Initial Environmental Examination NEPAL: Electricity Grid

Total Page:16

File Type:pdf, Size:1020Kb

Initial Environmental Examination NEPAL: Electricity Grid Initial Environmental Examination Document Stage: Final Project Number: 54107-001 October 2020 NEPAL: Electricity Grid Modernization Project Part 1 Prepared by Nepal Electricity Authority, Government of Nepal for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 12 August 2020) Currency Unit = Nepali Rupee/s (Rs) Rs1.00 = $0.008344 $1.00 = Rs119.8400 ABBREVIATIONS ADB Asian Development Bank AIS air insulated substation CBS Central Bureau of Statistics CE common era CO2 carbon dioxide COD chemical oxygen demand DHM Department of Hydrology and Meteorology DO dissolved oxygen EGMP electricity grid modernization project EHS environment, health, and safety EIA environmental impact assessment EMF electromagnetic field EMP environmental management plan EPI environmental performance index GIS gas insulated substation GRM grievance redress mechanism HDI human development index IEE initial environmental examination IEEE Institute of Electrical and Electronics Engineer Inc. ICNRP International Commission on Non-Ionizing Radiation Protection IUCN International Union for Conservation of Nature kV kilovolt LPG liquefied petroleum gas masl meters above sea level mm millimeter µg/m³ micro gram per cubic meter NEA Nepal Electricity Authority PM2.5 fine particulate matter below 2.5 micrometers PMD project management directorate PTDEEP Power Transmission and Distribution Efficiency Enhancement Project Power Transmission and Distribution System Strengthening PTDSSP Project ROW right of way SASEC South Asia Sub-regional Economic Cooperation SF6 sulfur hexafluoride SNNP Shivapuri Nagarjun National Park SPCC spill prevention control and countermeasures UNESCO United Nations Educational, Scientific and Cultural Organization WEIGHTS AND MEASURES amp – ampere ha – hectare Hz – hertz km – kilometer (1,000 meters) kV – kilovolt (1,000 volts) kW – kilowatt (1,000 watts) mG – milligauss NOTES In this report, "$" refers to US dollars unless otherwise stated. This Initial Environmental Examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CONTENTS Page EXECUTIVE SUMMARY i I. INTRODUCTION 1 A. Project Background and Rationale 1 B. Objective and Scope of the IEE 2 C. Methodology of the IEE 3 D. Structure of the IEE 3 II. POLICY, LEGAL AND ADMINSTRATIVE FRAMEWORK 5 A. National (Nepal) Environmental, Health and Safety Policy Framework 5 B. NEA’s Environmental and Social Management Framework 25 C. ADB’s Safeguard Policy Statement (2009) Requirements 27 D. Other Applied Standards 29 E. International and Regional Treaties, Agreements and Conventions 29 III. DESCRIPTION OF THE PROJECT 31 A. Project Components and Locations 31 B. Nature, Size and Location of Project Facilities under each Component 34 C. Design Principles and Construction Works 66 D. Operation and Maintenance 72 E. Existing Facilities 73 F. Associated Facilities 73 G. Project Benefits 75 H. Analysis of Alternatives 75 I. Climate Change Risks 77 J. Project Cost and Implementation Schedule 77 IV. DESCRIPTION OF THE ENVIRONMENT 80 A. Environmental Setting of the Project Components 80 B. Physical Environment 117 C. Biological Environment 141 D. Socio-Economic Resources 163 V. ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 176 A. Introduction 176 B. Analysis of the Impacts 176 C. Impact Assessment, Mitigation and Compensation (Offset) Measures 194 D. Cumulative and Induced Impacts 254 VI. INFORMATION DISCLOSURE, CONSULTATION, AND PARTICIPATION 257 A. Consultation Process 257 B. Concerned Stakeholder Consultations 260 C. Public/Community Consultations 269 D. Meaningful Ongoing Consultation 281 E. Information Disclosure 283 VII. GRIEVANCE REDRESS MECHANISM 284 VIII. ENVIRONMENTAL MANAGEMENT PLAN 291 A. Introduction 291 B. Proposed Corrective Action Plan 292 C. Proposed Mitigation Plan 293 D. Proposed Monitoring Plan 293 E. EMP Work Plan 295 F. Institutional Arrangement and Responsibilities for EMP 296 G. Capacity Development 303 H. Environmental Management Budget 305 IX. CONCLUSION AND RECOMMENDATIONS 307 EXECUTIVE SUMMARY 1. This initial environmental examination (IEE) including an environmental management plan (EMP) for the proposed Electricity Grid Modernization Project (EGMP or the Project) by Nepal Electricity Authority (NEA) has been prepared in compliance with the Asian Development Bank’s (ADB) Safeguard Policy Statement (2009) and national (Nepal) environmental assessment health, and safety requirements. 