Land Bounded by Lawley Middleway, Curzon Street, Pitt Street and Digbeth Branch Canal, Eastside, Birmingham, B4

Total Page:16

File Type:pdf, Size:1020Kb

Land Bounded by Lawley Middleway, Curzon Street, Pitt Street and Digbeth Branch Canal, Eastside, Birmingham, B4 Committee Date: 20/03/2014 Application Number: 2013/09485/PA Accepted: 27/12/2013 Application Type: Full Planning Target Date: 28/03/2014 Ward: Nechells Land bounded by Lawley Middleway, Curzon Street, Pitt Street and Digbeth Branch Canal, Eastside, Birmingham, B4 Development to provide student residential accommodation (Sui Generis), retailing floorspace (Classes A1 and/or A3) and commercial floorspace (Use Class B1) with associated car parking, landscaping, amenity space and highway works Applicant: Alumno Developments (Birmingham) Ltd c/o Agent Agent: GL Hearn 20 Soho Square, London, W1D 3QW Recommendation Approve Subject To Conditions 1. Proposal 1.1. This detailed planning application proposes the construction of a multi-storey building comprising of 625 student bedrooms, 404 sq.m GIA (gross internal area) ground floor retail/restaurant unit (Use Classes A1 and/or A3) and four ancillary B1 business incubation units (208 sq.m GIA). In addition a new service road would be provided and improvements to the canal tow path form part of the current proposals. BACKGROUND 1.2. The application site forms part of the wider Eastside Locks redevelopment site which benefits from outline planning consent for various uses (not including student accommodation). The site comprises of plots H and L of the former masterplan, which has consent for a total of 1,600 sq.m (A1-A5 retail); 16,000 sq.m residential and a maximum of 200 parking spaces within a building up to part 5 / part 8 storeys high. Therefore, as the proposed use as student residential differs from the outline consider this application is not reliant upon the existing outline permission. However, consideration has been given to the remainder of the Eastside Locks masterplan in order to deliver a comprehensive and joined up approach. PROPOSED USE 1.3. Student accommodation would be the primary use of the proposed building with the 625 bedrooms arranged into self-contained cluster units providing the following range of accommodation: • 32 X 2 bed (non-ensuite) • 12 X 5 bed (including 20 accessible bedrooms) Page 1 of 23 • 25 X 6 bed (including 7 accessible) • 41 X 7 bed • 8 X 8 bed 1.4. The cluster units would comprise individual ‘standard’ rooms (measuring either 10sq.m where bathrooms are shared or 13 sq.m for ensuite units). All rooms would contain a double bed, wardrobe and desk space, with the ensuite rooms benefitting from dedicated W/C and shower facilities. 1.5. A total of 27 accessible bedrooms would be provided. These rooms would have level thresholds and accessible bathrooms with the shared cluster facilities also fully accessible with low worktops and appliances at an appropriate height. 1.6. The rooms would be arranged in clusters of between two and eight bedroom groups with common kitchen, dining and living room facilities provided for each cluster. These shared spaces would primarily be located at the ends of the building and the wings to maximise light and vistas. 1.7. A single student entrance to the building would benefit from a 24/h accessibility with the supporting Management Plan stating that between 9:00 – 17:00 daily the reception would be manned, with a security guard presence outside of this time. 1.8. The ‘move in’ process will be planned to ensure that all students to not arrive at once, with a managed appointment system in place. 1.9. A Study of Need accompanies this application which concludes that there is unmet demand for student housing within the City, with a particular shortfall in the City Centre to provide for the expanding Birmingham City University campus at Eastside. DESIGN 1.10. The application proposals show a single development block which would present a cranked frontage to Lawley Middleway spanning from Pitt Street in the north to within 15 metres of Curzon Street to the south forming a crescent shape. The block would be split into three similar sized elements deriving from a largely standardised floor layout throughout the building. These blocks would each have a common circulation corridor providing vertical circulation accessed off a central pedestrian access fronting the canal. The building would be predominantly 9 storeys in height to the Middleway. 1.11. A 17 storey (58.7m) tower would mark the corner of Curzon Street and Lawley Middleway. 1.12. The rear of the building would be punctuated by three finger-like projections (wings) to the west also 9 storeys in height. The minimum distance between a rear wing and the canal tow path is 13.5m with the main bulk of the building typically over 20m from the canal. 