INFRAVIA® SYSTEM Next Generation Infrastructure and Sustainable Mobility for Smart Cities

Total Page:16

File Type:pdf, Size:1020Kb

INFRAVIA® SYSTEM Next Generation Infrastructure and Sustainable Mobility for Smart Cities INFRAVIA® SYSTEM Next Generation Infrastructure and Sustainable Mobility for Smart Cities “Simplicity is the ultimate sophistication” Leonardo da Vinci Technologic Park "Sapiens ParqueParque"" PROBLEM: INFRASTRUCTURE IN URBAN AREAS IS OUR INFRASTRUCTURE FIT FOR A SMART CITY? PROBLEM: INFRASTRUCTURE IN URBAN AREAS UNDERGROUND UTILITY IS THE SOLUTION? PROBLEM: INFRASTRUCTURE IN URBAN AREAS UNDERGROUND UTILITIES TODAY •NO COORDINATION OF THE NETWORK'S CONSTRUCTION WITH THE URBAN DESIGN •NO ACCURATE KNOWLEDGE OF UNDERGROUND NETWORKS 4 •NO COORDINATION OF THE CONSTRUCTION AND MAINTENANCE BETWEEN UTILITY CONCESSIONAIRES •UNKNOWN AND UNSAFE UNDERGROUND •INSTALLATIONS LOCATED MAINLY UNDER THE STREET, CAUSING PROBLEMS RELATED TO SUCCESSIVE WORKS OF PAVING AND MOBILITY. PROBLEM: INFRASTRUCTURE IN URBAN AREAS UNDERGROUND UTILITIES TODAY ECONOMIC IMPACT OF INFRASTRUCTURE NETWORKS - Current Model GERMANY UK https://www.geolsoc.org.uk/~/media/Files/GSL/Events/1Sus%20exploit%20of%20the%20subsurface%20presentations/Day%202%20P2%20-%20Sustainability%20assessment%20tools%20for%20utility%20streetworks.pdf?la=en ECONOMIC IMPACT OF INFRASTRUCTURE NETWORKS PROBLEM: INFRASTRUCTURE IN URBAN AREAS UNDERGROUND UTILITIES TODAY IMPACT ON SECURITY OF ASSETS AND PEOPLE - Underground network accident /Kaohsiung 2014 “A series of gas explosions “The pipeline map data was in the southern Taiwanese established by Kaohsiung city of Kaohsiung has killed Public Works Bureau failed to 25 people and injured 267” provide the exact data” https://www.bbc.com/news/world- https://www.sciencedirect.com/science/ asia-28594693.%202014. article/pii/S187770581600391X IMPROVEMENTS THROUGH THE UNDERGROUND PLANNING Utility TTunnelunnel Joint Trench Advantages Source : U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT (19831983) COST OF BURIED ELECTRICAL NETWORK ELECTRICAL INSTALLATION CIVIL CONSTRUCTION SERVICES EQUIPMENTS DUCTS LABOR LABOR OTHER PAVING SERVICES SERVICES MATERIALS EQUIPMENTS Source : BUT...MORE OF THE SAME Utility TunnelTunnel Joint Trench •No physical separation between the networks allowing accidents related to the accidental contact. •Lack of accuracy of the exact position of networks. •High maintenance cost. 1880 2018 1866 2018 •High construction cost and maintenance •Great impact on the environment during construction •Risks related to the security of assets and persons by direct access to networks THE SOLUTION IS INNOVATION ! INFRAVIA® SYSTEM Innovative Solutions for Infrastructureand Sustainable Mobility for Smart Cities It combines the physical security of the underground facilities in a Utility Tunnel and the simplicity and low costs of a Joint Trench, creating accessible sidewalks and bike lanes. Smart Infrastructure for Smart Cities Next Generation Infrastructure and Sustainable Mobility for Smart Cities INFRAVIA® SYSTEM In the sidewalk (F ): (A) Natural Gas, (B) Telecommunications, Cable TV, Data, (C) Potable Water/ firefighter system (concept with Standpipe), (D) Electric lines (low), (E) Electric lines (medium) / Public Illumination, (Q) Basis and drainage structure system – made with recycled gravel from bricks and concrete construction waste, (R) sand cover, (S) Recycled Plastic Walls – INFRAVIAS structure. In the Bike Lane (H): (I) Natural Gas main, (G) Sewer, (T) Recycled water pipeline. Storm water drainage (J): (eco drainage system) - (O) Concrete curb, (N) Vegetation (Specific plant species to assist in the filtration of rain water), (L) Eco Filter – To filter the rain water and – made with recycled gravel from bricks and concrete construction waste, (M) Drainage