2. The project will finance high-priority transmission and distribution systems investments under three outputs. Output 1: electricity transmission capacity in project areas strengthened and modernized; Output 2: electricity distribution system in project areas modernized; and Output 3: capacity of NEA and electricity users in project areas strengthened. Only the first two outputs involve physical activities. Output 1 will involve the construction of construction of 88 km of 132 kV and 25 km of 220 kV new transmission lines. It also involves the upgrade of 144 km of existing 132 kV and 66 kV transmission lines and automation of 34 existing substations. Output 2 will involve the construction of 30km of 33 kV distribution lines and a distribution command and control center. It also involves the installation of an estimated 350,000 smart meters. Between Outputs 1 and 2, 7 new or extended transmission/distribution substations will be constructed. The project is aligned with the following impacts: Reliable and efficient electricity for all achieved by 2028 and NEA developed as modern and sustainable corporate entity providing reliable services to its customers. The project will have the following outcome: coverage, reliability, efficiency, and financial sustainability of electricity supply in Nepal improved. 3. The project is estimated to cost $195 million. ADB will finance the project through a $156 million project loan while the balance of funds will come from counterpart funding by the Government of Nepal. NEA will serve as the executing agency and will implement the EGMP through its Project Management Directorate (PMD). The EGMP will be implemented over 5 years and is expected to be completed by March 2026. 4. Under ADB’s Safeguard Policy Statement (2009), the EGMP has been classified as “B” for environment requiring the preparation of an IEE. Following the requirements of ADB’s Safeguard Policy Statement (2009) and national (Nepal) environmental assessment health, and safety requirements, this IEE has been prepared, covering all components of the EGMP having environmental impact. 5. The transmission line and substation work under Output 1 will be spread across various locations in Province number 1, Bagmati province, Gandaki province, province number 5, and Karnali province. 6. A total of 227.5 ha will fall under the rights of way of the 3 new overhead transmission lines, including 86.7 ha of forest land for which a compensatory reforestation program will be implemented. Compensatory reforestation at a ratio of 1:25 will be provided for the 12,950 trees to be felled on forest land (8,358 private trees will also be lost) as well as forest land replacement for 3 ha of land to be planted at 1,600 trees/ha under tower footings. In particular, 7.4 km of the new Ghorahi-Madichaur transmission line runs along a river valley that falls within the IUCN category VI Chure Conservation Area which is designated to conserve natural habitats whilst allowing sustainable use of natural resources. 400 m of this section also passes ii through the outskirts of the Dang Deukhuri Foothill Forests and West Rapti Wetlands Important Bird Area. Due to the location of Ghorahi substation within the protected area, whilst alternative routings were considered to minimize forest loss, it has been unavoidable to pass through it. However, its protected area management plan specifically includes improving access to energy including through “extension of access to national electricity power transmission” as an objective. 