APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information

Serial Item Details Number 1. Name of the project/s Allahabad State University 2. S. No. in the schedule Schedule8 (a) 3. Proposed capacity/ area/length/ Total Plot Area : 485623.0 m2 tonnage to be handled/ command area/ Built Up Area:137629.12 m2 lease area/ number of wells to be drilled 4. New/ Expansion/ Modernization New 5. Existing Capacity/ Area etc. Not Applicable 6. Category of Project i.e. ‘A’ or ‘B’ Category B2 7. Does it attract the general condition? Not Applicable If yes, please specify. 8. Does it attract the specific condition? Not Applicable If yes, please specify. 9. Location Saraswati High-Tech city, Naini District Allahabad State Uttar Pradesh 10. Nearest railway station/ airport along The nearest Railway Station is with distance in kms  -Cheonki Railway station -3.63 Km, NW  -Naini Railway Station,- 5.26 Km, NW  -Karchana railway station -5.43 Km, S 11. Nearest Town, city, District Nearby places is Headquarters along with distance in  -Sadwakalan– 0.84 Km, N kms  -ChakDurgadatt– 2.27 Km, NW  -Bharauha– 1.68 Km, N 12. Village Panchayats, ZillaParishad, Nagar Nigam Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) 13. Name of the applicant Vice chancellor, Allahabad university 14. Registered Address CPI Hostel complex, Mahatama Gandhi road, civil line, Allahabad (UP), 15. Address for correspondence: CPI Hostel complex, Mahatama Gandhi road, civil line, Allahabad (UP),India Name Dr. Rajendra Prasad Designation (Owner/Partner/ CEO) Vice Chancellor

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 1 Form 1- Allahabad State university at Saraswati High-Tech City, Naini, District- Allahabad Uttar Pradesh

Address CPI Hostel complex, Mahatama Gandhi road, civil line, Allahabad (UP),India Pin Code 211001 E-mail [email protected]

Telephone No. - Fax No. - 16. Details of Alternative Sites examined, Not Applicable if any. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects None 18. Whether separate application of No interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves Not Applicable approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z. Notification, 1991? 22. Whether there is any Government Not Applicable Order/ Policy relevant/ relating to the site? 23. Forest land involved (hectares) No. 24. Whether there is any litigation No. pending against the project and/ or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/ directions of the Court, if any and its relevance with the proposed project

(II) Activity 1. Construction, operation, or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 2 Form 1- Allahabad State university at Saraswati High-Tech City, Naini, District- Allahabad Uttar Pradesh

Details thereof (with approximate S. Information/Checklist Yes/ quantities /rates, wherever possible) No. confirmation No with source of information data 1.1 Permanent or temporary change in No The total plot area of 485623.0 m2has land use, land cover or topography been proposed, under institutional land including increase in intensity of &the land has been made available at land use (with respect to local Saraswati high-tech city, Naini, District- land use plan) Allahabad, Uttar Pradesh. as per G.O. No. 51/sattar-4-2017-B-5/2016 Dt. 03 january 2017 1.2 Clearance of existing land, No There is existing greenery at the vegetation and buildings? proposed project site, which will be retained along with proposed green area development. 1.3 Creation of new land uses? Yes The total plot area of 485623.0 m2has been proposed, under institutional land &the land has been made available at Saraswati high-tech city, Naini, District- Allahabad, Uttar Pradesh. as per G.O. No. 51/sattar-4-2017-B-5/2016 Dt. 03 january 2017 1.4 Pre-construction investigations Yes Pre- Construction Investigation regarding e.g. bore houses, soil testing? sub soil exploration and testing has been carried out at the proposed project site to study the pertinent physical and mechanical properties of soil underlying the site. 1.5 Construction works? Yes As per Building Plan 1.6 Demolition works? No The project site is a vacant land in terms of cement infrastructure; hence no demolition of building or any other concrete structure will take place at the project site. 1.7 Temporary sites used for No 300 nos. labours from different areas construction works or housing of will be engaged. During construction construction workers? period Labours will be allowed for staying in encampment. 1.8 Above ground buildings, Yes As per building plan structures or earthworks including (During the project construction phase, linear structures, cut and fill or excavation will be required only during excavations construction of foundations. However, the soil excavated will be reused for

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 3 Form 1- Allahabad State university at Saraswati High-Tech City, Naini, District- Allahabad Uttar Pradesh

