SH-88: Barunapul-Rasiyari Subproject, Bihar State Highways II Project

Total Page:16

File Type:pdf, Size:1020Kb

SH-88: Barunapul-Rasiyari Subproject, Bihar State Highways II Project Initial Environmental Examination November 2011 IND: Bihar State Highways II Project – Additional Financing (SH-88: Barunapul-Rasiyari Subproject) Prepared by Bihar State Road Development Corporation Limited for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 30 November 2011) Currency unit – Indian rupee (Rs) INR1.00 = $0.0192104505 $1.00 = INR52.055000 ABBREVIATIONS ADB – Asian Development Bank BSHPII- – Bihar State Highways Project II- Additional Financing AF BSRDC – Bihar State Road Development Corporation Ltd. BSPCB – Bihar State Pollution Control Board CGM – Chief General Manager CPCB – Central Pollution Control Board CRRI – Central Road Research Institute DoE – Department of Environment DFO – District Forest Officer DGM – Deputy General Manager DPR – Detailed Project Report EA – Executing Agency EFRC – Environment Friendly Road Construction EIA – Environmental Impact Assessment EMP – Environmental Management Plan EMoP – Environmental Management and Monitoring Plan EO – Environmental Officer GDP – Gross Domestic Product GoI – Government of India GoB – Government of Bihar GRC – Grievance Redressal Mechanism IEE – Initial Environmental Examination IMD – Indian Meteorological Department INR – Indian Rupees IPP – Indigenous Peoples Plan IRC – Indian Road Congress MDRs – Major District Roads MoEF – Ministry of Environment and Forests MoSRTH – Ministry of Shipping, Road Transport and Highways MSL – Mean Sea Level NGO – Non Government Organization NH – National Highway NOx – Oxides of Nitrogen NSDP – Net State Domestic Product PCU – Passenger Car Unit PIU – Project Implementation Unit PPEs – Personal Protective Equipments PWD – Public Works Department R and R – Resettlement and Rehabilitation ROB – Road Over Bridge ROW – Right of Way RCD – Road Construction Department a Rs. – Indian Rupees RSPM – Respirable Suspended Particulate Matter RP – Resettlement Plan SC – Supervision Consultant SH – State Highway SO2 – Sulphur Dioxide SPM – Suspended Particulate Matter SPS – ADB‟s Safeguard Policy Statement SOI – Survey of India SPCB – State Pollution Control Board TA – Technical Assistance TCS – Typical Cross Section TOR – Terms of Reference UNDP – United Nation Development Program WEIGHTS AND MEASURES Km – kilometer M – meter NOTE In this report, "$" refers to US dollars. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. b TABLE OF CONTENTS 1. Executive summary................................................................................................. I 2. Introduction ............................................................................................................ 1 2.1. Project Background/Rationale ........................................................................... 1 2.2. Executing Agency ............................................................................................. 1 2.3. Technical Assistance for Environmental Safeguard ........................................... 1 2.4. Purpose of the Study ......................................................................................... 2 2.5. Extent of IEE ..................................................................................................... 2 2.6. IEE Content ....................................................................................................... 2 2.7. Methodology ..................................................................................................... 2 2.7.1. Information/ data Sources .......................................................................... 3 2.7.2. Public Consultation .................................................................................... 4 3. Policy, Legal And Administartive Framework ...................................................... 5 3.1. Country‟s Legal Framework and Regulatory Requirements for the Project. ....... 5 3.2. Procedure for Environmental Clearance ........................................................... 6 4. Description Of The Subproject .............................................................................. 8 4.1. Project Location ................................................................................................ 8 4.2. Category of the Project ..................................................................................... 8 4.3. Need for the Subproject .................................................................................... 8 4.4. Existing and Projected Traffic ............................................................................ 8 4.5. Characteristics of the Existing Road ................................................................ 10 4.6. Key Rehabilitation and Reconstruction Activities ............................................. 11 5. Description of the Environment .......................................................................... 16 5.1. Physical Environment ...................................................................................... 16 5.1.1. Meteorology and Climate ......................................................................... 16 5.1.2. Natural Hazards ....................................................................................... 16 5.1.3. Air and Noise Quality ............................................................................... 