20CSA001 Contract Name: Consultancy Services for the Conduct of Feasibility Study of Proposed Construction of Missi

Total Page:16

File Type:pdf, Size:1020Kb

20CSA001 Contract Name: Consultancy Services for the Conduct of Feasibility Study of Proposed Construction of Missi Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE I City of San Fernando, La Union Contract ID: 20CSA001 Contract Name: Consultancy Services for the Conduct of Feasibility Study of Proposed Construction of Missing Links and New Roads Cervantes (Ilocos Sur) - Besao- Sagada (Mt. Province) Road Via Laylaya (Region I) Application for Eligibility and Shortlisting June 04, 2020 1 Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGIONAL OFFICE I City of San Fernando, La Union Request for Expression of Interest (REOI) for the CONSULTANCY SERVICES FOR THE CONDUCT OF FEASIBILITY STUDY OF PROPOSED CONSTRUCTION OF MISSING LINKS AND NEW ROADS CERVANTES (ILOCOS SUR) - BESAO- SAGADA (MT. PROVINCE) ROAD VIA LAYLAYA (REGION I) 1. The DPWH-Regional Office I through Preliminary Detailed Engineering (PDE) 2020 intends to apply the sum of Eighteen Million Nine Hundred Sixty One Thousand Seven Hundred Twenty Four Pesos and Nine Centavos(Php18,961,724.09) being the Approved Budget for the Contract (ABC) to payments under the contract for the Consultancy Services for the Conduct of Feasibility Study of Proposed Construction of Missing Links and New Roads Cervantes (Ilocos Sur) - Besao-Sagada (Mt. Province) Road Via Laylaya (Region I) with Contract ID 20CSA001. Bids received in excess of the ABC shall be automatically rejected at the opening of the financial proposals. 2. The DPWH-Regional Office I now calls for the submission of eligibility documents for Consultancy Services for the Conduct of Feasibility Study of the proposed construction of Cervantes (Ilocos Sur)-Besao-Sagada (Mt. Province) via Laylaya Road is an inter-linking Regional Road Project connecting the towns of Quirino & Cervantes, Ilocos Sur and Besao & Sagada, Mt. Province. The Region I component starts at Brgy. Patungcaleo, Quirino, Ilocos Sur and ends at Brgy. Patiacan, Quirino, Ilocos Sur with an estimated length of 14.302 kilometers with a carriageway width of 6.70 meter and thickness of 0.280 meter. The approximate length of the project is 40.754 kilometers (Region I and CAR).. Interested consultants must submit their eligibility documents on or before June 04, 2020 @ 10:00 am at 2nd Floor, Conference Room of DPWH-Regional Office I, City of San Fernando, La Union. Applications for eligibility will be evaluated based on a non- discretionary “pass/fail” criterion. 3. The BAC shall draw up the short list of consultants from those who have submitted EOI with Eligibility Documents and have been determined as eligible in accordance with the provisions of Republic Act 9184 (RA 9184), otherwise known as the “Government Procurement Reform Act”, and its Implementing Rules and Regulations (IRR). The short list shall consist of three (3) prospective bidders who will be entitled to submit bids. The criteria and rating system for short listing are: i. Experience of the Firm …………….… 35 points ii. Qualifications of Key Personnel …. 40 points iii. Job Capacity …………………………..… 25 points 2 4. Bidding will be conducted through open competitive bidding procedures using non-discretionary “pass/fail” criterion as specified in the IRR of RA 9184. Bidding is restricted to Filipino citizens/sole proprietorships, partnerships, or organizations with at least sixty percent (60%) interest or outstanding capital stock belonging to citizens of the Philippines. 5. The Procuring Entity shall evaluate bids using the Quality-Cost Based Evaluation (QCBE) Method. In accordance with DO 07, series of 2015, the weights of Quality (Technical Proposal) and Cost (Financial Proposal) shall be 60% and 40%, respectively. The criteria and rating system for the evaluation of bids shall be provided in the Instructions to Bidders. 6. The contract shall be completed within One Hundred Fifty (150) cd. 7. The DPWH-Regional Office I reserves the right to reject any and all bids, annul the bidding process, or not award the contract at any time prior to contract award, without thereby incurring any liability to the affected bidder or bidders. 8. For further information, please refer to: DAISY M. MANZANO DPWH-Regional Office I Aguila Road, City of San Fernando, La Union Telefax: (072) 607-1298 Email address: [email protected] GERRY G. JUCAR Chairperson Bids and Awards Committee DPWH Regional Office I DATE OF PUBLICATION: May 28, 2020-June 03, 2020 3 Eligibility Documents (EDs) 1. Eligibility Criteria 1.1. The following persons/entities shall be allowed to participate in the bidding for Consulting Services: (a) Duly licensed Filipino citizen/sole proprietorships; (b) Partnerships duly organized under the laws of the Philippines and of which at least sixty percent (60%) of the interest belongs to citizens of the Philippines; (c) Corporations duly organized under the laws of the Philippines and of which at least sixty percent (60%) of the outstanding capital stock belongs to citizens of the Philippines; (d) Cooperatives duly organized under the laws of the Philippines; or (e) Persons/entities