FOR LEASE Colliers International 340 Albert Street | Suite 930 2855 Swansea Crescent | OTTAWA, on Ottawa, on | K1R 7Y6 P: +1 613 567 8050 F: +1 613 67 8035

Total Page:16

File Type:pdf, Size:1020Kb

FOR LEASE Colliers International 340 Albert Street | Suite 930 2855 Swansea Crescent | OTTAWA, on Ottawa, on | K1R 7Y6 P: +1 613 567 8050 F: +1 613 67 8035 VIEW ONLINE collierscanada.com Asking Price: $8.50 PSF NET CONTACT US: Warren Wilkinson Managing Director | Sales Representative +1 613 683 2207 [email protected] Ryan Aubertin Sales Representative +1 613 683 2205 [email protected] FOR LEASE Colliers International 340 Albert Street | Suite 930 2855 Swansea Crescent | OTTAWA, ON Ottawa, ON | K1R 7Y6 P: +1 613 567 8050 F: +1 613 67 8035 Accelerating success. FOR LEASE | 2855 SWANSEA CRESCENT, SUITE 150 - OTTAWA | ON Parking Signage Public Transit Loading SF Ceiling Height Easy Access Ample On-Site Pylon & OC Transpo & Dock 10,240 SF 24 Feet Highway 417 Building Future LRT THE AREA DISTANCE Located in the Hawthorne Business Park at the corner of Ages Drive and Swansea Crescent. This property provides Highway 417 5 min. drive an excellent opportunity in a quiet business neighbourhood, Highway 416 30 min. drive with many local amenities close by. Ideal for a warehouse | distribution user. Lots of natural light and only minutes from Kanata 36 min. drive Highway 417 interchange. Downtown Ottawa 17 min. drive Highway 174 7 min. drive BELFAST ROAD ST. LAURENT BOULEVARD INDUSTRIAL AVENUE INNES ROAD OLD INNES ROAD SHEFFIELD ROAD RIVERSIDE DR. LANCASTER ROAD SMYTH ROAD ST. LAURENT BOULEVARDRUSSELL ROAD ELMVALE SHOPPING CENTRE WALKLEY ROAD RUSSELL ROAD HAWTHORNE ROAD CONROY ROAD ST. LAURENT BOULEVARD 2855 Swansea HERON ROAD Crescent HUNT CLUB ROAD FOR LEASE | 2855 SWANSEA CRESCENT, SUITE 150 - OTTAWA | ON FLOOR PLAN COMING SOON Available Space Available Space Suite 150 - 10,240 SF Rental Rate $8.50 PSF Additional Rent $6.66 PSF (plus utilities) Comments • Warehouse space • Four (4) dock level loading doors with levelers, bumpers and door seals • 25,000 pound dock leveler capacity • Power - 600 V electrical service • 32’ x 40’ column spacing • Fully sprinklered • Clear ceiling height - 24 feet • Heated by gas Available December 1, 2018 CONTACT US: Warren Wilkinson** Ryan Aubertin* Managing Director | Sales Representative Sales Representative +1 613 683 2207 +1 613 683 2205 [email protected] [email protected] This document/email has been prepared by Colliers International for advertising and general information only. Colliers International makes no guarantees, representations or warranties of any kind, expressed or implied, regarding the information including, but not limited to, warranties of content, accuracy and reliability. Any interested party should undertake their own inquiries as to the accuracy of the information. Colliers International excludes unequivocally all inferred or implied terms, conditions and warranties arising out of this document and excludes all liability for loss and damages arising there from. Colliers International is a worldwide affiliation of independently owned and operated companies. This publication is the copyrighted property of Colliers International and /or its licensor(s). © 2018. All rights reserved. Colliers Macaulay Nicolls Inc., Brokerage. *Sales Representative **Managing Director | Sales Representative Accelerating success..