1.13. Elevationally, a simple palette of two primary materials is proposed. The lower one/two storeys of the building would be constructed of a dark brick to provide a visual link to the materials used in the canal environment and also to add a human scaled reference to the elevations. Above this a light coloured reconstituted stone would be used. The stone work would be modelled to provide interest with chamfers creating depth. Windows would be full height floor-to-ceiling maximising natural light Page 2 of 23 and views. Whilst rooms would be air conditioned, windows will be openable to provide natural ventilation and therefore architectural metal grilles will be provided for safety purposes. 1.14. LAYOUT 1.15. Around the crescent shaped building there would be a new bollarded shared surface access road running parallel to the Digbeth Branch Canal linking the future Pound Square (part of the wider Eastside Locks development) to Curzon Street. This new road would be well landscaped with a small flight of steps and ramp providing direct and convenient access to the canal tow path. 1.16. The retail store would be located at the base of the tower nearest to Curzon Street with pedestrian access facing Curzon Street. Travelling north the building would provide two incubation units, a refuse store, offices, the main student entrance foyer, the cycle store then two further incubation units. There would be no day-to-day access into the building from the Middleway elevation. The incubation units would provide space for business start-ups by post-graduate students. 1.17. In response to the change in levels across the site, the ground floor level would change by a storey as you move along the building. 1.18. Two podium level private courtyards would be provided on the canal elevation for student use. These would be accessible from the internal common rooms. These spaces would provide two distinct experiences, with a ‘social space’ catering for group seating, a games space with the potential for larger congregational spaces facing television screens within the common room. The second ‘personal space’ is intended to provide opportunity for more individual, private and quiet activities and would be divided with chest-height hedging in planters. 1.19. On site parking would be limited to four disabled parking bays and four management and incubation unit parking spaces accessed off the new shared road along the canal side and a separate 11 space customer car park associated with the ground floor retail unit on the Middleway site frontage. In addition the building would incorporate a secure 156 space cycle store for student use in addition to external visitor cycle racks. ECONOMIC IMPACT 1.20. The accompanying Economic Benefits Report outlines that the project is estimated to result in around £11m being spent on labour during the construction phase (which could represent up to £30m worth of investment). It is anticipated that the students would spend almost £3.5m annually, much of which in the local economy. Once operational, the student element of the development is likely to generate around 18 jobs. SUSTAINABILITY 1.21. The scheme is accompanied by a BREEAM pre-assessment which indicates that the scheme is likely to achieve a rating of ‘very good’. This is achieved through the use of highly efficient materials in the building’s envelope, utilising passive design measures such as the building’s orientation, maximising the use of natural light, intelligent low energy lighting, connection to the district energy supply for heat and hot water, air source heat pumps to deal with areas of potential excessive solar gain and low-flow fittings and water efficient fixtures. Page 3 of 23 1.22. In addition, Brown Roofs (which includes crushed stone and masonry) providing a total of 350 sq.m would be provided. These areas would be located upon the three wings providing both a visual benefit from upper parts of the building and a rich habitat for flora and fauna including invertebrates, bats and birds (including the Black Redstart). 1.23. The supporting Biodiversity Statement recommends that bat boxes, bird nesting boxes and provision of native planting be incorporated into the proposals as Ecological Enhancement measures. 1.24. The Arboricultural Assessment states that the two Norwegian Maple trees that would be removed as a consequence of the development are of moderate quality and value (Category B). The proposed planting plan shows a total of 38 new trees, with tree planting concentrated along the canal corridor. 1.25. This application is accompanied by a Planning Statement; Design and Access Statement; Verified Views; Air Quality Assessment; Consultation Statement; Daylight and Sunlight Statement; Land Contamination Desk Study; Management Plan; Biodiversity Assessment; Economic Benefits Report; Flood Risk Assessment; Heritage Statement; BREEAM Pre-Assessment Statement; Noise Assessment; Wind Microclimate Desk Study; Flood Risk and Drainage Statement; Study of Need; Transport Assessment; Travel Plan and an Arboricultural Survey. 1.26. An Environmental Impact Assessment (EIA) Screening Opinion was issued at pre- application stage and it was concluded that the proposed development would not have significant effects on the environment and therefore an EIA is not needed.
