Tender for Construction of Substation Civil Works In

Total Page:16

File Type:pdf, Size:1020Kb

Tender for Construction of Substation Civil Works In Tender for Construction of Substation Civil Works in Bintulu Region (Bintulu Town, Tatau, Kuala Tatau, Sebauh, Ulu Sebauh, Samalaju, Sg Asap, Bakun, Murum, Belaga and Inclusive All Outstation Areas Under Bintulu Jurisdiction) (TENDER REF. NO.: BTU 2/2021/SS) TENDER NOTICE Suitably qualified tenderers are invited for the Tender for Construction of Substation Civil Works in Bintulu Region (Bintulu Town, Tatau, Kuala Tatau, Sebauh, Ulu Sebauh, Samalaju, Sg Asap, Bakun, Murum, Belaga and Inclusive All Outstation Areas Under Bintulu Jurisdiction) stated as follows: Tender Reference No. Title Eligibility Tender for Construction of Substation Civil Works in • UPK under Works, Class D or above, Head I Sub- Bintulu Region (Bintulu Town, Tatau, Kuala Tatau, Sebauh, Head 1, Head II Sub-Head 2, and BTU 2/2021/SS Ulu Sebauh, Samalaju, Sg Asap, Bakun, Murum, Belaga • CIDB Grade G2 or above, Category CE21 and B04 and Inclusive All Outstation Areas Under Bintulu • past project experience Jurisdiction) Instruction to Tenderers: Mandatory Requirement Tenderers shall possess adequate financial capability and experience as follows: • UPK under Works, Class D or above, Head I Sub-Head 1, Head II Sub-Head 2, and • CIDB Grade G2 or above, Category CE21 and B04 • past project experience *Interested tenderers are required to produce evidence of fulfilling above-mentioned mandatory requirement. Failing which, your intention will be rejected. General Instructions 1. This tender exercise will be conducted on an online Ariba platform. The entire event will be managed by SEPRO (Sarawak Energy e-Procurement) Team. Tender details are available for viewing at https://etender.sarawakenergy.com/etender/notice/notice.jsp 2. Please note that all Tenderers are required to register in SEPRO to participate in this tender. If your company is not registered in SEPRO, please allow ample time to complete registration. Vendors can self-register to SEPRO via the URL provided: http://bit.ly/register2SEPRO. The registration is free of charge. 3. Interested Tenderer that meets the eligibility is required to do the following steps: A) Email your interest to participate for this tender exercise to [email protected]. Please include the following details: • Tender Reference: • Tender Title: • Company Contact Person: • Company Name: • Phone Number: • Email Address: • (Attach all softcopy of evidence for mandatory requirement) 4. Tender documents can only be accessible to the Tenderer after registration. A) SEPRO team will acknowledge receipt upon receiving your email on interest to participate. If you have any inquiries on SEPRO please contact us at the following channel: • Email: [email protected] • Phone: 082-330127 Monday to Thursday : 9.00am – 1.00pm and 2.00pm – 4.00pm Friday : 9.00am – 11.30am and 2.30pm – 4.00pm Note: Sarawak Energy Berhad is not liable for any cost incurred by the Tenderer in preparing the tenders. Intent to participate will close 2 days prior the tender closing date and time Tender submission shall be submitted online through SEPRO system no later than 3:00 p.m. (Malaysia Local Time) on the date specified below. Tender Reference Number Closing Date Closing Time BTU 2/2021/SS Wednesday, 3rd March 2021 3:00 PM All enquiries regarding the Tender should be addressed to: Distribution Department Sarawak Energy Berhad, Bintulu Regional Office Jalan Pisang Emas, 97000 Bintulu, Sarawak Attention: Senior O&M Manager (Distribution Department) T: +6086 331 151 F: +6086 335 096 Email : [email protected] INTRODUCTION 1. Purpose The purpose of this tender process is to procure tender offers from contractors to perform all works required in connection with tender for construction of substation civil works in Bintulu Region (Bintulu Town, Tatau, Kuala Tatau, Sebauh, Ulu Sebauh, Samalaju, Sg Asap, Bakun, Murum, Belaga and inclusive all outstation areas under Bintulu jurisdiction). 