Details thereof (with approximate S. Information/Checklist Yes/ quantities /rates, wherever possible) No. confirmation No with source of information data backfilling, landscaping and the fertile top soil will be reused for horticulture purpose) 1.9 Underground works including No Not applicable mining or tunneling? 1.10 Reclamation works? No Not applicable 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing No It is a construction of Allahabad State processes? University; hence no production and manufacturing processes shall be carried out. 1.14 Facilities for storage of goods or Yes Separate raw material yard will be materials? made. Cement will be separately stored under cover in bales. Sand will be stacked nearby under tarpaulin cover. Bricks and steel will be laid in open. The raw material yard will be located within the project site. 1.15 Facilities for treatment or disposal Yes A210 KLD STP has been proposed for of solid waste or liquid effluents? the treatment of waste water generated from the domestic requirement &30 KLD ETP for the treatment of laboratory& canteen within the proposed project It is depicted in water balancing chart of conceptual plan in chapter no. 6 (Environment Management Plan) Solid Waste Management Plan is also enclosed in Conceptual Plan. 1.16 Facilities for long term housing of No Labors from different areas will be operational workers? hired. During construction period Labours will be allowed for staying in encampment. Proper Sanitary Facilities like Temporary Toilets etc. will be provided & treatment will be done using septic/soak pits. 1.17 New road, rail or sea traffic during No No, New roads, rail or sea traffic will construction or operation? be hired. 1.18 New road, rail, air waterborne or No No alteration in existing transport other transport infrastructure infrastructure is anticipated.

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 4 Form 1- Allahabad State university at Saraswati High-Tech City, Naini, District- Allahabad Uttar Pradesh

Details thereof (with approximate S. Information/Checklist Yes/ quantities /rates, wherever possible) No. confirmation No with source of information data including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No The project site has good road transport routes or infrastructure connectivity leading to changes in traffic NH76 (Mirjapur road)-0.03 Km, W movements? (approach road) NH 27- 5.17 km, W Karma road-2.07 Km, W Kohadarghat road-5.28 Km, S Forming nexus around the site. No such closure or diversion of existing transport will be done. 1.20 New or diverted transmission No No new or diverted transmission lines lines or pipelines? or pipelines will be done. 1.21 Impoundment, damming, No No impoundment, damming, culverting, realignment or other culverting, realignment, or other changes to the hydrology of change to the hydrology of surface watercourses or aquifers? water courses or aquifers is proposed. 1.22 Stream crossings? No No Stream is crossing at project site. Ganga River at 3.16 Km in E direction is the nearest surface water source available at the present project location. 1.23 Abstraction or transfers of water Yes Ground Water: It is estimated that from ground or surface waters? approx. 346.59 KLD of water will be required in proposed project. Water requirement shall be met through tube well. 1.24 Changes in water bodies or the No Surface drainage will not be affected land surface affecting drainage or with the proposed project. run-off? 1.25 Transport of personnel or Yes Transport of personnel or materials for materials for construction, construction, operation, or operation or decommissioning? decommissioning shall be done by road transport. 1.26 Long-term dismantling or No Not Applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 5 Form 1- Allahabad State university at Saraswati High-Tech City, Naini, District- Allahabad Uttar Pradesh

Details thereof (with approximate S. Information/Checklist Yes/ quantities /rates, wherever possible) No. confirmation No with source of information data environment? 1.28 Influx of people to an area in No 300 nos. labours from different areas either temporarily or will be engaged. During construction permanently? period Labour will be allowed for staying in encampment 1.29 Introduction of alien species? No As on date, there is no history of alien species at the proposed site. 1.30 Loss of native species or genetic No There will be no loss of native species diversity? or genetic diversity. 1.31 Any other actions? No None

2.Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate S. Information/checklist Yes quantities /rates, wherever possible) with No. confirmation /No source of information data. 2.1 Land especially undeveloped or Yes The total plot area of 485623.0 m2has been agricultural land (ha) proposed, under institutional land &the land has been made available at Saraswati high- tech city, Naini, District- Allahabad, Uttar Pradesh. as per G.O. No. 51/sattar-4-2017-B- 5/2016 Dt. 03 january 2017 Water (expected source & Yes Source: Tube well : 346.59 KLD 2.2 competing users) unit: KLD Total Domestic Water 138.6 Requirement KLD Total requirement for 98.45 Gardening KLD 7.28 DG Cooling KLD 72.26 Flushing KLD Laboratory uses &canteen 30.0 KLD washes 346.59 Total KLD