forming themselves into a JV, i.e., a group of two (2) or more persons/entities that intend to be jointly and severally responsible or liable for a particular contract: Provided, however, that Filipino ownership or interest thereof shall be at least sixty percent (60%). For this purpose, Filipino ownership or interest shall be based on the contributions of each of the members of the joint venture as specified in their JVA. 1.2. When the types and fields of Consulting Services involve the practice of professions regulated by law, those who will actually perform the services shall be Filipino citizens and registered professionals authorized by the appropriate regulatory body to practice those professions and allied professions specified in the EDS. In accordance with DPWH Department Order No. 195 series of 1992, pursuant to the provisions of R.A. 544, procurement and employment of corporations as consultants for the practice of civil engineering under locally- funded project is not allowed. For Feasibility Studies and Non-Civil Engineering Services involving multi-disciplinary services, corporations, partnerships, and sole proprietorship shall be allowed, but licensing requirements on regulated professions shall be applied. 1.3. If the Request for Expression of Interest allows participation of foreign consultants, prospective foreign bidders may be eligible subject to the conditions stated in the EDS. 1.4. Government owned or –controlled corporations (GOCCs) may be eligible to participate only if they can establish that they (a) are legally and financially autonomous, (b) operate under commercial law, and (c) are not attached agencies of the Procuring Entity. 4 2. Eligibility Requirements 2.1. If a consultant intends to participate in the bidding for this contract in response to the Procuring Entity’s Request for Expression of Interest (REOI), the consultant must submit its Expression of Interest (EOI), using Form DPWH CONSL-05, together with the following required Eligibility Documents on or before the date of the Eligibility Check specified in the REOI and Clause 5 of these EDs, for purposes of determining eligibility of prospective bidders: (a) Class “A” Documents – Legal Documents (i) Registration certificate from Securities and Exchange Commission (SEC) in the case of a Partnership or Corporation, Department of Trade and Industry (DTI) in the case of a sole proprietorship, or Cooperative Development Authority (CDA) in the case of a cooperative, or any proof of such registration as stated in the EDS; (ii) Mayor’s/Business Permit issued by the city or municipality where the principal place of business of the prospective bidder is located; For an individual consultant participating in the exercise of a profession and not under a sole proprietorship, a BIR Certificate of Registration shall be submitted, in lieu of the DTI registration and the Mayor’s Business Permit. (iii) Tax Clearance per Executive Order (EO) No. 398, series of 2005, as finally reviewed and approved by the Bureau of Internal Revenue (BIR). Technical Documents (iv) Statement of the prospective bidder of all its ongoing and completed government and private contracts, including contracts awarded but not yet started, if any, whether similar or not similar in nature and complexity to the contract to be bid, within the relevant period provided in the EDS. The consultant shall use Form DPWH-CONSL-06(TPF2A) and Form DPWH-CONSL- 07(TPF2B) for this purpose. The statement shall include, for each contract, the following: (iv.1) the name and location of the contract; (iv.2) date of award of the contract; (iv.3) type and brief description of consulting services; (iv.4) consultant’s role (whether main consultant, subcontractor, or partner in a JV) and description of specific services it provided; 5 (iv.5) amount of contract; (iv.6) contract duration; and (iv.7) certificate of satisfactory completion or equivalent document specified in the EDS issued by the client, in the case of a completed contract; (v) Statement of the consultant specifying its nationality and confirming that those who will actually perform the service are registered professionals authorized by the appropriate regulatory body to practice those professions and allied professions in accordance with Clause 1.2 of these EDs. Financial Document (vi) The consultant’s audited financial statements, showing, among others, the consultant’s total and current assets and liabilities, stamped “received” by the BIR or its duly accredited and authorized institutions, for the preceding calendar year which should not be earlier than two (2) years from the date of bid submission. To facilitate determination of eligibility, however, the BAC of a Procuring Entity shall use the contents of the PhilGEPS electronic registry of consultants, in accordance with Section 8.5.2. However, foreign consultants participating in the procurement by a Philippine Foreign Service or Post shall be allowed to submit their eligibility documents under Section 24.1, in lieu of the PhilGEPS Certificate of Registration required in Section 8.5.2; provided that the winning bidder should register with the PhilGEPS in accordance with Section 37.1.4 (IRR Section 24.4.3).