2. Background Sarawak Energy is wholly-owned by the state government of Sarawak and is responsible for the generation, transmission and distribution of electricity to industrial and residential customers within Sarawak. Sarawak Energy has a proud history of more than 70 years of service to the Sarawak community and now provides electricity to more than 500,000 account holders. In recent years, Sarawak Energy has made strong progress on an exciting transformation journey, focused on harnessing the state’s abundant energy resources in hydropower, natural gas and coal to create new opportunities for the Sarawak community. With firm plans for further rapid growth, Sarawak Energy is on track to become the leading producer of renewable energy in South East Asia. By supporting the state government’s Sarawak corridor of renewable energy or score program, Sarawak Energy is helping our community reach the goal of becoming a high-income state by 2020. 3. Commercial basis for tender offers Tender offers shall be submitted in accordance with the requirements set out in the tender documents. The conditions of contract are based upon Sarawak Energy’s standard terms and supported by contract appendices that collectively set out and describe Sarawak Energy’s requirements for the works. This is an Annual Contract. DESCRIPTION / SPECIFICATIONS (I) The Works to be provided by Annual Contractor include the following: • Construction of brick walled type substation; • Construction of chain link fencing type substation; • Construction of transformer and switchgear foundation; • Construction of concrete bases for LT pillar and metering unit; • Earth filling and turfing for the substation site; • Construction of access road and concrete walkway crossing and; • Minor civil repair work in Bintulu Region. (Bintulu Region covers Bintulu Town, Tatau, Kuala Tatau, Sebauh, Samalaju, Sg Asap, Bakun, Murum, Belaga and all outstation areas under Bintulu jurisdiction) • Zone A (Bintulu Town) • Zone B (Sebauh, Ulu Sebauh, Tatau, Kuala Tatau & Samalaju) • Zone C (Sg. Asap, Bakun, Murum & Belaga) (II) Penalties The following penalties shall be imposed by the Company on the Contractor for failing to comply with the Contract Specifications and requirements. The penalty monies shall be deducted from monies due or which may become due to the Contractor. (a) Work progress/completion target The Contractor shall complete the works within the agreed completion period failing which a penalty of RM100.00 per day per location for the number of days. (b) Clearance of site upon job completion The Contractor shall clear away and remove all debris immediately after completion, failing which the Company shall impose a penalty charge of RM200.00 per incident. (c) Submission of monthly work reports and checklists The Company will impose the following penalties for failure to submit the monthly work reports and checklists as follow: • RM50.00 per day for the first 5 days after the due date. • RM150.00 per day for the next consecutive 10 days. • Forfeit the whole monthly contract charges if no report is received 15 days after the due date. (d) Failure to attend mandatory safety briefing by the Company for any new worker assigned to perform the contract works shall impose RM 200.00 per person. (e) Noncompliance Noncompliance with all the applicable legal requirements of Malaysia (Sarawak), local authority regulations, SEB’s safety rules, SEB’s life saving rules and instruction shall subject the Contractor to the following actions from the Company: I. For first noncompliance, SEB shall issue a letter of warning and the Contractor shall implement the corrective actions within the specified period of time. II. For first repeating noncompliance or failure in implementing the required corrective action within the specified period of time given in (i), the Contractor shall be issued with a second warning letter and a fine not exceeding Five Thousand Ringgit Malaysia (RM5,000) for every noncompliance or failure in implementing the required corrective action within the specified period. SEB shall determine and deduct the actual amount of the penalty from the Contractor’s contract payment claim. III. For the second repeating noncompliance or failure in implementing the required corrective action within the specified period of time given in (ii), the Contractor shall be issued with a letter of final warning and a fine not exceeding Fifty Thousand Ringgit Malaysia (RM50,000) for every noncompliance or in implementing the required corrective action within the specified period. SEB shall determine and deduct the actual amount of the penalty from the Contractor’s contract payment claim. IV. For the third repeating noncompliance or failure in implementing the required corrective action within the specified period of time given in (iii), the contract with the Contractor shall be terminated. .