pipe – to collect the rain water, (J) Aperture for rainwater entrance. Street (P) Developed research and projects: from 2007 to 2016 Production of the components: 2015 Construction: 2016 Tests: 2016 and 2017 Location: Technologic Park "Sapiens Parque" - Brazil https://www.youtube.com/watch?v=oz58IvM2PgY INNOVATIONS INFRAVIA® 2.0 SUSTAINABILITY - UTILIZATION OF URBAN WASTE AS RAW MATERIAL FOR PRODUCTION OF THE INFRAVIA SYSTEM Signature of the MoU between INFRAVIA and CS BIOENERGIA's plant for energy production CS BIOENERGIA for the production of the plastic through the generation of biogas from sewage panels of the system through urban waste. and urban waste - (Construction 2016) CS BIOENERGIA's plant for energy production through the generation of biogas from Plastic removed during the Raw material for the sewage and urban waste - (In operation 2018) urban waste processing. INFRAVIA System. Estimated production - 100% mechanized and 120 tons/day of recycled plastic automated process. http://www.fapesc.sc.gov.br/infravia-fortalece-vies-da-sustentabilidade-da-infraestrutura-urbana-com-novo-parceiro/ INNOVATIONS INFRAVIA® 2.0 INFRAVIA SAFETY MONITORING SYSTEM AND ASSET MANAGEMENT AND ELECTRIC CAR CHARGER ACOUSTIC FIBER OPTIC TECHNOLOGY 1 Intrusion detection tests – Sapiens Parque -2017 4 1) Intrusion Detection Through vibration analysis technology, a common fiber optic cable detects movement in the sidewalk pavement and protective 3 layer, and accurately points the location to the occurrence at a remote monitoring center. 2 2) Detection of Leak (Gas) Through DTS technology, a common fiber optic cable is transformed into a thermometer that allows to detect and locate temperature variations, allowing to identify gas and liquid leaks in real time, as well as its precise location. 3) Detection of Leak (Liquid) Through DTS technology, a common fiber optic cable is transformed into a thermometer that allows to detect and locate temperature variations, allowing to identify gas and liquid leaks in real time, as well as its precise location. 4) Hot Spot Monitoring and Arc Failures / Isolation By combining temperature and vibration technologies, it is possible to identify insulation or arc faults and monitor hot spots along low, medium and high voltage lines as well as monitor the temperature of transformers and junctions, generating automatic alerts to the maintenance team before a serious occurrence. INNOVATIONS INFRAVIA® 2.0 INFRAVIA SAFETY MONITORING SYSTEM AND ASSET MANAGEMENT AUGMENTED REALITY INFRAVIA AR app INFRAVIA AR app in use -Test Augmented reality application developed exclusively for the INFRAVIA system by the Innovation Center of the National Industrial Learning Service - SENAI, the INFRAVIA AR, already in tests, for safety monitoring and asset management Projects developed in Building Information Model - BIM in partnership with Bentley. INNOVATIONS INFRAVIA® 2.0 INFRAVIA DRAINAGE SYSTEM AND ROOT BARRIER ROOT BARRIER CURRENT CONDITION DRAINAGE SYSTEM New filter INTERNATIONAL UNDERGROUND INFRASTRUCTURE COURSE INFRAVIA® SYSTEM : CASE OF SUCCESS AND REFERENCE - IKT GERMANY - 2016 http://www.ikt.de/wp-content/uploads/2016/07/ikt-international-masterclass-programme.pdf GLOBAL PARTNERS SIGNATURE OF MEMORANDUM OF UNDERSTANDING ((MoUMoU)) FOR SIGNATURE OF MEMORANDUM OF UNDERSTANDING ((MoUMoU)) FOR DEVELOPMENT OF THE INFRAVIA SYSTEM IN PARTNERSHIP DEVELOPMENT OF THE INFRAVIA SYSTEM IN GERMANY -2017 WITH BENTLEY SYSTEMS, GLOBAL LEADER IN BUILDING INFORMATION MODEL (BIM) SOFTWARESOFTWARE--2018 http://www.fapesc.sc.gov.br/projeto-infravias-tem-destaque-internacional/ BRAZILIAN STANDARD ABOUT THE THEME 1st Meeting of CE-18: 600.25 - Study Committee of Technical Galleries for the creation of the standard in the theme, on 02/16/2016 and presentation of the INFRAVIA® System. Participation in the committee for creation of the Brazilian Standard ABNT NBR 16584/2017 HIGHLIGHT IN SPECIALIZED MAGAZINES IN THE AREA AND NATIONAL AND INTERNATIONAL AWARDS COMPETITIVE ADVANTAGES / POTENTIAL COMPETITORS Comparing INFRAVIA® System with individual system and utility tunnel (construction). SYSTEM ADVANTAGES SAFETY ASPECTS 1) Excavation Depth Below 1.25 m - No Need Shoring * 2) Unnecessary The Use Of Excavation Equipment And The Cutting Tool. 3) Possibility Of Using Suction Equipment To Remove Material From The Trench - Approx. 