13.32 ha of land within the Chure Conservation Area will fall under the right of way of the transmission line which is mainly agricultural land (modified habitat) with existing road access; thus no forest land is impacted with the protected area and the transmission line will not open up access to it. Dang Deukhuri Foothill Forests and West Rapti Wetlands Important Bird Area was recently extended to include the Charinge Community Forest, this forest land supports a breeding site for critically endangered vultures, located approximately 2 km distant. To ensure ADB’s Safeguard Policy Statement (2009) critical habitat requirements can be met, and there will be no reduction in their population due to electrocution or collision, “bird sensitive” design following international good practice will be adopted including installation of bird divertors along the entire transmission line to minimize collision risk. During detailed design towers will also be located as far west as is possible from Charinge Community Forest and the river. Whilst the other new transmission lines do not affect protected areas,
Recommended publications
  • Tourism in Pokhara: Issues, Trends and Future Prospects for Peace and Prosperity
    Tourism in Pokhara: Issues, Trends and Future Prospects for Peace and Prosperity 1 Tourism in Pokhara Issues, Trends and Future Prospects for Peace and Prosperity Edited by Bishnu Raj Upreti Pranil Kumar Upadhayaya Tikaram Sapkota Published by Pokhara Tourism Council, Pokhara South Asia Regional Coordination Office of NCCR North-South and Nepal Centre for Contemporary Research, Kathmandu Kathmandu 2013 Citation: Upreti BR, Upadhayaya PK, Sapkota T, editors. 2013. Tourism in Pokhara Issues, Trends and Future Prospects for Peace and Prosperity. Kathmandu: Pokhara Tourism Council (PTC), South Asia Regional Coordination Office of the Swiss National Centre of Competence in Research (NCCR North- South) and Nepal Center for Contemporary Research (NCCR), Kathmandu. Copyright © 2013 PTC, NCCR North-South and NCCR, Kathmandu, Nepal All rights reserved. ISBN: 978-9937-2-6169-2 Subsidised price: NPR 390/- Cover concept: Pranil Upadhayaya Layout design: Jyoti Khatiwada Printed at: Heidel Press Pvt. Ltd., Dillibazar, Kathmandu Cover photo design: Tourists at the outskirts of Pokhara with Mt. Annapurna and Machhapuchhre on back (top) and Fewa Lake (down) by Ashess Shakya Disclaimer: The content and materials presented in this book are of the respective authors and do not necessarily reflect the views and opinions of Pokhara Tourism Council (PTC), the Swiss National Centre of Competence in Research (NCCR North-South) and Nepal Centre for Contemporary Research (NCCR). Dedication To the people who contributed to developing Pokhara as a tourism city and paradise The editors of the book Tourism in Pokhara: Issues, Trends and Future Prospects for Peace and Prosperity acknowledge supports of Pokhara Tourism Council (PTC) and the Swiss National Centre of Competence in Research (NCCR) North-South, co-funded by the Swiss National Science Foundation (SNSF), the Swiss Agency for Development and Cooperation (SDC), and the participating institutions.
    [Show full text]
  • Code Under Name Girls Boys Total Girls Boys Total 010290001
    P|D|LL|S G8 G10 Code Under Name Girls Boys Total Girls Boys Total 010290001 Maiwakhola Gaunpalika Patidanda Ma Vi 15 22 37 25 17 42 010360002 Meringden Gaunpalika Singha Devi Adharbhut Vidyalaya 8 2 10 0 0 0 010370001 Mikwakhola Gaunpalika Sanwa Ma V 27 26 53 50 19 69 010160009 Phaktanglung Rural Municipality Saraswati Chyaribook Ma V 28 10 38 33 22 55 010060001 Phungling Nagarpalika Siddhakali Ma V 11 14 25 23 8 31 010320004 Phungling Nagarpalika Bhanu Jana Ma V 88 77 165 120 130 250 010320012 Phungling Nagarpalika Birendra Ma V 19 18 37 18 30 48 010020003 Sidingba Gaunpalika Angepa Adharbhut Vidyalaya 5 6 11 0 0 0 030410009 Deumai Nagarpalika Janta Adharbhut Vidyalaya 19 13 32 0 0 0 030100003 Phakphokthum Gaunpalika Janaki Ma V 13 5 18 23 9 32 030230002 Phakphokthum Gaunpalika Singhadevi Adharbhut Vidyalaya 7 7 14 0 0 0 030230004 Phakphokthum Gaunpalika Jalpa Ma V 17 25 42 25 23 48 030330008 Phakphokthum Gaunpalika Khambang Ma V 5 4 9 1 2 3 030030001 Ilam Municipality Amar Secondary School 26 14 40 62 48 110 030030005 Ilam Municipality Barbote Basic School 9 9 18 0 0 0 030030011 Ilam Municipality Shree Saptamai Gurukul Sanskrit Vidyashram Secondary School 0 17 17 1 12 13 030130001 Ilam Municipality Purna Smarak Secondary School 16 15 31 22 20 42 030150001 Ilam Municipality Adarsha Secondary School 50 60 110 57 41 98 030460003 Ilam Municipality Bal Kanya Ma V 30 20 50 23 17 40 030460006 Ilam Municipality Maheshwor Adharbhut Vidyalaya 12 15 27 0 0 0 030070014 Mai Nagarpalika Kankai Ma V 50 44 94 99 67 166 030190004 Maijogmai Gaunpalika
