What: Ceiling Removal Where: South Side of Corridor 190 & Corridor 193
Total Page:16
File Type:pdf, Size:1020Kb
KGL 1st Floor Ceiling Removal Yale Kline Geology Code Upgrades Project New Haven, CT Turner Project # 201026 Updated November 2, 2020 What: Ceiling Removal Where: South side of corridor 190 & corridor 193 (see attached plan) Start Date: 11/9/2020 Impact: Limited user access during ceiling removal (see shaded areas) Contacts: Vic Hoyecki – Project Superintendent – (203)943-2950 Pam Buonocore – KGL Operations Manager – (203)915-4651 Mark Veroneau – Yale Associate Project Manager – (475)241-2476 1 2 3 4 5 6 7 8 9 10 11 12 13 14 L2 F2 M2 F2 Yale University A4.00K A4.00K A4.01K A4.01K ET VER IT LUX AS GENERAL NOTES - FLOOR PLAN A G F EA E D DA C B KGL KGL KGL KGL KGL KGL KGL KGL 1. DIMENSIONS NOTED AS "EQUAL" OR "EQ" WITHIN A ROOM REFER TO A DISTANCE RELATIONSHIP CONTAINED ONLY IN THAT ROOM AT AN OPPOSING OR PARALLEL WALL UNLESS NOTED OTHERWISE. M7 2 TYPICAL CODE-REQUIRED MANEUVERING CLEARANCES FOR ACCESSIBILITY AT DOORS A6.03K IS SHOWN IN THE CODE PLANS LEGEND. THE REQUIRED MANEUVERING CLEARANCES FOR EACH DOOR ARE SHOWN ON THE FLOOR PLAN OR LAYOUT DRAWINGS. THE Y A L E CONTRACTOR SHALL BE FULLY RESPONSIBLE TO COORDINATE THE REQUIREMENT FOR MANEUVERING CLEARANCES WITH SUBCONTRACTORS, VENDORS AND INSTALLERS AND VERIFY THAT THE INSTALLED WORK WILL PROVIDE THE REQUIRED MANEUVERING CLEARANCES. REPORT ALL DEVIATIONS FROM THE MANEUVERING CLEARANCE DN REQUIREMENTS TO THE ARCHITECT. DO NOT PROCEED WITH THE INSTALLATION OF DN ANY WORK ENCROACHING ON THE REQUIRED MANEUVERING CLEARANCES UNTIL THE ISSUE HAS BEEN RESOLVED WITH THE ARCHITECT. MAKE NECESSARY CORRECTIONS. 1 Central Campus KGL 3. DIMENSIONS SHOWN ON ARCHITECTURAL FLOOR PLANS AND ENLARGED PLAN DETAILS ARE TO FACE OF STUD, TO FACE OF MASONRY OR TO CENTER LINE OF COLUMN UNLESS DN K6 LECTURE OTHERWISE NOTED. B A6.01K 123 STOR 013 123E 123B Office of Facilities STAIR 5 D8 4. ENSURE FINISH SURFACES ARE FLUSH AND SEAMLESS WHERE PARTITIONS AND/OR 123S A6.01K FURRING ARE COPLANAR. 2 Whitney Avenue New Haven, CT 06520 M1 5. ALL PIPING, CONDUITS AND RELATED MECHANICAL AND ELECTRICAL ITEMS SHALL BE A4.02K CONCEALED WITHIN PARTITION WALL ASSEMBLY IN FINISHED AREA, U.N.O.. VP RES LAB F1 6. PROVIDE BACKING/BLOCKING TO SUPPORT ALL WALL MOUNTED ITEMS. TEACHING 126 A4.02K COLLECTION RESLB SV TEACH LAB 7 ALL MECHANICAL PADS TO BE 4" HIGH MINIMUM. U.N.O SIZE OF PAD TO BE VERIFIED BY 122B 126A 122 CONTRACTOR. ELEC 192 SF 122B 126A 193A J12 J12 A6.55K 8 PITCH SLABS (AND OTHER FLOORS) TO FLOOR DRAINS, TYP. A6.52K Acoustic and Audio Visual Consultant 2 KGL CAVANAUGH TOCCI ASSOCIATES Inc. K10 C M12 A6.01K A7.03K Building Envelope Consultant 122 SHAFT G 126 LEAVITT ASSOCIATES Inc. Civil Engineer 193A PD OFF LANGAN ENGINEERING UP 192B 125 DN 125 193S STAIR 2 FAC OFF Code Consultant 193S 124 CORRIDOR TELECOM CORRIDOR PHILIP R. SHERMAN, P.E TEACHING NEW 120-2 193 192B 192 HANDRAILS LAB SHAFT D STOR STOR 124 Landscape Architects 120 123D 123C 4 123D 123C MAIL INT CORR - JAMES