18 5.1.3.1 Air Quality ............................................................................................. 18 5.1.3.2 Noise Level ........................................................................................... 19 5.1.4. Landforms/Physiography and Topography ............................................... 19 5.1.5. Geology ................................................................................................... 20 5.1.6. Soil ........................................................................................................... 20 5.1.7. Land use .................................................................................................. 20 5.1.8. Groundwater ............................................................................................ 21 5.1.8.1 Occurrence and Yield ........................................................................... 21 5.1.8.2 Groundwater Quality ............................................................................. 21 c Source: Environmental Impact Assessment during DPR ........................................ 22 5.1.9. Surface water Resources ......................................................................... 22 5.1.9.1 River System/Hydrology and Water bodies along the Road .................. 22 Source: Field Survey .......................................................................................... 23 5.1.9.2 Surface Water Quality .......................................................................... 23 5.2. Ecological Resources ...................................................................................... 24 5.2.1. Terrestrial Ecology ................................................................................... 24 5.2.1.1 Forests ................................................................................................. 24 5.2.1.2 Wild Life and Protected Areas .............................................................. 24 5.2.1.3 Road Side Plantations .......................................................................... 24 5.2.2. Aquatic Ecology ....................................................................................... 24 5.3. Economic Development .................................................................................. 24 5.3.1. Industries ................................................................................................. 25 5.3.2. Infrastructure Facilities ............................................................................. 25 5.3.2.1 Water Supply ........................................................................................ 25 5.3.2.2 Transportation ...................................................................................... 25 5.3.2.3 Power Sources and Availability ............................................................. 26 5.3.2.4 Agriculture ............................................................................................ 26 5.3.2.5 Mineral Resources ................................................................................ 26 5.3.2.6 Tourism ................................................................................................ 26 5.4. Social and Cultural Resources ........................................................................ 27 5.4.1. Population and Communities ................................................................... 27 5.4.2. Health Facilities ........................................................................................ 27 Source: Bihar through Figures, 2007 .................................................................. 28 5.4.3. Literacy .................................................................................................... 28 Source: Directorate of Economics
Recommended publications
  • Final English Version of E-Bulletin (6
    Embassy of India 6 - 12 Dec 2020 Jakarta INDIA'S LATEST NEWS NEWS MISSION'S ACTIVITIES HIGHLIGHT Agra, City of Taj Mahal Metro project inaugurated; Nitin Gadkari Inaugurates Three- Lane Koilwar Bridge on Sone River Worth Rs 266 Crore; Bhagalpur address for winged guests; #India@75 Efficient new method of harvesting water from air developed by IIT Guwahati; Lakshadweep declared first UT to become 100% organic. : indianembassyjakarta.gov.in : IndianEmbJkt : IndiaInIndonesia : Embassy of India Jakarta 1 Agra, City of Taj Mahal Metro project inaugurated Prime Minister Narendra Modi inaugurated the construction work of Agra Metro project in Agra, Uttar Pradesh through video conference. The metro project comprised of two corridors with a total length of 29.4 km and is estimated to cost Rs 8,3796.2 Million. The project will cater to more than 6 million tourists and 2.6 million residents of Agra every year. It will also provide an environment-friendly mass rapid transit system to Agra. The project will connect major tourist attractions like Taj Mahal, Agra Fort, Sikandra with railway stations and bus stands and it will be completed in five years. The metro in Agra will run at a speed of 80 Kmph and the cost of one metro rail of three coaches is pegged at Rs 80 Million. Source: Times Now Nitin Gadkari Inaugurates Three-Lane Koilwar Bridge on Sone River Worth Rs 266 Crore Union Minister for Road Transport and Highways, Nitin Gadkari, inaugurated the three-lane Koilwar bridge on the Sone river in Bihar through video conference. The bridge costing Rs 266 crore would make commuting easier in South Bihar.