150 Liters Per Interconnection 4) Excluding The Possibility Of Accidental Contact PLANNING AND URBAN CADASTRE 11)) Facilities in defined positions. 22)) Precise knowledge of the location of each utility. 33)) Derivations and interconnections with defined parameters. COMPLETE STREETS X 11)) The stripe of interlocking blocks located over the trench may be flagged for both urban accessibility statement (tactile floor indicationblocks), as well as informationfrom the utilities, stating that the area contains facilities; 22)) SSignalized, it becomes clear to the community that the site is A "cradle" of facilities that should be protected from excavations. 3) Its position in the sidewalk does not disturb the car traffic in the streets and reduced the use of trucks and other equipment. U$ 1,15 M /Km U$ 2,65 M /Km SMART ENERGY GRID 11)) Concept of joint trench system with smart energy grid -" INFRAVIA System ®“ 22)) Use the joint trench model for transmission of "energy" - natural gas and electricity. 33))All A systems in the trench can be monitored and operated by telemetry methods: integration of the systems, safety and economy. 44))UUsing the joint trench as power transmission element. 33)) concept generation of district - gain in reliability and stability of systems; 55))EEnergy management with integration of the systems; production of "energy" through renewable sources. Storage of 'energy' * through natural gas storage. 66))The T clients that now only consume natural gas and electricity, can generate electricity at the end of the system through cogeneration systems using natural
Recommended publications
  • Tunnel from Wikipedia, the Free Encyclopedia This Article Is About Underground Passages
    Tunnel From Wikipedia, the free encyclopedia This article is about underground passages. For other uses, see Tunnel (disambiguation). "Underpass" redirects here. For the John Foxx song, see Underpass (song). Entrance to a road tunnel inGuanajuato, Mexico. Utility tunnel for heating pipes between Rigshospitalet and Amagerværket in Copenhagen,Denmark Tunnel on the Taipei Metro inTaiwan Southern portal of the 421 m long (1,381 ft) Chirk canal tunnel A tunnel is an underground or underwater passageway, dug through the surrounding soil/earth/rock and enclosed except for entrance and exit, commonly at each end. A pipeline is not a tunnel, though some recent tunnels have used immersed tube construction techniques rather than traditional tunnel boring methods. A tunnel may be for foot or vehicular road traffic, for rail traffic, or for a canal. The central portions of a rapid transit network are usually in tunnel. Some tunnels are aqueducts to supply water for consumption or for hydroelectric stations or are sewers. Utility tunnels are used for routing steam, chilled water, electrical power or telecommunication cables, as well as connecting buildings for convenient passage of people and equipment. Secret tunnels are built for military purposes, or by civilians for smuggling of weapons, contraband, or people. Special tunnels, such aswildlife crossings, are built to allow wildlife to cross human-made barriers safely. Contents [hide] 1 Terminology 2 History o 2.1 Clay-kicking 3 Geotechnical investigation and design o 3.1 Choice of tunnels vs.
