Ontario Infrastructure Projects/ Toronto

Total Page:16

File Type:pdf, Size:1020Kb

Ontario Infrastructure Projects/ Toronto Date Modified: 2009-10-23 Ontario Infrastructure Projects / Toronto Location Project Federal Toronto GO Transit $250,000,000 Toronto Toronto York Subway Extension $697,000,000 Toronto Sheppard East Light Rail Transit Line $333,000,000 Toronto Revitalization of Union Station $133,000,000 Toronto Yonge-Dundas Square Permanent Storage Facility $66,667 Toronto Todmorden Mills Heritage Museum and Arts Centre $423,000 Toronto Sidewalks $2,666,667 Toronto Don Valley Parkway Resurfacing $333,333 Toronto Lakeshore Resurfacing $103,635 Toronto Gardiner Resurfacing $563,032 Toronto Deanewood Pedestrian Bridge Rehabilitation $206,897 Toronto Bloor-Islington Bridge Rehabilitation $344,828 Toronto Mount Pleasant Bridge Rehabilitation $413,793 Toronto Gardiner Road Bridge Rehabilitation $206,897 Toronto Gardiner-Bathurst/Strachan Bridge Rehabilitation $827,586 Toronto Steeles Avenue Resurfacing $5,000,000 Toronto Major Road Reconstruction/ Resurfacing Finch Ave E $168,667 Toronto Major Road Reconstruction / Resurfacing - Eglinton Ave E $38,000 Toronto Major Road Reconstruction / Resurfacing - Leslie St $177,667 Toronto Major Road Reconstruction/ Resurfacing - Don Mills Rd $19,333 Toronto Major Road Reconstruction / Resurfacing Finch Ave 2 $321,333 Toronto Major Road Reconstruction / Resurfacing - Yonge St $557,000 Toronto Major Road Reconstruction / Resurfacing - Empress Ave $19,000 Toronto Major Road Reconstruction / Resurfacing - Lawrence Ave $556,333 Toronto Major Road Reconstruction / Resurfacing - Millwood Rd $142,667 Toronto Major Road Reconstruction / Resurfacing - Victoria Park Ave $3,000,000 Toronto Laneways Projects - Bellevue $26,667 Toronto Laneways Projects - Weston $23,667 Toronto Laneways Projects - Corbet $116,667 Toronto Laneways Projects - Humber $14,333 Toronto Laneways Projects - Jane $6,333 Toronto Laneways Projects - Ascott $14,333 Toronto Laneways Projects - Miller $46,000 Toronto Laneways Projects - Dufferin $46,000 Toronto Laneways Projects - Lindner $11,333 Toronto Laneways Projects - Hepbourne $5,200 Toronto Laneways Projects - Dovercourt A $25,667 Toronto Laneways Projects - Dovercourt B $5,000 Toronto Laneways Projects - Argyle $18,667 Toronto Laneways Projects - Chesley $17,667 Toronto Laneways Projects - Brock $15,667 Toronto Laneways Projects - Argyle (2) $14,333 Toronto Laneways Projects - College $10,000 Toronto Laneways Projects - College B $41,333 Toronto Laneways Projects - College C $5,667 Toronto Laneways Projects - Delaware $9,333 Toronto Laneways Projects - Bloor A $16,667 Toronto Laneways Projects - Bloor B $7,667 Toronto Laneways Projects - Tichester $24,333 Toronto Laneways Projects - Spadina $16,667 Toronto Laneways Projects - Eglinton $33,000 Toronto Laneways Projects - Scrivener $23,333 Toronto Laneways Projects - Price $18,333 Toronto Local Road Resurfacing - Abigail Place $11,104 Toronto Laneways Projects - Yonge $7,000 Toronto Local Road Resurfacing - Allanhurst Drive $285,656 Toronto Laneways Projects - Gerrard $14,000 Toronto Local Road Resurfacing - Ardell Avenue $20,839 Toronto Laneways Projects - Hastings $20,333 Toronto Laneways Projects - Harriet $6,667 Toronto Local Road Resurfacing - Ashdean Drive $48,978 Toronto Laneways Projects - Gerrard A $8,667 Toronto Local Road Resurfacing - Attwell Drive