Recommended publications
  • Anti-Inflammatory Potential of Hexane Extract of Mud Lobster (Thalassina Anomala) in Lipopolysaccharide-Stimulated RAW 264.7 Macrophages
    Anti-Inflammatory Potential of Hexane Extract of Mud Lobster (Thalassina anomala) in Lipopolysaccharide-Stimulated RAW 264.7 Macrophages Authors: Nur Nadiah Zakaria, Masnindah Malahubban, Sharida Fakurazi, Wong Sie Chuong and Amy Halimah Rajaee* *Corresponding author: [email protected] DOI: https://doi.org/10.21315/tlsr2021.32.1.9 Highlights • All samples collected from Kuala Tatau, Bintulu; Kuala Balingian, Mukah and Sarikei were identified as Thalassina anomala. • The hexane extract of T. anomala exhibits anti-inflammatory potential in LPS-stimulated RAW 264.7 macrophages. • The non-polar compounds detected in the hexane extract of T. anomala by GC-MS analysis revealed 19 putative metabolites which may contribute to the anti-inflammatory activities. TLSR, 32(1), 2021 © Penerbit Universiti Sains Malaysia, 2021 Tropical Life Sciences Research, 32(1), 145–162, 2021 Anti-Inflammatory Potential of Hexane Extract of Mud Lobster (Thalassina anomala) in Lipopolysaccharide-Stimulated RAW 264.7 Macrophages 1Nur Nadiah Zakaria, 1Masnindah Malahubban, 3Sharida Fakurazi, 2Wong Sie Chuong and 1,4Amy Halimah Rajaee* 1Department of Animal Science and Fishery, Faculty of Agricultural Science and Forestry, Universiti Putra Malaysia Bintulu Sarawak Campus, 97000 Bintulu, Sarawak, Malaysia 2Department of Science and Technology, Faculty of Humanities, Management and Science, Universiti Putra Malaysia Bintulu Sarawak Campus, 97000 Bintulu, Sarawak, Malaysia 3Department of Human Anatomy, Faculty of Medicine and Health Sciences, Universiti Putra Malaysia, 43400 UPM Serdang, Selangor, Malaysia 4Halal Products Research Institute, Universiti Putra Malaysia, Putra Infoport, 43400 UPM Serdang, Selangor, Malaysia Publication date: 31 March 2021 To cite this article: Nur Nadiah Zakaria, Masnindah Malahubban, Sharida Fakurazi, Wong Sie Chuong and Amy Halimah Rajaee.
    [Show full text]
  • The Sarawak Rivers Ordinance, 1993
    For Reference Only THE SARAWAK RIVERS ORDINANCE, 1993 THE SARAWAK RIVERS (TRAFFIC) REGULATIONS, 1993 [Swk. L.N. 130/93] ARRANGEMENT OF REGULATIONS PART I INTRODUCTION Regulation 1. Citation and commencement 2. Interpretation PART II REGULATION OF RIVERINE TRAFFIC 3. Side of river to be taken 4. Ferry boats 5. Vessels to slacken speed when rounding sharp bends and when meeting sailing vessels, etc. 6. Navigation of vessel in unsafe or dangerous condition 7. Vessels not to tow vessels in line or abreast nor rafts over a certain size 8. Vessels to be properly manned and a proper look-out to be kept 9. Goods not to be shipped or unshipped into or from craft without permission 10. Speed limit 11. Movement of traffic 12. Distress signals 13. Fog and bad visibility signals 14. Sailing vessels and vessels navigable by oars or paddles 15. Safety of vessels 16. Damage by wash 17. Obstruction PART III ANCHORING, MOORING AND BERTHING 18. Anchorage 19. Loss of anchor, etc. 20.SarawakDischarge of goods and passengers LawNet 21. Securing of vessel before discharge of goods and passengers For Reference Only Regulation 22. Responsibility of master of vessel 23. Lights and signals 24. Control of anchorage area, wharf, etc. 25. Wharf fees 26. Supply of fresh water to vessels 27. No obstruction to be placed to any inside passage or ferry 28. Vessel not to remain at Government wharves more than two hours PART IV WHARVES 29. Wharves 30. Application for authorisation 31. Authorisation for wharf 32. Suspension and withdrawal PART V PERMITS FOR RIVERINE TRANSPORT 33.