    [Show full text]
  • Numerical Study on the Longitudinal Response Characteristics of Utility Tunnel Under Strong Earthquake: a Case Study
    Hindawi Advances in Civil Engineering Volume 2020, Article ID 8813303, 12 pages https://doi.org/10.1155/2020/8813303 Research Article Numerical Study on the Longitudinal Response Characteristics of Utility Tunnel under Strong Earthquake: A Case Study Guoyi Tang,1 Yumei Fang,1 Yi Zhong,2 Jie Yuan ,3 Bin Ruan,2 Yi Fang,3 and Qi Wu4 1 e 1st Geological Brigade of Jiangsu Geology and Mineral Exploration Bureau, Nanjing 210009, China 2School of Civil Engineering and Mechanics, Huazhong University of Science and Technology, Wuhan 430074, China 3Institute of Crustal Dynamics, China Earthquake Administration, Beijing 100085, China 4Institute of Geotechnical Engineering, Nanjing Tech University, Nanjing 210009, China Correspondence should be addressed to Jie Yuan; [email protected] Received 24 May 2020; Revised 23 July 2020; Accepted 31 July 2020; Published 20 August 2020 Academic Editor: Peixin Shi Copyright © 2020 Guoyi Tang et al. +is is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. In this paper, the longitudinal seismic response characteristics of utility tunnel subjected to strong earthquake was investigated based on a practical utility tunnel project and numerical method. Firstly, the generalized response displacement method (GRDM) that was used to conduct this study was reviewed briefly. Secondly, the information of the referenced engineering and the finite element model was introduced in detail, where a novel method to model the joints between utility tunnel segments was presented. +irdly, a series of seismic response of the utility tunnel were provided, including inner force and intersegment opening width.
    [Show full text]
  • Funds for Disabled Students Misused
    - PAR N DAILY 9; Nu 64 Published for San lose State University since 1934 Wednesday, December 4, 1991 Funds for disabled students misused By Nicholas D. Smith campuses) allocated," said Kurt needed services, according to Sjoberg. Schutter said that it can take two There are 770 disabled students in Sjoberg said he had visited four of Daily staff svnter Sjoberg, acting state auditor general. Upon hearing about the review, months or longer to get disability test- the department currently, Schutter the 20 CSU campuses to determine the The use of the money by the cam- CSU officials said that CSU would ing at SJSU. said. Last year there were 689, and extent of the needs. More than half a million dollars puses was found to be inappropriate follow the review's recommended At another campus, despite a direc- 526 two years ago. "There were unmet needs at all the destined for California State because the needs of the CSU's 8,000 action to initiate a better monitoring tive from the CSU not to cut funding, The number of people who read for locations we visited," he said. Sjoberg University disabled student services disabled students were not satisfied system, according Boyd Home, CSU the budget for disabled students was disabled students has been cut to a did not visit SJSU. was spent inappropriately on other before using the money on other assistant vice chancellor of manage- reduced by S50,000. minimum, Tamer said. He also said he While federal and state law states items, according to a government audit things.