Recommended publications
  • POPCEN Report No. 3.Pdf
    CITATION: Philippine Statistics Authority, 2015 Census of Population, Report No. 3 – Population, Land Area, and Population Density ISSN 0117-1453 ISSN 0117-1453 REPORT NO. 3 22001155 CCeennssuuss ooff PPooppuullaattiioonn PPooppuullaattiioonn,, LLaanndd AArreeaa,, aanndd PPooppuullaattiioonn DDeennssiittyy Republic of the Philippines Philippine Statistics Authority Quezon City REPUBLIC OF THE PHILIPPINES HIS EXCELLENCY PRESIDENT RODRIGO R. DUTERTE PHILIPPINE STATISTICS AUTHORITY BOARD Honorable Ernesto M. Pernia Chairperson PHILIPPINE STATISTICS AUTHORITY Lisa Grace S. Bersales, Ph.D. National Statistician Josie B. Perez Deputy National Statistician Censuses and Technical Coordination Office Minerva Eloisa P. Esquivias Assistant National Statistician National Censuses Service ISSN 0117-1453 FOREWORD The Philippine Statistics Authority (PSA) conducted the 2015 Census of Population (POPCEN 2015) in August 2015 primarily to update the country’s population and its demographic characteristics, such as the size, composition, and geographic distribution. Report No. 3 – Population, Land Area, and Population Density is among the series of publications that present the results of the POPCEN 2015. This publication provides information on the population size, land area, and population density by region, province, highly urbanized city, and city/municipality based on the data from population census conducted by the PSA in the years 2000, 2010, and 2015; and data on land area by city/municipality as of December 2013 that was provided by the Land Management Bureau (LMB) of the Department of Environment and Natural Resources (DENR). Also presented in this report is the percent change in the population density over the three census years. The population density shows the relationship of the population to the size of land where the population resides.
    [Show full text]
  • 3.5.4.2 Final Report of Kankana-Ey Besao Size
    Ethnomedical documentation of selected Philippine ethnolinguistic groups: the Busaos Kankana-ey people of Barangay Catengan, Besao, Mountain Province A collaborative project of Philippine Institute of Traditional and Alternative Health Care, Department of Health, Sta Cruz, Manila University of the Philippines Manila, Ermita, Manila 2000 August Page 1 ACKNOWLEDGEMENT We wish to thank the Provincial Health Office of Mountain Province for the assistance and suggestions given during the initial phase of the study, and Dr Penelope Domogo for the suggestions and referrals on the study sites. We also thank the people of Besao especially Hon Johnson N Bantog for the permission to conduct the study in his locality, and Ms Joyce Callisen for the guidance and help in the coordination in the study site. And lastly, we would like to give our deepest thanks to the people of Brgy Catengan, Brgy Captain Dondie Babake for allowing us to conduct our study in their community, the family of Mrs Vergie Sagampod for the warm acceptance and accommodation given the researcher during the study period, and the healers, mothers, youth members and children for the information that they shared. Page 2 TABLE OF CONTENTS Executive summary Background of the study Objectives Methodology Review of literature Results Recommendations References Appendices Page 3 Ethnomedical documentation of selected Philippine ethnolinguistic groups: the Busaos Kankana-ey people of Besao, Mountain Province EXECUTIVE SUMMARY An ethnomedical documentation of the Busaos people in Mountain Province was conducted in March to July 2000. The five-month study focused on the indigenous healers present in the community. The study included the documentation of the health perceptions, beliefs and practices of the Busaos, including the ethnopharmacological knowledge of the community.
