January 2012 School Travel Plans

Total Page:16

File Type:pdf, Size:1020Kb

January 2012 School Travel Plans REPORT AGENDA ITEM 11 LEICESTERSHIRE COUNTY COUNCIL HIGHWAYS FORUM FOR BLABY 25 TH JANUARY 2012 SCHOOL TRAVEL PLANS – UPDATE REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT Introduction 1. To update Members of the Forum on the delivery of School Travel Plans. Background 2. The County Council has been working with schools to develop travel plans through successive Local Transport Plans (LTP) since April 2000. School Travel Plans (STP) aim to reduce the number of cars arriving at the school gate, by supporting initiatives, with schools, to improve the safety and convenience of non-car travel. 3. The Leicestershire County Council Scrutiny Review Panel on Home to School Transport made a number of recommendations in 2010. These included continued support for STPs, walking buses and opportunities for Councillors to get more involved, helping schools in their patch. The Council under the Education and Inspections Act 2006 continues to have a duty, to promote sustainable travel to school. Progress to Date 4. 83.75% of schools currently have a STP in place (21/12/2011). The remaining schools which are developing or have yet to commit to developing a STP, are found in Appendix A . 5. The County Council has continued to encourage the review of STP and that schools share their reviews, with us. A STP Review template and supporting guidance for schools has been developed. They can get this from the County Council’s website. In the past year, 9 schools have completed a review of their STP. Approximately 40 more, in development, are listed in Appendix B . 6. Schools have and continue to be offered programmes that can support their work to encourage more sustainable travel: • Approximately 216 Advisory 20 m.p.h. zones and a further 8 created by year- end • Physical infrastructure improvements, for example crossings, way marking schemes and signed cycle routes • 46 schools across the county have got grants for cycle or mini-scooter parking, in the last 3 years. A further 19 will install parking in 2011/12 • At 62 primary schools, Star Travel, an incentive-based scheme to encourage walking, cycling, car sharing and bus use • 25 Walking bus routes associated with primary schools, most of which operate throughout the week 1 E:\moderngov\data\published\Intranet\C00000698\M00003427\AI00030281\$jh5otmde.doc Programme Outcomes 7. An indicator of success is positive change in the type of travel to school, by children. It is monitored by the percentage of pupils travelling by car (as sole passenger) aged 5- 15. The table below shows how well we did. Mode of travel to Leicestershire schools 06-07 07-08 08-09 09-10 10-11 Base LTP Target 26% 25% 24% 23% Actual 26.2% 25.5% 24.6% 23.5% 23.75% The Council has a target to reduce this, to 21.5% by 2016. However, for 2011/12, the intention is to seek to maintain last year’s level. The reasons for this short-term target are related to: • Changes to school transport (historical and other policy exceptions) • Schools becoming academies which may change the influence the Council has on travel at those schools, in the short term. Future Development 8. In the future, new STPs and reviews will be developed using the co-ordinated ‘Choose How You Move’ message; saving money, improving health, saving time and protecting the environment. Parents, pupils and staff will be encouraged to use more sustainable modes of travel, for more of their journeys. 9. Support to all schools will primarily be through web-based resources now available. Primarily, an area-based approach and solutions will be taken to help solve problems on the surrounding transport network. Schools with the highest numbers of cars carrying children, within these areas, will be prioritised for help. Outside targeted areas, low- level support will be offered, to all schools, via the Council’s web pages. 