2.3 Minerals (MT) No Not applicable 2.4 Construction material – stone, Yes Material from excavation at the project site aggregates, sand / soil (expected will be used for construction purposes. source – MT) Additional construction material like stones, aggregates, sand will be procured from

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 6 Form 1- Allahabad State university at Saraswati High-Tech City, Naini, District- Allahabad Uttar Pradesh

nearby area. 2.5 Forests and timber (source – No Not Applicable MT) 2.6 Energy including electricity and Yes The expected power demand for the fuels (source, competing users) proposed project will be supplied through Unit: fuel (MT), energy (MW) Uttar Pradesh Power Corporation Ltd. 2.7 Any other natural resources (use No None appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S. Information/Checklist Yes/ Details thereof (with approximate No. confirmation No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, Yes This is a development of Allahabad State which are hazardous (as per University which falls under institutional MSIHC rules) to human health projects and no storage of hazardous or the environment (flora, fauna, chemicals (as per MSIHC rules) will be and water supplies) done, apart from used oil. Suitable management practice will be adopted for the same. Used Genset oil will be stored in HDPE drums, kept in covered rooms under lock and key, and will be sold to authorize vendors only. Specialized care will be taken to prevent leaks and spills. High Speed Diesel (low Sulphur Variety) will be used for D.G. Sets (02 x 500 KVA& 01× 1000 KVA) however; the quantity stored will be below the threshold limit specified by the MSIHC rules. 3.2 Changes in occurrence of disease No Suitable drainage and waste management or affect disease vectors (e.g. measures will be adopted in both the insect or water borne diseases) construction and operational phase which will restrict stagnation or accumulation of water. This will effectively restrict the reproduction and growth of disease vectors. 3.3 Affect the welfare of people e.g. Yes Socio Economic condition will improve by changing living conditions? with better opportunity for housing facilities in the Naini, Allahabad including

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 7 Form 1- Allahabad State university at Saraswati High-Tech City, Naini, District- Allahabad Uttar Pradesh

S. Information/Checklist Yes/ Details thereof (with approximate No. confirmation No quantities/rates, wherever possible) with source of information data adjoining areas and Villages. No use, storage, treatment, handling, or production is envisaged from the proposed project. Thus no major adverse impacts on the human health / environments are envisaged. Moreover this project will provide employment to about 300 labors from different areas during the construction phase and nearly 3904 personnel’s shall be benefitted from the project during operation phase. Thus the proposed project is supposed to have major beneficial impacts. 3.4 Vulnerable groups of people No No, vulnerable group of people will be who could be affected by the affected by the project. project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No None

4. Production of solid wastes during construction or operation or decommissioning (MT/month) Details thereof (with approximate S. Information/Checklist Yes/ quantities/rates, wherever possible) No. confirmation No with source of information data 4.1 Spoil, overburden or mine No Not applicable 4.2 Municipalwastes waste (domestic and Yes 1415.6 Kg/ Day municipal solid waste or commercial wastes) during operation including floating population shall be generated. Detail of Solid Waste Management is given in Conceptual Plan.

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 8 Form 1- Allahabad State university at Saraswati High-Tech City, Naini, District- Allahabad Uttar Pradesh

4.3 Hazardous wastes (as per Yes Hazardous waste shall be generated from Hazardous Waste the laboratory and canteen of university Management Rules) campus. This shall be treated by using proposed 30 KLD ETP. Spent oil from DG set will be carefully stored in HDPE drums in isolated covered facility. This spent oil will be sold to vendors authorized by CPCB for the treatment of the same. Suitable care will be taken so that spills/ leaks of used oil from storage could be avoided. Mercury contaminated waste would not be mixed with other hazardous waste or with general waste. It would not be swept down the drain and wherever possible, it would be disposed off at a hazardous waste facility or given to a mercury based equipment manufacturer.

4.4 Other industrial process wastes This is a construction project; hence there No will be no other industrial process waste. 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge Yes About 7.0 Kg/day of sludge will be from effluent treatment generated from 210KLD STP within the University campus, which will be passed through filter press where it will be dried and form a cake and then used as manure in green area of the project. 4.7 Construction or demolition Yes Construction waste will be generated wastes which shall be used for flooring & Back filling in roads etc. 4.8 Redundant machinery or No Not applicable equipment 4.9 Contaminated soils or other No Not applicable materials 4.10 Agricultural wastes No Not applicable 4.11 Other solid wastes No N.A.

