From New York Via Connecticut Turnpike (I-95): Take Exit 22 in Connecticut - Round Hill Road

Total Page:16

File Type:pdf, Size:1020Kb

From New York Via Connecticut Turnpike (I-95): Take Exit 22 in Connecticut - Round Hill Road Barone Campus Center. Dogwood room is in here Parking Garage – Park Here Main Entrance You will enter here. You will North Benson Rd see a Guard Shack. The Guard will point you to the Garage From New York via Connecticut Turnpike (I-95): Take exit 22 in Connecticut - Round Hill Road. Continue straight through the stop sign at the end of the ramp. At the traffic light, take a left onto North Benson Road (Rt. 135) and continue straight for 0.8 miles (through two traffic lights.) The sign for the main entrance to Fairfield University will be on the left. From Providence and New Haven via Connecticut Turnpike (I-95): Take exit 22 in Connecticut - North Benson Road. Turn right at the end of the ramp onto North Benson Rd. (Rte. 135). Go straight for 0.8 miles (through two traffic lights). The main entrance to Fairfield University will be on the left. From Hartford or Vermont via I-91: Take I-91 South to I-95 South in New Haven. Take exit 22 in Connecticut - North Benson Road. Turn right at the end of the ramp onto North Benson Rd. (Rte. 135). Go straight for 0.8 miles (through two traffic lights). The main entrance to Fairfield University will be on the left. From New York via Merritt Parkway (Rt. 15): Take exit 44. Turn left off the ramp, and turn right onto Black Rock Tpke. (Rt. 58) at the light. Proceed 2 miles to Stillson Rd. (Rt. 135) and turn right. Bear left, at the second light, onto North Benson Road. The University entrance will be on your right. From Hartford and New Haven via Merritt Parkway (Rt. 15): Take exit 44, take a quick left off the ramp, then take another quick left onto Black Rock Tpke. (Rt. 58), proceed 2 miles to Stillson Rd. (Rt. 135) and turn right. Bear left, at the second light, onto North Benson Road. The University entrance will be on your right. From Boston/New Hampshire and North: Take the Mass Pike (Route 90) West to I-84 West (exit 9). Merge onto I-91 South. I-91 merges into I-95 South in New Haven. Take exit 22 - North Benson Road. Turn right at the end of the ramp onto North Benson Rd. (Rte. 135). Go straight for 0.8 miles (through two traffic lights). The main entrance to Fairfield University will be on the left. .
Recommended publications
  • Heroes Tunnel Project Route 15 Wilbur Cross Parkway State Project No
    HEROES TUNNEL PROJECT ROUTE 15 WILBUR CROSS PARKWAY STATE PROJECT NO. 167-108 PURPOSE AND NEED STATEMENT (Revised 7/3/18) PROJECT CONTEXT The Heroes Tunnel is located along the Wilbur Cross Parkway (Route 15) in the Town of Woodbridge and the City of New Haven, near the Town of Hamden border. The Heroes Tunnel is a 1,200-foot long tunnel, which passes through West Rock Ridge in New Haven and Woodbridge. The existing tunnel was constructed between spring 1948 and fall 1949 and consists of two 28-foot wide by 19-foot high barrels with horseshoe cross-sections. The northbound and southbound barrels of the tunnel consist of two 11-foot wide travel lanes with 6-inch shoulders and a 2-foot 6-inch wide raised maintenance walk on each side. The centerlines of the barrels are approximately 63 feet apart. It is the only tunnel to pass beneath a natural land feature in the State of Connecticut and is eligible for listing on both the National and State Registers of Historic Places. The Heroes Tunnel Project limits encompass the 1,200-foot tunnel and extend approximately 2,000 feet from the tunnel portals, in both the northbound and southbound directions, as illustrated in Figure 1 attached. EXISTING TRANSPORTATION NETWORK The Wilbur Cross Parkway is a limited access highway, classified as an urban principal arterial – other expressway, comprising a portion of Route 15 between Milford and Meriden where commercial vehicles, trailers, towed vehicles and buses are prohibited. As a continuation of the Merritt Parkway in Fairfield County, Route 15 is an important route between the New York City metropolitan area and central Connecticut.
