Acceptable Risk

Total Page:16

File Type:pdf, Size:1020Kb

Acceptable Risk Review Report Address: 6 Sovereign House, Nelson Quay, Milford Haven, SA73 3AJ Grid Reference: Your Reference: Groundsure Reference: Date: 190311,205788 17423903 17423903 5 Dec 2017 Written By: Reviewed By: Anna Maria Gallart MEng Matthew Brown MSc AIEMA BSc (Hons) AIEMA Contaminated Land Flood Risk ACCEPTABLE RISK Assessed potential for environmental risk associated Assessed potential for flood risk associated with this with this property: property: Low-Moderate High The following opinion is provided by Groundsure on the basis of the information available at the time this report was produced. Statutory or Third Party Action Is there a risk of statutory (e.g. Part 2A EPA 1990) or third party action being taken Unlikely against the site? Banking Security Does the property represent Acceptable Banking Security from an environmental Yes perspective? Environmental Liability Is there a risk that the property value may be impacted due to environmental liability Unlikely issues? Please contact us with any Groundsure reference: 17423903 questions relating to this report: Date: 5 Dec 2017 1 Tel: 08444 159 000 [email protected] Recommendations None required. Consultancy Opinion Current Land Use Groundsure has been advised by the client (or their advisers) that the property is currently used for commercial purposes and will continue in that use. The 0.01 ha site has been identified to comprise part of a building occupying the entire property footprint, labelled as Sovereign House. The study area lies within a predominantly commercial setting with the aforementioned building extending off site to the east and west. Hardstanding is noted to the north with Nelson Quay (road) identified beyond. An unnamed lane lies to the south, with a marina noted beyond. Historical Land Use – On-Site Historically, the site was situated within a beach c.1862. No significant changes were observed until c.1878, by which time the site had been developed as part of a dock. By c.1906, part of a building had been constructed in the north and railway lines were established along the southern perimeter. Further changes were noted on subsequent mapping from c.1937, at which time the area had been redeveloped to comprise part of a building, labelled as a fish market. The study area remained in similar layout until c.1991, by which time the property had been cleared. Recent aerial photography indicates that the property was redeveloped into its current layout by c.2006. Historical Land Use – Surrounding Area Historically, land use in the vicinity of the property has included the aforementioned railway lines noted to extend off site to the west and east c.1906-1908 and railway lines 12m to the north c.1937-1991. Environmental Permits and Register Entries No Environmental Permits of concern have been identified in proximity to the property. No entries on the Local Authority's Contaminated Land Register have been identified within 500m of the site. Environmental Damage Regulations Sensitivity Assessment The site has been assessed in relation to relevant receptors under the regulations, and is noted to have a high sensitivity. As the site does not appear to be in current industrial use, there is unlikely to be a significant risk of Environmental Damage at the property. However, if you require an assessment of operational risk at the property, please contact Groundsure for further advice. Site Setting and Overall Environmental Sensitivity The site is situated on the underlying geology comprising bedrock layers of the Milford Haven Group. Groundwater mapping indicates the bedrock layers to be classified as a Secondary A aquifer. Potentially vulnerable receptors have been identified including the site users, the underlying aquifer and the aforementioned marina. Groundsure considers that the property has a moderate to high environmental sensitivity. Please contact us with any questions relating to this report: Groundsure Reference: 17423903 Tel: 08444 159 000 Date: 5 Dec 2017 2 [email protected] Conclusion Groundsure has not identified a potential contaminant-pathway-receptor relationship that is likely to give rise to significant environmental liability. The study site is considered unlikely to be subject to individual statutory investigation, and Groundsure therefore concludes that the site represents an Acceptable Environmental Risk. Please refer to the Groundsure Risk Assessment Methodology contained within this report. Please contact us with any questions relating to this report: Groundsure Reference: 17423903 Tel: 08444 159 000 Date: 5 Dec 2017 3 [email protected] Further Information Environmental Consultancy If you would like any further assistance regarding this report, please contact the Groundsure Helpline on 08444 159 000 to discuss the findings free of charge. Phase 1 Environmental Risk Assessment If you would like to undertake a Phase 1 Environmental Risk Assessment, Groundsure would be pleased to provide you with a quotation for this more detailed assessment of the property. The cost of the Phase 1 would include a discount to