Commissioning of the KEKB B-Factoryinvited
Proceedings of the 1999 Particle Accelerator Conference, New York, 1999 COMMISSIONING OF THE KEKB B–FACTORY K. Akai, N. Akasaka, A. Enomoto, J. Flanagan, H. Fukuma, Y. Funakoshi, K. Furukawa, J. Haba, S. Hiramatsu, K. Hosoyama, N. Huang∗, T. Ieiri, N. Iida, T. Kamitani, S. Kato, M. Kikuchi, E. Kikutani, H. Koiso, S.–I. Kurokawa, M. Masuzawa, S. Michizono, T. Mimashi, T. Nakamura, Y. Ogawa, K. Ohmi, Y. Ohnishi, S. Ohsawa, N. Ohuchi, K. Oide,D.Pestrikov†,K.Satoh, M. Suetake, Y. Suetsugu, T. Suwada, M. Tawada, M. Tejima, M. Tobiyama, N. Yamamoto, M. Yoshida, S. Yoshimoto, M. Yoshioka, KEK, Oho, Tsukuba, Ibaraki 305-0801, Japan, T. Browder, Univ. of Hawaii, 2505 Correa Road, Honolulu, HI 96822, U.S.A. Abstract The commissioning of the KEKB B–Factory storage rings started on Dec. 1, 1998. The two rings both achieved a stored current of over 0.5 A after operating for four months. The two beams were successfully collided several times. The commissioning stopped on Apr. 19, taking a 5-week break to install the Belle detector. 1 BRIEF HISTORY OF THE COMMISSIONING The KEKB B–Factory[1] consists of two storage rings, the LER (3.5 GeV, e+) and the HER (8 GeV, e−), and the in- jector Linac/beam-transport (BT) system. The Linac was upgraded from the injector for TRISTAN, and was com- missioned starting in June 1997, including part of the BT line. The injector complex was ready before the start of commissioning of the rings.[2] Figure 1 shows the growth of the stored currents in the two rings through the period of commissioning.
[Show full text]