    [Show full text]
  • Lo Fil) 2Ozo by and Between
    * Contract ID 20Proo41 Contract Name Convergence and Specia! Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations, Tadian-sagada Via Besao Road leading to Tirad Pass View, Fidelisan Falls, Sumaguing Cave, Balangagan Cave, Ayyuweng di lambak ed Tadian Festival, Kiltepan Sunrise, Besao Sunset Hanging Coffins, Echo Valley, Tadian, Mountain Province Location of the .Tadian, Mountain Province Contract CONTRACT AGREEMENT KNOW ALL MEN BY THESE PRESENTS: This CONTRACT AGREEMENT, made this lo fil) 2ozo by and between: The GOVERNMENT irr THE REPUBLTC OF THE PHILTPPTNES through the Department of Public Works and Highways-Mountain Province First District Engineering Office (DPWH-MPFDEO) represented herein by ALEXANDER C. CASTAfrEDA, District Engineer, duly authorized for this purpose, with main office address at Lower Caluttit, Bontoc, Mountain Province, hereinafter referred to as the "PROCURING ENTITY"; GENERAL CONSTRUCTION, a single proprietorship organized and existing and by virtue of laws of the Republic of the Philippines, with main office address at POBLACION, TADIAN, MOUNTAIN PROVINCE, represented herein by REYNALDO S. DEL AMOR, duly authorized for this purpose, hereinafter referred to as the *CONTRACTOR; WITNESSETH: WHEREAS, the PROCURING ENTITY is desirous that the CONTRACTOR execute the Works under 20PI0041 - Convergence and Special Support Program Construction/ Improvement of Access Roads leading to Declared Tourism Destinations, Tadian-Sagada via Besao Road leading to Tirad Pass View, 6
    [Show full text]
  • 2278-6236 Inayan: the Tenet for Peace Among Igorots
    International Journal of Advanced Research in ISSN: 2278-6236 Management and Social Sciences Impact Factor: 6.284 INAYAN: THE TENET FOR PEACE AMONG IGOROTS Rhonda Vail G. Leyaley* Abstract: This research study was conducted to determine the meaning of Inayan and how this principle is used by the Igorots as a peaceful means of solving issues that involves untoward killings, accidents, theft and land grabbing. The descriptive method was used in this study. Key informants were interviewed using a prepared questionnaire. Foremost, the meaning of Inayan among Igorots is, it is the summary of the Ten Commandments. For more peaceful means, they’d rather do the rituals like the “Daw-es” to appease their pain and anger. This is letting the Supreme Being which they call Kabunyan take the course of action in “punishing” those who have committed wrong towards them. It is recommended that the principles of Inayan be disseminated to the younger generation through the curriculum; that the practices and rituals will be fully documented to be used as references; and to develop instructional materials that will advocate the principle of Inayan; Keywords: Inayan, Peace, Igorots, Rituals, Kankanaey *Bulanao, Tabuk City, Kalinga Vol. 5 | No. 2 | February 2016 www.garph.co.uk IJARMSS | 239 International Journal of Advanced Research in ISSN: 2278-6236 Management and Social Sciences Impact Factor: 6.284 I. INTRODUCTION In a society where tribal conflicts are very evident, a group of individuals has a very distinguishable practice in maintaining the culture of peace among themselves. They are the Igorots. The Cordillera region of Northern Philippines is the ancestral domain of the Igorots.