South $106,564 Toronto Laneways Projects - Gerrard B $8,667 Toronto Local Road Resurfacing - Bannatyne Drive $266,813 Toronto Local Road Resurfacing - Batterswood Drive $57,953 Toronto Local Road Resurfacing - Bellechasse Street $30,117 Toronto Local Road Resurfacing - Bethridge Road $327,199 Toronto Local Road Resurfacing - Blackburn Street $22,897 Toronto Local Road Resurfacing - Blythwood Road $121,989 Toronto Local Road Resurfacing - Bowater Drive $55,671 Toronto Local Road Resurfacing - Brazil Gate $6,388 Toronto Local Road Resurfacing - Buttercup Court $136,519 Toronto Local Road Resurfacing - Cabana Drive $137,657 Toronto Local Road Resurfacing - Calora Court $38,278 Toronto Local Road Resurfacing - Cardwell Avenue $50,289 Toronto Local Road Resurfacing - Castledene Crescent $57,953 Toronto Local Road Resurfacing - Cheatham Place $66,951 Toronto Local Road Resurfacing - Clarion Road $67,509 Toronto Local Road Resurfacing - Cliffcrest Crescent $78,272 Toronto Local Road Resurfacing - Cliffcrest Drive $90,199 Toronto Local Road Resurfacing - Cliffcrest Drive (2) $48,310 Toronto Local Road Resurfacing - Coxworth Crescent $55,671 Toronto Local Road Resurfacing - Cranston Road $20,063 Toronto Local Road Resurfacing - Cushendun Road $50,535 Toronto Local Road Resurfacing - Dimplefield Place $50,956 Toronto Local Road Resurfacing - Dowry Street $90,510 Toronto Local Road Resurfacing - Duncanwoods Drive $48,649 Toronto Local Road Resurfacing - Dunlace Drive $63,206 Toronto Local Road Resurfacing - Dunsany Crescent $63,733 Toronto Local Road Resurfacing - Ealing Drive $57,801 Toronto Local Road Resurfacing - Earlscourt Avenue $69,556 Toronto Local Road Resurfacing - Elliotwood Court $22,816 Toronto Local Road Resurfacing - Evansway Street $40,277 Toronto Local Road Resurfacing - Firestone Road $40,612 Toronto Local Road Resurfacing - Forestbrook Crescent $46,393 Toronto Local Road Reconstruction - Arnold $36,667 Toronto Local Road Resurfacing - Geary Avenue $124,312 Toronto Local Road Reconstruction - Berwick $83,333 Toronto Local Road Resurfacing - Givendale Road $44,111 Toronto Local Road Reconstruction - Eastwood $317,000 Toronto Local Road Resurfacing - Glenridge Road $48,674 Toronto Local Road Reconstruction - Jeanette $104,667 Toronto Local Road Resurfacing - Goodless Court $27,836 Toronto Local Road Reconstruction - Ontario $191,333 Toronto Local Road Reconstruction - Primrose $20,333 Toronto Local Road Reconstruction - Superior $26,333 Toronto Local Road Reconstruction - Towns $34,667 Toronto Local Road Reconstruction - Verwood $185,667 Toronto Local Road Resurfacing - Gordon Park Drive $24,820 Toronto Local Road Resurfacing - Goskin Court $42,238 Toronto Local Road Resurfacing - Hollingworth Drive $48,674 Toronto Local Road Resurfacing - Humber Summit Lane $54,758 Toronto Local Road Resurfacing - Husband Drive $8,918 Toronto Local Road Resurfacing - Ingleport Place $8,992 Toronto Local Road Resurfacing - Kelsonia Avenue $131,465 Toronto Local Road Resurfacing - La Peer Boulevard $97,348 Toronto Local Road Resurfacing - Landry Avenue $23,120 Toronto Local Road Resurfacing - Larchmere Avenue $36,784 Toronto Local Road Resurfacing - Latton Road $15,085 Toronto Local Road Resurfacing - Littledean Court $42,238 Toronto Local Road Resurfacing - Lofthouse Square $70,296 Toronto Local Road Resurfacing - Lyndford Drive $70,882 Toronto Local Road Resurfacing - MacDuff Crescent $53,389 Toronto Local Road Resurfacing - Maitland Street $128,681 Toronto Local Road Resurfacing - Marilyn Avenue $52,496 Toronto Local Road Resurfacing - Merrygale Crescent $52,933 Toronto Local Road Resurfacing - Midcroft Drive $37,221 Toronto Local Road Resurfacing - Millport Drive $5,551 Toronto Local Road Resurfacing - Mountstephen Street $36,810 Toronto Local Road Resurfacing - Munro Street $128,588 Toronto Local Road Resurfacing - Navenby Crescent $28,115 Toronto Local Road Resurfacing - Osterhout Place $32,399 Toronto Local Road Resurfacing - Palmer Avenue $178,460 Toronto Local Road Resurfacing - Penn Drive $37,863 Toronto Local Road Resurfacing - Zealand $24,489 Toronto Local Road Resurfacing - Peterlee Avenue $38,179 Toronto Local Road Resurfacing - Yorkshire $46,393 Toronto Local Road Resurfacing - Woodsworth $74,532 Toronto Local Road Resurfacing - Prairie Drive $27,259 Toronto Local Road Resurfacing - Wicklow $88,070 Toronto Local Road Resurfacing - Westwater $76,424 Toronto Local Road Resurfacing - Primrose Avenue $73,011 Toronto Local Road Resurfacing - Waterbury $99,326 Toronto Local Road Resurfacing - Vickson $98,505 Toronto Local Road Resurfacing - Primula Crescent $23,231 Toronto Local Road Resurfacing - Randall Crescent $201,427 Toronto Local Road Resurfacing - Vanderbrent $55,519 Toronto Local Road Resurfacing - VanCamp $55,060 Toronto Local Road Resurfacing - Ranstone Gardens $146,028 Toronto Local Road Resurfacing - Tremont $46,520 Toronto Local Road Resurfacing - Ravencliff Crescent $67,231 Toronto Local Road Resurfacing - Redcar Avenue $85,437 Toronto Local Road Resurfacing - Redcastle Crescent $100,315 Toronto Local Road Resurfacing - Reidmount Avenue $171,962 Toronto Local Road Resurfacing - Richbourne Court $70,352 Toronto Local Road Resurfacing - Robinson Avenue $81,073 Toronto Local Road Resurfacing - Robintide Crescent $34,695 Toronto Local Road Resurfacing - Rubydale Gardens $46,462 Toronto Local Road Resurfacing - Sanctbury Place $46,849 Toronto Local Road Resurfacing - Sombrero Court $47,973 Toronto Local Road Resurfacing - Stubbs Drive $53,998 Toronto Local Road Resurfacing - Superior Avenue $41,824 Toronto Local Road Resurfacing - Swansdown Drive $41,829 Toronto Local Road Resurfacing - Tayrow Road $8,620 Toronto Local Road Resurfacing - Tinbury Place $46,135 Toronto 157 King St. E Roof Replacement $120,000 Toronto 40 College St. Recaulk Exterior Cladding Panels $111,667 Toronto 150 Disco Road Asphalt Pavement $666,667 Toronto 2222 Eglinton Ave. E. Asphalt Re-pavement $178,333 Toronto DeepLake Water Cooling - Front Street $588,333 Toronto Salt Management Facilities $666,667 Toronto Salt Management Facilities $666,667 Toronto Rexdale Multi-Service Community Hub $1,000,000 Toronto Toronto Police 11 Division - Central Lockup $9,693,000 Toronto Fairview Library Project $300,000 Toronto
Recommended publications
  • As Toronto Finds Distant Holes for Its Waste, the 905 Sees Incineration in a New, Appealing Light July 30, 2007
