(To Be Published in the Gazette of India, Part-II, and Section 3, Sub

Total Page:16

File Type:pdf, Size:1020Kb

(To Be Published in the Gazette of India, Part-II, and Section 3, Sub MCPI Private Proposed Expansion of PTA manufacturing capacity by setting up a plant of 1.25 MTPA capacity at Village & P. O. Bhuniaraichak, Tehsil : Sutahata, Haldia, Dist : Purba FORM 1 Limited Midnapore, West Bengal, Pin – 721635 Form-1 (I) BASIC INFORMATION S. No. Item Detail 1. Name of the project/s Proposed Expansion of PTA manufacturing capacity by setting up a plant of 1.25 MTPA capacity 2. S. No. in the schedule 5(e) 3. Proposed capacity/ area /length/tonnage/ Product: Purified Terephthalic Acid to/be handled/ command area/ lease area/ (PTA) number of wells to be drilled Production Capacity: 1.25 MTPA Area: 3.55 acres within the existing plant boundary Project Cost: INR 3700 Cr 4. New/ Expansion/Modernization Expansion 5. Existing Capacity/ Area etc. Two PTA manufacturing lines having a total production capacity of 1.37 MTPA As of now 324 acres( Plant area- Hectares including proposed plant) 6. Category of Projects i.e. ‘A’ or ‘B’ “A” 7. Does it attract the general condition? If Yes. yes, please specify. Project Site falls under Critically polluted Area. 8. Does it attract the specific condition? If No yes, please specify. 9. Location Latitude: 22°04’53.12” N Longitude: 88°10’02.86” E Across boundary area and centre of MCPI Plot / survey / Khasra No. Plot No: 1075 to 1131,1381to1399 Dag No:1105,1168.1082,1081,1056 Ward No:5 Khaitan:1167, JL No:122,128,121,129 Village Bhuniaraichak Tehsil Sutahata, Haldia District Purba Midnapore State West Bengal Pin – 721635 Page - 1 MCPI Private Proposed Expansion of PTA manufacturing capacity by setting up a plant of 1.25 MTPA capacity at Village & P. O. Bhuniaraichak, Tehsil : Sutahata, Haldia, Dist : Purba FORM 1 Limited Midnapore, West Bengal, Pin – 721635 10. Nearest railway Station/airport along with • Durgachak Railway Station – 1.5 km distance in kms. from project site • Haldia Railway Station – 11 km from the project site • Netaji Subhash Chandra Bose International Airport – 135 km from the project site 11. Nearest Town, city, District Headquarters Haldia – 6 km from the project site along with distance in kms. District HQ – Tamluk – 34 km form the project site 12. Village Panchayats, Zilla Parishad, Haldia Municipality Municipal Corporation, Local body Dr. Ambedkar Bhawan, Administrative (complete postal addresses with telephone Building nos. to be given) City Center. P.O.: Debhog, Haldia, Dist : Purba Medinipur, West Bengal Ph. : 03224 252996 / 252996 / 252644 /253410 / 252718 13. Name of the applicant MCPI Private Limited (formerly MCC PTA India Corp. Private Limited and Materials Chemicals and Performance Intermediaries Private Limited) 14. Registered Address Bengal Intelligent Park, Tower-1 3rd Floor,Block-EM,Plot No-3 SaltLake City, Sector-V, Kolkata-700091 15. Address for correspondence : Name Mr.Ananta Charan Mishra Designation (Owner/Partner/CEO) Executive Vice President (Plant Head) Address MCPI Pvt Limited Vill & P.O.- Bhuniariachak Via Sutahata (Haldia) Purba Midnapore West Bengal Pin Code 721635 E-mail [email protected] Telephone No. +91 3224 275572 /73 Fax No. +91 3224275574 16. Details of Alternative Sites examined, if No alternate site was considered as the any. Location of these sites should be proposed expansion shall take place shown on a topo sheet. within the existing plant area. 17. Interlinked Projects No 18. Whether separate application of interlinked NA project has been submitted? 19. If yes, date of submission NA 20. If no, reason NA 21. Whether the proposal involves No Page - 2 MCPI Private Proposed Expansion of PTA manufacturing capacity by setting up a plant of 1.25 MTPA capacity at Village & P. O. Bhuniaraichak, Tehsil : Sutahata, Haldia, Dist : Purba FORM 1 Limited Midnapore, West Bengal, Pin – 721635 approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22. Whether there is any Government No Order/Policy relevant/ relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation pending No against the project and/or land in which the projects is proposed to be set up? (a) Name of the Court (b) Case No. (c) Orders/ directions of the court, if any and its relevance with the proposed project. * Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.) Page - 3 MCPI Private Proposed Expansion of PTA manufacturing capacity by setting up a plant of 1.25 MTPA capacity at Village & P. O. Bhuniaraichak, Tehsil : Sutahata, Haldia, Dist : Purba FORM 1 Limited Midnapore, West Bengal, Pin – 721635 (II) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies etc.) Details thereof (with approximate Information / Checklist S. No. Yes/No quantities / rates, wherever possible) confirmation with source of information data 1.1 Permanent or temporary change in The proposed expansion project shall land use, land cover or topography be set up on 25 acres of land within including increase in intensity of the existing plant premises. The land land use (with respect to local is generally flat and does not come land use plan) under flood zone. It does not have any human settlement. The proposed land has already been classified as an Industrial land. The expansion project Yes shall be done following a land use plan, which will be made taking into consideration relevant guidelines / stipulations of the concerned Authorities. Moreover, the planning of the project, development of green belt and other landscape on the proposed site would be done to enhance the aesthetics of the area. 1.2 Clearance of existing land, Site clearing and preparation activities vegetation and buildings? will involve removal of scanty Yes vegetation as available on the plot. The proposed land has already been classified as an Industrial land. 1.3 Creation of new land uses? Yes Proposed expansion project shall be developed following a well - designed land-use plan. A positive change in the land use due to the proposed project is expected. 1.4 Pre-construction investigations Soil testing already carried out as per Yes e.g. bore houses, soil testing? requirement. 1.5 Construction works? The civil works for the construction and development of the proposed project include earthwork excavation; Yes construction of factory sheds, storage sheds / godowns; utilities; internal roads & parking areas, etc. 1.6 Demolition works? No - 1.7 Temporary sites used for Local contractors & workers will be construction works or housing of No engaged for the construction activity. construction workers? Suitable temporary arrangements shall Page - 4 MCPI Private Proposed Expansion of PTA manufacturing capacity by setting up a plant of 1.25 MTPA capacity at Village & P. O. Bhuniaraichak, Tehsil : Sutahata, Haldia, Dist : Purba FORM 1 Limited Midnapore, West Bengal, Pin – 721635 be made for them near the project site. 1.8 Above ground buildings, Yes Please refer Project Report. structures or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including No - mining or tunneling? 1.10 Reclamation works? No - 1.11 Dredging? No - 1.12 Offshore structures? No - 1.13 Production and manufacturing Yes Please refer Project Report. processes? 1.14 Facilities for storage of goods or All construction materials will be materials? Yes handled through site store within the project boundary. 1.15 Facilities for treatment or disposal MCPI has an Integrated Scrap yard for of solid waste or liquid effluents? storing hazardous as well as non- hazardous solid wastes in operation within its plant premises. Final disposal of hazardous waste is being done through TSDF at Haldia. Co-processing of solid Hazardous waste of process sludge is being done through M/s Ambuja Cement & M/s Odisha Cement Limited. ETP sludge is being sent to M/s WBWML for disposal. Waste oil and used oil is being Yes disposed through WBPCB authorized recyclers. E-waste disposal is being done through WBPCB authorized recyclers. The same facilities shall be utilised after expansion by renewing the contract for the increased capacities with the respective bodies. The general waste will compose of inorganic, organic, plastics. The entire waste volume shall be segregated and disposed off in consultation with the concerned authorities. Page - 5 MCPI Private Proposed Expansion of PTA manufacturing capacity by setting up a plant of 1.25 MTPA capacity at Village & P. O. Bhuniaraichak, Tehsil : Sutahata, Haldia, Dist : Purba FORM 1 Limited Midnapore, West Bengal, Pin – 721635 Septic tank sludge will be disposed off-site in consultation with the concerned local authority. Process wastewater generated from the expansion part of the project (170 m3/hr.) will be treated in a new effluent treatment plant. Treated effluent meeting the relevant discharge standards will be used in non-critical purposes and the excess treated wastewater shall be disposed into Hugli River through the existing final outlet. 1.16 Facilities for long term housing of No new housing shall be created. The operational workers? operational workers will live in the No existing colonies as well as in the nearby locality. 1.17 New road, rail or sea traffic
Recommended publications
  • Techno Economic Feasibility Report of M/S Modern India Con-Cast Ltd