5. Release of pollutants or any hazardous, toxic, or noxious substances to air (Kg/hr.)

Details thereof (with approximate S. Information/Checklist Yes/ quantities/rates, wherever possible) with No. confirmation No source of information data

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 9 Form 1- Allahabad State university at Saraswati High-Tech City, Naini, District- Allahabad Uttar Pradesh

Details thereof (with approximate S. Information/Checklist Yes/ quantities/rates, wherever possible) with No. confirmation No source of information data 5.1 Emissions from combustion of Yes HC - 1.3 g/KW -hr fossil fuels from stationary or PM - 0.30 g/KW-hr mobile sources NOx – 9.2 g/KW-hr CO - 3.5 g/KW-hr 5.2 Emissions from production No Not applicable processes 5.3 Emissions from materials Yes This will be restricted to the construction handling including storage or phase and to the construction site only; transport 5.4 Emissions from construction Yes This will be restricted to the construction activities including plant and phase and to the construction site only. equipment 5.5 Dust or odours from handling Yes Dust is likely to be generated during of materials including construction. Water will be sprinkled and construction materials, sewage tarpaulin cover will be provided over and waste stored raw material to reduce dust emission. Sewage waste will be treated through 210 KLD sewage treatment plant based on FAB Technology has been proposed. 30 KLD ETPis proposed for the treatment of laboratory & Canteen. Solid waste management plan is enclosed in conceptual plan in chapter no. 6 5.6 Emissions from incineration of No Not Applicable waste 5.7 Emissions from burning of No Open burning of biomass/ other material waste in open air (e.g. slash will be prohibited. materials, construction debris) 5.8 Emissions from any other No Not applicable sources

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 10 Form 1- Allahabad State university at Saraswati High-Tech City, Naini, District- Allahabad Uttar Pradesh

6. Generation of Noise and Vibration, and Emissions of Light and Heat: Details thereof (with approximate S. Information/Checklist Yes/ quantities/rates, wherever possible) with No confirmation No source of information data with source . of information data 6.1 From operation of equipment No During construction the machinery used for e.g. engines, ventilation plant, construction will be of highest standard of crushers reputed make and will adhere to international standards. These standards itself take care of noise pollution control / vibration control and air emission control. Hence insignificant impacts due to construction machinery are envisaged. Apart from this, the construction activities will be restricted to day time only. Source of noise in the operational phase will be D.G. Sets only. Within the proposed State University, (01 no. of DG Set 1000 KVA& 02 nos. 500 KVA) is expected which in acoustic enclosures. The D.G. Sets will be in operation during power failure only.

6.2 From industrial or similar No Not applicable processes 6.3 From construction or demolition Yes Due to the various construction activities there will be short-term noise impacts in the immediate vicinity of the project site. The construction activities will include the following noise generating activities:  Operation of D.G. Sets, concreting and mixing  Excavation etc. 6.4 From blasting or piling No No blasting or piling will be done. 6.5 From construction or Yes Some amount of noise (60-68 db(A) will operational traffic be generated from vehicular movement in the construction and operational phase within premises of university. Plantation shall be done at the periphery and along road side area to ensure noise attenuation.

6.6 From lighting or cooling systems No None

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 11 Form 1- Allahabad State university at Saraswati High-Tech City, Naini, District- Allahabad Uttar Pradesh

6.7 From any other sources No None

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: Details thereof (with approximate S. Information/Checklist Yes/ quantities/rates, wherever possible) No. confirmation No with source of information data 7.1 From handling, storage, use or No Used Oil Filter will be stored on PACCA pit spillage of hazardous materials after filling in HDPE bags latter on will be disposed off at nominated site from pollution control board for land fill as per the norms. Used oil and oil containing sludge will be stored at nominate PACCA area and will be disposed off through authorized recycler by CPCB & MOEF. Hence no risk of contamination is envisaged. 7.2 From discharge of sewage or No A 210 KLD STPbased on FAB technology other effluents to water or the has been proposed to treat 100% waste water land (expected mode and place within the State University, the STP treated of discharge) water will be totally reused for Flushing, Gardening, DG Set Cooling, purposes. Details of 210 KLD STP is given in Conceptual Plan. The effluents from the laboratory & canteen within the university building shall be treated by using30 KLD ETP