Recommended publications
  • Local Environmental Management Plan Birmingham City Council
    High Speed Rail (London-West Midlands) Local Environmental Management Plan Birmingham City Council December 2017 www.gov.uk/hs2 High Speed Two (HS2) Limited has been tasked by the Department for Transport (DfT) with managing the delivery of a new national high speed rail network. It is a non-departmental public body wholly owned by the DfT. High Speed Two (HS2) Limited, Two Snowhill Snow Hill Queensway Birmingham B4 6GA Telephone: 08081 434 434 General email enquiries: [email protected] Website: www.gov.uk/hs2 A report prepared by Lang O'Rourke and Mace on behalf of HS2 Ltd. High Speed Two (HS2) Limited has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the HS2 website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact High Speed Two (HS2) Limited. © High Speed Two (HS2) Limited, 2017, except where otherwise stated. Copyright in the typographical arrangement rests with High Speed Two (HS2) Limited. This information is licensed under the Open Government Licence v2.0. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government- licence/ version/2 or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. Printed in Great Britain on paper containing at least 75% recycled fibre.
    [Show full text]
  • Birmingham City Council Planning Committee 27 May 2021
    Birmingham City Council Planning Committee 27 May 2021 I submit for your consideration the attached reports for the North West team. Recommendation Report No. Application No / Location / Proposal Approve - Conditions 9 2020/08399/PA Land off Witton Road and Tame Road Witton Birmingham B6 Development of a new Inner City Football Academy, erection of building containing indoor 3G training pitch, changing facilities, parents lounge and ancillary office space, creation of outdoor 3G training pitch, two accesses, two car parks, associated hard and soft landscaping and lighting and resurfacing of staff car park to west of River Tame Approve - Conditions 10 2021/02809/PA Birmingham Alexander Stadium Walsall Road Perry Barr Birmingham B42 2LR Reserved Matters application following 2019/07968/PA for the installation of temporary lighting and catenary structures required to host the Commonwealth Games 2022. Approve - Conditions 11 2021/00528/PA Boldmere Gate Sutton Park Stonehouse Road Sutton Coldfield Birmingham B73 6LH Alterations and refurbishment of existing car park Page 1 of 1 Director, Inclusive Growth (Acting) Committee Date: 27/05/2021 Application Number: 2020/08399/PA Accepted: 23/11/2020 Application Type: Full Planning Target Date: 04/05/2021 Ward: Aston Land off Witton Road and Tame Road, Witton, Birmingham, B6 Development of a new Inner City Football Academy, erection of building containing indoor 3G training pitch, changing facilities, parents lounge and ancillary office space, creation of outdoor 3G training pitch, two accesses, two car parks, associated hard and soft landscaping and lighting and resurfacing of staff car park to west of River Tame Recommendation Approve subject to Conditions 1.