    [Show full text]
  • Water Resource English Cover-2019-20.Cdr
    A Panoramic View of Krishna Raja Sagara Dam, Karnataka GOVERNMENT OF INDIA MINISTRY OF JAL SHAKTI DEPARTMENT OF WATER RESOURCES RIVER DEVELOPMENT AND GANGA REJUVENATION NEW DELHI ANNUAL REPORT 2019-20 GOVERNMENT OF INDIA MINISTRY OF JAL SHAKTI DEPARTMENT OF WATER RESOURCES RIVER DEVELOPMENT AND GANGA REJUVENATION NEW DELHI Content Sl. No. CHAPTER PAGE NO. 1. OVERVIEW 1-14 2. WATER RESOURCES SCENARIO 17-20 3. MAJOR PROGRAMMES 23-64 4. INTER-STATE RIVER ISSUES 67-71 5. INTERNATIONAL COOPERATION 75-81 6. EXTERNAL ASSISTANCE IN WATER RESOURCES SECTOR 85-96 7. ORGANISATIONS AND INSTITUTIONS 99-170 8. PUBLIC SECTOR ENTERPRISES 173-184 9. INITIATIVES IN NORTH EAST 187-194 10. ADMINISTRATION, TRAINING AND GOVERNANACE 197-202 11. TRANSPARENCY 205 12. ROLE OF WOMEN IN WATER RESOURCES MANAGEMENT 206 13. PROGRESSIVE USE OF HINDI 207-208 14. STAFF WELFARE 211-212 15. VIGILANCE 213 16. APPOINTMENT OF PERSONS WITH SPECIAL NEEDS 214 Annexures Sl. No. ANNEXURES PAGE NO. I. ORGANISATION CHART 217 II. STAFF IN POSITION AS ON 31.12.2019 218 III. LIST OF NAMES & ADDRESSES OF SENIOR OFFICERS & HEADS 219-222 OF ORGANISATIONS UNDER THE DEPARTMENT IV. BUDGET AT GLANCE 223-224 V. 225-226 COMPLETED/ ALMOST COMPLETED LIST OF PRIORITY PROJECTS (AIBP WORKS) REPORTED VI. CENTRAL ASSISTANCE & STATE SHARE DURING RELEASED 227 PMKSY 2016-20 FOR AIBP WORKS FOR 99 PRIORITY PROJECTS UNDER VII. CENTRAL ASSISTANCE & STATE SHARE RELEASED DURING 228 UNDER PMKSY 2016-20 FOR CADWM WORKS FOR 99 PRIORITY PROJECTS VIII. 229 UNDER FMP COMPONENT OF FMBAP STATE/UT-WISE DETAILS OF CENTRAL ASSISTANCE RELEASED IX.
    [Show full text]
  • East Central Railway
    10.1.1 पूव मय रेलवे EAST CENTRAL RAILWAY 20192019----2020 के िलए पƗरसंपिēयĪ कƙ खरीद , िनमाϕण और बदलाव Assets-Acquisition, Construction and Replacement for 2019-20 (Figures in thousand of Rupees)(आंकड़े हजार Đ . मĞ) पूंजी पूंजी िनिध मूआिन िविन संिन रारेसंको जोड़ िववरण Particulars Capital CF DRF. DF SF RRSK TOTAL 11 (a) New Lines (Construction) 248,00,00 .. .. .. 200,00,00 .. 448,00,00 14 G Gauge Conversion 185,00,00 .. .. .. .. .. 185,00,00 15 ह Doubling 10,00,00 .. .. .. .. .. 10,00,00 16 - G Traffic Facilities-Yard 16,46,33 .. .. 3,05,00 .. 8,82,18 28,33,51 G ^ G Remodelling & Others 17 Computerisation 2,01,00 .. 5,00,00 57,50 .. .. 7,58,50 21 Rolling Stock 16,80,00 .. .. 1,75,00 .. 13,20,00 31,75,00 22 * 4 - Leased Assets - Payment 511,32,64 202,97,36 .. .. .. .. 714,30,00 of Capital Component 29 E G - Road Safety Works-Level .. .. .. .. .. 59,28,48 59,28,48 Crossings. 30 E G -/ Road Safety Works-Road .. .. .. .. .. 144,62,00 144,62,00 Over/Under Bridges. 31 Track Renewals .. .. .. .. .. 634,84,29 634,84,29 32 G Bridge Works 4,35,00 .. .. .. .. 51,95,90 56,30,90 33 G Signalling and 4,00 .. .. .. .. 132,40,02 132,44,02 Telecommunication 36 ^ G - G Other Electrical Works 29,07,31 .. 2,03,84 1,97,81 .. 78,22 33,87,18 K excl TRD 37 G G Traction Distribution 1,00,00 .. .. .. .. 84,69,86 85,69,86 Works 41 U Machinery & Plant 4,16,35 .