    Techno Economic Feasibility Report of M/s Modern India Con -cast Ltd Expansion cum modification Project At: Haldia, Dist - Purba Medinipur, WB Techno Economic Feasibility Report of M/s Modern India Con -cast Ltd Expansion cum modification Project At: Haldia, Dist - Purba Medinipur, WB CONTENTS CHAPTER-1 ............................................................................................................................................................. 5 EXECUTIVE SUMMARY ........................................................................................................................................... 5 CHAPTER-2 ............................................................................................................................................................. 7 INTRODUCTION OF THE PROJECT ........................................................................................................................... 7 2.1 IDENTIFICATION OF PROJECT & PROJECT PROPONENT ...................................................................................................... 7 2.2 BRIEF DESCRIPTION OF NATURE OF THE PROJECT ........................................................................................................ 7 2.3 NEED OF THE PROJECT AND IMPORTANCE OF THE PROJECT TO THE COUNTRY AND REGION ................................................. 7 2.3.1 Domestic Market ................................................................................................................................... 9 2.4 EMPLOYMENT
    [Show full text]
  • New Regn.Pdf
    LIST OF NEWLY REGISTERED DEALERS FOR THE PERIOD FROM 01-DECEMBER-08 TO 16-DECEMBER-08 CHARGE NAME VAT NO. CST NO. TRADE NAME ADDRESS ALIPUR 19604024078 19604024272 BAHAR COMMODEAL PVT. LTD. 16 BELVEDRE ROAD KOLKATA 700027 19604028055 MAHAVIR LOGISTICS 541/B, BLOCK 'N NW ALIPORE KOLKATA 700053 19604027085 P. S. ENTERPRISE 100 DIAMOND HARBOUR ROAD KOLKATA 700023 19604031062 19604031256 PULKIT HOLDINGS PVT. LTD. 16F JUDGES COURT ROAD KOLKATA 700027 19604030092 19604030286 R. S. INDUSTRIES (INDIA) 26E, TURF ROAD KALIGHAT 700025 19604026018 19604026212 RAJ LAXMI JEWELLERS 49/1 CIRCULAR GARDEN ROAD KOLKATA 700023 19604025048 19604025242 SAPNA HERBALS & COSMETICS PVT. LTD. 12/5 MOMINPUR ROAD KOLKATA 700023 19604029025 19604029219 SOOKERATING TEA ESTATE PVT. LTD. P-115, BLOCK-F NEW ALIPORE KOLKATA 700053 19604023011 SURFRAJ & CO. F-79 GARDENREACH ROAD KOLKATA 700024 ARMENIAN STREET 19521285018 19521285212 M/S. TEXPERTS INDIA PRIVATE LIMITED, 21, ROOPCHAND ROY STREET, 3RD FLOOR, KOLKATA 700007 19521286085 19521286279 TIRUPATI ENTERPRISES IST FLOOR, 153, RABINDRA SARANI, KOLKATA 700007 ASANSOL 19747189094 ARCHANA PEARLS 8, ELITE PLAZA G.C. MITRA ROAD ASANSOL 713301 19747194041 ASANSOL REFRIGERATOR MART 46 G.T. ROAD, DURGA MARKET, GIRIJA MOR ASANSOL 713301 19747182013 AUTO GARAGE FARI ROAD BARAKAR, ASANSOL 713324 19747178036 BADAL RUIDAS VIA- ASANSOL KALLA VILLAGE, RUIDAS PAR KALLA (C.H) 713340 19747175029 19747175223 BALBIR ENTERPRISES STATION ROAD BARAKAR 713324 19747179006 19747179297 BAZAR 24 24 G.T. ROAD (WEST) RANIGANJ SEARSOL RAJBARI 713358
    [Show full text]
  • Contents: Volume I
    Land Use & Development Control Plan: Final Report Extended Haldia Planning Area 2026 Contents: Volume I 1. Introduction ................................................................................................................. 1 1.1 Background ............................................................................................................................. 1 1.2 Aim and Objectives ................................................................................................................. 1 1.3 Vision ....................................................................................................................................... 2 1.4 Plan Preparation Methodology ............................................................................................... 2 1.5 Highlights of the LU & DC Plan ................................................................................................ 3 1.6 Review of Perspective Plan 2025 ............................................................................................ 3 1.6.1 Aim & Objectives of the Perspective Plan 2025 .............................................................. 3 1.6.2 Future Development Strategy ......................................................................................... 4 2. Regional Study & Existing Profile .................................................................................. 8 2.1 District Profile ........................................................................................................................
