WEST CATCHMENT MANAGEMENT AUTHORITY

Powlett River Estuary Management Plan

FINAL August 2015 Estuary Mouth looking north. Contents

Preface 3

Acknowledgements 3

Acronyms 3

1 Introduction 4 1.1 Background 5 1.2 The plan 5 1.2.1 Objective 5 1.2.2 Scope 5 1.2.3 Links to the West Gippsland Regional Waterway Strategy 5

2 Development of this plan 6 2.1 Community and stakeholder engagement 6 2.2 Data sources and information collection 6

3 The powlett river estuary 7 3.1 Estuary processes 7 3.2 Condition 9 3.3 Environmental values 10 3.3.1 Plant communities and species 10 3.3.2 Fish species 14 3.3.3 Bird species 16 3.3.4 Other fauna 18 3.4 Social and economic values 18

4 Threats and management issues 19 4.1 Threats within the estuary and near coastal environment 19 4.2 Threats from the upstream catchment 22 4.3 Water quality 23

5 Current management 24

6 Management goals and targets for the powlett river estuary 27 6.1 Hierarchy of goals and targets 27 6.2 Goals 27 6.3 Management outcome targets 28

Powlett River Estuary Management Plan | 1 7 Development of the action plan 29 7.1 Risk assessment 29 7.2 Identifying Priority Reaches in the catchment 30 7.3 Prioritisation of actions in the estuary 30 7.4 Implementation of actions 32

8 Action plan (2015 – 2023) 33 8.1 Actions in the estuary (E) 34 A. Focus on maintaining or improving esturine condition and values 35 B. Actions to mitigate the need for artificial estuary mouth openings 37 C. Collecting information to inform estuary management 38 8.2 Actions in the catchment (C) 42 D. Actions within the catchment to reduce upstream threats to the estuary 42

9 Monitoring, evaluation and review of the plan 45

2 | Powlett River Estuary Management Plan Preface The West Gippsland Catchment Management Authority (CMA) has developed this Estuary Management Plan (EMP) for the Powlett River to guide future strategic management directions.

The plan sets out an ambitious action plan which will improve and protect the aspects of the estuary which the community value.

The West Gippsland CMA, Bass Coast Shire Council, Parks , Bass Coast Landcare Network and other interested groups will be able to use this plan to access initiative funding from a range of sources to implement the recommended actions in this plan. Acknowledgements

This report has been prepared by Simone Wilkie, Bron Gwyther and Greg Peters of Riverness Pty Ltd, in partnership with Thompson Berrill Landscape Design Pty Ltd.

The development of this report has involved the collective effort of a number of departments and individuals, in particular:

• Steering Group – Matt Khoury (West Gippsland CMA and Chair), Eleisha Keogh (West Gippsland CMA), Deirdre Griepsma and Diana Whittington (Bass Coast Shire Council), Darren Hill and Gerard Delaney (Parks Victoria), Dave Bateman (Bass Coast Landcare Network) • Reference Group Members – Roz Jessop (Central Coastal Board) Brett Vurlow (SGW), Richard Allen and Adam Dunn (West Gippsland CMA), Darren Deering, Jeffrey Woodham and Chris Angwin (DEDJTR, Fisheries) • Community workshop participants – Martin Fuller (West Gippsland CMA), Paul Smith (Gippsland Coastal Board), Trevor Buck (VRFish), Mike Linsell (EstuaryWatch and recreational fisherman), Ken Nethercote, Robin and Sally Lowe, Clive Hollins and Paul Spiers (landholders). • Boon Wurrung Foundation Acronyms

AVIRA The Aquatic Values Identification and Risk Assessment BCLN Bass Coast Landcare Network BCSC Bass Coast Shire Council CMA Catchment Management Authority DELWP Department of Environment, Land, Water and Planning DEDJTR Department of Economic Development, Jobs, Transport and Resources EEMSS Estuary Entrance Management Support System EMP Estuary Management Plan EPA Environment Protection Authority EVC Ecological Vegetation Class ISC Index of Stream Condition MER Monitoring, Evaluation and Reporting RWS West Gippsland Regional Waterway Strategy SGW Water VRFish Victorian Recreational Fishing Peak-Body WGCMA West Gippsland Catchment Management Authority WMP Waterway Management Plan

Powlett River Estuary Management Plan | 3 1 Introduction

1.1 Background The Powlett River estuary is located approximately 130km south east of . Its headwaters are in the near , and it flows generally south west towards the coast between and , as shown in the map below. It is listed as a Nationally Important Wetland due to its extensive saltmarsh and wetland communities and heritage values. It also provides habitat for the critically endangered Orange-bellied Parrot.

The Powlett River estuary is an intermittently closed estuary with a history of management challenges associated with this.

Over the past ten years the West Gippsland Catchment Management Authority (WGCMA), Parks Victoria, Bass Coast Landcare Network, Bass Coast Shire Council, the Department of Environment, Land, Water and Planning (DELWP) and the Department of Economic Development, Jobs, Transport and Resources (DEDJTR) (formerly known as the Department of Environment and Primary Industries), landholders and community groups have been undertaking works in the catchment to protect the river and estuary values.

A recent review of the management of the Powlett River estuary recommended that an Estuary Management Plan (EMP) be developed.

Location of the Powlett River.

4 | Powlett River Estuary Management Plan Introduction 1.0

1.2 The Plan This EMP incorporates the whole of the Powlett catchment, including the nearby coastline. It focuses on maintaining or improving estuarine condition and values, collecting information to inform estuary entrance management and prioritising activities including those needed to mitigate the need for artificial estuary mouth openings.

1.2.1 Objective The Powlett River Estuary Management Plan:

• includes a prioritised list of costed management activities for each agency/organisation to combat the local (i.e. estuarine), coastal (i.e. marine) and broader catchment (i.e. freshwater) threats to key estuarine values. • includes a prioritised list of costed monitoring activities for each agency/organisation that will provide data to better inform future estuarine management decisions and the implementation of the EMP. • provides a clear, concise estuary management plan, which can be used by waterway/catchment managers and community groups/organisations to attract future funding and support to maintain or improve estuary condition.

1.2.2 Scope The focus of this estuary management plan is the protection of the values within the Powlett River estuary (the extent of the estuary is shown in dark blue on the map below). These include environmental, social, economic and cultural values. It identifies the values of, and includes actions for, both public and private land. A series of overarching goals, identified through engagement with government stakeholders, community groups, interest groups and individuals, guide the priorities for the plan.

While the focus of the plan is the values within the estuary, actions are recommended for the entire catchment to address threats to the estuary from the catchment.

The extent of the Powlett River estuary – the focus of the plan is the values within the estuary.

Powlett River Estuary Management Plan | 5 1.2.3 Links to the West Gippsland Regional Waterway Strategy The Plan has been developed to align with the West Gippsland Regional Waterway Strategy (RWS) (2014) and therefore has an eight year timeframe. Longer term goals (8+ years) have been identified for estuary condition to acknowledge that changes in environmental condition can take significant time following the implementation of on-ground works.

The development of an estuary management plan for the Powlett River is a priority action in the West Gippsland RWS. Development of an estuary management plan also aligns with policies for estuary management outlined in the Victorian Waterway Management Strategy (2013).