    [Show full text]
  • Seismic Response Characteristics of Shallow-Buried Utility Tunnel Systems 1,2 3 2 4 2 A.P
    th The 14 World Conference on Earthquake Engineering October 12-17, 2008, Beijing, China SEISMIC RESPONSE CHARACTERISTICS OF SHALLOW-BURIED UTILITY TUNNEL SYSTEMS 1,2 3 2 4 2 A.P. Tang , R.C.Feng , X.Y. Zhou , L.F.Wang and W.M.Yan 1 Professor, School. of Civil Engineering , Harbin Institute of Technology, Harbin, China 2 Professor, College of Architecture and Civil Engineering, Beijing University of Technology , Beijing, China 3 Assistant Engineering, China Communication Group Bridge Technology (CCGBT), Beijing, China 4 PHD student, School. of Civil Engineering , Harbin Institute of Technology, Harbin. China Email:[email protected] ABSTRACT : Utility tunnel(UT) is an integration system containing many sub-lifeline systems like water transmitting, power, telecommunication, gas-supply system, etc, so, UT is key factor to sustain the healthy development of society and economy. To improve its anti-seismic capacity, the paper studies the performance characteristics of utility tunnel system under seismic loads based on a shaking-table experiment. Herein, two models of two-span UT with rectangular section are set up, one is used to simulate the main utility tunnel, and the other is for branch utility tunnel. Three kinds of pipeline are installed in UT to model the water-supply system, cable and power-line system respectively. This research is used to identify and explore seismic performance of utility tunnel body and its inner pipeline. Anti-seismic performance of pipeline abutment and joints based on passive control device is also experimented to check their capacity of resisting earthquake damage. The experiment is done on the 3m X 3 m shaking-table; three selected seismic records are input.
    [Show full text]
  • Utility Tunnels – Proven Sustainability Above and Below Ground Axel Laistner, Hermann Laistner (Dipl.-Ing
    Utility Tunnels – Proven Sustainability Above and Below Ground Axel Laistner, Hermann Laistner (Dipl.-Ing. Dr. techn. Axel Laistner, axel laistner consulting UG(hb), Rosenstr. 6 – 73466 Lauchheim, [email protected]) (Dipl.-Ing(FH) Dipl.-Ing.(FH) Hermann Laistner, Hardtsteige 29 – 73466 Lauchheim) 1 ABSTRACT Utility tunnels have been elements of urban supply systems for almost two centuries now. However, their use and implementation is still less determined by urban planning and urban needs – and more by the qualities, preconceptions and determination of the urban managers in question. During the 1990s in the course of the German reunification process the fluidity of the urban management situation created opportunities for new approaches to this old technology. In conjunction with landmark urban development projects on the path to urben sustainability, utility tunnels were used as one of the many instruments and approaches to achieve sustainable developments. Now – almost 20 years later we can look at these developments and the utility tunnels and have a first discussion on their sustainability success. At present a new relevance developes in regard of this technology. The current urban development schemes in China, India and many other places of the world are of such scale, that questions of doing it right while doing it timely are of prime significance. At the same time, we are facing a situation, in which – within the coming 40 years – the whole energy supply and distribution system of the world – including China and India – will need to be 100% restructured and reworked. We need a whole new quality of system flexibility and reaction capacity in urban engineering to achieve the path to urban sustainability.