10. In 2012/13, remaining commitments for ‘safe routes to schools’ (SRS) works are expected to be completed e.g. • Advisory 20 mph zones • Traffic calming • Works to walking and cycling routes Following that, there will not be a specific SRS programme; but infrastructure needs identified through STP will feed into the overall Active and Sustainable Travel programme. 11. This report focuses on the change of approach that is being adopted for STP as a result of Local Transport Plan 3 (LTP3). A report will be submitted to the next Highway Forum, which will give an update on the LTP3 approach and the refreshed LTP3 implementation plan. Equal Opportunities Implications 12. Measures to address school travel are specifically designed to reduce road danger or improve access for vulnerable road users, particularly pedestrians, cyclists, disabled people, and the very old and very young. 2 E:\moderngov\data\published\Intranet\C00000698\M00003427\AI00030281\$jh5otmde.doc Recommendation 13. It is recommended that Members note the contents of this report. Officer to Contact Jonathan O’Farrell Tel: 0116 305 0001 School Travel Plan Co-ordinator Email: [email protected] Background Papers 2010 Scrutiny Review Panel on Home to School Transport - recommendations 3 E:\moderngov\data\published\Intranet\C00000698\M00003427\AI00030281\$jh5otmde.doc APPENDIX A (21st. Dec. 2011) Schools which have not developed a travel plan, to adoption by L.C.C. D.f.E. No. Working Blaby Schools towards STP? Thurlaston C of E Primary School 3320 NO PRIVATE Oakwood School 6021 NO PRIVATE Brook House Day School 6023 NO 5-14 Short Stay School (PRU) 1102 YES Countesthorpe Nursery School 1000 NO D.f.E. No. Working Charnwood Schools towards STP? Birstall Riverside Community Primary School 2368 NO Loughborough Ashmount School 7006 YES Loughborough de Lisle Catholic School 4601 YES Thurmaston Bishop Ellis Catholic Primary School 3345 NO Thurmaston Church Hill Infant School 2110 NO PRIVATE Ratcliffe College 6001 NO PRIVATE Trinity College 6025 NO Woodhouse Eaves Maplewell Hall School YES D.f.E. No. Working Hinckley and Bosworth Schools towards STP? Barwell Infant School 2049 NO Stanton-under-Bardon Community Primary School 2070 NO Hinckley Mount Grace High School 4010 YES Hinckley St Mary's C of E Primary School 3042 YES Markfield Mercenfeld Primary School 2069 YES PRIVATE Dixie Grammar School 6004 NO PRIVATE Twycross House School 6006 NO PRIVATE Twycross House Pre Prep School 6014 NO PRIVATE Jamia Islamia (Islamic Studies Centre) 6015 NO PRIVATE The Cedars 6022 NO PRIVATE Sketchley Horizon 6026 NO PRIVATE Hazel House 6027 NO PRIVATE Peckleton School 6029 NO 1 E:\moderngov\data\published\Intranet\C00000698\M00003427\AI00030281\$jh5otmde.doc APPENDIX A (21st. Dec. 2011) Schools which have not developed a travel plan, to adoption by L.C.C. D.f.E. No. Working Harborough Schools towards STP? Market Harborough St Joseph's Catholic Primary 3347 NO Market Harborough The Robert Smyth Academy 4003 YES Hallaton Church of England Primary School 3107 NO Husbands Bosworth C of E Primary School 3046 YES Thurnby Fernvale Primary School 2149 YES PRIVATE Brooke House College (Boarding School) 6005 NO PRIVATE Stoneygate School 6002 NO PRIVATE Claybrook Cottage School 6028 NO D.f.E. No. Working Melton Schools towards STP? Ab Kettleby Community Primary School 2000 NO Bottesford Belvoir High School & Comm Centre 4036 NO Hose Church of England Primary School 3043 YES Long Clawson C of E Primary School 3053 NO Melton Mowbray Birch Wood (Comm Special School) 7215 YES Melton Mowbray The Long Field High School 5400 NO Somerby Primary School 2094 NO PRIVATE The Grange Therapeutic School 6010 NO D.f.E. No. Working N.W.L.D.C. Schools towards STP? Albert Village Community Primary School 2006 YES