AMP’S DEVELOPMENT CRITERIA An eligible asset is defined as a renewable energy asset or project that seeks to deliver a carbon emissions reduction and can satisfy the following conditions prior to acquisition: • the asset or project is the subject of an executed energy supply agreement; • planning permission for the asset (where required) has been granted; • the installer contract for the asset has been executed; and • a lease or licence agreement for the site for the relevant asset has been executed.

aggregated micro power holdings plc aggregated micro power aggregated micro power holdings plc aggregated micro power Biomass Boiler CONTACT wood waste John Bailey to energy to energy biofuels wood waste Installation Portfolio T: to 01829 energy 522004 to energy biofuels M: 07875 123515 E: [email protected] HIGH SCHOOL AMP Sandbach High School prides itself on 5 ROYAL SCHOOL, its ethos of “good practice” and “high 9 achievement” for which it has received HASELMERE Aggregated Micro Power Holdings plc (“AMP”) develops, installs and operates recognition. Fuelled by AMP Energy wood biomass boiler installations throughout the UK. pellet, a Herz 800kW Biofire biomass 2 The installation of one ETA 350kW wood boiler was installed and commissioned in pellet boiler for heating. Commissioning 4 February 2015. due by the end March 2016. To date AMP has developed a series of successful installations across a wide 1 range of sectors including Business Parks, Care Homes, Schools, Agricultural 3 10 PROJECT VALUE: £401,000 11 PROJECT VALUE: Facilities and Leisure Centres. These installations are owned and financed 7 8 £240,000 through Aggregated Micro Power Infrastructure Limited (“AMPIL”). AMP also 6 provides long term fuel supply and O&M services to AMPIL.

Biomass School £Thousands per Wood pellet1. Burning chamber 6. Auger AMP has a strong pipeline of prospective new developments and will share 2. Back of boiler / base 7. Fan development fees with installers who introduceESCO projects to us. year savings of flue connection 8. Chain drive 3. Fire pot 9. Hopper 4. Gas /oil back burner 10. Auger motor connection 11. Drop box 5. Heat exchangers DORFOLD DAIRY CROFT PREPARATORY HOUSE FARM, SCHOOL UPTON BY Two ETA 199kW and one ETA 140kW HIGH This will be a dedicated wood were installed in separate cabins and drying facility using existing commissioned in December 2014. SCHOOL farm structures on Dorfold The school has 400 pupils and as well KINGHAM Dairy Farm. The plant will be as adding a two storey teaching block in Upton is a school of HILL SCHOOL, used to dry woodchip for sale 2009 the school also opened its 600 seat 1600 pupils. in domestic and non domestic Theatre and fully equipped 400m2 Sports A Hertz 350kW Biomatic biomass boiler was OXFORDSHIRE markets. The installation hall in 2012. installed and commissioned in June 2014. includes 2 ETA 499 kW boilers The installation of two Fröling 999kW and a static drying floor from PROJECT VALUE: £269,000 wood chip boilers. Commissioning due PWR Bioheat. Commissioning PROJECT VALUE: £413,000 by the end of March 2016. due by the end of March 2016. PROJECT VALUE: PROJECT VALUE: £1,331,000 £873,000 SHIREBROOK LEISURE CENTRE, DERBYSHIRE

Two ETA 95kW boilers were installed and commissioned in June 2014. The CHOWLEY OAK facility originally comprised a four court badminton sports hall, fitness suite, bar, VILLA NURSERY, BUSINESS PARK small cafeteria and changing facilities. More recently a high specification glass ESSEX A Hargassner 199kW biomass boiler was backed squash court, a children’s indoor installed and commissioned in April 2014 soft play area, Boxigym, outdoor floodlit A Binder 1,650kW biomass steam boiler The boiler heats 3 separate office buildings five-a-side all weather pitch and state of will be installed to provide heating for on the park. the art skate park have been added. greenhouses. A Heliex CHP unit will also be installed where any excess electricity produced will be fed into the National PROJECT VALUE: £154,000 PROJECT VALUE: £167,000 Grid. Commissioning due by the end of March 2016. PROJECT VALUE: CHERRY TREES WHITBY HIGH SCHOOL £1,100,000 CARE HOME Little-known initiative guarantees school’sWhitby High School in Ellesmere upgrade Port, Owned by Barchester Healthcare Homes Cheshire has 1600 pupils from the ages of Limited, the home was built using 11 to 18. A 500kW Binder biomass boiler environmentally friendly design and the fuelled by wood chip supplied by AMP to biomass decision was taken to use biomass energy Energy was installed and commissioned in to heat the nursing home. A Hertz 199kW December 2014. COLIN MYERS TIMBER Firematic biomass boiler was installed MERCHANT, , Preparatory school swapsCHAMPNEYS fossil FOREST fuels for carbonand commissioned-neutral in May 2014, wood fuelled by pelletsPROJECT VALUE: £311,000 WOOD PROCESSING CHESHIRE MERE HEALTH SPA wood pellets supplied by AMP Energy. FACILITY The installation of a Binder 999kW The Spa is situated in the middle of a PROJECT VALUE: £152,000 The acquisition of a Commercial drying wood chip boiler, the supply of a chipper Royal Forest with 87 bedrooms as well site in Cumbria to add to AMPIL’s and storage facility. The boiler will be as treatment rooms, gym, tennis court The little-known ‘Forest Fuels Biomass ESCO” scheme thatportfolio. The The site dries wood chip for fuelled by the waste offcuts from the One of the UK’s leadingand swimming pool. Because the spa customers using Heizomat 800kW timber merchant’s activities and heat is housed in two separate buildings, Croft School took advantage of is open to all schools that boiler. the workshops. Colin Myers will thus two biomass boilers were installed, a reduce the amount of gate fee payable on Hargassner 199kW boiler and an 800kW require replacement boilers for their heat and hot water. ForPROJECT VALUE: disposal to land fill. Commissioning due by preparatory schocontainerisedols, The Binder boiler. Croft The plant was the end of March 2016. £794,000 commissioned in March 2015. The Croft School it provided all the upfront costs of their new PROJECT VALUE: £468,000 School in StratfordPROJECT Upon VALUE: £520,000 biomass system, including the boiler itself, the system design, its installation, and all planning and development costs. Avon, has taken a huge step towards becoming zero- “The Forest Fuels Biomass ESCO has made it possible for us to have a brand new boiler system carbon thanks to 100% without any capital investment, which was funding it received for biomass particularly attractive to us with aging fossil fuel boilers. boiler systems from Forest Fuels. “What made it most appealing though was the fact that all future maintenance and repairs are taken care of, so we’ll have no unknown costs or resources. Our site staff will save a lot of the time they previously spent looking after our old boilers.” Barney Thornton, The Croft School’s Director of Project Development

Call: 01409 281977 Contact: Peter Solly Email: [email protected]