I-80 Corridor Improvement Project

I-80 Corridor Improvement Project

I-80 CORRIDOR IMPROVEMENT PROJECT 1 DISCUSSION TOPICS Need and Purpose 3 Managed Lane Types 4 Managed Lane Benefits 5 Project Alternatives 6 Project Limits and Scope 7-14 Funding and Schedule 15 2 NEED AND PURPOSE Need Purpose Recurring Morning and Ease Congestion & Improve Evening Congestion Person Throughput Inefficient Operational and Improve Freeway Mainline, Movement of Goods Ramps & Interchanges Operations Single Occupancy with Support & Improve Reliable limited Multi-modal Options Goods Movement & Modality Lack of Traveler Information Provide Expedited Travel Time and Monitoring Information 3 MANAGED LANE TYPES HOV- High Occupancy Vehicle Lane (Bus/Carpool) • Allows and restricts access to certain vehicles • Based on minimum occupancy requirement HOT- High Occupancy Toll Lane • Free access to vehicles that meet the minimum occupancy requirement • Priced access to vehicles that do not meet the minimum occupancy requirement Express Lane • All users pay a toll to access this lane • Discounts can be given to certain vehicle types (Carpool) Transit Only Lane • Only Transit accesses the Lane 4 MANAGED LANES BENEFIT • Designed to keep vehicle speeds at or above 45 mph o Initial Design for HOV Lanes o Variable pricing to maintain 45 mph • More reliable travel times for Managed Lane users • Improved General Purpose Lane Operations • Move more people than General Purpose Lanes o Minimum occupancy requirement (Carpools) o Carpools are encouraged because: o Lead to more reliable travel times o Help Lower vehicle emissions o Drivers can save money 5 ALTERNATIVES No Build (Keep Existing Conditions): 3 General Purpose Lanes in each direction Widen Freeway to 4 Lanes in each direction: 3 General Purpose Lanes, 1 Managed Lane Repurpose No. 1 Lane in each direction to HOV Lane: 2 General Purpose Lanes, and 1 HOV Lane 6 PROJECT LIMITS AND SCOPE • On I-80: From Eastern Solano County Ln to West El Camino Ave • And on US 50: From I-80/US 50 Junction to I-5 • Add Managed Lanes • ITS Elements Yolo Sacramento • Bike/Ped Improvements • Signing & Striping Improvements CR 105 7 PROJECT LIMITS AND SCOPE Segment 1A - From Kidwell Road to just Solano/Yolo County Line • Add Ramp Metering • Add ITS Elements Yolo Sacramento CR 105 8 PROJECT LIMITS AND SCOPE Segment 1B - From Yolo/Solano Co. Line to west of Yolo Causeway • Widen Median for a Managed Lane • Add ITS Elements Yolo Sacramento CR 105 9 PROJECT LIMITS AND SCOPE Segment 1C - From Chiles Rd to west of Yolo Causeway • Stripe an additional lane for a Managed Lane • Add ITS Elements Yolo • Pedestrian-Bicycle Class I Improvements and Sacramento Addition CR 105 10 PROJECT LIMITS AND SCOPE Segment 2 - From east of Yolo Causeway to W. El Camino Ave • Stripe an additional lane for a Managed Lane • Add ITS Elements Yolo Sacramento CR 105 11 PROJECT LIMITS AND SCOPE Segment 2 – at Bryte Bend Bridge • Restripe existing bridge for a Managed Lane • Add ITS Elements Yolo Sacramento CR 105 12 PROJECT LIMITS AND SCOPE Segment 3A - From I-80/US 50 separation to Jefferson Blvd • Convert an existing lane for a Managed Lane • Add ITS Elements Yolo Sacramento CR 105 13 PROJECT LIMITS AND SCOPE Segment 3B – From Jefferson Blvd to Pioneer Bridge over Sacramento River • Convert an existing lane for a Managed Lane • Add ITS Elements Yolo Sacramento CR 105 14 PROJECT ESTIMATE Total Project Cost $100 - $600M depending on Alternative PROJECT MILESTONES Draft Environmental Document Winter 2021 for Public Review Environmental Clearance Spring 2022 Complete Design Complete Spring 2024 Construction Start Fall 2025 15 Caltrans ensures that no person in the state of California is excluded from participation in, Nawid Nessar denied the benefits of, or otherwise subjected Project Manager to discrimination in Caltrans programs, (530) 682-3679 policies, procedures, activities, and services [email protected] on the grounds of race, color, national origin, sex, age, or disability. Dennis Keaton FOR MORE INFORMATION: Public Information Officer https://dot.ca.gov/caltrans-near-me/district- (916) 825-5252 3/d3-projects/d3-yolo-80-corridor- [email protected] improvement 16.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    16 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us