    [Show full text]
  • Kod Dan Nama Sempadan Pentadbiran Tanah (Unique Parcel Identifier – Upi)
    KOD DAN NAMA SEMPADAN PENTADBIRAN TANAH (UNIQUE PARCEL IDENTIFIER – UPI) Jawatankuasa Teknikal Standard MyGDI (JTSM) 2011 i KOD DAN NAMA SEMPADAN PENTADBIRAN TANAH Hakcipta terpelihara. Tidak dibenarkan mengeluar ulang mana-mana isi kandungan buku ini dalam apa jua bentuk dan dengan cara apa jua sama ada secara elektronik, fotokopi, mekanik, rakaman atau cara lain sebelum mendapat izin bertulis daripada : Urus setia Jawatankuasa Teknikal Standard MyGDI (JTSM) Pusat Infrastruktur Data Geospatial Negara (MaCGDI) Kementerian Sumber Asli & Alam Sekitar Cetakan Pertama 2012 Diterbit dan dicetak di Malaysia oleh Pusat Infrastruktur Data Geospatial Negara (MaCGDI) Kementerian Sumber Asli & Alam Sekitar Tingkat 7 & 8, Wisma Sumber Asli No. 25 Persiaran Perdana, Presint 4 62574 Putrajaya Tel : 603-8886 1111 Fax : 603-8889 4851 www.mygeoportal.gov.my ii KOD DAN NAMA SEMPADAN PENTADBIRAN TANAH KANDUNGAN PERKARA MUKA SURAT 1.0 Tujuan 1 2.0 Latar Belakang 2.1 Pengenalan 1 2.2 Langkah Awal Penyelarasan 1 2.3 Rasional Penyelarasan Kod UPI 2 2.4 Faedah Penyelarasan Kod UPI 2 2.5 Kaedah Penyelarasan Kod dan Nama Sempadan 3 Pentadbiran Tanah 3.0 Penerangan Mengenai Struktur Kod UPI di Sarawak 7 4.0 Pembangunan Aplikasi UPI 4.1 Modul-modul Aplikasi UPI 9 4.2 Kaedah untuk Melayari Aplikasi UPI 11 5.0 Penutup 17 Lampiran : Senarai Kod dan Nama Sempadan Pentadbiran Tanah bagi Negeri Sarawak o Peta Malaysia – Negeri Sarawak 20 o Peta Negeri Sarawak – Bahgaian-bahagian o Bahagian Kuching 21 o Bahagian Sri Aman 22 o Bahagian Sibu 23 o Bahagian Miri 24 o Bahagian Limbang 25 o Bahagian Sarikei 26 o Bahagian Kapit 27 o Bahagian Samarahan 28 o Bahagian Bintulu 29 o Bahagian Mukah 30 o Bahagian Betong 31 o Glosari iii KOD DAN NAMA SEMPADAN PENTADBIRAN TANAH 1.0 TUJUAN Dokumen ini diterbitkan sebagai sumber rujukan kepada agensi dalam menentukan senarai Kod dan Nama Sempadan Pentadbiran Tanah yang seragam bagi semua negeri di Malaysia.
    [Show full text]
  • Enr 3.5 Other Routes
    AIP MALAYSIA ENR 3.5 - 1 ENR 3.5 OTHER ROUTES 1 KUALA LUMPUR TERMINAL AREA - VFR ROUTES SYSTEM 1.1 Introduction 1.1.1 VFR routes are provided to allow transit through the Kuala Lumpur CTR, VFR access to SAAS Subang Airport and helicopter VFR access routes to KLIA Sepang. 1.1.2 Simpang is served directly by a VFR route. 1.1.3 VFR routes apply only to controlled airspace. However VFR routes are described from/to the first significant visual fix outside controlled airspace. 1.2 Route description 1.2.1 VFR Route 1 : VFR Route 1 is a coastal route providing transit through the CTR. Route description: Kuala Selangor - 1 500 FT - Track west of coastal road - Port Klang -1 500 FT - Morib - 1 000 FT - Track coastal over water - Tanjong Sepat - 1 000 FT - Track coastal over water - Port Dickson. Airspace classification: C Hour of operation: HJ Note : VFR traffic between Port Klang and Port Dickson may be held enroute subject to disposition of KLIA traffic. 1.2.2 VFR Route 2 : VFR Route 2 is an inland route providing transit through the CTR . Route description: Serendah - 2 000 FT - Rawang - 2 000 FT - Batu Caves - 2 000 FT - Simpang - 2 000 FT- Kajang - 2 000 FT - Mantin - 1 900 FT - Seremban - 1 900 FT - Pedas. Airspace classification: C Hour of operation: HJ 1.2.3 VFR Route 3 : VFR Route 3 is an inland route providing access across the central mountain range to VFR route 2. Route description: Bentong - 3 000 FT - Track via Highway - Batu Caves.
