Queensland Public Boat Ramps
Queensland public boat ramps Ramp Location Ramp Location Atherton shire Brisbane city (cont.) Tinaroo (Church Street) Tinaroo Falls Dam Shorncliffe (Jetty Street) Cabbage Tree Creek Boat Harbour—north bank Balonne shire Shorncliffe (Sinbad Street) Cabbage Tree Creek Boat Harbour—north bank St George (Bowen Street) Jack Taylor Weir Shorncliffe (Yundah Street) Cabbage Tree Creek Boat Harbour—north bank Banana shire Wynnum (Glenora Street) Wynnum Creek—north bank Baralaba Weir Dawson River Broadsound shire Callide Dam Biloela—Calvale Road (lower ramp) Carmilla Beach (Carmilla Creek Road) Carmilla Creek—south bank, mouth of creek Callide Dam Biloela—Calvale Road (upper ramp) Clairview Beach (Colonial Drive) Clairview Beach Moura Dawson River—8 km west of Moura St Lawrence (Howards Road– Waverley Creek) Bund Creek—north bank Lake Victoria Callide Creek Bundaberg city Theodore Dawson River Bundaberg (Kirby’s Wall) Burnett River—south bank (5 km east of Bundaberg) Beaudesert shire Bundaberg (Queen Street) Burnett River—north bank (downstream) Logan River (Henderson Street– Henderson Reserve) Logan Reserve Bundaberg (Queen Street) Burnett River—north bank (upstream) Biggenden shire Burdekin shire Paradise Dam–Main Dam 500 m upstream from visitors centre Barramundi Creek (Morris Creek Road) via Hodel Road Boonah shire Cromarty Creek (Boat Ramp Road) via Giru (off the Haughton River) Groper Creek settlement Maroon Dam HG Slatter Park (Hinkson Esplanade) downstream from jetty Moogerah Dam AG Muller Park Groper Creek settlement Bowen shire (Hinkson -
Sunwater Irrigation Price Review: 2012-17 Volume 2 Macintyre Brook Water Supply Scheme
Final Report SunWater Irrigation Price Review: 2012-17 Volume 2 Macintyre Brook Water Supply Scheme April 2012 Level 19, 12 Creek Street Brisbane Queensland 4000 GPO Box 2257 Brisbane Qld 4001 Telephone (07) 3222 0555 Facsimile (07) 3222 0599 [email protected] www.qca.org.au © Queensland Competition Authority 2012 The Queensland Competition Authority supports and encourages the dissemination and exchange of information. However, copyright protects this document. The Queensland Competition Authority has no objection to this material being reproduced, made available online or electronically but only if it is recognised as the owner of the copyright and this material remains unaltered. Queensland Competition Authority Table of Contents TABLE OF CONTENTS PAGE GLOSSARY III EXECUTIVE SUMMARY IV 1. MACINTYRE BROOK WATER SUPPLY SCHEME 1 1.1 Scheme Description 1 1.2 Bulk Water Infrastructure 1 1.3 Network Service Plans 2 1.4 Consultation 2 2. REGULATORY FRAMEWORK 4 2.1 Introduction 4 2.2 Draft Report 4 2.3 Submissions Received from Stakeholders on the Draft Report 6 2.4 Authority’s Response to Submissions Received on the Draft Report 6 3. PRICING FRAMEWORK 7 3.1 Tariff Structure 7 3.2 Water Use Forecasts 9 3.3 Tariff Groups 10 3.4 Continuous Sharing Arrangements 11 4. RENEWALS ANNUITY 12 4.1 Background 12 4.2 SunWater’s Opening ARR Balance (1 July 2006) 13 4.3 Past Renewals Expenditure 14 4.4 Opening ARR Balance (at 1 July 2012) 26 4.5 Future Renewals Expenditure 27 4.6 SunWater’s Consultation with Customers 39 4.7 Allocation of Renewals Expenditure According to WAE Priority 40 4.8 Calculating the Renewals Annuity 44 5. -
Pdf\Baffle Boyne Calliope Kolan.Pdf) N
!! Rockhampton 0 5 10 20 30 40 50 Legend !! BROADMEADOWS Keppel !! Automatic rainfall station (RN) Kilometres F !! Manual/Daily rainfall station (DN) itz Bay r Map projection: Geographical Lat and Lon (GDA94). o Automatic river height station (RV) y *# Cape R Capricorn # Manual river height station (RV) Midgee ## !! +! Forecast site (quantitative) Curtis Forecast site (qualitative) PORT ALMA +! #TIDE TM !R !. !( Ck Population centre (large, medium, small) !! erma at Ink n Ck Bo River, creek BAJOOL !! k !POST OFFICE Coral Sea Major highway C Island !( Main road BR Marmor UCE Basin boundary C !! u Catchment boundary SOUTH !! DARTS CK r H ti n W s a Y Dam, lake, water body l g a R MOUNT Swamp !!( !! RAGLAN CK LARCOM! Mt Larcom !! AUCKLAND POINT TM# Gladstone !