    [Show full text]
  • Tunneling & Underground Construction
    ® & Tunneling & Underground Construction tucThe Official Publication of UCA of SME www.TUCmagazine.com Volume 13 N0. 3 September 2019 2019 RETC recap Design procurement for the Amtrak Hudson project LA Metro Regional connector transit project ///// Special Editorial Supplement from the publisher of ™ 19-05-09_001_ID19117_eAz_LosAngeles_TUC_213x283_RZgp METRO LOS ANGELES, USA CREATING VIBRANT ARTERIES UNDERGROUND 120 million passengers are travelling through the City of Angels each day. 6 EPB Shields are creating more than 20 km new metro sections for the American city with their powerful performances. With the Herrenknecht branch in Sumner (WA), Herrenknecht guarantees technical assistance and service at any time. herrenknecht.com/MetroLA/ Client: Los Angeles Metropolitan Transportation Authority Customer: The Walsh Group, Ltd. / J.F. Shea Construction / HNTB Corporation, Skanska USA Civil West California District Inc. / Traylor Bros., Inc., Skanska USA Civil West California District Inc. / Traylor Bros., Inc. / J.F. Shea Construction, Tutor Perini / O&G JV 19-05-09_001_ID19117_eAz_LosAngeles_TUC_213x283_RZgp.indd 1 09.05.19 14:19 tuc& September Contents Departments Cover Story 2 Chairman’s column In This Issue In May 2019, the last of six earth pressure balance machines had completed 4 excavationat Lot 4 Mexico City’s Tunel Underground construction news Emisor Oriente, page 12. More than 1,400 tunneling professionals gathered in Chicago for the Rapid Excavation & Tunneling Conference. T&UC’s Bill 52 Gleason reports on page 28. Cover photo UCA of SME News courtesy of Robbins. 62 Tunnel demand forecast Feature Articles 64 28 Classifieds More than 1,400 professionals gather in Chicago for 2019 RETC 64 Index of advertisers William Gleason 35 Design and construction procurement for the Amtrak Hudson Tunnel project Phil Rice, Richard Flanagan and Mohammed Nasim 43 LA Metro Regional connector transit project: Successful halfway-through completion Mike Harrington and Tung Vu tucmagazine.com AN OFFICIAL PUBLICATION OF UCA OF SME | WWW.SMENET.ORG | VOLUME 13 NO.
    [Show full text]
  • CSUSB Scholarworks July 17 1970
    California State University, San Bernardino CSUSB ScholarWorks Friday Bulletin Arthur E. Nelson University Archives 7-17-1970 July 17 1970 Friday Bulletin Follow this and additional works at: https://scholarworks.lib.csusb.edu/fridaybulletin Part of the Educational Leadership Commons, Educational Methods Commons, and the Higher Education Commons Recommended Citation Friday Bulletin, "July 17 1970" (1970). Friday Bulletin. 187. https://scholarworks.lib.csusb.edu/fridaybulletin/187 This Article is brought to you for free and open access by the Arthur E. Nelson University Archives at CSUSB ScholarWorks. It has been accepted for inclusion in Friday Bulletin by an authorized administrator of CSUSB ScholarWorks. For more information, please contact [email protected]. CALIFORNIA STATE COLLEGE, SAN BERNARDINO v- The BULLETIN July 17, 1970 FALL.1970,ADMISSION NOW Application for admission to the College CLOSED TO ALL BUT GRABS for the 1970-71 Fall Term is now closed AND RETURNING STUDENTS to all but graduates and returning students. Graduate students will be cut off from applying for admission when their numbers reach 250. Returning students include any person previously enrolled at the College for classes other than during summer sessions. 1970-71 CATALOG DUE The College's 1970-71 Catalog is ex­ FROM PRINTER NEXT WEEK pected to be received from the State Printer some time during the last week of July. The Publications office will distribute the Catalog to on- campus personnel. Students and prospective students must pur­ chase their copies, according to state regulation. They will be available for purchase at the Bookstore at $1.05 per copy. * * * CSCSB CREDENTIAL Dr.