Belton Church of England Primary School 3010 NO Breedon St Hardulphs C of E Primary School 3016 NO PRIVATE Manor House Preparatory School 6003 NO PRIVATE Grace Dieu Manor School 6007 NO PRIVATE Lewis Charlton School 6020 NO D.f.E. No. Working Oadby and Wigston Schools towards STP? South Wigston High School 5402 YES Wigston Magna Bushloe High School 5401 YES 2 E:\moderngov\data\published\Intranet\C00000698\M00003427\AI00030281\$jh5otmde.doc APPENDIX B (21st. Dec. 2011) Schools which have reviewed their travel plan or are receiving support to do so D.f.E. No. Reviewed or Blaby Schools Working Towards Reviewed Narborough The Pastures Primary School 2380 21/12/11 Blaby Stokes C of E Primary School 3012 Working Towards Enderby Brockington College 4506 Working Towards Countesthorpe Community College 4050 Working Towards Braunstone Kingsway Primary School 2181 Working Towards D.f.E. No. Reviewed or Charnwood Schools Working Towards PRIVATE Reviewed Fairfield School 6000 14/12/11 PRIVATE Reviewed Loughborough High School 6009 14/12/11 PRIVATE Reviewed Loughborough Grammar School 6012 14/12/11 Reviewed Quorn St Bartholomew's C of E Primary School 3070 15/09/11 Reviewed Loughborough Mountfields Lodge School 2194 15/04/2010 Reviewed Syston The Merton Primary School 2161 03/03/2011 Reviewed Barkby The Pochin School 3006 29/11/2010 Mountsorrel Christ Church & St Peter's C of E Primary 3211 Working Towards Barrow Humphrey Perkins High School 4000 Working Towards Loughborough Holywell Primary School 2331 Working Towards Birstall Longslade Community College 4039 Working Towards Birstall The Stonehill High School 4029 Working Towards Queniborough C of E Primary School 3069 Working Towards Loughborough Thorpe Acre Infant School 2120 Working Towards Loughborough Robert Bakewell Primary School & CC 2192 Working Towards Loughborough Outwoods Edge Community Primary 2169 Working Towards D.f.E. No. Reviewed or Hinckley and Bosworth Schools Working Towards Hinckley Battling Brook Community Primary School 2162 Working Towards Markfield South Charnwood High School 4018 Working Towards Burbage Hastings High School 4026 Working Towards Congerstone Primary School 2090 Working Towards Groby Brookvale High School 4051 Working Towards Earl Shilton Townlands C of E Primary School 3213 Working Towards Hinckley Holliers Walk Primary School 2044 Working Towards 1 E:\moderngov\data\published\Intranet\C00000698\M00003427\AI00030281\$jh5otmde.doc APPENDIX B (21st.
Recommended publications
  • School Administrator South Wingfield Primary School Church Lane South Wingfield Alfreton Derbyshire DE55 7NJ
    School Administrator South Wingfield Primary School Church Lane South Wingfield Alfreton Derbyshire DE55 7NJ School Administrator Newhall Green High School Brailsford Primary School Da Vinci Community College Newall Green High School Main Road St Andrew's View Greenbrow Road Brailsford Ashbourne Breadsall Manchester Derbys Derby Greater Manchester DE6 3DA DE21 4ET M23 2SX School Administrator School Administrator School Administrator Tower View Primary School Little Eaton Primary School Ockbrook School Vancouver Drive Alfreton Road The Settlement Winshill Little Eaton Ockbrook Burton On Trent Derby Derby DE15 0EZ DE21 5AB Derbyshire DE72 3RJ Meadow Lane Infant School Fritchley Under 5's Playgroup Jesse Gray Primary School Meadow Lane The Chapel Hall Musters Road Chilwell Chapel Street West Bridgford Nottinghamshire Fritchley Belper Nottingham NG9 5AA DE56 2FR Nottinghamshire NG2 7DD South East Derbyshire College School Administrator Field Road Oakwood Junior School Ilkeston Holbrook Road Derbyshire Alvaston DE7 5RS Derby Derbyshire DE24 0DD School Secretary School Secretary Leaps and Bounds Day Nursery Holmefields Primary School Ashcroft Primary School Wellington Court Parkway Deepdale Lane Belper Chellaston Sinfin Derbyshire Derby Derby DE56 1UP DE73 1NY Derbyshire DE24 3HF School Administrator Derby Grammar School School Administrator All Saints C of E Primary School Derby Grammar School Wirksworth Infant School Tatenhill Lane Rykneld Road Harrison Drive Rangemore Littleover Wirksworth Burton on Trent Derby Matlock Staffordshire Derbyshire