reflect the entire cost of the report already undertaken. Whilst quotes are provided on a site-specific basis, these reports generally start from approximately £1,200+VAT. Please note that a Phase 1 report will often be required to support planning applications. Environmental Insurance Environmental insurance may be available for the subject property. Please contact Groundsure for further details. Please contact us with any questions relating to this report: Groundsure Reference: 17423903 Tel: 08444 159 000 Date: 5 Dec 2017 4 [email protected] Executive Summary: Flood Risk The following opinion is provided by Groundsure on the basis of the information available at the time of writing and contained within this report. Negligible Low Low- Moderate Moderate- High Moderate High Is insurance cover for flooding likely to be available for the property based upon Environment Agency/Natural Resources Wales Risk of Flooding from Rivers and the Sea (RoFRaS) data? May not be available What is the highest Environment Agency/Natural Resources Wales Risk of Flooding from Rivers and the Sea (RoFRaS) rating for the property? High What is the highest Environment Agency/Natural Resources Wales Flood Zone risk at the property? High What is the risk of flooding from pluvial/surface water sources? Negligible If the site were to be redeveloped, would a NPPF flood risk assessment be required? Yes Please contact us with any questions relating to this report: Groundsure Reference: 17423903 Tel: 08444 159 000 Date: 5 Dec 2017 5 [email protected] Flood Recommendations It is recommended that several insurers are contacted to confirm the availability of reasonably priced insurance for the property. The purchaser may wish to make specific enquiries of the vendor regarding the history of flooding at the property. Risk of Flooding from Rivers and the Sea (RoFRaS) As the site lies within or in close proximity to an area with a High risk rating in the RoFRaS database, a prudent purchaser may wish to consider reducing the impact of flooding at the property by installing flood protection measures. Such measures may help reduce the effects of flooding at the property if flood defences are absent or are breached, and may assist in obtaining insurance for the site. Furthermore, it is recommended that anyone living within an area at High risk signs up to the Environment Agency/Natural Resources Wales's Flood Warning Scheme on 0345 988 1188 or at www.environment-agency.gov.uk. Environment Agency/Natural Resources Wales Flood Zones The site has been identified to lie within Flood Zone 3 as designated by the Environment Agency/Natural Resources Wales, indicating the site has a predicted chance of flooding of greater than 1.0% from fluvial sources or greater than 0.5% from coastal sources in any given year. It is recommended that a purchaser consider reducing the impact of flooding at the property by installing flood protection measures at the site. Such measures may help reduce the effects of flooding at the property if flood defences are absent or are breached, and may assist in obtaining insurance for the site. Further information on flood protection measures may be obtained from the National Flood Forum or the Flood Protection Association. A more detailed flood risk assessment may further quantify the risk of flooding at the site as well as examining the history of flooding at the site, reviewing the standard of protection afforded to the site and providing a quote for a a Full Flood Risk Assessment to meet the requirements of NPPF, if required. Groundsure Flooding Desktop Reports are available from £500 + VAT. Please contact Groundsure for further details. Groundwater Flooding The area is not considered to be prone to groundwater flooding Development Guidance If the site is to be developed, a detailed Flood Risk Assessment will be required. 'Highly Vulnerable' developments, as defined within NPPF, will not be permitted within a Zone 3 floodplain, and 'Essential Infrastructure' and 'More Vulnerable' developments will be required to pass an Exemption Test prior to permission being granted. A Groundsure Flooding Desktop Report would assist in clarifying the flood risk to the property and assessing the potential for development at the site in relation to flood risk. Groundsure Flooding Desktop Reports are available from £500 + VAT. Please contact Groundsure for further details. JBA Surface Water (Pluvial) Flooding The site and areas in close proximity have been assessed to not be at risk from surface water (pluvial) flooding. No further guidance is required. Historical Flood Events The site is not recorded to have been subject to historical flooding. However, the absence of data does not provide a definitive conclusion that the site has never flooded, only that the Environment Agency/Natural Resources Wales hold no record of any flooding at the site. Please contact us with any questions relating to this report: Groundsure Reference: 17423903 Tel: 08444 159 000 Date: 5 Dec 2017 6 [email protected] Additional Matters The following additional risk issues are outside the scope of the opinion provided by this report.