Recommended publications
  • NCAFA Constitution By-Laws, Rules & Regulations Page 2 of 70 Revision January 2020 DEFINITIONS to Be Added
    NATIONAL CAPITAL AMATEUR FOOTBALL ASSOCIATION CONSTITUTION BY-LAWS AND RULES AND REGULATIONS January 2020 Changes from the previous version are highlighted in yellow Table of Contents DEFINITIONS ....................................................................................................... 3 1 GUIDING PRINCIPLES ................................................................................. 3 2 MEMBERSHIP .............................................................................................. 3 3 LEAGUE STRUCTURE ................................................................................. 6 4 EXECUTIVE FUNCTIONS........................................................................... 10 5 ADVISORY GROUP .................................................................................... 11 6 MEETINGS .................................................................................................. 11 7 AMENDMENTS TO THE CONSTITUTION ................................................. 13 8 BY-LAWS AND REGULATIONS ................................................................ 13 9 FINANCES .................................................................................................. 14 10 BURSARIES ............................................................................................ 14 11 SANDY RUCKSTUHL VOLUNTEER OF THE YEAR AWARD ............... 15 12 VOLUNTEER SCREENING ..................................................................... 16 13 REMUNERATION ...................................................................................
    [Show full text]
  • Project Synopsis
    Final Draft Road Network Development Report Submitted to the City of Ottawa by IBI Group September 2013 Table of Contents 1. Introduction .......................................................................................... 1 1.1 Objectives ............................................................................................................ 1 1.2 Approach ............................................................................................................. 1 1.3 Report Structure .................................................................................................. 3 2. Background Information ...................................................................... 4 2.1 The TRANS Screenline System ......................................................................... 4 2.2 The TRANS Forecasting Model ......................................................................... 4 2.3 The 2008 Transportation Master Plan ............................................................... 7 2.4 Progress Since 2008 ........................................................................................... 9 Community Design Plans and Other Studies ................................................................. 9 Environmental Assessments ........................................................................................ 10 Approvals and Construction .......................................................................................... 10 3. Needs and Opportunities ..................................................................
    [Show full text]
  • Ottawa Transportation Report.Pdf
    OTTAWA THE IMPACT OF TRANSPORTATION IMPROVEMENTS ON HOUSING VALUES IN THE OTTAWA REGION Don R Campbell, Senior Analyst Melanie Reuter, Director of Research Allyssa Epp, Research Analyst WWW.REINCANADA.COM AUTHORS Don R. Campbell, Senior Analyst, REIN Ltd Melanie Reuter, Director of Research, REIN Ltd Allyssa Fischer, Research Analyst, REIN Ltd © The Real Estate Investment Network Ltd. 6 – 27250 58 Cr Langley, BC V4W 3W7 Tel (604) 856-2825 Fax (604) 856-0091 E-Mail: [email protected] Web Page: www.reincanada.com Important Disclaimer: This Report, or any seminars or updates given in relation thereto, is sold, or otherwise provided, on the understanding that the authors – Don R. Campbell, Melanie Reuter, Allyssa Fischer, and The Real Estate Investment Network Ltd and their instructors, are not responsible for any results or results of any actions taken in reliance upon any information contained in this report, or conveyed by way of the said seminars, nor for any errors contained therein or presented thereat or omissions in relation thereto. It is further understood that the said authors and instructors do not purport to render legal, accounting, tax, investment, financial planning or other professional advice. The said authors and instructors hereby disclaim all and any liability to any person, whether a purchaser of this Report, a student of the said seminars, or otherwise, arising in respect of this Report, or the said seminars, and of the consequences of anything done or purported to be done by any such person in reliance, whether in whole or part, upon the whole or any part of the contents of this Report or the said seminars.