( TIDE TM # Note: Base spatial data shown in this map is obtained from Yarwun !R!! GLADSTONE PACIFIC Geoscience Australia and Queensland Department of Natural GLADSTONE!! #TIDE TM (AWS) Resources, Mines and Energy. G # GLADSTONE RADAR C L r h a a AWS/AL a !( r v POLICE CK Port n Bracewell c e o l n m AL Curtis el Basin Locality C C k k !! ! #BOYNE ISLAND AL Townsville Qld border, R CASTLEHOPE coastline A !! OCEAN ! l Bowen m #TM Basin HAZELDEAN !! Rodds Bay a #!( boundary CALLIOPE CALLIOPE Calliope !! ! ! FIG pe ! !! !! C io STATION BENARABY AL Mackay TREE l (STOWE RD) AL # k l a C k C !! AWOONGA DAM k # C e AL/HW TM WY l b ! H Awoonga ! ! u I Emerald Rockhampton o Dam ve UPPER BELL CK D r ag !! IVERAGH BOROREN-IVERAGH Bustard AL s h AL !! N m RAIL TM Bay o !! SEVENTEEN SEVENTY ! O T ! Bundaberg S k # !! SPRINGS C B !( W Seventeen Seventy R A MARLUA AL !! U D ! ! k # ! MT MONGREL C C k !! FERNDALE ! Gympie UPPER RAINBOW ! E Charleville ! !! C AL E Roma AL B st CA er o . -
Map Marking Information for Kingaroy, Queensland [All
Map marking information for Kingaroy,Queensland [All] Courtesy of David Jansen Latitude range: -30 19.8 to -23 13.5 Longitude range: 146 15.7 to 153 33.7 File created Tuesday,15June 2021 at 00:58 GMT UNOFFICIAL, USE ATYOUR OWN RISK Do not use for navigation, for flight verification only. Always consult the relevant publications for current and correct information. This service is provided free of charge with no warrantees, expressed or implied. User assumes all risk of use. WayPoint Latitude Longitude ID Distance Bearing Description 95 Cornells Rd Strip 30 19.8 S 152 27.5 E CORNERIP 421 172 Access from Bald Hills Rd 158 Hernani Strip 30 19.4 S 152 25.1 E HERNARIP 420 172 East side, Armidale Rd, South of Hernani NSW 51 Brigalows Station Strip 30 13.0 S 150 22.1 E BRIGARIP 429 199 Access from Trevallyn Rd NSW 151 Guyra Strip 30 11.9 S 151 40.4 E GUYRARIP 402 182 Paddock North of town 79 Clerkness 30 9.9 S151 6.0 ECLERKESS 405 190 Georges Creek Rd, Bundarra NSW 2359 329 Upper Horton ALA 30 6.3 S150 24.2 E UPPERALA 416 199 Upper Horton NSW 2347, Access via Horton Rd 31 Ben Lomond Strip 30 0.7 S151 40.8 E BENLORIP 382 182 414 Inn Rd, Ben Lomond NSW 2365 280 Silent Grove Strip 29 58.1 S 151 38.1 E SILENRIP 377 183 698 Maybole Rd, Ben Lomond NSW 2365 Bed and Breakfast 165 Inverell Airport 29 53.2 S 151 8.7 E YIVL 374 190 Inverell Airport, Aerodrome Access Road, Gilgai NSW 2360 35 Bingara ALA 29 48.9 S 150 32.0 E BINGAALA 381 199 Bingara Airstrip Rd West from B95 55 Brodies Plains AF 29 46.4 S 151 9.9 E YINO 361 190 Inverell North Airport, Inverell NSW 2360. -
NW Queensland Water Supply Strategy Investigation
NW Queensland Water Supply Strategy Investigation Final Consultant Report 9 March 2016 Document history Author/s Romy Greiner Brett Twycross Rohan Lucas Checked Adam Neilly Approved Brett Twycross Contact: Name Alluvium Consulting Australia ABN 76 151 119 792 Contact person Brett Twycross Ph. (07) 4724 2170 Email [email protected] Address 412 Flinders Street Townsville QLD 4810 Postal address PO Box 1581 Townsville QLD 4810 Ref Contents 1 Introduction 1 2 Methodology 2 2.1 Geographic scope and relevant regional characteristics 2 2.2 Situation and vulnerability analysis 3 2.3 Multi criteria decision analysis 5 2.3.1 The principles of multi criteria decision making 5 2.3.2 Quantitative criteria 7 2.3.3 Qualitative criteria 8 3 Situation analysis: Water demand and supply 12 3.1 Overview 12 3.2 Urban water demand and supply 14 3.2.1 Mount Isa 14 3.2.2 Cloncurry 15 3.3 Mining and mineral processing water demand and supply 16 3.3.1 Mount Isa precinct 16 3.3.2 Cloncurry precinct 17 3.4 Agriculture 18 3.5 Uncommitted water 19 3.6 Projected demand and water security 19 3.7 Vulnerability to water shortages 20 4 Water infrastructure alternatives 21 4.1 New water storage in the upper Cloncurry River catchment 23 4.1.1 Cave Hill Dam 23 4.1.2 Black Fort Dam 25 4.1.3 Painted Rock Dam 26 4.1.4 Slaty Creek 27 4.1.5 Combination of Black Fort Dam and Slaty Creek 27 4.2 Increasing the capacity of the Lake Julius water supply 28 4.3 Utilising currently unused water storage infrastructure 30 4.3.1 Corella Dam 30 4.3.2 Lake Mary Kathleen 31 5 Ranking -