    [Show full text]
  • Bhojpur District, Bihar State
    भूजल सूचना पुस्तिका भोजपुर स्जला, बिहार Ground Water Information Booklet Bhojpur District, Bihar State 84° 15' 84° 30' 84° 45' BIHAR STATE ADMINISTRATIVE MAP N BHOJPUR DISTRICT, BIHAR. Ganga R. 25° 25° 45' 45' GANGA RIVER Barhara Gaura Bhagar N. Dehra N. Shahpur Gangi N. Koilwar Chher N. Bihiya ARA 25° Udawant 25° nagar 30' Gangi N. 30' Jagdishpur Garhani KumhariSandes N. Charpokhari Agiaon Banas N. Piro 25° Sahar 25° 15' SON RIVER 15' LEGEND Tarari District Boundary Block Boundary River District HQ. 0 5 10 15 20 Km Block HQ. Road Scale Railway 84° 15' 84° 30' 84° 45' के न्द्रीय भमू िजल िो셍 ड Central Ground water Board Ministry of Water Resources जल संसाधन िंत्रालय (Govt. of India) (भारि सरकार) Mid-Eastern Region िध्य-पर्वू ी क्षेत्र Patna पटना मसिंिर 2013 September 2013 1 PREPARED BY - Shri S. Sahu Sc. B UNDER SUPERVISION OF - Shri A.K.Agrawal, Scientist’D’ CARTOGRAPHY - Shri Lokendra Kumar, D/Man Gd-II 2 UPDATED BY - Shri S.N.Dwivedi, Sc- C & Dr. Fakhre Alam, STA (Hg) CONTENTS DISTRICT AT A GLANCE. 5-6 1. INTRODUCTION 7 - 10 1.1 Location, Area and Administrative Details 1.2 Basin/Sub-Basin and Drainage 1.3 Landuse, Agriculture and Irrigation Practices 1.4 Studies/Activities carried by CGWB 2. CLIMATE AND RAINFALL 10 3. GEOMORPHOLOGY AND SOIL 10-11 3.1 Geomorphology 3.2 Soil 4. GROUND WATER SCENARIO 11 - 17 4.1 Water Bearing Formations 4.2 Occurrence & Movement of Ground Water 4.3 Depth to Water Level 4.4 Ground Water Quality 4.4.1 Arsenic in Ground Water 4.5 Ground Water Resources 5.