    [Show full text]
  • Supplier Payments Over £500 - May 2017
    Supplier payments over £500 - May 2017 Invoice Corporate Subjective Payment Vendor Name Description Amount Payment Date 2M HEATH & HOMECARE SERVICES LTD&&ISHC3873 Home Care / Domiciliary -2956.59 19/05/2017 2M HEATH & HOMECARE SERVICES LTD&&ISHC3873 Home Care / Domiciliary 1659.84 19/05/2017 2M HEATH & HOMECARE SERVICES LTD&&ISHC3873 Home Care / Domiciliary 11922.24 19/05/2017 ABBERDALE LIMITED&&SSAROE40419 Residential 1704 08/05/2017 Abbey Court Nursing & Residential Homes Ltd &&SSARO03285 Residential 1677.43 08/05/2017 ABBEYFIELDS EXTRA CARE&&SSAROE52835 Residential 550.29 08/05/2017 ABBEYFIELDS EXTRA CARE&&SSAROE52835 Residential 1726.83 08/05/2017 ABBEYFIELDS EXTRA CARE&&SSAROE52835 Residential 2728.32 08/05/2017 ABBEYFIELDS EXTRA CARE&&SSAROE52835 Residential 17569.04 08/05/2017 ABBEY HEALTHCARE (AARON COURT) LTD&&SSARO2996 Nursing 11514.4 08/05/2017 ABBEY HEALTHCARE (AARON COURT) LTD&&SSARO2996 Private Contractors 11514.4 08/05/2017 ABBEY HEALTHCARE (AARON COURT) LTD&&SSARO2996 Residential 11514.4 08/05/2017 ABBOTSFORD CARE LTD&&SSARO2339 Residential 16364 08/05/2017 ABERRY HOUSE&&SSAROE40470 Residential 2400 08/05/2017 AB Kettleby Community Primary School Academy Personal Accounts - Other 2000 17/05/2017 ABSOLUTE CARE AGENCY&&ISHC2620 Home Care / Domiciliary -5792.05 19/05/2017 ABSOLUTE CARE AGENCY&&ISHC2620 Home Care / Domiciliary 985.62 19/05/2017 ABSOLUTE CARE AGENCY&&ISHC2620 Home Care / Domiciliary 1017.21 19/05/2017 ABSOLUTE CARE AGENCY&&ISHC2620 Home Care / Domiciliary 3061.25 19/05/2017 ABSOLUTE CARE AGENCY&&ISHC2620 Home
    [Show full text]
  • Experienced Part-Time Learning Support Assistant
    Experienced Part-Time Learning Support Assistant Job Description About the School: Grace Dieu Manor School has a long and successful history of educating boys and girls. Established by the Rosminian Fathers in 1933, the School is situated in 120 acres of stunningly beautiful grounds on the edge of Charnwood Forest in North West Leicestershire. Steeped in history, Grace Dieu Manor School is a vibrant, Catholic, co-educational day school for boys and girls, aged 3 – 11. Applicants are urged to gain a sense of the ethos and atmosphere of the School by viewing the website www.gracedieu.com. The renowned educational enterprise at Grace Dieu Manor School ensures that the care and development of its pupils is its priority. The stimulating and happy environment ensures that children grow in confidence and reach their academic potential before departing to a broad range of top Senior Schools including: Ratcliffe College, Loughborough Grammar School, Loughborough High School, Repton and Trent College. Pastoral: ‘There is a very happy, friendly, family feel throughout the school. Every individual is well-respected and treated with great courtesy and care.’ (ISI Inspection Report, November 2013) Moral: ‘Pupils have a fully developed sense of right and wrong which is developed from the earliest age in the Early Years Foundation Stage.’ (ISI Inspection Report, November 2013) Social: ‘the emphasis that the school places on developing pupils’ confidence and self-esteem has led to pupils of all abilities achieving well in a range of sports and aesthetic activities such as art, music and drama.’ (ISI Inspection Report, November 2013) Academic: ‘Pupils make good progress throughout the school to reach high standards by the end of Year 8 because the curriculum is good and the teaching effective’ (ISI Inspection Report, November 2013) Job Description: .