    [Show full text]
  • Field Diary Birgunj ICD: Nepal's Largest Dry Port
    Field Diary Birgunj ICD: Nepal’s Largest Dry Port Sugam Bajracharya Research Fellow, Nepal Economic Forum About the Field Visit In collaboration with CUTS International, Nepal Economic Forum (NEF) conducted a field survey under the study ‘Enabling a Political-Economy Discourse for Multimodal Connectivity in the BBIN Sub-region.’ As a result, a team of enumerators from NEF visited the Birgunj Inland Clearance Depot (ICD), the Birgunj Integrated Check Point (ICP), and the surrounding city of Birgunj in December 2020. The objective of the visit was to make a ground-level assessment of the current scenario of the developments in port infrastructure, trade logistics, and the surrounding infrastructure that might play a pivotal role in the multimodal connectivity of Nepal and the BBIN sub-region. The visit also intended to hold stakeholder consultations to get a view of challenges in daily trade operations. Connectivity to Birgunj ICD and ICP The Birgunj ICD is located in the Parsa district of Province 2. The nearest city, Birgunj, is at a distance of 8 km from the dry port, and the nearest Simara airport is 23.4 km away. The ICP is located right next to the ICD at the Nepal-India border. The city of Birgunj is about 140 km south of Kathmandu and takes about four and a half hours to reach via the Kulekhani-Hetauda route. However, large vehicles like buses and trucks are only allowed to travel the Kathmandu-Birgunj route via the Prithvi Highway, which is about 300 km and takes approximately 8-10 hours. Therefore, a 15-minute direct flight from the Tribhuvan International Airport in Kathmandu to Simara Airport is the fastest option available to travel to Birgunj.
    [Show full text]
  • Terms of References for Preparation of the Detailed Project Proposal For
    Terms of References for Preparation of the Detailed Project Proposal for the implementation of intensive value chain development program of vegetable and fruits in the 13 selected North-South road corridor of Nepal 1. Background Agriculture is the major contributing sector in national economy and this is possible by increasing production and productivity of crops, vegetables and fruits. Increasing agriculture productivity is also necessary for enhancing food security and is possible only when we can develop the value chain of fruits and vegetables. Therefore, it is utmost necessary to develop value chain of fruits and vegetables to increase market potentiality and comparative advantage. Government of Nepal has given priority for the value chain development in agriculture through the budget speech and it was clearly mentioned in the agriculture sector transformation guideline 2075 implementation action plan issued by the Ministry of Agriculture and Livestock development. With the increasing commercialization of agricultural, especially fruits and vegetables has been given high priority by many development agencies including government, non-government, private and donor agencies. Various agencies are promoting fruits and vegetable value chain in the various road corridor of the Nepal. But a consolidated and comprehensive project proposal has not been prepared so far for the implementation of intensive value chain development program of fruits and vegetables in the potential north-south road corridor in Nepal. Keeping in this in view and according to the approved annual program of Center for Agricultural Infrastructure Development and Mechanization Promotion (CAIDMP) for the fiscal year 2075/76, it is targeted to prepare Detailed Project Proposal for the implementation of intensive value chain development program of vegetable and fruits in the 13 selected North-South road corridor of Nepal Accordingly, it is also planned to prepare detail project proposal through consultancy service according to the related acts and rules of Nepal.