    [Show full text]
  • Bhojpur 2019-20
    Ministry of Micro, Small & Medium Enterprises Government of India DISTRICT PROFILE BHOJPUR 2019-20 Carried out by MSME-Development Institute (Ministry of MSME, Govt. of India,) Patliputra Industrial Estate, Patna-13 Phone:- 0612-2262719, 2262208, 2263211 Fax: 06121 -2262186 e-mail: [email protected] Web- www.msmedipatna.gov.in Veer Kunwar Singh Memorial, Ara, Bhojpur Sun Temple, Tarari, Bhojpur 2 FOREWORD At the instance of the Development Commissioner, Micro, Small & Medium Enterprises, Government of India, New Delhi, District Industrial Profile containing basic information about the district of Bhojpur has been updated by MSME-DI, Patna under the Annual Plan 2019-20. It covers the information pertaining to the availability of resources, infrastructural support, existing status of industries, institutional support for MSMEs, etc. I am sure this District Industrial Profile would be highly beneficial for all the Stakeholders of MSMEs. It is full of academic essence and is expected to provide all kinds of relevant information about the District at a glance. This compilation aims to provide the user a comprehensive insight into the industrial scenario of the district. I would like to appreciate the relentless effort taken by Shri Ravi Kant, Assistant Director (EI) in preparing this informative District Industrial Profile right from the stage of data collection, compilation upto the final presentation. Any suggestion from the stakeholders for value addition in the report is welcome. Place: Patna Date: 31.03.2020 3 Brief Industrial Profile of Bhojpur District 1. General Characteristics of the District– Bhojpur district was carved out of erstwhile Shahbad district in 1992. The Kunwar Singh, the leader of the Mutineers during Sepoy Mutiny in 1857, was from district Bhojpur.
    [Show full text]
  • List of 85 Bridges in India
    List of 85 Bridges In India Connecting Name River Length Feet Opened Type cities Bhupen Hazarika Setu, Lohit Assam River 9,150 30,020 2017 Road Tinsukia Dibang River Bridge, Dibang Arunachal Pradesh River 6,200 20,300 2018 Road Bomjur-Meka Mahatma Gandhi Setu, Patna–Hajip Bihar Ganges 5,750 18,860 1982 Road ur Bandra-Worli Sea Link, Mahim Maharashtra bay 5,600 18,400 2009 Road Mumbai Brahmap Rail-cum-roa Bogibeel Bridge, Assam utra River 4,940 16,210 2018 d Dibrugarh Vikramshila Setu, Bihar Ganges 4,700 15,400 2001 Road Bhagalpur Vembanad Rail Bridge, Vembana Kerala d Lake 4,620 15,160 2011 Rail Kochi Digha–Sonpur Bridge, Rail-cum-roa Patna–Sonp Bihar Ganges 4,556 14,948 2016 d ur Arrah–Chhapra Bridge, Arrah–Chhap Bihar Ganges 4,350 14,270 2017 Road ra Godavari Fourth Bridge Kovvur–Rajahmundry Bypass Bridge, Andhra Godavari Pradesh River 4,135 13,566 2015 Road Rajahmundry Munger Ganga Bridge, Rail-cum-Ro Bihar Ganges 3,750 12,300 2020 ad Munger Chahlari Ghat Bridge, Ghaghra Bahraich–Sit Uttar Pradesh River 3,249 10,659 2017 Road apur Jawahar Setu, Bihar Son River 3,061 10,043 1965 Road Dehri Nehru Setu, Bihar Son River 3,059 10,036 1900 Rail Dehri Kolia Bhomora Setu, Brahmap Tezpur–Kalia Assam utra River 3,015 9,892 1987 Road bor Korthi-Kolhar Bridge, Krishna Karnataka River 3,000 9,800 2006 Road Bijapur Netaji Subhas Chandra Kathajodi Bose Setu, Odisha River 2,880 9,450 2017 Road Cuttack Godavari Bridge, Andhra Godavari Rail-cum-roa Pradesh River 2,790 1974 d Rajahmundry Old Godavari Bridge Now decommissioned, Godavari Andhra Pradesh
    [Show full text]
  • BIHAR SPECIAL Current Affairs (December 2020)
    www.gradeup.co BIHAR SPECIAL Current Affairs (December 2020) Bollywood actor Sanjay Mishra becomes brand ambassador of Patna Municipal Corporation • The people of Bihar to make the state capital clean and beautiful, Bollywood’s famous comedy actor Sanjay Mishra has been declared the brand ambassador of Patna Municipal Corporation. Actor Sanjay Mishra who is going to convey the message, “Beauty of Patna is the Duty of Patna” among the people the state capital. Kabartal Wetland of Begusarai included in the Ramsar list • Ramsar Convention declared Kabartal Wetland also known as Kanwar Jheel in Begusarai, Bihar as a site of international importance. It covers 2,620 hectares of the Indo-Gangetic plains in the northern Bihar State. • Kabartal has become the first in Bihar and the 39th Ramsar site in India. This lake was given the status of bird sanctuary by the Bihar government in 1987. EC Appoints First Transgender Woman as Presiding Officer for Bihar Polls • Monika Das, is the first-ever transgender person to be appointed as a presiding poll officer in independent India’s history. Her selection is a big victory for the transgender community, which can often be underrepresented in public life. • For the past five years, she has been working at a bank, currently employed with Canara Bank. Prior to this, Monica has also become the country's first transgender banker. Fisheries and animal husbandry schemes inaugurated in Bihar • Prime Minister Shri Narendra Modi launched PM Matsya Sampada Yojana, e- Gopala App & several initiatives linked to studies and research in fisheries production, dairy, animal husbandry and agriculture in Bihar through video conferencing.