    [Show full text]
  • Trans-Asian Railway in the Southern Corridor of Asia-Europe Routes
    ECONOMIC AND SOCIAL COMMISSION FOR ASIA AND THE PACIFIC DEVELOPMENT OF THE TRANS-ASIAN RAILWAY TRANS-ASIAN RAILWAY IN THE SOUTHERN CORRIDOR OF ASIA-EUROPE ROUTES UNITED NATIONS ECONOMIC AND SOCIAL COMMISSION FOR ASIA AND THE PACIFIC DEVELOPMENT OF THE TRANS-ASIAN RAILWAY TRANS-ASIAN RAILWAY IN THE SOUTHERN CORRIDOR OF ASIA-EUROPE ROUTES UNITED NATIONS New York, 1999 ST/ESCAP/1980 This publication was prepared by Peter Hodgkinson, Consultant, with financial support by the Government of Germany through GTZ German Technical Cooperation. The description employed and the presentation of material in this publication do not imply the expression of any opinion whatsoever on the part of the Secretariat of the United Nations concerning the legal status of any country, territory, city or area, or of its authorities, or concerning the delimitation of its frontiers or boundaries. This publication has been issued without formal editing. CONTENTS Page 1. INTRODUCTION .................................................................................................................1 2. NETWORK IDENTIFICATION............................................................................................3 2.1 Routes of international significance .........................................................................3 2.1.1 Route TAR-S1.............................................................................................5 2.1.2 Route TAR-S2.............................................................................................5 2.1.3 Route TAR-S3.............................................................................................7
    [Show full text]
  • Speech of Mamata Banerjee Introducing the Railway Budget 2011-12 25Th February 2011
    Speech of Mamata Banerjee introducing the Railway Budget 2011-12 25th February 2011 1. Madam Speaker, I rise to present before this august House the Revised Estimates for 2010-11 and the estimated receipts and expenditure for 2011-12. I deem it an honour to present the third Railway Budget under the kind guidance of the hon'ble Prime Minister. I profusely thank the Finance Minster for his continued support and encouragement to the railways. 2. As the hon’ble members are aware, the wheels of the railways continue to move 24 hours, all 365 days. Railway’s services are comparable to emergency services, required all the time. I am proud of the 14 lakh members of my railway family, who toil day and night with unparalleled dedication. I am also grateful to all passengers without whose cooperation and consideration, we could not have run this vast system. I have also received unstinted support from our two recognised federations and staff and officers’ associations. 3. Madam, rail transportation is vitally interlinked with the economic development of the country. With the economy slated to grow at a rate of 8-9%, it is imperative that the railways grow at an even faster pace. I see the railways as an artery of this pulsating nation. Our lines touch the lives of humble people in tiny villages, as they touch the lives of those in the bustling metropolises. 4. We are taking a two-pronged approach, scripted on the one hand, by a sustainable, efficient and rapidly growing Indian Railways, and on the other, by an acute sense of social responsibility towards the common people of this nation.
