VSL News 2006 Issue 2

Total Page:16

File Type:pdf, Size:1020Kb

VSL News 2006 Issue 2 VSLNews2-2006 29/11/06 17:39 Page 1 NEWS THE VSL NEWS MAGAZINE • ISSUE TWO 2006 VSL & PARTNERSHIPS Attractive network for business ETA for VSL Casino in Macao VSLNews2-2006 29/11/06 17:39 Page 2 SUSTAINABLE DEVELOPMENT 4 SUSTAINABLE Global issues at local level: VSL objectives to help ensure sustainable development 4 DEVELOPMENT 4 FACTS&TRENDS 6 Protection of critical assets: New tests for Ductal® 6 Tanks: Cryogenic success in Fujian, China 7 PARTNERSHIPS COVER STORY 8 8 VSL and partnerships: Attractive network for business Some of VSL’s new trump cards for relevant services: JV partnerships recently signed… SITE INSIGHTS 14 Australia: Gateway to alliance 14 Dubai: Record pace for world’s biggest mall 18 France: Landmark win for VSoL® 23 CORES 6 Chile: 30,000m2 distribution centre in Santiago 23 Hong Kong: Shatin T3 bridge nears completion 17 highlights FOCUS 24 European Technical Approval (ETA) for VSL post-tensioning systems This provides VSL with the most comprehensive range (from 1 to 55 strands) of ETA approved of the market. SLABS 21 TECH SHOW 27 Playing mega scale in Macao PRECAST 27 Venetian Macao Phase I is a large scale development to build another giant casino. For VSL, it is a large scale precast beam installation project Cover photo: the Venetian Macao Resort Hotel Phase I NEWS, magazine published by VSL International Ltd. • Bern, Switzerland and VSL • Challenger - Saint-Quentin-en-Yvelines, France. Director of Publication: Jean-Philippe Trin • [email protected] Editor in chief: Jane Rousseau • [email protected] Co-ordinators: Carlos Such, Renata Tamburrino, Doris Tong. Distribution: Sandra Puel • [email protected] Design: Red Line Photos: D. Allan, F-X. de Larminat, J. Roussseau, others. Copyright: VSL • VSLNews2-2006 29/11/06 17:39 Page 3 ISSUE TWO • 2006 EDITORIAL Sustainable development: our responsibility For over 50 years, VSL has made valuable contributions towards innovative and highly-efficient construction solutions focusing on raw material consumption (concrete, steel, etc.). Our local facilities spanning more than 40 countries and our training policy are both aimed at long-term sustainability, by promoting integration and economic development across many nations. The term sustainable development is in vogue today, but the prime focus needs to be placed on personal and collective responsibility. We must adapt our mode of operations and make the most of our team spirit inside the company to expand the approach and convert our broad-based drive for environmental protection into decisive actions. Sustainable development is more than a concept, it embodies a daily practice derived from a visionary objective and from the will to work for a future to preserve a high- quality planet for our children's sake. Jean-Philippe Trin VSLNews2-2006 29/11/06 17:39 Page 4 SUSTAINABLE DEVELOPMENT CONSTRUCTION AND SUSTAINABLE DEVELOPMENT Global issues at VSL is constantly reassessing its way of working and looking to best practice, quite simply to ‘be the best’. Sustainable development is already firmly on the agenda. During 2006 objectives have been developed. round the world, from developed areas of the world, and governments and industry is not enough to control the A to the public, there is a problem, especially in developing growing realisation that current areas. As development continues methods of development are and grows in intensity, new and unsustainable. In 1987 the UN larger problems will emerge. For successfully promoted the most example there simply is not widely used definition of enough fuel in the world for sustainable development countries like China and India use “Development which meets the cars like North America does. 4 needs of the present without The effects on the world of Asia’s compromising the ability of future recent demands for natural generations to meet their own resources can clearly be seen needs”. Current levels of resource (e.g. steel shortages). It has risks. For example consumer usage and wastage are placing to recently been reported that China’s boycotts due to poor performance high a burden on the planet. greenhouse gas emissions will risk corporate reputation. Globally we are not meeting the exceed the USA’s 20 years earlier Companies that anticipate changes needs of the present let alone than predicted. in resource availability and considering the future. acceptability of working practice New ways are in a stronger position. A part to play of doing business Leaders in business, government, We are using up our natural Higher energy costs, a growing academia, and communities are resources quicker than we are demand from consumers and providing innovative new solutions replenishing them. We face a governments are putting greater to sustainability issues. Large future that will be less secure. pressure on businesses to change. corporations, as well as small We all need to However, these businesses are going beyond legal reduce our Development which