    [Show full text]
  • Report Agenda Item 9 Leicestershire County
    REPORT AGENDA ITEM 9 LEICESTERSHIRE COUNTY COUNCIL HIGHWAYS FORUM FOR HARBOROUGH 7TH MARCH 2012 SCHOOL TRAVEL PLANS – UPDATE REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT Introduction 1. To update Members of the Forum on the delivery of School Travel Plans. Background 2. The County Council has been working with schools to develop travel plans through successive Local Transport Plans (LTP) since April 2000. School Travel Plans (STP) aim to reduce the number of cars arriving at the school gate, by supporting initiatives, with schools, to improve the safety and convenience of non-car travel. 3. The Leicestershire County Council Scrutiny Review Panel on Home to School Transport made a number of recommendations in 2010. These included continued support for STPs, walking buses and opportunities for Councillors to get more involved, helping schools in their patch. The Council under the Education and Inspections Act 2006 continues to have a duty, to promote sustainable travel to school. Progress to Date 4. 83.75% of schools currently have a STP in place (21/12/2011). The remaining schools which are developing or have yet to commit to developing a STP, are found in Appendix A . 5. The County Council has continued to encourage the review of STP and that schools share their reviews, with us. A STP Review template and supporting guidance for schools has been developed. They can get this from the County Council’s website. In the past year, 9 schools have completed a review of their STP. Approximately 40 more, in development, are listed in Appendix B . 6. Schools have and continue to be offered programmes that can support their work to encourage more sustainable travel: • Approximately 216 Advisory 20 m.p.h.
    [Show full text]
  • Vendor Name Corporate Subjective Description Invoice Payment
    Vendor Name Corporate Subjective Description Invoice Payment AmountPayment Date Nottingham University Hospitals NHS Trust Other Local Authorities 1413.96 16/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 548.7 07/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 552.96 07/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 563.4 23/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 577.2 23/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 621 23/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 648 23/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 696 23/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 710.4 07/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 748.2 23/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 751.2 07/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 772.2 07/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 792 23/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 828 07/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 864 07/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 960 07/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 1006.2 23/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 1032 07/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 1056 07/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 1078.2 23/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 1341.6 07/01/2015 Murphys Taxis Ltd Home to Sch Trans - Buses 1437.6 07/01/2015 Murphys Taxis Ltd Recharge of Pooled Transp Cost 1140 07/01/2015 Murphys Taxis Ltd Recharge of Pooled Transp Cost 1168.51 07/01/2015 Murphys Taxis Ltd Recharge of Pooled Transp Cost 1257.6 07/01/2015 Murphys Taxis Ltd S.E.N.
    [Show full text]
  • School Travel Plans – Update
    REPORT AGENDA ITEM 9 LEICESTERSHIRE COUNTY COUNCIL HIGHWAYS FORUM FOR HARBOROUGH 8TH DECEMBER 2009 SCHOOL TRAVEL PLANS – UPDATE REPORT OF THE DIRECTOR OF HIGHWAYS TRANSPORTATION AND WASTE MANAGEMENT Introduction 1. The purpose of this report is to update Members of the Forum on the progress being made within the County on developing School Travel Plans and the implementation of associated highway schemes. Background 2. Over the past 20 years, the number of children travelling to school by car has almost doubled and the Department for Transport (DfT) has estimated that, in urban areas in term time, nearly one in five cars at 8.50 am is on the school run. The County Council has been working with schools to develop travel plans through the Local Transport Plan (LTP) since March 2000. School Travel Plans aim to reduce the number of cars arriving at the school gate, mainly by developing initiatives to improve the safety and convenience of alternative travel modes. 3. The LTP sets out a target for 90% of schools in Leicestershire to have completed a travel plan by the end of 2010/11. 4. In September 2003, the DfT and the Department for Education and Skills (DfES) launched the ‘Travelling to School Initiative’. A government grant is paid to each school when its Travel Plan is approved (excluding independent schools). Grants for primary and secondary schools differ. The grant for primary schools is £3,750 plus £5 per pupil and for secondary schools it is £5,000 plus £5 per pupil. This grant has to be spent within the school to promote sustainable travel and cannot be spent on the highway.