6 | Powlett River Estuary Management Plan 2 Development of this Plan

2.1 Community and stakeholder engagement The Powlett River EMP has been developed with a high level of community and stakeholder involvement. The West Gippsland CMA has managed the development of the EMP through a steering group made up of representatives from West Gippsland CMA, Parks Victoria, Bass Coast Landcare Network and the Bass Coast Shire Council. A reference group consisting of representatives from various community groups and agencies provided input to the development of the Plan through meetings, input of technical advice and review of the draft actions.

Three key opportunities have been provided for broader community input, namely:

1. Community Consultative Group meeting. A community workshop was held to allow participants (i.e. those acknowledged on page 3) to review the information collated from the review of existing information and field work, identify goals for the future management of the creek and to identify management issues and threats (held on 29 January 2015). 2. Draft for public comment. The draft Powlett River EMP was open for public comment from 18 May to 5 June 2015. 3. Public open house. Agency staff and project team members were available to discuss with interested members of the community the draft Plan, the public submission process and the Powlett River estuary more generally on the 31 May 2015 at Kilcunda.

Following the closing of submissions on the draft Plan, community and stakeholder comments were considered and the Plan was amended accordingly.

2.2 Data sources and information collection Information on the environmental values of the Powlett River estuary has been sourced from:

• DELWP Biodiversity Interactive Maps and Victorian Biodiversity Atlas. The DELWP Biodiversity Interactive Maps provide information on Victoria’s land boundaries and land uses. The Victorian Biodiversity Atlas holds information on flora and fauna recorded through surveys. • AVIRA database. The Aquatic Values Identification and Risk Assessment database was used in the development of regional waterway strategies and for local strategic planning activities. AVIRA is used to store data on the environmental, social, cultural and economic values of waterways and also has a risk assessment function. The Powlett River estuary and catchment is represented in AVIRA as four river reaches and an estuary reach. • Field investigations. The project team undertook brief field assessments including mapping of significant features for consideration in the plan. • Aerial photograph interpretation. Aerial photograph interpretation was undertaken to identify streamside areas of remnant vegetation, revegetation, stream channelisation and significant changes in land use and vegetation communities. • Community and stakeholder input.

Powlett River Estuary Management Plan | 7 3 The Powlett River Estuary

3.1 Estuary processes An estuary is a place where fresh and marine waters interact, providing a unique highly variable environment. In Victoria, the ocean exchange of many estuaries intermittently stops, following the formation of a sand bar at the mouth of the estuary.

The Powlett River estuary is a west facing, wave dominated estuary that intermittently closes to the sea. This is a natural seasonal process and results in increased water levels in the estuary. High water levels bring significant environmental benefits when adjoining wetlands and fringing vegetation are flooded. Ideally, natural processes prevail whereby the system breaches the sandbar naturally, before there is a major impact on surrounding land and infrastructure. Factors contributing to estuary mouth status are described below.

Factors contributing to estuary mouth status – Estuary mouth status is determined by the complex interaction of factors influencing water flow and sand deposition. All of these factors must be discussed when considering an artificial estuary mouth opening, to ensure safety, efficiency and ecosystem health. Sourced: Arundel, 2006, EEMSS manual.

Estuary mouth conditions alter seasonally. The Powlett River estuary generally forms a sandbar and closes to the sea during late summer/autumn, when freshwater flows are generally low. During estuary mouth closures, the water column stratifies, leaving a dense saline bottom layer and a top freshwater layer. Dissolved oxygen levels are gradually depleted in the bottom layer. Increases in freshwater flow into the estuary, often in late winter and early spring, flush away the sand bar and push marine water from the estuary.

Prolonged dry conditions, such as those experienced in the late 1990s – 2012, result in more frequent and longer duration estuary mouth closures.

8 | Powlett River Estuary Management Plan The Powlett River Estuary 3.0

To reduce the impact of high water levels on socio-economic assets (such as surrounding agricultural land), on occasion it is necessary to artificially open a closed estuary mouth, prior to the winter and spring flows. Artificial estuary mouth openings can carry a high risk of damage to the health of the estuary. These risks may include:

• Mass fish deaths • Disruption of fish spawning events • Premature drainage of wetlands – leading to long-term decline • Exposure and oxidation of potential acid sulphate soils.

The Powlett River Estuary mouth intermittently closes its connection to the sea.

Powlett River Estuary Management Plan | 9 3.2 Condition The Powlett River catchment and estuary has been divided into five reaches to assist with management planning and for assessing environmental condition. The five reaches are:

• 27-205: Powlett River estuary to Bass Highway • 27-5: Powlett River downstream of Lance Creek to Bass Highway • 27-6: Powlett River upstream of Lance Creek • 27-7: Foster Creek downstream of Burndale • 27-8: Foster Creek upstream of Burndale.

The five reaches are shown in the map below.

The Index of Stream Condition reaches in the Powlett River catchment.

The Powlett River catchment was assessed as part of the third Index of Stream Condition (ISC) completed in 2010. The Powlett River (ISC reaches 5 and 6) were assessed as being in poor condition. The Foster Creek (ISC reaches 7 and 8) was assessed as being in moderate condition.

The ISC uses five sub-indices to describe river and estuary condition. The five sub-indices are Hydrology, Physical Form, Streamside Zone, Water Quality and Aquatic Life.

• Hydrology – refers to the amount of water that is within the river channel and how much this would have varied from natural conditions. • Physical Form – looks at the river bank condition as well as instream habitats and barriers to fish migration. • Streamside Zone – measures woody vegetation along the waterway’s edge. • Water Quality – includes measures of phosphorus, turbidity, salinity and pH. • Aquatic Life – is based on the number and type of aquatic macroinvertebrates found with the river.

10 | Powlett River Estuary Management Plan The Powlett River Estuary 3.0

The table below shows the sub-index score (out of 10) for each reach within the Powlett catchment.

Physical Streamside Water Aquatic Reach Hydrology ISC Score Condition Form Zone Quality Life

27-205 Estuary Not assessed as part of ISC

27-5 Powlett Estuary 5 9 4 3 3 22 Poor

27-6 Powlett River 5 8 4 4 3 20 Poor

27-7 Foster Creek 6 9 6 no data 4 28 Moderate

27-8 Foster Creek 6 10 5 no data 3 25 Moderate

Despite the overall condition rankings for the Powlett indicating poor and moderate conditions, significant values remain within the estuary and near coastal environment. These values are described in the sections below.

3.3 Environmental values The environmental values associated with the Powlett River estuary include a diverse range of bird, plant and fish communities. They are dependent on the variability of the typical estuarine characteristics such as river flow, flooding, variable salinities and salt wedge movement.

3.3.1 Plant communities and species Vegetation communities are described in Victoria through mapping units called Ecological Vegetation Classes (EVCs). The EVCs occurring along the Powlett River estuary are listed in the table and diagram below. Coastal Saltmarsh vegetation has recently been protected under the Commonwealth government’s Environmental Protection and Biodiversity Conservation Act 1999 (EPBC Act).