    [Show full text]
  • Contract Summary
    I-95 NEW HAVEN HARBOR CROSSING CORRIDOR IMPROVEMENT PROGRAM New Haven, East Haven, Branford, CT TRANSPORTATION MANAGEMENT PLAN November 2012 VERSION 3.0 Prepared For: Connecticut Department of Transportation 2800 Berlin Turnpike Newington, Connecticut 06131-7546 Submitted by: Parsons Brinckerhoff 148 Eastern Boulevard, Suite 200 Glastonbury, Connecticut 06033 I-95 New Haven Harbor Crossing Corridor Transportation Management Plan Improvement Program Version 3.0 Branford, East Haven, New Haven November 2012 Table of Contents Section Page • Letter of Endorsement 3 • Preface 4 • TMP Distribution 6 • Revision History / Change Management Process 10 • List of Acronyms 13 • Executive Summary 14 • TMP Roles and Responsibilities 17 • Program Project Descriptions 21 • Existing and Future Conditions 27 • Work Zone Impact Assessment 30 • Work Zone Impacts Management Strategies 34 − Temporary Traffic Control 34 − Transportation Operations 38 − Public Information / Public Outreach 40 • Monitoring 45 • Implementation Costs 51 • Appendix 1 I-95 New Haven Harbor Crossing Corridor Transportation Management Plan Improvement Program Version 3.0 Branford, East Haven, New Haven November 2012 Reference Documents Note: PDF files of the Reference Documents are included on the attached disk. • Accident Reports & Tables • Contract Plans and Special Provisions (See the Appendix for Lists) − Contract B − Contract E − Reconstruction of I-95 NB in the Long Wharf Area − Reconstruction of Waterfront Street − Route 34 East Downtown Crossing − Reconstruction of I-95 Over
    [Show full text]
  • Fuel Station Listing
    STATE OF CONNECTICUT-DEPARTMENT OF TRANSPORTATION (DOT) & OTHER STATE AGENCY (OSA) - FUEL STATION LISTING ALPHABETICAL ORDER BY TOWN Updated 7/08/2021 Station # Column = DOT designates a Transportation operated facility - OSA designates an Other State Agency operated facility (fueling restrictions are as noted) DOT ROUTINE STATION HOURS ARE FROM 8:00 A.M. TO 3:30 P.M. - UNLESS OTHERWISE NOTED OSA ROUTINE STATION HOURS ARE Noted WITH EACH FACILITY BELOW (where available) TYPE OF FUEL Locked Accessible STA. NO. TOWN TEL. No. STATION LOCATION AVAILABLE COUNTY Gate Generator Facilities 3 Chidsey Road Unleaded DOT 546 AVON 860-677-0953 Hartford Yes Yes Yes Route 10, South of Route 44, Right on Chidsey Road Diesel 1 Breault Road, Off Route 42 Unleaded DOT 514 BEACON FALLS 203-881-0529 New Haven Yes Yes No Route 8 S/B, Exit 24, Right on South Main for 2 miles, Left on Breault Road Diesel 362 Boston Turnpike - Route 6 Unleaded DOT 550 BOLTON 860-649-1708 I-384 to Route 6, 3/10 mile east of Route 85, 1000' west of Williams Road Tolland Yes Yes Yes Diesel STATION HOURS: 24 HOURS - DOT ACCESS ONLY Unleaded DOT 206 BRANFORD 203-488-8450 69 Leetes Island Road - I-95 - Exit 56 New Haven Yes Yes Yes North Bound at top of Ramp, right onto Leetes Island Road Diesel 1106 North Avenue (Correctional Facility) OSA 551 BRIDGEPORT 203-579-6742 Unleaded Fairfield Yes Yes Non-DOT CORRECTIONS USE ONLY Unleaded DOT 512 BROOKFIELD 203-740-3622 ***Station Under Construction*** Fairfield Yes Yes No Diesel 158 Westminster Road, Route 14 Unleaded DOT 557 CANTERBURY 860-546-7110
    [Show full text]
  • Zoning Regulations of the Town of Stratford