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 12 Form 1- Allahabad State university at Saraswati High-Tech City, Naini, District- Allahabad Uttar Pradesh

Details thereof (with approximate S. Information/Checklist Yes/ quantities/rates, wherever possible) No. confirmation No with source of information data 7.3 By deposition of pollutants No The proposed university shall treat the total emitted to air into the land or grey and black water within its own into water premises by setting up 210 KLD sewagetreatment plant and treated water from STP shall be totally utilized for flushing, DG set cooling, & Gardening with Zero Discharge. Treated Water from STP – 143.37 KLD Total Reused Water Breakup- 1. DG Set Cooling – 7.28 KLD 2. Flushing –72.26 KLD 3. Gardening –98.45 KLD Total treated water from ETP will be used for floor washing, sewer washing etc. within the university premises. Zero discharge of treated water achieved. Hence, no any pollutant gets into the water or air. 7.4 From any other sources No Not applicable 7.5 Is there a risk of long term No Not applicable buildup of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

Details thereof (with approximate S. Information/Checklist Yes/ quantities/rates, wherever possible) No. confirmation No with source of information data 8.1 From explosions, spillages, fires No This is basically a development of State etc from storage, handling, use University and does not involve major or production of hazardous hazardous construction activity. Hence substances chances of explosions, spillages, fires are minimal.

During Construction 300 nos. of labours will be provided with suitable personal protective equipment (PPE) as required under the health & safety norms. Training and awareness about the safety norms will

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 13 Form 1- Allahabad State university at Saraswati High-Tech City, Naini, District- Allahabad Uttar Pradesh

Details thereof (with approximate S. Information/Checklist Yes/ quantities/rates, wherever possible) No. confirmation No with source of information data be provided to all supervisors and labours involved in construction activity.

An agreement will be signed with the contractor, which will clearly deal with the safety aspects during construction.

No major hazardous waste is being stored within the project site. No Industrial or process activity is involved in this project hence chances of chemical hazards and accidents are minimal. However, suitable fire fighting measures will be provided 8.2 From any other causes No None 8.3 Could the project be affected by No The seismic hazard map of India was natural disasters causing updated in 2000 by the Bureau of Indian environmental damage (e.g. Standards (BIS). The Allahabad city is floods, earthquakes, landslides, located in the seismic Zone III with cloudburst etc)? majority of the portion having provision of earthquake resistance in construction.

Suitable seismic coefficients in horizontal and vertical directions respectively, will be adopted while designing the structure. There are no chances of flood and landslide in the plain area of Allahabad.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Details thereof (with approximate S. No. Information/Checklist Yes/ quantities/rates, wherever possible) confirmation No with source of information data

9.1 Lead to development of Development of 210 KLD STP for total supporting. grey and black water treatment Utilities, ancillary development Development of 30 KLD ETP for the or development stimulated by treatment of laboratory & canteen

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 14 Form 1- Allahabad State university at Saraswati High-Tech City, Naini, District- Allahabad Uttar Pradesh

the project which could have impact on the environment e.g.: • Supporting infrastructure Yes It is development of Allahabad State (roads, power supply, waste or University, with adequate Overall waste water treatment, etc.) development facilities.

• Housing development Yes Not Applicable

• Extractive industries No Not Applicable

• Supply industries No Not Applicable

• Other No 9.2 Lead to after-use of the site, No Proper care shall be taken to avoid any which could have an impact on impact on the environment. the environment 9.3 Set a precedent for later Yes Infrastructure Development and developments improvement in living standard of the area Socio Economic conditions will improve.

9.4 Have cumulative effects due to No The study area along NH-76, Mirzapur

proximity to other existing or road has no other developmental area.

planned projects with similar However abadi areas and facilities exist effects in 1000 m vicinity from project site. Hence cumulative effects are unforeseen.

III Environmental Sensitivity S. Areas Name/ Aerial distance (within Identity No. 15km.) Proposed project location boundary 1 Areas protected under No No such area is involved. international conventions, national or local legislation for their ecological, landscape, cultural or other related value.