    [Show full text]
  • 2019 - Secondary Immunisation Schedule Online Version
    2019 - Secondary Immunisation Schedule online version Teenage Digital School HPV session 1 HPV session 2 booster and School Full address and telephone number Code date date Men ACWY session date Al-Aqsa Schools Trust LE134809 The Wayne Way Leicester LE5 4PP T: 01162760953 25/09/2019 20/05/2020 27/01/2020 Al-Ihsaan Community College LE136823 1 Kamloops Crescent Leicester LE1 2HX T: 01163192360 25/09/2019 20/05/2020 27/01/2020 ALP Leicester LE139559 Stonehill Avenue Birstall LE4 4JG T: 01163262624 12/09/2019 23/04/2020 23/01/2020 Apollo Partnership Trust T/A Castle Rock High School LE138478 Meadow Lane Coalville LE67 4BR T: 01530834368 01/10/2019 12/05/2020 24/02/2020 Ash Field Academy LE138094 Broad Avenue Leicester LE5 4PY T: 01162737151 19/09/2019 30/04/2020 23/01/2020 Ashmount School LE120352 Thorpe Hill Loughborough LE11 4SQ T: 01509268506 09/09/2019 20/04/2020 05/02/2020 Avanti Fields School LE143679 2 Bruce Street Leicester LE3 0AF T: 01163266813 08/10/2019 19/05/2020 Babington Academy LE143247 Strasbourg Drive Beaumont Leys Leicester LE4 0SZ T: 01162221616 07/10/2019 18/05/2020 04/02/2020 Beauchamp College LE139624 Ridge Way Oadby Leicester LE2 5TP T: 01162729100 20/09/2019 01/05/2020 22/01/2020 Beaumont Leys School LE120281 Anstey Lane Leicester LE4 0FL T: 01162344480 19/09/2019 30/04/2020 21/01/2020 Birch Wood (Melton Area Special School) LE134640 Grange Drive Melton Mowbray LE13 1HA T: 01664483340 01/10/2019 12/05/2020 12/02/2020 Bosworth Academy LE137969 Leicester Lane Desford Leicester LE9 9JL T: 01455822841 26/09/2019 07/05/2020
    [Show full text]
  • Preparatory Schools 2018 a Guide to 1500 Independent Preparatory and Junior Schools in the United Kingdom 1 Providing Education for 2 ⁄2 to 13-Year-Olds
    JOHN CATT’S Preparatory Schools 2018 A guide to 1500 independent preparatory and junior schools in the United Kingdom 1 providing education for 2 ⁄2 to 13-year-olds 21ST EDITION The UK’s Leading Supplier of School and Specialist Minibuses • Fully Type Approved 9 - 17 Seat Choose with confidence, our knowledge and School Minibuses support make the difference • All The Leading Manufacturers • D1 and B Licence Driver Options 01202 827678 • New Euro Six Engines, Low Emission redkite-minibuses.com Zone (LEZ) Compliant [email protected] • Finance Option To Suit all Budgets • Nationwide Service and Support FORD PEUGEOT VAUXHALL APPROVED SUPPLIERS JOHN CATT’S Preparatory Schools 2018 21st Edition Editor: Jonathan Barnes Published in 2018 by John Catt Educational Ltd, 12 Deben Mill Business Centre, Woodbridge, Suffolk IP12 1BL UK Tel: 01394 389850 Fax: 01394 386893 Email: [email protected] Website: www.johncatt.com © 2017 John Catt Educational Ltd All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior permission of the publishers. Database right John Catt Educational Limited (maker). Extraction or reuse of the contents of this publication other than for private non-commercial purposes expressly permitted by law is strictly prohibited. Opinions expressed in this publication are those of the contributors, and are not necessarily those of the publishers or the sponsors. We cannot accept responsibility for any errors or omissions. Designed and typeset by John Catt Educational Limited. A CIP catalogue record for this book is available from the British Library.