    [Show full text]
  • Report of the Comptroller and Auditor General of India STATUS OF
    Report of the Comptroller and Auditor General of India STATUS OF ONGOING PROJECTS IN INDIAN RAILWAYS for the year ended March 2014 Laid in Lok Sabha/Rajya Sabha on_____________ Union Government (Railways) No. 48 of 2015 CONTENTS Paragraph Pages List of Abbreviations i to ii Executive Summary iii to ix CHAPTER 1 - Status of Ongoing Projects of Indian Railways- New Lines, Doubling and Gauge Conversion Introduction 1.1 1 Organisation Structure 1.2 2 Audit objectives 1.3 2 Scope and Audit Methodology 1.4 3 Audit Criteria 1.5 3 Audit Findings 1.6 4-35 Conclusion 1.6.14 35 Recommendations 1.6.15 36 CHAPTER 2 - Management of Works Contract in Indian Railways Introduction 2.1 37 Audit Findings 2.2 38-56 Conclusion 2.4 56 Recommendations 2.5 56 CHAPTER 3 - Dedicated Freight Corridor Projects Introduction 3.1 58 About the Project 3.1.1 58 Approval and Planning of the Project 3.2 60 Conclusion 3.4 69 Recommendations 3.5 69 CHAPTER 4 – Modernisation of Signalling and Telecommunication System by Indian Railway Project Management Unit Introduction 4.1 70 Organisation Structure 4.2 72 Audit Findings 4.4 72 Conclusion 4.6 94 Recommendations 4.7 95 APPENDIX Status of Ongoing Projects of Indian Railways- New Lines, Doubling and Gauge Conversion 96-179 Management of Works Contract in Indian Railways 180-181 Modernisation of Signalling and Telecommunication System by Indian Railway Project Management Unit 182-186 ANNEXURE Status of Ongoing Projects of Indian Railways- New Lines, Doubling and Gauge Conversion 187-286 Management of Works Contract in Indian Railways 287-302 Modernisation of Signalling and Telecommunication System by Indian Railway Project Management Unit 303-316 PREFACE This Report for the year ended March 2014 has been prepared for submission to the President of India under Article 151 of the Constitution of India.
    [Show full text]
  • SAARC Regional Multimodal Transport Study
    SAARC Regional Multimodal Transport Study SAARC REGIONAL MULTIMODAL TRANSPORT STUDY (SRMTS) Prepared for the SAARC Secretariat June 2006 i SAARC Regional Multimodal Transport Study © SAARC Secretariat No part of this publication may be reproduced in any form without prior permission or due acknowledgement. Published by SAARC Secretariat P.O. Box: 4222 Kathmandu, Nepal Tel: (977-1) 4221785, 4226350, 4231334 Fax: (977-1) 4227033, 4223991 Email: [email protected] Web-site: www.saarc-sec.org Printed by: WordScape, Nepal ii SAARC Regional Multimodal Transport Study PREFACE At the Twelfth SAARC Summit (Islamabad, 4-6 January 2004), the Heads of State or Government emphasized that for accelerated and balanced economic growth it is essential to strengthen transportation, transit and communication links across the region. Subsequently, SAARC Regional Multimodal Transport Study (SRMTS) has been conducted with a view to enhance transport connectivity among the Member States of SAARC to promote intra-regional trade and travel. SRMTS is a comprehensive Study covering all modes of transport - road, rail, maritime, aviation and inland waterways. The Report of the SRMTS has been appreciated by the higher SAARC bodies and its recommendations have now been prioritized. The SAARC Leaders have called for early implementation of the recommendations contained in the Study. I am also pleased to mention that action is being taken to extend SRMTS to include Afghanistan. I commend the national and regional consultants for conducting the Study successfully. I also wish to express my appreciation to the Asian Development Bank (ADB) for providing technical and financial assistance (under ADB RETA 6187: Promoting South Asian Regional Economic Cooperation) in conducting the SRMTS.