challenges are also compliance to conserve resources. environmental meets the needs of the opportunities to Perhaps the single most influential impact, not just improve factor that has emerged is the because it is the present without performance realization that waste reduction, right thing to do, compromising the ability through reduced energy efficiency, and pollution but also because of future generations to input costs, better prevention make economic sense. it is in our own “ external relations Companies are starting to meet their own needs long-term best and greater understand that sustainability (Definition used by UN and many interests. other organizations). innovation. involves more than ethical The standard In tomorrow's considerations - it improves the approaches in the past to the world, sustainability will more bottom line and is good business. environmental problems visibly impact on business generated by business have been performance.” Increasingly, social How to survive? legal driven "end-of-the-pipe" and environmental issues are an Sustainable Development is not a clean-up efforts. This approach area of risk for businesses new thing to VSL though it has not has had limited success in alongside traditional economic been called this before. Few NEWS N°2•2006 VSLNews2-2006 29/11/06 17:39 Page 5 t local level businesses survive for 50 years, as improving is even better. • Improving the capability of staff VSL has done, that have not As such during 2006 objectives to assist in designing already embraced aspects of have been developed to ensure and implementing sustainable sustainability. For example VSL that VSL is covering ‘the development initiatives; invests heavily in R&D and is fundamentals’, and targeting its • Auditing of suppliers on quality continually introducing new efforts. These include reducing and social issues; techniques (e.g. Pipeline impacts on the environment, • Initiating research projects Rehabilitation). employees and the wider focused on sustainable An important aspect of community. In particular the development; sustainability for VSL is being part following areas will be focused on • Encouraging reduction, reuse, of the local community. This has in 2007: recycling; been done by adopting a decentralized business model, which better meet the needs of local markets and allows greater flexibility in decision making. VSL 5 also produces high quality work, more safely and with less waste than its competitors, and of course VSL’s core activities reduce the resources used by clients and increase efficiency (e.g. prestressing, precasting). Additionally VSL also looks after its employees better than the norm especially in ‘terms and conditions’ (30 year service awards are not uncommon in VSL). They are also active in supporting charities (e.g. the Lighthouse Club Construction Charity in Hong Kong) and industry • Assessing customer • Providing educational support to development initiatives. satisfaction systematically employees and their families. and in relation to a wider Global issues range of business VSL operates in over 40 countries, at a local level concerns; employing 80 different Until now there has • Aiming to be a nationalities usually as a small or been no clear leader in health medium sized company. VSL is strategy in relation to & safety therefore in a position to some of the wider standards in all understand global issues at a local aspects of areas; level, and also local issues. This is sustainability such as • Improving the not something new, and is not a environmental impacts. ratio of women marketing slogan, it has been a The full power of the group in technical cornerstone of VSL’s success to network has not been used at and date. The new measures are the local level to address all operational simply expanding the scope of sustainability issues. Also roles; what is meant by ‘sustainable while VSL may be good, development’. ■ NEWS N°2•2006 VSLNews2-2006 29/11/06 17:39 Page 6 FACTS&TRENDS Geotechnics Long cores > Intrafor’s steerable long hole coring method is attracting considerable interest among tunnel designers in Hong Kong. It will be used to gather information about the complex geology of fault zones at the ends of a 5.5km-long drainage tunnel to be built from Tsuen Wan to Ting Kau. The advanced technology of horizontal directional coring will enable coreholes of 935m and 660m to be drilled from the portals across the fault zones. ■ Contact: [email protected] Ground engineering intrafor.com First project in the UAE Network > VSL is carrying out its first to 1,200mm. A BC40 cutter and five New Turkish 6 ground engineering project in the cranes were mobilised from Hong UAE, with Intrafor’s installation Kong and Perth. They will shortly of diaphragm walls for Burjuman be joined by a second cutter, an licensee station and a cut and cover tunnel MBC30. The project team has a as part of the new Dubai Metro. challenging task in installing Japan Turkey Metro JV has been 73,000m2 of diaphragm wall by building the metro since late 2005.
