) months alier the effective date ofcorltract. The Consultant will also hand over computer center with GIS maps, GIS dalabase, Engineering Analysis and other related soltware packages in good running condition along with PCR.
d) Anal],sis ofNPV. ERR, IRR, CBR, FRR should be inctuded in pCR.
5,9 Paym€nt schedule: The consultant shall be paid in accord:frce with the follo*,ing pa]ment
sl. Payment Deliverables Time line upotr No. successful complel Within 02 weeks afier the 2% oflotal contracl 1. ef fcctive date of conlraci (AsperAn.5.l). Within 0l months af(er the 2 Capacit) Buildnrg Materials ellecti!e datc of contract (As per Ait.5.2). Pnmary Sur\e) Rcpon olthe existing Within 0 I months alier rhe Systenr and Fesibiliry Study of Pq)osed 3. effective 4%+4% ofrotal contract Undcrgomd Disribution Ne6r'o* date of contract (As perArt.5.1). (Pioqress ReDod-1) Intermcdiate Survey Repot ofthe r Within 02 months after the existing System and Feasibiliry Study of 4.5%+4.5% of rotal cffeclive date of contracl Prcposed Under$ourd Dist-ibution N-odr (As per Art.5.1).
GIS Map aM databaseDevelopmemon Within 3 months alte. rhe 8%+8% oftotal conftct 5. exisring and proposed Undergoud effective date of contract Distributlon Netlvod. (As perAn.5.5). 6. MaslerPlan Within I monrhs after rhe 8% oftotal conr]act a) Draft Mastcr Plan efi-eclive date of cornact (As perArt.5.6 1). l Witlir 4 months afler the b) Fi.al \'1ast0 Plan effecd!e date of conbac(As per Ad.5.6.2) I
a) FllA,EMP. Re-lettlemenl issuc b) Preparation of BOQ.Estimate,Bid Documenis tbr appointjng contractor and work Plan ol existing Di System and proposed U Distribution Ner\r'ork. Within 6 months after the 02o/o+ 12o/d+ \2Yd+ 05Yd+ c)Materials Sp€cificalions of propos effective daie of contract(As 12Yo+ 02% ol total U./G Dist bution Nenvork. . per Arr. 5.7,5.8). contract amormt d) Project Completion Reporl(PCR inciuding comparative slalcmcnt of and system loss of existing OH line proposed u/G system. e) STD (Standard Tender Document). O & M manual.
Note: 1 . Pa1 ment w i 11 be made afier dre appro! al of each consecutive report. 2. Final Pa)nrent will be made after acceptance ofalldeli,rerables. 3. ltem rvise bill (break up) to be submitted. ,+. Man month will be made as perwork done. 5. Pedormance Securily - The contract shall be accompanied by a perfomance security given by the intemational consultant in the shape of a Pay order/ Ba* Drafr/ Bank Guarantee in a fonn acceptable to the PBS at 50/o of contract price. Tte Performance Securitv must be valid for 28 (Trenfy Eight) days morc of the contmct period. Perforaance SecuriE may also be deposited through certified Pay order/ Bank Drali/ Bank Guarantee in favor of PBS. The PerionEnce Security may be released on application lbrm the consultant when confact period exceeds 28(Twen8 Eight) days, fo, the faithful performance ofthe contract according to its tenor. With the extension of the contract the Consultant shell either extend the validity of&e Performance Secud! covering the extended period of the contract or shall fumish a ner, Securit) and in the second case the PBS Securilv will be released. Ifthe securiq tenor is more than extended period no fresh Perfomance Securitv or extension of Securit\ or fresh alte rate Securit,"- will be required against Perfomanoe Securit].