Recommended publications
  • National Assembly for Wales Y Pwyllgor Newid Hinsawdd
    Cynulliad Cenedlaethol Cymru | National Assembly for Wales Y Pwyllgor Newid Hinsawdd, Amgylchedd a Materion Gwledig | Climate Change, Environment and Rural Affairs Committee Effaith Brexit ar bysgodfeydd yng Nghymru | The impact of Brexit on fisheries in Wales FW 06 Ymateb gan : Porthladd Aberdaugleddau Evidence from : Port of Milford Haven Summary As Wales’ largest fishing port, the Port of Milford Haven (“the Port” or “Milford Haven”) welcomes the opportunity to contribute to the Climate Change, Environment and Rural Affairs Committee’s inquiry into the impact of Brexit on fisheries in Wales. The Port sees fisheries as a Brexit opportunity for Wales. Opportunities centre on maximising the value from existing economic clusters – whether engineering or fishing – particularly in manufacturing and processing. Regaining control of access and the management of Wales’ fishing resources will present the possibility to incrementally grow the domestic fishing fleet (over 10m vessels), increase domestic fish landings and facilitate more processing at Welsh ports to the benefit of coastal communities. This is not about supplanting foreign fleets but about being in control of the issue of licences and quotas to foreign and domestic vessels in a way that reinforces the economics of onshore logistics, service and processing centres. This blue business growth would align with the aims of the Economic Action Plan and the Marine Plan for Wales, but will be dictated by the settlement forged between the UK Government and the European Union (“EU”), the content of the UK Fisheries Bill and the devolved framework agreed between the UK and Welsh governments. Port of Milford Haven overview The Port of Milford Haven is Wales’ largest port and Britain’s largest energy port.
    [Show full text]
  • Annual Report & Financial Statements 2016
    6 1 0 2 s t n e m e t a t S l a i c n a n i F & t r o p e R l a u n n A Port of Milford Haven Annual Report & Financial Statements 2016 Head Office: Gorsewood Drive, Milford Haven, Pembrokeshire SA73 3EP Tel: +44 (0) 1646 696100 Fa x: +44 (0) 1646 696125 [email protected] www.mhpa.co.uk Business Units: Milford Marina Cleddau House, Milford Haven SA73 3AF Tel: +44 (0) 1646 696312 Fax: +44 (0) 1646 696314 enquiries@ milfordmarina.com www.milfordmarina.com Milford Fish Docks Cleddau House, Milford Haven, Pembrokeshire SA73 3AF Tel: +44 (0) 1646 696300 Fax: +44 (0) 1646 696302 enquiries@ milfordfishdocks.com www.milfordfishdocks.com Quayside Properties Suite 5, Cedar Court , Milford Haven, Pembrokeshire SA73 3LS Tel: +44 (0)1646 696380 Fax: +44 (0)1646 696381 [email protected] www.quayside.properties Pembroke Port Port Office, The Royal Dockyard, Pembroke Dock, Pembrokeshire SA72 6TD Tel: +44 (0) 1646 623420 Fax: +44 (0) 1646 623439 [email protected] www.pembrokeport.com Published by the Port of Milford Haven and produced in Pembrokeshire with the dedicated assistance of our staff. Photography: Aurora Imaging, Owen Howells, Gareth Davies Photography, Martin Cavaney, Derek Phillips Photograp hy, Alex Brown Design: rockpooldesign.co.uk Print: Forrest Print. This publication is printed on paper from sustainable forests using vegetabl e based inks Port of Milford Haven Annual Report & Financial Statements 2016 Contents 2016 Highlights 2 Chairman’s Statement 4 Chief Executive’s Report 6 Strategic Report 8 Risk Management 11
    [Show full text]
  • 2014 Business Review
    4 1 0 2 w e i v e R s s e n i s u B Port of Milford Haven Business Review 2014 Port of Milford Haven Business Review 2014 The Port of Milford Haven performed well in 2014, handling over 34m tonnes of cargo, representing an average of 10 shipping movements every day. By any measure the Port of Milford Haven continues to be the UK’s top energy port - it is one of the busiest waterways in the country, serving the energy needs of the British economy, as well as hosting an active boating and yachting community and retaining a significant role as Wales’ largest fishing port. | 1 Port of Milford Haven Business Review 2014 2 | Port of Milford Haven Business Review 2014 | 6 Chairman’s Statement | 8 Chief Executive’s Report | 22 Health, Safety and Security | 26 Environment | 28 Stakeholder Engagement | 32 Business Model | 34 Governance | 37 Board Members | 40 Senior Management Team | 42 Financial Performance | 3 Port of Milford Haven Business Review 2014 2014 Highlights Up to 60 traditional vessels visited the Milford Haven Waterway for Seafair Haven 4 | Murco ceased refining in April Business Review 2014 2014. The site is due to be sold to Port of Milford Haven Puma Energy as a storage and importation terminal The Port sponsored Milford Haven School's new Sixth Form Study Centre A 5MW 20,000 panel solar array at Liddeston Ridge was switched on in Spring 2014. The array, along with the power PATCH was the Port's generated by roof 2014 Charitable Cause mounted solar panels, of the Year resulted in the Port becoming carbon neutral The Port was granted outline planning The redevelopment of permission by Pembrokeshire County Council Wales’ largest fishing for its Milford Dock Master Plan.