    [Show full text]
  • Nepal Human Rights Year Book 2021 (ENGLISH EDITION) (This Report Covers the Period - January to December 2020)
    Nepal Human Rights Year Book 2021 (ENGLISH EDITION) (This Report Covers the Period - January to December 2020) Editor-In-Chief Shree Ram Bajagain Editor Aarya Adhikari Editorial Team Govinda Prasad Tripathee Ramesh Prasad Timalsina Data Analyst Anuj KC Cover/Graphic Designer Gita Mali For Human Rights and Social Justice Informal Sector Service Centre (INSEC) Nagarjun Municipality-10, Syuchatar, Kathmandu POBox : 2726, Kathmandu, Nepal Tel: +977-1-5218770 Fax:+977-1-5218251 E-mail: [email protected] Website: www.insec.org.np; www.inseconline.org All materials published in this book may be used with due acknowledgement. First Edition 1000 Copies February 19, 2021 © Informal Sector Service Centre (INSEC) ISBN: 978-9937-9239-5-8 Printed at Dream Graphic Press Kathmandu Contents Acknowledgement Acronyms and Abbreviations Foreword CHAPTERS Chapter 1 Situation of Human Rights in 2020: Overall Assessment Accountability Towards Commitment 1 Review of the Social and Political Issues Raised in the Last 29 Years of Nepal Human Rights Year Book 25 Chapter 2 State and Human Rights Chapter 2.1 Judiciary 37 Chapter 2.2 Executive 47 Chapter 2.3 Legislature 57 Chapter 3 Study Report 3.1 Status of Implementation of the Labor Act at Tea Gardens of Province 1 69 3.2 Witchcraft, an Evil Practice: Continuation of Violence against Women 73 3.3 Natural Disasters in Sindhupalchok and Their Effects on Economic and Social Rights 78 3.4 Problems and Challenges of Sugarcane Farmers 82 3.5 Child Marriage and Violations of Child Rights in Karnali Province 88 36 Socio-economic
    [Show full text]
  • INDUSTRIAL FACTOR COSTS Some Highlights
    INDUSTRIAL FACTOR COSTS Some Highlights 1. Cost of Industrial Sites: a) Kathmandu Rs. 4,200,000 To 11,200,000 b) Outside Kathmandu Lalitpur Rs. 2,800,000 To 5,600,000 Bhaktapur Rs. 2,800,000 To 5,600,000 Hetauda Rs. 1,400,000 To 2,800,000 Pokhara Rs. 1,400,000 To 2,800,000 Butwal Rs. 1,400,000 To 2,800,000 Dharan Rs. 1,400,000 To 2,800,000 Nepalgunj Rs. 700,000 To 1,400,000 Surkhet Rs. 420,000 To 700,000 Biratnagar Rs. 2,800,000 To 5,600,000 Birgunj Rs. 2,800,000 To 5,600,000 Banepa, Dhulikhel Rs. 1,400,000 To 2,800,000 Note: Per Ropani, i.e. 5,476 sq.ft. 2. Construction Costs: a) Factory Building Rs. 1200 -1500 per sq.ft. b) Office Building Rs. 1500 -1900 per sq.ft. c) Material Cost (Average): i. Aluminum composite Pannel (of different sizes) - Rs.110 - 140 / Square foot. ii. Galvanized Iron sheet - Plain / Corrugated / Color (of different gauze and size): Plain and Corrugated- Rs.3700-8600 / Bundle, Color - Rs.5200-10500 / Bundle iii. Bricks-Non machine- Rs.4000-5500 / Thousand Pieces Machine made- Rs.8000- 8500 per Thousand Pieces iv. Cement (of different quality & companies) – Rs.570-725 per bag (50 kg) White Cement (of companies) - Rs.1650 per bag v. Glass – White Rs.28-36 / Square foot Color Rs.55- 65 / Square foot vi. Marble (Rajasthani) un-polished of different sizes) – Rs.105 -200 per Sq. Ft. vii. Plywood Commercial (of different sizes) – Rs.30-120 per Sq.