Recommended publications
  • Highways Infrastructure Transport—Footbridges/ Pedestrian Tunnels 6157TB Centre Street Escalator Link (Stage 1)
    CAPITAL WORKS RESERVE FUND (Payments) Sub- Approved Actual Revised head project expenditure estimate Estimate (Code) Approved projects estimate to 31.3.2018 2018–19 2019–20 ————— ————— ————— ————— $’000 $’000 $’000 $’000 Head 706—Highways Infrastructure Transport—Footbridges/ pedestrian tunnels 6157TB Centre Street escalator link (stage 1) ............ 60,700 53,409 910 482 6158TB Elevated walkway between Tong Ming Street and Tong Tak Street, Tseung Kwan O ....................................... 221,600 24,686 27,400 30,000 6162TB Extension of footbridge network in Tsuen Wan—Footbridge A along Tai Ho Road............................................. 183,850 165,063 854 524 6164TB Footbridge connecting Tsuen Wan Plaza, Skyline Plaza and adjacent landscaping area ...................................... 146,200 11,993 19,860 26,100 6167TB Provision of barrier-free access facilities at public footbridges, elevated walkways and subways— design works and phase 1 construction works ................................... 292,100 230,887 6,635 2,807 6168TB Lift and pedestrian walkway system at Waterloo Hill ....................................... 116,700 25,664 14,191 22,133 6169TB Lift and pedestrian walkway system at Cheung Hang Estate, Tsing Yi ............. 222,700 34,121 30,141 20,237 6173TB Extension of the CITIC Tower Footbridge to the Legislative Council Complex at Tamar ...................... 74,300 49,323 100 12,177 6175TB Lift and pedestrian walkway system between Kwai Shing Circuit and Hing Shing Road, Kwai Chung ............... 239,400 22,393 24,000 45,152 6178TB Lift and pedestrian walkway system between Castle Peak Road and Kung Yip Street, Kwai Chung ................. 584,400 — 200 84,017 6182TB Elevated pedestrian corridor in Yuen Long Town connecting with Long Ping Station .................................... Cat. B — — 88,830 † 6185TB Lift and pedestrian walkway system between Tai Wo Hau Road and Wo Tong Tsui Street, Kwai Chung ............................................
    [Show full text]
  • Global Reach, Endless Possibilities
    Global reach, endless possibilities China Hong Kong India Indonesia Japan Malaysia Philippines Singapore Thailand Vietnam www.aecom.com Building a better world. One AECOM AECOM has continuously expanded its expertise and portfolio of work since it was established in 1990. With all of its operating companies now united as One AECOM, the firm offers clients an integrated platform of services and spirit of collaborative excellence. AECOM is a global provider of professional, technical and management support services to a broad range of markets, including transportation, ENR – #1 Transportation facilities, environmental and energy. Growing from 3,000 employees in the United States in 1990 to & General Building; #3 over 44,000 worldwide today, AECOM is a Fortune 500 company that serves clients in more than Design Firms 24,000+ employees 100 countries and had revenue of US$6.1 billion during the 12-month period ending June 30, 2009. ENR - #1 General ENSR and EDAW joined AECOM is a leader in all of the key markets that it serves, and provides a blend of global reach, local Building; #3 Design AECOM ENR - #1 Pure Design, Firms knowledge, innovation, and technical excellence to deliver solutions that enhance and sustain the London 2012 Olympic Bid Transportation, Mass 13,800+ employees NASA Shuttle Recovery Transit/Rail, Airports, world’s built, natural, and social environments. Chicago Skyway Program Education, Government Dubai Festival City Noble Windfarms Offices, Transmission and Los Angeles Distribution and General Community College Building
    [Show full text]
  • Safe Community Tung Chung
    Safe Community Tung Chung Name of the Community: Tung Chung Country: China, Special Administrative Region Number of inhabitants: About 100,000 Programme started year: 2003 (designated in 2006) International Safe Communities Network Membership: Redesignation year: 2011 Info address on www for the Programme: No – being constructed and will be attached to the HK OSH Council For further information contact Mr. Leung Siu Tong Tung Chung Safe & Healthy City Shop 211, 2/F, Yat Tung Shopping Centre, Yat Tung (I) Estate, Tung Chung, N.T. Phone: (852) 35201575 Fax: (852) 35201574 E-mail: [email protected] Tung Chung Safe & Healthy City Project Background of Tung Chung Tung Chung situates at the northern part of the Lantau Island, the largest island in Hong Kong. It connects Kowloon with the New Territories South via Route 8 Expressway, linking the Airport, Tung Chung, Disneyland, Tsing Yi and Shatin. Tung Chung was a fishing village developed as part of the airport core program, and now becomes the hub of the Greater Pearl River Delta with the building of the Hong Kong-Zhuhai-Macau Bridge. As the most populated areas in Lantau and fastest growing town in Hong Kong, Tung Chung is also the Gateway to Hong Kong. The HK International Airport is just a few minutes away and Tung Chung serves as interchange for all transports to the famous scenery spots in Lantau, such as the Hong Kong Disneyland Resort, Buddha (Tian Tan Buddha), and the Ngong Ping 360 Cable Car. With the active pursuance of the Tung Chung Safe and Community and leadership of the District Councilors, more recreation facilities, public transport network, and healthcare infrastructure are set up, such as the new public library, cycling paths, herbal garden and the construction of the new North Lantau Hospital.