    [Show full text]
  • APPENDIX C Schools Still to Develop a Travel Plan
    APPENDIX C (7TH OCT 2008 ) Schools still to develop a Travel Plan School District Blaby Stokes C of E Primary School Blaby Braunstone Winstanley Community College Blaby Brook House Day School Blaby Countesthorpe Leysland High School Blaby Countesthorpe Nursery School Blaby Narborough The Pastures Primary School Blaby Oakwood School Blaby Student Support Service PRU Blaby The Grange Therapeutic School Blaby Thurlaston C of E Primary School Blaby Anstey Woolden Hill Community Primary School Charnwood Birstall Highcliffe Primary School Charnwood Birstall Longslade Community College Charnwood Birstall Riverside Community Primary School Charnwood Long Whatton C of E Primary School Charnwood Loughborough Ashmount School Charnwood Loughborough Rosebery Primary School Charnwood Our Ladys Convent School Charnwood Ratcliffe College Charnwood Shepshed St Botolph's Primary School Charnwood Sileby Highgate Community Primary School Charnwood Thurcaston Richard Hill C of E Primary School Charnwood Thurmaston Bishop Ellis Catholic Primary School Charnwood Trinity College Charnwood Woodhouse Eaves Maplewell Hall School Charnwood Desford Community Primary School H&B Dixie Grammar School H&B Earl Shilton Weavers Close Primary School H&B Hinckley St Mary's C of E Primary School H&B Jamia Islamia (Islamic Studies Centre) H&B Newbold Verdon Primary School H&B Sketchley Horizon H&B Stanton-under-Bardon Community Primary School H&B The Cedars H&B Twycross House Pre Prep School H&B Twycross House School H&B Arnesby Church of England Primary School Harb Brooke
    [Show full text]
  • Indoor Built Sports Facilities Strategy
    INDOOR BUILT SPORTS FACILITY STRATEGY 2018-2036 CHARNWOOD BOROUGH COUNCIL DECEMBER 2018 CHARNWOOD BOROUGH COUNCIL SPORTS FACILITY STRATEGY INDOOR SPORTS FACILITY STRATEGY CONTENTS EXECUTIVE SUMMARY 1 INTRODUCTION 1 VISION 1 AIM 1 OUR STRATEGY 2 SPORTS AND GEOGRAPHICAL SCOPE 3 STRATEGY ANALYSIS 4 PRIORITY INVESTMENT NEEDS 6 ACTION PLAN 8 STAGE A- INTRODUCTION AND SCOPE 15 INTRODUCTION 15 PURPOSE AND OBJECTIVES IN DEVELOPING A SPORTS FACILITIES STRATEGY 17 STRATEGY STRUCTURE 17 SPORTS AND GEOGRAPHICAL SCOPE 19 PROPORTIONATE APPROACH 19 PROJECT MANAGEMENT 20 STRATEGIC POLICY AND CONTEXT 21 INTRODUCTION 21 NATIONAL LEVEL 21 NATIONAL PLANNING POLICY FRAMEWORK (NPPF) 21 A NEW STRATEGY FOR SPORT – DEPARTMENT FOR CULTURE, MEDIA AND SPORT 22 SPORT ENGLAND STRATEGY 2016- 2021 TOWARDS AN ACTIVE NATION’ 23 LOCAL LEVEL 24 FUTURE DEVELOPMENT IN THE BOROUGH 26 CHARNWOOD CORE STRATEGY, 2011 TO 2028 26 HOUSING AND ECONOMIC DEVELOPMENT NEEDS ASSESSMENT (HEDNA) 27 POPULATION PROFILES AND PROJECTIONS. 27 POPULATION PROFILE – DEPRIVATION 31 HEALTH PROFILE 33 SUMMARY OF KEY DEMOGRAPHIC FACTORS AND THEIR IMPLICATIONS 34 PHYSICAL ACTIVITY AND PARTICIPATION 34 THE INTRINSIC VALUE OF PARTICIPATION 34 CURRENT PARTICIPATION RATES 35 SPORTS ACTIVITY 38 MARKET SEGMENTATION 38 THE ECONOMIC VALUE OF SPORT 41 STAGE B - EXISTING FACILITY PROVISION 42 INTRODUCTION 42 SUPPLY OF FORMAL SPORT AND RECREATIONAL FACILITIES IN CHARNWOOD 42 CATCHMENT AREAS 43 PUBLIC TRANSPORT 43 STAGE B (ANOG) - ASSESSMENT OF EXISTING SPORTS FACILITY PROVISION IN CHARNWOOD 43 OPERATIONAL MANAGEMENT
    [Show full text]
  • Report Agenda Item 12 Leicestershire County