    [Show full text]
  • TACR: India: Preparing the Bihar State Highways II Project
    Technical Assistance Consultant’s Report Project Number: 41629 October 2010 India: Preparing the Bihar State Highways II Project Prepared by Sheladia Associates, Inc. Maryland, USA For Road Construction Department Government of Bihar This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project’s design. TA No. 7198-INDIA: Preparing the Bihar State Highways II Project Final Report TTTAAABBBLLLEEE OOOFFF CCCOOONNNTTTEEENNNTTTSSS 1 INTRODUCTION .............................................................................................................................. 8 1.1 INTRODUCTION .............................................................................................................................. 8 1.2 PROJECT APPRECIATION............................................................................................................. 8 1.2.1 Project Location and Details 9 1.2.2 Road Network of Bihar 11 1.3 PERFORMANCE OF THE STUDY ................................................................................................ 14 1.3.1 Staff Mobilization 14 1.3.2 Work Shop 14 1.4 STRUCTURE OF THE FINAL REPORT ....................................................................................... 14 2 SOCIO ECONOMIC PROFILE OF PROJECT AREA ..................................................................
    [Show full text]
  • Population of Class Wise Towns in Bihar
    POPULATION OF CLASS WISE TOWNS IN BIHAR S. No. Towns Population S. No. Towns Population Class I Towns 17 Supaul (Nagar Parishad) 54085 1 Bettiah (Nagar Parishad) 116670 18 Araria (Nagar Parishad) 60861 2 Motihari (Nagar Parishad) 100683 19 Kishanganj (Nagar Parishad) 85590 3 Muzaffarpur (Nagar Nigam) 305525 20 Beehat (Nagar Parishad) 64579 4 Hajipur (Nagar Parishad) 119412 21 Barauni (Nagar Parishad) 58628 5 Patna (Nagar Nigam) 1432209 22 Benipur (Nagar Parishad) 62203 6 Danapur Nizamat (Nagar Parishad) 131176 Total 1557267 7 Bihar Sharif (Nagar Nigam) 232071 Class III Towns 8 Arrah (Nagar Nigam) 203380 1 Narkatiaganj (Nagar Parishad) 40830 9 Sasaram (Nagar Parishad) 131172 2 Ramnagar (Nagar Panchayat) 38554 10 Dehri DalmiyaNagar (Nagar Parishad) 119057 3 Chanpatia (Nagar Panchayat) 22038 11 Gaya (Nagar Nigam) 389192 4 Raxaul (Nagar