    [Show full text]
  • Employees Share Joy of Engineering
    SPACE CENTER April 9, 1999 Roundup VOL. 38, NO. 6 L YNDON B. JOHNSON SPACE CENTER, HOUSTON, TEXAS Employees share joy of engineering HIS YEAR, JSC celebrated eight years of observing National Engineers Week when some 175 civil service and contractor employees visited ele- mentary, middle and high school classrooms to encourage students to pur- Tsue careers in engineering, science, math and technology. The visits were part of a national outreach program called Discover “E” (“E” for Engineering). This year’s activities continued into March. To reach more students this year, JSC’s Education and Community Support Branch partnered with Texas Education Agency’s Education Service Centers last August to distribute brochures concerning JSC’s JASON Project to about 3,000 Houston area teachers. “As a follow-on to that partnership, we developed a National Engineers Week invitation list that included some twenty school districts,” said Mae Mangieri, JSC’s National Engineers Week coordinator. “We were pleased that twenty-seven Houston Independent School Dis- trict schools responded to our invitation to partici- pate in this year’s pro- gram. In 1998, only eight HISD schools responded to our invitation.” The volunteers shared their unique space-related knowledge with students JSC Photo S99-02352 and teachers as part of DISCOVER “E”– JSC engineer Howard Hu, above left, works with students from Webster JSC’s commitment to the Intermediate School as part of National Engineers Week activities. Hu and children from local educational com- Rene DeLafuente’s class built paper rockets powered by Alka-Seltzer and water. Fourth munity. During their grade student Cedric Martin raises his hand to ask a question during Astronaut Steven Nagel’s visit.
    [Show full text]
  • CITY of CHICAGO BID OPPORTUNITY LIST October 15, 2019
    CITY OF CHICAGO BID OPPORTUNITY LIST October 15, 2019 NOTICE: DPS now administers two types of solicitations: ePROCUREMENT and NON-ePROCUREMENT. Check Solicitation Status column for more information. NEW - eProcurement (Electronic) Bids: Available online ONLY, require an online response, not available for pick up in the Bid & Bond Room. Bidders must be registered with the City of Chicago in order to bid. Please visit www.cityofchicago.org/eProcurement. After registering, you may view and respond to eProcurement solicitations at the Current Bid and Solicitation Opportunities Page. Notifications related to the bid specification are automatically sent to respondents to eProcurement Solicitations. Non-eProcurement Bids: Bidders are responsible for obtaining bid materials. Updated bid specification packages are available for immediate downloading at www.cityofchicago.org/bids or for pick-up at Bid & Bond Room 103 unless otherwise indicated. To have a bid specification package mailed to you, please call the Bid & Bond Room at 312-744-9773 and request the document by the specification number. When applicable, copies of bid specifications, plans and drawings may be obtained after submitting a deposit in the amount specified for each set of documents. The city will only accept a certified check, cashier’s check or money order; cash is not accepted. Bid-Document Holders (Specification Take-Out List): eProcurement: Viewing or downloading an eProcurement bid after logging into iSupplier will add you to the Specification Take-Out List. Non- eProcurement: Contact the Bid & Bond Room at [email protected], referencing the specification number and a copy of a business card. This entitles the Bidder to receive notices related to the bid specification.
    [Show full text]
  • Development and Applications of Common Utility Tunnels in China T ⁎ Tianyu Wang, Lixin Tan, Shaoyin Xie, Baosong Ma
    Tunnelling and Underground Space Technology 76 (2018) 92–106 Contents lists available at ScienceDirect Tunnelling and Underground Space Technology journal homepage: www.elsevier.com/locate/tust Development and applications of common utility tunnels in China T ⁎ Tianyu Wang, Lixin Tan, Shaoyin Xie, Baosong Ma College of Engineering, China University of Geosciences-Wuhan, No. 388 Lumo Road, Wuhan, Hubei Province, China ARTICLE INFO ABSTRACT Keywords: Common utility tunnels (utilidors) are attracting more and more attention in China with the rapid urban de- Utility tunnel velopment and growing need for public facilities. China is a large country with a huge north–south divide, which China leads to different situations of construction, types of utilities incorporated, route design and governance issues Latest status for utility tunnels in different cities. This paper introduces the latest status for such tunnels in China by collecting Future development and analyzing existing and planned utility tunnels in China from 1959 to 2020. Furthermore, the key issues that may influence the development of utility tunnels in the next decade in China are summarized. These, in com- bination with the domestic and foreign research status, suggest typical cases and a policy orientation which may be helpful to the future development of common utility tunnels in China and other countries. 1. Introduction pollution and transport problems (Laistner and Laistner, 2012). Since then, common utility tunnels have been widely used around the world The world-wide trend of increased urbanisation creates problems (Cano-Hurtado and Canto-Perello, 1999; Zhang, 2014). for expanding and newly-developing cities alike. The increasing popu- In England, the government also developed utility tunnels as com- lation also leads to a great demand for reliable infrastructure, nowadays munal facilities.