Ecological Vegetation Classes (EVCs) and Bioregional Conservation Extent in hectares Significance in Victoria (where known)

83 Swampy Riparian Woodland Endangered

53 Swamp Scrub Endangered

9 Coastal Saltmarsh Least Concern

– Coastal Tussock Saltmarsh* Vulnerable 3

– Wet Saltmarsh Herbland* Depleted 16

10 Estuarine Wetland Depleted 52

2 Coast Banksia Woodland Vulnerable

* In 2011, a report on Mangroves and coastal saltmarsh of Victoria was completed. The report recommended that the EVC 9 – Coastal Saltmarsh be refined. New Coastal Saltmarsh EVCs and associated bioregional conservation significance have been recommended, and those occurring in the Powlett River estuary have been presented above.

Powlett River Estuary Management Plan | 11 Ecological Vegetation Classes at the Powlett River Estuary

A conceptualisation of the EVCs within the Powlett River estuary. Each vegetation class is located at different levels on the floodplain, based on the water requirements and tolerances to factors such as salinity. Wet Saltmarsh Herbland is the most frequently inundated and salt tolerant vegetation class, whilst Coast Banksia Woodland is located higher up the sand dunes off the floodplain. The health of the vegetation is reliant on an appropriate salinity and water regime.

Left: Coast Banksia Woodland. Right: Coastal Saltmarsh (Coastal Tussock Saltmarsh on higher ground graduating to Wet Saltmarsh Herbland in the foreground).

The location of existing vegetation communities is shown in the map on the next page. The map also indicates the reduction in estuarine wetland and saltmarsh since European settlement.

12 | Powlett River Estuary Management Plan The Powlett River Estuary 3.0 Trim along this line so you can fold A3 to A4 and have Trim some of the map showing when folded.

Powlett River Estuary Management Plan | 13 Pictured top: Australian Grayling, photo by Tarmo A Raadik. Above left: Black Bream, photo by David Stork, and East Australian Salmon (above right) are popular species targeted by recreational anglers.

3.3.2 Fish species Twenty-two species of fish have been recorded in the Powlett estuary, as listed on page 15. Many of these species are considered estuarine residents who spend their entire lifecycle in the estuary. Estuarine resident fish include Black Bream, Estuary Perch and Lagoon Goby. Estuarine opportunists, such as Silver Trevally and Long-snouted Flounder, complete their lifecycle at sea, but may enter estuaries in large numbers to exploit the available estuarine habitats. While other species, including Old Wife and Australian Grayling, are estuarine dependents that rely on estuaries for part of their lifecycle. Marine stragglers enter estuaries irregularly and are generally found near estuary mouths where salinities remain high.

Australian Grayling are the only native fish species with conservation significance found in the Powlett River estuary. Australian Grayling spawn in the freshwater reaches of coastal rivers. The juveniles return to the freshwater reaches of rivers after roughly six months at sea and spend the rest of their lives in river habitats. The Australian Grayling is listed as threatened under the Flora and Fauna Guarantee Act 1988, and vulnerable under the EPBC Act.

14 | Powlett River Estuary Management Plan The Powlett River Estuary 3.0

Fish groups in the Powlett Estuary

Conceptualisation showing use of the estuary by the different groups of fish.

Fish Species

Short-finned Eel Black Bream Southern Blue-spotted Goby

Spotted Galaxias Luderick Lagoon Goby

Common Galaxias Old Wife Flat-headed Gudgeon

Eastern Fortesque Yellow-Eye Mullet Long snouted Flounder

Estuary Perch Tupong Greenback Flounder

Silver Trevally Tamar River Goby Smooth Toadfish

Eastern Australian Salmon Bridled Goby Eastern Blue-spot Goby

Australian Grayling*

*The Australian Grayling is listed as threatened under the Flora and Fauna Guarantee Act 1988, and vulnerable under the EPBC Act.

Powlett River Estuary Management Plan | 15 3.3.3 Bird species Thirty-one significant bird species have been found during studies within the estuary, wetlands and coastal zone, as listed below. Of these, the Orange-bellied Parrot (OBP) is the only species considered critically endangered. The OBP uses the Coastal Saltmarsh at the Powlett estuary for feeding. Many other more common bird species will also frequent the estuary.

Pictured above left: Orange-bellied Parrot, photo by Birdlife Australia, feed in the saltmarsh and Hooded Plover, photo by Morris 2015 (above right) nest on the beach at the mouth of the Powlett River.

Conservation Status Conservation status Conservation status Victoria Australia International

Environment Species Flora and Fauna Advisory List of Protection and International Guarantee Act Threatened Fauna Biodiversity agreements 1988 Conservation Act 1999

Australasian Vulnerable Shoveler

Black-faced Near threatened Cormorant

Caspian Tern Listed Near threatened CAMBA, JAMBA

Clamorous Reed Bonn Convention Warbler

Common Sandpiper Vulnerable Bonn Convention, CAMBA, JAMBA

Common Vulnerable Bonn Convention, Greenshank CAMBA, JAMBA

Double-banded Bonn Convention Plover

Eastern Great Egret Listed Vulnerable CAMBA, JAMBA

Emu Near threatened

Gull-billed Tern Listed Endangered

Hardhead Vulnerable

Hooded Plover Listed Vulnerable

Intermediate Egret Listed Endangered

16 | Powlett River Estuary Management Plan The Powlett River Estuary 3.0

...continued from page 16

Conservation Status Conservation status Conservation status Victoria Australia International

Environment Species Flora and Fauna Advisory List of Protection and International Guarantee Act Threatened Fauna Biodiversity agreements 1988 Conservation Act 1999

Latham’s Snipe Near threatened Bonn Convention, CAMBA, JAMBA

Little Egret Listed Endangered

Magpie Goose Listed Near threatened

Musk Duck Vulnerable

Orange-bellied Listed Critically Parrot endangered

Pacific Golden Vulnerable Bonn Convention, Plover CAMBA, JAMBA

Pacific Gull Near threatened

Pied Cormorant Near threatened

Red-necked Stint Bonn Convention, CAMBA, JAMBA

Royal Spoonbill Near threatened

Ruddy Turnstone Vulnerable Bonn Convention, CAMBA, JAMBA

Sanderling Near threatened Bonn Convention, CAMBA, JAMBA

Sharp-tailed Bonn Convention, Sandpiper CAMBA, JAMBA

Short-tailed JAMBA, ROKAMBA Shearwater

Sooty Albatross Listed Vulnerable Bonn Convention

Sooty Oystercatcher Near threatened

White-fronted Tern Near threatened

White-bellied Sea- Listed Vulnerable CAMBA Eagle

*Japan-Australia Migratory Bird Agreement (JAMBA); China-Australia Migratory Bird Agreement (CAMBA); Republic of Korea-Australia Migratory Bird Agreement (ROKAMBA); Convention on the Conservation of Migratory Species of Wild Animals (Bonn Convention).

Powlett River Estuary Management Plan | 17 3.3.4 Other fauna There are three other listed fauna species that have been found near the Powlett River estuary as shown in the table below.

Environment Flora and Fauna Advisory List of Protection and Species Guarantee Act 1988 Threatened Fauna Biodiversity Conservation Act 1999 Southern Brown Listed Near Threatened Endangered Bandicoot

Swamp Antechinus Listed Near Threatened

Swamp Skink Listed Vulnerable

3.4 Social and economic values The Powlett river estuary has significant social values, particularly from the Mouth of Powlett Road bridge to the estuary mouth, this area has high scenic value. The area is commonly used for non-motor boating (kayak, canoe, etc.), picnics, BBQs, recreational fishing, sightseeing, swimming, walking and bird watching.