CORNER FIELD OPERATIONS 1006 SF 1 - 124A 3 191E 191 KGL EXHIBIT 191 191D Lighting Designer 123A 123B D M7 CBBLD Inc. A4.02K INFILL DOOR OPENING WITH BRICK SALVAGED M11 Mechanical, Electrical, & Plumbing Engineer F8 FROM VESTIBULE WALL DEMOLITION A6.02K A4.02K ARUP 4 Structural Engineer KGL GILZANZ MURRAY STEFICEK LLP Corridor Ceiling Removal Start Date: 11/9/2020 UP 191A-4 191A-1 Specification Writer CORRIDOR KALIN ASSOCIATES Inc. 191 120-1 191S VESTIBULE 5 191A KGL C E N T E R B R O O K STAIR 3 191A-5 191A-2 191S E REFER TO YPM Architects and Planners, LLP SHEET A1.13 VESTIBULE 191A-6 191A-3 67 Main Street 191G Post Office Box 955 191G-1 325 SF Centerbrook, Connecticut 06409-0955 6 C6 KGL Telephone 860.767.0175 Facsimile 860.767.8719 M1 A7.02K C8 C13 A4.03K F1 C10 A4.03K 3 7 2 - 191B - KGL 191C DW 191 JAN TOILET H/C STOR 191 A3.00K H2 190D 191C 191B 190D 119B F 119A KITCH MEN H12 101A 101 M10 118 A6.51K J12 A6.54K TELCOM CONF SV A7.02K 190N 101 REF. 118-2 118-1 ELEV 299 190E 190E CLASSROOM REFER TO YPM 109N M7 119 SHEET A1.13 A7.01K G11 SHAFT F A3.00K A10.02K M2 190F SHAFT B PD OFF 117A 8 KGL TELCOM 117A G 190F 102 117B-1 INT CORR 117 117C CONF RM CLASSROOM OFF SV 102 116 103 FAC OFF 117B CONF RM 117C 116-1A 116-2 103 CR 10 KGL INT CORR 115 W OMEN H/C 115 104 104 H GSTU OFF GSTU OFF GSTU OFF 115C 115B 115A CR OVERALL PLAN LEGEND J12 EXISTING WALLS 114 A6.50K OFF SV RES LAB 105-2 MINERALOGY COLLECTION 105-1 106 M11 114 105 106 NEW W ALLS A7.04K 1914 SF 106B 12 FAC OFF CR KGL EXISTING DOORS J12 106A 106B A6.53K SHAFT E COLLECTION STORAGE 113C J 113C ELEC PD OFF 190G K13 000 NEW DOORS 258 SF STAIR 1 106A A6.01K 190S 190S 2 DN - AREA BEYOND 190G UP SHAFT A 190M ARCHITECTURAL PROJECT 107A ELEC SCOPE RESEARCH LAB 190M KGL 1st Floor Corridor Ceiling Removal 113 PD OFF STOR 107 OWNER FURNISHED 107 107A Yale Kline Geology Laboratory Code 107A-1 DN 14 ARCHITECTURAL NO. DATE REVISION KGL WOODWORK AND ISSUE/REVISION M8 105 Upgrades Project CASEWORK A4.03K 113A 190H W ASH RM STOR ELEC CORRIDOR W ASH RM 190J 190L 190H 190K 108 PHASE F8 190 RF-1 - NEW BBT K New Haven, CT A4.03K FLOORING INCLUDING 111 109 112 110 EGRESS STAIR TREADS BID DOCUMENTS UNLESS NOTED Turner Project No. 201026 OTHERWISE IN FLOOR RES LAB FINISH SCHEDULE 113B 108 PROJECT NAME FAC OFF FAC OFF FAC OFF FAC OFF Data Date: November 3, 2020 PCF-2 - GROUND, SEALED COLL STOR AND POLISHED CONCRETE 112 111 110 109 113B Yale Kline Geology By: VJH Laboratory Code Upgrades 16 KGL DN BUILDING NAME & ADDRESS L DN YALE KLINE GEOLOGY LABORATORY 210 WHITNEY AVE, NEW HAVEN, CT 06511 6/11/2020 6:39:43 PM 6:39:43 6/11/2020 PROJECT NUMBER M12 17081006 A6.03K D7 ESC DRAWING TITLE A3.00K FIRST FLOOR PLAN ADDITION K SCALE DRAW N BY A KGL G 1/8" = 1'-0" AAE PROJECT LIMIT LINE PROJECT LIMIT LINE ARCHITECTURAL TO REMAIN M TO REMAIN ARCHITECTURAL L CAD FILENAME DATE C:\Revit Local Files\1674 Yale KGL A18 Central_paradis.rvt A18 KGL Yale Files\1674 Local C:\Revit PEABODY LOADING 17081006 A1.10K 6/12/2020 DRAWING NUMBER 1st FLOOR PLAN M1 1/8" = 1'-0" N KEYPLAN A1.10K 012.