    ZONING REGULATIONS OF THE TOWN OF STRATFORD With Amendments through September 1, 2015 REPRINTED FROM THE CODE OF STRATFORD, CONNECTICUT ZONING REGULATIONS OF THE TOWN OF STRATFORD With Amendments through September 1, 2015 REPRINTED FROM THE CODE OF STRATFORD, CONNECTICUT TABLE OF CONTENTS STRATFORD ZONING REGULATIONS P R E F A C E ......................................................................................................... 1 SECTION 1. DEFINITIONS. ......................................................................................... 1 SECTION 2. DISTRICTS. ............................................................................................ 11 2.1 DIVISION IN DISTRICTS. ........................................................................................... 11 2.2 ZONING MAP. ........................................................................................................... 12 2.3 MORE RESTRICTIVE DISTRICTS. ............................................................................... 12 2.4 ZONING OF STREETS. ............................................................................................... 13 2.5 LAND UNDER WATER. .............................................................................................. 13 SECTION 3. GENERAL REQUIREMENTS. ............................................................ 13 3.1 COMPLIANCE WITH REGULATIONS. .......................................................................... 13 3.1.1. COASTAL AREA MANAGEMENT REGULATIONS. ...................................................
    [Show full text]
  • Merritt Parkway, Reservoir Road Bridge HAER Ho. CT-120 Spanning Reservoir Road at the 32.04 Mile Mark on the Merritt Parkway
    Merritt Parkway, Reservoir Road Bridge HAER Ho. CT-120 Spanning Reservoir Road at the 32.04 mile mark on the Merritt Parkway Trumbull t, A y* Fairf ield County W& h-> Connecticut C -'1 / J -'0 PHOTOGRAPHS m WRITTEN HISTORICAL AND DESCRIPTIVE DATA Historic American Engineering Record National Park Service U.S. Department of the Interior P.O. Box 37127 .-..Washington-* D.C. 20013-7127 # C J 'hi. HISTORIC AMERICAN ENGINEERING RECORD Merritt Parkway. Reservoir Road Bridge HAER No. CT-120 Location: Spanning Reservoir Road at the 32.04 mile mark on the Merritt Parkway in Trumbull, Fairfield County, Connecticut UTM: 18.651160.4566195 Quad: Bridgeport, Connecticut Construction Date: 1939 Engineer: Connecticut Highway Department Architect: George L. Dunkelberger, of the Connecticut Highway Department, acted as head architect for all Merritt Parkway bridges. Contractor: Mariani Construction Company New Haven, Connecticut Present Owner: Connecticut Department of Transportation Wethersfield, Connecticut Present Use: Used by traffic on the Merritt Parkway to cross Reservoir Road Significance: The bridges of the Merritt Parkway were predominately inspired by the Art Deco and Art Moderne architectural styles of the 1930s. Experimental forming techniques were employed to create the ornamental characteristics of the bridges. This, combined with the philosophy of incorporating architecture into bridge design and the individuality of each structure, makes them distinctive. Historians: Todd Thibodeau, HABS/HAER Historian Corinne Smith, HAER Engineer August 1992 For more detailed information on the Merritt Parkway, refer to the Merritt Parkway History Report, HAER No. CT-63. Merritt Parkway, Reservoir Road Bridge HAER No. CT-120 (page 2) LOCAL HISTORY In 1668, there were only five settlers living beyond the two- mile limit of the Stratford meeting house.