    [Show full text]
  • Legislative Council Panel on Transport
    LC Paper No. CB(1)1346/03-04(03) For Discussion on 26 March 2004 Legislative Council Panel on Transport Staffing Proposal related to the Hong Kong-Zhuhai-Macao Bridge Project PURPOSE This paper briefs Members on the Administration’s proposal to create two supernumerary posts of one Principal Government Engineer (PGE) (D3) and one Chief Engineer (CE) (D1); and to temporarily redeploy one permanent CE post in the Highways Department (HyD). We plan to submit the proposal to the Establishment Subcommittee (ESC) of the Finance Committee (FC) for consideration at its meeting on 28 April 2004. PROPOSAL 2. HyD needs to establish a project management office to take up the planning and implementation of the proposed Hong Kong-Zhuhai-Macao Bridge (HZMB) and related highway infrastructure projects. We propose to create two supernumerary posts of one PGE (D3) and one CE (D1); and to temporarily redeploy one permanent CE post of the Major Works Project Management Office (MWPMO) for a period of six years with effect from 1 July 2004 to plan and implement the HZMB and related highway infrastructure projects. Page 2 JUSTIFICATION Establishment of HZMB Project Management Office in HyD 3. In August 2003, an HZMB Advance Work Co-ordination Group (AWCG) was established by the governments of the Hong Kong Special Administrative Region (HKSAR), Guangdong and Macao Special Administrative Region to co-ordinate and take forward the advance work for the HZMB, including studies on alignment, environmental impact and hydrology. Director of Highways is one of the three representatives from the HKSAR sitting on the AWCG.
    [Show full text]
  • Head 6 — ROYALTIES and CONCESSIONS
    Head 6 — ROYALTIES AND CONCESSIONS Details of Revenue Sub- Actual Original Revised head revenue estimate estimate Estimate (Code) 2017–18 2018–19 2018–19 2019–20 ————— ————— ————— ————— $’000 $’000 $’000 $’000 020 Quarries and mining ........................................... 129,433 95,813 98,146 94,133 030 Bridges and tunnels ............................................ 2,301,464 2,775,043 2,466,554 2,512,884 070 Petrol filling ....................................................... 2,126 2,104 2,353 2,376 100 Parking ............................................................... 434,075 425,890 453,202 468,498 170 Vehicle examination .......................................... 50,044 53,391 51,431 51,431 201 Slaughterhouse concessions ............................... 29,001 28,300 28,447 28,447 202 Other royalties and concessions ......................... 295,814 296,492 303,715 345,475 ————— ————— ————— ————— Total ........................................................ 3,241,957 3,677,033 3,403,848 3,503,244 Description of Revenue Sources This revenue head covers royalties payable by franchised companies, revenue from government car parks, bridges and tunnels, petrol filling stations and various other royalties and concessions. Subhead 020 Quarries and mining covers royalties from quarry contracts and mining leases. Subhead 030 Bridges and tunnels covers royalties from the Tate’s Cairn Tunnel on or before 10 July 2018 and Discovery Bay Tunnel; revenue from Route 8 between Cheung Sha Wan and Sha Tin; and concessions payable by contractors assuming management responsibilities for the Aberdeen Tunnel, Kai Tak Tunnel, Lion Rock Tunnel, Shing Mun Tunnels, Tseung Kwan O Tunnel, the Tsing Ma Control Area, the Cross-Harbour Tunnel, the Eastern Harbour Crossing, and with effect from 11 July 2018, the Tate’s Cairn Tunnel. Subhead 070 Petrol filling covers royalties from three petrol filling stations of oil companies in Hong Kong.