The coastal dunes near the mouth of the Powlett River estuary have Aboriginal cultural heritage significance with a number of coastal midden sites recorded.

The economic values of the estuary are mostly placed with the landholders along the river, with grazing common along the entire river length upstream of the Mouth of Powlett Road.

The Powlett River catchment is identified as a rural water source for irrigation and stock and for domestic supply. Water is pumped directly from the stream in the upper catchment for this purpose.

The Lance Creek Reservoir is located on Lance Creek in the upper catchment. It is 4200 ML in size. Lance Creek Reservoir supplies drinking water to the townships of Wonthaggi, Cape Paterson and Inverloch.

18 | Powlett River Estuary Management Plan 4 Threats and Management Issues

4.1 Threats within the estuary and near coastal environment The Victorian Waterway Management Strategy lists a range of threats to the health of estuaries. These include:

• Growing populations • High levels of recreational use • Unpermitted entrance mouth openings • Changes in water regimes • High levels of sediment and nutrients • Pollution events • Habitat modification • Land reclamation • Invasion by weeds or pest animals • Salinisation and acidification.

Catchment Management Authorities around Victoria collect data on the values and threats to waterways using the Aquatic Values Identification and Risk Assessment (AVIRA) methodology. Data has been collected for the Powlett River and included in AVIRA. High or very high threats identified within the Powlett River estuary are:

• Pest animals (e.g. foxes, cats, Yellowfin Goby) and plants (e.g. Sea Spurge) • Degraded water quality • Bank instability • Disturbance of acid sulphate soils • Livestock access • Altered marine exchange.

Trampling and bank erosion associated with pedestrian access are significant threats within the estuary.

Powlett River Estuary Management Plan | 19 Other threats that were identified during field investigation include:

• Trampling and bank erosion associated with pedestrian access • Litter • Channelisation of the river channel • Rural drainage and drain clearing.

In addition to those threats identified through AVIRA, and the fieldwork for the development of this EMP, the Victorian Coastal Saltmarsh project (2011) identified threatening processes specific to the coastal saltmarsh vegetation within the estuary and ranked the intensity of the impact. The results of this are presented in the table below:

Threat Extent of Threat Intensity of Impact

Land-claim Widespread High

Vehicle Access Locally evident Low

Stock Grazing Widespread High

Weed Invasion Locally evident Low

Inappropriate Recreation Locally evident Low

Overdevelopment Widespread Low

Landward Barrier (artificial) - Low

Landward Barrier (landuse) - -

Land-claim through rural drainage and stock grazing are significant threats within the estuary.

20 | Powlett River Estuary Management Plan Threats and Management Issues 4.0

Conceptualisation of threats to the Powlett River estuary values (Please note: N = Nitrogen, P = Phosphorus and DO = Dissolved Oxygen).

The Powlett River estuary has been straightened and channelised in several sections. Historically the estuarine wetland and swamp scrub vegetation would have spread across the floodplain, without a defined channel in many sections.

Powlett River Estuary Management Plan | 21 4.2 Threats from the upstream catchment In addition to addressing threats within the estuary, threats from the upstream catchment are also identified. Actions to protect the health and condition of the estuary also need to be undertaken within the catchment. The following table below identifies threats to the estuary in the Powlett River and Foster Creek catchments.

The waterways in the catchment have been channelised and riparian vegetation is lacking, barriers to fish movement exist and the steep hillslopes high in the catchment have been cleared.

22 | Powlett River Estuary Management Plan Threats and Management Issues 4.0

Threats to the estuary in the Powlett River and Foster Creek catchments

Reach Location Threats

Powlett River (Lower) Powlett River downstream of • degraded water quality Reach 27 – 5 Lance Creek to Bass Highway • degraded riparian vegetation (large trees in particular) • livestock access • reduced streamside vegetation width • invasive fish

Powlett River (Upper) Powlett River upstream of • degraded water quality Reach 27 – 6 Lance Creek • degraded riparian vegetation • livestock access • reduced streamside vegetation width • barriers to fish movement*

Foster Creek (Lower) Foster Creek downstream of • degraded water quality Reach 27 – 7 Burndale • livestock access

Foster Creek (Upper) Foster Creek upstream of • reduced streamside vegetation width Reach 27 – 8 Burndale

*There are two barriers to fish movement in reach 27-6. The first is the streamflow gauging station at Wattle Bank and the other is the South Gippsland Water pumping station rock structure at Wonthaggi North.

4.3 Water quality As mentioned in the estuary condition and threats sections, the Powlett River and estuary is subject to poor water quality conditions. The Powlett River Management Review (2014) undertook an assessment of water quality data against the State Environmental Protection Policy (Waters of Victoria) guidelines. The assessment found that the Powlett River did not meet the water quality objectives for the turbidity, total nitrogen and total phosphorus parameters. Failing to meet objectives associated with these parameters has been identified as largely associated with land use practice in the catchment. Such practices include unrestricted stock access to waterways and associated impacts such as soil compaction, bank erosion, trampling and removal of vegetation and direct inputs of phosphorus and nitrogen from animal waste, dairies and fertiliser use.

Assessment of water quality in the estuary against the estuary water quality guidelines identified that dissolved oxygen levels were below the guideline values during all years. Low dissolved oxygen levels can severely impact fish and other aquatic species in the estuary.

High levels of nutrients, such as nitrogen and phosphorus entering the estuary from the catchment, are likely to trigger the growth of algal blooms in the estuary. Algal blooms produce high levels of dissolved oxygen during daylight hours when the algae is photosynthesising, however, oxygen levels can drop to critical levels overnight impacting aquatic species.

Powlett River Estuary Management Plan | 23 5 Current Management

Many government agencies, community groups and individuals have roles and responsibilities for managing the Powlett River estuary. These roles, responsibilities and current management activities are outlined in the table below.

Agency / Group Responsibility

Parks Victoria Manages the parks and conservation reserves within the Powlett estuary. Parks Victoria create, manage and maintain visitor sites and manage a range of assets, including visitor facilities and access points. They also provide permits for access for activities such as horse riding. Applies to DELWP to undertake works on public land under Section 27 Coastal Management Act 1979 consent for artificial estuary mouth openings. Undertakes maintenance and management of tracks, car parks and signage, and pest plant and animal management within the public land boundaries.

Bass Coast Shire Council Involved in the management of the Powlett River estuary through it’s role as responsible planning authority, manager of stormwater drainage and onsite domestic wastewater systems, user of integrated water systems, land manager, emergency management, and supporter of community groups. Specifically with regard to the Powlett estuary, the Bass Coast Shire has the following roles and responsibilities, to: • Incorporate waterway and catchment management objectives, priorities and actions into strategic and statutory planning processes • Undertake elements of floodplain management in accordance with the renewed Victorian Floodplain Management Strategy • Develop and implement urban stormwater plans • Manage on-site domestic wastewater systems • Manage sections of waterways where formal agreements are in place • Manage rural drainage where appropriate.