    REPORT AGENDA ITEM 12 LEICESTERSHIRE COUNTY COUNCIL HIGHWAYS FORUM FOR HARBOROUGH 15 TH DECEMBER 2010 SCHOOL TRAVEL PLANS – UPDATE REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT Introduction 1. The purpose of this report is to update Members of the Forum on the progress being made within the County on developing School Travel Plans and the implementation of associated highway schemes. Background 2. The County Council has been working with schools to develop travel plans through the Local Transport Plan (LTP) since March 2000. School Travel Plans aim to reduce the number of cars arriving at the school gate, mainly by developing initiatives to improve the safety and convenience of alternative travel modes. 3. The LTP sets out a target for 90% of schools in Leicestershire to have completed a travel plan by the end of 2010/11. 4. In September 2003, the Department for Transport (DfT) and the Department for Education and Skills (DfES) launched the ‘Travelling to School Initiative’. A government grant was paid to each school, up to March 2010, when its travel plan was approved (excluding independent schools). Grants for primary and secondary schools differed. The grant for primary schools was £3,750 plus £5 per pupil and for secondary schools it was £5,000 plus £5 per pupil. This grant was to be spent within the school to promote sustainable travel and cannot be spent on the highway. The grant is no longer available to any school developing a travel plan in 2010/11. At the time of writing this report, an announcement to clarify the Department for Education's position on overdue payment of the grant to schools who developed Travel Plans in 2009/10 is awaited.
    [Show full text]
  • Indoor Built Sports Facility Strategy 2018-2036
    INDOOR BUILT SPORTS FACILITY STRATEGY 2018-2036 CHARNWOOD BOROUGH COUNCIL DECEMBER 2018 CHARNWOOD BOROUGH COUNCIL SPORTS FACILITY STRATEGY INDOOR SPORTS FACILITY STRATEGY CONTENTS EXECUTIVE SUMMARY 1 INTRODUCTION 1 VISION 1 AIM 1 OUR STRATEGY 2 SPORTS AND GEOGRAPHICAL SCOPE 3 STRATEGY ANALYSIS 4 PRIORITY INVESTMENT NEEDS 6 ACTION PLAN 8 STAGE A- INTRODUCTION AND SCOPE 15 INTRODUCTION 15 PURPOSE AND OBJECTIVES IN DEVELOPING A SPORTS FACILITIES STRATEGY 17 STRATEGY STRUCTURE 17 SPORTS AND GEOGRAPHICAL SCOPE 19 PROPORTIONATE APPROACH 19 PROJECT MANAGEMENT 20 STRATEGIC POLICY AND CONTEXT 21 INTRODUCTION 21 NATIONAL LEVEL 21 NATIONAL PLANNING POLICY FRAMEWORK (NPPF) 21 A NEW STRATEGY FOR SPORT – DEPARTMENT FOR CULTURE, MEDIA AND SPORT 22 SPORT ENGLAND STRATEGY 2016- 2021 TOWARDS AN ACTIVE NATION’ 23 LOCAL LEVEL 24 FUTURE DEVELOPMENT IN THE BOROUGH 26 CHARNWOOD CORE STRATEGY, 2011 TO 2028 26 HOUSING AND ECONOMIC DEVELOPMENT NEEDS ASSESSMENT (HEDNA) 27 POPULATION PROFILES AND PROJECTIONS. 27 POPULATION PROFILE – DEPRIVATION 31 HEALTH PROFILE 33 SUMMARY OF KEY DEMOGRAPHIC FACTORS AND THEIR IMPLICATIONS 34 PHYSICAL ACTIVITY AND PARTICIPATION 34 THE INTRINSIC VALUE OF PARTICIPATION 34 CURRENT PARTICIPATION RATES 35 SPORTS ACTIVITY 38 MARKET SEGMENTATION 38 THE ECONOMIC VALUE OF SPORT 41 STAGE B - EXISTING FACILITY PROVISION 42 INTRODUCTION 42 SUPPLY OF FORMAL SPORT AND RECREATIONAL FACILITIES IN CHARNWOOD 42 CATCHMENT AREAS 43 PUBLIC TRANSPORT 43 STAGE B (ANOG) - ASSESSMENT OF EXISTING SPORTS FACILITY PROVISION IN CHARNWOOD 43 OPERATIONAL MANAGEMENT
    [Show full text]