    [Show full text]
  • COVID19 Reporting of Naukunda RM, Rasuwa.Pdf
    स्थानिय तहको विवरण प्रदेश जिल्ला स्थानिय तहको नाम Bagmati Rasuwa Naukunda Rural Mun सूचना प्रविधि अधिकृत पद नाम सम्पर्क नं. वडा ठेगाना कैफियत सूचना प्रविधि अधिकृतसुमित कुमार संग्रौला 9823290882 ६ गोसाईकुण्ड गाउँपालिका जिम्मेवार पदाधिकारीहरू क्र.स. पद नाम सम्पर्क नं. वडा ठेगाना कैफियत 1 प्रमुख प्रशासकीय अधिकृतनवदीप राई 9807365365 १३ विराटनगर, मोरङ 2 सामजिक विकास/ स्वास्थ्यअण प्रसाद शाखा पौडेल प्रमुख 9818162060 ५ शुभ-कालिका गाउँपालिका, रसुवा 3 सूचना अधिकारी डबल बहादुर वि.के 9804669795 ५ धनगढी उपमहानगरपालिका, कालिका 4 अन्य नितेश कुमार यादव 9816810792 ६ पिपरा गाउँपालिका, महोत्तरी 5 6 n विपद व्यवस्थापनमा सहयोगी संस्थाहरू क्र.स. प्रकार नाम सम्पर्क नं. वडा ठेगाना कैफियत 1 2 3 4 5 6 7 8 9 n ारेाइन केको ववरण ID ारेाइन केको नाम वडा ठेगाना केन्द्रको सम्पर्क व्यक्तिसम्पर्क नं. भवनको प्रकार बनाउने निकाय वारेटाइन केको मता Geo Location (Lat, Long) Q1 गौतम बुद्ध मा.वि क्वारेन्टाइन स्थल ३ फाम्चेत नितेश कुमार यादव 9816810792 विध्यालय अन्य (वेड संया) 10 28.006129636870693,85.27118702477858 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Qn भारत लगायत विदेशबाट आएका व्यक्तिहरूको विवरण अधारभूत विवरण ारेाइन/अताल रफर वा घर पठाईएको ववरण विदेशबाट आएको हो भने मात्र कैिफयत ID नाम, थर लिङ्ग उमेर (वर्ष) वडा ठेगाना सम्पर्क नं.
    [Show full text]
  • Final Report
    Detail Study of Self-Reliant Industrial Goods in Nepal Final Report Submitted To: Government of Nepal Ministry of Industry, Commerce and Supplies Department of Industry Tripureswor, Kathmandu, Nepal Submitted By: Quality & Environmental Management Service Pvt. Ltd. Kathmandu, Nepal Telephone-01-5705455, E-mail- [email protected] June, 2021 ACKNOWLEDGEMENT Quality and Environmental Management Service Pvt. Ltd. takes an opportunity to express its’ gratitude to those Experts/stakeholders who contributed their valuable time and added precious value in this study. Particularly it extends sincere appreciation to Mr. Jiblal Bhusal, Director General, Mr. Krishna Prasad Kharel, Director; Mr. Pushpa Raj Shiwakoti, Statistical Officer, Mr. Santosh Koirala Mechanical Engineer and others staff of the Department of Industry for their kind inputs and guidance to bring this report to the final stage. We would also like to appreciate for the time and inputs of Mr. Jiblal Kharel Board member of Nepal Tea and Coffee Development Board (NTCDB), Mr. Naresh Katwal Chairperson of Federation of Nepalese Business Association, Mr. Dilli Baskota Member Sectary of HOTPA, Mr. Asish Sigdel Chairperson of NEEMA, Mr. Chandra khadgi member Sectary of NPMA, Mr Suresh Mittal Chairperson NTPA Jhapa and Mr. Rudra Prasad Neupane Board Member of FMAN. We would also like to thank for valuable input from Mr. Bikash Keyal Director of Narayani Strips Pvt. Ltd, Mr. A.K Jha GM of Hulas Steel Pvt. Ltd, Mr. Dibya Sapkota GM of Aarati Strip Pvt. Ltd., Mr Devendra Sahoo GM of Panchakanya Steel Pvt. Ltd, Mr. Laxman Aryal Chairperson of Jasmin Paints Pvt. Ltd. Mr.Buddhi Bahadur K.C chairperson of Applo Paints Pvt.