Parishad) 41610 12 Bhagalpur (Nagar Nigam) 340767 5 Sugauli (Nagar Panchayat) 31432 13 Darbhanga (Nagar Nigam) 267348 6 Dhaka (Nagar Panchayat) 32632 14 Munger (Nagar Nigam) 188050 7 Areraj (Nagar Panchayat) 20356 15 Chapra (Nagar Parishad) 179190 8 Sheohar (Nagar Panchayat) 21262 16 Siwan (Nagar Parishad) 109919 9 Bairgania (Nagar Panchayat) 34836 17 Saharsa (Nagar Parishad) 125167 10 Motipur (Nagar Panchayat) 21957 18 Purnia (Nagar Nigam) 171687 11 Kanti (Nagar Panchayat) 20871 19 Katihar (Nagar Nigam) 190873 12 Mahnar Bazar (Nagar Panchayat) 37370 Total 4853548 13 Lalganj (Nagar Panchayat) 29873 Class II Towns 14 Barh (Nagar Parishad) 48442 1 Begusarai (Nagar Nigam) 93741 15 Masaurhi (Nagar Parishad) 45248
    [Show full text]
  • Ground Water Information Booklet Darbhanga District, Bihar State
    भूजल सूचना पुस्तिका दरभंगा स्जला, बिहार Ground Water Information Booklet Darbhanga District, Bihar State 85°-45' 86°-0' 86°-15' ADMINISTRATIVE MAP BIHAR STATE DARBHANGA DISTRICT, BIHAR. 0 5 10 15 Km Ganga R. Jale Scale Keotiranway 26° 26° 15' 15' Manigachi Singwara DARBHANGA Bahadurpur Alinagar Benipur Hayaghat Ghanshyampur 26° 26° 0' 0' Baheri Goura bouram Kiratpur Biraul LEGEND District Boundary Block Boundary Road Kusheshwar Kusheshwar Railway Asthan Asthan (E) District Headquarter 25° Block Headquarter 25° 45' River 45' 85°-45' 86°-0' 86°-15' के न्द्रीय भमू िजल िो셍 ड Central Ground water Board Ministry of Water Resources जल संसाधन िंत्रालय (Govt. of India) (भारि सरकार) Mid-Eastern Region िध्य-पर्वू ी क्षेत्र Patna पटना मसिंिर 2013 September 2013 1 PREPARED BY - Shri S. Sahu Sc. B UNDER SUPERVISION OF - Shri A.K.Agrawal, Scientist’D’ CARTOGRAPHY - Shri Lokendra Kumar, Draughtsman UPDATED BY - Shri S.N.Dwivedi, Sc-C & Dr. Fakhre Alam, STA (Hg) 2 CONTENTS DISTRICT AT A GLANCE 5 – 6 1. INTRODUCTION 7 - 11 1.1 Location, Area and Population 1.2 Basin/Sub-Basin and Drainage 1.3 Land use, agriculture and irrigation practices 1.4 Studies/Activities carried by CGWB 2. CLIMATE AND RAINFALL 11 - 12 3. GEOMORPHOLOGY AND SOIL 12 - 13 3.1 Geomorphology 3.2 Soil 4. HYDROGEOLOGY 13 - 17 4.1 Water Bearing Formations 4.2 Mode of Occurrence of Ground Water 4.3 Hydraulic Characteristics of Aquifers 4.4 Depth to water level 4.5 Ground Water Quality 5. GROUND WATER RESOURCES 17 - 18 5.1 Status of groundwater development 6.