    [Show full text]
  • Gloucester Street Names Including Vanier, Rockcliffe, and East and South Ottawa
    Gloucester Street Names Including Vanier, Rockcliffe, and East and South Ottawa Updated March 8, 2021 Do you know the history behind a street name not on the list? Please contact us at [email protected] with the details. • - The Gloucester Historical Society wishes to thank others for sharing their research on street names including: o Société franco-ontarienne du patrimoine et de l’histoire d’Orléans for Orléans street names https://www.sfopho.com o The Hunt Club Community Association for Hunt Club street names https://hunt-club.ca/ and particularly John Sankey http://johnsankey.ca/name.html o Vanier Museoparc and Léo Paquette for Vanier street names https://museoparc.ca/en/ Neighbourhood Street Name Themes Neighbourhood Theme Details Examples Alta Vista American States The portion of Connecticut, Michigan, Urbandale Acres Illinois, Virginia, others closest to Heron Road Blackburn Hamlet Streets named with Eastpark, Southpark, ‘Park’ Glen Park, many others Blossom Park National Research Queensdale Village Maass, Parkin, Council scientists (Queensdale and Stedman Albion) on former Metcalfe Road Field Station site (Radar research) Eastway Gardens Alphabeted streets Avenue K, L, N to U Hunt Club Castles The Chateaus of Hunt Buckingham, Club near Riverside Chatsworth, Drive Cheltenham, Chambord, Cardiff, Versailles Hunt Club Entertainers West part of Hunt Club Paul Anka, Rich Little, Dean Martin, Boone Hunt Club Finnish Municipalities The first section of Tapiola, Tammela, Greenboro built near Rastila, Somero, Johnston Road.
    [Show full text]
  • 96 Bus Time Schedule & Line Route
    96 bus time schedule & line map 96 Hurdman / Greenboro View In Website Mode The 96 bus line (Hurdman / Greenboro) has 2 routes. For regular weekdays, their operation hours are: (1) Hurdman / Greenboro: 6:42 AM - 11:15 PM (2) Merivale / 96b Hunt Club: 5:23 AM - 9:16 PM Use the Moovit App to ƒnd the closest 96 bus station near you and ƒnd out when is the next 96 bus arriving. Direction: Hurdman / Greenboro 96 bus Time Schedule 45 stops Hurdman / Greenboro Route Timetable: VIEW LINE SCHEDULE Sunday 8:39 AM - 6:10 PM Monday 6:42 AM - 11:15 PM Viewmount / Grant Carman 1755 Viewmount Drive, Ottawa Tuesday 6:42 AM - 11:15 PM Basil Macdonald / Grant Carman Wednesday 6:42 AM - 11:15 PM 120 Grant Carman Dr, Ottawa Thursday 6:42 AM - 11:15 PM Merivale / Basil Macdonald Friday 6:42 AM - 11:15 PM 1701 Merivale Road, Ottawa Saturday 6:57 AM - 6:58 PM Merivale / Viewmount Merivale Road, Ottawa Merivale / Colonnade 1680 Merivale Road, Ottawa 96 bus Info Direction: Hurdman / Greenboro Merivale / Woodƒeld Stops: 45 1720 Merivale Road, Ottawa Trip Duration: 23 min Line Summary: Viewmount / Grant Carman, Basil Merivale / West Hunt Club Macdonald / Grant Carman, Merivale / Basil 1814 Merivale Road, Ottawa Macdonald, Merivale / Viewmount, Merivale / Colonnade, Merivale / Woodƒeld, Merivale / West Merivale / Jamie Hunt Club, Merivale / Jamie, Merivale / Camelot, 1876 Merivale Road, Ottawa Merivale / Enterprise, Merivale / Cleopatra, Merivale / Slack, Merivale / Capital, Macfarlane / Briggs, Merivale / Camelot Macfarlane / Belledune, Macfarlane / Pineglen, 1900
    [Show full text]
  • Ottawa Jewish Bulletin Subscription
    blue - 300 c gree n - 362 c brown - 1535 c JNF CANADA EDUCATORS Call today to arrange or renew your MISSION TO ISRAEL Ottawa Jewish JULY 13 - 19, 2020 ISRAEL AT THE RIGHT TIME, RIGHT PRICE Bulletin Subscription JNFOTTAWA.CA 613.798.2411 Call 613-798-4696, Ext. 256 Ottawa Jewish Bulletin MARCH 23, 2020 | ADAR 27, 5780 ESTABLISHED 1937 OTTAWAJEWISHBULLETIN.COM | $2 Remembering Jon Braun, 1957-2020 Jon Braun, director of ing thousands of kids about the value of sports. For many, he was their connec- athletics, leagues and tion to the Jewish community. “Jon was all about the kids… mak- summer camps at the ing sure they got to experience and SJCC since 1988 was a get a taste of different activities in the sporting world,” said SJCC Youth Pro- beloved figure to the grams Manager and Specialty Camps Director Gail Lieff. “This was his prior- generations of chil- ity when he took over the JCC Sports Camp and turned it into the Travelling dren and adults whose Sports Camp.” lives he touched over Jon’s official title at the SJCC was director of Athletics where he oversaw the past 32 years. sports leagues for adults and kids, in addition to being executive director BY PAMELA ROSENBERG of Summer Camps and director of the SOLOWAY JEWISH COMMUNITY CENTRE Travelling Sports Camp. Although none of those job descriptions include fund- on Braun passed away unexpectedly raising, ensuring there was enough on March 9, at age 63, leaving gen- money in the pot so that every child erations of Ottawa families at a loss.