    Toronto Star As Toronto finds distant holes for its waste, the 905 sees incineration in a new, appealing light July 30, 2007 Phinjo Gombu STAFF REPORTER Despite skepticism and some opposition, Durham Region is deeply committed to building the GTA's first garbage incinerator in 15 years, says the region's works commissioner. "Years ago, there was a fundamental commitment by Durham Region that there would be no new landfills established (here)," says Cliff Curtis. "And council seems to have bought into the concept that we need to look after our own waste." That seems to be a unique position in the GTA, where disposing of trash in one's own backyard tends to stink politically. Sustainable self-sufficiency, with acceptance of some risk, is a goal other regions seem to be avoiding. Toronto and Peel have signed long-term deals to use landfills outside the GTA, though Peel already incinerates half its waste. York plans to turn some of its garbage into pellets to be burned somewhere else. For the time being, Halton has decided to continue to use a Milton landfill. After the province promised Michigan legislators that Ontario would stop shipping garbage to landfills in the state by 2010, councils across the GTA scrambled to find alternatives. Most have taken a step back from incineration, long fraught with concerns about emissions. Halton Region decided to defer considering an energy-from-waste incinerator for five years. Peel signed a long-term deal with a landfill near Sarnia for half of its trash, despite the fact its Algonquin Power plant in Brampton, built in 1992, already burns almost 140,000 tonnes of garbage a year and is undergoing a retrofit so it can dispose of more.
    [Show full text]
  • Solid Waste Management Services Staff Recommended 2020 Operating Budget 2020 – 2029 Capital Budget & Plan
    Solid Waste Management Services Staff Recommended 2020 Operating Budget 2020 – 2029 Capital Budget & Plan Budget Briefing to Budget Committee November 15, 2019 While we aim to provide fully accessible content, there is no text alternative available for some of the content within these pages. If you require alternate formats or need assistance understanding our charts, graphs, or any other content, please contact us at 416-392-7896 or [email protected]. Overview Overview and Highlights 2020 Staff Recommended Operating Budget and Plan 2020 – 2029 Staff Recommended Capital Budget and Plan Rate Changes 2 Overview and Highlights 3 Solid Waste Management Services – What We Do Solid Waste Management Services (SWMS) is an Integrated System and is responsible for: Integrated Waste Management System City Beautification Collection & Processing & Education & Residual Transfer Transport Enforcement Management SWMS manages 7 Transfer Stations, 2 Organics Processing Facility with one under expansion, 3 Collection Yards and 1 Litter Collection Yard, Green Lane Landfill + 160 Closed Landfills, 1.5 million residential bins and operates approximately 750 vehicles and pieces of equipment with an asset value of $700M . 4 Solid Waste Management Services – What is Seen After Raptors Parade / After SWM Parks and Curbside Collection 5 Solid Waste Management Services – How It’s Done Litter Management Collections Transfer Stations Haulage Open and Closed Landfill Mgmt. Recycling Processing Recycling Marketing Organics Processing in Renewable Natural Gas Special Waste Handling Anaerobic Digesters Development Community Outreach Policy & Research Customer Experience Circular Economy Asset Mgmt. & Capital Delivery Facility Maintenance Technology / Smart City Innovation Education Business Services 6 Solid Waste Management Services - Highlights • Completed an organizational realignment • New Safety Strategy and Program Initiated • Negotiated contracts for D2 collections, Disco Org.