    [Show full text]
  • Chapter 4 Traction Member Traction at Railway Board Is Overall in Charge of the Electrical Department of Indian Railway
    ChapterChapter 4 4 ReportReport No. No. 5 of 20182018 (Railways) Chapter 4 Traction Member Traction at Railway Board is overall in charge of the Electrical department of Indian Railway. He is also responsible for Railway Electrification Workshops (exclusively for locomotives) and Energy/Fuel Management. At Zonal level, Chief Electrical Engineer (CEE) is responsible for operation and maintenance of Electric Locos, Electric Multiple Unit train (EMU), Mainline Electric Multiple Unit train (MEMU), maintenance and operation of Overhead Electrical Equipment (OHE), electrical coaching stock etc. Maintenance of Diesel locomotives is supervised by Chief Motive Power (Diesel). Production Units Chittaranjan Locomotive Works (CLW) and Diesel Locomotive Works (DLW) are managed independently by General Managers reporting to Member Traction at Railway Board. The total expenditure of Indian Railways on repair and maintenance of Motive Power (including plant and equipment) and expenditure on fuel (diesel and electricity) during the year 2016-17 was ` 8338.88 crore143 and ` 26427.26 crore144 respectively. An expenditure of ` 263.79 crore145 was incurred in production units of locomotives during the year 2016-17. During the year, apart from regular audit of vouchers and tenders, 407 offices of Electrical department including CLW and DLW were inspected by Audit. This chapter includes one long paragraph on ‘setting up of diesel locomotive manufacturing unit at Marhowra, Bihar’. In addition, this chapter also includes two individual paragraphs highlighting issues of utilization of diesel locos in completely electrified routes and incorrect fixation of contract demand. 143 Grant no.05 – Repair and maintenance of Motive Power for 2016-17 and Minor Head 400 of Grant no.07 – repair and maintenance of plant and equipment 144 Grant no.10 – Operating Expenses – Fuel for 2016-17 145 DLW, Varanasi, DMW, Patiala and CLW, Chittaranjan 114 114 ReportReport No.
    [Show full text]
  • Industrial Park Profile of WBSIDC
    Industrial Park Profile INVEST IN BENGAL of WBSIDC West Bengal Small Industries Development Corporation Limited INVEST IN BENGAL Industrial Park Profile of WBSIDC West Bengal Small Industries Development Corporation Limited Industrial Park Profile of WBSIDC © WBSIDC January 2018 Ambari-Falakata Industrial Estate • Location Ambari Falakata Industrial Estate, Mogradangi, P.O. Payachari, Dist. Jalpaiguri, Latitude : 26.595255 (N), Longitude: 88.516511 (E) • Year of establishment 2009 • Accessibility » Situated at 0.5 KM from NH31B. » Nearest Railway Station: Ambari Falakata Railway Station » Nearest Airport: Bagdogra Airport, Jaipaiguri, West Bengal • Area 61.84 Acre • No. of Plot/Shed/Stall/Bldg Space 183 • No. of Functioning Units NA • No. of Non Functioning Units Allotment started recently • Rate Rs. 1.50 Lakh/Kattah with Rebate. (15% up to 30 Kattah / 25% above 30 to 60 K / 35% above 60K). • Type of Industries Allotment started recently. • Lease Period for units For 99 Years • Common Infrastructure » Internal Road connected with Main Road with Gates & Securities » Surface drainage network » Street lights » Power supply to individual units provided directly by the Service Provider WBSEDCL. • Maintenance By WBSIDC Ltd • Vacancy Position 144 Plots • Contact Person (SAE/Association) » SAE: Mr. Gopal Karmakar, Mobile No: 9434431276 » Association: Not yet formed. • Employment » Direct : Allotment started recently » Indirect: Allotment started recently. 5 Industrial Park Profile of WBSIDC Ashokenagar Industrial Estate • Location Ashokenagar Industrial Estate, Badamtola, P.O. & P.S. Ashokenagar, Dist. North 24 Parganas, Pin – 743222, Latitude: 22.836189 (N), Longitude: 88.612604 (E) • Year of establishment: 1989 • Accessibility » Situated on Jessore Road. » Nearest Railway Station: Ashokenagar Railway Station » Nearest Airport: Netaji Subhas Chandra Airport (CCU), Kolkata • Area 4.68 Acre • No.
    [Show full text]
  • Pattern of International Trade Through West Bengal: Some Evidence from Port-Level Data
    INDIAN INSTITUTE OF MANAGEMENT CALCUTTA WORKING PAPER SERIES WPS No. 737/ November 2013 Pattern of International Trade through West Bengal: Some Evidence from Port-Level Data by Parthapratim Pal Assistant Professor, IIM Calcutta, Diamond Harbour Road, Joka P.O., Kolkata 700 104 Pattern of International Trade through West Bengal: Some Evidence from Port-Level Data Parthapratim Pal1 I. Introduction West Bengal has a long international border and it occupies an important strategic location in the eastern part of India. Locational advantages suggest that it should play a crucial role in India’s pursuit for increased trade with other Asian countries. As West Bengal is close to Bangladesh, Myanmar, Thailand and a number of other East and South East Asian countries, it has the potential to become a gateway for India’s ‘Look East Policy’. State level export data published in the Economic Survey 2011-12 show that by total volume of exports, West Bengal rank 8th among the top 15 exporting states of India in 2010-11 (Table 1). Moreover, by Exports to State Domestic Product (SDP) ratio, West Bengal ranks 15th and 13th respectively in 2009-10 and 2010-11 among the top 15 exporting states of India. Port specific trade data show that relative importance of exports through the ports of West Bengal is declining in India’s total exports. For example, in 2003-04 exports through the ports of West Bengal accounted for more than 6 percent of India’s total exports. But the same share declined to around 3.4 percent in 2009-10 before recovering to just above 4 percent in 2012-13.