    [Show full text]
  • S. No. RSETI Name of Director Address 1 Ambala Sh. Davinder Kalra 08950011123 0171-2530363 PNB RSETI Ambala, Village Singhwala
    S. No. RSETI Name of Director Address 1 Ambala Sh. Davinder Kalra PNB RSETI Ambala, Village Singhwala, 08950011123 Hisar Road, Near Batra Palace, Ambala 0171-2530363 City – 134003 Email: [email protected] Sh. Sudarshan Prasad Arwal 09955994009 PNB RSETI Arwal, Ino. Pul, Mokri, 06337-228122 2 Jehanabad Road, Arwal, Bihar-804401 Email: [email protected] 3 Aurangabad Sh. Santosh Kumar Sinha PNB RSETI Aurangabad, North Koel 09955994010 Irrigation I.B, near Town School 094314-84871 Gandhi Nagar Distt. Aurangabad, Bihar-824101 Email: [email protected] 4 Baghra, Sh. Vinod Mohan PNB RSETI Baghra, Muzaffarnagar, PNB Muzaffarnagar 08958000062 Rural Self PNB RSETI Singhwala 09897037454 Employment Training Institute, Block 0131-2486025 Development Premise, Baghra, Muzaffarnagar, UP Email: [email protected] 5 Bharatpur Sh. Manoj Kr Gupta PNB RSETI Bharatpur, PNB Circle Office, 09829492011 IInd Floor, Super Bazaar Bharatpur, 05644-222463 Rajasthan Email: [email protected] 6 Bhiwani Sh. Jiya Lal PNB RSETI Bhiwani, Loharu Road, 09991180080 Bhiwani, Haryana – 127021 01664-246644 Email: [email protected] 7 Bhojpur Sh. Raj Kumar Singh PNB RSETI Bhojpur E Kisan Bhawan 09771468105 Koilwar Block, Koilwar Bhojpur Bihar- 06182-282405 802160 Email: [email protected] 8 Bijnore Sh. Suman Kumar PNB RSETI Bijnore, BDO Office, Haidaur 08171997949 District, Bijnor- 246726 01342-274041 Email: [email protected] 9 Budaun Sh. Nawal Kishore Singh PNB RSETI Budaun, Near PNB Civil Lines, 08171718248 Budaun, UP- 243601 05832-220048 Email: [email protected] 10 Bulandshahr Sh R K Bakshi PNB RSETI Bulandshahr, PNB Rural Self 08171113793 Employment Training Institute, Shivaji 05732-290091 Nagar (Annopshahr Road) Anoopshahr Road, Hazratpur, Bulandshahr, UP- 203001 E-mail [email protected] 11 Buxar Shri A K Sinha PNB RSETI Buxar, Near Ambassodar 09771420576 Hotel & Mahindra Scooty Distt.
    [Show full text]
  • Final Feasibility Report on Detailed Hydrographic Survey Sone River
    STRABAG India Pvt Ltd, New Delhi FINAL FEASIBILITY REPORT ON DETAILED HYDROGRAPHIC SURVEY SONE RIVER FROM GANGA CONFLUENCE AT TODARPUR (CH 0 KM), TO INDRAPURI BARRAGE NEAR DEHRI (CH 141.0 KM) NATIONAL WATERWAY NO- 94 VOLUME-I Submitted To INLAND WATERWAYS AUTHORITY OF INDIA A-13, Sector-1,NOIDA DIST-Gautam Buddha Nagar UTTAR PRADESH PIN- 201 301(UP) Email: [email protected] Web: www.iwai.nic.in Submitted By STRABAG INDIA PVT LTD. Southern Park, Unit No.6, 4th Floor D-2, DDA District Centre, Saket, New Delhi 110017 India Tel : 91-11 492 01 492 , 91-11 492 01 454 Fax : 91-11 -492 01 493 Email: [email protected] Web:www.strabagindia.com Submitted Date / 09 /2018 Date of Submission: /01 /2018 IWAI - NW-94, Sone River (Todarpur to Indrapuri barrage near Dehri) P a g e | 1 STRABAG India Pvt Ltd, New Delhi ACKNOWLEDGEMENT STRABAG India Pvt. Ltd. (SIPL) express their gratitude to Shri S. K. Gangwar, Member (Technical) and Ms. Nutan Guha Biswas, IAS, Ex-Chairperson, IWAI for providing us the opportunity for "Detailed Hydrographic and Topography Survey of Sone River in Region VII of Proposed new waterways, a dream and very important part of Nation Development”. SIPL would also like to thank Shri Pravir Pandey, IA & AS, Chairman, Shri Alok Ranjan, ICAS, Member (Finance) and Shri Shashi Bhushan Shukla, Member (Traffic). SIPL wishes to express their gratitude to Capt. Ashish Arya, Hydrographic Chief and Cdr. P.K. Srivastava, Ex Hydrographic Chief, IWAI for his guidance and technical inputs in this project. SIPL would also like to thank Sh.
    [Show full text]