    [Show full text]
  • Toronto Integrated Solid Waste Resource Management ("TIRM") Process - Request for Proposals for Disposal Services
    Toronto Integrated Solid Waste Resource Management ("TIRM") Process - Request for Proposals for Disposal Services (City Council on June 7, 8 and 9, 2000, amended this Clause by deleting from the recommendation of the Works Committee, after the words “Emergency Services”, the words “a verifiable environmental”, and inserting in lieu thereof the words “an environmental”, and adding to such recommendation the words “verifiable to the satisfaction of the Commissioner of Works and Emergency Services”, so that the recommendation of the Works Committee shall now read as follows: “The Works Committee recommends that TIRM Respondents offering disposal services be required to have in place at the time of contract implementation, or an implementation schedule acceptable to the Commissioner of Works and Emergency Services, an environmental management system for their disposal, operations and applicable transportation systems, verifiable to the satisfaction of the Commissioner of Works and Emergency Services.”) The Works Committee recommends that TIRM Respondents offering disposal services be required to have in place at the time of contract implementation, or an implementation schedule acceptable to the Commissioner of Works and Emergency Services, a verifiable environmental management system for their disposal, operations and applicable transportation systems. The Works Committee reports, for the information of Council, having received presentations by the following Respondents to the TIRM Request for Proposals for Disposal Services: - Essex-Windsor Solid Waste Authority, represented by: - Mr. Todd R. Pepper, General Manager, Essex-Windsor Solid Waste Authority. (A copy of the aforementioned presentation was submitted to the Committee.) - Green Lane Landfill, represented by: - Ms. Anne Hiscock, Green Lane Landfill. (A copy of the aforementioned presentation was submitted to the Committee.) - Onyx North America Corporation (formerly Browning Ferris Industries), represented by: - Mr.
    [Show full text]
  • Lesson's Learned
    What’s Up Up North!!! Lesson’s Learned Sustainable Integrated Solid Waste Resource Management in Canada in the 21st Century © 2014 HDR, all rights reserved. Background Key Projects Key Lessons Learned Summary BACKGROUND BY THE NUMBERS Population: ~35 million (1/10 the US) about approximately the size of California Landmass: ~ 9.9 M sq km (slightly larger than the US) 13 Provinces and Territories Approximately 90% of the population is concentrated within 160 km (100 mi) of the US border Generates ~ 25 million tonnes per year ( ~ 27 M tons) WASTE MANAGEMENT IN CANADA KEY CANADIAN PROJECTS KEY PROJECTS City of Toronto Regions of Durham/ York City of Edmonton Southern Alberta Energy from Waste Alliance City of Surrey This image cannot currently be displayed. CITY OF TORONTO Over 4 million inhabitants Generates over 1,000,000 tonnes per year Separate collection of Recyclables and Organics Key City Owned Facilities: o Dufferin Creek AD Plant – 27,500 tons per year o Disco Road AD Plant – 83,000 tons per year o Green Lane Landfill (out-of-City) – capacity to 2040 TORONTO’S WASTE STRATEGY VISION Reduce the amount of waste generated, reuse what they can, and recycle and recover the remaining resources to reinvest back into the economy. Embrace a waste management system that is user friendly with programs and facilities that balance the needs of the community and environment with long term financial sustainability. Ensure a safe, clean, beautiful and healthy City for the future. EVALUATING LONG TERM OPTIONS EVOLUTION OF WASTE MANAGEMENT IN DURHAM REGION Durham Region was established in 1974.
    [Show full text]
  • Solid Waste Management Services 3
    OPERATING PROGRAM SUMMARY CONTENTS Overview 1: 2017 – 2018 Service Overview and Plan 5 2: 2017 Operating Budget by Service 15 3: Issues for Discussion 31 Appendices: 1. 2016 Performance 36 2. 2017 Operating Budget by Expenditure Category 37 Solid Waste Management Services 3. 2017 Organization Chart 38 2017 OPERATING BUDGET OVERVIEW 4. Summary of 2017 Service Solid Waste Management Services is responsible for collecting, Changes 39 transporting, processing, composting and disposal of municipal and 5. Summary of 2017 New & some private sector waste. This includes garbage, Blue Bin Enhanced Service Priorities 40 recyclables, Green Bin organics, litter, yard waste, oversized and metal items, as well as household hazardous waste and electronic waste. 6. Inflows/Outflows to / from Reserves & Reserve Funds 41 SWMS' goal is to be a leader in providing innovative waste management services within the City of Toronto in a safe, efficient, and 7. 2017 User Fee Rate courteous manner, creating environmental sustainability, promoting Changes 44 waste diversion and maintaining a clean city. 2017 Operating Budget Highlights The total cost to deliver these services to Toronto residents, businesses and visitors is $378.292 million gross with a $19.831 million net reserve contribution as shown below. 2016 2017 (in $000's) Change Budget Budget $ % Gross Expenditures 368,463.2 378,292.4 9,829.2 2.7% Gross Revenues 388,938.4 398,123.7 9,185.3 2.4% Net Contribution (20,475.2) (19,831.3) 643.9 (3.1%) For 2017, $19.7 million in opening budget pressures were identified arising from operating requirements including contract services increases, inflation and provision to support the SWMS Capital program.