West Gippsland CMA Develops and implements a Regional Waterway Strategy that accounts for community needs relating to the use and values of waterways. Carries out works and activities in accordance with the Regional Waterway Strategy to improve the values of waterways Manages the bed and banks of waterways through licensing works on waterways, and implementing works such as erosion control, fish passage and habitat enhancement. Is responsible for aspects of floodplain management, including flood modelling, mapping and strategy development and providing advice on development applications for land prone to flooding. Undertakes regional planning for native vegetation and control of invasive plants and animals. Authorities such as Bass Coast Shire Council must take account of these plans when determining applications for vegetation removal. Licences the opening of the Powlett River estuary mouth, maintain the Estuary Entrance Management Support System (EEMSS), provide advice on the risks associated with artificial estuary entrance management and make a final decision on the opening of the estuary mouth (refer to page 26 for more information). Undertakes projects throughout the catchment in partnership with landholders to fence and revegetate stream frontages.

24 | Powlett River Estuary Management Plan Threats and Management Issues 5.0

...continued from page 24

Agency / Group Responsibility

EPA Victoria Licences discharges to the Powlett River and enforce licence conditions associated with those discharges. Responds to water quality incidents, fish deaths and pollution events. Sets water quality indicators for rivers and estuaries through the State Environment Protection Policy. Supports programs to implement best practice management of dairy effluent and other nutrient and pollution producing activities.

Bass Coast Landcare Works with local landholders to seek and provide funding for waterway Network rehabilitation works and land health programs, including Environmental Best Management Practice on farms workshops.

Boon Wurrung Represents the traditional people and custodians of the lands from the Foundation to Wilsons Promontory and are proud members of the Kulin People – Boonwurrung and Woiwurrung.

Individuals and land Ensure that activities on their land do not degrade or cause damage to land, managers soil or water resources. Responsible for invasive plant and animal control and litter control on their land.

Crown Land Water Responsible for managing licensed Crown Land Water Frontage in accordance Frontage Licence with their licence conditions. This includes: holders • Only undertaking activities consistent with the licence purpose, and in accordance with any specific requirements provided by DELWP. • Not limiting or discouraging public access. • Minimising risks to the public. • Maintaining the land in good order and condition. • Informing DELWP of any significant incidents or orders on the land (e.g. a pollution event). • Ensuring that rubbish does not accumulate on the frontage or nearby land. • Obtaining permission from DELWP before storing chemicals, starting a fire, removing timber, planting or removing vegetation or adding fertilisers etc. or building any structure or improvement. • Providing a stile or gate or other pedestrian access in any fence around the licensed land where it joins Crown land.

Powlett River Estuary Management Plan | 25 Artificial estuary mouth opening There are two authorisations required before any estuary mouth is artificially opened. A ‘works on waterways’ permit issued by the Catchment Management Authority (CMA) as an authority under the Water Act 1989 (section 67); and A consent to ‘use’ or ‘develop’ coastal Crown land, issued under the Coastal Management Act 1995 (section 37). The consent is issued by the Department of Environment, Land, Water and Planning, or Parks Victoria if the land is reserved under the National Parks Act 1975 (section 27). The Estuary Entrance Management Support System (EEMSS) is a decision support tool that guides estuary managers when making the decision whether or not to artificially open an estuary. The EEMSS ensures a consistent process is followed each time so all assets are considered and openings are safe and effective. EEMSS is a risk based system. Populating EEMSS requires the collection of information on socio-economic, environmental and cultural assets that may be affected by artificial estuary entrance openings. The following table shows the assets considered in EEMSS.

• Roads and bridges • Birds • Cultural heritage • Agricultural land • Plant communities • Indigenious culture • Fishing (EVCs) • Jetties • Fish • Walking tracks • Boat ramps • Recreational land • Camping Cultural Assets • Swimming • Stormwater infrastructure • Septics • Human health Assets Environmental

Social-Economic Assets • Watercraft • Built infrastructure

West Gippsland CMA populated EEMSS for the Powlett River catchment in 2009. A number of assets have been identified as key drivers for artificially opening the Powlett River estuary mouth. These assets are: • the Mouth of Powlett Rd, downstream of the bridge • telephone cables located near the bridge on the Mouth of Powlett Rd • agricultural land. To protect the ecological values associated with the Powlett River estuary, actions to remove or alter these drivers for artificial estuary mouth opening are recommended within the EMP. One of the actions is to investigate raising a 300 metre section of the Mouth of Powlett Road. Inundation of this section of road currently affects access to several private properties, the Powlett River Caravan Park and the visitor carpark at the estuary mouth. Removal or alteration of the drivers of artificial openings would provide a more natural water regime that would support ecological values and processes such as: • natural water regime for saltmarsh communities • breeding and nursery habitat for estuarine fish • wading habitat for migratory and other water birds. Actions to address the other drivers for artificial estuary mouth opening are also included within the EMP.

26 | Powlett River Estuary Management Plan 6 Management Goals and targets for the Powlett River Estuary

6.1 Hierarchy of goals and targets

Management Management Goal 8 + years outputs 1+ years outcome target 1 - 8 Desired future Number and type of years condition of a value action to be completed Desired future level or reduction of a threat

• 5 km of riparian • Livestock access • Swamp Scrub, fencing to the estuarine Swampy Riparian • 10 ha of remnant wetlands is Woodland and vegetation reduced to less Estuarine Wetland protection than 25 per cent vegetation of the area communities are enhanced and significantly increase in area

6.2 Goals Using the information gathered through community and stakeholder input, seven goals have been identified to guide the priorities and actions in the Powlett River EMP. These goals relate to the identified values of the estuary. It should be noted there may be significant time lag in achieving the goals, and it is expected that this will occur in a period greater than the 8 year timeframe of the Plan.

Through the implementation of the Powlett River EMP the following condition outcomes will be achieved:

1. Swamp Scrub, Swampy Riparian Woodland and Estuarine Wetland vegetation communities are enhanced and significantly increase in area. 2. Orange-bellied Parrot continue to use the Powlett estuary as a feeding site, as the Coastal Saltmarsh vegetation communities have been protected and enhanced. 3. All abilities access points are provided for recreational fishing and enjoyment of the estuary. 4. Continued availability of multiple recreational opportunities exists and environmental impacts are minimised. 5. Recreationally targeted and native estuarine fish communities are enhanced through a network of resilient habitat areas. 6. Hooded Plover continue to successfully breed at the mouth of the Powlett River, and significant waterbirds continue to visit the floodplain and wetlands of the Powlett estuary. 7. The Coast Banksia Woodland vegetation community is protected.

Powlett River Estuary Management Plan | 27 Conceptualisation of the Powlett River estuary goals

6.3 Management outcome targets To achieve the goals, a number of management outcome targets are required to be met. Management outcome targets generally relate to reductions in the level of threats that are affecting the values and can be measured after one to eight years. For the Powlett River EMP, management outcome targets can also be developed around the community values of the estuary.

The management outcome targets for the estuary are:

• Potential and active acid sulphate soils are mapped in detail within the estuary extent and appropriate protection is in place through statutory planning mechanisms. • Livestock access to the estuarine wetlands is reduced to less than 25 per cent of the area. • Bank erosion in the Powlett River estuary is reduced to less than 50 per cent of the reach eroding. • Invasive weeds (shrubs and ground layer) are reduced to less than 20 per cent of the riparian area.

Water quality is identified as a key threat to be addressed by this EMP. A management outcome target has not been set for water quality, as the timeframes required to improve water quality are longer term, and could not be achieved or measured in a 1 - 8 year timeframe. The EMP will contribute to a long term improvement in water quality in the estuary.