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 15 Form 1- Allahabad State university at Saraswati High-Tech City, Naini, District- Allahabad Uttar Pradesh

S. Areas Name/ Aerial distance (within Identity No. 15km.) Proposed project location boundary 2 Areas which are Yes Watercourses- important or sensitive for Ganga river 3.16 Km, E ecological reasons - river 7.06 Km N Wetlands, watercourses Tons river (largest 17.97 Km, NE or other water bodies, tributary of Yamuna)- coastal zone, biospheres, From the proposed project site mountains, forests 3 Areas used by protected, No No protected or sensitive area important or sensitive is located within 15 km radius species of flora or fauna of the proposed project. for breeding, nesting, foraging, resting, over 4 Inland,wintering, coastal, migration. marine or No None underground waters 5 State, National No None boundaries

6 Routes or facilities used Yes by the public for accessto NH76 (Mirjapur road) 0.03 Km, W recreation or other NH 27- 5.17 km, W 5.17 km, W tourist, pilgrim areas. Karma road-2.07 Km, 2.07 Km, W W Kohadarghat road- 5.28 Km, S 5.28 Km, S

7 Defense installations No None 8 Densely populated or Yes  built-up area The project site is proposed  near moderately build up  area like  Sadwakalan  - 0.84 Km, N  NH76 (Mirjapur  - 0.03 Km, W (approach road) road)   Cheonki Railway  -3.63 Km, NW station -4.83 Km, NW  Naini Bus stop

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 16 Form 1- Allahabad State university at Saraswati High-Tech City, Naini, District- Allahabad Uttar Pradesh

S. Areas Name/ Aerial distance (within Identity No. 15km.) Proposed project location boundary  Kendriya Vidhyalaya -1.65 Km, NW  I.T.I, Naini -1.13 Km ,NW  ESI hospital -2.58 Km, NW  Durga Mandir -4.03 Km, NW 9 Areas occupied by Yes Many hospitals, schools, place sensitive man-made land Many hospitals, schools, place of worships &community uses (hospitals, of worships &community facilities are available schools, places of facilities are available worship, community Hospitals: Hospitals: facilities) ESI hospital 2.58 Km, NW

Jahangir memorial 5.53 Km, N

charitable hospital

Schools: Schools: Kendriya Vidhyalaya– 1.65 Km, NW Savitri Devi SLS Inter 4.72 Km, N college Dr. Murli Manohar 5.08 Km, N Joshi Inter college Places of Worship: Places of Worship: Durga Mandir 4.03 Km,NW Sai Mandir 3.93 Km, N Hanuman Mandir 3.56 Km, N Colleges: Colleges: I.T.I, Naini 1.13 Km ,NW United institute of 1.12 Km, S technology Sushant IT & 5.10 Km, N Management college Industries – Industries – - Electrical equipment - 2.41 Km,N manufacturer

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 17 Form 1- Allahabad State university at Saraswati High-Tech City, Naini, District- Allahabad Uttar Pradesh

S. Areas Name/ Aerial distance (within Identity No. 15km.) Proposed project location boundary 10 Areas containing Yes important, high quality or Surface Water Resources: scarce resources Ganga river 3.16 Km, E (Ground water Yamuna river 7.06 Km N resources, surface Tons river (largest 17.97 Km, NE resources, forestry, tributary of Yamuna)- agriculture, fisheries,

tourism, minerals) Ground water resources;- Tubewell

11 Areas already subjected No There will be no adverse to pollution or impact from proposed project. environmental damage. (Those where existing legal environmental standards are exceeded) 12 Areas susceptible to No The seismic hazard map of natural hazard which India was updated in 2000 by could cause the the Bureau of Indian Standards project to present (BIS). The Allahabad city is environmental problems (Earthquakes, located in the seismic Zone III subsidence, landslides, with majority of the portion erosion, flooding or having provision of earthquake extreme or adverse resistance in construction. climatic conditions) Suitable seismic coefficients in horizontal and vertical directions respectively will be adopted while designing the structures. There are no possibilities of the proposed project site getting flooded as per records available.

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 18 Form 1- Allahabad State university at Saraswati High-Tech City, Naini, District- Allahabad Uttar Pradesh

(IV)Proposed Terms of Reference for EIA Studies “I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.

Date: 01.01.2018 Place:Naini, Allahabad

(Authorized Signatory)

Environmental Consultant- M/s Sawen Consultancy Services Pvt. Ltd., Lucknow 19