    [Show full text]
  • Pembrokeshire Single Integrated Plan 2013-2018
    Pembrokeshire Single Integrated Plan 2013-2018 Annual Review 2015-16 For a copy of this document in large print, Braille, audio tape or an alternative language please contact Jackie Meskimmon on (01437) 776613. For further information please contact: Nick Evans Partnership and Scrutiny Support Manager Pembrokeshire County Council County Hall Haverfordwest Pembrokeshire SA61 1TP Telephone: (01437) 775858 [email protected] CONTENTS Foreword .......................................................................... 1 Introduction ..................................................................... 3 Children And Families ....................................................... 5 Economy .......................................................................... 13 Environment .................................................................... 21 Health, Care And Well-Being ............................................ 28 Safeguarding .................................................................... 38 Safety ............................................................................... 50 2015/16 Annual Scorecard ................................................ 60 Planning For The Future .................................................... 62 Foreword I am pleased to introduce the Pembrokeshire Single Integrated Plan Annual Review for 2015-2016. This is our third review of the Single Integrated Plan and is our self-assessment of the progress that partners have made during the third year of our joint strategy. It also builds on
    [Show full text]
  • Pembrokeshire County Council Cyngor Sir Penfro
    Pembrokeshire County Council Cyngor Sir Penfro Freedom of Information Request: 10679 Directorate: Community Services – Infrastructure Response Date: 07/07/2020 Request: Request for information regarding – Private Roads and Highways I would like to submit a Freedom of Information request for you to provide me with a full list (in a machine-readable format, preferably Excel) of highways maintainable at public expense (including adopted roads) in Pembrokeshire. In addition, I would also like to request a complete list of private roads and highways within the Borough. Finally, if available, I would like a list of roads and property maintained by Network Rail within the Borough. Response: Please see the attached excel spreadsheet for list of highways. Section 21 - Accessible by other means In accordance with Section 21 of the Act we are not required to reproduce information that is ‘accessible by other means’, i.e. the information is already available to the public, even if there is a fee for obtaining that information. We have therefore provided a Weblink to the information requested. • https://www.pembrokeshire.gov.uk/highways-development/highway-records Once on the webpage click on ‘local highways search service’ The highway register is publicly available on OS based plans for viewing at the office or alternatively the Council does provide a service where this information can be collated once the property of interest has been identified. A straightforward highway limit search is £18 per property, which includes a plan or £6 for an email confirmation personal search, the highway register show roads under agreement or bond. With regards to the list of roads and properties maintained by Network Rail we can confirm that Pembrokeshire County Council does not hold this information.