    [Show full text]
  • 2015Suspension 2008Registere
    LIST OF SEC REGISTERED CORPORATIONS FY 2008 WHICH FAILED TO SUBMIT FS AND GIS FOR PERIOD 2009 TO 2013 Date SEC Number Company Name Registered 1 CN200808877 "CASTLESPRING ELDERLY & SENIOR CITIZEN ASSOCIATION (CESCA)," INC. 06/11/2008 2 CS200719335 "GO" GENERICS SUPERDRUG INC. 01/30/2008 3 CS200802980 "JUST US" INDUSTRIAL & CONSTRUCTION SERVICES INC. 02/28/2008 4 CN200812088 "KABAGANG" NI DOC LOUIE CHUA INC. 08/05/2008 5 CN200803880 #1-PROBINSYANG MAUNLAD SANDIGAN NG BAYAN (#1-PRO-MASA NG 03/12/2008 6 CN200831927 (CEAG) CARCAR EMERGENCY ASSISTANCE GROUP RESCUE UNIT, INC. 12/10/2008 CN200830435 (D'EXTRA TOURS) DO EXCEL XENOS TEAM RIDERS ASSOCIATION AND TRACK 11/11/2008 7 OVER UNITED ROADS OR SEAS INC. 8 CN200804630 (MAZBDA) MARAGONDONZAPOTE BUS DRIVERS ASSN. INC. 03/28/2008 9 CN200813013 *CASTULE URBAN POOR ASSOCIATION INC. 08/28/2008 10 CS200830445 1 MORE ENTERTAINMENT INC. 11/12/2008 11 CN200811216 1 TULONG AT AGAPAY SA KABATAAN INC. 07/17/2008 12 CN200815933 1004 SHALOM METHODIST CHURCH, INC. 10/10/2008 13 CS200804199 1129 GOLDEN BRIDGE INTL INC. 03/19/2008 14 CS200809641 12-STAR REALTY DEVELOPMENT CORP. 06/24/2008 15 CS200828395 138 YE SEN FA INC. 07/07/2008 16 CN200801915 13TH CLUB OF ANTIPOLO INC. 02/11/2008 17 CS200818390 1415 GROUP, INC. 11/25/2008 18 CN200805092 15 LUCKY STARS OFW ASSOCIATION INC. 04/04/2008 19 CS200807505 153 METALS & MINING CORP. 05/19/2008 20 CS200828236 168 CREDIT CORPORATION 06/05/2008 21 CS200812630 168 MEGASAVE TRADING CORP. 08/14/2008 22 CS200819056 168 TAXI CORP.
    [Show full text]
  • JOSELINE “JOYCE” P. NIWANE Assistant Secretary for Policy and Plans DSWD-Central Office Batasan Pambansa Complex, Constitution Hills Quezon City
    JOSELINE “JOYCE” P. NIWANE Assistant Secretary for Policy and Plans DSWD-Central Office Batasan Pambansa Complex, Constitution Hills Quezon City Personal Information Date of Birth: April 3, 1964 Place of Birth: Baguio City Marital Status: Single Parents: COL. Francisco Niwane(Ret) Mrs. Adela P. Niwane Education Elementary: Holy Family Academy, Baguio City 1971-1977 High School: Holy Family Academy, Baguio City 1977-1981 College: Saint Louis University, Baguio City 1982-1985 Post Education: 1. University of the Philippines (1989-1990) - Masters in Public Administration 2. University of Washington, Seattle, USA ( 2001-2002) -Post Graduate in Public Policy and Social Justice 3. Saint Mary’s University (2005-2006) - Masters in Public Administration AWARDS/ FELLOWSHIPS RECEVEIVED: 1986 : “Merit of Valor” Award – World Vision International 1996 : 1st Provincial AWARD OF MERIT – Provincial Government of Ifugao 1997 : Dangal ng Bayan Awardee - CSC and Pres. Fidel V. Ramos 1998 : Model Public Servant Awardee of the Year – KILOSBAYAN AND GMA 7 1998 : Outstanding Cordillera Woman of the Year – Midland Courier 1998 : 1st National Congress of Honor Awardee 2001 : Ifugao Achievers Award - Provincial Government of Ifugao 2001-2002 : Hubert Humphrey Fellowship Program/Fulbright- United States of America Government 2013 : Best Provincial Social Welfare and Dev’t. Officer – DSWD-CAR 2015 : Galing Pook Award - DILG 2016 : Gawad Gabay : Galing sa Paggabay sa mga Bata para sa Magandang Buhay “ Champion of Positive and Non-violent discipline for the Filipino
    [Show full text]
  • Documentation of the Best Practices in the Implementation of Kalahi-Cidss in the Municipality of Besao