28 | Powlett River Estuary Management Plan 7 Development of the Action Plan

7.1 Risk assessment A risk assessment was undertaken, which looked at the links between the values and the threats within the Powlett River estuary. The risk assessment process prioritised the risks that were directly linked to the goals for the EMP.

The following threats have been identified ashigh or very high risk to the values within the Powlett River estuary:

• Degraded water quality • Disturbance of acid sulphate soils • Livestock access • Invasive fauna (terrestrial) • Invasive flora (aquatic) • Bank instability • Invasive flora (riparian) – ground layer • Invasive flora (riparian) – shrub layer • Altered marine exchange – artificial estuary mouth opening.

Powlett River Estuary Management Plan | 29 7.2 Identifying priority reaches in the catchment To specifically address the risk of degraded water quality, actions in the catchment are required. An assessment of the types and quantity of works within the catchment was undertaken as outlined below. Actions in the catchment also address other risks within the estuary.

Process for identifying priority areas for the establishment of riparian buffers in the catchment.

• Powlett River, Woolshed Creek, Bridge Creek, Archies Creek Identify key (East and West), West Creek, Foster Creek waterways

• Using aerial photography identify: - Sources of weeds Assess - Adjoining land use vegetation - Width of tree canopy - Types of trees present

Assess • Identified based on vegetation condition vegetation

• Prioritised based on condition and proximity to estuary Prioritise buffers

• Identify any completed on-ground works Calculate • Estimate fencing requirements and locations buffer length • Calculate length of fencing

7.3 Prioritisation of actions in the estuary To assist the West Gippsland CMA and other stakeholders to allocate funding to the identified actions and to seek appropriate external funding, the actions have been prioritised. The criteria for determining the priorities were, the action is:

1. Part of ongoing maintenance or an existing plan/strategy 2. Cost effective and addresses a number of goals 3. Particularly effective in addressing key community concerns 4. Technically/socially/politically feasible. Each action is assigned high, medium or low priority. This is based on whether the action meets one or more of the criteria above. As the plan is subject to funding applications in the future, it is not appropriate to put a timeframe on the priorities or the actions. Rather, it is anticipated that funding will be sought for the high priority actions, followed by the medium and then low priority actions.

The actions are displayed on the maps accompanying the action tables in section 8.

30 | Powlett River Estuary Management Plan Development of the Action Plan 7.0

Using riparian buffer strips to improve water quality Vegetation within a riparian zone can slow the overland movement of water, and cause sediment and attached nutrients to be deposited on the land before they can reach the stream channel. Riparian vegetation can also take up and remove some of the nutrients being transported.

Recent studies in Australia have shown that both natural vegetation and grassy filter strips can trap around 90% of the sediment moving from upslope. These strips can be just as effective in trapping or absorbing nutrients.

To ensure that the riparian buffers improve riparian vegetation condition and filter water quality the buffers should be set a minimum of 20 metres from the stream bank with fences running parallel to flood flows rather than following the natural meander pattern of the stream.

The buffer itself should be a combination of:

• metres of grass buffer (adjacent to the fence); and • metres of natural vegetation (adjacent to the stream). It is important to recognise that, although riparian buffers can be effective in preventing sediment and nutrients from reaching streams, and thereby help to protect and improve water quality, they are not a substitute for good land management elsewhere in the catchment.

An excellent example of a riparian buffer strip created by fencing remnant vegetation on the lower Powlett River.

Best management practices on farms In addition to establishing riparian buffer strips, minimising sources of nutrients and sediment is also important. Other actions for improving water quality are:

• Maintain adequate vegetation cover throughout the catchment (i.e. avoiding bare ground) • Apply fertiliser at appropriate rates, so that it maximises the return from investment and minimises off-site losses • Avoid fertiliser application during periods of intense run-off • Install land class fencing • Manage stock access to riparian lands (including gullies).

Powlett River Estuary Management Plan | 31 7.4 Implementation of actions Actions have been assigned to a lead agency and partners. Many actions are recommended to be undertaken on public land, such as the land near the estuary mouth managed by Parks Victoria or on Crown land water frontage. Other actions such as fencing and revegetation of the creek frontage are recommended to be undertaken on private land.

In the Powlett catchment, fencing of the waterways occurs as part of a voluntary partnership between the West Gippsland CMA or Bass Coast Landcare Network and private landholders in priority areas. The fencing setbacks and access to water for stock through alternate mechanisms such as troughs are negotiated on an individual basis with landholders based on minimum requirements for fencing. In addition the Victorian Waterway Management Strategy includes policy to facilitate a take and use licence for stock and domestic water for landholders who fence their waterways. The policy requires licensing costs to be minimised and application fees covered by CMAs when landholders enter into agreements to protect waterway frontages. It is hoped that this policy will facilitate the protection of river frontages, by addressing one of the key concerns of landholders (i.e. loss of access to stock and domestic water from the waterway).

Fencing and revegetation along the Powlett River estuary undertaken in partnership between the West Gippsland CMA and the landholder.

32 | Powlett River Estuary Management Plan 8 Action Plan (2015 – 2023)

The 8-year action plan has been developed with four key action areas. These are:

A. Focus on maintaining or improving estuarine condition and values B. Actions to mitigate the need for artificial estuary mouth openings C. Collecting information to inform estuary management D. Actions within the catchment to reduce upstream threats to the estuary. The action plan is presented in the tables below. Actions are colour coded to show the area of focus.

A. Orange

B. Green

C. Purple

D. Yellow

Action locations are displayed on the action plan maps and are colour coded to show the area of focus. Locations of actions are approximate and subject to detailed work planning and funding processes.

Powlett River Estuary Management Plan | 33 34 | Powlett River Estuary Management Plan | Powlett RiverEstuaryManagement Plan 8.1 Actions in the estuary (E)

A. Focus on maintaining or improving estuarine condition and values

Activity Project Management Activity / Output Quantity Unit Cost ($) Priority Number Partners

E.1 Install bollards to exclude parking within the saltmarsh, east of the bridge on 60 Metres BCSC N/C H Mouth of Powlett Rd.

E.2 Investigate raising and formalising the Mouth of the Powlett carpark and entrance road. Ensure the height and drainage is consistent with that proposed 1 Investigation Parks Victoria N/C M in E.30. Use permeable materials and stormwater management to prevent road contaminants from reaching estuary.

E.3 Install signage clearly indicating removal of rubbish and location of nearest bins BCSC, Interpretive and toilet facilities (Kilcunda). 3 WGCMA/ Parks 3,000 H signage Victoria

E.4 Maintain signage indicating location, season and requirements for Hooded Interpretive 1 Parks Victoria 1,500 H Plover breeding on the beach and importance of the areas to other shore birds. signage

E.5 Maintain permit system for horse riding on the beach to continue to inform riders of Hooded Plover habitat and how they can avoid disturbing their fragile 1 Plan Parks Victoria N/C H environment.

E.6 Continue to temporarily fence Hooded Plover nest sites in breeding season Birdlife Bass N/C H (August – February). Coast

E.7 Improve signage regarding responsible dog ownership in public places. Interpretive 1 Parks Victoria 1,500 H signage

E.8 Investigate improved fishing access (including all abilities access) south of the Parks Victoria/ Mouth of the Powlett Road Bridge (focussing on the area adjoining the mouth 20 Metres WGCMA, 260,000 H of the Powlett Carpark). This will consider improved pathways and fishing DEDJTR platforms.