    [Show full text]
  • 110 Digbeth 10 St Martin-In-The-Bull Ring 11 Moor Street Station 12
    This guided walk explores an often- forgotten corner of Birmingham, Digbeth, charting its transformation from open fields to being one of Britain's industrial powerhouses. Once on the outskirts of a rural market town surrounded by orchards and water meadows, Digbeth developed into a slum in the 19th century with the highest population density the city has ever seen. Today the area is changing again as work gets underway for the new HS2 rail network. Time 1 of hour walk MOLA Headland Start your journey at St Bartholomew's Infrastructure exploring Chapel, follow the map to explore the Birmingham's heritage for HS2 area's lesser-known historical delights. 1 6 St Bartholomew's Chapel River Rea Aqueduct St Bartholomew’s was built in 1749 as The River Rea has long been used as a the chapel of ease for St-Martin-in-the- source of power for watermills rather than Bull Ring and could seat 1800 people. a transport route, it was straightened and Heavily damaged by bombing in World narrowed through the city to increase its War Two it was pulled down in 1943. The power. This aqueduct was designed to Clayton Hotel now stands on the site of safely carry the canal over the river. the chapel. 7 Heath Watermill 2 It's hard to imagine that most of this land Curzon Street Station was undeveloped water meadows in the Built in 1838 it was the end of the London Middles Ages, with a broad river winding to Birmingham Railway and the Grand through it. The Heath watermill was Junction Railway which ran to Liverpool.
    [Show full text]
  • Environmental Draft Statement
    PHASE ONE DRAFT ENVIRONMENTAL STATEMENT Community Forum Area Report 26 | Washwood Heath to Curzon Street HS2 London-West Midlands May 2013 ENGINE FOR GROWTH DRAFT ENVIRONMENTAL STATEMENT Community Forum Area Report ENGINE FOR GROWTH 26 I Washwood Heath to Curzon Street High Speed Two (HS2) Limited, 2nd Floor, Eland House, Bressenden Place, London SW1E 5DU Telephone 020 7944 4908 General email enquiries: [email protected] Website: www.hs2.org.uk © Crown copyright, 2013, except where otherwise stated Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence/ or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. To order further copies contact: DfT Publications Tel: 0300 123 1102 Web: www.dft.gov.uk/orderingpublications Product code: ES/14 Printed in Great Britain on paper containing at least 75% recycled fibre. CFA Report – Washwood Heath to Curzon Street/No 26 I Contents Contents Draft Volume 2: Community Forum Area Report – Washwood Heath to Curzon Street/No 26 5 Structure of the HS2 draft Environmental Statement 5 Part A: Introduction 6 1 Introduction 7 1.1 Introduction
    [Show full text]
  • West Midlands Environmental Statement
    L ondon -WEST MI -WEST d LA nd S Env S I ron ME n tal S tateme n T | Vol 5 Vol London- | Technical Appendices Technical WEST MIDLANDS ENVIRONMENTAL STATEMENT | Transport Assessment Transport (TR-001-000) Volume 5 | Technical Appendices Transport Assessment (TR-001-000) Part 9: West Midlands assessment Traffic and transport | November 2013 9: W Midlands assessment 9: VOL VOL VOL ES 3.5.0.12.9 5 5 5 London- WEST MIDLANDS ENVIRONMENTAL STATEMENT Volume 5 | Technical Appendices Transport Assessment (TR-001-000) Part 9: West Midlands assessment Traffic and transport November 2013 ES 3.5.0.12.9 High Speed Two (HS2) Limited has been tasked by the Department for Transport (DfT) with managing the delivery of a new national high speed rail network. It is a non-departmental public body wholly owned by the DfT. A report prepared for High Speed Two (HS2) Limited. High Speed Two (HS2) Limited, Eland House, Bressenden Place, London SW1E 5DU Details of how to obtain further copies are available from HS2 Ltd. Telephone: 020 7944 4908 General email enquiries: [email protected] Website: www.hs2.org.uk High Speed Two (HS2) Limited has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the HS2 website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact High Speed Two (HS2) Limited. Printed in Great Britain on paper containing at least 75% recycled fibre.