    [Show full text]
  • Urban Settlements Report
    Urban Settlements Report Development Plans September 2019 1 2 Contents 1. Introduction .................................................................................................. 4 2. Methodology................................................................................................. 5 3. Data Analysis ............................................................................................... 7 4. The Towns Settlement Hierarchy ................................................................ 11 5. Conclusions................................................................................................ 13 Appendix 1 ........................................................................................................ 14 3 1. Introduction 1.1 A study of the availability of Services and Facilities in Pembrokeshire’s Urban and Rural Settlements, identified in the LDP Preferred Strategy (December 2018), is an important part of the evidence base for the development of LDP 2. Understanding the levels of services and facilities provides a clear understanding of the way in which the towns of Pembrokeshire function in order to identify strategies and locations for housing and other development during the life of the Plan. 1.2 According to the draft National Development Framework (Consultation 7 August – 1 November 2019) the Welsh Government “supports the role of the regional centres of Carmarthen, Llandrindod Wells, Newtown, Aberystwyth and the four Haven Towns (Milford Haven, Haverfordwest, Pembroke and Pembroke Dock). These
    [Show full text]
  • Housing Allocations Section, Allocations Are Listed Alongside Others at the Same Level of the Settlement Hierarchy (See Policy SP12 the Settlement Hierarchy)
    Development Sites Supplementary Planning Guidance Updated version, December 2016 SUPPLEMENTARY PLANNING GUIDANCE (SPG) Development Sites For use alongside: Local Development Plan: from Adoption (2013-2021) PEMBROKESHIRE COUNTY COUNCIL 1 Development Sites Supplementary Planning Guidance Updated version, December 2016 Preface This Supplementary Planning Guidance (SPG) provides site specific information on all sites allocated for development in the Local Development Plan. The SPG has been prepared to provide prospective developers with an indication of the known constraints on individual sites. The information provided is a guide to the likely issues and considerations that will arise on each development site. However, it may be necessary to request additional information and contributions to address issues not identified in this SPG. This guidance applies to all areas of Pembrokeshire excluding the National Park. The SPG will be a significant material consideration in determining planning applications. 2 Development Sites Supplementary Planning Guidance Updated version, December 2016 Contents Preface ......................................................................................................................... 2 Introduction ................................................................................................................ 4 1 How to use this Guidance ............................................................................. 5 2 Considerations that apply to all sites.......................................................10
    [Show full text]
  • 2018 Annual Report & Accounts
    Port of Milford Haven 20 Annual Report & Financial Statements 18 Port of Milford Haven Annual Report & Financial Statements 2018 “We are, first and foremost, a port. 2018 Summary In 2018 we celebrated 60 years of expert, dedicated operations helping Trading results for 2018: the nation transport goods quickly Turnover £22.1m and efficiently. Our future will be Operating profit £0.9m built upon these firm foundations as Post-tax loss £(1.0)m we expand into new ventures that 31m tonnes cargo volume Our operational focus is to deliver realise the full potential of our assets, solutions in: Over 2,000 commercial vessels called strengthen our relationships and at the Port Transportation Energy, Renewables and Engineering create new opportunities.” 0 Lost Time Incidents Port Marine Safety Code retained Retail, Leisure and Tourism Investors in People retained Fishing, Fish Processing and Aquaculture Chris Martin, Chair Celebrating our 60th anniversary A new Wellbeing Team champions positive mental and physical health 460,000 sq ft mixed use development, Milford Waterfront, gained resolution to grant outline planning consent 11% increase in ferry freight 13% increase in solar outputs 2.5% sickness absence - now lower than the national average Contents 2018 Summary 1 Strategic Report Welcome from the Chair 2 Our Vision, Strategy and Values 5 Chief Executive’s Q&A 6 Our People 9 Our Business 10 Principal Risks and Uncertainties 12 Our Operational Divisions 14 Stakeholder Engagement 19 Our Environment 22 Safety & Security 25 Corporate Governance 26 Meet the Board and Senior Management Team 28 Report of the Board 31 Directors’ Responsibilities Statement 35 Independent Auditor’s Report 36 Financial Statements 38 60 years of port operations 66 1 Port of Milford Haven Annual Report & Financial Statements 2018 Welcome from our Chair, Chris Martin As Chair of the Port, I have great pleasure Marine, as they open up new opportunities to report on our 60th year of operation.