    [Show full text]
  • Phase I Environmental Site Assessment but Is Solely Intended to Be Used As a Database Review of Environmental Records
    Geotechnical patersongroup Engineering +FBrownfield Environmental Engineering Hydrogeology Geological Engineering Phase I - Environmental Site Assessment Materials Testing 144 Bentley Avenue Ottawa, Ontario Building Science Archaeological Studies Prepared For Danviwill Holdings Inc. Paterson Group Inc. Consulting Engineers 154 Colonnade Road South August 21, 2020 Ottawa (Nepean), Ontario Canada K2E 7J5 Report: PE4998-1 Tel: (613) 226-7381 Fax: (613) 226-6344 www.patersongroup.ca patersongroup Phase I - Environmental Site Assessment Ottawa Kingston North Bay 144 Bentley Avenue Ottawa, Ontario TABLE OF CONTENTS EXECUTIVE SUMMARY ..................................................................................................ii Assessment ...........................................................................................................ii 1.0 INTRODUCTION ................................................................................................... 1 2.0 PROPERTY INFORMATION ................................................................................. 2 3.0 SCOPE OF INVESTIGATION ............................................................................... 3 4.0 RECORDS REVIEW ............................................................................................. 4 4.1 General ........................................................................................................ 4 4.2 Environmental Source Information .............................................................. 5 4.3 Physical Setting Sources ............................................................................
    [Show full text]
  • Report Template
    1 Report to/Rapport au : Transportation Committee Comité des transports November 27, 2012 27 novembre 2012 Submitted by/Soumis par : Nancy Schepers, Deputy City Manager/Directrice municipale adjointe, Planning and Infrastructure/Urbanisme et Infrastructure Contact Person / Personne ressource: Bob Streicher, Acting Manager/Gestionnaire par intérim, Transportation Planning/Planification des transports, Planning and Growth Management/Urbanisme et Gestion de la croissance (613) 580-2424 x 22723, [email protected] CITY WIDE / À L’ÉCHELLE DE LA VILLE Ref N°: ACS2012-PAI-PGM-0260 SUBJECT: JOINT STUDY TO ASSESS CUMULATIVE EFFECTS OF TRANSPORTATION INFRASTRUCTURES ON THE NATIONAL CAPITAL GREENBELT – STUDY REPORT OBJET : ÉTUDE CONJOINTE VISANT À ÉVALUER LES EFFETS CUMULATIFS DES INFRASTRUCTURES DE TRANSPORT SUR LA CEINTURE DE VERDURE DE LA CAPITALE NATIONALE – RAPPORT D’ÉTUDE REPORT RECOMMENDATIONS That the Transportation Committee receive this report for information. RECOMMANDATIONS DU RAPPORT Que le Comité des Transports prenne connaissance de ce rapport. BACKGROUND The purpose of this study undertaken in partnership with the National Capital Commission (NCC) was to identify projects within the Transportation Master Plan (TMP) and other transportation projects that have emerged since the completion of the TMP that could have an impact on the environmental integrity of the federal Greenbelt lands. By examining the cumulative effects of the construction of this infrastructure on the Greenbelt lands, a framework now has been established to ensure that the associated Environmental Assessments (EAs) that require federal approval will move forward more expediently. 2 One of the NCC’s mandates is to protect the Greenbelt. Current practice has been that the NCC only comments or provides input on projects that are identified in its Greenbelt Master Plan (GBMP).