    [Show full text]
  • The Development of Common Duct in Taiwan and Its Enlightenment To
    2016 Joint International Conference on Economics and Management Engineering (ICEME 2016) and International Conference on Economics and Business Management (EBM 2016) ISBN: 978-1-60595-365-6 The Development of Common Duct in Taiwan and Its Enlightenment to China Qi-Ming CUI 1,a,* , Hong ZHANG 2,b , Xiang WEI 3,c 1,2,3Beijing University of Civil Engineering and Architecture, China [email protected], [email protected], [email protected] * Corresponding author Keywords: Utility tunnel, Common duct, Taiwan, Enlightenment. Abstract: Utility tunnel built in the urban underground is used to hold two or more urban pipeline engineering structures and ancillary facilities, that is also known as the common duct in Taiwan. The construction of utility tunnel can effectively eliminate the "zipper of the road" and reasonably use underground space, which is the important direction of modern smart city in sustainable development. This paper summarizes the development course of common duct in Taiwan area and discusses its accomplishments from construction achievements, the legal system, funding sources, system planning and public pipeline database. On this basis, according to the existing problems in the development of utility tunnel in China, this paper points out some enlightenments that China gets from the development of common duct in Taiwan, so as to provide positive enlightenments for large-scale construction of utility tunnel in our country. Introduction The urbanization rate in our country has reached 56.1% by 2015, with the urbanization process is accelerating, the pressure for maintaining normal operation of the city municipal pipeline keeps increasing, the lack of scale of underground pipeline and low management level were exposed.
    [Show full text]
  • Economic Analysis and Information Modeling of Smart Multi-Purpose Utility Tunnels and Submitted in Partial Fulfillment of the Requirements for the Degree Of
    Economic Analysis and Information Modeling of Smart Multi-purpose Utility Tunnels Ali Alaghbandrad A Thesis In the Department Of Building, Civil, and Environmental Engineering Presented in Partial Fulfillment of the Requirements For the Degree of Doctor of Philosophy (Building Engineering) at Concordia University Montreal, Quebec, Canada September 2020 © Ali Alaghbandrad, 2020 CONCORDIA UNIVERSITY SCHOOL OF GRADUATE STUDIES This is to certify that the thesis prepared By: Ali Alaghbandrad Entitled: Economic Analysis and Information Modeling of Smart Multi-purpose Utility Tunnels and submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy (Building Engineering) complies with the regulations of the University and meets the accepted standards with respect to originality and quality. Signed by the final examining committee: Chair Dr. Ahmed Kishk External Examiner Dr. Islam Shahrour External to Program Dr. Javad Dargahi Examiner Dr. Osama Moselhi Examiner Dr. Sang Hyeok Han Thesis Supervisor Dr. Amin Hammad Approved by Dr. Michelle Nokken, Graduate Program Director 10/12/2020 Date of Defense Dr. Mourad Debbabi, Dean, Gina Cody School of Engineering and Computer Science ABSTRACT Economic Analysis and Information Modeling of Smart Multi-purpose Utility Tunnels Ali Alaghbandrad, PhD Concordia University, 2020 The traditional method of buried utilities (i.e. water, sewer and gas pipes, and electrical and telecommunication cables) has been used for many decades particularly in urban areas. Repeated excavations are needed to access these underground utilities for maintenance, repair, and renewal activities. Urban areas have been experiencing many street closures and traffic disruptions because of excavation for maintaining underground utilities. These construction works have imposed major costs on public and private utility companies as well as on citizens and local businesses (social cost).
    [Show full text]