E.9 Undertake public events discussing the values of the estuary. Engagement 4 All 8,000 H Event

E.10 Install fishing platforms upstream of the Mouth of the Powlett Bridge on the WGCMA/ western bank. 20 Metres DEDJTR, 100,000 L VRFish Action Plan 8.0 L H H H H H H H H M M M Priority N/C N/C N/C N/C N/C N/C N/C 90,000 30,000 19,200 10,000 120,000 Cost ($) VRFish VRFish DELWP DELWP Project Project DEDJTR, WGCMA WGCMA Partners WGCMA/ WGCMA/ and DELWP and DELWP Parks Victoria Parks Victoria Victoria/BCLN Victoria/BCLN DEDJTR/VRFish WGCMA/ Parks WGCMA/ BCLN WGCMA/ BCLN WGCMA/ BCLN WGCMA/ BCLN Ha Ha Ha Ha Unit Metres Habitat Agreements Investigation Large Woody Large Woody Statutory Plan

1 4 5 5 5 8 45 20 Quantity Management Activity / Output Install boardwalk through saltmarsh and along bank downstream of the Mouth of Powlett Bridge on the eastern bank. Investigate the feasibility of installing fishing/viewing platforms at end Bridge at Dalyston with Bank of the Rail Trail Drain and Western the Wonthaggi kayak access included. with VRFish and local recreational anglers regarding fishing facilities Work funding. to increase habitat Install large woody habitat at four sites within the estuary, for Black Bream and other recreationally targeted species - liaise with fishing community and fish experts for best locations. habitat, Continue to undertake maintenance of the Coast Banksia Woodland including weed control and maintenance of protective fencing bollards. to protect vegetation Fence remnant Coastal Saltmarsh and Estuarine Wetland from the impacts of grazing. to protect Fence remnant Swamp Scrub and Swampy Riparian Woodland vegetation from the impacts of grazing. Enhance riparian areas through planting of indigenous vegetation. Ensure that Crown land water frontage licensees are aware of their licence conditions and obligations. Ensure that drainage, waterway and floodplain works are undertaken in accordance with planning and works on waterways permit conditions. Undertake fox and feral cat management programs, particularly targeting Orange-bellied Parrot feeding areas and Hooded Plover nesting area. Establish riparian management agreements with landholders. E.14 E.12 E.22 E.15 E.11 E.13 E.21 E.17 E.18 E.19 E.20 E.16 Activity Number A. Focus on maintaining or improving estuarine condition and values continued A. Focus on maintaining or improving

Powlett River Estuary Management Plan | 35 36 | Powlett River Estuary Management Plan | Powlett RiverEstuaryManagement Plan A. Focus on maintaining or improving estuarine condition and values continued Activity Project Management Activity / Output Quantity Unit Cost ($) Priority Number Partners

E.23 Undertake maintenance of past river health works, including woody and other WGCMA, weed control, replanting and fence maintenance (3 passes over 8 years). 5 Ha BCLN/ 10,000 H Landholders

E.24 Investigate formalising the carpark and developing a canoe launch on the 1 Sites BCSC N/C M western upstream side of the Mouth of Powlett Road.

E.25 Install fishing platforms near the confluence with Bridge Creek to assist with WGCMA/ water quality monitoring activities. 4 Metres DEDJTR, 20,000 L VRFish

E.26 Undertake compliance activities to ensure that game hunting during estuary DEDJTR N/C M mouth closure is undertaken according to all legal requirements.

E.27 Review game hunting access annually in line with seasonal conditions and DELWP N/C M specific likely impact to estuary values.

E.28 Develop communications materials to assist with prevention of the introduction and spread of threats weeds such as Spiny Rush and Spartina into the estuary 1 Publication WGCMA 2,000 M and wetlands.

E.29 Investigate unlicensed grazing of Crown land water frontage along the estuary 1 Investigation DELWP N/C H and lower Powlett and opportunities for riparian improvement activities.

Estimated Total Cost $675,200

Notes: Costs provided in this action plan are indicative only. They do not include project management or overhead costs for delivery of projects. N/C – Not costed. B. Actions to mitigate the need for artificial estuary mouth openings

Activity Project Management Activity / Output Quantity Unit Cost ($) Priority Number Partners

Investigate the raising of Mouth of Powlett Road to mitigate the need to open E.30 the river mouth to avoid inundation of this road. Investigate alternative options 300 Metres WGCMA/ BCSC N/C H for access when the road is inundated.

Investigate further opportunities for land buyback within the inundation area of E.31 Ha WGCMA N/C H the estuary.

Design and implement a program of stewardship payments for the seasonal inundation of estuary floodplain, resulting from estuary mouth closures. E.32 Priority should be given to enhancing coastal saltmarsh and estuarine wetland WGCMA 150,000 H communities. Payments should be calculated and prioritised based on potential value to estuary health and ability to minimise artificial estuary mouth openings.

Investigate options for the provision of communication services to residents Telstra / E.33 N/C H downstream of the Mouth of Powlett Road Bridge during estuary mouth closure. landholders

Estimated Total Cost $150,000

Notes: Costs provided in this action plan are indicative only. They do not include project management or overhead costs for delivery of projects. N/C – Not costed. Powlett River EstuaryManagement Plan | Action Plan8.0 37 38 | Powlett River Estuary Management Plan | Powlett RiverEstuaryManagement Plan C. Collecting information to inform estuary management

Activity Project Management Activity / Output Quantity Unit Cost ($) Priority Number Partners

Review and update Estuary Artificial Opening MOU in line with Victorian Water E.34 1 Plan WGCMA N/C H Management Strategy policy 13.3.

Review and update Estuary Closure Management and Artificial Opening E.35 4 Plan WGCMA N/C H procedures.

E.36 Maintenance of the EEMSS. 1 Plan WGCMA N/C H

Continue to undertake monthly EstuaryWatch monitoring at current sites within E.37 6 Sites WGCMA N/C H the Powlett catchment.

Establish Waterwatch monitoring at key confluences of tributaries and the E.38 6 Sites WGCMA N/C M Powlett River to capture data on nutrient inputs.

Investigate opportunities to encourage the conversion of Crown land water E.39 20 Agreements WGCMA N/C H frontage grazing licences to riparian management licences.

Investigate and identify opportunities to minimise coastal dune erosion E.40 associated with recreational activities at the estuary mouth - risk assessment and Parks Victoria N/C L management.

Undertake annual bird surveys throughout the estuary, specifically targeting BirdLife Bass E.41 8 Investigations N/C M significant species such as Orange-bellied Parrot. Coast

Investigate options for improving the interpretive information regarding Publication & Parks Victoria/ E.42 key values and threats that is available to estuary visitors (e.g. signage and 1 Interpretive N/C H WGCMA publication). Signage

Undertake hydraulic modelling and bathymetry survey of the Powlett estuary floodplain to understand the impacts and benefits of the structures (including E.43 levees and drains) and landforms that affect the movement of water before, 1 Investigation WGCMA 80,000 H during and after artificial estuary mouth opening, before considering any updates, changes or removal of these floodplain features.