    [Show full text]
  • Appendix a Consultation Record
    APPENDIX A CONSULTATION RECORD MEETING REPORT Date: July 14, 2014 Project: O-Train Extension EA Date of meeting: June 26, 2014 Project Number: 3414015-000 Location: Honeywell Room, Author: E. Sangster Ottawa City Hall Purpose: Transit Design and Operations Workshop Attendees: Initial E-Mail Steven Boyle, City of Ottawa SB [email protected] Alex Carr, City of Ottawa AC [email protected] Vivi Chi, City of Ottawa VC [email protected] Dennis Gratton, City of Ottawa DG [email protected] Frank McKinney, City of Ottawa FM [email protected] Kornel Mucsi, City of Ottawa KM [email protected] Pat Scrimgeour, City of Ottawa PSC [email protected] Colin Simpson, City of Ottawa CS [email protected] Derek Washnuk, City of Ottawa DW [email protected] Yvon Larochelle, OMCIAA YL [email protected] Alex Stecky-Efantis, OMCIAA AS [email protected] Paul Croft, Parsons Corporation PC [email protected] David Hopper, Parsons Corporation DH [email protected] Scott Bowers, MMM Group SB [email protected] Tim Dickinson, MMM Group TD [email protected] Paul Nimigon, MMM Group PN [email protected] Emily Sangster, MMM Group ES [email protected] Peter Steacy, MMM Group PST [email protected] DISTRIBUTION: All Attendees Item Details Action By 1. Introductions CS and PST provided an introduction to the study team, objectives, process and rationale. 2. Operational Considerations DH provided an overview of the existing OC Transpo network, which the O-Train extension will support. Transit network planning principles to be considered as part of this study include coverage, capacity, reliability, and legibility.
    [Show full text]
  • EMERGENCY ACTION PLAN 2019-20 Nepean Ravens Tween AA (Coach)
    EMERGENCY ACTION PLAN 2019-20 Nepean Ravens Tween AA (Coach) Emergency: 9-1-1 for all emergencies Manager: Name 613-xxx-xxxx Coach: Name 613-xxx-xxxx Manager: Name 613-xxx-xxxx A/Coach: Name 613-xxx-xxxx Trainer/AC: Name 613-xxx-xxxx A/Coach: Name 613-xxx-xxxx Home Facilities Nearest Hospital Directions Carleton University Ice House CHEO From Arena: Raven Road 401 Smyth Road Turn RIGHT onto University Drive (travel 750 m). Ottawa, ON K1S Ottawa, ON K1H 8L1 Turn RIGHT onto Bronson Ave. (travel 1 km). 613.247.2061 613.737.7600 Take RAMP onto Riverside Drive EAST (travel 2.4 km). 613.520.2600 ext 4655 Take RAMP onto Smythe Road EAST (travel 1.2 km). Turn LEFT at South Haven Place (follow signs to the Emergency Entrance). Merivale (Darwin) Arena Queensway Carleton From Arena: 1765 Merivale Road 3054 Baseline Road Turn LEFT onto Merivale Road (travel 750 m). Ottawa, ON K2G 1E1 Ottawa, ON K2H 8P4 Turn RIGHT onto West Hunt Club Road (travel 4.4 km). 613.224.3168 613.721.2000 Turn RIGHT onto Greenbank Road (travel 2.2 km). Turn LEFT onto Baseline Road (travel 1.5 km). Turn RIGHT onto John Sutherland Drive (follow signs to the Emergency Entrance). Nepean Sportsplex Queensway Carleton From Arena: 1701 Woodroffe Avenue 3054 Baseline Road Turn RIGHT onto Woodroffe (travel 200 m). Ottawa, ON K2G 1W2 Ottawa, ON K2H 8P4 Turn LEFT onto West Hunt Club Road (travel 2.3 km). 613.580.2828 613.721.2000 Turn RIGHT onto Greenbank Road (travel 2.2 km).