    [Show full text]
  • GGR 381 H1F: Field Course in Environmental Geography COURSE SCHEDULE and READINGS | FALL 2016
    GGR 381 H1F: Field Course in Environmental Geography COURSE SCHEDULE AND READINGS | FALL 2016 Course Schedule Overview Tues. Sept. 6 In-class Session Introductory Session and Field Trip and trip to High Park (9:30 a.m. – 4 p.m.) Meet at Sid Smith, Room 5017A at 9:30 a.m. Following class, meet at the north gates of High Park at 1:30 p.m. The gates are at the intersection of Colborne Lodge Drive and Bloor St. West, near the High Park TTC Station. Wed. Sept. 7 Field Trip The Port Lands (8:45 a.m. – 4 p.m.) Meet at the Ashbridges Bay Wastewater Plant (9 Leslie St., south of Lakeshore Blvd. East) at 8:45 a.m. In the afternoon we will be visiting the Portlands Energy Centre (470 Unwin Ave.) Thu. Sept. 8 Field Trip Food in the City (8:15 a.m. – 4 p.m.) Meet at the Ontario Food Terminal (165 The Queensway, east of Park Lawn Rd.) at 8:15 a.m. In the afternoon we will be visiting Black Creek Community Farm (4929 Jane St.) Fri. Sept. 9 Field Trip Mines and Airports (7:15 a.m. – 4:30 Meet at the Huron St. entrance to Sid Smith Hall, p.m.) 100 St George St. at 7:15 a.m. We will be traveling by bus and leaving at 7:30 a.m. sharp. We will be visiting the Aberfoyle Sand and Gravel Pits in the morning and Pearson International Airport in the afternoon. Fri. Sept. 16 In-class Session Sid Smith, Room 2101 (12 – 2 p.m.) Fri.
    [Show full text]
  • Arbitration Under Chapter Eleven of the Nafta and the Uncitral Arbitration Rules
    ARBITRATION UNDER CHAPTER ELEVEN OF THE NAFTA AND THE UNCITRAL ARBITRATION RULES BETWEEN VITO G. GALLO Claimant AND GOVERNMENT OF CANADA Respondent PROCEDURAL ORDER NO. 2 [Amended] 10 February 2009 ARBITRAL TRIBUNAL Professor Juan Fernández-Armesto (President) Professor Jean-Gabriel Castel J. Christopher Thomas, Q.C. CONSIDERING 1. The documentary requests filed by each party on 15 October 2008, numbered GAL 13 and CAN 11, and the objections to the counterparty’s documentary requests of 12 January 2009, numbered GAL 15 and CAN 12. 2. That further to these communications, the parties submitted GAL 17 and CAN 16 as short rebuttals, and Canada presented CAN 17 dealing with the additional production of document pertaining to requests nos. 73, 77, 78, 60(n) and 80. 3. That, according to Procedural Order no. 1, the Arbitral Tribunal may, in its discretion, order one disputing party to communicate to the other documents or limited categories of documents. In the exercise of its discretion, the Arbitral Tribunal will have regard to the specificity of the request, the relevance of the requested documents, the fact that they are in the possession, power or control of the disputing party, any applicable privileges, and all surrounding circumstances. The Arbitral Tribunal issues this PROCEDURAL ORDER NO. 2 This Procedural Order rules on the documentary requests (I) clarifying preliminary issues raised by the parties and (II) deciding on each of the disputed documentary requests. I. Preliminary Issues 1. Each party has claimed that (a) the documents so far produced by the other party are, to a large extent, unorganised; (b) privilege has been asserted over an unspecified number of documents; (c) some of the requested documents are not in its possession, but rather in the possession of third parties; and (d) there is a possibility of late production.
