1 DISCUSSION TOPICS

Need and Purpose 3 Managed Types 4  Benefits 5 Project Alternatives 6 Project Limits and Scope 7-14 Funding and Schedule 15

2 NEED AND PURPOSE

Need Purpose

Recurring Morning and Ease Congestion & Improve Evening Congestion Person Throughput

Inefficient Operational and Improve Freeway Mainline, Movement of Goods Ramps & Interchanges Operations

Single Occupancy with Support & Improve Reliable limited Multi-modal Options Goods Movement & Modality

Lack of Traveler Information Provide Expedited Travel Time and Monitoring Information

3 MANAGED LANE TYPES

HOV- High Occupancy Vehicle Lane (Bus/Carpool) • Allows and restricts access to certain vehicles • Based on minimum occupancy requirement HOT- High Occupancy Toll Lane • Free access to vehicles that meet the minimum occupancy requirement • Priced access to vehicles that do not meet the minimum occupancy requirement Express Lane • All users pay a toll to access this lane • Discounts can be given to certain vehicle types (Carpool) Transit Only Lane • Only Transit accesses the Lane

4 MANAGED BENEFIT

• Designed to keep vehicle speeds at or above 45 mph o Initial Design for HOV Lanes o Variable pricing to maintain 45 mph • More reliable travel times for Managed Lane users • Improved General Purpose Lane Operations • Move more people than General Purpose Lanes o Minimum occupancy requirement (Carpools) o Carpools are encouraged because: o Lead to more reliable travel times o Help Lower vehicle emissions o Drivers can save money

5 ALTERNATIVES

 No Build (Keep Existing Conditions): 3 General Purpose Lanes in each direction  Widen Freeway to 4 Lanes in each direction: 3 General Purpose Lanes, 1 Managed Lane  Repurpose No. 1 Lane in each direction to HOV Lane: 2 General Purpose Lanes, and 1 HOV Lane

6 • • • • • • Signing & Striping Improvements Striping & Signing Improvements Bike/Ped ITS Elements Lanes Managed Add And on US 50: I From 50: on US And On I On - 80: From Eastern Solano County Ln to West El Camino Camino West El Aveto Ln County Solano Eastern From 80: PROJECT LIMITSAND SCOPE - 80/US 50 Junction I to Junction 50 80/US

CR 105 - 5

Yolo

Sacramento 7 PROJECT LIMITS AND SCOPE

Segment 1A - From Kidwell to just Solano/Yolo County Line • Add Ramp Metering • Add ITS Elements Yolo Sacramento CR 105

8 PROJECT LIMITS AND SCOPE

Segment 1B - From Yolo/Solano Co. Line to west of Yolo Causeway • Widen Median for a Managed Lane • Add ITS Elements Yolo Sacramento CR 105

9 PROJECT LIMITS AND SCOPE

Segment 1C - From Chiles Rd to west of Yolo Causeway • Stripe an additional lane for a Managed Lane • Add ITS Elements Yolo

• Pedestrian-Bicycle Class I Improvements and Sacramento Addition CR 105

10 PROJECT LIMITS AND SCOPE

Segment 2 - From east of Yolo Causeway to W. El Camino Ave • Stripe an additional lane for a Managed Lane • Add ITS Elements Yolo Sacramento CR 105

11 PROJECT LIMITS AND SCOPE

Segment 2 – at Bryte Bend • Restripe existing bridge for a Managed Lane • Add ITS Elements Yolo Sacramento CR 105

12 PROJECT LIMITS AND SCOPE

Segment 3A - From I-80/US 50 separation to Jefferson Blvd • Convert an existing lane for a Managed Lane • Add ITS Elements Yolo Sacramento CR 105

13 PROJECT LIMITS AND SCOPE

Segment 3B – From Jefferson Blvd to Pioneer Bridge over Sacramento River • Convert an existing lane for a Managed Lane • Add ITS Elements Yolo Sacramento CR 105

14 PROJECT ESTIMATE

Total Project Cost $100 - $600M depending on Alternative

PROJECT MILESTONES Draft Environmental Document Winter 2021 for Public Review Environmental Clearance Spring 2022 Complete

Design Complete Spring 2024

Construction Start Fall 2025

15 Caltrans ensures that no person in the state of is excluded from participation in, Nawid Nessar denied the benefits of, or otherwise subjected Project Manager to discrimination in Caltrans programs, (530) 682-3679 policies, procedures, activities, and services [email protected] on the grounds of race, color, national origin, sex, age, or disability. Dennis Keaton FOR MORE INFORMATION: Public Information Officer https://dot.ca.gov/caltrans-near-me/district- (916) 825-5252 3/d3-projects/d3-yolo-80-corridor- [email protected] improvement