    [Show full text]
  • A Cut Around Sutton Coldfield
    A CUT AROUND SUTTON COLDFIELD D J Redwood A Cut Around Sutton Coldfield Stories of the Birmingham & Fazeley canal from Dunton to Minworth Introduction In 2014 personal interests in canals, family and local history came together during a quest for a new research paper. In examining the 1841 Census for unusual occupations in Sutton Coldfield, I noticed some entries that indicated canal based employment. From this small amount of information, I set out to discover what happened to some of the families who lived alongside the ‘Cut’ on the southern boundary of the Royal Town. It is unlikely that the Birmingham & Fazeley Canal had any major economic impact on many of the townspeople. Indeed, for much of its existence, it would have been quite remote, except for those families who lived in the small villages and settlements close to Sutton Coldfield through which the canal was cut in the late 18th century. This paper will focus mainly on those who lived in the 19th and early 20th centuries along or near the 3-mile pound from Dunton where the A446 crosses the canal near Curdworth Top Lock to where the A38 is taken across the waterway at the start of the Minworth Locks. Additionally, the role of the canal in the building of the Minworth Sewage Works will be explored as it played a key part in its’ construction and in the movement of supplies and materials. During my research, I came across a small number of other items related to the length of canal I have focussed upon and these have been gathered together as Snippets.
    [Show full text]
  • Download: Appendix D
    Appendix D: Scheme Impact Proforma Individual Schemes BIRMINGHAM CYCLING BID - Proforma Details for individual schemes Car Traffic vehicle Car Traffic vehicle kilometres Percentage of kilometres (per (per average day) Average trip length Average trip length Average cycling speed Average cycling speed Number of Additional (new) Number of users additional cyclists that Scheme No. ROUTE Description of infrastructure/facilities Route length (km) Route length (km) average day) (km) (km) (km/hr) (km/hr) users (per day) users (per day) would have driven a car otherwise. (No scheme) (With scheme) (No Scheme) (With Scheme) (No scheme) (with scheme) (No Scheme) (With Scheme) (No Scheme) (With Scheme) (with scheme) [Mode shift only] NORTH BIRMINGHAM 1 Birchfield Road Parallel Route #1 New Town to Handsworth Wood and Perry Barr via Wheeler Street. Separate spurs to Handsworth Wood via Westminster Road, Perry Hall via 2.1 7.9 2.1 3.7 20 20 294 79 373 100% 294 0 Cliveden Avenue, and BCU at Wellhead Lane. 2 River Tame Way Uses recreation grounds between Walsall Road and Hamstead Station. Extension of Birchfield Road Parallel Route (above), exact route 3.2 5.4 3.2 3.7 20 20 201 54 255 100% 201 0 depends on public rights-of-way and land issues. 3 A34 Birchfield Road Main Corridor Lancaster Circus to Perry Barr. Mostly based around bus lanes, with cycle lane or shared-use links in-between. Links to existing route on 0.0 6.1 0.0 3.7 20 20 227 61 288 100% 227 0 Walsall Road. 4 Birchfield Road Parallel Route #2 Dartmouth Circus to Wellhead Lane / BCU via The BroadwayRoute via Thomas Street.