    [Show full text]
  • Zero Waste Toronto a Vision for Our City Now Is the Time
    ZERO WASTE TORONTO A VISION FOR OUR CITY NOW IS THE TIME. February 2016 green jobs, all while dramatically Right now, we are facing a major cutting our greenhouse gas decision that will affect our emissions and conserving natural environment, our economy and resources. It means more support our city. In the next six months, for the innovative businesses and City Councillors and Torontonians community groups that are already will discuss, debate and decide demonstrating the success of zero what Toronto’s Long Term Waste waste strategies. Management Strategy will be. This sets us on a path for how The good news is that the City of we will deal with our city’s waste Toronto has taken some important for the next 50 years. The path steps towards a zero waste future. we choose reflects the vision we share for our future. In this report, we celebrate the waste-free steps we have already This report outlines a vision for zero taken in our city and we identify the waste - a future where there is no steps we still need to take towards waste, where everything is designed a zero waste future. Using examples to be reused or to become the from our own communities and materials and resources to create from other leaders around the something new. This vision world, this report points out key is about eliminating waste and opportunities and wrong turns we taking responsibility for our actions. need to avoid. Around the world and right here This report provides innovative in Canada, communities are adopting ideas and concrete examples that zero waste.
    [Show full text]
  • Automated Cart Recycling: a Study of Municipal Collection and Operations in Ontario
    Automated Cart Recycling: A Study of Municipal Collection and Operations in Ontario CIF Project 888 V2 Updated June 2016 Automated Cart Recycling: Study of Ontario Municipalities – January 2016 – CIF Project 888 © 2016. All rights reserved. No part of this publication may be reproduced, recorded or transmitted in any form or by any means, electronic, mechanical, photographic, sound, magnetic or other, without advance written permission from the owner. This Project has been delivered with the assistance of the Continuous Improvement Fund (CIF), a fund financed by Ontario municipalities. Notwithstanding this support, the views expressed are the views of the author(s) and the CIF. CIF partners accept no responsibility for these views. Disclaimer This report is provided as opinion for discussion only and is not designed to replace qualified engineering, architectural or legal advice in any way. Municipalities are cautioned to obtain qualified advice and certified/approved drawings and plans prior to undertaking or adopting any recommendations that may affect programs or facilities. Project Team Acknowledgements This guide was developed with the contributions, expertise and guidance of the following team of industry experts: Report Authors: Janet Robins, www.robinsconsulting.ca Laurie Westaway, E: [email protected] CIF Tech Advisors: Gary Everett and Mike Birett Municipal Survey: Phil Jensen, www.ch2m.com Automated Cart Recycling: Study of Ontario Municipalities – January 2016 – CIF Project 888 Table of Contents 1 Introduction 3 2 Study Overview
    [Show full text]
  • Local Solutions to a Global Problem? Canadian Municipal Policy
    LOCAL SOLUTIONS TO A GLOBAL PROBLEM? CANADIAN MUNICIPAL POLICY RESPONSES TO CLIMATE CHANGE by Elizabeth Schwartz B.P.A.P.M., Carleton University, 2006 M.A., University of Toronto, 2008 A THESIS SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF DOCTOR OF PHILOSOPHY in THE FACULTY OF GRADUATE AND POSTDOCTORAL STUDIES (Political Science) THE UNIVERSITY OF BRITISH COLUMBIA (Vancouver) April 2016 © Elizabeth Schwartz, 2016 Abstract Urbanization and global warming are two of the most pressing issues facing humanity over the next 50 years. Why do some local governments enact more climate change mitigation policies than others? What makes some cities leaders in urban sustainability, while others lag far behind? Over the past decade, global climate change negotiations have repeatedly failed to produce binding commitments and robust responses by national governments. These failures have led academics and practitioners to put increasing emphasis on the potential for sub-national governments, including cities, to undertake commitments that might substitute for national action on climate change. Applying concepts from the comparative public policy literature to the study of urban politics, this dissertation puts forward and tests a new theory to explain variation in Canadian cities’ climate change policy. I find that political economy factors reduce the likelihood that cities will adopt climate change policy that will significantly reduce greenhouse gas emissions, but the presence of independent municipal environment departments makes the adoption of such policy more likely. This dissertation employs a systematic and explicit process tracing methodology. It examines the decision-making of four Canadian cities (Brampton, Toronto, Winnipeg and Vancouver) across four policy areas (landfill gas management, fleet services, cycling infrastructure and building standards).