Region Region
THE MACKAY REGION Visitor Guide 2020 mackayregion.com VISITOR INFORMATION CENTRES Mackay Region Visitor Information Centre CONTENTS Sarina Field of Dreams, Bruce Highway, Sarina P: 07 4837 1228 EXPERIENCES E: [email protected] Open: 9am – 5pm, 7 days (May to October) Wildlife Encounters ...........................................................................................4–5 9am – 5pm Monday to Friday (November to April) Nature Reserved ..................................................................................................6–7 9am – 3pm Saturday Hooked on Mackay ...........................................................................................8–9 9am – 1pm Sunday Family Fun ..............................................................................................................10–11 Melba House Visitor Information Centre Local Flavours & Culture ............................................................................12–13 Melba House, Eungella Road, Marian P: 07 4954 4299 LOCATIONS E: [email protected] Cape Hillsborough & Hibiscus Coast ...............................................14–15 Open: 9am – 3pm, 7 days Eungella & Pioneer Valley .........................................................................16–17 Mackay Visitor Information Centre Mackay City & Marina .................................................................................. 18–19 320 Nebo Road, Mackay (pre-Feb 2020) Northern Beaches .........................................................................................20–21 -
Emergency Management of Sunwater's Dam Portfolio in The
Emergency management of SunWater’s dam portfolio in the 2010-11 Queensland floods Robert Keogh, Rob Ayre, Peter Richardson, Barry Jeppesen, Olga Kakourakis SunWater Limited SunWater owns 23 referable dams and operates a further two dams for other owners. The dams are located across Queensland from Texas and St George in the South to the Atherton Tablelands in the north to Mt Isa in the west. During the period December 2010 to February 2011 there were several significant rainfall events across Queensland. The first occurred in late December 2010, the second in mid January 2011 and third in early February 2011. Generally it was the most significant rainfall event in Queensland since the 1970’s. 22 Emergency Action Plans were activated simultaneously by SunWater. Eleven dams experienced a flood of record during the events. This paper will discuss what has been learnt from these events including the optimisation of management structures for a dam owner with a large portfolio of dams: review of O&M Manuals including the adequacy of backup systems: relationships with the State disaster management framework: the value of rigorous communication protocols: managing fear and a general lack of understanding in the community: and the value of being prepared. Keywords: Emergency Management, Floods, . In addition to the dams SunWater owns, the following 1 Background storages are managed under facility management SunWater and its subsidiary company Burnett Water Pty contracts: Ltd own 231 referable storages consisting of 18 Category 2 Glenlyon Dam – (Category 2 dam) for the Border 2 dams and 5 Category 1 dams under the Water Supply Rivers Commission (Safety and Reliability) Act 2008 and Water Act 2000. -
Emergency Action Plan - Callide Dam Telephone and Radio Notification List - Section 3; Controlled Copy Sheet Update - Section 1