    [Show full text]
  • Issues and Problems Faced by Rural Farmers in Paddy Cultivation: a Case Study of the Iban Paddy Cultivation in Kuala Tatau, Sarawak
    ISSN 2549-3922 EISSN 2549-3930 Journal of Regional and Rural Development Planning Juni 2017, 1 (2): 174-182 Issues and Problems Faced by Rural Farmers in Paddy Cultivation: A Case Study of the Iban Paddy Cultivation in Kuala Tatau, Sarawak Daniel Ugih Echoh1, Norizan Md Nor1, Salfarina Abdul Gapor2 & Tarmiji Masron3 1School of Humanities, Universiti Sains Malaysia, 11800 Penang, Malaysia; 2School of Built Environment, University College of Technology Sarawak, 96000 Sibu, Sarawak; 3Faculty of Social Sciences Universiti Malaysia Sarawak. 94300 Kota Samarahan, Sarawak. *Corresponding author, e-mail: [email protected] (Received: 9 May 2017; Accepted: 19 July 2017) ABSTRACT Rice is an important staple food in Asia. However, modernization and rapid development have reduced and threatened the practice, especially maintaining traditional hill rice cultivation, as in this case study by the Iban in Kuala Tatau located in the largest state in Malaysia, called Sarawak. It is important to understand the problems and challenges of this issue to ensure food security among the rural population in Sarawak, particularly the Iban. Therefore, this paper aims to discuss the issues and problems faced by rice farmers in Kuala Tatau, Sarawak. The respondents were Iban farmers in Kuala Tatau; named Sungai Semanok and Kuala Serupai, were selected as it is at a great distance from urban areas named Bintulu, and they still practices paddy cultivation. For the purpose of obtaining the data, qualitative research methods through in-depth interview techniques, group discussion and observation were utilized and the data were analyzed using content analysis. The results showed that the rice sector faced major problems such as the decrease of the number of farmers and a weak system in the distribution of subsidies.
    [Show full text]
  • Tropical Agricultural Science
    Pertanika J. Trop. Agric. Sc. 42 (1): 209 - 223 (2019) TROPICAL AGRICULTURAL SCIENCE Journal homepage: http://www.pertanika.upm.edu.my/ Length-weight and Morphometric Analysis of Mud Lobster, Thalassina anomala from Sarawak, Malaysia Zakaria Nur-Nadiah1, Masnindah Malahubban1, Sharida Fakurazi2, Sie Chuong Wong3 and Amy Halimah Rajaee1* 1Department of Animal Science and Fishery, Faculty of Agriculture and Food Sciences, Universiti Putra Malaysia Bintulu Sarawak Campus, 97008 Bintulu, Sarawak, Malaysia 2Department of Human Anatomy, Faculty of Medicine and Health Sciences, Universiti Putra Malaysia, 43400 Serdang, Selangor, Malaysia 3Department of Basic Science and Engineering, Faculty of Agriculture and Food Sciences, Universiti Putra Malaysia Bintulu Sarawak Campus, 97008 Bintulu, Sarawak, Malaysia ABSTRACT Mud lobsters (Thalassina spp.) are nocturnal organisms, belong to Order Decapoda which are lesser known and least studied although their presence were widely distributed across the Indo-West Pacific Region. Mud lobster is considered as an important organism in the mangrove ecosystem for its burrowing activities and the role of its mounds or burrows as home to other animals. All mud lobster samples collected from four distinct regions in Sarawak (Kuala Tatau, Kuala Balingian, Sarikei and Lingga) were identified asThalassina anomala based on the morphological characteristics. Morphometric variations between sexes of T. anomala were examined. Sexual dimorphism can be observed where males had significantly longer carapace length, left chelae propodus length and larger left chelae propodus width compared to females (p<0.05). Meanwhile, sexual dimorphism can also be seen in the abdominal width, in which it was significantly larger in females, for both absolute values (p<0.01) and also the relative values (p<0.001).