    [Show full text]
  • Solid Waste Management Services 2021 Operating Budget and 2021-2030 Capital Budget & Plan Briefing to Budget Committee
    BUDGET Solid Waste Management Services 2021 Operating Budget and 2021-2030 Capital Budget & Plan Briefing to Budget Committee November 6, 2020 Overview Description What Services We Provide Solid Waste Management Services collects, transports, processes, City Beautification composts and disposes of municipal and some private sector waste, What We Deliver: Litter Pick-up, Parks Bins and Street Litter Bin Collection, Special Event recyclables, organics, electronics waste and household hazardous waste. Collection How Much Resources (2021 gross operating budget): $37.288 million SWMS manages three collection yards and one litter collection yard, seven transfer stations, six household hazardous waste depots, two organics Residual Management processing facilities, Green Lane Landfill and 160 former landfills. What We Deliver: Management of Green Lane Landfill site, Perpetual Care, Energy Generation SWMS customers include single-family homes, multi-residential buildings, How Much Resources (2021 gross operating budget): $39.955 million small businesses, street and parks bins, special events, schools, City divisions agencies and corporations, and private waste is accepted at out Solid Waste Collection & Transfer Drop-off Depots and landfill. What We Deliver: Collection of Garbage, Blue Bin Recycling, Green Bin Organics, Durable Goods, Yard Waste, Municipal Hazardous and Special Waste, Oversized Items, Transfer Station management SWMS also provides city-wide benefits through litter pick-up, parks bin How Much Resources (2021 gross operating budget):
    [Show full text]
  • The 'Zero Waste to Landfill'
    Lincoln University Digital Thesis Copyright Statement The digital copy of this thesis is protected by the Copyright Act 1994 (New Zealand). This thesis may be consulted by you, provided you comply with the provisions of the Act and the following conditions of use: you will use the copy only for the purposes of research or private study you will recognise the author's right to be identified as the author of the thesis and due acknowledgement will be made to the author where appropriate you will obtain the author's permission before publishing any material from the thesis. All for naught? A critical study of zero waste to landfill initiatives A thesis submitted in partial fulfilment of the requirements for the Degree of Doctor of Philosophy at Lincoln University by Robert Krausz Lincoln University 2012 i ii Abstract of a thesis submitted in partial fulfilment of the requirements for the Degree of Doctor of Philosophy. Abstract All for naught? A critical study of zero waste to landfill initiatives by Robert Krausz Modern human society operates under a prevailing waste management paradigm,that is based upon linear systems which convert resources, through synthesis of problematic materials and disposability-focused manufacturing processes, into largely non-recoverable and poorly-degradable wastes which ultimately require dumping in landfills. Zero waste is an alternative paradigm based on circular systems thinking, where wastes are fully recovered through the use of appropriate materials only, and design for durability. The global zero waste movement has emerged in response to mounting waste-related problems which include pollution, health impacts, and the loss of land to new landfills.
    [Show full text]