TRANSMITTAL ADVICE Date: TO: SunWater HIO (CC4) Attention: PO Box 15536 City East Q4002 DESCRIPTION Emergency Action Plan - Callide Dam Telephone and Radio Notification List - Section 3; Controlled Copy sheet Update - Section 1 Attached isa revised insert for the Emergency Action Plan for the above Dam. Please: • Place the new pages into Sections 1 and 3 and discard the superseded pages • Sign the receipt advice below and return same by mail orFax RECEIPT ADVICE Received by ... .. ... .Date . Designation Return this Transmittal Advice to: Principal Engineer Dam Safety, Infrastructure Management SunWater PO Box 15536, City East, Old 4002 Or Fax to SECTION 1 EMERGENCY ACTION PLAN - CALLIDE DAM ~ater TABLE OF CONTENTS SECTION 1 Table of Contents, Controlled Copy Distribution List and Document Control Sheet SECTION 2 Emergency Evaluation Procedures SECTION 3 Notification & Emergency Communication List SECTION 4 Introduction to EAP, Responsibilities & Dam Description SECTION 5 Emergency Identification, Evaluation and Actions • Scenario 1: Flood Operation • Scenario 2: Rapid Drawdown • Scenario 3: Sunny Day Failure (Earthquake orPiping) • Scenario 4: ChemicallToxic Spill • Scenario 5: Terrorist Activity SECTION 6 Emergency Event Operation Recording Procedures • Emergency Event Recording Sheets • Flood Operation record sheet • Sunny Day Failure (Earthquake) record sheet • Sunny Day Failure (Piping) record sheet • Chemical! Toxic Spill record sheet • Terrorist Activity record sheet SECTION 7 Emergency Access Routes & Preventative Actions • Preventative -
Strategic Framework December 2019 CS9570 12/19
Department of Natural Resources, Mines and Energy Queensland bulk water opportunities statement Part A – Strategic framework December 2019 CS9570 12/19 Front cover image: Chinaman Creek Dam Back cover image: Copperlode Falls Dam © State of Queensland, 2019 The Queensland Government supports and encourages the dissemination and exchange of its information. The copyright in this publication is licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. Under this licence you are free, without having to seek our permission, to use this publication in accordance with the licence terms. You must keep intact the copyright notice and attribute the State of Queensland as the source of the publication. For more information on this licence, visit https://creativecommons.org/licenses/by/4.0/. The information contained herein is subject to change without notice. The Queensland Government shall not be liable for technical or other errors or omissions contained herein. The reader/user accepts all risks and responsibility for losses, damages, costs and other consequences resulting directly or indirectly from using this information. Hinze Dam Queensland bulk water opportunities statement Contents Figures, insets and tables .....................................................................iv 1. Introduction .............................................................................1 1.1 Purpose 1 1.2 Context 1 1.3 Current scope 2 1.4 Objectives and principles 3 1.5 Objectives 3 1.6 Principles guiding Queensland Government investment 5 1.7 Summary of initiatives 9 2. Background and current considerations ....................................................11 2.1 History of bulk water in Queensland 11 2.2 Current policy environment 12 2.3 Planning complexity 13 2.4 Drivers of bulk water use 13 3. -
Rural Irrigation Price Review 2020–24 Part A: Overview
Final report Rural irrigation price review 2020–24 Part A: Overview January 2020 © Queensland Competition Authority 2020 The Queensland Competition Authority supports and encourages the dissemination and exchange of information. However, copyright protects this document. The Queensland Competition Authority has no objection to this material being reproduced, made available online or electronically but only if it is recognised as the owner of the copyright2 and this material remains unaltered. Queensland Competition Authority Contents Contents EXECUTIVE SUMMARY III Scope of our review iii Approach iii Prices iii Revenue and cost risks v Approach to apportioning dam safety upgrade capex v Costs vi Recommendations vi 1 OVERVIEW OF OUR APPROACH 1 1.1 Background 1 1.2 Referral 1 1.3 Irrigation services 2 1.4 Key regulatory obligations 3 1.5 Our approach to the investigation and recommending prices 3 1.6 Review process 5 2 PRICING FRAMEWORK 6 2.1 Introduction 6 2.2 Scope of our investigation 6 2.3 Matters we are required to consider in undertaking our investigation 9 2.4 Approach 10 2.5 Stakeholders' submissions 10 2.6 Relevant matters for this investigation 11 2.7 Approach to bill moderation and the transition to lower bound prices 22 2.8 Summary of approach to relevant matters 23 3 RISK AND THE REGULATORY FRAMEWORK 24 3.1 Background 24 3.2 Revenue risk 27 3.3 Cost risk 33 4 APPORTIONING DAM SAFETY UPGRADE CAPITAL EXPENDITURE 44 4.1 Overview 44 4.2 Dam safety compliance obligations 46 4.3 Recent developments and drivers of dam safety upgrades -