    [Show full text]
  • National Rail Plan - India
    National Rail Plan - India Executive Summary Preparation of National Rail Plan (NRP) – India Executive Summary EXECUTIVE SUMMARY 0.1. Background Indian Railways is the 4th largest railway network in the world by size with 123,542 kilometres of total tracks over a 67,415 Kms route. In the fiscal year ending March 2019, IR carried 8.4 billion passengers and transported 1.2 billion tonnes of freight. Indian Railways runs 13,523 passenger trains and 9,146 freight trains daily on its network with passenger trains running at an average speed of 50.6kmph and freight trains at 24kmph. As of March 2019, Indian Railways rolling stock consisted of 2,89,185 freight wagons, 74,003 passenger coachers and 12,147 locomotives. Indian Railways had 1.3 million employees making it world’s eighth largest employer. Now moving forward and with a vision to develop Indian Railways as a world class system which shall be able to cater to the demand by keeping pace with growth and compliment the economic development, Ministry of Railways has envisioned the preparation of National Rail Plan (NRP) for India keeping the year 2050 as the horizon. For this purpose, Ministry of Railways has mandated RITES Limited to provide advisory services by further appointing a Consultant. In pursuance of the above and to enable preparation of National Rail Plan, the RITES have assigned the study to M/s AECOM India Private Limited. 0.2. Vision and Objectives of the Plan The study was envisaged with keeping a following vision …. “To enhance rail freight share … … to prepare a compressive strategy for the Rail Sector in the form of National Rail Plan for creation of adequate capacity by 2030 that will cater to the demand up to 2050 i.e.
    [Show full text]
  • Purbamedinipur.Pdf
    PREFACE Under the proper guidance of Smt. Antara Acharya, IAS, District Magistrate, Purba Medinipur and active supervision of Shri Abhijit Maitra, WBCS (Exe.). Additional District Magistrate (Disaster Management), Purba Medinipur the District Action Plan for Disaster Preparedness, 2016 has been developed by Shri Bimal Kumar Maity, District Disaster Management Officer, Purba Medinipur and prepared by Shri Debasis Mitra, Upper Division Assistant, District Disaster Management Section, Purba Medinipur. Place :- Tamluk, Purba Medinipur st Dated :- The 31 May, 2016 C:\DDMP 2016\Purba Medinipur\District Action Plan for Disaster Preparedness 2016_Front Page, Preface & Index.doc INDEX DISTRICT ACTION PLAN FOR DISASTER PREPAREDNESS, 2016 PURBA MEDINIPUR Sl. Page Sl. Page Particulars Particulars No. No. No. No. 1 General Introduction Aims / Objective 1 26 Preparedness Plan of Civil Defence Department 57 2 Administrative GIS Map District 2 27 Resources 57 3 Overview of District 3 28 Flood Rescue Shelter 57 4 Type of Disasters 3 29 Temporary Flood Rescue Shelter 59 5 Cyclone Prone Blocks Map 4 30 Food Godown 68 6 Flood Prone Blocks Map 5 31 Public Distribution System 69 7 Mazor Hazards Map 6 32 Health Infrastructure 69 8 Climatic Profile 7 33 Multipurpose Cyclone Shelter 71 9 Rainfall / Rain Recording Station 7 34 Country Boat 72 Last 06 Years Analysis of Disaster Episode in this 10 8 35 Stock Position of Tarpaulin & Clothings 75 District Important Contact Details of District Disaster 11 Geographic Profile 8 36 76 Management Authority Important Contact
    [Show full text]