    [Show full text]
  • Site a – Pok Hong Estate, Shatin Wai (Year 7 8 12 13) Route 1 Bus Stops
    Site A – Pok Hong Estate, Shatin Wai (Year 7 8 12 13) Route 1 Bus Stops: TIN KA PING PRIMARY SCHOOL, The Salvation Army Tin Ka Ping School, Sha Kok Street 田家炳學校, 救世軍田家炳學校, 沙角街 Route Information: 170 Sha Tin Station To Wah Fu (Central) Joint Operation of KMB & CTB , Time or day specific services 170 Sha Tin Station To Wah Fu (Central) Joint Operation of KMB & CTB 182 Yu Chui Court To Central (Macau Ferry) Joint Operation of KMB & CTB 47X Kwai Shing (East) To Chun Shek Kowloon Motor Bus 81K Sui Wo Court To Sun Tin Wai Kowloon Motor Bus 85A Kwong Yuen To Kowloon City Ferry Kowloon Motor Bus 89B Sha Tin Wai To Kwun Tong Railway Station Kowloon Motor Bus 982X Shui Chuen O Estate To Wan Chai (Hennessy Road) Joint Operation of KMB & CTB , Time or day specific services 982X YU CHUI COURT To Wan Chai (Hennessy Road) Joint Operation of KMB & CTB , Time or day specific services N170 Sha Tin Central (New Town Plaza) To Wah Fu (Central) Joint Operation of KMB & CTB N182 Kwong Yuen To Central (Macau Ferry) Joint Operation of KMB & CTB N281 Kam Ying Court To Hung Hom Station Kowloon Motor Bus NA41 SHA TIN (SHUI CHUEN O) To AIRPORT (GROUND TRANSPORTATION CENTRE) Long Win Bus Route 2 Bus Stops: POK TAI HOUSE, 博泰樓 Route Information: 288 SHUI CHUEN O To SHA TIN CENTRAL (CIRCULAR) Kowloon Motor Bus 288A SHUI CHUEN O To SHA TIN CENTRAL (CIRCULAR) Kowloon Motor Bus , Time or day specific services 682B Shui Chueu O Estate To Chai Wan (East) New World First Bus , Time or day specific services Route 3 Bus Stops: POK HONG B/T, Pok Hong Estate, Yat Tai Street 博康巴士總站,
    [Show full text]
  • Stonecutters Bridge – Latest Construction Challenges
    IABSE SYMPOSIUM WEIMAR 2007 Stonecutters Bridge – Latest Construction Challenges Steve KITE Iain HUBERT Christian VENETZ Associate Senior Deputy Project Manager Design Manager Arup Maeda – Hitachi – Yokogawa – VSL Hong Kong Ltd Hong Kong Hsin Chong JV Hong Kong [email protected] Hong Kong [email protected] [email protected] Summary Stonecutters Bridge will span 1018m across the Rambler Channel in Hong Kong providing 73.5m high clearance above the busy shipping channel. Construction commenced in early 2004. Upper tower construction from level +175m to +293m combines circular duplex stainless steel skin segments with carbon steel anchor boxes at the core and a concrete infill wall to form the composite structure. The 88m lengths of steel twin-box decks around the towers are over land. Individual deck segments were delivered to site by barge and offloaded using a frame cantilevering from the tower. After segment welding, a Heavy Lift operation is used to raise the 4000T decks by 75m, using strand jacks on temporary works supported from the towers and the concrete back spans. Transverse and longitudinal sliding operations are required for final positioning. Trial assembly of the steelwork components during fabrication in China ensures accurate fit up and geometry control during erection so that site operations are not hindered. Main span cantilevering and installation of the prefabricated parallel wire stay cables will follow. Keywords: cable-stayed bridge; composite construction; lifting scheme; twin-box deck 1. Introduction Stonecutters Bridge will form the centrepiece of Hong Kong’s latest infrastructure improvement, the new Route 8 - an alternative road to the international airport link, also providing enhanced access connections into the new container terminal on Tsing Yi Island.