    ISDC ISDC2014 CONFERENCE PROCEEDINGS 2014 ISBN: 978-967-0474-74-8 DOCUMENTATION OF THE BEST PRACTICES IN THE IMPLEMENTATION OF KALAHI-CIDSS IN THE MUNICIPALITY OF BESAO Cezanne B. Panay [email protected] Mountain Province State Polytechnic College Abstract This study sought to document the Best practices of Besao in the implementation of Kapitbisig Laban sa Kahirapan-Comprehensive and Integrated Delivery of Social Services. Approaches and processes have become part of a development framework. The highlights in the evolution of processes and approaches are the changing dole-out paradigm to inclusive growth development paradigm and from the top to bottom planning to bottom to top planning. In general, the objective of KALAHI-CIDSS is: 1) Improve the responsiveness of local government to community needs; 2) Encourage communities to engage in development activities. 3) Deliver benefits to barangay residents through the individual sub-projects. KALAHI-CIDSS follows a community driven Strategy (People Centered Approach). CDD is operationalized through five-stage, three cycle community mobilization process called the Community empowerment Cycle or CEAC. The Three Cycle is progressive and was married with the existing cultural practices and this bore out Best Practices that can be adopted and pursued in the light of achieving Community Development. Implementation of KALAHI- CIDSS in Besao so far has undertaken notable implication. Findings show the following factors or practices which emerged during the implementation: 1) Inter-local Cooperation, 2) Harmonization of the KALAHI-CIDSS Processes in the Local Council Proceses 3) Adoption of the Community Plan in the Municipal Strategic Development Plan 4. Environmental Management, and 5) People’s participation and empowerment through synergized efforts between the Local Government Units and the PO’s and NGO’s.
    [Show full text]
  • Heirloom Recipes of the Cordillera
    Heirloom Recipes of the Cordillera Partners for Indigenous Knowledge Philippines HEIRLOOM RECIPES OF THE CORDILLERA Philippine Copyright 2019 Philippine Task Force for Indigenous People’s Rights (TFIP) Partners for Indigenous Knowledge Philippines (PIKP) This work is available under a Creative Commons Attribution-Noncommercial License (CC BY-NC). Reproduction of this publication for educational or other non-commercial purposes is authorized without prior permission from the copyright holders provided the source is fully acknowledged. Reproduction for resale or other commercial purpose is prohibited without prior written permission from the copyright holders. Published by: Philippine Task Force for Indigenous People’s Rights (TFIP) #16 Loro Street, Dizon Subdivision, Baguio City, Philippines And Partners for Indigenous Knowledge Philippines (PIKP) #54 Evangelista Street, Leonila Hill, Baguio City, Philippines With support from: VOICE https://voice.global Editor: Judy Cariño-Fangloy Illustrations: Sixto Talastas & Edward Alejandro Balawag Cover: Edward Alejandro Balawag Book design and layout: Ana Kinja Tauli Project Team: Marciana Balusdan Jill Cariño Judy Cariño-Fangloy Anna Karla Himmiwat Maria Elena Regpala Sixto Talastas Ana Kinja Tauli ISBN: 978-621-96088-0-0 To the next generation, May they inherit the wisdom of their ancestors Contents Introduction 1 Rice 3 Roots 39 Vegetables 55 Fish, Snails and Crabs 89 Meat 105 Preserves 117 Drinks 137 Our Informants 153 Foreword This book introduces readers to foods eaten and shared among families and communities of indigenous peoples in the Cordillera region of the Philippines. Heirloom recipes were generously shared and demonstrated by key informants from Benguet, Ifugao, Mountain Province, Kalinga and Apayao during food and cooking workshops in Conner, Besao, Sagada, Bangued, Dalupirip and Baguio City.