    [Show full text]
  • Annual Report 2006-2007
    1 Annual Report 2006-2007 Membership information and a summary of the activities undertaken by the Pembrokeshire Community Health Council 1st April 2006 to 31 st March 2007 2 CONTENTS Subject.................................................................................................... Page Number Contact Details ...........................................................................................................3 The Chief Officer’s Report.......................................................................................4 Membership Changes ...............................................................................................6 CHC Staff.....................................................................................................................6 Membership Schedule ..............................................................................................7 The Committee Structure .........................................................................................8 Membership/External Representation...................................................................9 Council Member’s Participation in Meetings and Events ...............................10 Member Attendance at Council Meetings ..........................................................11 Accident & Emergency Services Report ..............................................................12 Acute Services Report .............................................................................................13 Mental Health & Learning Disabilities
    [Show full text]
  • Request for Proposals For
    Request for Proposals for 5.0 MWp Solar Photovoltaic Power Plant At Liddeston Ridge For Port of Milford Haven January 2013 1 Table of Contents 1) Instructions to Bidders. 2) Details of Deliverables from Bidders. 3) Technical Specification of Project - Provided by Customer. 4) Information on Tender evaluation. 5) General and Specific Conditions of Contract. 2 Definitions CDM Regulations means the Construction (Design and Management) Regulations 2007(S.I.2007/320), the associated Approved Code of Practice entitled, “Managing Health and Safety in Construction” (published in2007) including without limitation Chapter 2 thereof and any other relevant guidance issued from time to time by the UK Health and Safety Executive. PVS means power plant & associated infrastructure MHPA means Milford Haven Port Authority Customer means Milford Haven Port Authority EPC means Engineering Procurement and Construction Contractor Site means Liddeston Ridge, Milford Haven, Pembrokeshire, Wales, UK, SA73 2BS. PWI means Pure Wafer International. 3 1, Instruction to Bidders Project Overview Milford Haven Port Authority (MHPA) are seeking competitive proposals for the complete development , construction and start-up of a single 5.0MWp utility scale solar photovoltaic energy power plant (PVS) at Liddeston Ridge , Milford Haven, Pembrokeshire, Wales, UK, SA73 2BS. The PVS is to be designed, engineered and constructed in accordance with Milford Haven Port Authority’s requirements as defined in this RFP and the EPC agreement. The PV system shall be connected to a 33KV metering circuit breaker installed by the local distributed network operator (Western Power Distribution) connected to a tee in the overhead cable line between the Steynton and Milford Haven 33KV/11KV substation that runs through the site at Liddeston Ridge (as described in the connection agreement, see Appendix A).
    [Show full text]
  • MHPA Climate Change Adaptation Report to Defra
    Adapting to Climate Change ll. Milford Haven Port Authority Second Report to the Secretary of State. June 2015 Adapting to Climate Change. Milford Haven Port Authority Second Report to the Secretary of State. June 2015 2 Adapting to Climate Change. Milford Haven Port Authority Second Report to the Secretary of State. June 2015 Adapting to Climate Change Milford Haven Port Authority Second Report to the Secretary of State Contents list Section Title Page Number i Contents list 3 1 Introduction 4 2 Proposed actions from the 2011 report 5 2.1 Adaptation actions for high priority risk 5 2.2 Implementation of adaptation actions 8 2.3 Opportunities presented or enhanced by climate change 8 3 Achievements to date, (June 2015). 9 3.1 Hubberston Pill and Goose Pill water level sensors 9 3.2 Hakin Jetty 10 3.3 Marine Works Licences 10 3.4 Meteorological data analysis and monitoring 10 3.4.1 Meteorological stations 10 3.4.2 Analysis of MHPA Meteorological data 11 3.5 Extreme events 11 3.5.1 Climate change risk 11 3.5.2 Extreme weather events 12 3.5.3 Delays to shipping and pilotage 13 3.6 Business opportunities and initiatives 14 3.6.1 Renewable energy - Photovoltaics 14 3.6.2 Carbon footprint calculations 14 4 References 17 5 Summary Table. 18 3 Adapting to Climate Change. Milford Haven Port Authority Second Report to the Secretary of State. June 2015 1. Introduction Under the Climate Change Act 2008, section 63(5), the Defra Secretary of State has powers to direct certain Reporting Authorities to report on the anticipated impacts of climate change, and on their proposals for adaptation and embedding into their strategic business planning.
    [Show full text]
  • Pembrokeshire County Council Local Development Plan: Habitats Regulations Appraisal Report
    Pembrokeshire County Council Local Development Plan: Habitats Regulations Appraisal Report Deposit Plan – Incorporating Post Deposit Changes March 2012 Local Development Plan HRA of LDP 1 Local Development Plan HRA of LDP Table of Contents NON-TECHNICAL SUMMARY.................................................................................. 3 CHAPTER 1: INTRODUCTION................................................................................. 5 CHAPTER 2: METHOD............................................................................................. 7 CHAPTER 3: PEMBROKESHIRE COUNTY COUNCIL LOCAL DEVELOPMENT PLAN ........................................................................................................................ 9 CHAPTER 4: HRA OF LDP..................................................................................... 11 Effects on European sites .................................................................................... 12 Potential effects from the Local Development Plan............................................ 12 In-combination effects .......................................................................................... 13 Screening of the LDP ............................................................................................ 15 Strategic policy screening.................................................................................... 15 Screening of general policies............................................................................... 15 Screening of allocated sites
    [Show full text]