    [Show full text]
  • Task Division Amongst the Iban Farming Community Within Men and Women in Kuala Tatau, Sarawak, Malaysia
    ISSN 2039-2117 (online) Mediterranean Journal of Social Sciences Vol 6 No 4 S3 ISSN 2039-9340 (print) MCSER Publishing, Rome-Italy August 2015 Task Division amongst the Iban Farming Community within Men and Women in Kuala Tatau, Sarawak, Malaysia Daniel Ugeh U.1 Salfarina Abdul Gapor2 Novel Lyndon3 Mohd. Nor Shahizan Ali4 Sivapalan S. Selvadurai5 1 Research Officer, School of Social Sciences, Universiti Sains Malaysia; [email protected] 2 Associate Professor, School of Built Environment, University College of Technology Sarawak, Malaysia; [email protected] 3 Associate Professor, Faculty of Social Sciences and Humanities, Universiti Kebangsaan Malaysia; [email protected] 4 Senior Lecturer, Faculty of Social Sciences and Humanities, Universiti Kebangsaan Malaysia; [email protected] 5 Associate Professor, Faculty of Social Sciences and Humanities, Universiti Kebangsaan Malaysia; [email protected] Doi:10.5901/mjss.2015.v6n4s3p136 Abstract Gender issues have always been the centre of attention when it comes to the study of farming activities in rural areas.This article aims to study the task division amongst the Iban men and women farmers in the dry rice paddy fields by the coast of Kuala Tatau, Sarawak. The method chosen in the course of this study was the qualitative research method by interviewing and discussing amongst focus groups and also observing the farmers in Sungai Semanok and Kuala Serupai. The outcome of this study was that most women worked full time in the paddy fields, whereas men work part time as contract workers to support the family’s household expenses. The men would only help the women when performing physical demanding tasks such as spraying pesticides in large quantity, transporting large amount of paddy, performing the manggul1ritual and paddy harvesting.
    [Show full text]
  • (06 JULAI 2021) 1. LAPORAN HARIAN A. Status Kes COVID-19 Di
    Kenyataan Media JPBN Bil 187/2021 JAWATANKUASA PENGURUSAN BENCANA NEGERI SARAWAK KENYATAAN MEDIA (06 JULAI 2021) 1. LAPORAN HARIAN A. Status Kes COVID-19 Di Dalam Wad Hospital Dan Masih Di PKRC. Hari ini terdapat 371 kes baharu yang telah pulih dan dibenarkan discaj pada hari ini iaitu: • 108 kes dari Hospital Umum Sarawak dan PKRC di bawah Hospital Umum Sarawak; • 70 kes dari Hospital Bintulu dan PKRC di bawah Hospital Bintulu; • 42 kes dari Hospital Sibu dan PKRC di di bawah Hospital Sibu; • 37 kes dari Hospital Miri dan PKRC di bawah Hospital Miri; • 36 kes dari Hospital Sri Aman dan PKRC Sri Aman; • 26 kes dari PKRC Serian; • 19 kes dari PKRC Mukah; • 17 kes dari Hospital Sarikei dan PKRC di bawah Hospital Sarikei; • 12 kes dari Hospital Kapit dan PKRC di bawah Hospital Kapit; • 2 kes dari PKRC Betong; • 1 kes dari PKRC Lawas; dan • 1 kes dari Hospital Limbang. 1 Kenyataan Media JPBN Bil 187/2021 Ini menjadikan jumlah keseluruhan kes positif COVID-19 yang telah pulih atau dibenarkan discaj setakat hari ini adalah seramai 56,745 orang atau 84.35% dari jumlah keseluruhan kes COVID-19 di Sarawak. Jumlah kes aktiF yang masih mendapat rawatan dan diasingkan di PKRC dan wad hospital mengikut hospital rujukan adalah seramai 9,950 orang. B. Kes Baharu COVID-19. Hari ini terdapat 286 kes baharu COVID-19 dikesan. Sejumlah 199 atau 69.58 peratus daripada jumlah kes ini telah dikesan di lima (5) buah daerah iaitu di Daerah Kuching, Subis, Miri, Sibu dan Bintulu. Daerah-daerah yang merekodkan kes pada hari ini ialah daerah Kuching (85), Subis (50), Miri (32), Sibu (21), Bintulu (11), Saratok (11), Serian (11), Song (8), Asajaya (8), Sri Aman (7), Kapit (7), Bau (5), Bukit Mabong (5), Telang Usan (5), Tatau (4), Samarahan (4), Kanowit (3), Sarikei (2), Tanjung Manis (2), Simunjan (1), Selangau (1), Meradong (1), Beluru (1) dan Lundu (1).