    [Show full text]
  • 131 Beach Road Supplemtal
    Joseph H. Versteeg Professional Profile Principal of Versteeg Associates LLC, a consulting firm specializing in the interpretation and proper application of building codes, fire/life safety codes, and accessibility standards; compliance reviews of architectural and engineering plans and specifications; compliance inspections of buildings and life safety systems; formulating and implementing fire safety/protection strategies; evacuation planning, as well as developing and instructing fire/life safety training programs. Established 1994. Summary of Qualifications • Commanding Officer of the Technical Services Section; Supervisor of the Fire Safety Code and Plan Review Units - Office of the Connecticut State Fire Marshal responsible for all compliance activities, investigations of complaints, post fire examinations, the evaluation of alternative methods of compliance and monitoring of corrective actions, conduct inspections of buildings and reviews of architectural drawings for compliance with the Fire Safety Code; develop and present training programs in code related topics. • Certified Fire Marshal and Licensed Building Official – State of Connecticut • Certified Fire Protection Specialist – CFPS Board-National Fire Protection Association • Principal member of the Technical Committees on Means of Egress and Residential Occupancies of the National Fire Protection Association’s Life Safety Code (NFPA-101) and the Building Construction and Safety Code of the National Fire Protection Association (NFPA-5000); • Chairperson of the Technical Committee on Alternative Approaches to Life Safety of the National Fire Protection Association (NFPA-101A). • Principal member of the Technical Correlating Committee on Healthcare Facilities of the National Fire Protection Association (NFPA-99). • Principal member of the Technical Committee on Fire Protection for Marinas and Boatyards of the National Fire Protection Association (NFPA-303).
    [Show full text]
  • Prayer Pledge Ofallegiance Community Development Re
    AGENDA SPECIAL CITY COUNCIL MEETING MONDAY MARCH 22 2010 RESCHEDULED FROM MARCH 15 201 0 7 00 P M CITY COUNCIL CHAMBERS CITY HALL 45 LYON TERRACE BRIDGEPORT CONNECTICUT Prayer Pledge ofAllegiance Roll Call MINUTES FOR APPROVAL Approval of City Council Minutes February 16 2010 COMMUNICATIONS TO BE REFERRED TO COMMITTEES 39 09 8 Communication from Central Grants Community Development re Supplemental Information concerning Item 39 09 Program Year 36 Annual Action Plan CDBG ESG HOME HOPWA referred to Economic and Community Development and Environment Committee 44 09 Communication from OPED re Disposition of City Owned Properties by Auction Sale to Abutter or Bridgeport Housing Authority and request for Public Hearing Ordered concerning the same referred to Economic and Community Development and Environment Committee 45 09 Communication from Mayor re Proposed Five Year Capital Plan for fiscal years 2011 2015 referred to Budget and Appropriations Committee 46 09 Communication from OPED re Disposition of City Owned Property 751 Kossuth Street to The Boys and Girls Clubs of Bridgeport Inc BGC referred to Economic and Community Development and Environment Committee 47 09 Communication from OPED re Disposition of City Owned Properties to Habitat for Humanity referred to Economic and Community Development and Environment Committee Page 2 Agenda City Council Meeting March 15 2010 rescheduled to March 22 2010 Special Meeting COMMUNICATIONS TO BE REFERRED TO COMMITTEES CONTINUED Revitalization re of East Side 48 09 a Communication from Neighborhood
    [Show full text]
  • Dynamic Social and Economic Effects of the Connecticut Turnpike Annette M
    28 sistance of Ian R. Kingham, George E. Frangos, and Highway Research Record 399, 1973, pp. 12-26. Krieger W. Henderson, Jr., of the NCHRP staff is 13. P. L. Niebanck and J. B. Pope. The Elderly in gratefully acknowledged. Older Urban Areas: Problems of Adaptation and the Effects of Relocation. Univ. of Pennsylvania REFERENCES Press, Philadelphia, 1965. 14. G. Fellman. Implications for Planning Policy of 1. J. E. Burkhardt, N. K. Boyd, and T. K. Martin. Neighborhood Resistance to Urban Renewal and Residential Dislocation: Costs and Consequences. Highway Proposals. Urban Planning Research and RMC Research Corporation, Bethesda, MD, Dec. Demonstration Project, Brandeis University, 1976. Waltham, MA; Massachusetts Department of 2. F. P. Bosselman and others. New Approaches to Housing and Urban Development, Boston, 1969. Compensation for Residential Takings. NCHRP, 15. M. Fried and P. Gliecher. Some Sources of Report 107, 1970. Residential Satisfaction in an Urban Slum. Journal 3. A. Downs. Losses Imposed on Urban Households of the American Institute of Planners, Vol. 27, by Uncompensated Highway and Renewal Costs. 1961, pp. 305-314. ill Urban Problems and Prospects, Chicago, Mark­ 16. L. Watts and others. The Middle-Income Negro ham Press, 1971. Family Faces Urban Renewal. Florence Hellen 4. F. I Michelman. Property, utility, and Fairness: Graduate School for Advanced Studies in Social Comments on the Ethical Foundation of "Just Welfare, Brandeis University, Waltham, MA; Compensation" Law. Harvard Law Review, Vol. Massachusetts Department of Commerce and De­ 80, April 1967, pp. 1165-1258. velopment, Boston, 1964. 5. J. M. Mogey. Social Effects of Eminent Domain. 17. C. W.