    [Show full text]
  • Hunt Club Road Rental Apartment 1026-1054 Hunt Club Road Ottawa, Ontario
    Engineering Land / Site Development Municipal Infrastructure Hunt Club Road Rental Environmental / Water Resources Apartment Traffic / Transportation 1026-1054 Hunt Club Road Structural Recreational Ottawa, Ontario Planning Land / Site Planning Rationale Development Planning Application Management Municipal Planning Documents & Studies Expert Witness (OMB) Wireless Industry Landscape Architecture Urban Design & Streetscapes Open Space, Parks & Recreation Planning Community & Residential Developments Commercial & Institutional Sites Environmental Restoration HUNT CLUB ROAD RENTAL APARTMENT 1026-1054 HUNT CLUB ROAD OTTAWA, ONTARIO PLANNING RATIONALE IN SUPPORT OF AN APPLICATION FOR SITE PLAN CONTROL AND LIFTING HOLDING ZONE Prepared For: Prepared By: Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 May 8, 2020 Novatech File: 117036 Ref: R-2020-061 May 8, 2020 City of Ottawa Planning, Infrastructure, and Economic Development Department 110 Laurier Ave. West, 4th Floor Ottawa, Ontario K1P 1J1 Attention: Jean-Charles Renaud, Planner II Reference: Hunt Club Road Rental Apartment Planning Rationale in Support of Applications for Site Plan Control and Lifting Holding Zone 1026-1054 Hunt Club Road Our File No.: 117036 Novatech has been retained by Claridge Homes (‘Claridge’) to prepare this Planning Rationale in support of applications for Site Plan Control and Lifting Holding Zone for their properties municipally known as 1026, 1038, 1040, 1050, and 1054 Hunt Club Road, Ottawa, Ontario. The properties, with exception of 1026 Hunt Club Road, bisect the municipal ward boundaries of both Ward 16 – River and Ward 10 – Gloucester-Southgate. The municipal properties herein will be referred to the as the ‘Subject Site’. Claridge is proposing to develop a seven-storey mid-rise residential apartment building that will consist of seventy-seven (77) rental apartment units at various sizes.
    [Show full text]
  • Report Template
    1 Report to/Rapport au : Transportation Committee Comité des transports November 26, 2012 26 novembre 2012 Submitted by/Soumis par : Nancy Schepers, Deputy City Manager/Directrice municipale adjointe, Planning and Infrastructure/Urbanisme et Infrastructure Contact Person / Personne ressource: Bob Streicher, Acting Manager/Gestionnaire par intérim, Transportation Planning/Planification des transports, Planning and Growth Management/Urbanisme et Gestion de la croissance (613) 580-2424 x 22723, [email protected] College (8), Rideau-Goulbourn (21), Ref N°: ACS2012-PAI-PGM-0255 Kanata South (23) SUBJECT: KANATA SOUTH (TERRY FOX TO WEST HUNT CLUB ROAD) ENVIRONMENTAL ASSESSMENT – AMENDMENT TO STUDY SCOPE OBJET : ÉTUDE D’ÉVALUATION ENVIRONNEMENTALE DE KANATA-SUD (DE LA PROMENADE TERRY-FOX AU CHEMIN HUNT CLUB OUEST) – MODIFICATION À LA PORTÉE DE L’ÉTUDE REPORT RECOMMENDATION That the Transportation Committee approve the amended Study Scope of Work for the former Hope Side Road Extension (Richmond Road to West Hunt Club Road) Environmental Assessment Study now named the Kanata South Environmental Assessment Study. RECOMMANDATION DU RAPPORT Que le Comité des transports approuve la modification de la portée de l’étude d’évaluation environnementale du prolongement de l’ancien chemin Hope Side (du chemin Richmond au chemin Hunt Club Ouest) qui s’appelle désormais l’Étude d’évaluation environnementale de Kanata-Sud. BACKGROUND On 21 November 2007, Transportation Committee approved the Hope Side Road Extension (Richmond Road to West Hunt Club Road) Environmental Assessment – Statement of Work (ACS2007-PTE-POL-0066). The City’s Transportation Master Plan 2 (TMP) envisioned the extension of Hope Side Road east as a new two lane road connecting to Moodie Drive, then extending east and north towards West Hunt Club Road.
    [Show full text]