@,at^,, *,)L!$iis::l-' 5.10 Stalfing: for the assignment should include the 'lhe person-months and field of elpertise of the professional fblloring: 5'10.1 ConsultancY: 5'10.1.1 InternationalKeyExperts' Ke\-fxDtrti of Man- sr. Number Months I Position Persons Months eam Ilnderground cable ExPerv l 2 2 K-1 1 Leader Underground llrstrlburlon K-2 Modern 1 2 2 Network Designer 1.5 K-3 Civii Engineer/Ducting Expert 1 1.5
1 K-,r Economic/! inarrcial Anal,YSt I I
I 1 KJ Social and Environmental Specialist 1 Total= 1.5
Note: Loctl Expert maY be Included'
5.10.1.2 Local KeY Experts' Local ExDert: Number SL oI No. Persons
Deput-\ Team I-eader (Digital Mapping)
A-2 Electricalsub-stationspecialist
[![:*:*]-.--*.'--,-,,"fF ic..rai.ut". Oitabase Design & Digital A ' ,,rpp'ng co*a ilr-urot,o i.ttioution and System
Local Non kev stalTs: 4Srp.*it* iSu*"Y.taffs,33/1 i/0'4 kV Feeder and Related Dato t)supo-ui.or(sut-.tution/S*'itching Stationsloffi ce l,ocation and Related
., uozlSl.:i""rl*.r 5.10.2 Qualification and Experience
Educational qualifications and experiences ofthe professional stafffor the assignment should be as follows: 5.10.2.1 InternationalKeyExpert: 5.10.2.1.1 Underground csble Exp€rt /Team Leader:
The Team Leader must have a minimum B.Sc. in Electrical Engineering with minimum ol l0 years related experience u.ith 5 years experience in modem power distributiotl network planning and design, She/he should have experience to prepfie a plan for modem and automated underground Electricity Distriburion Network like smafi city in the world and must have working experience in simiiar conditions outside the home country. She,&e must have knowledge about cable ducting system. She,he must have anal).tical ability to review analyze and previous studies in BREB area as well as power sector master plan and have experience of planning and implementarion of underground Distribution Net\ork projecr ahrough ducting sysrem.
5.10.2.1.2 Modern Underground Distribution NetworkDesigner:
The Modem Dist bution Network Expert must have minimum B.Sc. in Electrical Engineering with minimum I0years experience with 5 years experience in modem power distdbution system design of modem cities. She,&e should ha\e experience to prepare rhe piannin8, design drawing and estimation of Underground distribution system.
His function r,.ilt include all engineering and technical matrers relatinS to this contract. arrangement Ior prompt and efficient execution of work to be performed as outljned herein and required by BREB,assuring adequate number olpersonnel assigned b) rhe Consultanc.v firm for the work to be done, organizing and coordinating all services enumerated in line with this contract. He has to provide updated drawing (AutoCAD) and existing underground cable routes shown in the geographical maps. 5.10.2.1.3 Civil Engineer/Ducting Expert /rTunnet Expert : Minimum B.Sc. in Civil Engineerjng, with Dinimum of t0 (Ten) years experience among which minimum 05 yeals in underg.ound ducting system and able to prepare drawing, design and estimare of Utilit-v Duct for the desired underground networking system. He also experienced about utility tunnel, utility cofiidor or utilid or is a passage built underground or above ground to carly utilitv lines such as rlPP]r.?))*r*' *y;:-?.,1" ffi- - :.;-* --,;; -':__-_ !-- -_].J
5.10.2.1.,1 Economic/Financiat Aralyst:
Minimum Master's degree in Economics, Finance, Business Administration or rclated discjplines $,ith minimuin 10 (Ten) years experience in econometrics, demand lorecasting. cost estimafion, financial and economic analysis and other related matter Abre to nL operate financiar moder/toor and famiriaritv with the Bangladesh powersector.
5.10.2.1.5 Social and Environmenlal Specialistl
He must have minimum B.Sc. in ElectricaLMechanical Engineering or Master,s in Geographical Information Science with at least l0 yems of experience of distribution consultancy services including surveying & data collection oi poF€r distribution netq,ork. He must have capability to plan, organize. monitor & coordinate all the functions related to surveying ard data collectjon ofelectrical distribution system under this proposed project and lead the suney team.
5.t0.2.2 Local Key Erperr:
5.10.2.2,1 Depurt Te:rm Leader (Digital Mapping)
He must have minimum B.Sc. in Computer Science & Engineering/ Electicay Mechanical Engineering or Master,s in Geographicai Information Science with at least 10 years of experience of distribution consultancy services including cls / Digital Mapping and provide training on the same to the ctient. He must have capabilit) to plan, orgarize, monitor & coordinate the works of data aralysis and design appropriate dara base and conducr cIS / digital mapping of the distribution nerw-ork under this proposed project.
5.10.2.2.2 Electrical Sub-station Specialisr
Mi]limum B.SC in Elecrrical Engineering. \rith minimum of 10 ( l!n) years Experienoe among which minimum 0S ],ears in Electrical Sub_station for mder- ground dLrcling s)slen and abre to prepare dmwing, design and estimale ofutirity Duct/Csbte trench tor the desired under$ound networking system. 5.10.2.2.3 Coordinator, Survey
He must have minimum B.Sc_ in Electrical/ Mechanical Engineering or Master's ir1 Geographical Information Science with at least 10 years of experience of distribution consultancy services including surveying & data coliection of power distribution network. He must have capability to plan, organize, monitor & coordinate ali the functions related to surveying and data colJ5.10.2.2.5 Coordiratov, Distributior snd System Planning
He must have minimum B. Sc. in Electrical/ Mechanical Engineering or equivalent qualification with at least 10 years of experience in electrical distribution system consultancy services including GIS based distribution system planning with analysis / studies, Load Forecast' Prcparation of Master
Plan and preparation ofBOQ and material estimate and provide training on the
same 1o the client in poNer distribution sector. Must have capability to plan,
organize. monitor & coodinaie all the functions related to GIS based network planning ofdistribution system under this proposed project
Local Non kev stafls.