Undertake a detailed risk assessment, including onground mapping to identify E.44 1 Investigation DEDJTR 30,000 H potential and active acid sulphate soils with the Powlett estuarine floodplain. C. Collecting information to inform estuary management continued Activity Project Management Activity / Output Quantity Unit Cost ($) Priority Number Partners

Promote an angler diary program to capture data on the health and activity of the recreational fishery with the Powlett estuary. Include a description of E.45 the Yellowfin Goby, its noxious status and the impact it can have on native fish DEDJTR N/C H populations in the angler diary program material. Also include instructions regarding angler responsibilities in relation to this species.

Investigate the use of the saltmarsh, wetlands and estuary channel by E.46 recreational fish species and other native fish species, particularly Black Bream, 1 Investigation DEDJTR N/C M and prioritise areas for further protection.

Install and maintain a continuous monitoring structure to collect height Monitoring E.47 and water quality data in the Powlett estuary – including surface and depth 1 WGCMA 110,000 H Station readings.

Undertake monitoring to prevent the introduction and spread of high threat E.48 weeds such as Spiny Rush and Spartina into the estuary and wetlands, and Sea 8 Investigations WGCMA N/C M Spurge on the beach.

Continue to build understanding of, and plan for, the risks associated with E.49 WGCMA N/C H climate change, including sea level rise. This includes future flood risk.

Estimated Total Cost $220,000

Notes: Costs provided in this action plan are indicative only. They do not include project management or overhead costs for delivery of projects.

Powlett River EstuaryManagement Plan | N/C – Not costed. Action Plan8.0 39 Action Plan 8.0 Trim along this line so you can fold A3 to A4 and have Trim some of the map showing when folded.

Powlett River Estuary Management Plan | 40 Action Plan 8.0 Trim along this line so you can fold A3 to A4 and have Trim some of the map showing when folded.

Powlett River Estuary Management Plan | 41 42 | Powlett River Estuary Management Plan | Powlett RiverEstuaryManagement Plan 8.2 Actions in the catchment (C)

D. Actions within the catchment to reduce upstream threats to the estuary

Activity Project Reach Management Activity / Output Quantity Unit Cost ($) Priority Number Partners

Undertake 13 km of riparian fencing – Powlett River (Bass Hwy to Powlett River C.1 13 Km WGCMA/BCLN $81,770 H Pinkerton Rd).

Undertake 19 km of riparian fencing – Powlett River (McCraws Rd Powlett River C.2 19 Km WGCMA/BCLN $119,510 M to Outrim – Inverloch Rd).

Woolshed Undertake 3 km of riparian fencing – Woolshed Creek (Bass Hwy C.3 3 Km WGCMA/BCLN $18,870 H Creek to Rances Rd).

Woolshed Undertake 10 km of riparian fencing – Woolshed Creek (Upstream C.4 10 Km WGCMA/BCLN $62,900 H Creek of Rances Rd).

Bridge Creek C.5 Undertake 3 km of riparian fencing on Bridge Creek. 3 Km WGCMA/BCLN $18,870 H

Archies Creek Undertake 12 km of riparian fencing on Archies Creek East C.6 12 Km WGCMA/BCLN $75,480 H East Branch Branch.

West Creek C.7 Undertake 7 km of riparian fencing on West Creek. 7 Km WGCMA/BCLN $44,030 H

Undertake 5 ha woody weed removal in priority areas identified All C.8 5 Ha WGCMA $60,000 M in action C.9.

Confirm extent of willow infestation and undertake removal All C.9 where complementary works (e.g. fencing and revegetation) are 1 Investigation WGCMA N/C H undertaken.

Undertake awareness raising events with a focus on the link All C.10 4 Ha WGCMA/BCLN $8,000 H between catchment conditions and estuary health.

Continue to implement Whole Farm Planning/ Best Management All C.11 16 Plans BCLN/DELWP N/C H Practice programs.

All C.12 Ensure compliance with dairy effluent management requirements. N/A EPA Victoria N/C H

Ensure that instream vegetation such as reeds are retained, where All C.13 good quality riparian vegetation is lacking, through engagement N/A WGCMA/ BCLN N/C H and Works on Waterways Permit conditions for instream works. D. Actions within the catchment to reduce upstream threats to the estuary continued Activity Project Reach Management Activity / Output Quantity Unit Cost ($) Priority Number Partners

Ensure that Crown land water frontage licensees are aware of DELWP/ All C.14 N/A N/C H their licence conditions and obligations. WGCMA

Undertake maintenance of past river health works, including WGCMA, BCLN/ All C.15 woody and other weed control, replanting and fence 5 Ha $10,000 H Landholders maintenance (3 passes over 8 years).

Design and implement the most feasible fish passage past the South Gippsland Water pumping station rock structure at Foster Creek C.16 Korumburra – Wonthaggi Road, Wonthaggi North, considering 1 Fishway WGCMA/SGW $50,000 H species requirements, installation costs and ongoing maintenance costs/requirements.

Design and implement the most feasible fish passage past flow gauge at the Powlett River Foster Creek Junction, Inverloch – Powlett River C.17 1 Fishway WGCMA $70,000 H Road, Wattle Bank, considering species requirements, installation costs and ongoing maintenance costs/requirements.

Implement a best practice program to support dairy farmers to All C.18 1 Program WGCMA N/C H better manage and retain nutrients on farm.

Undertake a detailed land use study to identify land use type All C.19 and coverage across the Powlett catchment to understand 1 Investigation WGCMA N/C H contributions of land use to water quality impacts.

Powlett River EstuaryManagement Plan | Investigate the causes and frequency of historical fish deaths that WGCMA/ EPA Powlett River C.20 have occurred in Reach 27-5, near the confluence of Foster Creek Investigations N/C H Victoria and Powlett River and Lance Creek and Powlett River.

Investigate unlicensed grazing of Crown land water frontage Powlett River C.21 along the estuary and lower Powlett (Refer E.29) and Investigations DELWP N/C H (27-5) opportunities for riparian improvement activities. Action Plan8.0 Estimated Total Cost $619,430

Notes: Costs provided in this action plan are indicative only. They do not include project management or overhead costs for delivery of projects. N/C – Not costed. 43 Action Plan 8.0 Trim along this line so you can fold A3 to A4 and have Trim some of the map showing when folded.

Powlett River Estuary Management Plan | 44 9 Monitoring, Evaluation and Review of the Plan

Monitoring, evaluation and reporting (MER) are integral components of natural resource management programs. A simple MER approach is recommended for this EMP.

To determine the effectiveness of the Plan it is recommended that the West Gippsland CMA produce:

• A short implementation report for the community every year outlining: - a summary of activities completed. - a summary of key issues or events that occurred along the waterway. • A mid-term review report (2019) of implementing the Plan, including: - the findings from the short annual implementation reports. - progress against the management outcome targets. - progress against the activity targets. • A final review following the eighth year of the implementation period.

45 | Powlett River Estuary Management Plan Powlett River Estuary Mouth. Office 16 Hotham Street Traralgon VIC 3844 Telephone 1300 094 262 Facsimile 03 5175 7899

Leongatha Office Corner Young & Bair Streets VIC 3953 Telephone 1300 094 262 Facsimile 03 5662 5569

Correspondence PO Box 1374, Traralgon 3844

Email [email protected]

Website www.wgcma.vic.gov.au www.italicherrydesign.com.au