SH-88: Barunapul-Rasiyari Subproject, Bihar State Highways II Project

SH-88: Barunapul-Rasiyari Subproject, Bihar State Highways II Project

Initial Environmental Examination November 2011 IND: Bihar State Highways II Project – Additional Financing (SH-88: Barunapul-Rasiyari Subproject) Prepared by Bihar State Road Development Corporation Limited for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 30 November 2011) Currency unit – Indian rupee (Rs) INR1.00 = $0.0192104505 $1.00 = INR52.055000 ABBREVIATIONS ADB – Asian Development Bank BSHPII- – Bihar State Highways Project II- Additional Financing AF BSRDC – Bihar State Road Development Corporation Ltd. BSPCB – Bihar State Pollution Control Board CGM – Chief General Manager CPCB – Central Pollution Control Board CRRI – Central Road Research Institute DoE – Department of Environment DFO – District Forest Officer DGM – Deputy General Manager DPR – Detailed Project Report EA – Executing Agency EFRC – Environment Friendly Road Construction EIA – Environmental Impact Assessment EMP – Environmental Management Plan EMoP – Environmental Management and Monitoring Plan EO – Environmental Officer GDP – Gross Domestic Product GoI – Government of India GoB – Government of Bihar GRC – Grievance Redressal Mechanism IEE – Initial Environmental Examination IMD – Indian Meteorological Department INR – Indian Rupees IPP – Indigenous Peoples Plan IRC – Indian Road Congress MDRs – Major District Roads MoEF – Ministry of Environment and Forests MoSRTH – Ministry of Shipping, Road Transport and Highways MSL – Mean Sea Level NGO – Non Government Organization NH – National Highway NOx – Oxides of Nitrogen NSDP – Net State Domestic Product PCU – Passenger Car Unit PIU – Project Implementation Unit PPEs – Personal Protective Equipments PWD – Public Works Department R and R – Resettlement and Rehabilitation ROB – Road Over Bridge ROW – Right of Way RCD – Road Construction Department a Rs. – Indian Rupees RSPM – Respirable Suspended Particulate Matter RP – Resettlement Plan SC – Supervision Consultant SH – State Highway SO2 – Sulphur Dioxide SPM – Suspended Particulate Matter SPS – ADB‟s Safeguard Policy Statement SOI – Survey of India SPCB – State Pollution Control Board TA – Technical Assistance TCS – Typical Cross Section TOR – Terms of Reference UNDP – United Nation Development Program WEIGHTS AND MEASURES Km – kilometer M – meter NOTE In this report, "$" refers to US dollars. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. b TABLE OF CONTENTS 1. Executive summary................................................................................................. I 2. Introduction ............................................................................................................ 1 2.1. Project Background/Rationale ........................................................................... 1 2.2. Executing Agency ............................................................................................. 1 2.3. Technical Assistance for Environmental Safeguard ........................................... 1 2.4. Purpose of the Study ......................................................................................... 2 2.5. Extent of IEE ..................................................................................................... 2 2.6. IEE Content ....................................................................................................... 2 2.7. Methodology ..................................................................................................... 2 2.7.1. Information/ data Sources .......................................................................... 3 2.7.2. Public Consultation .................................................................................... 4 3. Policy, Legal And Administartive Framework ...................................................... 5 3.1. Country‟s Legal Framework and Regulatory Requirements for the Project. ....... 5 3.2. Procedure for Environmental Clearance ........................................................... 6 4. Description Of The Subproject .............................................................................. 8 4.1. Project Location ................................................................................................ 8 4.2. Category of the Project ..................................................................................... 8 4.3. Need for the Subproject .................................................................................... 8 4.4. Existing and Projected Traffic ............................................................................ 8 4.5. Characteristics of the Existing Road ................................................................ 10 4.6. Key Rehabilitation and Reconstruction Activities ............................................. 11 5. Description of the Environment .......................................................................... 16 5.1. Physical Environment ...................................................................................... 16 5.1.1. Meteorology and Climate ......................................................................... 16 5.1.2. Natural Hazards ....................................................................................... 16 5.1.3. Air and Noise Quality ............................................................................... 18 5.1.3.1 Air Quality ............................................................................................. 18 5.1.3.2 Noise Level ........................................................................................... 19 5.1.4. Landforms/Physiography and Topography ............................................... 19 5.1.5. Geology ................................................................................................... 20 5.1.6. Soil ........................................................................................................... 20 5.1.7. Land use .................................................................................................. 20 5.1.8. Groundwater ............................................................................................ 21 5.1.8.1 Occurrence and Yield ........................................................................... 21 5.1.8.2 Groundwater Quality ............................................................................. 21 c Source: Environmental Impact Assessment during DPR ........................................ 22 5.1.9. Surface water Resources ......................................................................... 22 5.1.9.1 River System/Hydrology and Water bodies along the Road .................. 22 Source: Field Survey .......................................................................................... 23 5.1.9.2 Surface Water Quality .......................................................................... 23 5.2. Ecological Resources ...................................................................................... 24 5.2.1. Terrestrial Ecology ................................................................................... 24 5.2.1.1 Forests ................................................................................................. 24 5.2.1.2 Wild Life and Protected Areas .............................................................. 24 5.2.1.3 Road Side Plantations .......................................................................... 24 5.2.2. Aquatic Ecology ....................................................................................... 24 5.3. Economic Development .................................................................................. 24 5.3.1. Industries ................................................................................................. 25 5.3.2. Infrastructure Facilities ............................................................................. 25 5.3.2.1 Water Supply ........................................................................................ 25 5.3.2.2 Transportation ...................................................................................... 25 5.3.2.3 Power Sources and Availability ............................................................. 26 5.3.2.4 Agriculture ............................................................................................ 26 5.3.2.5 Mineral Resources ................................................................................ 26 5.3.2.6 Tourism ................................................................................................ 26 5.4. Social and Cultural Resources ........................................................................ 27 5.4.1. Population and Communities ................................................................... 27 5.4.2. Health Facilities ........................................................................................ 27 Source: Bihar through Figures, 2007 .................................................................. 28 5.4.3. Literacy .................................................................................................... 28 Source: Directorate of Economics

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    124 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us