    [Show full text]
  • Bagmati Province Emergency Response Preparedness
    VULNERABILITY INDICATORS BAGMATI PROVINCE EMERGENCY RESPONSE PREPAREDNESS as of June 2021 Water and Sanitation Human Development Indicators Source of Drinking Water Improved Source of Drinking water 30,636.40 Gross Domestic Product 97.3% NPR million ie n t Infant Mortality Rate (MICS) Unimproved Source of Drinking water 16 per thousand 2.7% Human Development Index (HDI) 0.66 Type of Toilet Used 72.01 Life expectancy (HDI) Improved Sanitation facilities 97.8 % Unimproved Sanitation facilities Note* : 2.2 % This is a living document. We will be continuously editing and updating with revisions. 76.7 % of household population with E. coli in source water Early Childhood Development Attitude towards Domestic Violence Index score of children age 3-4 years are developmentally on 29.5% of women age 15-49 years believes a husband is justi�ied in 73.9% beating his wife in various circumstances track in literacy- numeracy, physical, social-emotional, and learning domains 56.5 % of women age 15-49 years believes a mother-in-law is justi�ied in verbally abusing and threatening her daughter-in-law 6.9% of children age 0-17 living with neither in various circumstance biological parent Icons : https://thenounproject.com/ Source : Multiple Indicator Cluster Surveys 2019 and HDI 2019 report VULNERABILITY INDICATORS BAGMATI PROVINCE EMERGENCY RESPONSE PREPAREDNESS as of June 2021 Adult / Child Disfunctioning Shelter Natural floor Other Rudimentary wall Functional dif�iculties in at least one domain: Other Seeing, Hearing, Walking, Communication ie n t 2.4 % Mud bonded bricks/stone Age 18 - 49 1.3 % Finished floor Finished wall Age 02 - 04 1.0 % Type of House Foundation Type of Outer Wall Health Insurance covergae Finished roof It is one protection scheme that present the percentage of men and women covered by health insurance Age 15 - 49 5.2 % 6.3% Type of Roof Age 05 - 17 5.9% Rural Urban The Nepal Multiple Indicator Cluster Survey (MICS) is an international % of women using appropriate multi-purpose household survey.
    [Show full text]
  • 2.3 Nepal Road Network
    2.3 Nepal Road Network Overview Primary Roads in Nepal Major Road Construction Projects Distance Matrix Road Security Weighbridges and Axle Load Limits Road Class and Surface Conditions Province 1 Province 2 Bagmati Province Gandaki Province Province 5 Karnali Province Sudurpashchim Province Overview Roads are the predominant mode of transport in Nepal. Road network of Nepal is categorized into the strategic road network (SRN), which comprises of highways and feeder roads, and the local road network (LRN), comprising of district roads and Urban roads. Nepal’s road network consists of about 64,500 km of roads. Of these, about 13,500 km belong to the SRN, the core network of national highways and feeder roads connecting district headquarters. (Picture : Nepal Road Standard 2070) The network density is low, at 14 kms per 100 km2 and 0.9 km per 1,000 people. 60% of the road network is concentrated in the lowland (Terai) areas. A Department of Roads (DoR’s) survey shows that 50% of the population of the hill areas still must walk two hours to reach an SRN road. Two of the 77 district headquarters, namely Humla, and Dolpa are yet to be connected to the SRN. Page 1 (Source: Sector Assessment [Summary]: Road Transport) Primary Roads in Nepal S. Rd. Name of Highway Length Node Feature Remarks N. Ref. (km) No. Start Point End Point 1 H01 Mahendra Highway 1027.67 Mechi Bridge, Jhapa Gadda chowki Border, East to West of Country Border Kanchanpur 2 H02 Tribhuvan Highway 159.66 Tribhuvan Statue, Sirsiya Bridge, Birgunj Connects biggest Customs to Capital Tripureshwor Border 3 H03 Arniko Highway 112.83 Maitighar Junction, KTM Friendship Bridge, Connects Chinese border to Capital Kodari Border 4 H04 Prithvi Highway 173.43 Naubise (TRP) Prithvi Chowk, Pokhara Connects Province 3 to Province 4 5 H05 Narayanghat - Mugling 36.16 Pulchowk, Naryanghat Mugling Naryanghat to Mugling Highway (PRM) 6 H06 Dhulikhel Sindhuli 198 Bhittamod border, Dhulikhel (ARM) 135.94 Km.