    [Show full text]
  • Head 60 — HIGHWAYS DEPARTMENT
    Head 60 — HIGHWAYS DEPARTMENT Controlling officer: the Director of Highways will account for expenditure under this Head. Estimate 2007–08 .................................................................................................................................. $2,007.2m Establishment ceiling 2007–08 (notional annual mid-point salary value) representing an estimated 1 869 non-directorate posts as at 31 March 2007 rising by 103 posts to 1 972 posts as at 31 March 2008........................................................................................................................................ $605.3m In addition, there will be an estimated 34 directorate posts as at 31 March 2007 reducing by one post to 33 posts as at 31 March 2008. Commitment balance............................................................................................................................ $0.9m Controlling Officer’s Report Programmes Programme (1) Capital Projects This programme contributes to Policy Area 21: Transport (Secretary for the Environment, Transport and Works) and Policy Area 23: Environmental Protection and Conservation (Secretary for the Environment, Transport and Works). Programme (2) District and Maintenance These programmes contribute to Policy Area 21: Transport Programme (3) Railway Development (Secretary for the Environment, Transport and Works). Programme (4) Technical Services Detail Programme (1): Capital Projects 2005–06 2006–07 2006–07 2007–08 (Actual) (Original) (Revised) (Estimate) Financial provision ($m) 284.0 268.6 263.2 267.8 (−2.0%) (+1.7%) (or −0.3% on 2006–07 Original) Aim 2 The aim is to expand and improve the road network in order to meet the growth in traffic demand, serve new development areas and facilitate the movement of people and goods across the boundary in accordance with approved programmes and at the same time contribute towards sustainable development. Brief Description 3 The Department is responsible for the implementation of highway projects in the Public Works Programme.
    [Show full text]
  • Transportation Guide for Central Counting Station
    中央點票站交通指南 Transportation Guide for Central Counting Station 11日 月 12 DecemberSeptember 11 4 12日 月 12 December 12 The counting of votes and announcement of election results for the 2016 Election Committee Subsector Elections will be held in the Central Counting Station at Halls 6, 8 and 10 of the AsiaWorld-Expo (AWE) which can be accessed by the following modes of transportation. 1 By Airport Express 1.1 Airport Express provides a direct and convenient link to and from the AWE with the in-venue AWE Station. Please leave the Station and enter the Central Counting Station through 1/F Central Concourse *. 1.2 Airport Express operates daily with the following route: Hong Kong Station Kowloon Station Tsing Yi Station Airport Station AsiaWorld-Expo Station Estimated Travelling Round-trip Adult Fare From Time to AsiaWorld-Expo (with two-day validity from Station 11 to 12 Dec 2016 +) Hong Kong Station 28 mins HK $57 Kowloon Station 25 mins HK $57 Tsing Yi Station 17 mins HK $42 ++ Airport Station 1 min + Visitors can buy tickets with Octopus Card at the designated counters (located at Lower Level 2 of Hong Kong Station or Kowloon Station – Trains to Airport and AsiaWorld-Expo and Level U4 of Tsing Yi Station – Trains to Airport and AsiaWorld-Expo respectively). Counter Opening Hours : 11 December 2016 - 4:00 pm till the last train 12 December 2016 - the first train to 3:00 pm ++ Single journey ticket is available at HK$5 or using Octopus Card for a single journey at HK$5. 1.3 Visitors planning to take the Airport Express are advised to note the following daily timetable - From City/Airport to the AsiaWorld-Expo Airport Express Station First Train Last Train Headway (mins) Hong Kong 05:50 00:48 10 -12 Kowloon 05:53 00:52 10 -12 Tsing Yi 06:00 00:59 10 -12 Airport 06:15 01:13 10 -12 *Candidates and agents should enter the Central Counting Station for registration at the reception counter at Hall 11, G/F West Entrance, AWE.
    [Show full text]
  • Regional and Hong Kong's Transport Network Planning Framework
    This subject paper is intended to be a research paper on the results of studies or surveys from government land private sectors that are pertinent to the subject on Regional and Hong Kong's Transport Network Planning Framework. The views and analyses as contained in this paper are intended to stimulate public discussion and input to the planning process of the "HK2030 Study" and do not imply endorsement of the HKSARG. WORKING PAPER NO. 21 REGIONAL AND HONG KONG'S TRANSPORT NETWORK PLANNING FRAMEWORK Introduction 1. Railways and expressways are the main arteries of cities. They are the backbones to facilitate movements of goods and people. The prosperity and growth of a city depend very much on the efficient operation and development of its circulation systems. 2. This paper gives an overview of the existing and future strategic transport network in particular road and railway infrastructure in the Guangdong Province of the Mainland China 1. It also examines the present and future development of our Hong Kong's transport network in order to set the basic framework for planning an integrated transport system in the next stage of the study. Regional Transport Network I. Guangdong Province A. Road Infrastructure Exisitng Road Infrastrucutre 3. To accelerate the modernisation of transportation in China, in the early 1990s, the Ministry of Transportation put forward a strategic and ambitious distribution plan for the national trunk road system. Highways in China can be classified into 6 technical categories. They are expressway, Class I to IV Highways and others. According to the Guangdong Statistical Bureau (Table 1), there were a total of about 95,610km of roads covering the Guangdong Province in 1999, of which 953 km (1%) were expressway and 17,199km (18%) were Classes I and II highways.