    [Show full text]
  • Human Rights Based Approach to Development As Experienced in Ten Indigenous Communities in the Philippines
    UMAN IGHTS ASED E H R B XPE R PPROACH TO EVELOPMENT IENCED A D H AS XPERIENCED IN E UMAN IN T EN R TEN INDIGENOUS COMMUNITIES I IG NDIGENOUS H TS IN THE HILIPPINES P B ASED C A OMMUNITIES PP R OAC H TO Project Implemented by IN D DINTEG T EVELOPMENT H (Cordillera Indigenous Peoples Legal Center) E P Funded by the H ILIPPINES European Union European Union and the AS International Work Group for Indigenous Affairs Copyright DINTEG First published 2015 Disclaimer: The contents of this publication is the sole responsibility of DINTEG and can in no way be taken to reflect the views of the European Union. Printed by: Rianella Printing Press HUMAN RIGHTS BASED APPROACH TO DEVELOPMENT AS EXPERIENCED IN TEN INDIGENOUS COMMUNITIES IN THE PHILIPPINES To Janjan and Jordan Capion who were massacred together with their anti-mining activist mother, Juvy Capion, on 18 October 2012 in the tri-boundary of Davao del Sur, South Cotabato and Sultan Kudarat where Xstrata – Sagittarius Mining Incorporated is operating. CONTENTS INTRODUCTION I. HUMAN RIGHTS BASED APPROACH TO DEVELOPMENT AS EXPERIENCED IN TEN INDIGENOUS COMMUNITIES IN THE PHILIPPINES A. EXECUTIVE SUMMARY B. THE HUMAN RIGHTS BASED APPROACH TO DEVELOPMENT PROJECT C. ACTUAL IMPLEMENTATION D. PROJECT OUTPUTS, OUTCOMES AND IMPACT E. FACILITAING FACTORS, AREAS OF SHORTCOMINGS AND CONTINUING CHALLENGES F. APPLICATION OF THE SEQUENTIAL STEPS IN HUMAN RIGHTS BASED APPROACH IN THE 10 PILOT AREAS II. EXTERNAL EVALUATION REPORT ON THE LGU ENGAGEMENT COMPONENT OF THE HUMAN RIGHTS BASED APPROACH TO DEVELOPMENT PROJECT G. INTRODUCTION H. RESULTS OF THE EVALUATION I.
    [Show full text]
  • LIST of MUNICIPAL HEALTH OFFICERS Cordillera Administrative Region As of January 7, 2020
    LIST OF MUNICIPAL HEALTH OFFICERS Cordillera Administrative Region As of January 7, 2020 Province/ City Provincial Offices and Municipality Rural Health Units Contact Number Email Address Dr. Maria Christina V. Cabrera (PHO II) 0917-175-952 [email protected] [email protected] / Dr. Alex M. Bayubay (DMO V) [email protected] Bangued MHO: Bangued Dr. Glygoric A. Cortes (MHO) Boliney RHU: 0927-421-2696 Boliney Ms. Princess Mae S. Stimson (PHN) Bucay RHU: 0917-302-6781 Bucay Dr. June G. Aznar (MHO) Bucloc RHU: 0906-572-5201 [email protected] Bucloc Dr. Andrew Chamson M. Bacuso (DTTB) Daguioman RHU: 0927-803-9131 Daguioman Dr. Rellin Gay A. Apelo (DTTB) Danglas RHU: 0905-498-0789 [email protected] Danglas ABRA Dr. Joan Rose G. Lampac (MHO) Dolores RHU: 0917-779-3925 Dolores Dr. Joan Rose G. Lampac (DTTB) Lacub RHU: 0917-801-6914 Lacub Ms. Lea Sharon B. Ibay (PHN) 0916-897-3343 Lagangilang RHU: 0921-668-9667 [email protected] Lagangilang Dr. Ruby Rose L. Orosco (MHO) Lagayan RHU: 0917-895-6744/ 0917-412-4627 [email protected] Lagayan Dr. Melanie Aggudong (DTTB) Langiden RHU: Langiden Dr. Antonio L. Valera (PHO I) La Paz RHU: La Paz Ms. Caroline Afos Parel (OIC- PHN) Licuaan- Licuan_Baay RHU: 0926-916-5646 Baay Dr. Ma. Flavie D. Blanca (MHO) Luba RHU: 0917-825-7359 [email protected] Luba Dr. Anthea Marie R. Gabaoen (MHO) Malibcong RHU: 0917-854-4304/ 0977-177-8740 [email protected] Malibcong Dr. Mira Peace B. Kapuno (MHO) Manabo RHU: Manabo Dr. Joel Beleno (MHO) Peñarrubia RHU: 0906-574-1318 [email protected] Peñarrubia Dr.