Darling Downs - DD1
Priority Agricultural Areas - Darling Downs - DD1 Legend Railway Regional Plans boundary Parcel boundary C o g o Lake and dam o n R i Priority Agricultural Area ver DD4 DD7 DD1 DD5 DD8 M a r a n o a DD2 DD3 DD6 DD9 R iv e r r ive e R onn Bal 02.25 4.5 9 13.5 18 Ej Beardmore Dam kilometres B a l o n To the extent permitted by law, The Department of State Development, n e Infrastructure and Planning gives no warranty in relation to the material or R i information contained in this data (including accuracy, reliability, v e r completeness or suitability) and accepts no liability (including without limitation, liability in negligence) for any loss, damage or costs (including indirect or consequential damage) relating to any use of the material or information contained in this Data; and responsibility or liability for any loss or damage arising from its use. Priority Agricultural Areas - Darling Downs - DD2 Legend Bollon St George Railway Regional Plans boundary Parcel boundary Lake and dam Priority Agricultural Area DD4 DD7 Ba DD1 DD5 DD8 lo n n e R i v DD2 DD3 DD6 DD9 e r r e iv R n a rr Na Dirranbandi ive r lgo a R Cu r e v i R a 02.25 4.5 9 13.5 18 ar k h kilometres Bo To the extent permitted by law, The Department of State Development, Infrastructure and Planning gives no warranty in relation to the material or information contained in this data (including accuracy, reliability, Lake Bokhara completeness or suitability) and accepts no liability (including without limitation, Hebel liability in negligence) for any loss, damage or costs (including indirect or consequential damage) relating to any use of the material or information contained in this Data; and responsibility or liability for any loss or damage New South Wales arising from its use. -
Published on DNRME Disclosure Log RTI Act 2009
CTS No. 31998/19 DATE DUE TO DLO 18/12/2019 ELECTORATE OFFICE Ipswich Electorate Office NAME OF CONSTITUENT/MEMBER OF PUBLIC Sch 4 - Personal Information If applicable ISSUE Linking dams across Queensland RESPONDING OFFICER Name: Darren Thompson Author Position: Team Leader Business Unit: Water Supply, Natural Resources Division Phone: 3166 0154 FINAL APPROVAL Name: Trevor Dann DG/DDG/ED Position: Acting Executive Director Log Business Unit: Water Supply, Natural Resources Division Phone: 3137 4285 PLEASE NOTE: This advice is provided for the information of the Office of the Minister for Natural Resources, Mines and Energy to assist in preparing a response to the Electorate Office SUGGESTED RESPONSE TO ELECTORATE OFFICE Linking Dams Disclosure • Though the concept of large scale systems similar to those of the Bradfield Scheme have significant challenges, there may be an opportunity to undertake targeted improvements to regional connectivity where demand and supply characteristics are right. • There are already examples of this type of connectivity2009 that exist across the state where dams and pipelines provide water to where a demonstrated demand for water exists including Burdekin Haughton Water Supply scheme to Ross River Dam, the Burdekin to Moranbah pipeline and the North West pipeline near Mount Isa. DNRMEAct • The Queensland Government is ready to have a conversation with the Australian Government and its new National Water Grid Authorityon on a range of water infrastructure proposals including the opportunity for further increasing regional connectivityRTI where it makes sense (e.g. available supply within responsible limits commensurate with Queensland Water Plans and demonstrated demand for the water). • This could include identifying opportunities to explore the concept of connecting bulk water storages to where there is a clear demand for water at a price commensurate with the costs providing the water.