    [Show full text]
  • Vfr Routes System
    AIP MALAYSIA ENR 3.5-1 16 AUG 2018 ENR 3.5 OTHER ATS ROUTES 3.5.1 KUALA LUMPUR TERMINAL AREA -VFR ROUTES SYSTEM 3.5.1.1 Introduction 3.5.1.1.1 VFR routes are provided to allow transit through the Kuala Lumpur CTR, VFR access to Subang/Sultan Abdul Aziz Shahand helicopter VFR access routes to KL International / Sepang 3.5.1.1.2 Simpang is served directly by a VFR route. 3.5.1.1.3 VFR routes apply only to controlled airspace. However VFR routes are described from/to the first significant visual fix outside controlled airspace. 3.5.1.2 Route description 3.5.1.2.1 VFR Route 1: VFR Route 1 is a coastal route providing transit through the CTR. Route description: Kuala Selangor - 1 500 FT - Track west of coastal road - Port Klang -1 500 FT - Morib -1 000 FT - Track coastal over water - Tanjong Sepat - 1 000 FT - Track coastal over water - Port Dickson. Airspace classification: C Hours of operation: HJ Note: VFR traffic between Port Klang and Port Dickson may be held enroute subject to disposition of KLIA traffic. 3.5.1.2.2 VFR Route 2: VFR Route 2 is an inland route providing transit through the CTR. Route description: Serendah - 2 000 FT - Rawang - 2 000 FT - Batu Caves - 2 000 FT - Simpang - 2 000 FT - Kajang - 2 000 FT - Mantin - 1 900 FT - Seremban - 1 900 FT - Pedas. Airspace classification: C Hours of operation: HJ 3.5.1.2.3 VFR Route 3: VFR Route 3 is an inland route providing access across the central mountain range to VFR route 2.