    [Show full text]
  • Forests and Watershed Profile of Local Level (744) Structure of Nepal
    Forests and Watershed Profile of Local Level (744) Structure of Nepal Volumes: Volume I : Forest & Watershed Profile of Province 1 Volume II : Forest & Watershed Profile of Province 2 Volume III : Forest & Watershed Profile of Province 3 Volume IV : Forest & Watershed Profile of Province 4 Volume V : Forest & Watershed Profile of Province 5 Volume VI : Forest & Watershed Profile of Province 6 Volume VII : Forest & Watershed Profile of Province 7 Government of Nepal Ministry of Forests and Soil Conservation Department of Forest Research and Survey Kathmandu July 2017 © Department of Forest Research and Survey, 2017 Any reproduction of this publication in full or in part should mention the title and credit DFRS. Citation: DFRS, 2017. Forests and Watershed Profile of Local Level (744) Structure of Nepal. Department of Forest Research and Survey (DFRS). Kathmandu, Nepal Prepared by: Coordinator : Dr. Deepak Kumar Kharal, DG, DFRS Member : Dr. Prem Poudel, Under-secretary, DSCWM Member : Rabindra Maharjan, Under-secretary, DoF Member : Shiva Khanal, Under-secretary, DFRS Member : Raj Kumar Rimal, AFO, DoF Member Secretary : Amul Kumar Acharya, ARO, DFRS Published by: Department of Forest Research and Survey P. O. Box 3339, Babarmahal Kathmandu, Nepal Tel: 977-1-4233510 Fax: 977-1-4220159 Email: [email protected] Web: www.dfrs.gov.np Cover map: Front cover: Map of Forest Cover of Nepal FOREWORD Forest of Nepal has been a long standing key natural resource supporting nation's economy in many ways. Forests resources have significant contribution to ecosystem balance and livelihood of large portion of population in Nepal. Sustainable management of forest resources is essential to support overall development goals.
    [Show full text]
  • Vulnerability and Impacts Assessment for Adaptation Planning In
    VULNERABILITY AND I M PAC T S A SSESSMENT FOR A DA P TAT I O N P LANNING IN PA N C H A S E M O U N TA I N E C O L O G I C A L R E G I O N , N EPAL IMPLEMENTING AGENCY IMPLEMENTING PARTNERS SUPPORTED BY Ministry of Forest and Soil Conservation, Department of Forests UNE P Empowered lives. Resilient nations. VULNERABILITY AND I M PAC T S A SSESSMENT FOR A DA P TAT I O N P LANNING IN PA N C H A S E M O U N TA I N E C O L O G I C A L R E G I O N , N EPAL Copyright © 2015 Mountain EbA Project, Nepal The material in this publication may be reproduced in whole or in part and in any form for educational or non-profit uses, without prior written permission from the copyright holder, provided acknowledgement of the source is made. We would appreciate receiving a copy of any product which uses this publication as a source. Citation: Dixit, A., Karki, M. and Shukla, A. (2015): Vulnerability and Impacts Assessment for Adaptation Planning in Panchase Mountain Ecological Region, Nepal, Kathmandu, Nepal: Government of Nepal, United Nations Environment Programme, United Nations Development Programme, International Union for Conservation of Nature, German Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety and Institute for Social and Environmental Transition-Nepal. ISBN : 978-9937-8519-2-3 Published by: Government of Nepal (GoN), United Nations Environment Programme (UNEP), United Nations Development Programme (UNDP), International Union for Conservation of Nature (IUCN), German Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety (BMUB) and Institute for Social and Environmental Transition-Nepal (ISET-N).
    [Show full text]