    [Show full text]
  • Learning Brief
    Learning Brief LEARNING BRIEF “Pakada and tutya”: Gaining the Indigenous Communities’ Consent for Project Implementation Key Messages It is tradition in the Cordilleras or among Indigenous Peoples’ (IPs) that before entering into any territory, pakada” andone mustto leave: seek Pakada” first the in consent Kankana-ey of the (Besao, community. Sagada It • Introducing a project is called “ which means“pakacha” permission to enter to the ICC needs pakaja” andpakada” Sadanga, Mt. Province), in Bontoc, Mt. understanding, Province, “ in Tubo, Abra. Although the word transparency, respect tradition“ ofis deriveddeliberating from whether the Ilocano to approve dialect, itor was deny and perseverance. The practiced by the IPs of Cordillera combined with their culture, tradition and beliefs of the community Tutyathe request is usually to enter done their in their community dap-ays/ators/atos which they call as must be considered “tutya” in Kankana-ey term used in Sagada and Besao. when introducing a which project. Approval of keyrefer players to an indigenous to administer open the meeting agreements place related made of to the stone slabs where bonfire is usually set at its center. The project by the community pakada” tutya” represented by the different dap-ays (Tubo, Sagada and is in accordance with “ and “ are the Council of Elders (COEs) their customary laws and experiences. Their Besao), ators (Sadanga) and atos (Mainit, Bontoc). experiences include the historical struggles This traditional approach was consciously followed by the project in gaining the consent of the indigenous of the community communities of Abra and Mountain Province for its involving ownership and mountains:SIKAME-IWMP Sisipitan, initiative.
    [Show full text]
  • Songs: an Initial Stylistic Assessment
    Article Selected Lyrics of Bontok’s “Antoway, Ayoweng, and Chag-Ay” Songs: An Initial Stylistic Assessment Jonnelle D. Fagsao Mountain Province State Polytechnic College, Bontoc, Mountain Province 2616, Philippines; [email protected] Received: 3 June 2019; Accepted: 24 July 2019; Published: 26 July 2019 Abstract: Most of the studies of Bontok songs in Bontoc, Mountain Province, Philippines have focused on the need to preserve an aspect of the “Ifuntok” (people of Bontoc) society, but the major aim of this paper first proposes an understanding of the Tokwifi’s “Antoway”, Bacwaden’s “Ayyoweng”, and Khensay’s “Chag-ay”, commonly regarded as songs of the Bontoks during wakes and funerals, taking into consideration its intrinsic potential on literary themes and musicality. This paper then organizes the framework of Prototype and Relevance Theory and applies it to the selected songs found in the three collections. It attempts to express how prototype and relevance theory can improve not only a thematic analysis of the selected songs, but also the extra-textual interpretations that can be drawn from them. In doing so, it adds to the contemporary thoughtful understanding of Bontok indigenous tradition, as they are deceptively eliminated of the impression of the past, recontextualized in today’s literature and music curriculum, and associated in contemporary free issues and concerns in the Bontok community. Keywords: antoway; ayyoweng; bontoc; mountain province; bontok; chag-ay; ifuntok songs; lufun; prototype theory and relevance theory 1. Introduction Does Bontoc, Mountain Province have her own songs which bears the stamp of the Bontoks’ cultural character? Do the Bontoks have indigenous songs, songs which when heard makes them feel that it is a component of their existence, belonging to their heart and soul, faithful in its revelation to their sentiments and ideals? To this question, undoubtedly, the answer would be: they have, in much the same way that they have language, customs, traditions, and natural aspirations.
    [Show full text]