    [Show full text]
  • Flexibility in Highway Design
    Flexibility in Highway Design U.S. Department of Transportation Federal Highway Administration Page i This page intentionally left blank. Page ii A Message from the Administrator Dear Colleague: One of the greatest challenges the highway community faces is providing safe, efficient transportation service that conserves, and even enhances the environmental, scenic, historic, and community resources that are so vital to our way of life. This guide will help you meet that challenge. The Federal Highway Administration (FHWA) has been pleased to work with the American Association of State Highway and Transportation Officials and other interested groups, including the Bicycle Federation of America, the National Trust for Historic Preservation, and Scenic America, to develop this publication. It identifies and explains the opportunities, flexibilities, and constraints facing designers and design teams responsible for the development of transportation facilities. This guide does not attempt to create new standards. Rather, the guide builds on the flexibility in current laws and regulations to explore opportunities to use flexible design as a tool to help sustain important community interests without compromising safety. To do so, this guide stresses the need to identify and discuss those flexibilities and to continue breaking down barriers that sometimes make it difficult for highway designers to be aware of local concerns of interested organizations and citizens. The partnership formed to develop this guidance grew out of the design-related provisions of the Intermodal Surface Transportation Efficiency Act of 1991 and the National Highway System Designation Act of 1995. Congress provided dramatic new flexibilities in funding, stressed the importance of preserving historic and scenic values, and provided for enhancing communities through transportation improvements.
    [Show full text]
  • Investigations of a Colonial New England Roadway Cecelia S
    Northeast Historical Archaeology Volume 10 Article 1 1981 Investigations of a Colonial New England Roadway Cecelia S. Kirkorian Joseph D. Zeranski Follow this and additional works at: http://orb.binghamton.edu/neha Part of the Archaeological Anthropology Commons Recommended Citation Kirkorian, Cecelia S. and Zeranski, Joseph D. (1981) "Investigations of a Colonial New England Roadway," Northeast Historical Archaeology: Vol. 10 10, Article 1. https://doi.org/10.22191/neha/vol10/iss1/1 Available at: http://orb.binghamton.edu/neha/vol10/iss1/1 This Article is brought to you for free and open access by The Open Repository @ Binghamton (The ORB). It has been accepted for inclusion in Northeast Historical Archaeology by an authorized editor of The Open Repository @ Binghamton (The ORB). For more information, please contact [email protected]. Investigations of a Colonial New England Roadway Cover Page Footnote We gratefully acknowledge the invaluable assistance of Denise Trtolatis both in the field and for support throughout the project. The bulk density testing was conducted under the guidance of Dr. Harvey Luce and Mary Lou Peloetier, School of Agriculture, University of Connecticut, Storrs, CT. Bill Hollis and Ann Ross were kind enough to photographically record the site. Robert Weiner, Geography Department, University of Connecticut, Storrs, C, was responsibile for the graphic reproductions. Funding for this project was provided in part by the Public Archaeology Survey Team, University of Cennecticut, Storrs, CT and the Archaeological Associates of greenwich, Greenwich, YMCA, owners of the site in 1979, this work would not have been possible. This article is available in Northeast Historical Archaeology: http://orb.binghamton.edu/neha/vol10/iss1/1 1 New England suggests a strong correlation Investigations of A between the predicted and observed network Colonial New England development.