    [Show full text]
  • CB Clke 97 * VILE, NIGEL. Pub Walks Along the Kennet & Avon Canal
    RCHS BIBILIOGRAPHY PROJECT BIBLIOGRAPHY OF PERIODICAL LITERATURE OF INLAND WATERWAY TRANSPORT HISTORY Updated 27.10.18. Please send additions/corrections/comments to Grahame Boyes, [email protected]. This bibliography is arranged by class, as defined in the following table. It can be searched by calling up the FIND function (Control + F) and then entering the class or a keyword/phrase. Note that, to aid searching, some entries have also been given a subsidiary classification at the end. CLASSIFICATION SCHEME CA GENERAL HISTORY AND DESCRIPTION OF INLAND WATERWAY TRANSPORT IN THE BRITISH ISLES CB INLAND WATERWAY TRANSPORT AT PARTICULAR PERIODS CB1 Antiquity and early use of inland navigation up to c.1600 (arranged by region of the British Isles) CB1z Boats CB2 c.1600–1750 The age of river improvement schemes CB3 c.1750–1850 The Canal Age CB4 c.1850–1947 The period of decline CB5 1948– Nationalisation and after; the rebirth of canals as leisure amenities CC INLAND WATERWAY TRANSPORT IN PARTICULAR REGIONS OF THE BRITISH ISLES CC1a England—Southern England CC1b England—South West region CC1c England—South East region CC1cl London CC1d England—West Midlands region CC1e England—East Midlands region CC1f England—East Anglia CC1fq England—East Anglia: guides CC1g England—Northern England CC1h England—North West region CC1i England—Yorkshire and North Humberside region CC1j England—North region CC2 Scotland CC3 Wales CC4 Ireland CC4L Ireland: individual canals and navigations CC4Lbal Ballinamore & Ballyconnel Canal and Shannon–Erne Waterway CC4Lban Lower and Upper Bann Navigations and Lough Neagh CC4Lbar Barrow Navigation CC4Lboy Boyne Navigation CC4Lcor Corrib Navigation, including the Eglinton Canal and Cong Canal CC4Ldub Dublin & Kingstown Ship Canal (proposed) CC4Lern Erne Navigation CC4Lgra Grand Canal, including the County of Kildare Canal CC4Llag Lagan Navigation CC4Llif R.
    [Show full text]
  • Urban Design Group Issue 63 July 1997 Topic: Symposium on The
    I Urban Design 1 Quarterly The Journal of the ' Urban Design Group Issue 63 July 1997 i Topic: Symposium on The New Urban Design Agenda i I I ' Practice Profile Civic Trust Regeneration Unit I ISSN 0266-6480 Urban Design Group Contributors Regular contributors Forum for: Robert Cowan Derek Abbott architects • town planners • Writer and Consultant on Urban Architect and Planner involved in engineers • landscape architects and affairs. Currently working with Urban consultancy, writing and teaching. Initiatives on Good Practice Guidance all those interested in the quality of Previously Conservation Officer for for Design in the Planning System. North Devon. the built environment Mike Galloway John Billingham The Urban Design Group, founded nineteen Town Planner and urban Designer. Architect and Planner, formerly years ago, has been established to provide Project Director of Crown Street Director of Design and Development high standards of performance and inter- Regeneration Scheme, Glasgow. Milton Keynes Development professional cooperation in planning, Member of Urban Villages Forum. Corporation. architecture, urban design, and other related disciplines; and to educate the relevant Angus Gavin Sebastian Loew professions and the public in matters relating to Planning Advisor for the Chairman of Architect and Planner, until recently urban design. Membership is made up of Solidere, the private sector Principal Lecturer at the School of architects, planners, landscape architects, corporation charged with the Urban Development at South Bank reconstruction of Beirut's war engineers, surveyors, historians, lawyers, University. damaged city centre. Formerly leader photographers, in fact anyone interested in the of the consultants' team that prepared Marion Roberts quality of our built environment.