    [Show full text]
  • Using Free and Paid Digital Tools to Optimize Project Management
    Using Free and Paid Logarajah Thambyrajah Digital Tools to Optimize PMP Project Management Project Management Institute Malaysia Chapter PMIMY Morning Talk 25th May 2019 Lessons Learned Sharing 10am to 12noon Session Relationship skills • Communicate progress with actionable reports • Managing local cultures and practices • Conflict management between partners and clients Delivering to changes Lessons • Managing scope creep, stakeholder expectations • Managing costs to delivery requirements • Manage resources to fit changed work operating Learned environment Nail down processes • Question everything. • “What exactly is required?, “Why must be done this way?”, Propose alternatives. • Check by asking “Show me”. Be at Ground Zero. Accurate Reporting • Stakeholder Management • Tracking Schedule and Delivery Schedule Compression Digital Tools • Delivering to Changes • Acquisition, Phase Readiness, Deployments, RFS, - Goals UAT Control Costs • Collapsed traditional processes with digital processes • Replace agencies with qualified free agents (gigs) Collapsing and Digitalizing Processes with Ishikawa / Fishbone Diagram Total Inputs Method Machine Man Material Deliverable (e.g. Work Package) Time Money Total Cost Accessibility Issue to Greenfield Sites Digitalizing Processes - Digitalizing Site Surveys Industry Standard Process Method Machine Man Material Use Crane to get height Crane Crane Operator Balloons to do LOS Studies 4WD LOS Site Surveyor Access Road for Heavy Cranes DSLR Site Acquirer Garmin GPS Scheduler Suitable Site Time Money Digital
    [Show full text]
  • Malaysian Palm
    A cleared peat forest to be developed into an oil palm plantation in Betong Division, Sarawak. social justice, forests & agrofuels malaysian palm oil - green gold or green wash? a commentary on the sustainability claims of malaysia’s palm oil lobby, with a special focus on the state of sarawak october 2008 | issue 114 England, Wales & Northern Ireland Europe International malaysian palm oil - green gold or green wash? a commentary on the sustainability claims of malaysia’s palm oil lobby, with a special focus on the state of sarawak malaysian palm oil - e m i t green gold or green wash? s m a e r a commentary on the sustainability claims of malaysia’s d / h o t palm oil lobby, with a special focus on the state of sarawak n a u g g october 2008 | issue 114 n e h International k © friends of the earth international is the world’s largest grassroots environmental network, uniting 69 diverse national member groups and some 5,000 local activist groups on every continent. With approximately 2 million members and supporters around the world, we campaign on today’s most urgent social and environmental issues. We challenge the current model of economic and corporate globalization, and promote solutions that will help to create environmentally sustainable and socially just societies. our vision is of a peaceful and sustainable world based on societies living in harmony with nature. We envision a society of interdependent people living in dignity, wholeness and fulfilment in which equity and human and peoples’ rights are realized. This will be a society built upon peoples’ sovereignty and participation.
    [Show full text]
  • Pur 21/16 Nr
    SARAWAK ENERGY BERHAD From: Distribution Procurement & Contract Division Distribution Department Kuching 93050 Sarawak Malaysia Our Ref.: PUR 7/17/OCY Date: 1st March 2017 To: UPK Registered Tenderers Head VIIB, Class IV or above, Sub-Head 2d or above and CIDB G3 or above, Category ME (E04 & E05) Menara Sarawak Energy, No. 1, The Isthmus, 93050 Kuching, Sarawak Dear Sir/Madam, TENDER FOR STREET LIGHTING MAINTENANCE IN BINTULU, BINTULU REGION TENDER REF.: PUR 7/17 You are cordially invited to tender for services listed in the attached schedule. Please refer to Tender Document for the instructions & conditions to tender. Tenders are to be submitted in sealed plain envelope marked: 1. “CONFIDENTIAL” – TENDER FOR STREET LIGHTING MAINTENANCE IN BINTULU, BINTULU REGION 2. Tender Ref. : PUR 7/17 3. Closing date and time : 29th March 2017 at 3.00 p.m. 4. Warning: Do Not Open Before The Closing Date And Time addressed to: The Chief Executive Officer, Sarawak Energy Berhad, c/o The Officer-In-Charge, Tender Box, Level 1 (Ground Floor) North Wing, No. 1, The Isthmus, Menara Sarawak Energy 93050 Kuching, Sarawak. or hand-delivered to: The Officer-In-Charge Tender Box, Level 1 (Ground Floor) North Wing, No. 1, The Isthmus, Menara Sarawak Energy, 93050 Kuching, Sarawak. Sarawak Energy Berhad. and to reach the Tender Box addressed above on or before: 29th March 2017 at 3.00 p.m. Yours faithfully, Leonora Liong Peh Ling for CHIEF EXECUTIVE OFFICER Tender For Street Lighting Maintenance In Bintulu, Bintulu Region INSTRUCTIONS TO PERSONS TENDERING 1. The Tenderer must be a registered Contractor with the following:- a) UPK under Works Head VIIB, Class IV or above under the following sub-heads; • 2d (for Overhead Lines works up to 415V) or above and b) CIDB Grade G3 or above, Category ME (E04 & E05) Tenderers are required to submit proof of UPK and CIDB registrations together with their tender submission.
    [Show full text]