    [Show full text]
  • Norwalk, Ct 467 Connecticut Avenue
    RETAIL SPACE FOR SALE/GROUND LEASE/ OR BUILD TO SUIT NORWALK, CT 467 CONNECTICUT AVENUE SIZE 5,000 SF - Vacant Land Potential 2 Level 10,000 SF for low intensity uses ASKING RENT Upon Request 5,000 SF NEIGHBORS CVS Pharmacy, Best Buy, TJ Maxx, Dollar Tree, Sprint, GNC, GameStop, The Tile Shop, ShopRite, Stop & Shop, P.C. Richard & Son, Kohl’s, T-Mobile, Five Below, Party City, Old Navy, Starbucks, PetSmart, Wendy’s, Dunkin’, The Vitamin Shoppe, The Home Depot, Walmart, HomeGoods, Crunch Fitness, Costco Wholesale COMMENTS 55 Parking Spaces Access and visibility at signalized intersection of Connecticut Avenue and Rampart Road RAMPART ROAD CONTACT EXCLUSIVE AGENTS LISA DANIEL [email protected] 203.302.1701 CONNECTICUT AVENUE JEFFREY L. NABLE [email protected] 203.302.1701 100 Jericho Quadrangle Suite 120 Please visit us at ripcony.com for more information Jericho, NY 11753 This information has been secured from sources we believe to be reliable, but we make no representations as to the accuracy of the 516.933.8880 information. References to square footage are approximate. Buyer must verify the information and bears all risk for any inaccuracies. NORWALK, CONNECTICUT MARKET AERIAL 153,300 VPD 26,000 VPD DARINOR PLAZA I-95 LUMBER LIQUIDATORS HARDWOOD FLOORING FOR LESS! CONNECTICUT AVENUE 138,000 VPD 27,600 82 VPD 467 CONNECTICUT AVENUE NORWALK, CONNECTICUT ripcony.com AERIAL 138,000 VPD 26,000 VPD 467 CONNECTICUT CONNECTICUT AVENUE AVENUE CONNECTICUT TURNPIKE LUMBER LIQUIDATORS HARDWOOD FLOORING FOR LESS! 467 CONNECTICUT AVENUE NORWALK, CONNECTICUT N ripcony.com AERIAL CONNECTICUT TURNPIKE 138 ,000 VPD CONNECTICUT AVENUE 5,000 SF 26,000 VPD N 467 CONNECTICUT AVENUE NORWALK, CONNECTICUT ripcony.com SITE PLAN CONNECTICUT AVE (U.S.
    [Show full text]
  • Planning Study to Provide Municipal Sewer Service to Candlewood Lake Area Submitted To: Brookfield Water Pollution Control Authority
    Proposal for Planning Study to Provide Municipal Sewer Service to Candlewood Lake Area Submitted to: Brookfield Water Pollution Control Authority October 1, 2018 B-0805-P007 October 1, 2018 Mr. Nelson Malwitz, Chairman Brookfield Water Pollution Control Authority 53 Commerce Road, Unit A1 Brookfield, CT 06804 Re: Request for Qualifications Planning Study to Provide Municipal Sewer Service to the Candlewood Lake Area Dear Mr. Malwitz: The Candlewood Shores/Arrowhead Point section of Brookfield is comprised of small residential lots within a peninsula that extends into Candlewood Lake. Installation of municipal sewers in this area could not only help improve lake water quality, but could also be a huge benefit to any property owners in the area facing inadequate or failing on-site septic systems. The Town of Brookfield WPCA is seeking to engage an engineering firm with the necessary experience to evaluate alternatives for providing municipal sewer service to this area. Tighe & Bond has this experience, and we are ready to assist the WPCA by providing the following: . Identification of routing options to connect this area to the Town of Brookfield’s sewer system, and development of budgetary cost estimates for each alternative. Performing a feasibility and cost evaluation for a potential localized treatment facility. Identification of the permits and realistic permitting timelines for each option from local and State authorities. Work with the WPCA on obtaining a 55% Planning Grant from the Connecticut Department of Energy and Environmental Protection (CTDEEP) for this project. Tighe & Bond’s team is capable of performing all tasks contemplated in this RFP, as are other engineering firms.
    [Show full text]