    [Show full text]
  • (Public Pack)Agenda Document for the Cabinet, 13/01/2014 14:00
    The Cabinet Notice of Meeting Monday 13 January 2014 2.00 p.m. The Council Chamber Elizabeth House Church Street Stratford-upon-Avon Members of The Cabinet are requested to attend Leader Councillor Christopher Saint Deputy Leader Councillor Stephen Thirlwell (Partnerships Portfolio) Councillor Mike Brain Customer Access Portfolio Councillor Jennie Ellard Finance and Business Administration Portfolio Councillor Maurice Howse Enterprise, Housing and Revenues Portfolio Councillor Lynda Organ Technical Services Portfolio Councillor Gillian Roache Community Safety, Health and Wellbeing Portfolio Councillor Jonathan Spence Environment & Planning Portfolio Observers: Councillor Christopher Mills Chairman of the Council Councillor Stephen Gray Chairman of the OSC Councillor Richard Cheney Leader Liberal Democrat Group Councillor Roger Wright Leader Independent Group Councillor Juliet Short Leader Stratford First Independent Group Paul Lankester Chief Executive Elizabeth House, Church Street Stratford-upon-Avon CV37 6HX For further information about this agenda Telephone 01789 267575 Contact: Caroline Nash Facsimile 01789 260007 Minicom 01789 260747 Telephone: 01789 260245 DX700737 STRATFORD-ON-AVON 2 e-mail: [email protected] website www.stratford.gov.uk THE CABINET PROCEDURE FOR PUBLIC PARTICIPATION AT MEETINGS Members of the public are permitted to address The Cabinet if notice has been given in writing or by electronic mail to the Chief Executive no later than midday two clear days before the day of the meeting. Each notice
    [Show full text]
  • Birmingham Eastside Extension
    Birmingham Eastside Extension Environmental Statement Volume 2 Technical Appendix G: Policies and Plans Technical Information MMD-300207-HS30-DOC-0000-1028 October 2016 West Midlands Combined Authority Birmingham Eastside Extension Policies and Plans Technical Information Issue and revision record Revision Date Originator Checker Coordinator Approver Description A July 2016 LC PE CS KL First draft B October 2016 LC PE CS KL Final for submission Information class: Standard This document is issued for the party which commissioned it We accept no responsibility for the consequences of this and for specific purposes connected with the above-captioned document being relied upon by any other party, or being used project only. It should not be relied upon by any other party or for any other purpose, or containing any error or omission used for any other purpose. which is due to an error or omission in data supplied to us by other parties. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it. MMD/300207/HS30/DOC/0000/1028/B October 2016 C:\Users\wor69917\Desktop\Plans and Policies TA.docx Birmingham Unitary Development Plan (2005) The Birmingham Plan BIRMINGHAM UNITARY DEVELOPMENT PLAN 2005 (incorporating Alterations approved by the City Council for adoption on 11 October 2005) will be made to meet the city’s needs in adjoining authorities.] The circumstances of this particular proposal are exceptional, and justify the alteration to the Green Belt boundary. In amending the Green Belt, the “Area of Development Restraint” has been identified to establish a new boundary, which will endure in the long-term.
    [Show full text]
  • Heritage Report 2016-2017
    Heritage Report 2016/2017 September 2017 1 Fig 1. Distribution of designated heritage assets owned by the Canal & River Trust 2 Case Studies The following case studies are included in the Report: Managing Our Heritage Elland Bridge reconstructed 6 Control house repairs — Anderton Boat Lift 7 Chisnell Lift Bridge repaired 8 Pocklington Canal project 9 Finsley Gate Wharf 10 Heritage properties refurbished 11 Maintaining High Standards Saul Junction Lock 14 Hampstead Road Lock 15 Type 22 pillbox, Cowley 15 Brick Lock, River Stort 16 Kentish Town Lock 16 Whitehouses Pumping Station 16 Engagement Birmingham University student placements 17 Architectural Heritage Survey revisited 17 Watton lime kilns restored 17 Marple Red Wheels 18 Every Mile Counts 19 Heritage Heroes 20 WHS canoe access points 21 Social Media War on the Waterways 22 Birmingham Heritage Week 22 Skills and Training Skills for the Future 23 Birmingham City University canal course 24 WHS Youth Ambassadors programme 25 3 Foreword The Trust’s waterways heritage is a unique national and local asset that attracts and intrigues people. 2016/17 saw new volunteers joining us, more visitors to our open days, and greater community engagement than ever before. At the same time, high quality repairs and developments were much in evidence in our core work of engineering and property, our highest profile project being the reconstruction of flood-damaged Elland Bridge on the Calder & Hebble Navigation. In 2016/17 our heritage advisers worked closely with fundraising colleagues to develop informed bids for grants for a variety of projects. We also increased our media coverage for heritage through events like Birmingham Heritage Week and our own War on the Waterways campaign.
    [Show full text]