    [Show full text]
  • Construction and Outline of Stonecutters Bridge, Hong Kong — the Third Longest Cable-Stayed Bridge in the World —
    Construction and Outline of Stonecutters Bridge, Hong Kong — The Third Longest Cable-Stayed Bridge in the World — 世界第三位の中央支間を持つ斜張橋の概要と施工 ― ストーンカッターズ橋 ― * ** * Yuji KOBAYASHI, P.E.Jp: Yokogawa Bridge Corp. 小林 雄次,技術士(建設部門):(株)横河ブリッジ **Kaoru YAMANE: MAEDA CORPORATION 山根 薫:前田建設工業(株) Contact: [email protected] Keywords: cable-stayed bridge, construction of towers, falsework system DOI: 10.11474/JPCI.NR.2014.117 Synopsis Width: 53.3m Stonecutters Bridge has a 1,018m long main span, Tower Height: 298mPD (The ground level is which is third longest in the world as cable-stayed approximate 5mpD) bridge. The bridge crosses the Ramber Channel Owner: Highways Department of the Government of between Stonecutters Island and Tsin Yi Island, and is the Hong Kong Special Administrative Region a part of the new Route 8. The new Route 8 links the Detailed Design: Ove Arup & Partners Hong Kong Hong Kong Airport to Western Kowloon and leads Limited further to Shatin in New Territories. This paper focuses Contractor : Maeda - Hitachi - Yokogawa on the construction of the towers, the side span concrete - Hsin Chong Joint Venture works and erection of main span segments. Details of Construction Period: Apr. 2004 – Dec. 2009 construction are covered by other papers [1] [4]. Location: Hong Kong Special Administrative Region, China Structural Data Structure: Cable-stayed bridge 1. Introduction Bridge Length: 1,596.0m The profile of Stonecutters Bridge as seen in Fig.1 and Span: 69.25m + 2@70m + 79.75m + 1,018m Fig.2 is a new generation of long span cable-stayed 79.75m + 2@70m + 69.25m bridges.
    [Show full text]
  • 706 Highways
    Capital Works Reserve Fund STATEMENT OF PROJECT PAYMENTS FOR 2007-08 Head 706 — HIGHWAYS Subhead Approved Original Project Estimate Estimate Cumulative Expenditure Amended to 31.3.2008 Estimate Actual $’000 $’000 $’000 Infrastructure Transport — Footbridges/pedestrian tunnels 6121TB Duplication of Pedder Street Footbridge 65,000 - 56,244 353 293 6143TB Improvement to pedestrian subway system at Kwai 57,700 21,347 Fuk Road roundabout 10,669 21,347 10,669 6145TB Extension of footbridge network in Tsuen Wan - 3,083 - 3,083 - 6150TB Reconstruction of two footbridges across Choi 46,200 1,795 Hung Road near Shatin Pass Road and Tai Shing 39,877 1,795 1,204 Street 6152TB Footbridge across Po Kong Village Road at the 22,000 911 junction with Tsz Wan Shan Road 18,304 911 712 6156TB Fortress Hill Pedestrian Link 23,800 4,286 20,803 6,786 5,588 Transport — Traffic control 6017TC Area traffic control and closed circuit television 97,200 2,064 system for Tai Po and North Districts 62,217 3,850 3,185 6018TC Renewal of Hong Kong area traffic control and 127,400 207 closed circuit television systems 51,781 4,795 3,757 6019TC Area traffic control and closed circuit television 153,500 44,350 system for Tuen Mun and Yuen Long districts 64,592 44,350 38,783 6021TC Provision of traffic control and surveillance facilities - 2,590 for existing strategic roads — stage 1 - 2,590 - 6022TC Replacement of area traffic control and closed 337,200 8,530 circuit television systems for Kowloon, Tsuen Wan 3,258 8,530 3,258 and Sha Tin and expansion of the systems to Tseung
    [Show full text]