5.10.2.2.6 Supervisor (Survey stuff33/11/0.4 kV Feeder and Related Data)
He must have minimum B.Sc. in ElectricalMechanical Engineering or Master's in Geogaphical Information Science with at least 05 years of experjence oiGIS surr'ey & dala collection of power distribution network He
must have capabilit-l 10 plan. organize. monitor & coordinate all the functions related to sun'eying and data collection of electrical distdbutjon system under
this proposed project and lead the survey team
5.10.2.2.7 Supervisor(Sub-station/Switching Stations/Office Location and Related Data)
He must ha\e minimu B Sc. in ElectricalMechanical Engineeing or Nlaster's in Geographical lnformatiofl Science wiih at least 05 years of experience ofGIS sufl/ey & data collection of power distnbution n€two* He nust have capability to plan, organize, monitor & coordinate all the functions relaied !o suNeying and data collectioo of electical distribution system under this proposed project and lead the survey team. 8r,:',^ . ^^..-na:'rc.rl\lt{ i' '. qa,nt(i' ' $J\d -',:-'rl ONSITE CAPACITY SI]PPORT PERSONNEL
The onsite capacit!" supporl personnel shall be available for a continuous period ofsix (6) months (or as otheflvise agreed) from the date ofthe acceptance certificate. The support personnel shall provide their owD computer and peripherals in order to perform their duties. The onsite support persoDnel shall be responsible to the Purchaser's nominated representative for undertaking their specified role and duties.
'lhe Purchaser is responsible for ensurine access to appropriare work resources and the involv€ment of relevant Purchaser stalf in capacit) development activities. including but not limited to structured training, on- e-job training, undenaking suppo( tasks, development and review of documentation and configuration, trouble-shooting and help desk assistance-
Within one month ofthe commencement ofduties, the support personnel shall prcvide the Purchaser $ith a delailed \,!ork plan. The work plan shall detail the period of time to be spent on each work item, planned completion date and specific outputs. This plan shall include, but is not limited to: (a.) Systems optimisation (b) Specillcationandconfigurationdocumentation (c) Work procedures documentation 1d1 1 rainrng and knou ledge transfer program
'lhe support personnel shall submit a monthly report to the Purchaser detailing progress and issues related to the agreed \\,ork plan.
6.1 RXQUIRIMENTS FOR FINAL INSPECTION A1l ofthe tbllorving items must. without exception, be completed prior to the Purchaser issuing a ce(ificaie ofacceptance,
(a) I'est the complete contract installation works and leave the work in perfect condition for occupation. (b) Thoroughly clean all parts. (c) Provision of complete operating instructions and "as built" documentation records to the approval ofthe Pu.chaser and delivery ofsufflcient copies. (d) CarD oul ill specified lesting and commissioning. (e) Supply Authority inspection of the completed installation. (f) Provision of commissioning and test reports/certificales.
PERT'ORMANCE TESTT\IG The Supplier shall carry out perfbrmance testing at compleiion to certily that the installation contbnns to fhe specification. The Purchaser reserves the right to review the Supplier's perlomance tesdng or undertake separate testing.
This certification shall include:
(a) Physical inspection of installation methods, configurations and practice utilised against the speci{ication. (b) Physical inspection of piocedures, configuration and dia8ram documentation to assue that it is complete, legible. corect and comprchensive. G) Assessment of ICT Seryir?-officers that thev are familiar with and have complete knorvledge of all in and are able to provide standard procedures. t9 9"' ....sa\n -ha\ l"i"\ (d) Electrical and transmission pertbrmance to assure minimum requirements of the specification have been met or exceeded. 1.0 Attach€d Drawings / Documents
Ihese Bidding Documenr. inclUde. no drarlrng..
List ofDocrmerts Sl. No, I)ocumetrt Name Purpose I BREB distribution Sites List all BREB site locations for the implementarion within Dhaka PBS-l
Hard\\,are Specillcarion tsrochure Installation ofGlS Server and Hardware 3. Soitware Specilication Brochure Development ofGIS based Power . Distribution Svstern ,{, Work Plan Development ofGIS based Power Distribution System and Engineedng analysis 5. Curriculum Vitae ofLocal and Foreign Verifi cation of the consultants Consultants qualification 6. Detail of personnel to involved in the Justification ofthe work plan field survey, GIS mapping and database developments.
4a,, _ rrr:slia!o T:#lrH:::s'